Administrative Calendar of Irrigation & Waterways Department (2016) Irrigation & Waterways Department is responsible for management and development of surface irrigation from reservoirs / barrages or through canal networking, as well as for upkeep and improvement of around 10,400 km length of river and sea embankments and improvement of drainage channels. During last four and half years, Irrigation & Waterways Department has Brought 2,75,500 acre of area under irrigation; Completed improvement of flood embankments including anti-erosion works for a total length of 2013 km; Completed re-excavation of rivers and drainage channels for a total length of 601 km and commissioned 3 new big pump houses in Kolkata Metropolitan area; Completed construction of 117 numbers of RCC road bridges on rivers and drainage channels; Completed upgradation of inspection paths on canal / river embankment to alternative roads for a length of 300 km; Commissioned a new jetty to establish 24x7 connectivity between Sagar Island and Kakdwip Main Land. January 2016 Brief Name of Works scheduled to be completed during the month Length (km) / No. District 1 New check dams under RKVY(3 Nos.) and JALATIRTHA(4 Nos.) on Jhoras (Streams) 1 each at Blocks Purulia-II, Arsha, Manbazar-II, Barabazar, Hura, Kashipur and Raghunathpur-II. 7 Nos. Purulia 2 Regulator cum Bridge over river Behula at Paschimpara, Hatgacha at Block Kalna. 1 No. Burdwan 3 Damodar left bank protection at Amarpur, Block Galsi-II. 1.2 km Burdwan 4 New additional drainage sluice at Harali on Upper Rampur Channel at Block Udaynarayanpur. 1 No. Howrah 5 Protection to Rupnarayan left embankment at Birampur, Panitras and Mellock at Blocks Bagnan I & II. 1.9 km Howrah 6 Bridge over Intercepting Channel at Mondalpara within Kolkata Municipal Corporation (KMC) area. 1 No. Kolkata 7 Bridges over Lower Bagjola Khal at, i. Jirangachi and Jamirgachi at Block Bhangore-II 2 Nos. South 24-Parganas ii. Natunpukur-Patharghata at Block Rajarhat 1 No. North 24-Parganas Other Activities & Time Schedule : 1 Departmental review meeting on utilization of Plan fund and preparation of detailed Budget Estimate for next financial year.

Administrative Calendar Irrigation & Waterways Department (2016

  • Upload
    vunhu

  • View
    237

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Administrative Calendar Irrigation & Waterways Department (2016

Administrative Calendar

of Irrigation & Waterways Department (2016)

Irrigation & Waterways Department is responsible for management and development of surface irrigation from reservoirs / barrages or through canal networking, as well as for upkeep and improvement of around 10,400 km length of river and sea embankments and improvement of drainage channels.

During last four and half years, Irrigation & Waterways Department has

Brought 2,75,500 acre of area under irrigation;

Completed improvement of flood embankments including anti-erosion works for a total length of 2013 km;

Completed re-excavation of rivers and drainage channels for a total length of 601 km and commissioned 3 new big pump houses in Kolkata Metropolitan area;

Completed construction of 117 numbers of RCC road bridges on rivers and drainage channels;

Completed upgradation of inspection paths on canal / river embankment to alternative roads for a length of 300 km;

Commissioned a new jetty to establish 24x7 connectivity between Sagar Island and Kakdwip Main Land.

January 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 New check dams under ‘RKVY’ (3 Nos.) and ‘JALATIRTHA’ (4 Nos.) on Jhoras (Streams) 1 each at Blocks Purulia-II, Arsha, Manbazar-II, Barabazar, Hura, Kashipur and Raghunathpur-II.

7 Nos. Purulia 2 Regulator cum Bridge over river Behula at Paschimpara,

Hatgacha at Block Kalna. 1 No. Burdwan

3 Damodar left bank protection at Amarpur, Block Galsi-II. 1.2 km Burdwan 4 New additional drainage sluice at Harali on Upper Rampur

Channel at Block Udaynarayanpur. 1 No. Howrah

5 Protection to Rupnarayan left embankment at Birampur, Panitras

and Mellock at Blocks Bagnan I & II. 1.9 km Howrah

6 Bridge over Intercepting Channel at Mondalpara within Kolkata Municipal Corporation (KMC) area.

1 No. Kolkata

7 Bridges over Lower Bagjola Khal at,

i. Jirangachi and Jamirgachi at Block Bhangore-II 2 Nos. South 24-Parganas

ii. Natunpukur-Patharghata at Block Rajarhat 1 No. North 24-Parganas

Other Activities & Time Schedule :

1 Departmental review meeting on utilization of Plan fund and preparation of detailed Budget Estimate for next financial year.

Page 2: Administrative Calendar Irrigation & Waterways Department (2016

February 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 Improvement of Subhasini embankment on left bank of river Torsa at Block Kalchini.

