108
Advanced Advanced Traveller Traveller Information and Traffic Information and Traffic Management Systems Management Systems for Highway 2 for Highway 2 Project Overview & Summary of Project Overview & Summary of Recommendations Recommendations January 16, 2004 January 16, 2004

Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

  • Upload
    lyquynh

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

Advanced Advanced TravellerTravellerInformation and Traffic Information and Traffic

Management Systems Management Systems for Highway 2for Highway 2

Project Overview & Summary of Project Overview & Summary of Recommendations Recommendations

January 16, 2004January 16, 2004

Page 2: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

2

Outline of WorkshopOutline of Workshop

•• Introductory Remarks Introductory Remarks • Allan Lo, Alberta Transportation

•• What is ITS ?What is ITS ?• Tim Schnarr, Delcan Corporation

•• Summary of Needs Summary of Needs • Alf Guebert, Earth Tech, Canada

•• ITS Blueprint for Highway 2ITS Blueprint for Highway 2• Tim Schnarr, Delcan Corporation

•• RWIS Program RWIS Program • Mark Pinet, M.F. Pinet & Assoc.

•• SummarySummary• Tim Schnarr, Delcan Corporation

Page 3: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

3

Intelligent Transportation SystemsIntelligent Transportation Systems

Tim SchnarrTim Schnarr

DelcanDelcan CorporationCorporation

Page 4: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

4

What is ITS?What is ITS?

ITS can be defined as:ITS can be defined as:•• ““ITSITS: the application of : the application of advanced technologiesadvanced technologies

(computers, sensors, control, communications, and (computers, sensors, control, communications, and electronic devices) in electronic devices) in transportationtransportation to save to save lives, lives, time,time, money, energy and the environmentmoney, energy and the environment””

– ITS Canada

•• A A tooltool to help us to help us do our jobs better !do our jobs better !

•• Not an end in itself !Not an end in itself !

Page 5: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

5

Why do we need ITS?Why do we need ITS?

• Safety

• Mobility

• Efficiency

• Energy

• Environment

• Productivity

Page 6: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

6

What can ITS do?What can ITS do?

Major Areas of ITSMajor Areas of ITS

•• Traffic managementTraffic management

•• Incident managementIncident management

•• Public transportPublic transport

•• TravellerTraveller informationinformation

•• Electronic paymentElectronic payment

•• Road weather informationRoad weather information

•• Commercial vehiclesCommercial vehicles

•• Emergency management Emergency management

•• Vehicle control & safety Vehicle control & safety

•• Information warehousingInformation warehousing

Page 7: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

7

Traffic ManagementTraffic Management

• Traffic Signals

• Vehicle Detection

• Dynamic Message Signs

• Ramp Metering

Page 8: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

8

Incident ManagementIncident Management

• CCTV

• Vehicle Detection

• Dynamic Message Signs

• Animal Detection

Page 9: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

9

Road Weather InformationRoad Weather Information

• CCTV

• Pavement Sensors

• Atmospheric Sensors

Page 10: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

10

Traveller InformationTraveller Information

• Dynamic Message Signs

• Website

• Media

• Personal Devices

• In-Vehicle Devices

Page 11: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

11

Commercial Vehicle OperationsCommercial Vehicle Operations

• Weigh-In-Motion

• Automatic Vehicle Identification

• Commercial Vehicle Electronic Clearance

• Automated Roadside Safety Inspection

• Commercial Vehicle Admin. Processes

Page 12: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

12

Information WarehousingInformation Warehousing

•• Data ArchivingData Archiving

•• Data FusionData Fusion

Data Management

Page 13: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

13

BENEFITS OF ITS TO USERSBENEFITS OF ITS TO USERS

• Reduce Collisions and their Severity

Page 14: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

14

u Alleviate Traffic Congestion/Driver Frustration

BENEFITS OF ITS TO USERSBENEFITS OF ITS TO USERS

Page 15: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

15

• Enable Environmental Monitoring and Protection

BENEFITS OF ITS TO USERSBENEFITS OF ITS TO USERS

Page 16: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

16

• Enhance Productivity and Operational Efficiency

BENEFITS OF ITS TO USERSBENEFITS OF ITS TO USERS

Page 17: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

17

• Provide Comfort, Convenience and Security

BENEFITS OF ITS TO USERSBENEFITS OF ITS TO USERS

Page 18: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

18

Who Benefits?Who Benefits?

