Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
Advanced
Bar Refurbishment - Edinburgh
Company Profile
G1.6 Trident House
175 Renfrew Road
Paisley PA3 4EF
t 0141 887 2244
f 0141 230 2377
www.advancedrefurb.co.uk
Registered in Scotland No.318783
Advancedrefurbishment contracts ltd
Advanced Refurbishment Contracts Limited is a new and growing business
specialising in building refurbishment and fit out projects. Established in April
2007 we successfully deliver refurbishment and fitout works up to a maximum
of £400,000.
We have a wealth of experience operating in the commercial, education,
leisure, and public sectors. We have a customer focused approach which
delivers a first class service which is why over 90% of our work comes from
satisfied clients and referrals.
Our aim is to continuously develop our relationship with both the clients and
suppliers in order to achieve the highest quality finish to our works.
Advancedrefurbishment contracts ltd
Bar Refurbishment Edinburgh & Livingston
We carried out the bespoke refurbishment of the bars within Edinburgh and Livingston including design
based on the Clients concept and provided practical solutions to form the frameworks.
Edinburgh - work was completed in 3 weeks and within the budget of £20k
Livingston - work was completed in 10 days and within the budget of £25k
Works to the bars included; over-cladding the existing bar, strip out of gantry and formation and
installation of bespoke replacement, formation and installation of bespoke glass bonded shelving,
custom lighting to highlight the area, granite counter top, new flooring and decoration.
Bar Refurbishment – Livingston
Advancedrefurbishment contracts ltd
Kilmarnock College
Working in partnership with industry leading HAA Design architect we supplied the complete
refurbishment requirement Kilmarnock College. The works entailed the complete refurbishment of the
Reception, and the creation of the new Management suite, Principals Office and Student New Meeting
Facilities. We also manufactured the Bespoke Workstations Reception Counters and Computer
Stations for students.
Project Value was £252k and completed within the 10 week period.
The major works comprised of frameless Glass partitioning systems and solid partitioning, curved
meeting areas, new ceilings, complete rewire and lighting installation, ventilation, decoration and floor
finishes.
Advancedrefurbishment contracts ltd
Thistle Hotel – Café
Advanced Refurbishment carried out the refurbishment to the Café area within the Thistle Hotel,
Glasgow.
The work was completed in 5 weeks and within the budget of £42k
Work content involved opening through structural wall, structural steel installation, removal of raised
floors, formation of new floor levels, wall cladding, lighting, flooring, decoration and alteration to bar
servery area.
Advancedrefurbishment contracts ltd
Paisley Museum Pillar Gallery & Shawl Store
The works comprised of the replacement and repair of existing antique cornice in various locations. The
installation of space age technology insulation foil to the high ceiling and relining with plasterboard and
timber framing to create detailed finish to the ceiling.
Painting of the walls and ceiling highlighting the details in different colours, sanding the existing wooden
floor and resealing to finish the look. We also formed and decorated bespoke covers for the original
heating system that is located within the room.
The picture below shows the level of detail and quality of the finish in creating the hardwood veneered
panels with the famous Paisley pattern carved into the covers. These covers where machined on site
and constructed to suit each area. Our joiners worked hard to create these units and are now
considered as works of art on display within the museum.
Project Value £71k
Advancedrefurbishment contracts ltd
North Lanarkshire Council – Dalziel High School
The woks involved the construction of a new fitness suite within the confines of a central courtyard. We
carried out these works during the school year and within normal working hours. We managed to work
around the live environment by adhering to the school tea and lunch breaks for deliveries of materials,
loading up the site and removing debris.
Project Value was £256k and completed within the 8 week period.
The works comprised of the construction of a timber kit extension with brickwork and render to the
external leaf, re-routing the existing soil & foul drainage systems and extending to suit new toilets and
shower rooms. The installation of Cemex beam and block floor systems with a self-levelling granite
screed and underfloor heating, JJI roof joist system and flat roof installation as well as repairs to existing
slated roof. We installed new doors, windows and toilet, shower and changing facilities. New electrics,
flooring, wall and ceiling finishes throughout.
Advancedrefurbishment contracts ltd
One Stop Shop, Clydebank
Advanced Refurbishment carried out the refurbishment of the offices, interview rooms and bank kiosks
for West Dunbartonshire Council.