2.2 km Alipurduar 2 New check dams under ‘RKVY’ (2 Nos.) and ‘JALATIRTHA’

(7 Nos.) on Jhoras (Streams) at Blocks Purulia-II (1 No.), Arsha (1 No.), Purulia-I (1 No.), Barabazar (1 No.), Hura (3 Nos.), Raghunathpur-II (1 No.) and Manbazar-I (1 No.).

9 Nos. Purulia 3 Rehabilitation and improvement of Ghatal Branch Canal of

Kangsabati Reservoir Project at Block Joypur. 7.0 km Bankura

4 Damodar right bank protection at village Amrul, Block

Khandaghosh. 0.7 km Burdwan

5 Rehabilitation and improvement of Jangalmahal Main Canal at

Block Ausgram-II. 12.2 km Burdwan

6 Bridges at Block Sabang,

i. over Amrakhali Khal at Markandachak 1 No. Paschim Medinipur

ii. over Kalimandap Khal at Moharbazar 1 No. 7 Bridge over Dakatia Khal at Sikrishnapur, Block Dhanekhali. 1 No. Hooghly

Other Activities & Time Schedule :

1 District tours of Minister-in-charge with senior Officers for reviewing progress of works.

Page 3: Administrative Calendar Irrigation & Waterways Department (2016

March 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 Extension of segregating embankment between river Teesta and Karala in Block Sadar.

2.5 km Jalpaiguri 2 Gangadhar bank protection works at Baxirhat – Chhotolawkuthi,

Block Tufanganj-II. 2.1 km Coochbehar

3 Bituminous road over Malior embankment in Block Harish-

chandrapur. 10.0 km Malda

4 New check dams under ‘RKVY’ (7 Nos.) and ‘JALATIRTHA’

(38 Nos.) on Jhoras (Streams) at Blocks Arsha (2 Nos.), Barabazar (3 Nos.), Puncha (9 Nos.), Raghunathpur-I (3 Nos.), Raghunathpur-II (4 Nos.), Purulia-I (7 Nos.), Purulia-II (7 Nos.), Para (1 No.), Manbazar-I (2 Nos.), Jaipur (1 No.), Balarampur (2 Nos.), Kashipur (2 Nos.), Hura (1 No.) and Bagmundi (1 No.).

45 Nos. Purulia 5 Modernisation of Shyamagiri Bundh Irrigation Scheme at village

Shyamagiri, Block Bishnupur. 1 No. Bankura

6 Hooghly right embankment protection at Uluberia Municipality. 0.6 km Howrah 7 Mundeswari left bank protection at Dafarchak, Block Khanakul-I

and at Sosapota, Block Khanakul-II. 1.4 km Hooghly

8 Bridge over Suburban Head Cut Channel at Chowbhaga Bazar

within Kolkata Municipal Corporation (KMC) area. 1 No. South 24-Parganas

9 Raising and strengthening of Sundarban embankment along river

Jagaddal at Sitarampur, Block Patharpratima. 0.6 Km South 24-Parganas

Other Activities & Time Schedule :

1 Inter departmental review meeting to assess requirement vis-a-vis availability of canal water for Boro irrigation in South 24-Parganas.

Page 4: Administrative Calendar Irrigation & Waterways Department (2016

April 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 New bituminous road on Bibiganj – Jharsingheswar Embankment along right bank of Teesta at Block Haldibari.

12.5 km Coochbehar 2 New bituminous road on Coochbehar Town Protective Embank-

ment from Khagrabari Main Road to Harinchowra, Block Coochbehar-I.

7.6 km Coochbehar 3 New bituminous road on left bank of Kopai South Main Canal at

P.S. Labhpur. 12.3 km Birbhum

4 New check dams under ‘RKVY’ (11 Nos.) and ‘JALATIRTHA’

(40 Nos.) on Jhoras (Streams) at Blocks Purulia-II (12 Nos.), Jaipur (6 Nos.), Purulia-I (7 Nos.), Raghunathpur-II (5 Nos.), Puncha (10 Nos.), Hura (1 No.), Barabazar (2 Nos.), Manbazar-I (3 Nos.), Manbazar-II (1 No.), Arsha (2 Nos.), Santuri (1 No.) and Jhalda-I (1 No.).