•• TravellingTravelling publicpublic

•• Business / IndustryBusiness / Industry

•• GovernmentGovernment

•• Transportation Transportation practitionerspractitioners

•• EnvironmentEnvironment

Page 19: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

19

BenefitsBenefits

5:15:1Road Weather InformationRoad Weather Information

6:16:1Commercial Vehicle Commercial Vehicle OperationsOperations

6:16:1Incident ManagementIncident Management

7:17:1Traffic ManagementTraffic Management

2:12:1Traveller InformationTraveller Information

Typical Typical

BenefitBenefit––Cost RatioCost Ratio

ITS AreaITS Area

Page 20: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

Highway 2Highway 2

ITS BlueprintITS Blueprint

Page 21: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

21

Study Area Study Area –– Highway 2Highway 2

Page 22: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

22

Study Area Study Area –– National Highway SystemNational Highway System

Page 23: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

23

Summary of NeedsSummary of Needs

Alf Alf GuebertGuebert

Earth Tech CanadaEarth Tech Canada

Page 24: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

24

Stakeholder InterviewsStakeholder Interviews

•• One to one interviews at project outsetOne to one interviews at project outset

•• Discussion of needsDiscussion of needs

•• Approximately 50 interviews with 45 agenciesApproximately 50 interviews with 45 agencies

•• Other informal discussionsOther informal discussions

•• Stakeholders contacted exceeds 90 individualsStakeholders contacted exceeds 90 individuals

Page 25: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

25

Common ThemesCommon Themes

•• Road Condition & Traffic InformationRoad Condition & Traffic Information

•• Incident ManagementIncident Management

•• Road Weather Information SystemsRoad Weather Information Systems

•• Traffic Control & ManagementTraffic Control & Management

•• Work Zone SafetyWork Zone Safety

•• Commercial Vehicle OperationsCommercial Vehicle Operations

•• InterInter--Agency CoordinationAgency Coordination

•• Data Collection/ManagementData Collection/Management

Page 26: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

26

Road Condition & Traffic Road Condition & Traffic InformationInformation

•• More accurate and timely More accurate and timely informationinformation

•• Wider dissemination and easier Wider dissemination and easier access to informationaccess to information

•• Improve sharing of information Improve sharing of information and dataand data

Page 27: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

27

Incident ManagementIncident Management

•• Timely detection & verification (location)Timely detection & verification (location)

•• Coordination, control and monitoring of lane Coordination, control and monitoring of lane closuresclosures

•• Highway closure capabilities Highway closure capabilities

•• Protection of site & personnelProtection of site & personnel

•• Hazardous materialsHazardous materials

Page 28: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

28

Road Weather Information SystemsRoad Weather Information Systems

•• Existing atmospheric and road Existing atmospheric and road conditionsconditions

•• Ability to forecast atmospheric Ability to forecast atmospheric and pavement conditions and pavement conditions

Page 29: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

29

Traffic Control & ManagementTraffic Control & Management

•• Improve safetyImprove safety

•• Maximize capacity of existing Maximize capacity of existing infrastructureinfrastructure

•• Minimize impacts of recurrent Minimize impacts of recurrent congestioncongestion

•• Minimize stops and reduce travel Minimize stops and reduce travel time in major corridorstime in major corridors

Page 30: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

30

Work Zone SafetyWork Zone Safety

•• Protection and safety of site Protection and safety of site personnelpersonnel

•• Improve Improve travellertraveller informationinformation

Page 31: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

31

Commercial Vehicle OperationsCommercial Vehicle Operations

•• Minimize infrastructure damage Minimize infrastructure damage due to over height and overweight due to over height and overweight loadsloads

•• Minimize delays at vehicle Minimize delays at vehicle inspection stationsinspection stations

•• Compatibility with other Compatibility with other provinces and statesprovinces and states

