6
STUDIO TWENTYSEVEN ARCHITECTURE 1600 K STREET NW // SUITE #800 // WASHINGTON, DC // 20006 ARLINGTION EDUCATION CENTER REUSE IMAGES ARE HIGHLIGHTS FROM BLPC/PFRC MEETING #3 UNLESS NOTED OTHERWISE COMMUNITY FORUM - 5 DEC 2018 1 1. As a reminder the APS Project Manager is: Steve Stricker (703) 228-7749 [email protected] 2. Public meeting dates and past presentations are posted on the APS project website: https://www.apsva.us/education-center-reuse/ 3. To provide feedback and/or comments to APS use: [email protected] NEXT STEPS + ADJOURN Adjourn BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 70 Project included in the FY2019-28 Capital Improvement Plan (CIP) Renovate the Education Center to both increase the capacity of Washington- Lee initially, and later to adapt to possible future instructional and grade level changes Support APS Strategic Plan Goals, specifically for Healthy, Safe, and Supported Students Address capacity by providing 500-600 high school seats Open by start of school 2021 Spend a maximum project cost of $37 million, using every effort to spend less BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 5 Project Parameters COMMITTEE ROLES OF BLPC/PFRC Project Timeline REVISED MEETING SCHEDULE BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 9 APS Strategic Plan - Design Principles DRAFT SCHEMATIC DESIGN BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 40 PROJECT PARAMETERS AND PRINCIPLES

Adjourn APS Strategic Plan - Design Principles

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Adjourn APS Strategic Plan - Design Principles

STUDIOTWENTYSEVENARCHITECTURE1600 K STREET NW // SUITE #800 // WASHINGTON, DC // 20006202.939.0027 (T) // 202.939.0270 (F) // WWW.STUDIO27ARCH.COM

ARLINGTION EDUCATION CENTER REUSE

IMAGES ARE HIGHLIGHTS FROM BLPC/PFRC MEETING #3 UNLESS NOTED OTHERWISE

COMMUNITY FORUM - 5 DEC 2018 1

1. As a reminder the APS Project Manager is:Steve Stricker(703) 228-7749 [email protected]

2. Public meeting dates and past presentations are posted on the APS project website: https://www.apsva.us/education-center-reuse/

3. To provide feedback and/or comments to APS use: [email protected]

NEX

T ST

EPS

+ AD

JOU

RN

Adjourn

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 70

• Project included in the FY2019-28 Capital Improvement Plan (CIP)

• Renovate the Education Center to both increase the capacity of Washington-

Lee initially, and later to adapt to possible future instructional and grade level

changes

• Support APS Strategic Plan Goals, specifically for Healthy, Safe, and

Supported Students

• Address capacity by providing 500-600 high school seats

• Open by start of school 2021

• Spend a maximum project cost of $37 million, using every effort to spend less

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 5

Project Parameters

CO

MM

ITTE

E R

OLE

S O

F BL

PC/P

FRC

Project Timeline

REV

ISED

MEE

TIN

G S

CH

EDU

LE

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 9

APS Strategic Plan - Design Principles

DR

AFT

SCH

EMAT

IC D

ESIG

N

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 40

PROJECT PARAMETERS AND PRINCIPLES

Page 2: Adjourn APS Strategic Plan - Design Principles

STUDIOTWENTYSEVENARCHITECTURE1600 K STREET NW // SUITE #800 // WASHINGTON, DC // 20006202.939.0027 (T) // 202.939.0270 (F) // WWW.STUDIO27ARCH.COM

ARLINGTION EDUCATION CENTER REUSE

IMAGES ARE HIGHLIGHTS FROM BLPC/PFRC MEETING #3 UNLESS NOTED OTHERWISE

COMMUNITY FORUM - 5 DEC 2018 2TRANSPORTATION

TRAN

SPO

RTA

TIO

N

(1) General level of activity on N Quincy Street & conflicts between modes

(2) Pedestrian crossings of N Quincy St

(3) Long delays for side street traffic

Summary of Concerns

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 26

TRAN

SPO

RTA

TIO

N

Need to maintain visitor parking for the pool

Speeding concerns on N Quincy Street

Cut-through traffic on 13th and 14th to N Quincy St

Pedestrian crossing challengesN Quincy St at 13th and 14th

Southbound left turns from N Quincy Street onto Washington Blvd

Parking management in the garage (policies, pricing)

What we heard last meeting

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 12

TRAN

SPO

RTA

TIO

N

Parking Recommendations

Open 70 spaces in the Ed Center lot

Explore ways to decrease parking on site even further through demand management

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 18

Visitor Parking• Sd

• Keep mostly the same, but explore adding more near W-L front door.