51 Nos. Purulia 5 Bridge over Kangsabati River at Amkola, P.S. Lalgarh. 1 No. Paschim Medinipur (Carried over from 2015) 6 Bridge over river Chandia at Ismalichak, Block Moyna. 1 No. Purba Medinipur 7 Mundeswari left bank protection at Charsundalpur, Block

Balagarh and Chakbasia, Block Arambagh. 1.8 km Hooghly

8 Bridge over Nowai Khal at GP Kirtipur-II, Block Barasat-I. 1 No. North 24-Parganas 9 Bridge over Intercepting Channel on Gunamoni Sufai Road within

Kolkata Municipal Corporation (KMC) area. 1 No. Kolkata

Other Activities & Time Schedule :

1 Departmental meeting on allocation of Plan and Non-Plan fund for 2015-16 among Offices under Irrigation & Waterways Directorate throughout the State.

Page 5: Administrative Calendar Irrigation & Waterways Department (2016

May 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 Raising and strengthening of embankments in Kandi area,

i. along river Mayurakshi at Block Bharatpur-I

15.0 km Murshidabad

ii. along river Dwarka at Blocks Kandi & Khargram

iii. along river Bele at Block Kandi 2 Bridge over river Chandia at Sridharpur, Block Moyna. 1 No. Purba Medinipur 3 Amirabad Khal re-excavation from Sofiabad to Shyamchak at

Block Deshapran. 12.0 km Purba Medinipur

4 Orissa Coastal Canal re-excavation from Bhaitgarh to Sarpai at

Block Contai-III. 6.5 km Purba Medinipur

5 Argoal Drainage Cut re-excavation from Argoal to Pousa at Block

Patashpur-II. 14.0 km Purba Medinipur

6 Re-excavation of Biradighi Khal within Howrah Municipal

Corporation area. 2.46 km Howrah

7 Improvement of bituminous road from 58-vent sluice to Boalia, at

mouza Silampur, Blocks Uluberia-I and Shyampur-I. 6.5 km Howrah

8 Improvement of bituminous road along left bank of Lower Bagjola

Khal within Bidhannagar Municipal Corporation, Blocks Rajarhat, Bhangore and Haroa.

28.8 km North 24-Parganas & South 24-Parganas 9 Raising and strengthening of Sundarban embankment along left

bank of river Muriganga at Lakhipur, Block Kakdwip and right bank of river Muriganga at Sumatinagar, Block Sagar.

1.4 Km South 24-Parganas

Other Activities & Time Schedule :

1 Departmental meeting on flood preparedness, along with the concerned Central Government Departments / Organizations (IMD / CWC / GFCC etc.).

a North Bengal

b South Bengal

2 Routine pre-monsoon maintenance work on embankment, irrigation canal, drainage channel etc. (entire month).

Page 6: Administrative Calendar Irrigation & Waterways Department (2016

June 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 New bituminous road on left bank of Kopai South Main Canal at village Ballavpur, Block Bolpur-Siniketan.

3.2 km Birbhum 2 Rehabilitation and improvement of canal distribution network of

Kangsabati Reservoir Project at

i. Block Onda 30.7 km Bankura

ii. Block Indpur 18.7 km 3 New check dams under ‘JALATIRTHA’ at Blocks Raipur (3 Nos.),

Chhatna (1 No.) and Barjora (1 No.). 5 Nos. Bankura

4 Rehabilitation and improvement of Left Bank Main Canal of

Damodar Valley Project at Block Galsi-I. 4.6 km Burdwan

5 Chapa Khal re-excavation at Block Uluberia-I. 14.3 km Howrah 6 Bridges over Lower Bagjola Khal at Santimoynagar & Gauranga-

nagar within Bidhannagar Municipal Corporation area. 2 Nos. North 24-Parganas

7 Suburban Head Cut Channel re-excavation within Kolkata

Municipal Corporation area. 7.3 km Kolkata

8 Chairal Khal diversion protection near its outfall within Pujali

Municipality. 0.45 km South 24-Parganas

9 Raising and strengthening of Sundarban embankment along river

Muriganga at Bankimnagar, Block Sagar. 0.6 Km South 24-Parganas

Other Activities & Time Schedule :

1 Starting functions of Control Rooms for flood management at districts and also at headquarters.

2 Completion of routine maintenance works related to flood management.

Page 7: Administrative Calendar Irrigation & Waterways Department (2016

July 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 Pick-up weir for harnessing water resources of river Beral at Agarda, Block Onda.

1 No. Bankura 2 Rehabilitation and improvement of Left Bank Main Canal of

Damodar Valley Project at Blocks Durgapur-Faridpur & Kanksa. 11.8 km Burdwan

3 Tertiary drainage channels and new concrete pavement at

Bankra I, II & III Gram Panchayats (GPs), Block Domjur. 5.17 km Howrah

4 Nangla Khal, Padma River & its tributary and Jamuna River

re-excavation at Habra Municipality, Blocks Habra-I and Swarupnagar.

38.0 km North 24-Parganas 5 Ichhamati River re-excavation at Block Swarupnagar. 2.0 km North 24-Parganas

Other Activities & Time Schedule :

1 Patrolling of flood embankments and operating sluice gates (throughout the month) and undertaking emergent restoration. works, in case of disaster due to floods, cyclones etc.

