Request for Proposal
Addendum No.1 to the
Dated:
PUBLIC WORKS DEPARTMENT
GOVERNMENT OF RAJASTHAN
ADDENDUM NO.1
TO THE
REQUESTFORPROPOSAL(RF~
For
UPGRADING AND REHABILITATION OF ROADS IN THE DISTRICTS OFALWAR, BHARATPUR & JAIPUR IN THE STATE OF RAJASTHAN (PACKAGE-01) ON HYBRID ANNUITY MODEL UNDER SWISS CHALLENGE METHOD OF
PROCUREMENT
Addendum No.1 to the
Request for Proposal
Following modifications to the RFP for Swiss Challenge Package- 0 I: Upgrading andRehabilitation of Roads in the Districts of Alwar, Bharatpur & Jaipur in the State ofRajasthan (Package -0 I) on Hybrid Annuity Model under Swiss Challenge Method ofprocurement are made as under.
The deletions from the earlier text of the RFP/DCA are indicated as strikethroughs andadditions are underlined.
S.No.
2
22.1.1 The Concessionaire hereby agrees and undertakes that it shall achieveFinancial Close, for and in respect of debt equal to at least 56% (fifty six percent) of the Total Project Cost, within a period 180 (one hundred and eighty)days from the date of this Agreement and in the event of delay. it shall beentitled to a further period not exceeding 90 (ninety) days, subject to payment ofDamages to the Authority in a sum calculated at the rate of 0.05% (zero pointzero five per cent) of the Performance Security for each day of delay, providedthat the Damages specified herein shall be payable every week in advance andthe period beyond the said 180 (one hundred and eighty) days shall be grantedonly to the extent of Damages so paid; provided further that no Damages shallbe payable ifsuch delay in Financial Close has occurred as a result of anydefault or delay by the Authority in procuring satisfaction of the ConditionsPrecedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidanceof doubt, the Damages payable hereunder by the Concessionaire shall be inaddition to the Damages, if any, due and payable under the provisions of Clause4.3.
Reference ClauseAddendum to RFP
_{includin_gDCA Vol I and IU_DCA Vol I, ARTICLE 12,CONSTRUCTION OFTHE PROJECT, 12.3
Construction of the Project
12.3 Construction of the Project12.3.1 On or after the Appointed Date, the Concessionaire shall undertakeconstruction of the Project as specified in Schedule-B and Schedule-C, and inconformity with the Specifications and Standards set forth in Schedule-D. The1095th (ORe thousaRS RiRe!), fifth) 910th (nine hundred and tenth) day from theAppointed Date shall be the scheduled date for completion of the Project ( the"Scheduled Completion Date") and the Concessionaire agrees and undertakesthat the Proj_ect shall be cOlll£leted on or before the Scheduled Com_£ietion Date.
3
DCA Vol I, ARTICLE 22,FINANCIAL CLOSE, 22.1
Financial Close
22.1 Financial Close
Schedule - B, I.New ROB to be constructedR-I (Natani ka Bada -Kathkurnar), Appendix B- Name TotalXII, Detai Is of ROBs/ Des Width Stairei RoW Ske LengtRUBs ign of Case/S. Hess of w h of RemaLocation Ch Struct FootpatNo. iHg Rail An Struct rksain ure hibt way gle ureage Lm1 VUPNo. (Km)
'Ihe
RoB
locatiobG.Malakhe o 750m n is at12· NB-
1 da 60m 89 0.642 129 Both railwa050 ~~ sides v
Mchaina
ge km
92510
pg. 2
P
Request for Proposal
Addendum No.1 to the
S.No. Reference Clause Addendum to RFP_1includi'!_gDCA Vol I and II)
~ (on
bypas
5)4 Schedule - B, 4.19 Retaining WallR-2 (Ramgarh - Sikri)
SI. Location LengthSide RemarksNo. From To (M)
e*istiRg iR PSSfGSRElitisFlI 2+490 2+625 Ix70 RHSReQair and
Rehabilitatione*istiRg iR PSSFI GSFlsitisR2 2+600 2+650 Ix20 RHS ReQair andRehabilitation
e*istiRg iFlPSSFGSRsitisR3 2+960 3+290 Ixl20 LHS Re)2air and
Rehabilitation
e*istiRg iR PesFGSRsitieFl4 3+545 4+050 2x245 BHSRe)2air and