Staff/Student Parking• Sd

• Reopen 70 of the existing 128 parking spaces in the Ed Center lot

• Explore ways to further reduce parking demand

Bicycle Parking• Sd

• Add bicycle parking on N Quincy St side of campus

• Explore sheltered bike parking • Explore improvements to staff bike parking and

amenities

Summary of Recommendations

TRAN

SPO

RTA

TIO

N

Student drop-off/pick-up• Sd

• Add second designated area on N Quincy Street side, where metered parking is today

• Make drop-off/pick-up area available for visitors outside of arrival/dismissal times (e.g. 2-hour parking outside of arrival/dismissal times)

Bus loading/unloading• Sd

• Add 5 more spaces for bus activity in Ed Center lot

Traffic Operations• Select a recommended pedestrian crossing

treatment• Use arrival/dismissal procedures with APS staff

on sidewalk to enforce procedures

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 32

Page 3: Adjourn APS Strategic Plan - Design Principles

STUDIOTWENTYSEVENARCHITECTURE1600 K STREET NW // SUITE #800 // WASHINGTON, DC // 20006202.939.0027 (T) // 202.939.0270 (F) // WWW.STUDIO27ARCH.COM

ARLINGTION EDUCATION CENTER REUSE

IMAGES ARE HIGHLIGHTS FROM BLPC/PFRC MEETING #3 UNLESS NOTED OTHERWISE

COMMUNITY FORUM - 5 DEC 2018 3SITE DESIGN

DR

AFT

SCH

EMAT

IC D

ESIG

N

Blocking + StackingLEGEND

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 64

Existing Campus

DR

AFT

SCH

EMAT

IC D

ESIG

N

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 43

DR

AFT

SCH

EMAT

IC D

ESIG

N

Schematic Site Plan

WASHINGTON-LEE HIGH SCHOOL

NEW GROUND CONNECTION STAIR AND RAMP

NEW OUTDOORPLAY + GREEN SPACE

MAINTAIN ACCESS TO GENERATOR

QUIN

CY S

TREE

T

MODIFIED ED CENTER PARKING LOT (70 SPACES)

PLANETARIUM

MEMORIAL TREE

NEW ED CENTERMAIN ENTRANCE

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 45

DR

AFT

SCH

EMAT

IC D

ESIG

N

Bridge Design: Concepts

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 52

Post-meeting note: As discussed during BLPC/PFRC Meeting #3, the bridge is an alternate, outside the $37M project budget, currently being evaluated for cost and other factors.

Post-meeting note: As discussed during BLPC/PFRC Meeting #3, the play space is not necessary a high-school basketball court; the court is shown for size while APS staff evaluate the appropriate educational program for the possible outdoor play and green space

Post-meeting note: As discussed during BLPC/PFRC Meeting #3, the connection may be a ramp only, pending further design study.

Page 4: Adjourn APS Strategic Plan - Design Principles

STUDIOTWENTYSEVENARCHITECTURE1600 K STREET NW // SUITE #800 // WASHINGTON, DC // 20006202.939.0027 (T) // 202.939.0270 (F) // WWW.STUDIO27ARCH.COM

ARLINGTION EDUCATION CENTER REUSE

IMAGES ARE HIGHLIGHTS FROM BLPC/PFRC MEETING #3 UNLESS NOTED OTHERWISE

COMMUNITY FORUM - 5 DEC 2018 4

Existing Façade Concept Reuse- Concept of glass between white concrete forms

Curtainwall Replacement- Response to internal program – daylight, views and glare mitigation- Response to external environment – energy efficiency- Operable Vents

- Minimum of two operable vents per classroom- Minimal visual impact on exterior

Ground Floor Openings Enlargement- Response to program change from service spaces to classroom spaces

