57

Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm
Page 2: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm
Page 3: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Attachment 1

Summary of Changes to the 2017 FTIP

Page 4: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

16/17 $1,170,309 16/17 $1,170,309 HBP

16/17 $129,038 16/17 $129,038 Local Match

17/18 $10,460,240 17/18 $10,460,420 HBP

17/18 $843,848 17/18 $843,848 Local Match

17/18 $463,732 17/18 $463,732 State Bond

18/19 $2,388,250 18/19 $0 HBP

18/19 $0 18/19 $0 Local Match

18/19 $0 18/19 $0 State Bond

19/20 $26,231,335 19/20 $20,821,151 HBP

19/20 $780,029 19/20 $1,745,849 Local Match

19/20 $1,972,886 19/20 $573,500 State Bond

Beyond $80,401,919 Beyond $88,200,353 HBP

Beyond $6,218,644 Beyond $6,652,210 Local Match

Beyond $1,553,077 Beyond $1,553,077 State Bond

16/17 $2,387,385 16/17 $2,087,385 CMAQ

16/17 $1,699,250 16/17 $214,250 Local Match

17/18 $2,518,158 17/18 $2,818,158 CMAQ

17/18 $1,855,472 17/18 $3,340,472 Local Match

16/17 $1,159,095 16/17 $1,071,281 CMAQ

16/17 $1,311,305 16/17 $454,516 Local Match

16/17 $363,991 16/17 $584,860 RSTP

17/18 $943,038 17/18 $1,030,852 CMAQ

17/18 $948,212 17/18 $630,028 Local Match

19/20 $0 19/20 $363,991 RSTP

19/20 $0 19/20 $3,005,590 Local Match

16/17 $3,625,775 16/17 $3,647,537 RSTP

16/17 $271,246 16/17 $242,631 Local Match

19/20 $6,849,326 19/20 $6,485,335 RSTP

19/20 $3,064,799 19/20 $3,015,164 Local Match

Grouped Projects for Pavement

Resurfacing/Rehab (Grouped Projects for pavement resurfacing and/or rehabilitation:

Projects are consistent with 40 CFR Part

93.126 Exempt Tables 2 and Table 3

Categories - Pavement resurfacing and/or

rehabilitation (Using Toll Credits ))

CON Grouped Listing Updated

-$663,110 -1.10%Existing 21400000566

$2,415,477 19.41% Grouped Listing Updated

Project Identification

2017 FTIP

CTIPS ID# Sponsor Agency Project Title Current CTIPS Amount COMMENTS

SUMMARY OF CHANGES Agency: Various

Amendment #: 3 Amendment Type: Administrative Modification (Type I)

Current Total Project Cost Prior

FFY Fund Source

Funding

Total Project Change

Total Project%

Increase/Decrease

Prior CTIPS Amount

Current FFY

Various Agencies $0 0.00%

CON

21400000447

Grouped Projects for Highway Bridge

Program (Grouped Projects for Bridge Rehabilitation and

Reconstruction - HBP Program: Projects are

consistent with 40 CFR Part 93.126 Exempt Tables 2 Categories.

Widening narrow pavements or

reconstructing Bridges (No additional Travel

Lanes))

Existing

Prior Total Project Cost

Existing or New Project

CON

Phase

Updated CTIPS$165,309,808$165,309,808

CON

CON

CON

CON

$0 0.00% Grouped Listing UpdatedCON

Grouped Projects for Intersection

Signalization: Grouped Projects for Intersection Signalization projects

consistent with 40 CFR Part 93.126 Exempt

Table 3 category (Using Toll Credits)

Existing 21400000594 Various Agencies $31,356,670

Various Agencies $60,150,120 $59,487,010

$31,356,670

Existing 21400000565 Various Agencies

Grouped Projects for Intersection

Channelization: (Grouped Projects for

Intersection Channelization:

Projects are consistent with 40 CFR Part

93.126 Exempt Table 3 Categories - Intersection

Channelization Projects. (Using Toll

Credits))

$12,445,020 $14,860,497

Page 5: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Project Identification

CTIPS ID# Sponsor Agency Project Title Current CTIPS Amount COMMENTS

Current Total Project Cost Prior

FFY Fund Source

Funding

Total Project Change

Total Project%

Increase/Decrease

Prior CTIPS Amount

Current FFY

Prior Total Project Cost

Existing or New Project Phase

16/17 $79,000 16/17 $78,792 CMAQ

16/17 $10,000 16/17 $10,208 Local Match

17/18 $83,000 17/18 $83,218 CMAQ

17/18 $11,000 17/18 $10,782 Local Match

16/17 $65,000 16/17 $73,000 CMAQ

16/17 $8,000 16/17 $0 Local Match

17/18 $72,000 17/18 $81,000 CMAQ

17/18 $9,000 17/18 $0 Local Match

16/17 $182,000 16/17 $182,372 CMAQ

16/17 $24,000 16/17 $23,628 Local Match

17/18 $186,000 17/18 $185,913 CMAQ

17/18 $24,000 17/18 $24,087 Local Match

CONExisting 21400000254 Stanislaus County

Transit Fare Subsidy Program (Transit Fare

SubsidyProgram (TFS)

StaRT/MAX Employee Ride Program)

$793,000 $793,000 $0 0.00% Updated CTIPS

CON $0 0.00% Updated CTIPSExisting 21400000510 City of Modesto

Rideshare Program, City of Modesto

(Rideshare Program, City of Modesto (Toll

Credits))

$479,000 $479,000

CON $0 0.00% Updated CTIPSExisting 21400000479 Stanislaus Council of Governments

Regional Rideshare (Regional Rideshare

Program)$1,876,000 $1,876,000

Page 6: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Attachment 2

CTIPS Pages

Page 7: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Local Highway SystemDIST:10

 PPNO: 

EA: 

CTIPS ID:214-0000-0447

CT PROJECT ID: 

MPO ID.:STANCOG

COUNTY:Stanislaus County  

ROUTE:   

PM:                     

TITLE (DESCRIPTION):Grouped Projects for Highway Bridge Program (GroupedProjects for Bridge Rehabilitation and Reconstruction -HBP Program; Projects are consistent with 40 CFR Par93.126 Exempt Tables 2 categories. Widening narrowpavements or reconstructing Bridges (No AdditionalTravel Lanes))

MPO Aprv:  05/12/2017

State Aprv:  

Federal Aprv:  

 

EPA TABLE II or III EXEMPT CATEGORY

Safety Improvement Program.

  IMPLEMENTING AGENCY:  Various Agencies  PROJECT MANAGER:  DEBBIE TRUJILLO PHONE: (209)       525-4639 EMAIL: [email protected]

PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)

Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE

19 Official 05/12/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 3 165,309,808

18 Official 02/06/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 1 165,309,808

17 Official 09/21/2016 MTUCKER Adoption - Carry Over 137,430,549

16 Official 05/24/2016 JFABELA Amendment - Cost/Scope/Sch. Change 11

15 Official 04/29/2015 JFABELA Amendment - Cost/Scope/Sch. Change 4 141,858,633

14 Official 03/02/2015 JFABELA Amendment - Cost/Scope/Sch. Change 3 141,859,186

13 Official 06/18/2014 JFABELA Adoption - Carry Over 140,955,570

12 Official 07/14/2014 JFABELA Amendment - Cost/Scope/Sch. Change 15 37,609,143

11 Official 01/09/2014 JFABELA Amendment - Cost/Scope/Sch. Change 9 36,459,610

 * Highway Bridge Program - State -   * Fund Source 1 of 3 * Fund Type: Bridge - State (HBRR) * Funding Agency: Federal Highway Administration(FHWA)

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 29,217,144 1,170,309 10,460,420   20,821,151     88,200,353 149,869,377

Total: 29,217,144 1,170,309 10,460,420   20,821,151     88,200,353 149,869,377

 

* Local Funds -   * Fund Source 2 of 3 * Fund Type: Local Transportation Funds * Funding Agency:  

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 1,998,932 129,038 843,848   1,745,849     6,652,210 11,369,877

Total: 1,998,932 129,038 843,848   1,745,849     6,652,210 11,369,877

 

* State Bond -   * Fund Source 3 of 3 * Fund Type: Local Bridge Seismic Retrofit Account * Funding Agency: Caltrans

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 1,480,245   463,732   573,500     1,553,077 4,070,554

Total: 1,480,245   463,732   573,500     1,553,077 4,070,554

 

Project Total:   PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 32,696,321 1,299,347 11,768,000   23,140,500     96,405,640 165,309,808