RehabilitationTotal Length => 700
5 Schedule - B, Table B-3 Type of PavementR-3 (Mahuwa - Gadi -
Govindgarh), Length of section (Km)4.8 Type of PavementDesign & Pavement
6 Schedule - B, I. Bypasses,R-4 (Ajarka - Tala), S.l\io 3
Appendix B-III, Details of J.asat Sarai KalanBypasses and New
Alignments
7 Schedule - B, I. Proposed ROWR-4 (Ajarka - Tala), Details of...£n:~EosedROW for the Prqj_ectHi.g_hw~are_given below:Appendix B-V,
Design Chainage (Km)I. Details of Proposed S.No Proposed ROW (m)ROWand Additional LandFrom To
1 0+000 0+525 30
2 0+525 1+850 30
3 1+725 #G754+200I
16
4 44W§4+200 ~5+031 30
pg. 3
Request for Proposal
Addendum No.1 to the
S.No. Reference Clause Addendum to RFP(including DCA Vol I and II
5 ~5+031 ~11+350 16
6 ~11+350 ~13+000 +630
7 ~13+000 17+410 16
8 17+410 24+631 I 20iI Not in Scope of9 24+631 69+550Work Under NCRPB
10 69+550 70+300 16
11 70+300 72+750 16
12 72+750 73+435 20
13 73+435 82+640 21
14 82+640 84+400 16--I-- -+---
15 84+400 88+050 16
16 88+050 88+750 16
!Not in Scope of17 88+750 109+640
I Work Under NCRPB
18 109+640 n2*8GG 120+478 16
19 122*8GG120+478 122*7GG122+400 30
20 122*7GG122+400 124+760 16---
21 124+760 128+889 168 Schedule - B, 2. Additional Land Required
R-4 (Ajarka - Tala), Details of additional land to be acquired are_g_ivenbelow:Appendix B-Y, Design Chainage Additional Land2. Additional Land
rkrm Width (m) RemarkRequired S.No
From To LHS RIIS1 23,000 23·300 20 20 Toll Plaza
2 65·520 65·820 22 22 Toll Plaza
3 119·630 119·930 18 18 Toll Plaza
4 95+082 95+760 15 15 Agar BXEass
pg. 4
Request for Proposal
Addendum No.1 to the
S.No. Reference Clause Addendum to RFP(including DCA Vol I and II)
9 Schedule - B, A. At-Grade IntersectionsR-4 (Ajarka - Tala),Appendix B-VI, New Location of RemarkIntersections Indicate figure number ofintersection
S.No Typical Design in Manual to beDesign
referredChainage (km)
0+000Refer Chapter 3 of Manual (IRC 3-Leg
1SP:41-1994)
Refer Chapter 3 of Manual (IRC 3-Leg2 1+850
SP:41-1994)
Refer Chapter 3 of Manual (IRC 3-Leg3 4+200
SP:41-1994)
Refer Chapter 3 of Manual (IRC 3-Leg4 5+031
SP:41-1994)
Refer Chapter 3 of Manual (IRC 3-Leg5 11+350
SP:41-1994)
Refer Chapter 3 of Manual (IRC 3-Leg6 13+000
SP:41-1994)
Refer Chapter 3 of Manual (IRC 3-Leg7 120+478
SP:41-1994)
Refer Chapter 3 of Manual (IRC 3-Leg8 122+400
SP:41-1994)
Refer ChaRter 3 of Manual (IRC 3-Leg.2 95+082
SP:41-1994)
Refer ChaRter 3 of Manual (IRC 3-Leg10 95+760
SP:41-1994)
10 Schedule - B, Typical Cross - sections and ApplicationR-6 (Kotkasim - Tapukara
- Haryana Border), Length (m) (Km)Appendix B-1, Typical * * * * * * * * * * * * * * * * * *Cross - sections and
Application
pg. 5
Addendum No.1 to the
Request for Proposal
S.No. Reference Clause Addendum to RFP(including DCA Vol I and II)
II Schedule - B, Table 8-3 Type of Pavement DesignR-7 (Deeg - Kaman),
S.No.Chainage Length Type of
RemarkFrom To (Km) Pavement
I 5+000 6+200 1.200 Flexible
2 6+200 6+375 0.175 Flexible
3 6+375 8+000 1.625 Flexible
4 12+380 15+145 2.765 Flexible
5 15+445 17+400 1.955 Flexible (Cold in17+400 17+725 0.325 Place ffi
6 Flexible Recyclimg)
7 18+000 20+525 2.525 Flexible
8 20+525 20+800 0.275 Flexible2 20+800 22+000 1.200 FlexiblelQ 22+000 22+380 0.380 Flexible
pg.6
Addendum No.1 to the
Request for Proposal
12 Schedule - B, Table 8-4 Type of Rigid PavementR-7 (Deeg - Kaman), Length tm1 (Km)
* * * * * * * * * * * * * * * * * *13 Schedule - B, Typical Road Cross - section and Application
R-7 (Deeg - Kaman), Length (Km)Appendix B-1 * * * * * * * * * * * * * * * * * *
14 Schedule - B, Details of Stretches Proposed for Reconstruction ~ble PavementR-7 (Deeg - Kaman),
