ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects Addendum #1 November 9, 2018 To All Prospective Bidders: The Fortuna Union High School District (District) herewith issues Addendum No. 1 to the above- referenced solicitation. This Addendum shall be made part of the Contract Documents and the bidder shall acknowledge receipt thereof in their Proposals. Except as specifically modified by this document, all other terms and conditions remain in full force and effect. 1. Enclosed is the sign-in sheet from the Pre-Proposal walk through 11/7/18. 2. There will be another walk-through for subcontractors only (i.e., C-20 and C-38 specialty contractors) on-site next Tuesday 11/13/18 at 3:30 p.m. Meet at the district office. 3. We have plans received from the DSA. Please go to the Humboldt Builders Exchange or our Bid Opportunities web page to download them as they are large PDF files. 4. Attached are the building maps distributed at the mandatory walk-through 11/7/18. 5. Additional proposal items, e.g., forced air furnace replacements, will be added to the Scope of Work after the Tuesday Nov 13 bid walk for subcontractors.

ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

ADDENDUM TO RFQ/RFP

Fortuna Union High School District

Proposition 39

HVAC, Fenestration and Appliance Efficiency Projects

Addendum #1

November 9, 2018

To All Prospective Bidders:

The Fortuna Union High School District (District) herewith issues Addendum No. 1 to the above-

referenced solicitation. This Addendum shall be made part of the Contract Documents and the

bidder shall acknowledge receipt thereof in their Proposals. Except as specifically modified by this

document, all other terms and conditions remain in full force and effect.

1. Enclosed is the sign-in sheet from the Pre-Proposal walk through 11/7/18.

2. There will be another walk-through for subcontractors only (i.e., C-20 and C-38 specialty

contractors) on-site next Tuesday 11/13/18 at 3:30 p.m. Meet at the district office.

3. We have plans received from the DSA. Please go to the Humboldt Builders Exchange or our Bid

Opportunities web page to download them as they are large PDF files.

4. Attached are the building maps distributed at the mandatory walk-through 11/7/18.

5. Additional proposal items, e.g., forced air furnace replacements, will be added to the Scope of

Work after the Tuesday Nov 13 bid walk for subcontractors.

Page 2: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects
Page 3: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects
Page 4: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

PARKING

TEERTS

HT21

"I" STREET

PARKING

'J' STREET

TENNIS COURTS

FIELDHOUSE

MAINTENANCE

SHEDBUS

SHOP

TEERTS

HT41

FOOTBALL FIELD

AG.

SOFTBALL FIELD

BLEACHERS

BLEACHERSVISITOR'S

GREENHOUSE

'K' STREET

TEERTS

HT51

LATHHOUSE

TEERTS

HT61

EASTHIGH

SHOP

STARTHEALTHY

PARKING

PARKING

BUILDING FBLDG. E

BLDG. D

BLDG. C

BLDG.B

ADMIN.BLDG.

MUSIC

CAFETERIA

ART BUILDING

LIBRARY

METALSHOP

WOODSHOP

DAMON GYM

LOGANGYM

PARKING

AG BLDG.

BARN

AUTOSHOP

FORTUNA HIGH SCHOOL379 12TH STREETFORTUNA, CAPHONE: 707-725-4461

0217/JPA/Site Maps/FUHS_Site_Plan.pdf

Page 5: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

ENTRY

(NO WORK IN THIS AREA) GARAGE

TOILET ROOM

AG CLASSROOM#1

STORAGE

OFFICE

STORAGE

TOOL ROOM

AG SHOP

P M

A

R

) E (

REF.

N

W

O

D

TOILET ROOM

JANITOR

TOILET ROOM

STORAGE

(E) COMPRESSOR

L O O H C S H G I H N O I N U A N U T R O F T C I R T S I D L O O H C S H G I H N O I N U A N U T R O F

T E E R T S H T 2 1 9 7 3 A I N R O F I L A C , Y T N U O C T D L O B M U H , A N U T R O F

G N I D L I U B E R U T L U C I R G A

C Classroom Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off 07-2014/JPA/Site Maps/FUHS_Agriculture.pdf

AG CLASSROOM#2

Marianne Bithell
Text Box
2
Page 6: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