Total: 32,696,321 1,299,347 11,768,000   23,140,500     96,405,640 165,309,808

 

Products of CTIPS Page 1 05/12/2017 04:44:47

Page 8: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Local Highway SystemComments:******** Version 19 - 05/12/2017 **************** Version 18 - 12/15/2016 **************** Version 1 - 06/09/16 ********Project data transfered from 2014 FTIP.******** Version 16 - 04/15/2016 ********Updated per HBP Backup-List 3/25/25 from Caltrans******** Version 15 - 04/20/2015 **************** Version 14 - 01/05/2015 ********RTP# SC04 - SC74Back-up List: 2015 FTIP Appendix J******** Version 1 - 03/12/14 ********Project data transfered from 2012 FTIP.******** Version 11 - 01/09/2014 **************** Version 10 - 05/20/2013 **************** Version 9 - 01/24/2013 ********RTP Appendix # M-1/Page 1-2******** DFTIP Version 1 - 05/02/2012 **************** Version 7 - 04/30/2012 ********Updates based on 10/20/2011, 4:15 PM Caltrans 2010/11-2015/16 HBP Program List******** Version 6 - 11/02/2011 ********Updates based on 03/28/2011, 10:18 AM Caltrans 2008/9-2013/14 Highway Bridge Program List)******** Version 5 - 05/11/2011 **************** Version 4 - 12/15/2010 ********RTP Appendix # M-1/Page 1******** Version 3 - 07/08/2010 **************** Version 2 - 04/29/2010 **************** Version 1 - 05/15/2008 ********

Products of CTIPS Page 2 05/12/2017 04:44:47

Page 9: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Local Highway SystemDIST:10

 PPNO: 

EA: 

CTIPS ID:214-0000-0594

CT PROJECT ID: 

MPO ID.:STANCOG

COUNTY:Stanislaus County  

ROUTE:   

PM:                     

TITLE (DESCRIPTION):Grouped Projects for Intersection Signalization (GroupedProjects for Intersection Signalization projects consistentwith 40 CFR Part 93.126 Exempt Table 3 category(Using Toll Credits))

MPO Aprv:  05/12/2017

State Aprv:  

Federal Aprv:  

 

EPA TABLE II or III EXEMPT CATEGORY

Intersection signalization projects.

  IMPLEMENTING AGENCY:  Various Agencies  PROJECT MANAGER:  DEBBIE TRUJILLO PHONE: (209)       525-4639 EMAIL: [email protected]

PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)

Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE

24 Official 05/12/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 3 31,356,670

23 Official 02/06/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 1 31,356,670

22 Official 09/21/2016 MTUCKER Adoption - Carry Over 31,356,670

21 Official 07/28/2016 MTUCKER Amendment - Cost/Scope/Sch. Change 12

20 Official 03/29/2016 JFABELA Amendment - Cost/Scope/Sch. Change 9 31,356,670

19 Official 05/27/2015 JFABELA Amendment - Cost/Scope/Sch. Change 7 31,356,670

18 Official 05/20/2015 JFABELA Amendment - Cost/Scope/Sch. Change 5 31,428,220

17 Official 04/29/2015 JFABELA Amendment - Cost/Scope/Sch. Change 4 31,252,450

16 Official 01/21/2015 JFABELA Amendment - Cost/Scope/Sch. Change 2 31,208,428

 * CMAQ -   * Fund Source 1 of 4 * Fund Type: Congestion Mitigation * Funding Agency: Federal Highway Administration(FHWA)

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 12,750,730 2,087,385 2,818,158   909,090       18,565,363

Total: 12,750,730 2,087,385 2,818,158   909,090       18,565,363

 

* Local Funds -   * Fund Source 2 of 4 * Fund Type: City Funds * Funding Agency: Various Agencies

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 8,758,315 214,250 3,340,472           12,313,037

Total: 8,758,315 214,250 3,340,472           12,313,037

 

* CT Minor Pgm. -   * Fund Source 3 of 4 * Fund Type: SHOPP Advance Construction (AC) * Funding Agency: Caltrans

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 250,000               250,000

Total: 250,000               250,000

 * RSTP -   * Fund Source 4 of 4 * Fund Type: STP Local * Funding Agency: Federal Highway Administration(FHWA)

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 157,500 70,770             228,270

Total: 157,500 70,770             228,270

 

Project Total:   PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 21,916,545 2,372,405 6,158,630   909,090       31,356,670

Total: 21,916,545 2,372,405 6,158,630   909,090       31,356,670

 

Products of CTIPS Page 1 05/12/2017 04:46:12

Page 10: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Local Highway SystemComments:******** Version 24 - 05/12/2017 **************** Version 23 - 02/03/2017 **************** Version 1 - 06/09/16 ********Project data transfered from 2014 FTIP.******** Version 20 - 03/21/2016 **************** Version 19 - 05/26/2015 **************** Version 18 - 05/19/2015 **************** Version 17 - 04/23/2015 **************** Version 16 - 12/19/2014 ********RTP# C03 - SC38Back-up List: 2015 FTIP Appendix D******** Version 1 - 03/12/14 ********Project data transfered from 2012 FTIP.******** Version 14 - 02/28/2014 **************** Version 13 - 06/18/2013 **************** Version 12 - 01/04/2013 ********RTP Appendix # M-1/Page 1-9******** DFTIP Version 1 - 05/02/2012 **************** Version 8 - 04/30/2012 **************** Version 7 - 04/04/2012 ********Toll Credity FFY 11/12 $3,441 City of Turlock******** Version 6 - 11/21/2011 ********Toll Credits FFY 11/12 $30,970 City of Oakdale******** Version 5 - 09/26/2011 ********100% CMAQ funding per energy act provisions will be used, relieving local agency of match requirement: FFY10/11 City of Modesto "New Traffic Signal 2013" ($90,000)******** Version 4 - 07/21/2011 **************** Version 3 - 03/25/2011 **********An additional $250,000 is being applied from State Minor B funds to the City of Waterford "Western Ave & SR 132" Project******** Version 2 - 03/10/2011 **************** Version 1 - 12/20/2010 ********RTP, Appendix M-1

Products of CTIPS Page 2 05/12/2017 04:46:12

Page 11: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Local Highway SystemDIST:10

 PPNO: 

EA: 

CTIPS ID:214-0000-0565

CT PROJECT ID: 

MPO ID.:VA01

COUNTY:Stanislaus County  

ROUTE:   

PM:                     

TITLE (DESCRIPTION):Grouped Projects for Intersection Channelization(Grouped Projects for Intersection Channelization:Projects are consistent with 40 CFR Part 93.126 ExemptTable 3 Categories - Intersection ChannelizationProjects. (Using Toll Credits))

MPO Aprv:  05/12/2017

State Aprv:  

Federal Aprv:  

 

EPA TABLE II or III EXEMPT CATEGORY

Non signalization traffic control and operatng.

  IMPLEMENTING AGENCY:  Various Agencies  PROJECT MANAGER:  DEBBIE TRUJILLO PHONE: (209)       525-4639 EMAIL: [email protected]

PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)

Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE

25 Official 05/12/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 3 14,860,497

24 Official 02/06/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 1 12,445,020

23 Official 09/21/2016 MTUCKER Adoption - Carry Over 12,662,020

22 Official 07/28/2016 MTUCKER Amendment - Cost/Scope/Sch. Change 12

21 Official 05/24/2016 JFABELA Amendment - Cost/Scope/Sch. Change 11 12,662,020

20 Official 03/29/2016 JFABELA Amendment - Cost/Scope/Sch. Change 9 11,207,119

19 Official 05/27/2015 JFABELA Amendment - Cost/Scope/Sch. Change 7 11,452,549

18 Official 05/20/2015 JFABELA Amendment - Cost/Scope/Sch. Change 5 15,836,539

17 Official 04/29/2015 JFABELA Amendment - Cost/Scope/Sch. Change 4 15,271,054

 * CMAQ -   * Fund Source 1 of 3 * Fund Type: Congestion Mitigation * Funding Agency: Federal Highway Administration(FHWA)

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 6,042,226 1,071,281 1,030,852           8,144,359

Total: 6,042,226 1,071,281 1,030,852           8,144,359

 

* Local Funds -   * Fund Source 2 of 3 * Fund Type: City Funds * Funding Agency: Various Agencies

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 1,487,153 454,516 630,028   3,005,590       5,577,287

Total: 1,487,153 454,516 630,028   3,005,590       5,577,287

 * RSTP -   * Fund Source 3 of 3 * Fund Type: STP Local * Funding Agency: Federal Highway Administration(FHWA)

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 190,000 584,860     363,991       1,138,851