Page 32: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

32

InterInter--Agency CoordinationAgency Coordination

•• Coordination, control and Coordination, control and monitoring of lane closuresmonitoring of lane closures

•• Improve sharing of Improve sharing of travellertravellerinformation and datainformation and data

Page 33: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

33

Data Collection/ManagementData Collection/Management

•• Maximize use of existing Maximize use of existing equipment and systemsequipment and systems

•• Maximize access to Maximize access to information and data information and data (electronic sharing)(electronic sharing)

•• Develop partnershipsDevelop partnerships

Page 34: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

34

Summary of Stakeholder NeedsSummary of Stakeholder Needs

•• Accurate and timely road, weather and traffic Accurate and timely road, weather and traffic informationinformation

•• Scheduled events, incidents, highway closures Scheduled events, incidents, highway closures

•• Wider dissemination and easier access to the Wider dissemination and easier access to the informationinformation

•• Minimize impacts of recurrent congestionMinimize impacts of recurrent congestion

•• Data management and sharing (agencies)Data management and sharing (agencies)

Page 35: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

35

ITS Blueprint for Highway 2ITS Blueprint for Highway 2

Tim SchnarrTim Schnarr

DelcanDelcan CorporationCorporation

Page 36: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

36

What Is the ITS Blueprint ?What Is the ITS Blueprint ?

•• Blueprint for Future Action Blueprint for Future Action

•• Identifies Potential ITS Actions / Identifies Potential ITS Actions / DeploymentsDeployments

•• Identifies Priority SectionsIdentifies Priority Sections

Page 37: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

37

What Is the ITS Blueprint ?What Is the ITS Blueprint ?

What Can We Do to Address the What Can We Do to Address the

Needs ?Needs ?

Page 38: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

38

Highway 2 BlueprintHighway 2 Blueprint

Anthony Henday DriveDeerfoot Trail

Rural Section

Page 39: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

39

Preliminary Blueprint OutlinePreliminary Blueprint Outline

•• Broken down into three identifiable highway Broken down into three identifiable highway sections:sections:

• Rural • Deerfoot Trail (Urban)• Anthony Henday Drive (Urban-Rural)

•• Broken down by three timeframe periods:Broken down by three timeframe periods:• Immediate (0-2 years)• Short (3-5 years)• Long (6-10 years)

Page 40: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

40

Rural SectionRural Section

Page 41: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

41

Rural SectionRural Section

CHARACTERISTICSCHARACTERISTICS

•• Low VolumeLow Volume– Level of Service A/B– AADT’s 15,000 to 30,000 (50,000 in some sections)

•• Safety (800 Collisions Annually)Safety (800 Collisions Annually)– 40% Single Vehicle Collisions– 25% Animal Hits– 25% Weather Related*

* Road surface or weather is a contributing factor and RWIS may mitigate

Page 42: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

42

Rural Section Rural Section –– Existing SystemsExisting Systems

DMS

DMS

EDMONTON

CALGARY

OVERHEIGHT VEHICLE

DETECTOR

OVERHEIGHT VEHICLE

DETECTOR

Red Deer

Page 43: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

43

Rural Section ITS ProgramRural Section ITS Program

SHORT TERM (0 to 5 years)SHORT TERM (0 to 5 years)

•• TravellerTraveller Information Database Information Database

•• TravellerTraveller Information Dissemination Information Dissemination • Website• Dynamic Message Signs (Permanent & Portable)• Commercial Broadcast Radio

•• RWIS (National Highway System)RWIS (National Highway System)

•• Incident Management (Red Deer)Incident Management (Red Deer)

•• Animal Detection (Pilot Test)Animal Detection (Pilot Test)

Page 44: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

44

Rural Section Rural Section –– Short TermShort Term

Red Deer

DMS

TRAFFIC SIGNAL COORDINATION

(HWY 2A)

TRAFFIC SIGNAL COORDINATION

(HWY 2A)

RWIS

RWIS

DMS

RAMP TERMINALSIGNAL COORDDMS

DMS

EDMONTON

CALGARY

OVERHEIGHT VEHICLE

DETECTOR

OVERHEIGHT VEHICLE

DETECTOR

WILDLIFEDETECTION

CCTV/ INCIDENT

Mgmt.