Fourth Floor Openings Enlargement- Response to program and environment

DR

AFT

SCH

EMAT

IC D

ESIG

N

Envelope Improvements

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 56

BUILDING DESIGN

Existing Façade Elements

DR

AFT

SCH

EMAT

IC D

ESIG

N

Precast Concrete Panels :At Fourth Floor

Precast Arched Column Cap:At First, Second and Fourth Floors

Narrow Punched Windows: Vision Glass with Operable Vent

Curtainwall Spandrel Glazing:Black Back-painted Glass between Floors

Curtainwall Vision Glazing:Single-paned Vision Glass

Painted CIP Concrete Plinth:Ground Floor

Small Punched Windows:Vision Glass

Terrace Guardrail: Metal guardrail on Precast Cap

Plaster Exterior Soffit:At Fourth Floor

Three-story Curtainwall:At First, Second and Fourth Floors

Terrace:At First Floor

Precast Column Panels:At First, Second and Fourth Floors

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 55

Black Back-painted Glass at Curtainwall:Located at MEP Rooms, Storage, RR’s, + Stairwells

Existing Envelope Materials

DR

AFT

SCH

EMAT

IC D

ESIG

N

- Stable Cladding Panels- Cleaning + Repairs

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 57

Solar InsolationAnnual Cumulative Gains

DR

AFT

SCH

EMAT

IC D

ESIG

N

NE

SW

NW

SE

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 58

Page 5: Adjourn APS Strategic Plan - Design Principles

STUDIOTWENTYSEVENARCHITECTURE1600 K STREET NW // SUITE #800 // WASHINGTON, DC // 20006202.939.0027 (T) // 202.939.0270 (F) // WWW.STUDIO27ARCH.COM

ARLINGTION EDUCATION CENTER REUSE

IMAGES ARE HIGHLIGHTS FROM BLPC/PFRC MEETING #3 UNLESS NOTED OTHERWISE

COMMUNITY FORUM - 5 DEC 2018 5

DR

AFT

SCH

EMAT

IC D

ESIG

N

Frit Pattern Study

ANNUAL CUMULATIVE INSOLATION - North Elevation

Frit Concept - Center Focus

Frit Concept - Vertical Accentuation

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 63

BUILDING DESIGN

DR

AFT

SCH

EMAT

IC D

ESIG

N

Sun Control Options for CurtainwallOther than Opaque Glass

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 59

DR

AFT

SCH

EMAT

IC D

ESIG

N

Fritted GlassExamples

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 60

DR

AFT

SCH

EMAT

IC D

ESIG

N

Glazing Replacement Study

Enlarged Punched Opening

Enlarged HorizontalOpening

Glass Infill Vertical Fritted Glass Infill

Horizontal Fritted Glass Infill

Enlarge Openings at Ground Floor

Replace Existing Curtainwall

Replace ExistingWindows

Replace Existing Guardrail

Code Compliant Guardrail

BLPC / PFRC JOINT MEETING NOVEMBER 28, 2018 62

1st ,

2nd ,

+ 3r

dFl

oor

Con

cept

sG

roun

d Fl

oor

Con

cept

s

Enlarged Punched Opening

Page 6: Adjourn APS Strategic Plan - Design Principles

STUDIOTWENTYSEVENARCHITECTURE1600 K STREET NW // SUITE #800 // WASHINGTON, DC // 20006202.939.0027 (T) // 202.939.0270 (F) // WWW.STUDIO27ARCH.COM

ARLINGTION EDUCATION CENTER REUSE

IMAGES ARE HIGHLIGHTS FROM BLPC/PFRC MEETING #3 UNLESS NOTED OTHERWISE

COMMUNITY FORUM - 5 DEC 2018 6BUILDING DESIGN

GROUND FLOOR0' - 0"

FIRST FLOOR12' - 8"

SECOND FLOOR26' - 8"

THIRD FLOOR39' - 4"

FOURTH FLOOR52' - 0"

5a7a

T.O. ROOF65' - 0 5/8"

T.O. PANELS63' - 4"

90' - 10"19' - 2"90' - 10"

200' - 9 7/8"

65' -

0 5

/8"

1' -

8 5/

8"11

' - 4

"12

' - 8

"12

' - 8

"14

' - 0

"12

' - 8

"

FIRST FLOOR12' - 8"

SECOND FLOOR26' - 8"

THIRD FLOOR39' - 4"

FOURTH FLOOR52' - 0"

5a 7a

T.O. ROOF65' - 0 5/8"

T.O. PANELS63' - 4"

1' -

8 5/

8"11

' - 4

"12

' - 8

"12

' - 8

"14

' - 0

"

90' - 10" 19' - 2" 90' - 10"

200' - 9 7/8"

52' -

4 5

/8"