Total: 190,000 584,860     363,991       1,138,851

 

Project Total:   PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 7,719,379 2,110,657 1,660,880   3,369,581       14,860,497

Total: 7,719,379 2,110,657 1,660,880   3,369,581       14,860,497

 

Products of CTIPS Page 1 05/12/2017 04:47:03

Page 12: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Local Highway SystemComments:******** Version 25 - 05/12/2017 **************** Version 24 - 02/03/2017 **************** Version 1 - 06/09/16 ********Project data transfered from 2014 FTIP.******** Version 21 - 05/23/2016 **************** Version 20 - 03/21/2016 **************** Version 19 - 05/20/2015 **************** Version 18 - 05/14/2015 **************** Version 17 - 04/22/2015 **************** Version 16 - 12/19/2014 ********RTP# RE02 - SC32Back-up List : 2015 FTIP Appendix D******** Version 1 - 03/12/14 ********Project data transfered from 2012 FTIP.******** Version 13 - 02/28/2014 **************** Version 12 - 01/04/2013 ********RTP Appendix # M-1/Page 1-9******** DFTIP Version 1 - 05/02/2012 **************** Version 9 - 04/30/2012 **************** Version 8 - 04/04/2012 ********Toll Credits FFY 11/12 $9,176 City of Turlock******** Version 7 - 11/21/2011 ********Toll Credits FFY 11/12 $43,586 City of Modesto******** Version 6 - 09/26/2011 **************** Version 5 - 07/20/2011 **************** Version 4 - 05/11/2011 ********Toll Credits in FFY 10/11 CON $574 for City of Oakdale "G Street & Maag Ave"

Toll Credits in FFY 10/11 PE $6,882 for "SB Prescott at Plaza"

Toll Credits in FFY 10/11 PE $14,337 for "SB McHenry/Briggsmore Prescott at Plaza"

Toll Credits in FFY 11/12 CON $30,396 for City of Oakdale "G Street & Maag Ave"******** Version 3 - 03/25/2011 ********

******** Version 2 - 03/10/2011 **************** Version 1 - 07/26/2010 ********RTP Appendix # M-1/Page 3-8

Products of CTIPS Page 2 05/12/2017 04:47:03

Page 13: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Local Highway SystemDIST:10

 PPNO: 

EA: 

CTIPS ID:214-0000-0566

CT PROJECT ID: 

MPO ID.:VA02

COUNTY:Stanislaus County  

ROUTE:   

PM:                     

TITLE (DESCRIPTION):Grouped Projects for Pavement Resurfacing/Rehab(Grouped Projects for pavement resurfacing and/orrehabilitation: Projects are consistent with 40 CFR Part93.126 Exempt Tables 2 and Table 3 Categories -Pavement resurfacing and/or rehabilitation (Using TollCredits))

MPO Aprv:  05/12/2017

State Aprv:  

Federal Aprv:  

 

EPA TABLE II or III EXEMPT CATEGORY

Pavement resurfacing and/or rehabilitation.

  IMPLEMENTING AGENCY:  Various Agencies  PROJECT MANAGER:  DEBBIE TRUJILLO PHONE: (209)       525-4639 EMAIL: [email protected]

PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)

Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE

27 Official 05/12/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 3 59,487,010

26 Official 02/06/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 1 60,150,120

25 Official 09/21/2016 MTUCKER Adoption - Carry Over 48,122,581

24 Official 05/24/2016 JFABELA Amendment - Cost/Scope/Sch. Change 11

23 Official 03/29/2016 JFABELA Amendment - Cost/Scope/Sch. Change 9 48,190,071

22 Official 05/27/2015 JFABELA Amendment - Cost/Scope/Sch. Change 7 46,620,598

21 Official 05/20/2015 JFABELA Amendment - Cost/Scope/Sch. Change 5 46,920,598

20 Official 04/29/2015 JFABELA Amendment - Cost/Scope/Sch. Change 4 49,337,793

19 Official 01/21/2015 JFABELA Amendment - Cost/Scope/Sch. Change 2 45,418,358

 * RSTP -   * Fund Source 1 of 2 * Fund Type: STP Local * Funding Agency: Federal Highway Administration(FHWA)

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 32,092,575 3,404,906 5,241,275 6,533,747 6,485,335       53,757,838

Total: 32,092,575 3,404,906 5,241,275 6,533,747 6,485,335       53,757,838

 

* Local Funds -   * Fund Source 2 of 2 * Fund Type: City Funds * Funding Agency: Various Agencies

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 2,038,664 242,631 286,874 145,839 3,015,164       5,729,172

Total: 2,038,664 242,631 286,874 145,839 3,015,164       5,729,172

 

Project Total:   PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 34,131,239 3,647,537 5,528,149 6,679,586 9,500,499       59,487,010

Total: 34,131,239 3,647,537 5,528,149 6,679,586 9,500,499       59,487,010

 Comments:******** Version 27 - 05/12/2017 **************** Version 26 - 02/03/2017 **************** Version 1 - 06/09/16 ********Project data transfered from 2014 FTIP.******** Version 24 - 05/23/2016 **************** Version 23 - 03/22/2016 **************** Version 22 - 05/26/2015 **************** Version 21 - 05/19/2015 **************** Version 20 - 04/23/2015 **************** Version 19 - 12/19/2014 ********RTP# RE01 - SC32Back-up List: 2015 FTIP Appendix F******** Version 1 - 03/12/14 ********Project data transfered from 2012 FTIP.******** Version 15 - 03/03/2014 **************** Version 14 - 10/17/2013 **************** Version 13 - 05/20/2013 **************** Version 12 - 01/07/2013 ********RTP Appendix # M-1/Page 1-9******** DFTIP Version 1 - 05/02/2012 **************** Version 7 - 04/30/2012 ********Toll Credits in FFY 11/12 Stanislaus County******** Version 6 - 04/03/2012 ********Toll Credits FFY 11/12 $21,554 for City of Riverbank & $64,825 for StanCOG******** Version 5 - 11/21/2011 ********Toll Credits FFY 11/12 $63,085 - for 2 City of Modesto projects******** Version 4 - 09/26/2011 **************** Version 3 - 08/12/2011 ********

Products of CTIPS Page 1 05/12/2017 04:47:49

Page 14: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

******** Version 2 - 03/29/2011 **************** Version 1 - 07/27/2010 ********RTP Appendix # M-1/Page 3-8

Products of CTIPS Page 2 05/12/2017 04:47:49

Page 15: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Transit SystemDIST:10

 PPNO: 

EA: 

CTIPS ID:214-0000-0254

CT PROJECT ID: 

MPO ID.:04STA048C

COUNTY:Stanislaus County  

ROUTE:   

PM:                     

TITLE (DESCRIPTION):Transit Fare Subsidy Program (Transit Fare SubsidyProgram (TFS) StaRT/MAX Employee Ride Program)

MPO Aprv:  05/12/2017

State Aprv:  

Federal Aprv:  

 

EPA TABLE II or III EXEMPT CATEGORY

Non construction related activities.

  IMPLEMENTING AGENCY:  Stanislaus County  PROJECT MANAGER:  JUAN PORTILLO PHONE: (209)       525-7504 EMAIL: [email protected]

PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)

Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE

10 Official 05/12/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 3 698,000 95,000

9 Official 09/21/2016 MTUCKER Adoption - Carry Over 698,000 95,000

8 Official 06/18/2014 JFABELA Adoption - Carry Over 515,187 95,243

7 Official 07/25/2012 MPOBAGDE Adoption - Carry Over 95,243 95,243

6 Official 07/21/2010 DNGUYEN2 Adoption - Carry Over 349,636 95,243

5 Official 08/19/2009 SPHILIPS Amendment - Cost/Scope/Sch. Change 9 199,475 95,243

4 Official 04/17/2009 SPHILIPS Amendment - New Project 5 95,243

3 Official 07/12/2006 BABANATH Adoption - Carry Over 62,400

2 Official 08/11/2004 BABANATH Adoption - Carry Over 62,400

 

* CMAQ -   * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency: Stanislaus Council of Governments

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE 95,000               95,000

RW                  

CON 456,000 78,792 83,218           618,010

Total: 551,000 78,792 83,218           713,010

 

* Local Funds -   * Fund Source 2 of 2 * Fund Type: Local Transportation Funds * Funding Agency: Stanislaus County

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 59,000 10,208 10,782           79,990

Total: 59,000 10,208 10,782           79,990

 

Project Total:   PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE 95,000               95,000

RW                  

CON 515,000 89,000 94,000           698,000

Total: 610,000 89,000 94,000           793,000

 Comments:******** Version 10 - 05/09/2017 **************** Version 1 - 04/11/16 ********Project data transfered from 2014 FTIP.RTP # SC86******** Version 1 - 03/12/14 ********Project data transfered from 2012 FTIP.RTP Appendix # M-2/Page 1******** Version 1 - 05/01/12 ********Project data transfered from 2010 FTIP.******** Version 6 - 05/12/2010 **************** Version 5 - 06/14/2009 **************** Version 4 - 02/23/2009 **************** Version 3 - 05/27/2006 **************** Version 2 - 06/30/2004 **************** Version 1 - 06/30/2004 ********

Products of CTIPS Page 1 05/12/2017 04:48:44

Page 16: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Local Highway SystemDIST:10

 PPNO: 

EA: 

CTIPS ID:214-0000-0510

CT PROJECT ID: 

MPO ID.:08STA104

COUNTY:Stanislaus County  

ROUTE:   

PM:                     

TITLE (DESCRIPTION):Rideshare Program, City of Modesto (RideshareProgram, City of Modesto (Toll Credits))

MPO Aprv:  05/12/2017

State Aprv:  

Federal Aprv:  

 

EPA TABLE II or III EXEMPT CATEGORY

Ride-sharing and van-pooling program.