The work was completed in 8 weeks and within the budget of £90k
Work content involved the formation new openings through concrete wall, formation of Oak framed
glass fronted offices, solid partitions, new entrance screen, alterations to AC and electrics, flooring,
decoration and installation of client supplied bespoke furniture.
Advancedrefurbishment contracts ltd
Clyde Space, West of Scotland Science Park, Glasgow
Alteration works to form a new clean room facility and changing facility for the creation of their
successful UKube-1's satellite which went into orbit February 2013 becoming the first Scottish Satellite.
Our works was to create the partitioning system to form the dirty to clean changing facility and to create
the clean room partition where the satellite was constructed and tested. Works included a sealed
suspended ceiling and installation of a specialist air filtration system. Total Value £22k
Advancedrefurbishment contracts ltd
Central Scotland Forrest Trust
We carried out the refurbishment & alteration to the CSFT offices in Shotts, part of which is a listed
building.
Project Value was £230k and completed within the 16 week period.
The works included re-roofing in slate, lead-work and cast iron downpipes to match existing. We also
carried out full internal alteration including new electrics and plumbing throughout, decoration, flooring,
adjustments to existing timber cladding panels and formation of new to match existing, new doors and
windows including electrically operated roof lights and disconnection of the existing sewage tank and
creating of a new weed bed draining system formed from 45m of drainage pipework
Advancedrefurbishment contracts ltd
Larkhall Leisure Centre
The works carried out on behalf of South Lanarkshire Council involved
replacing the filtration system to the swimming pool and the
refurbishment of the changing facilities.
The work comprised of supporting the adjustable height floor to the
swimming pool prior to draining all water, the 12” asbestos filtration
pipework removal and various walls contaminated with Asbestos to
form a new back corridor to the swimming pool plant room. The
supply and installation of new filtration pipework and the refill of the
pool.
Other works included the complete strip out of the pool side changing
facility and replacement of the changing cubicles, lockers, retiling the
floor and replacement the drainage channels.
Project Value £210k
Advancedrefurbishment contracts ltd
Brighton Parish Church
We carried out the refurbishment works within the
church hall and toilets.
Project Value was £151k and completed within the 12
week period.
The works included new partitions including creating a
fire corridor, new gas meter, suspended ceilings, new
fire doors, full electrical re-wiring and replacement
fittings, decoration and new flooring throughout. We
installed new cubicles, IPS system and vanity units
within the bathrooms and new WHB’s, WC’s and
fixtures.
Advancedrefurbishment contracts ltd
Howco Ltd
Advanced Refurbishment is proud to present the new offices in the GMB building at Charing Cross.
The work was completed in 6 weeks and within budget of £108k.
Work content involved the formation of frameless glass fronted offices, curved partitions to reception
with solid Walnut finishing details, no expense was spared with the level of finishes.
Alteration works to existing toilets created DDA compliant toilet and shower facilities.
Advancedrefurbishment contracts ltd
Renfrewshire Council Headquarters Cotton Street Paisley
Over the past year we have been successfully completing under Competitive tendering and the councils
Procurement legislation rules for the refurbishment of the Perimeter replacement wall insulation to all
floors, then office refurbishment to 4th, 3rd ,2nd ground and lower ground floors
Each project has been won by Advanced Refurbishment contracts successfully under the council’s strict
competitive tendering rules
The total value of these projects completed in the past year is approximately £491k ,we have worked in
close proximity to the functioning areas of the council employees and have managed to work
successfully around getting materials on site and debris from site without affecting the daily work of the
building occupants.
Advancedrefurbishment contracts ltd
Turner Group
Working in conjunction with industry leading architectural practice Mclean Architects Ltd we supplied
the complete furniture requirement for over 100 staff in this converted diesel engine workshop. We
provided ‘Bench’ workstations and furniture for all other areas including the interactive boardroom and
meeting rooms, storage systems, breakout areas, management suites and the staff refectory. All
workstations are self contained with full power and data facilities including flat screen monitors and
suspended CPU units. Project Value £140k.
Since this installation we have continued to work with Turners
to meet their furniture requirements.