Office Conference Room/Storage

Superintendent’sOffice

Break Room/Storage

Business Manager Office

RR

0217/JPA/Site Maps/FUHS_Healthy_Start.pdf

AccountsPayable

Payroll

DistrictSecretary

DISTRICT OFFICE / HEALTHY STARTFORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA

Marianne Bithell
Text Box
1
Page 7: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

STEEL STORAGE WORK AREA

EQUIPMENT PLATFORM FINISHING ROOM

STORAGE PRODUCT

SUPPLIES TOOLS

OFFICE

LOBBY

ENTRY

TOILET ROOM

OFFICE

METAL SHOP

OFFICE SUPPLY PROJECT ROOM

WOOD SHOP

LUMBER ROOM

ROOM

MECH.

PROJECT ROOM

N

W

O

D

DOWN (E) RAMP

MECHANICAL

JANITOR

L O O H C S H G I H N O I N U A N U T R O F T C I R T S I D L O O H C S H G I H N O I N U A N U T R O F

T E E R T S H T 2 1 9 7 3 A I N R O F I L A C , Y T N U O C T D L O B M U H , A N U T R O F

L ARTS A I R T S U D N I

C Classroom Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

07-2014/JPA/Site Maps/FUHS_Industrial_Arts.pdf

Marianne Bithell
Text Box
3
Page 8: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

JAN.

WORK/STORAGE ROOM

LIFE SKILLS LIFE SKILLS

TOILET GIRL'S

UNISEX TOILET

CLASSROOM #1 CLASSROOM #2 CLASSROOM #4 CLASSROOM #5

CLASSROOM #6CLASSROOM #7

CHEMISTRY LAB

MECH.

CHEMSTORAGE

OFFICE

CORRIDOR

MECH.

MECH.

STAFF

LIFE ALCOVE

MECH.

MECH.

TOILET BOY'S

R

O

D

I R

R

O

C

MECH.

TECHNOLOGY LAB

CHANGING ROOM

STORAGE

PROJ. RM.

HALL

DARK RM.

A

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

Chemical Lab/Storage

0217/JPA/Site Maps/FUHS_F_Bldg.pdf

SCIENCE BUILDING “F”FORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA

Marianne Bithell
Text Box
4
Page 9: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

BUS SHOP

STORAGE

OFFICE

CLASSROOM

LOCKER ROOM

SUPPLY / STORAGE

AUTOSHOP

E G

A

R

O

T S

OFFICE

GARAGE

BOY'S TOILET

GIRL'S TOILET

ELECT. ROOM

FILE STORAGE

AUTOSHOP

AUTOSHOP

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut O�

Gas Shut O�

Main Electrical Shut

BUS BARN

0217/JPA/Site Maps/FUHS_Auto_Shop.pdf

OFFICE OFFICE

PSYCH.

SPEECH

AUTOSHOP BUILDINGFORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA

Marianne Bithell
Text Box
5
Page 10: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

CLASSROOM #1 CLASSROOM #2 CLASSROOM #3

CLASSROOM #6 CLASSROOM #5 CLASSROOM #4

CORRIDOR

VEST.

TOILET GIRL'S

JANITOR 1

JANITOR 2

VEST.

TOILET BOY'S

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

0217/JPA/Site Maps/FUHS_E_Bldg.pdf

CLASSROOM BUILDING “E”FORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA

Marianne Bithell
Text Box
6
Page 11: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

E C

A

P S E

P I P

GIRL'S TOILET

VEST.

JANITOR

VEST. MEN'S

E C

A

P S E

P I P

WOMEN'S TOILET

TOILET

BOY'S TOILET

CLASSROOM #1 CLASSROOM #2 CLASSROOM #3

CORRIDOR

CLASSROOM #4 CLASSROOM #5 CLASSROOM #6

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

0217/JPA/Site Maps/FUHS_D_Bldg.pdf

CLASSROOM BUILDING “D”FORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA

Marianne Bithell
Text Box
7
Page 12: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

CLASSROOM #1

BOY'S

COMPUTER LAB

CLASSROOM #2

CORRIDOR

GIRL'S

JANITOR

SUPPLIES

CLASSROOM #4/5

VEST. VEST.