  IMPLEMENTING AGENCY:  Modesto, City of  PROJECT MANAGER:  MEGAN DISTASO PHONE: (209)       571-5193 EMAIL: [email protected]

PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)

Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE

7 Official 05/12/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 3 479,000

6 Official 09/21/2016 MTUCKER Adoption - Carry Over 479,000

5 Official 06/18/2014 JFABELA Adoption - Carry Over 325,000

4 Official 07/25/2012 MPOBAGDE Adoption - Carry Over

3 Official 05/04/2011 JFABELA Amendment - Cost/Scope/Sch. Change 9 65,000

2 Official 11/17/2010 JFABELA Amendment - 2 130,000

1 Official 05/19/2010 JFABELA Amendment - New Project 21 130,000

 * CMAQ -   * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency: Federal Highway Administration(FHWA)

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 304,000 73,000 81,000           458,000

Total: 304,000 73,000 81,000           458,000

 

* Local Funds -   * Fund Source 2 of 2 * Fund Type: City Funds * Funding Agency: Modesto, City of

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 21,000               21,000

Total: 21,000               21,000

 

Project Total:   PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 325,000 73,000 81,000           479,000

Total: 325,000 73,000 81,000           479,000

 Comments:******** Version 7 - 04/05/2017 **************** Version 1 - 04/11/16 ********Project data transfered from 2014 FTIP.RTP# M34******** Version 1 - 03/12/14 ********Project data transfered from 2012 FTIP.RTP Appendix # M-2/Page 2Using Toll Credits******** Version 1 - 05/01/12 ********Project data transfered from 2010 FTIP.******** Version 3 - 03/24/2011 **************** Version 2 - 07/22/2010 ********100% CMAQ ($7,455 Local Match - FFY 09/10 CON)******** Version 1 - 04/15/2010 ********

Products of CTIPS Page 1 05/12/2017 04:49:28

Page 17: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Stanislaus Council of Governments - Federal Transportation Improvement Program(Dollars in Whole)

Transit SystemDIST:10

 PPNO: 

EA: 

CTIPS ID:214-0000-0479

CT PROJECT ID: 

MPO ID.:ST07

COUNTY:Stanislaus County  

ROUTE:   

PM:                     

TITLE (DESCRIPTION):Regional Rideshare (Regional Rideshare Program)

MPO Aprv:  05/12/2017

State Aprv:  

Federal Aprv:  

 

EPA TABLE II or III EXEMPT CATEGORY

Ride-sharing and van-pooling program.

  IMPLEMENTING AGENCY:  Stanislaus Council of Governments  PROJECT MANAGER:  DEBBIE TRUJILLO PHONE: (209)       525-4639 EMAIL: [email protected]

PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)

Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE

12 Official 05/12/2017 DTRUJILL Amendment - Cost/Scope/Sch. Change 3 1,876,000

11 Official 09/21/2016 MTUCKER Adoption - Carry Over 1,876,000

10 Official 05/27/2015 JFABELA Amendment - Cost/Scope/Sch. Change 7 1,875,000

9 Official 04/29/2015 JFABELA Amendment - Cost/Scope/Sch. Change 4

8 Official 03/02/2015 JFABELA Amendment - Cost/Scope/Sch. Change 3 1,875,000

7 Official 06/18/2014 JFABELA Adoption - Carry Over 1,460,000

6 Official 07/25/2012 MPOBAGDE Adoption - Carry Over 1,460,000

5 Official 07/21/2010 DNGUYEN2 Adoption - Carry Over 1,065,000

4 Official 01/20/2010 SPHILIPS Amendment - 8 690,195

 

* CMAQ -   * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency: Stanislaus Council of Governments

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 1,312,000 182,372 185,913           1,680,285

Total: 1,312,000 182,372 185,913           1,680,285

 

* Local Funds -   * Fund Source 2 of 2 * Fund Type: Local Transportation Funds * Funding Agency:  

  PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 148,000 23,628 24,087           195,715

Total: 148,000 23,628 24,087           195,715

 

Project Total:   PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND TOTAL

PE                  

RW                  

CON 1,460,000 206,000 210,000           1,876,000

Total: 1,460,000 206,000 210,000           1,876,000

 Comments:******** Version 12 - 05/09/2017 **************** Version 1 - 04/11/16 ********Project data transfered from 2014 FTIP.******** Version 10 - 05/26/2015 ********-Removed Federal some CMAQ Funds & added Local Funds to meet the 11.47% local match requirement for this program.

******** Version 9 - 04/20/2015 **************** Version 8 - 02/19/2015 ********RTP# RE11******** Version 1 - 03/12/14 ********Project data transfered from 2012 FTIP.RTP Appendix M-2/Page 1******** Version 1 - 05/01/12 ********Project data transfered from 2010 FTIP.RTP Appendix # M-1/Page 8******** Version 5 - 04/19/2010 **************** Version 4 - 10/13/2009 **************** Version 3 - 06/11/2009 **************** Version 2 - 04/22/2009 ********RTP pg 81******** Version 1 - 12/14/2008 ********

Products of CTIPS Page 1 05/12/2017 04:50:12

Page 18: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Attachment 3

Highway Bridge Program (HBP) Backup Listing:

http://www.stancog.org/pdf/ftip-amendments/2017/hbp.pdf

Page 19: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

Note id: 24

1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most currentlistings:

http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html

2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of thefederal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies for funding.

3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details seeChapter 3 of the Local Assistance Procedures Manual.

4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans.

5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed byCaltrans.

6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is theresponsibility of the MPOs and their local agencies.

7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP forbridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STPfunds with Regional STP funds.

8) Corrections to this report should be addressed to the District Local Assistance Engineer:

http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm

Notes:

3/29/2017, 5:28 PM

Caltrans, Division of Local Assistance Page 13/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 20: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Patterson BRIDGE NO. 38C0214, ROGERS ROAD OVER DELTA-MENDOTA CANAL, 0.5 MI N/O SPERRY AVE. Rehabilitate existing 2-lane bridge;Widen to standard 2-lane width.

Fund Source Summary:

PER/W

Total

CON

Total

4,246,200

100,000 450,000 550,000

100,000 100,000

100,000 450,000 100,000 4,896,2004,246,2004,246,200

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 398,385 88,530 4,334,606

11,470 51,615 11,470 561,594

100,000 450,000 100,000 4,896,200

3,759,161

487,039

4,246,200

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4097

5244(032)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 398,385 486,915

11,470 51,615 63,085

100,000 450,000 550,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,759,161

487,039

4,246,200

3,759,161

487,039

4,246,200

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 23/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 21: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0003, SANTA FE AVENUE OVER TUOLUMNE RIVER, 1.0 MI S OF S.H. 132. Replacement with combination of LSSRPSeismic Retrofit funds.. No adding lane capacity.

