17
Confidential Solar Power Business Aditya Birla Group Gajanan Joshi [email protected] 31 October, 2014 Solar Power Development: Expectations of Developers

Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Embed Size (px)

Citation preview

Page 1: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Aditya Birla Group Gajanan Joshi [email protected] 31 October, 2014

Solar Power Development: Expectations of Developers

Page 2: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Aditya Birla Group Overview

1. A US $40 billion Multi-National Corporation

2. 50 companies across 6 continents in 36 countries

3. Over 130 state-of-the-art manufacturing units

4. Over 53% revenues from international operations

5. Anchored by 136,000 employees of 42 different nationalities

6. Ranked No. 4 in the Global “Top Companies for Leaders” survey and ranked No. 1 in Asia Pacific (Aon Hewett, Fortune Magazine and RBL)

GLOBAL:

• The largest aluminum rolling company • Top three producers of primary aluminum in Asia • The largest single location copper smelter • The largest producer of viscose staple fibre • The largest manufacturer of linen fabric • The No. 1 producer of carbon black • The 4th largest producer of insulators • The 4th largest producer of acrylic fiber • Among the top 8 cement producers • Among the best energy efficient fertilizer plants • The largest Indian MNC with operations in the USA

INDIA:

• The top fashion (branded apparel) player • The largest producer in the chloralkali sector • The largest manufacturer of linen fabric • The 2nd largest producer of viscose filament yarn • A leading player in Life Insurance and Asset Management • Among the top 3 mobile telecom players • Among the top 3 Value Retail Chains in India • Among the top 6 BPO companies • A leading agriculture solutions provider

2

Page 3: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

5 MW Vituja,

Rajasthan FY12

15 MW Charanka,

Gujarat FY13 60 MW

Rajasthan, Telangana

FY14

Aditya Birla Group’s Solar Journey Execution Experience

• Platform formation in 2011 • Headquartered in Mumbai, Maharashtra • 25 Team Members

3

Page 4: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Installation Photos 15MW in Three Months

Week 1 Week 3 Week 5

Week 7 Week 9 Week 12

4

Page 5: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Rajasthan – Bhadla Solar Park 20MW in Four Months

5

Page 6: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Telangana 35MW (4 Projects) 3 to 4 months ahead of PPA schedule

6

Page 7: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Solar Business Aditya Birla Group Expertise

Project Manageme

nt Experience

Strong Fund Raising Ability

Extensive Power Sector

Expertise

Pan Indian Presence /

Local Expertise

Top Class Execution

Team

Best Equipped to address the Solar Requirements

Over 3GW rising to 6GW of captive power

Investments of over USD 48 billion in the

next 5 years

80MWp executed in record time

Investments in all major states in India

World class talent recruited

Page 8: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

• Start Date: May 23, 2011

• Commissioning Date: October 14, 2011

• Technology: Crystalline Silicon Modules (275 Wp) Three Phase String Inverters (17 kW) Fixed tilt

• Power Evacuation: 33 kV Grid

• ABG’S Role: Leasing of plant and machinery Design review and approval Selection of equipment Sourcing of key plant components Project Management

Solar Business Execution Experience

5MW Project in Rajasthan 15MW Project in Gujarat

• Start Date: Nov 14, 2011

• Commissioning Date: Jan 27, 2012

• Technology: Crystalline Silicon Modules (235/240 Wp) Central Inverters ( 500 kW) Seasonal tilt

• Power Evacuation: 66 kV Grid • ABG’S Role:

Project funding Design review and approval Selection of equipment Sourcing of imported components Project Supervision

Page 9: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Solar Business | Project Locations

20 MW – 1 Project

35 MW – 4 Projects

Solar Business Rajasthan and Telangana Project Locations

Page 10: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Expectations/Suggestions: Achieve Solar Targets

Note: This story has been updated to reflect the fact that the World Bank Doing Business 2015 report covers the period from June 2013 to May 2014 (when the UPA was in power).