Page 45: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

45

Rural Section ITS ProgramRural Section ITS Program

LONG TERM (6 to 10 years)LONG TERM (6 to 10 years)

•• RWISRWIS– Automated Surface Condition Reporting– Maintenance Decision Support System– FAST (Red Deer River Bridge)

•• Commercial VehicleCommercial Vehicle– Central Carrier Database– Electronic Sorter & Bypass System– Weigh-in-Motion

Page 46: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

46

Rural Section Rural Section ––Long TermLong Term

VEHICLE ID & BYPASS

VEHICLE ID & BYPASS

FASTRed Deer

DMS

HWY2_LongTerm.cdr

TRAFFIC SIGNAL COORDINATION

(HWY 2A)

TRAFFIC SIGNAL COORDINATION

(HWY 2A)

RWIS

RWIS

DMS

RAMP TERMINALSIGNAL COORDDMS

DMS

EDMONTON

CALGARY

OVERHEIGHT VEHICLE

DETECTOR

OVERHEIGHT VEHICLE

DETECTOR

WILDLIFEDETECTION

CCTV/ INCIDENT

Mgmt.

VEHICLE ID& BYPASS

Page 47: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

47

Deerfoot TrailDeerfoot Trail

Page 48: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

48

Deerfoot TrailDeerfoot Trail

CHARACTERISTICSCHARACTERISTICS

•• High VolumesHigh Volumes– LOS D– AADT’s of 50,000 to 140,000

•• SafetySafety– 560 collisions annually– 70% congestion related (50% rear ends, 20% side swipe)– 30% weather related*

* Road surface or weather is a contributing factor and RWIS may mitigate

Page 49: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

49

Deerfoot Trail ITS ProgramDeerfoot Trail ITS Program

SHORT TERM (0 TO 5 YEARS)SHORT TERM (0 TO 5 YEARS)

•• Ramp Terminal OperationsRamp Terminal Operations

•• Incident ManagementIncident Management• CCTV cameras• Collaborative TMC

•• TravellerTraveller Information Information • Database• DMS (Permanent & Portable)• Website• Commercial Broadcast Radio

•• Fixed Automated Spray Technology (FAST)Fixed Automated Spray Technology (FAST)– Calf Robe Bridge

Page 50: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

50

Deerfoot Trail Deerfoot Trail –– Short TermShort Term

ProposedDMS

ProposedDMS

Potential Signal Improvement/Off-ramp queue management

ProposedDMS

ProposedDMS

ProposedDMS

ProposedDMS

Stoney Tr.

Country Hills Blvd.

Airport Tr.

64 Ave N

McKnight Blvd.

32 Ave

16 Ave

Memorial Tr.

17 Ave S

Peigan Tr.

Glenmore Tr.

Southland Dr.

Anderson Rd.

139 Ave

Beddington Tr.

Hwy 22X

Incident Mgmt.From Beddington trail

to Hwy. 22x ProposedFAST

Page 51: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

51

Deerfoot Trail ITS ProgramDeerfoot Trail ITS Program

LONG TERM (6 to 10 years)LONG TERM (6 to 10 years)

•• Incident ManagementIncident Management– Additional CCTV cameras & DMS– Implement Automated Incident Detection

•• RWISRWIS– Automated Surface Condition Reporting– Maintenance Decision Support System

•• Ramp MeteringRamp Metering

Page 52: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

52

Deerfoot Trail Deerfoot Trail –– Long TermLong Term

ProposedDMS

ProposedDMS

Potential Signal Improvement/Off-ramp queue management

ProposedDMS

ProposedDMS

ProposedDMS

ProposedDMS

Stoney Tr.

Country Hills Blvd.

Airport Tr.

64 Ave N

McKnight Blvd.

32 Ave

16 Ave

Memorial Tr.

17 Ave S

Peigan Tr.

Glenmore Tr.

Southland Dr.

Anderson Rd.

139 Ave

Beddington Tr.

