View
221
Download
1
Tags:
Embed Size (px)
DESCRIPTION
LGAQ Tour- Lochiel Park 12 February 2010 Andrew Bishop Page 1 O-Bahn Busway (includes Lochend House 0.60Ha transferred to City of Campbelltown) Open Space: Residential/Housing: 14.71 Ha 10.51 Ha 4.20 Ha Total Site Area: Lochiel Park - Urban Planning • Master plan designed by Planner and Architect • Orientation of lots • Housing typologies • Shadow diagrams > building envelope plans Building Envelope Plans
Citation preview
Master Plan
CYFS (Hobbs House)
O-Bahn Busway
Lochend House
River Torrens/Linear
Park
Total Site Area:
14.71 Ha
Open Space:
10.51 Ha(includes Lochend House 0.60Ha transferred to City of Campbelltown)
Residential/Housing:
4.20 Ha
Lochiel Park - Urban Planning • Master plan designed by Planner and Architect
• Orientation of lots• Housing typologies • Shadow diagrams > building envelope plans
• Mews house
• Community title
• 7.8 star rating (AccuRate)
• Energy neutral outcome with 3.7kW of photo voltaic cells
Sustainability Centre
Development Assessment
• Staged LMC encumbrance approval process
• Sustainability rating tool
• Use of AccuRate rating tool
• Council will not assess until LMC has approved plans
Project Delivery
Green HouseCharterhouse (Hickinbotham )
Sierra Rossdale
AdelongAlpine (left project)
New Industry Housing Products
How? Energy Saving Strategies
66% reduction in energy use and 74% reduction of greenhouse gas emissions
• Optimise allotment orientation
• Passive dwelling design to maximise solar access and to reduce energy consumption
• 7.5 star rated homes
• Gas boosted solar hot water systems
• PV cells – minimum 1kW/100m2
• Electricity load limiting devices
How? Water Saving Strategies
78% saving of drinking water• Recycled stormwater used for toilet flushing,
cold tap washing machine, irrigation
• 189 Ha catchment feeds wetland
• Aquifer storage and recovery scheme (ASR)
• 1.5 kL Rainwater tanks supply all hotwater
• Use of high water effecient (WELS) appliances
Transport Strategies
Reduce vehicle use• Linking with the River Torrens
Linear Park for walking and cycling
• Enhancing access to public transport networks (signs etc)…
• Fostering opportunities for car pooling on intranet (encouraging reduced dependence on private vehicles)
• Local convenience shop
O’Bahn
Linear Park
Project Outcomes Greenhouse gas emissions
• Total embodied emissions 12,000 T
• Less emissions offset Urban Forest 10,000 T
• Total net embodied emissions 2,000 T
Cost of external planting $40,000($20 per ton current price)