TOILET

TOILET

CLASSROOM #3

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut O�

Gas Shut O�

Main Electrical Shut 0217/JPA/Site Maps/FUHS_C_Bldg.pdf

CLASSROOM BUILDING “C”FORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA

Marianne Bithell
Text Box
8
Page 13: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

BOY'S

JANITOR

B-1COMPUTER LAB

B-2COMPUTER LAB

CLASSROOM #3

GIRL'S

CORRIDOR

CULINARYCLASSROOM

CULINARYKITCHEN

HEATER

LAUNDRY

OFFICE

ELECT. EQUIP.

W/H

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

0217/JPA/Site Maps/FUHS_B_Building.pdf

CLASSROOM BUILDING “B”FORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA

Marianne Bithell
Text Box
9
Page 14: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

41

39

40

(E)D.S.

ADMINISTRATION BUILDINGFORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA 0217/JPA/Site Maps/FUHS_Administration.pdf

Special Ed Office

Waiting Area

General Office

Corridor

Copy Room Counselor

Counselor

Stor.

ConferenceRoom

Counselor

Corr.

Women

Men

Discipline Area

Mech Room

Secretary

Assistant Principal

Staff LoungeMailboxes

RestingToilet

Toilet

FHS Principal

StorageFHS

Secretary Counselor

Meeting Room

Attendance

RecordsStaff Lounge

SFO

RecordsBilingual

Aide Meeting Room

Counselor

Counselor

Hall

Marianne Bithell
Text Box
10
Page 15: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

LIBRARY

QUEST

QUEST

CORRIDOR

CLASSROOM

YEARBOOK ROOMQUESTENTRY

LOBBY

GIRL'S TOILET

BOY'S TOILET

CLASSROOMQUEST

JANITOR

CLASSROOM

CLASSROOM

CLASSROOM CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

QUEST

STORAGETEXTBOOK

PROCESSINGTEXTBOOK

SERVER ROOM

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

0217/JPA/Site Maps/FUHS_CommArts.pdf

STORAGE

STORAGE

SERVERROOM

COMMUNICATIVE ARTS BUILDING “J”FORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT

9

8

6

5

7

1

3

4

2

379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA

COMPUTER LAB

Marianne Bithell
Text Box
14
Page 16: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

REFRIG.

STORAGE

OFFICE

KITCHEN

OFFICE

CAFETERIA

BOY'S TOILET

STORAGE STORAGE

CLASSROOM CORRIDOR TOILET MEN'S

WOMEN'S TOILET

STORAGE

OFFICE

N

W

O

D

P M

A

R

) E (

P M

A

R

) E (

N

W

O

D

WALK-IN FREEZER

C Classroom

Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

0217/JPA/Site Maps/FUHS_Cafeteria.pdf

CAFETERIAFORTUNA UNION HIGH SCHOOLFORTUNA UNION HIGH SCHOOL DISTRICT379 12TH STREETFORTUNA, HUMBOLDT COUNTY, CALIFORNIA

Marianne Bithell
Text Box
12
Page 17: ADDENDUM TO RFQ/RFP Fortuna Union High School District ......ADDENDUM TO RFQ/RFP Fortuna Union High School District Proposition 39 HVAC, Fenestration and Appliance Efficiency Projects

CHORAL ROOM

LIBRARY

LISTENING

STORAGE

VESTIBULE

OFFICE MECH. RM.

PRACT.

PRACTICE RM.

MECH. RM

JANITOR

PRACT. PRACT.

E G

A

R

O

T S

STORAGE

ENSEMBLE RM.

OFFICE

INST. STOR.

VESTIBULE

BAND ROOM

CORRIDOR

TOILET

LOOHCS HGIH NOINU ANUTROFTCIRTSID LOOHCS HGIH NOINU ANUTROF

TEERTS HT21 973AINROFILAC ,YTNUOC TDLOBMUH ,ANUTROF

GNIDLIUB CISUM

C Classroom Fence

Exit/Door

Fire Extinguisher

Security Alarm Panel

Water Shut Off

Gas Shut Off

Main Electrical Shut Off

100509/JPA/Site Maps/FUHS_Music.pdf

Marianne Bithell
Text Box
13