2 Keeping constant liaison with DVC and Government of Jharkhand to moderate flood release from reservoirs during the entire month.

Page 8: Administrative Calendar Irrigation & Waterways Department (2016

August 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 Tertiary drainage channels and new concrete pavement at Gram Panchayats Salap I & II, Narna and Makardaha, Block Domjur.

10.6 km Howrah 2 Bridges over Dokhali Khal at Kharika and over Ganapath Khal at

Shyamsundarpur, Block Sabang. 2 Nos. Paschim Medinipur

3 Bhagirathi right bank protection at Noapara, Block Purbasthali. 1.0 km Burdwan

Other Activities & Time Schedule :

1 Patrolling of flood embankments and operating sluice gates (throughout the month) and undertaking emergent restoration. works, in case of disaster due to floods, cyclones etc.

2 Keeping constant liaison with DVC and Government of Jharkhand to moderate flood release from reservoirs during the entire month.

Page 9: Administrative Calendar Irrigation & Waterways Department (2016

September 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 Bridge over Midnapore Main Canal at Palashi, Block Debra 1 No. Paschim Medinipur 2 Bridge over Benedighi Khal at Khutia-Gokulpur, Block

Kharagpur-II. 1 No. Paschim Medinipur

Other Activities & Time Schedule :

1 Patrolling of flood embankments and operating sluice gates (throughout the month) and undertaking emergent restoration. works, in case of disaster due to floods, cyclones etc.

2 Keeping constant liaison with DVC and Government of Jharkhand to moderate flood release from reservoirs during the entire month.

Page 10: Administrative Calendar Irrigation & Waterways Department (2016

October 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 Bridge over SWF-DWF Channel at Bamanghata, Block Bhangore-II

1 No. South 24-Parganas

Other Activities & Time Schedule :

1 Patrolling of flood embankments and operating sluice gates (throughout the month) and undertaking emergent restoration. works, in case of disaster due to floods, cyclones etc.

2 Keeping constant liaison with DVC and Government of Jharkhand to moderate flood release from reservoirs during the entire month.

3 Half yearly departmental review meeting on Plan fund utilization.

Page 11: Administrative Calendar Irrigation & Waterways Department (2016

November 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 Rehabilitation and improvement of Tarafeni Main Canal (North) and its distributary at Blocks Jhargram and Binpur-II.

5.7 km Paschim Medinipur 2 Bridge over Ganapath Khal at Amda-Gobindapur, Block Sabang. 1 No. Paschim Medinipur 3 Moja Damodar re-excavation at Block Udaynarayanpur. 12.0 km Howrah 4 ‘Aila’ affected Sundarban embankment reconstruction (cluster of

works) at Blocks Sagar, Kakdwip, Gosaba and Basanti. 25.0 km South 24-Parganas

Other Activities & Time Schedule :

1 District level meeting for distribution of Rabi / Boro irrigation water in South & North Bengal.

Page 12: Administrative Calendar Irrigation & Waterways Department (2016

December 2016

Brief Name of Works scheduled to be completed during the month Length

(km) / No. District

1 Rehabilitation and improvement of Bishnupur Branch Canal under Kangsabati Reservoir Project in Block Bishnupur.

5.6 km Bankura 2 Raising and strengthening of embankments in Kandi area,

i. along river Mayurakshi at Block Bharatpur-I

15.0 km Murshidabad

ii. along river Dwarka at Blocks Kandi & Khargram

iii. along river Bele at Block Kandi 3 Modernisation of Tarkey and Champa Minor Irrigation Schemes

at Block Gopiballavpur-II. 2 Nos. Paschim Medinipur

4 Bridge over Silabati River at Kalmijole, Block Daspur-I. 1 No. Paschim Medinipur 5 Kaliaghai River re-excavation at Block Patashpur-I 19.0 km Purba Medinipur 6 Rajapur Khal re-excavation at Block Domjur. 14.4 km Howrah 7 Bridge over Nowai Khal at Diara, Block Barasat. 1 No. North 24-Parganas 8 ‘Aila’ affected Sundarban embankment reconstruction (cluster of

works) at Blocks Hingalganj, Sandeshkhali I & II and Hasnabad. 12.0 km North 24-Parganas

9 Bridge over SWF Channel at Ghunimeghi, Block Bhangore-II. 1 No. South 24-Parganas 10 Bridge over Chunakhali Khal including remodelling of 3-vented

sluice at mouza Chunakhali, Block Basanti. 1 No. South 24-Parganas

Other Activities & Time Schedule :

1 State level meeting for distribution of Rabi / Boro irrigation water in South Bengal.