Hwy 22X

Potential ramp metering

Potential ramp metering

Incident Mgmt.From Beddington trail

to Hwy. 22xProposed

FAST

Page 53: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

53

Anthony Anthony HendayHenday Drive (AHD)Drive (AHD)

Page 54: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

54

Anthony Anthony HendayHenday DriveDrive

CHARACTERISTICSCHARACTERISTICS

•• Moderate VolumesModerate Volumes– LOS B/C– forecast AADT’s of 30,000 to 70,000

Page 55: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

55

Anthony Anthony HendayHenday DriveDriveITS ProgramITS Program

SHORT TERM (0 TO 5 YEARS)SHORT TERM (0 TO 5 YEARS)

•• Integrate Traffic Signals with the CityIntegrate Traffic Signals with the City’’s s

•• TravellerTraveller InformationInformation– ATIS Database– Website– DMS

•• RWIS & FAST on River CrossingRWIS & FAST on River Crossing

•• Incident ManagementIncident Management– CCTV at Select Locations– Call-In Centre

Page 56: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

56

Anthony Anthony HendayHenday DriveDriveShort TermShort Term

HWY 16

HWY 16A

HWY 60

87 Ave

EDMONTON

62 Ave

127 St.

HWY 19

HWY 2AHD_ShortTerm.cdr

111 St.

Terw

illige

r Driv

e

CCTVCOVERAGE

CCTVCOVERAGE

FAST

DMS

DMS

Whitemud Drive

TRAFFIC SIGNALCOORDINATION

Page 57: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

57

Anthony Anthony HendayHenday DriveDriveITS ProgramITS Program

LONG TERM (6 to 10 years)LONG TERM (6 to 10 years)

•• Incident ManagementIncident Management– 100% CCTV coverage– Automated Incident Detection– Add DMS

•• RWISRWIS– Automated Surface Condition Reporting– Maintenance Decision Support System

Page 58: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

58

Anthony Anthony HendayHenday DriveDriveLong TermLong Term

HWY 16

HWY 16A

HWY 60

87 Ave

EDMONTON

62 Ave

127 St.

HWY 19

111 St.

Terw

illige

r Driv

e

CCTVCOVERAGE

CCTVCOVERAGE

FAST

DMS

DMS

INCIDENTMANAGEMENT

DMS

AHD_LongTerm.cdr

TRAFFIC SIGNALCOORDINATION

HWY 2

Page 59: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

59

Early WinnersEarly Winners

•• ATIS DatabaseATIS Database

•• DMSDMS

•• Incident ManagementIncident Management• CCTV along Deerfoot Trail• Collaborative TMC

•• RWISRWIS• Stations• FAST

Page 60: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

60

Capital CostsCapital Costs

•• Approximately $ 21 Million over 5 yearsApproximately $ 21 Million over 5 years

•• DistributionDistribution– 40% Deerfoot Trail– 30% RWIS– 15% Anthony Henday Drive– 15% Rural

Page 61: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

61

Operating & Maintenance CostsOperating & Maintenance Costs

•• Estimated $ 1Million to $ 2.5 Million AnnualEstimated $ 1Million to $ 2.5 Million Annual

•• Combined Capital & Operating of approx. $ 5 Combined Capital & Operating of approx. $ 5 Million AnnuallyMillion Annually

Operating

Capital

Time

Cost

Page 62: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

62

Potential BenefitsPotential Benefits

•• QuantifiedQuantified• Reduction in Vehicle Delays• Reduction in Number of Collisions• Reflects Impact of Incident Management, RWIS, etc.

•• QualitativeQualitative• Driver Frustration• Customer Satisfaction• Environmental• Reflects Impact of ATIS, RWIS, etc.

Page 63: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

63

Projected Benefit/Cost RatiosProjected Benefit/Cost Ratios

•• ATMS/ATISATMS/ATIS– Deerfoot Trail 7:1– Rural Section 3:1– Anthony Henday Drive 2:1

•• Road Weather InformationRoad Weather Information– Rural Section 5:1

•• FASTFAST– Deerfoot Trail 3:1– Anthony Henday Drive 3:1

Page 64: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

64

Where Do We End Up ?Where Do We End Up ?