Fund Source Summary:

PER/W

Total 820,000

CON

Total

11,400,000 11,400,000

312,531 400,000 1,532,531

150,000 150,000

462,531 400,000 11,400,000 13,082,531

820,000

Phase Summary:

Fed $

Local AC

Local Match

Total

94,054

820,000

LSSRP Bond

Total

463,732 463,732

409,479 354,120 10,092,420 11,581,965

53,052 45,880 843,848 1,036,834

462,531 400,000 11,400,000 13,082,531

725,946

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

2271

5938(080)5938(188)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

94,054

820,000

LSSRP Bond

Total276,684 354,120 1,356,750

35,847 45,880 175,781

312,531 400,000 1,532,531

725,946

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total132,795 132,795

17,205 17,205

150,000 150,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

463,732 463,732

10,092,420 10,092,420

843,848 843,848

11,400,000 11,400,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 33/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 22: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0004A, HICKMAN ROAD OVER TUOLUMNE RIVER, 0.15 MI S STATE ROUTE 132. Replace existing 2-lane bridge with astandard 2-lane bridge. (LSSRP contribution)

Fund Source Summary:

PER/W

Total 1,840,000

CON

Total

21,000,000

1,840,000

370,000 370,000

370,000 23,210,000

1,840,000

21,000,00021,000,000

Phase Summary:

Fed $

Local AC

Local Match

Total

211,048

1,840,000

LSSRP Bond

Total

-0 582,103

327,561 20,547,813

42,439 2,080,085

370,000 23,210,000

1,628,952

582,103

18,591,300

1,826,598

21,000,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Change!2272

5938(199)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

211,048

1,840,000

LSSRP Bond

Total1,628,952

211,048

1,840,000

1,628,952

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total327,561 327,561

42,439 42,439

370,000 370,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

-0 582,103

18,591,300

1,826,598

21,000,000

582,103

18,591,300

1,826,598

21,000,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 43/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 23: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0009, CRABTREE ROAD OVER DRY CREEK, 1.8 MI. S/O WARNERVILLE RD. Replace 2-lane bridge with a standard 2-lane bridge. 9/14/2010: Toll Credits programmed for PE & CON. 10/1/2015: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total 795,000

CON

Total

4,452,000

795,000

75,000 75,000

75,000 5,322,000

795,000

4,452,0004,452,000

Phase Summary:

Fed $

Local AC

Local Match

Total 795,000

LSSRP Bond

Total75,000 5,322,000

75,000 5,322,000

795,000 4,452,000

4,452,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3610

5938(227)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 795,000

LSSRP Bond

Total795,000

795,000

795,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total75,000 75,000

75,000 75,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,452,000

4,452,000

4,452,000

4,452,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 53/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 24: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0010, CROWS LANDING ROAD OVER SAN JOAQUIN RIVER, NEAR W. CARPENTER RD. Bridge replacement with limtedLSSRP Seismic Retrofit funds

Fund Source Summary:

PER/W

Total

150,000

1,758,000

CON

Total

17,200,400 17,200,400

625,000 2,233,000

500,000 650,000

1,125,000 17,200,400 20,083,400

1,608,000

Phase Summary:

Fed $

Local AC

Local Match

Total

201,643

1,758,000

LSSRP Bond

Total

573,500 573,500

995,963 15,227,514 17,779,834

129,038 1,399,386 1,730,066

1,125,000 17,200,400 20,083,400

1,556,357

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Change!2273

5938(071)5938(076)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

184,438

1,608,000

LSSRP Bond

Total553,313 1,976,875

71,688 256,125

625,000 2,233,000

1,423,562

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

17,205

150,000

LSSRP Bond

Total442,650 575,445

57,350 74,555

500,000 650,000

132,795

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

573,500 573,500

15,227,514 15,227,514

1,399,386 1,399,386

17,200,400 17,200,400

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 63/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 25: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0033, LAS PALMAS AVENUE OVER SAN JOAQUIN RIVER, 3 MI N/E STATE ROUTE 33. Preventive Maintenance project.

Fund Source Summary:

PER/W

Total 100,000

CON

Total

16,710,400

2,984,000

19,694,400

100,000

16,710,400

2,884,000

19,594,400

Phase Summary:

Fed $

Local AC

Local Match

Total

11,470

100,000

LSSRP Bond

Total17,435,452

2,258,948

19,694,400

88,530 17,346,922

2,247,478

19,594,400

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3883

5938(200)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

11,470

100,000

LSSRP Bond

Total2,641,735

342,265

2,984,000

88,530 2,553,205

330,795

2,884,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total14,793,717

1,916,683

16,710,400

14,793,717

1,916,683

16,710,400

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 73/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 26: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0048, GEER ROAD OVER TUOLUMNE RIVER, 1.3 MI S STATE ROUTE 132. LSSRP Seismic Retrofit.

Fund Source Summary:

PER/W

Total 301,000

CON

Total

1,615,036 1,615,036

301,000

1,615,036 1,916,036

301,000

Phase Summary:

Fed $

Local AC

Local Match

Total

34,525

301,000

LSSRP Bond

Total

185,245 185,245

1,429,791 1,696,267

34,525

1,615,036 1,916,036

266,475

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

2278

5938(071)5938(106)5938(154)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

34,525

301,000

LSSRP Bond

Total266,475

34,525

301,000

266,475

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

185,245 185,245

1,429,791 1,429,791

1,615,036 1,615,036

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 83/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 27: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0073, TIM BELL ROAD OVER DRY CREEK, 0.8 MI. S/O CLARIBEL ROAD. Replace historic 2-lane bridge with a standard2-lane bridge. 9/14/2010: Toll Credits programmed for PE & CON. 1/27/2016: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total 575,000

CON

Total

9,857,951

947,000 368,000 1,890,000

110,000 110,000

947,000 368,000 110,000 11,857,951

575,000

9,857,9519,857,951

Phase Summary:

Fed $

Local AC

Local Match

Total 575,000

LSSRP Bond

Total947,000 368,000 110,000 11,857,951

947,000 368,000 110,000 11,857,951

575,000 9,857,951

9,857,951

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3628

5938(189)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 575,000

LSSRP Bond

Total947,000 368,000 1,890,000

947,000 368,000 1,890,000

575,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total110,000 110,000

110,000 110,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total9,857,951

9,857,951

9,857,951

9,857,951

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 93/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 28: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0078, OAKDALE-WATERFORD OVER CLARIBEL LATERAL, 0.5 MI N/O CLARIBEL RD. Replace existing 2-lane bridgewith a 2-lane bridge. 10/12/2016 10:40:13 AM.

Fund Source Summary:

PER/W

Total

CON

Total

1,509,200

269,500 269,500

150,000

269,500 1,928,7001,509,200

150,000

1,659,200

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total238,588 1,707,478

30,912 221,222

269,500 1,928,700

1,468,890

190,310

1,659,200

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4502

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total238,588 238,588

30,912 30,912

269,500 269,500

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total132,795

17,205

150,000

132,795

17,205

150,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,336,095

173,105

1,509,200

1,336,095

173,105

1,509,200

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 103/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 29: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0080, VALLEY HOME ROAD, OVER LONE TREE CREEK, 0.68 MI S/E LONE TREE RD. Bridge Rehabilitation. Widen2-lane bridge to standard lanes and shoulders. (Not capacity increasing) 10/10/16.

Fund Source Summary:

PER/W

Total

CON

Total

1,878,800

335,500 335,500

100,000

335,500 2,314,3001,878,800

100,000

1,978,800

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total297,018 2,048,850

38,482 265,450

335,500 2,314,300

1,751,832

226,968

1,978,800

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4493

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total297,018 297,018

38,482 38,482

335,500 335,500

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530

11,470

100,000

88,530

11,470

100,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,663,302

215,498

1,878,800

1,663,302

215,498

1,878,800

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 113/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 30: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0150, GILBERT ROAD OVER TURLOCK IRRIGATION DISTRICT (TID) CERES MAIN CANAL, S/O HATCH ROAD. Replace2-lane bridge with a new 2-lane bridge. 9/16/2010: Toll Credits programmed for PE & CON.

Fund Source Summary:

PER/W

Total 150,000

CON

Total

1,208,665

293,000 443,000

293,000 1,651,665

150,000

1,208,6651,208,665

Phase Summary:

Fed $

Local AC

Local Match

Total 150,000

LSSRP Bond

Total293,000 1,651,665

293,000 1,651,665

150,000 1,208,665

1,208,665

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3619

5938(190)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 150,000

LSSRP Bond

Total293,000 443,000

293,000 443,000

150,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,208,665

1,208,665

1,208,665

1,208,665

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 123/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 31: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0154, PLEASANT VALLEY ROAD OVER SOUTH SAN JOAQUIN MAIN CANAL, 0.3 MI. E/O VICTORY ROAD. Replace2-lane bridge with a standard 2-lane bridge. 9/20/2010: Toll Credits programmed for PE & CON.