CONCEPT DESIGN PACKAGE

DRAWING DATE

DRAWING SCALE

DRAWING TITLEDRAWING TYPE

NOVEMBER 07, 2018

GENERAL

DRAWING NUMBER

ED CENTERREUSE

1426 N QUINCY STREETARLINGTON, VA 22207

KEY PLAN

1/8" = 1'-0" D3-1DEMOLITION EXTERIOR ELEVATIONS

NORTH

SCALE: REF: / 1/8" = 1'-0"D3-1 D1-01

BUILDING ELEVATION - NORTH1

SCALE: REF: / 1/8" = 1'-0"D3-1 D1-01

BUILDING ELEVATION - SOUTH2

ELEVATIONS GENERAL NOTES1. SEE MATERIALS REPORT FOR DETAILED SCOPE OF CLADDING REPAIRS2. ALL EXISTING CURTAIN WALL AND WINDOWS TO BE REPLACED IN KIND3. NEW ALUMINUM CURTAIN WALL GLAZING AT MULTI-STORY OPENINGS; ALLOW 25% SPANDREL EXTENTS, 25% FRITTED GLASS AND 25% CONCEALED VENTILATOR UNITS4. NEW OPERABLE ALUMINUM WINDOWS AT EXISTING WINDOW OPENINGS5. REPLACE ALL EXISTING RAILINGS

GROUND FLOOR0' - 0"

FIRST FLOOR12' - 8"

SECOND FLOOR26' - 8"

THIRD FLOOR39' - 4"

FOURTH FLOOR52' - 0"

12HxHGFEA B C DAx 12x

T.O. ROOF65' - 0 5/8"

T.O. PANELS63' - 4"

142' - 4"

10 1/2" 7' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 7' - 0" 56' - 1 1/8" 7' - 6" 10 1/2"

65' -

0 5

/8"

1' -

8 5/

8"11

' - 4

"12

' - 8

"12

' - 8

"14

' - 0

"12

' - 8

"

GROUND FLOOR0' - 0"

FIRST FLOOR12' - 8"

SECOND FLOOR26' - 8"

THIRD FLOOR39' - 4"

FOURTH FLOOR52' - 0"

1 Hx H G F E ABCD Ax1x

T.O. ROOF65' - 0 5/8"

T.O. PANELS63' - 4"

10 1/2" 7' - 6" 56' - 1 1/8" 7' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 7' - 0" 10 1/2"

142' - 4"

65' -

0 5

/8"

1' -

8 5/

8"11

' - 4

"12

' - 8

"12

' - 8

"14

' - 0

"12

' - 8

"

CONCEPT DESIGN PACKAGE

DRAWING DATE

DRAWING SCALE

DRAWING TITLEDRAWING TYPE

NOVEMBER 07, 2018

GENERAL

DRAWING NUMBER

ED CENTERREUSE

1426 N QUINCY STREETARLINGTON, VA 22207

KEY PLAN

1/8" = 1'-0" D3-2DEMOLITION EXTERIOR ELEVATIONS

NORTH

SCALE: REF: / 1/8" = 1'-0"D3-2 D1-01

BUILDING ELEVATION - WEST1

SCALE: REF: / 1/8" = 1'-0"D3-2 D1-01

BUILDING ELEVATION - EAST2

ELEVATIONS GENERAL NOTES1. SEE MATERIALS REPORT FOR DETAILED SCOPE OF CLADDING REPAIRS2. ALL EXISTING CURTAIN WALL AND WINDOWS TO BE REPLACED IN KIND3. NEW ALUMINUM CURTAIN WALL GLAZING AT MULTI-STORY OPENINGS; ALLOW 25% SPANDREL EXTENTS, 25% FRITTED GLASS AND 25% CONCEALED VENTILATOR UNITS4. NEW OPERABLE ALUMINUM WINDOWS AT EXISTING WINDOW OPENINGS5. REPLACE ALL EXISTING RAILINGS

GROUND FLOOR0' - 0"

FIRST FLOOR12' - 8"

SECOND FLOOR26' - 8"

THIRD FLOOR39' - 4"

FOURTH FLOOR52' - 0"

5a7a

T.O. ROOF65' - 0 5/8"

T.O. PANELS63' - 4"

90' - 10"19' - 2"90' - 10"

200' - 9 7/8"

65' -

0 5

/8"

1' -

8 5/

8"11

' - 4

"12

' - 8

"12

' - 8

"14

' - 0

"12

' - 8

"

FIRST FLOOR12' - 8"

SECOND FLOOR26' - 8"

THIRD FLOOR39' - 4"

FOURTH FLOOR52' - 0"