•• Road & Traffic Condition InformationRoad & Traffic Condition Information• Real-Time• DMS & Web-Based (Media)

•• Road Weather InformationRoad Weather Information• Improved surface conditions• Efficiency/management of maintenance operations

•• Incident ManagementIncident Management• Deerfoot Trail• Anthony Henday Drive• Rural

•• Technology Integration & TeamworkTechnology Integration & Teamwork

Page 65: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

65

RWIS ProgramRWIS Program

Mark Mark PinetPinet

M.F. M.F. PinetPinet & Associates& Associates

Page 66: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

66

Information Session Information Session ITS BlueprintITS Blueprint--RWIS RWIS

PMPM

•• Site location detailsSite location details

•• Summary of recommendationsSummary of recommendations

•• Equipment suite to be deployedEquipment suite to be deployed

Page 67: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

67

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

•• RWISC proposal Dictated RWISC proposal Dictated Results Results ––– 70 Sites – NHS – Completion Mar. 2006– Basic and “Limited Deployment”

Equipment

•• Two year deployment selected Two year deployment selected

•• Two contractsTwo contracts

Page 68: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

68

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

•• Result Result ––– GIS Model Highway

Segments Represented By Each RWIS site

– Table in document listing sites, equipment information

Page 69: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

69

Site TypesSite Types•• Remote sensingRemote sensing

– Hot spots/Problem Locations– Site Specific

•• VSVS

•• Deployment TriggerDeployment Trigger– Representative of a larger area– Pavement Condition Forecasts

•• 120 Trigger/hot spot120 Trigger/hot spot sites proposedsites proposed

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 70: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

70

•• FACTORS INFLUENCING NETWORK FACTORS INFLUENCING NETWORK ZONE LOCATIONZONE LOCATION--MACROMACRO FACTORS FACTORS

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 71: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

71

•• FACTORS INFLUENCING NETWORK FACTORS INFLUENCING NETWORK ZONE LOCATIONZONE LOCATION– Representative conditions in the Zone

• Topography/Geography

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 72: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

72

SouthSouth

Central Central

North North

Foothills Foothills

6 Meteorological Zones6 Meteorological Zones

Mountain Mountain

North North Central Central

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 73: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

73

•• FACTORS INFLUENCING NETWORK FACTORS INFLUENCING NETWORK ZONE LOCATIONZONE LOCATION

–Provincial Highways –National Highway system

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 74: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

74

•• Representative conditions in the Zone Representative conditions in the Zone • 50km Rural spacing• 30km Urban spacing

§§ Hot SpotsHot Spots-- Problem locationsProblem locations§§ Representative Sites Representative Sites --TriggersTriggers

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 75: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

75

•• FACTORS INFLUENCING NETWORK FACTORS INFLUENCING NETWORK ZONE LOCATIONZONE LOCATION

–Traffic Volumes

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 76: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

76

•• Representative conditions in the Zone Representative conditions in the Zone

• Water courses and • Bridge Locations

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 77: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

77

•• Representative conditions in the Zone Representative conditions in the Zone

• Collisions.

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 78: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

78

Steeper= Darker Steeper= Darker

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

•• Representative conditions in the Zone Representative conditions in the Zone

• Topography

Page 79: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

79

Trees Blue Trees Blue

•• Representative conditions in the Zone Representative conditions in the Zone

•• VegetationVegetation

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 80: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

80

•• Representative conditions in the Zone Representative conditions in the Zone Other Monitoring SitesOther Monitoring Sites

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 81: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

81

•• Result Result –––– GIS Model Results Illustrating GIS Model Results Illustrating

Highway Segments Represented Highway Segments Represented By Each RWIS siteBy Each RWIS site

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 82: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

82

•• FACTORS INFLUENCING SITE FACTORS INFLUENCING SITE LOCATIONLOCATION––MICROMICRO– Physical Geography

• Soil Type• Sky View • Obstructions (Vegetation)

– Operational• Pavement Conditions• Routes

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 83: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

83

Depending on Information Required and Depending on Information Required and Warrant Warrant --Dictated type of Equipment Dictated type of Equipment

CategoriesCategories

Level 1Level 1 RWIS Trigger SiteRWIS Trigger Site

Level 2 Level 2 RWIS Hot SpotRWIS Hot Spot

Level 3 Level 3 RWIS Trouble Hot SpotRWIS Trouble Hot Spot--FASTFAST

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Location RationaleLocation Rationale