Fund Source Summary:

PER/W

Total 270,000

CON

Total

1,512,000

343,000 613,000

343,000 2,125,000

270,000

1,512,0001,512,000

Phase Summary:

Fed $

Local AC

Local Match

Total 270,000

LSSRP Bond

Total343,000 2,125,000

343,000 2,125,000

270,000 1,512,000

1,512,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3652

5938(226)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 270,000

LSSRP Bond

Total343,000 613,000

343,000 613,000

270,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,512,000

1,512,000

1,512,000

1,512,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 133/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 32: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0157, MONTPELIER ROAD, OVER T.I.D. MAIN CANAL, AT DALLAS RD. Replace existing 2-lane bridge with 2-lane bridge.10/11/2016 3:33:50 PM.

Fund Source Summary:

PER/W

Total

CON

Total

2,179,800

389,250 389,250

100,000

389,250 2,669,0502,179,800

100,000

2,279,800

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total344,603 2,362,910

44,647 306,140

389,250 2,669,050

2,018,307

261,493

2,279,800

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4497

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total344,603 344,603

44,647 44,647

389,250 389,250

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530

11,470

100,000

88,530

11,470

100,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,929,777

250,023

2,179,800

1,929,777

250,023

2,179,800

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 143/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 33: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0168, KILBURN ROAD OVER ORESTIMBA CREEK, .45 MI S CROWS LANDING RD. Replace historic 2-lane bridge with astandard 2-lane bridge on improved alignment (No Added Lane Capacity). 4/1/2010: Toll Credits programmed for PE, R/W, & Con.

Fund Source Summary:

PER/W

Total 683,000

CON

Total

1,534,500 1,534,500

683,000

853,750 853,750

2,388,250 3,071,250

683,000

Phase Summary:

Fed $

Local AC

Local Match

Total 683,000

LSSRP Bond

Total2,388,250 3,071,250

2,388,250 3,071,250

683,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

359

5938(157)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 683,000

LSSRP Bond

Total683,000

683,000

683,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total853,750 853,750

853,750 853,750

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,534,500 1,534,500

1,534,500 1,534,500

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 153/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 34: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0170, COOPERSTOWN ROAD OVER GALLUP CREEK, 2.8 MI. NW/O LA GRANGE ROAD. Replace 2-lane bridge with astandard 2-lane bridge. 9/21/2010: Toll Credits programmed for PE & CON. 7/23/2013: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total 455,000

CON

Total

1,155,000

455,000

25,000 25,000

25,000 1,635,000

455,000

1,155,0001,155,000

Phase Summary:

Fed $

Local AC

Local Match

Total 455,000

LSSRP Bond

Total25,000 1,635,000

25,000 1,635,000

455,000 1,155,000

1,155,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3666

5938(191)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 455,000

LSSRP Bond

Total455,000

455,000

455,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total25,000 25,000

25,000 25,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,155,000

1,155,000

1,155,000

1,155,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 163/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 35: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0180, SHIELLS ROAD OVER CENTRAL CALIFORNIA IRRIGATION DISTRICT (CCID) MAIN CANAL, 0.42 MI. E/O EASTINROAD. Replace 2-lane bridge with a standard 2-lane bridge. 9/22/2010: Toll Credits programmed for PE & CON. 9/27/2016: Toll credits usedfor R/W.

Fund Source Summary:

PER/W

Total 225,000

CON

Total

1,260,000

215,000 440,000

40,000 40,000

215,000 40,000 1,740,000

225,000

1,260,0001,260,000

Phase Summary:

Fed $

Local AC

Local Match

Total 225,000

LSSRP Bond

Total215,000 40,000 1,740,000

215,000 40,000 1,740,000

225,000 1,260,000

1,260,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3675

5938(192)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 225,000

LSSRP Bond

Total215,000 440,000

215,000 440,000

225,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total40,000 40,000

40,000 40,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,260,000

1,260,000

1,260,000

1,260,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 173/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 36: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0199, MILTON ROAD, OVER ROCK CREEK TRIBUTARY BRIDGE. Replace existing 2-lane bridge with 2- lane new bridge(No added capacity).

Fund Source Summary:

PER/W

Total

CON

Total

1,624,000

290,000 290,000

75,000

290,000 1,989,0001,624,000

75,000

1,699,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total256,737 1,760,862

33,263 228,138

290,000 1,989,000

1,504,125

194,875

1,699,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4508

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total256,737 256,737

33,263 33,263

290,000 290,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total66,398

8,603

75,000

66,398

8,603

75,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,437,727

186,273

1,624,000

1,437,727

186,273

1,624,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 183/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 37: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0231, MILTON ROAD OVER ROCK CREEK TRIBUTARY, 3.7 MI. N/O SR 4. Replace 2-lane bridge with a standard 2-lanebridge.

Fund Source Summary:

PER/W

Total 675,000

CON

Total

3,780,000

675,000

75,000 75,000

75,000 4,530,000

675,000

3,780,0003,780,000

Phase Summary:

Fed $

Local AC

Local Match

Total

77,423

675,000

LSSRP Bond

Total66,398 4,010,409

8,603 519,591

75,000 4,530,000

597,578 3,346,434

433,566

3,780,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3872

5938(201)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

77,423

675,000

LSSRP Bond

Total597,578

77,423

675,000

597,578

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total66,398 66,398

8,603 8,603

75,000 75,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,346,434

433,566

3,780,000

3,346,434

433,566

3,780,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 193/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 38: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0232, MILTON ROAD, OVER HOODS CREEK, 1.6 MI S/O SR4. Replace existing 2- lane functionally obsolete bridge withstandard 2-lanes bridge. (non capacity increase).

Fund Source Summary:

PER/W

Total

CON

Total

3,088,400

551,500 551,500

75,000

551,500 3,714,9003,088,400

75,000

3,163,400

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total488,243 3,288,801

63,257 426,099

551,500 3,714,900

2,800,558

362,842

3,163,400

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4500

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total488,243 488,243

63,257 63,257

551,500 551,500

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total66,398

8,603

75,000

66,398

8,603

75,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,734,161

354,239

3,088,400

2,734,161

354,239

3,088,400

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 203/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 39: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0236, ST. FRANCIS AVENUE OVER MODESTO IRRIGATION DISTRICT (MID) MAIN CANAL, 0.1 MI. W/O McHENRYAVENUE. Replace 2-lane bridge with a standard 2-lane bridge. 9/22/2010: Toll Credits programmed for PE & CON. 9/17/2014: Toll creditsused for R/W.

Fund Source Summary:

PER/W

Total 200,000

CON

Total

1,120,000

160,000 360,000

25,000 25,000

160,000 25,000 1,505,000

200,000

1,120,0001,120,000

Phase Summary:

Fed $

Local AC

Local Match

Total 200,000

LSSRP Bond

Total160,000 25,000 1,505,000

160,000 25,000 1,505,000

200,000 1,120,000

1,120,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3677

5938(193)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 200,000

LSSRP Bond

Total160,000 360,000

160,000 360,000

200,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total25,000 25,000

25,000 25,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,120,000

1,120,000

1,120,000

1,120,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 213/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 40: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0257, COOPERSTOWN ROAD OVER RYDBERG CREEK, 3.9 MI. NW/O LA GRANGE ROAD. Replace 2-lane bridge with astandard 2-lane bridge. 9/28/2010: Toll Credits programmed for PE & CON. 7/23/2013: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total 450,000

CON

Total

1,463,000

450,000

75,000 75,000

75,000 1,988,000

450,000

1,463,0001,463,000

Phase Summary:

Fed $

Local AC

Local Match

Total 450,000

LSSRP Bond

Total75,000 1,988,000

75,000 1,988,000

450,000 1,463,000

1,463,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3682

5938(194)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 450,000

LSSRP Bond

Total450,000

450,000

450,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total75,000 75,000

75,000 75,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,463,000

1,463,000

1,463,000

1,463,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 223/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 41: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0262, PIONEER AVENUE, OVER LONE TREE CREEK, 100FT S/O FREELOVE ROAD. Replace existing 2-lane functionallyobsolete bridge with standard 2-lane bridge (non capacity increase). 10/12/2016: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total

CON

Total

1,379,000

246,250 246,250

100,000

246,250 1,725,2501,379,000

100,000

1,479,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total246,250 1,725,250

246,250 1,725,250

1,479,000

1,479,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4504

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total246,250 246,250

246,250 246,250

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total100,000

100,000

100,000

100,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,379,000

1,379,000

1,379,000

1,379,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 233/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 42: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0268, LAKE ROAD, OVER T.I.D. MAIN CANAL, 1.5 MI E/O HAWKINS RD. Replace existing 2-lane functionally obsoletebridge with standard 2-lane new bridge (non capacity increase).