5a 7a

T.O. ROOF65' - 0 5/8"

T.O. PANELS63' - 4"

1' -

8 5/

8"11

' - 4

"12

' - 8

"12

' - 8

"14

' - 0

"

90' - 10" 19' - 2" 90' - 10"

200' - 9 7/8"

52' -

4 5

/8"

CONCEPT DESIGN PACKAGE

DRAWING DATE

DRAWING SCALE

DRAWING TITLEDRAWING TYPE

NOVEMBER 07, 2018

GENERAL

DRAWING NUMBER

ED CENTERREUSE

1426 N QUINCY STREETARLINGTON, VA 22207

KEY PLAN

1/8" = 1'-0" D3-1DEMOLITION EXTERIOR ELEVATIONS

NORTH

SCALE: REF: / 1/8" = 1'-0"D3-1 D1-01

BUILDING ELEVATION - NORTH1

SCALE: REF: / 1/8" = 1'-0"D3-1 D1-01

BUILDING ELEVATION - SOUTH2

ELEVATIONS GENERAL NOTES1. SEE MATERIALS REPORT FOR DETAILED SCOPE OF CLADDING REPAIRS2. ALL EXISTING CURTAIN WALL AND WINDOWS TO BE REPLACED IN KIND3. NEW ALUMINUM CURTAIN WALL GLAZING AT MULTI-STORY OPENINGS; ALLOW 25% SPANDREL EXTENTS, 25% FRITTED GLASS AND 25% CONCEALED VENTILATOR UNITS4. NEW OPERABLE ALUMINUM WINDOWS AT EXISTING WINDOW OPENINGS5. REPLACE ALL EXISTING RAILINGS

GROUND FLOOR0' - 0"

FIRST FLOOR12' - 8"

SECOND FLOOR26' - 8"

THIRD FLOOR39' - 4"

FOURTH FLOOR52' - 0"

12HxHGFEA B C DAx 12x

T.O. ROOF65' - 0 5/8"

T.O. PANELS63' - 4"

142' - 4"

10 1/2" 7' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 7' - 0" 56' - 1 1/8" 7' - 6" 10 1/2"

65' -

0 5

/8"

1' -

8 5/

8"11

' - 4

"12

' - 8

"12

' - 8

"14

' - 0

"12

' - 8

"

GROUND FLOOR0' - 0"

FIRST FLOOR12' - 8"

SECOND FLOOR26' - 8"

THIRD FLOOR39' - 4"

FOURTH FLOOR52' - 0"

1 Hx H G F E ABCD Ax1x

T.O. ROOF65' - 0 5/8"

T.O. PANELS63' - 4"

10 1/2" 7' - 6" 56' - 1 1/8" 7' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 7' - 0" 10 1/2"

142' - 4"

65' -

0 5

/8"

1' -

8 5/

8"11

' - 4

"12

' - 8

"12

' - 8

"14

' - 0

"12

' - 8

"

CONCEPT DESIGN PACKAGE

DRAWING DATE

DRAWING SCALE

DRAWING TITLEDRAWING TYPE

NOVEMBER 07, 2018

GENERAL

DRAWING NUMBER

ED CENTERREUSE

1426 N QUINCY STREETARLINGTON, VA 22207

KEY PLAN

1/8" = 1'-0" D3-2DEMOLITION EXTERIOR ELEVATIONS

NORTH

SCALE: REF: / 1/8" = 1'-0"D3-2 D1-01

BUILDING ELEVATION - WEST1

SCALE: REF: / 1/8" = 1'-0"D3-2 D1-01

BUILDING ELEVATION - EAST2

ELEVATIONS GENERAL NOTES1. SEE MATERIALS REPORT FOR DETAILED SCOPE OF CLADDING REPAIRS2. ALL EXISTING CURTAIN WALL AND WINDOWS TO BE REPLACED IN KIND3. NEW ALUMINUM CURTAIN WALL GLAZING AT MULTI-STORY OPENINGS; ALLOW 25% SPANDREL EXTENTS, 25% FRITTED GLASS AND 25% CONCEALED VENTILATOR UNITS4. NEW OPERABLE ALUMINUM WINDOWS AT EXISTING WINDOW OPENINGS5. REPLACE ALL EXISTING RAILINGS

SOUTHWEST ELEVATIONSOUTH ELEVATION

NORTHEAST ELEVATIONNORTH ELEVATION

Post-meeting graphics showing the existing facade elements to be removed for replacement