Page 84: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

84

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Recommendations Recommendations

•• Phase OnePhase One-- TThirtyhirty basic RWIS sitesbasic RWIS sites,,central servercentral server and advanced sensor and advanced sensor demo sitedemo site

•• Phase OnePhase One bb) ) -- RRetrofitetrofit of Phase One of Phase One with advanced Pavement sensors with advanced Pavement sensors

•• Phase TwoPhase Two FFortyorty RWIS sitesRWIS sites including including advanced pavement sensors advanced pavement sensors (11) (11) with with upgrades of upgrades of seven seven existing RWIS sitesexisting RWIS sites. .

Page 85: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

85

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Recommendations Recommendations

Future Future

•• Evaluate NHS RWIS/Extend RWIS to other AreasEvaluate NHS RWIS/Extend RWIS to other Areas

•• Warrant and Priority Analysis FASTWarrant and Priority Analysis FAST

•• Exploit benefits of RWIS Exploit benefits of RWIS • Salt Management and Data Fusion

Page 86: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

86

•• Phase One ScopePhase One Scope– 30 Site

•• TimingTiming– Completion Dec. /04

•• Basic Equipment including Basic Equipment including CCTVCCTV

•• RWIS Watch Expert ModelRWIS Watch Expert Model

•• User Interface,VAMUser Interface,VAM

•• Retrofit Ph1 AdvancedRetrofit Ph1 Advanced

•• Cost Cost $3$3MM

CANAMEX North South Trade Corridor

Highway 16 East

Information SessionInformation SessionITS BlueprintITS Blueprint--RWISRWIS Staging Staging Phase 1 DeploymentPhase 1 Deployment

Page 87: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

87

•• Phase Two Scope Phase Two Scope

•• Timing Timing – Installed Dec. /05

•• Basic Equipment, Cameras Basic Equipment, Cameras

•• Advanced RWIS sensors Advanced RWIS sensors Ph2,Ph2,

•• Cost Cost $$4M4M

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Staging Phase 2 DeploymentStaging Phase 2 Deployment

Page 88: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

88

•• Calgary Calgary

•• Deerfoot RWIS Deerfoot RWIS upgrades upgrades

•• Ph 2 (proposed)Ph 2 (proposed)

•• Advanced sensor Advanced sensor Retrofit Retrofit

•• Adapt Calgary serverAdapt Calgary server

•• Cost Cost $$0.0.33MM

••

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWISPhase 2 Deployment Deerfoot upgradesPhase 2 Deployment Deerfoot upgrades

Page 89: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

89

Capture Calgary Capture Calgary RWIS on AT RWIS on AT NTCIP ESS NTCIP ESS serverserver

Deerfoot Deerfoot TrailTrailRWIS UpgradeRWIS Upgrade

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Phase 2 Deployment Calgary Phase 2 Deployment Calgary

Page 90: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

90

30 30 KmKm spacing spacing Suburban Suburban

Century RoadCentury Road

Leduc Weigh Leduc Weigh StnStn. .

Clover Bar Clover Bar

50 50 KmKm spacing spacing Rural Rural

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Phase 1 Deployment Edmonton Phase 1 Deployment Edmonton

AHDAHD

Page 91: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

91

•• AtmosphericAtmospheric– Wind Speed/Dir.– Precipitation– RH/Temp– Barometric Pressure – RPU– Tower

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Equipment SuiteEquipment Suite

Page 92: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

92

•• Pavement Pavement – Passive Pavement Sensor – Surface Temperature– Surface Condition– Residual Deicing Chemical %– Predicted freeze point

•• GroundGround– 2x Sub Surface Temperature

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Equipment SuiteEquipment Suite

Page 93: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

93

•• Cameras for Cameras for VisibilityVisibility

•• ((LIMITED DEPLOYMENT LIMITED DEPLOYMENT SENSORS SENSORS -- 30% of all 30% of all StationsStations per RWISC)per RWISC)

