ADP Template.docx

Embed Size (px)

Citation preview

  • 8/10/2019 ADP Template.docx

    1/9

    Agricultural Development Program

    Third Call (June 2014)

    Guide for ADP Propoal !u"miion

    Proposals submitted to ADP should include the following sections.

    1. Proposal Title (English and Arabic)

    2. Abstract.

    3. Introduction with relevant background.

    . Pro!ect "b!ectives.

    #. $aterials % $ethods.

    &. 'acilities and Euipents.

    *. +udget.

    ,. -eerences.

    /. Anne0es.

    /.1 Anne0 1 orat

    /.2 Anne0 2 +udget orat

    /.3 Anne0 3 4ogical 'raework $atri0

    /. Anne0 5A6TT hart

    Following is a brief explanation of each of the above mentioned sections:

    1 Pro#ect Title$

    Including the project title in Arabic and English.

    2 A"tract

    The proposal abstract should not exceed three hundred words and should appear at the

    beginning of the proposal. The abstract should briefly include:

    * Description of the project in view of the trategy for ustainable Agricultural

    Develop!ent "#$%$& needs.

    * 'bjectives and !ethodology.

  • 8/10/2019 ADP Template.docx

    2/9

    * Innovative approaches( if any.

    * )roject benefits and the expected outputs.

    % &ntroduction 'ith relevant "acground

    The )roposal should start with an Introduction which gives a bacground on the

    subject and should address the following:

    * The proble! to be addressed.

    * A brief +iterature review.

    * Docu!ent and ,uantifying and significancey of the proble!.

    * The objectives of the proposal.

    * -elevancy of goals with the trategy for ustainable Agricultural Develop!ent

    "#$%$&

    * Activities to be conducted to fulfill these objectives

    4 Pro#ect "#ective()

    The objectives describe clearly the expected outco!e of the project which should beachievable within the suggested project duration.

    * +aterial , +ethod

    The !aterials and !ethods section should contain :

    * description of the !aterials to be used throughout the proposed wor.

    * !ethods you plan to use to acco!plish your objectives

    * description of how you will i!ple!ent these !ethods and who will be responsiblefor the i!ple!entation of each objective.

    * description of the staffing expertise involved.

    * description of the plan of action.

    * ti!e fra!e re,uired for the project i!ple!entation.

  • 8/10/2019 ADP Template.docx

    3/9

    - .acilitie , /uipment

    A list of ade,uate facilities confir!s the capabilities of the proposing institution/sstrength in the intended field of study.

    The description of facilities should include any special e,uip!ent or assets in the

    institution/s.

    0ustification should be provided for additional ite!s needed to co!plete the wor.

    The proposal !ust docu!ent the availability to use another organi1ation/s facilities

    or e,uip!ent.

    udget

    The budget should contain an explanation and calculations of the project budget. The

    following ite!s should be taen into consideration:

    Ite!i1e 2 account for all costs

    0ustify budget ite!s

    Try not to overesti!ate or underesti!ate resource needs. 3udget lines for

    !echanis!s of the ADP!ay include:

    4ags: This budget line states the salary to be paid to the staff involved in the

    project. It should contain esti!ation of the percentage of ti!e each person

    listed will be spending on the project.

    -ental( lease( or purchase of e,uip!ent . It includes research fields and office

    e,uip!ents.

    5aterials and operation costs: che!icals( glassware( seeds( fertili1ers( fuels(

    !aintenance( sa!ple analysis( land and car rent( local transportation( per

    die!s and labors avenges as follows consu!ables( transportation( per die!s

    and services labors.

    International Travel: 6osts related to travels "ticets( per die!s( etc.&

    'ther costs: 7or ite!s that don/t fit into other budget line ite!s such as

    publications( attending worshops( sy!posiu!( etc.

    Indirect costs: 6osts that are clai!ed by the ).I institution as a co!pensation

    for costs that can/t be ,uantified( including ad!inistrative and accounting

    costs( !aintenance and operation of e,uip!ent( etc.

    ources of funding for the above !entioned budget ite!s( !ay include: funds

    re,uested fro! the AD)( co finance fro! other sources "including your institute&.

    Annex # of this te!plate illustrates a suggested budget for!at.

  • 8/10/2019 ADP Template.docx

    4/9

    3 it of 5eference

    If the proposal contains a li!ited nu!ber of references( footnotes !ay be used

    in the text to cite the!.

    If references are used extensively( they should appear after the budget and in

    separate list for! where they are nu!bered as they occur in the text.

    6 Anne7e

    681

    Anne71$ C9 format of P&: C8P& and main reearcher

    )lease copy the following sections to your word processing and fill the! up. )lease

    fill all sections included

    6;1;1

    P/5!

  • 8/10/2019 ADP Template.docx

    5/9

  • 8/10/2019 ADP Template.docx

    6/9

    6;1;4

    +/+/5!?&P . P5./!!&)rofessional body +evel of !e!bership ear of award

    6;1;*

    .&/D! . & 6;1;

    PAT/

  • 8/10/2019 ADP Template.docx

    7/9

    6;2

    Anne7 2$ udget format

    This for!at !ust be esti!ated for each year of the project

    /ligi"le cot rea do'n

    ADP

    upport(;/;)

    Cot

    haring(;/;)

    Total pro#ect(;/;)

    age (hould not

    e7ceed 10 B)

    )I "4ages per !onth&

    !ultiplied by nu!ber of

    !onths. )lease indicate the

    > of ti!e spent by each

    person in the project

    7or Each of the Assistants(

    please indicate the wags per

    !onth !ultiplied by

    nu!ber of !onths. )lease

    indicate the > of ti!e spent

    on the project

    Total

    /uipment AD) purchases

    ?onAD) purchases

    Total

    +aterial and

    operating cot

    6onsu!ables

    Transportation 2 per die!

    ervices and labors

    tationary

    5iscellaneous

    Total

    Travel &ntern; Air ticets

    )er Die!

    6onference registration fees

    Total

    ther cot =====

    -eport preparation

    )ublications 6osts

    Telephone and ===

    other direct costs

    Total Direct Cot

  • 8/10/2019 ADP Template.docx

    8/9

    &ndirect cot not to

    e7ceed *B (9alid

    for the P;&

    intitute)

    Total pro#ect cot

    (Direct &ndirect

    Cot)

    * )ercentage of allocated budget for each Ite! will be negotiable.

    6;%

    Anne7 %$ ogical .rame'or +atri7 (.+)

    +ogical 7ra!ewor 5atrix "+75& is an analytical( presentation and !anage!ent tool(

    which helps in developing a high ,uality project design.

  • 8/10/2019 ADP Template.docx

    9/9