Addendum/Corrigendum No.1 Request for Proposal for Providing Consultancy Services for Detailed Design and Engineering for Construction of Bus Depot at Village Gadaipur, South Delhi‐ Replies to clarification sought by bidders in pre‐tender meeting held on 8th September 2009 at DIMTS Office Reference Issues Query Comments by DIMTS
1 12.2
Page 14 of 75
The bidders whose average turnover in the past three years is not above Rs 50 lakhs will be rejected.
50 lakhs should be 25 Lakhs.
Please clarify.
A turnover of 25 lakhs is to be considered.Please read Rs.25 Lakhs in lieu of Rs.50 Lakhs.
2 3
Page 8 of 75
Whether the pre‐qualifications shall be evaluated collectively in case of a consortium or independently.
Please confirm. Collectively
3 1.3
Page 22 of 75
Does approving agency include UTTIPEC, in which case format of submission should be as prescribed by UTTIPEC’s website.
Please confirm. All statutory clearance required in the planning of the project has to be taken by the consultant
4 4
Page 27 of 75
Bus parking depot maintenance manual will be limited to civil infrastructure only or will extend to services, IT systems, and mechanical systems as in case of semi‐automatic multilevel parking?
Please elaborate. The maintenance manual will only be restricted to the technology adopted for parking
5 Semi‐automatic parking system technology consultant would be required for identifying the Appropriate technology as a specialist.
Please confirm. Is a part of scope defined in stage two of scope of work
6 Map & Location of Site Please provide us the geo‐coordinates of the site as well as a map showing the shape of the land.
Being provided on web. The Site is situated in Khasra no.323 in Gadaipur Village. The approximate site location sketch with dimension is attached.
7 Extension of Timelines Please extend the submission date by 15 days.
Date extended to 23rd Sept.09
Page 1of 3
Addendum/Corrigendum No.1 Request for Proposal for Providing Consultancy Services for Detailed Design and Engineering for Construction of Bus Depot at Village Gadaipur, South Delhi‐ Replies to clarification sought by bidders in pre‐tender meeting held on 8th September 2009 at DIMTS Office Sl.No Reference Query Comments by DIMTS
8 Refer Page
30 of 75
under item
4
Milestones and Payment
Schedule
Stage III: Assistance during
implementation
We request the Client to
kindly confirm the
implementation period of
the project, so that the
Consultant can envisage
the project requirement
and prepare the proposal
accordingly
Period of planning and
design is already given in
the RFP document
Stage III relates to
execution part. time line
to be provided by the
consultant
9 Please refer
Page 30 of
75 under
item 4:
Milestones and Payment
Schedule
We request the client to
kindly keep a provision of
10% as Mobilization
Advance against Bank
Guarantee of 10% to be
submitted by the
Consultant. Please
confirm
No mobilization advance
can be considered
10 Please refer
Page 30 of
75 under
item 4:
Milestones and Payment
Schedule
Stage III: Detailed Design &
Engineering
along with other reports and
approval
from required bodies; No. of
days‐ 90
(Duration of service)
We request the Client to
kindly extend duration of
Stage II by 60 more days
i.e 2 more months.
Please confirm.
The consultant shall have
to adhere to the time
frame for various
milestone as mentioned
in RFP
11
Please
Refer Page
35 of 75
under 3B:
Firms Experience
Certificate from the Client shall
be
enclosed failing which
experience shall
not be considered
In the event where the
project was completed
and the consultant still
waits for the completion
certificate to be issued by
the owner/employer, in
such an event, we suggest
the Contract Document
along with the scope of
services as per the
Contract Document along
RFP conditions prevails
Page 2of 3
Addendum/Corrigendum No.1 Request for Proposal for Providing Consultancy Services for Detailed Design and Engineering for Construction of Bus Depot at Village Gadaipur, South Delhi‐ Replies to clarification sought by bidders in pre‐tender meeting held on 8th September 2009 at DIMTS Office
Page 3of 3
Sl.No Reference Query Comments by DIMTS
with the Project Data
Sheets. Please Confirm.
12 Please
Refer Page
30 of 75
Stage III: Assistance during
implementation
The Consultant will be paid the
balance fee on prorate basis with
the progress of work in
installments of 5%
We request the Client to
kindly elaborate the
assistance required to be
provided by the
Consultant at the
implementation stage.
We understand that the
Consultant is required to
make periodic visit at site
and monitor whether the
construction work is
carried out as per the
technical specification
and contract document.
Please confirm.
StageIII attracts post
contractual
responsibilities to be
performed by the
consultant while
execution takes place for
providing details of
working drawings etc‐any
variation on account site
conditions ,their costing
etc.
13 Please
Refer Page
2 of 75
Completed proposals, must be
delivered in the office of DIMTS
Ltd on or before 3.00 PM,
September 15, 2009
It is requested that the
submission date may
please be kept three
weeks from date of issue
of written clarifications to
the queries raised by
consultants.
Date of submission of RFP
is extended to 23rd
Sept.09,at 3:00pm.