• Expert Models for prediction of – Fog– Blowing Snow– Rely RH, temp and

Wind Speed fpr prediction Vs Detection

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Equipment SuiteEquipment Suite

Page 94: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

94

Active Active ““AdvancedAdvanced””Pavement Sensors Pavement Sensors Passive Passive PavementPavement Sensor Sensor –– Surface Surface TemperatureTemperature–– Surface ConditionSurface Condition–– Residual Deicing Chemical %Residual Deicing Chemical %

–– Measured freeze pointMeasured freeze point

–– New Technology New Technology –– Phase 2 retrofit Phase 2 retrofit

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS Equipment SuiteEquipment Suite

Page 95: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

95

Alberta Transportation RWIS Network DesignAlberta Transportation RWIS Network Design

Advanced RWIS Next Advanced RWIS Next gengen--FASTFAST

Page 96: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

96

RWIS ArchitectureRWIS Architecture

ATIS ATMSATIS ATMS

VAM

Page 97: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

97

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS User InterfaceUser Interface

Page 98: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

98

Forecast ConditionsForecast Conditions

Past ConditionsPast Conditions

Existing ConditionsExisting Conditions

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWIS User InterfaceUser Interface

Page 99: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

99

Information Session Information Session ITS BlueprintITS Blueprint--RWISRWISImplementation Process Implementation Process

•• Tender ProcessTender Process

•• Detailed engineering designs / approvalsDetailed engineering designs / approvals

•• Construction contract administration and Construction contract administration and review during constructionreview during construction

•• Post construction servicesPost construction services

•• Post implementation servicesPost implementation services

Page 100: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

100

SummarySummary

Tim SchnarrTim Schnarr

DelcanDelcan CorporationCorporation

Page 101: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

101

ITS Blueprint ITS Blueprint

•• Framework Framework • ITS Actions / Deployments• Priority Sections• Staged Implementation

•• Reference Reference • Infrastructure Projects• Partnerships

Page 102: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

102

Challenges & OpportunitiesChallenges & Opportunities

•• InstitutionalInstitutional

•• InterInter--agency Coordination/Cooperationagency Coordination/Cooperation

•• PartnershipsPartnerships

Page 103: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

103

Regional Traffic Management Regional Traffic Management CentresCentres

•• 3 Regional 3 Regional TMCTMC’’ss

•• Role Role • Incident Detection• Monitor Incident & Traffic Conditions• Traffic Management/Response• Traveller Information

•• PartnershipPartnership• 911/Emergency Management• Local Municipality

Page 104: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

104

Roles & ResponsibilitiesRoles & Responsibilities

TMC 911/Emerg. Serv.

PublicCCTV

Maintenance

DMS

TrafficControl

AlternateRoutes

IncidentInfo

CCTVSite Clear

Police

Fire

Ambulance

Tow Truck

Page 105: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

105

RWISRWIS ValueValue--Added Meteorological Added Meteorological ServicesServices (VAM)(VAM)

•• Data RetrievalData Retrieval

•• ForecastingForecasting

•• Web Hosted User InterfaceWeb Hosted User Interface

•• Environment Canada / Private SectorEnvironment Canada / Private Sector

Page 106: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

106

Where Are We Now ?Where Are We Now ?

•• Projects UnderwayProjects Underway• DMS• RWIS

•• Projects ProposedProjects Proposed• Road & Traffic Condition Database• Deerfoot Trail

• CCTV, DMS, FAST, etc.• Red Deer

• CCTV, Animal Warning• Anthony Henday Drive

• CCTV

Page 107: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

107

Next StepsNext Steps

•• ““ITS ChampionITS Champion”” within Alberta within Alberta TransportationTransportation

•• Partnerships with Adjacent MunicipalitiesPartnerships with Adjacent Municipalities• Regional TMC’s• Joint Funding & Implementation of Projects

•• Partnerships with OthersPartnerships with Others• Emergency Management• Maintenance Contractors• Traveller Information – AMA

•• Rationalize ProjectsRationalize Projects

Page 108: Advanced Traveller Information and Traffic Management ... · Advanced Traveller Information and Traffic Management Systems for Highway 2 Project Overview & Summary of Recommendations

108

The End?The End?