Fund Source Summary:

PER/W

Total

CON

Total

3,495,800

624,250 624,250

175,000

624,250 4,295,0503,495,800

175,000

3,670,800

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total552,649 3,802,408

71,601 492,642

624,250 4,295,050

3,249,759

421,041

3,670,800

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4505

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total552,649 552,649

71,601 71,601

624,250 624,250

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total154,928

20,073

175,000

154,928

20,073

175,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,094,832

400,968

3,495,800

3,094,832

400,968

3,495,800

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 243/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 43: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0272, SONORA ROAD OVER MARTELLS CREEK, 0.1 MI E/O FRANKENHEIMER RD. SCOUR COUNTERMEASURE.3/11/2011: Toll Credits programmed for PE & CON.

Fund Source Summary:

PER/W

Total 17,969

CON

Total

100,625

13,000 30,969

13,000 131,594

17,969

100,625100,625

Phase Summary:

Fed $

Local AC

Local Match

Total 17,969

LSSRP Bond

Total13,000 131,594

13,000 131,594

17,969 100,625

100,625

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3805

5938(203)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 17,969

LSSRP Bond

Total13,000 30,969

13,000 30,969

17,969

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total100,625

100,625

100,625

100,625

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 253/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 44: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 38C0302, TEGNER ROAD OVER TURLOCK IRRIGATION DISTRICT (TID) LATERAL #5, AT JCT W/ HARDING ROAD. Replace 2-lane bridge with a standard 2-lane bridge. 9/23/2010: Toll Credits programmed for PE & CON. 9/17/2013: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total 87,500

CON

Total

1,260,457

208,153 84,347 380,000

50,000 50,000

208,153 134,347 1,690,457

87,500

1,260,4571,260,457

Phase Summary:

Fed $

Local AC

Local Match

Total 87,500

LSSRP Bond

Total208,153 134,347 1,690,457

208,153 134,347 1,690,457

87,500 1,260,457

1,260,457

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3687

5938(196)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 87,500

LSSRP Bond

Total208,153 84,347 380,000

208,153 84,347 380,000

87,500

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total50,000 50,000

50,000 50,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,260,457

1,260,457

1,260,457

1,260,457

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 263/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 45: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Stanislaus County BRIDGE NO. 39C0001, RIVER ROAD OVER SAN JOAQUIN RIVER, STANISLAUS COUNTY LINE. LSSRP Seismic Retrofit

Fund Source Summary:

PER/W

Total 964,400

CON

Total

8,465,342

731,600 1,696,000

15,600 15,600

731,600 15,600 10,176,942

964,400

8,465,3428,465,342

Phase Summary:

Fed $

Local AC

Local Match

Total

110,617

964,400

LSSRP Bond

Total

970,975

647,685 13,811 9,009,647

83,915 1,789 196,321

731,600 15,600 10,176,942

853,783

970,975

7,494,367

8,465,342

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

2282

5938(037)5938(176)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

110,617

964,400

LSSRP Bond

Total647,685 1,501,469

83,915 194,531

731,600 1,696,000

853,783

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total13,811 13,811

1,789 1,789

15,600 15,600

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

970,975

7,494,367

8,465,342

970,975

7,494,367

8,465,342

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 273/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 46: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

10 Stanislaus

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Number of Projects:

MPO Summary:

Fed $

Local AC

Local Match

Total for all Phases

740,778

10,366,869

LSSRP Bond

Total

-0 185,245 463,732 573,500 2,775,554

3,041,486 2,490,658 1,170,309 10,460,420 20,821,151 135,810,468

148,437 97,495 129,038 843,848 1,745,849 10,357,654

3,375,167 2,588,153 1,299,347 11,768,000 23,140,500 148,943,676

9,626,091

1,553,077

88,200,353

6,652,210

96,405,640

Totals:

Stanislaus Area Association Of Governments

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

26

Caltrans, Division of Local Assistance Page 283/29/2017, 5:28 PM Det2 FL4 SmlTxt brf

Page 47: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Attachment 4

Surface Transportation Block Grant Program (STBGP) Backup Listing:

http://www.stancog.org/pdf/ftip-amendments/2017/rstp-bk-up-

list-2017-ftip.pdf

Page 48: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Agency Project Description Project Location STBGPFederal Funds Local Funds Total Project Cost

Ceres Overlay Blaker Road from Service Road to Hackett Road 70,000$ 9,069$ 79,069$

Ceres OverlayMitchell Road Overlay Phase IV- Roeding Rd. to Service Rd. 551,618$ 78,245$ 629,863$

Hughson Pavement Rehabilitation Whitmore Avenue- Tully to Charles Street 200,000$ 25,912$ 225,912$

Modesto Pavement Rehabilitation

La Loma Ave. from James St. to Rowland Ave., Miller Ave. from El Vista Ave. to N. Riverside Dr.,Burney St. from 18th St. to Jennie St., 17th ST. from G St. to Burney St.,J St. from 9th St. to 17th St. 1,584,493$ Toll Credits 1,584,493$

Oakdale Pavement RehabilitationC Street Pavement Rehab Phase 2- from Yosemite to 1st St 237,526$ 30,774$ 268,300$

Turlock Rehabilitation E. Monte Vista Ave., from Geer Rd. to eastern city limits 761,269$ 98,631$ 859,900$

Totals 3,404,906$ 242,631$ 3,647,537$

Pavement Resurfacing and/or RehabilitationGrouped Projects

FFY 2016/17

Updated Per 2017 FTIP Administrative Modificaiton No. 3

Page 49: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Agency Project Description Project Location STBGPFederal Funds Local Funds Total Project Cost

Ceres Overlay Service Road from Blaker Road to Morgan Road 536,241$ 69,475$ 605,716$

Ceres OverlayService Road Overlay Phase II- Central Ave. to Blaker Rd. 458,305$ 59,379$ 517,684$

Modesto Pavement Rehabilitation Pelandale Ave. from Sisk Rd. to Dale Rd. 1,734,493$ Toll Credits 1,734,493$

Modesto Traffic Flow Improvements Oakdale Road and Scenic Drive Intersection Improvements 200,000$ Toll Credits 200,000$

Newman Rehabilitation The Intersection of Inyo Avenue & Canal School Road 373,076$ Toll Credits 373,076$

Oakdale Pavement Maintenance Program G Street (Maag to Ventanas) pavement Maintenance 237,526$ 30,774$ 268,300$

Patterson Roadway Reconstruction / OverlaySperry Avenue Improvements: Various locations along Sperry Avenue between Baldwin Rd. and American Eagle 220,869$ 28,615$ 249,484$

Riverbank OverlayOakdale Road between Patterson Road and Silver Rock Road 269,496$ Toll Credits 269,496$

Turlock Rehabilitation

1. Hawkeye Ave., between N. Olive Ave. and Daubenberger Rd.2. Lander Ave., between South Ave. and E. Glenwood Ave. 761,269$ 98,631$ 859,900$

Turlock Rehabilitation West Main Street from SR 99 to Lander Avenue 450,000$ Toll Credits 450,000$

Totals 5,241,275$ 286,874$ 5,528,149$

Pavement Resurfacing and/or RehabilitationGrouped Projects

FFY 2017/18

Updated Per 2017 FTIP Administrative Modificaiton No. 3

Page 50: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Agency Project Description Project Location STBGPFederal Funds Local Funds Total Project Cost

Ceres Overlay Blaker Road from Service Road to Hackett Road 489,304$ 63,394$ 552,698$

Hughson Pavement Rehabilitation Whitmore Avenue - Tully to Charles 100,000$ 12,956$ 112,956$

Modesto Pavement Rehabilitation

El Vista Avenue from Yosemite Boulevard (SR 132) to Scenic Drive; Coffee Road from Scenic Drive to Briggsmore Avenue 300,000$ Toll Credits 300,000$

Modesto Pavement Rehabilitation

Pavement Rehabilitation on Pelandale from Sisk to Dale; and on Standiford Ave. from McHenry to Sisk; Crows Landing Rd. from S 7th St. to W. Whitmore Ave. 2,101,983$ Toll Credits 2,101,983$

Newman Pavement Rehabilitation Main Street 145,131$ Toll Credits 145,131$

Oakdale Overlay Maag & E Street Overlay 277,918$ 36,007$ 313,925$

Patterson Roadway Reconstruction / OverlaySperry Avenue: Various locations from Rogers Rd to the west and Baldwin Rd to the east. 258,428$ 33,482$ 291,910$

Riverbank Overlay Eighth Street: Patterson Road to Kentucky Avenue 270,572$ Toll Credits 270,572$