“Ease of Doing Business” Ranking – 142nd

Starting Business – 158th Dealing with Construction Permits – 184th Enforcing Contracts – 186th 13 procedures to Start – 30 Days as against 4.8 procedures to Start – 9.2 Days

China – 90th Sri Lanka – 99th Nepal – 108th Bhutan – 125th Pakistan – 128th

Bangladesh – 173rd Afghanistan – 193rd

7th ranking in “Protecting Minority Investors”

World Bank Doing Business Report 2015

Page 11: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Expectations/Suggestions: Achieve Solar Targets

1. Clearer Target Setting: a) Break down the 5 year plan targets to yearly targets and plans. b) It shall provide clear roadmap for all the stake holders such as

Developers/EPC/Suppliers/State c) Better planning of resources avoiding slack period in between business spikes,

improving the economic aspects of the sector.

2. Infrastructure Coordination among Government Entities: a) The nodal agencies to firm up the plan with various power off-takers (with

whom they are planning to have PSA) b) It shall include the binding parameters viz. Transmission/Distribution availability

time & off-taking capacity c) Single Window Clearance Mechanism – State level and Central Level

Page 12: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Expectations/Suggestions: Achieve Solar Targets

3. Solar Park Development: a) The nodal agencies develop the Solar Parks with infra-structural facilities b) It shall establish associated infrastructure like Land Development, Internal

Roads, Fencing, Water connectivity, power evacuation facility between Solar plant and the designated GSS etc.

c) The nodal agency to shoulder the Land Acquisition tactivity. d) The Park can be also developed on the basis of PPP model where there shall

be separate independent tenders for solar park development

4. Project Monitoring:

a) Setting of strong joint monitoring and problem resolution committee (Nodal Agency + Solar Park Developer + Transcom + Discom + Developer) to timely liquidate the issues and ensure the completion of the respective scope of work.

b) This is to ensure timely commissioning of the Solar Projects.

Page 13: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Expectations/Suggestions: Achieve Solar Targets

5. RPO Target Setting: a) State agencies to coordinate closely with the CERC and SERC for setting up of

RPO targets with long term visibility and develop an effective mechanism to achieve the same in a time bound manner.

6. RPO Implementation and Enforcement:

a) The State Regulatory authorities to strictly enforce the RPO. b) The cost of avoidance should be significantly higher than the cost of

compliance.

7. Electricity Act Modification: a) Strong and Concerted approach to influence policy makers and legislatures to

ensure recognition of Solar Power from other energy saving approaches

Page 14: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Expectations/Suggestions: Achieve Solar Targets

8. Promotion of Renewable Power: a) Implementation of Open Access facilities for interstate sale of Solar Power b) Provision of banking and wheeling benefits c) Provide large capacity opportunities for developers to explore the volume benefit and try to pass

on as much benefit possible to off takers and society.

Page 15: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Expectations/Suggestions: Achieve Solar Targets 9. Implementation of FIT

a) The pace of Solar Project implementation is very slow b) Speculative bidding pattern is significant: providing success in bidding but poses severe

challenges in the implementation . c) Based on the prevailing CERC/SERC tariff – define the FIT and invite the developers to

implement large capacity Solar Projects. d) The developers with sound financial and execution capabilities shall be encouraged to develop

large capacities in shortest possible durations. e) It will be free from the negatives of the speculative biddings f) The lenders/investors will be more comfortable and can plan for long term horizon g) The developers are able to plan on long term basis. h) The success rate of Solar Power realisation shall be very high i) Highest probability of achieving the Solar Mission Targets.

Page 16: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business

Effect of Feed in Tariff

German PV Sector Growth

EEG - Erneuerbare-Energien-Gesetz (German Renewable Energy Act) Source: GIZ

In terms of policy, India is still in the stage that Germany was in 2000-04 and experimenting with different policies.

Page 17: Aditya Birla Group - odishasolarconference.com · Aditya Birla Group ... It shall provide clear roadmap for all the stake holders such as ... RPO targets with long term visibility

Confidential

Solar Power Business