Turlock Rehabilitation West Main Street from SR 99 to Lander Avenue 440,725$ Toll Credits 440,725$

Stanislaus County Overlay

Phase O:1. Milnes Road - Albers to Santa Fe2. Bradbury Road - Crows Landing Road to Merced County Line.3. Beckwith Road - Gates to HWY 994. Tully Road - Ladd Road to Bangs Ave.5. Carpenter Road - W. Main to Grayson Ave. 2,149,686$ Toll Credits 2,149,686$

Totals 6,533,747$ 145,839$ 6,679,586$

Pavement Resurfacing and/or RehabilitationGrouped Projects

FFY 2018/19

Updated Per 2017 FTIP Administrative Modificaiton No. 3

Page 51: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Agency Project Description Project Location STBGPFederal Funds Local Funds Total Project Cost

Modesto Pavement Rehabilitation

El Vista Avenue from Yosemite Boulevard (SR 132) to Scenic Drive; Coffee Road from Scenic Drive to Briggsmore Avenue 2,182,843$ Toll Credits 2,182,843$

Modesto Pavement Rehabilitation Paradise Road from Sheridan Street to Carpenter Road 2,080,464$ Toll Credits 2,080,464$

Modesto Pavement Rehabilitation

Tuolumne Boulevard from Sutter Ave to Neece Dr, Paradise Rd from Chicago Ave to 1st St, 1st St from Washington St to G St, andG St from 1st St to 2nd St 300,000$ Toll Credits 300,000$

Newman Pavement Rehabilitation Main Street 151,373$ Toll Credits 151,373$

Oakdale Pavement Reconstruction First Avenue - F Street to G Street 289,870$ Toll Credits 289,870$

Patterson Roadway Reconstruction / OverlaySperry Avenue: Various locations from Rogers Rd to the west and Baldwin Rd to the east. 269,543$ 34,922$ 304,465$

Riverbank Overlay Kentucky Avenue: Eighth Street to Claus Road 282,209$ Toll Credits 282,209$

Turlock Rehabilitation West Main Street from SR 99 to Lander Avenue 929,033$ 1,180,242$ 2,109,275$

Stanislaus County Reconstruction/Overlay

Phase M:1.Albers Rd. - Hwy 132 to Claribel Ave. 2. Patterson Rd. - Riverbank City limits to Albers Rd.3. E. Whitmore Ave. - Hughson City Limits to Hickman Rd.4. Hickman Rd. - E. Whitmore Ave. to 400 south of bridge5. 9th St. - River Rd. to 1400' North of Hatch Rd.6. Golden State Blvd. - Taylor Rd. to Nunes Rd.7. Nunes Rd. - Keyes Rd to Keyes Rd.8. Mitchell Rd. - Ceres Bridge to Yosemite Blvd. -$ 1,800,000$ 1,800,000$

Totals 6,485,335$ 3,015,164$ 9,500,499$

FFY 2019/20

Pavement Resurfacing and/or RehabilitationGrouped Projects

Updated Per 2017 FTIP Administrative Modificaiton No. 3

Page 52: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Attachment 5

Congestion Mitigation Air Quality Program (CMAQ) Intersection Signalization

Backup Listing:

http://www.stancog.org/pdf/ftip-amendments/2017/cmaq-signalization.pdf

Page 53: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Agency Project Description Project Location CMAQFederal Funds

STBGPFederal Funds Local Funds Project Cost

Ceres Signalize Morgan and Service Road 33,250$ -$ 14,250$ 47,500$

Riverbank SignalizePatterson Road & Roselle & Coordinated Pedestrian Railroad Safety Crossing Including Sidewalks 990,453$ 70,770$ Toll Credits 1,061,223$

Turlock Signalize N. Denair Ave. and Hawkeye Ave. 28,640$ -$ Toll Credits 28,640$

Turlock Signalize W. Main St. and West Ave. 35,042$ -$ Toll Credits 35,042$

Stanislaus County Signalize Keyes Rd/ Faith Home Rd Intersection 1,000,000$ -$ 200,000$ 1,200,000$

Totals 2,087,385$ 70,770$ 214,250$ 2,372,405$

Intersection Signalization

FFY 2016/17Grouped Projects

Updated Per 2017 FTIP Administrative Modificaiton No. 3

Page 54: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Agency Project Description Project Location CMAQFederal Funds

STBGPFederal Funds Local Funds Project Cost

Ceres Traffic Signal Morgan and Service Road 304,150$ -$ 130,350$ 434,500$

Modesto Traffic Signal

Upgrade Traffic Signal-2017: Tully Rd. at 9 St., 1 St. at H St., Paradise Rd. at H St., and 11 St. at Needham Ave. 868,750$ -$ (Toll Credits) 868,750$

Turlock Traffic Signal N. Denair Ave. and Hawkeye Ave. 329,360$ -$ (Toll Credits) 329,360$

Turlock Traffic Signal W. Main St. and West Ave. 427,513$ -$ (Toll Credits) 427,513$

Turlock Traffic Signal F St and Lander 288,385$ -$ (Toll Credits) 288,385$

Stanislaus County Signalize Crows Landing/Grayson Intersection 300,000$ -$ 1,485,000$ 1,785,000$

Stanislaus County Traffic SignalCarpenter Rd/Whitmore Ave. Intersection Signalization 300,000$ -$ 1,725,122$ 2,025,122$

Totals 2,818,158$ -$ 3,340,472$ 6,158,630$

Intersection Signalization

FFY 2017/18Grouped Projects

Updated Per 2017 FTIP Administrative Modificaiton No. 3

Page 55: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Agency Project Description Project Location CMAQFederal Funds

STBGPFederal Funds Local Funds Project Cost

Turlock Signalize Walnut/Taylor Intersection Improvements 909,090$ -$ Toll Credits 909,090$ Totals 909,090$ -$ -$ 909,090$

FFY 2019/20Grouped Projects

Intersection Signalization

Updated Per 2017 FTIP Administrative Modificaiton No. 3

Page 56: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Attachment 6

Congestion Mitigation Air Quality Program (CMAQ) Intersection Channelization

Backup Listing:

http://www.stancog.org/pdf/ftip-amendments/2017/cmaq-channelization.pdf

Page 57: Administrative Modification #3 · dist: 10 € ppno: € ea: € ctips id: 214-0000-0447 ct project id: € mpo id.: stancog county: stanislaus county € € route: € € € pm

Agency Project Description Project Location CMAQFederal Funds

STBGPFederal Funds Local Funds Project Cost

Ceres Traffic Flow Improvements Traffic Signal Modification at Roeding Road and Mitchell Road 334,112$ -$ 43,288$ 377,400$

Ceres Traffic Flow ImprovementsRoundabout at Central Ave/ Pine St/ Industrial Way and Morgan/Aristocrat 471,865$ -$ 61,135$ 533,000$

Patterson Traffic Flow Improvements

Roadway improvements at Sperry Ave., and S. Del Puerto Ave. to configure turn lanes in all directions and improve traffic flow 212,186$ 584,860$ 343,211$ 1,140,257$

Riverbank Traffic Flow Improvements

Traffic Management Intersection Improvements at Roselle Ave. and Morrill Rd., sidewalk infill to link pedestrian commute access along Morrill Road 53,118$ -$ 6,882$ 60,000$

Totals 1,071,281$ 584,860$ 454,516$ 2,110,657$

Agency Project Description Project Location CMAQFederal Funds

STBGPFederal Funds Local Funds Project Cost

Modesto Traffic Flow ImprovementsRight Turn Lane from eastbound Standiford Ave.to southbound Sisk Rd. 500,000$ -$ 400,000$ 900,000$

Riverbank Traffic Flow Improvements

Traffic Management Intersection Improvements at Roselle Ave. and Morrill Rd., sidewalk infill to link pedestrian commute access along Morrill Road 230,852$ -$ 195,618$ 426,470$

Stanislaus County Traffic Flow Improvements Claribel Rd/Roselle Ave Intersection 300,000$ -$ 34,410$ 334,410$

Totals 1,030,852$ -$ 630,028$ 1,660,880$

Agency Project Description Project Location CMAQFederal Funds

STBGPFederal Funds Local Funds Project Cost

Stanislaus County Traffic Flow Improvements Claribel Rd/Roselle Ave Intersection -$ 363,991$ 3,005,590$ 3,369,581$

Totals -$ 363,991$ 3,005,590$ 3,369,581$

Intersection ChannelizationGrouped Projects

FFY 2019/20

Intersection Channelization

Intersection Channelization

FFY 2017/18

FFY 2016/17Grouped Projects

Grouped Projects