Appendix B-II Design Chainage LengthS. No. Remark
From To (lim)
1 1+425 1+486 0.061 --+-l 1+486 :h345 1.859 -~l 3+345 4+260 0.915 -1_1 4+525 5+000 0.475 -4~ 8+000 8+025 0.025 -g 8+310 8+475 0.165 --~l 8+475 10+800 2.325 -~~ 10+800 11+490 0.690 -2 22+380 22-1524 0.144 --
Total ~6.65915 Schedule - B, 4.S. Type of Pavement & Pavement Design
R-8 (Kherli - Nadbai- Type of pavement shall be Flexible provided as per Section 5 of the Manual.Kumher to UP Border), 4.8 However, in the sections given in Table B 3, B 4 !i:l the type of pavement shall
Type of Pavement & be as specified therein.Pavement Design
....... _. D ......... •1'0 "' .Design
&Ne bengtfl Type of£"1. ._RemarkfKmt Pa'lemenl.. Frem +e
l Q.+OO9 ~ ~ F'leldele~ ~ ~ ~ F'leltiele~ ~ ~ ~ F'ieltieie4 ~ ~ GdW F'ieltiele§ ~ ~ b9W F'leltieie(, ~ ~ (M4G Fieltiele7 ~ ~ ~ F'ieltieie8 W+9W ~ ~ F'lel,ieie9 ~ ~ ~ F'leltiele:w ~ ~ G,WG F'ieltieleII ~ ~ ~ l'I~~ ~ ~ Q.,WQ FleltieleH ~ so-sas ~ Fleltiele14 ~ ~ ~ F'lelti13lel§ ~ ~ bHQ F'lelti13lel6 ~ ~ ~ Flelti13le
pg. 7
Request for Proposal
Addendum No.1 to the
i-7 ~ ~ ~ Fle~iele-18 ~ ~ ±mG Fle~iele+9 ~ ~ fh.±OO FlelEiele;!G ~ ~ g,g:ro FlelEieleU ~ ~ ~ Fle~iele~ ~ ~ ~ Fle~iele~ ~ ~ ~ Fle~ieleM ~ ~ ~ Fle~iele~ ~ ~ M4Q Fle~iele
Table B-4 B-3 Type of Pavement
S.No Design Chainage Length (in Type ofFrom To KM) Pavement
I 1+435 I; 865 0.43 Rigid
2 2+780 2~900 0.12 Rigid
3 5+010 5+160 0.15 Rigid
4 10+425 10+950 0.525 Rigid
5 17+672 18+810 1.138 Rigid
6 23+980 24+010 0.03 Rigid
7 24+010 24+270 0.26 Rigid
8 24+270 24+640 0.37 Rigid
9 30+345 30+480 0.135 Rigid
10 30+480 31+070 0.59 Rigid
II 33+ 180 33+970 0.79 Rigid
12 39+015 39+695 0.68 Rigid~- _-- "_0'
13 41+685 41 ~745 0.06 Rigid
14 42+175 42+340 0.165 Rigid
15 42+865 43+495 0.63 Rigid
16 45+530 45+655 0.125 Rigid
17 49+030 50+175 1.145
Total Length Km) 7.343* * * * * * * * * * * *Schedule - B, * * * * * *16
Length (Km)R-8 (Kherli - Nadbai-Kumher to UP Border),
* * * * * * * * * • *Appendix 8-1, Typical * * * * * * *Road Cross - sections and
AI'glication _._
pg.8
Request for Proposal
Addendum No.1 to the
17 Schedule - B, Details of Stretches Prl!l!_osedfor ReconstructionR-8 (Kherli - Nadbai -Design ChainageKumher to UP Border), SI. No. Length (Krn)Appendix B-I1, Details of
From ToStretches Proposed forPart-I (Kherli-Nadbai-Kumher)Reconstruction
I Oi-OOO O~O15 0.015----- -----_._--2 0+015 1+435 1.423 1+435 1+865 0.434 1+865 2+780 0.9155 2+780 2+900 0.126 2+900 3+050 0.157 3+050 5+010 1.968 5+010 5+160 0.159 5+160 5+800 0.6410 5+800 10+425 4.625II 10+425 10+950 0.52512 10+950 16-.-032 5.082u 23+980 24+010 0.03
+;H 24-+270 24-r640 0.37+412 27+050 27+650 0.6l.Q 30+345 30+480 0.135
Part-II (Kumher to UP Border)HI7 39+015 39+695 0.68Mil. 40+715 40+815 0.118 Schedule - B, 4. Widening of Culverts
R-8 (Kherli - Nadbai-Kumher to UP Border),
Existing Structure"Appendix B-X!, SI.No. DesignRemarksChainage(km) Type Width full
Part-I (Kherli-Nadbai-Kumher)
Widening as per1 1+630 Syphon 10 site conditions
IRC2 2+777 Slab Culvert 8.5 --00--
3 4+763 Slab Culvert 7.8 --00--
4 9+963 Slab Culvert 7.5 --00--
5 14+589 Slab Culvert 7.3 --00--
6 23+415 Syphon 10 --Do--I
24+865 Syphon 10 --00--7
8 25+535 Syphon 10 --00--
9 26+685 Syphon 10 --00--
10 27+035 Syphon 10 --00--
11 28+335 Syphon 10 --00--
pg. 9
Addendum No.1 to the
Request for Proposal
12 28+835 Syphon 10 --00--
13 29+135 Syphon 10 --00--
14 29+335 Syphon 10 --00--
15 36+335 Syphon 10 --00--
Part-II (Kumher-UP Border)
7.5Widening as per
16 40+765 Slab Culvert site ESRaitisRsIRC
17 41+565 Slab Culvert 7.2 --00--
18 41+765 Slab Culvert 10 --00--
19 46+315 Syphon 10 --00--
20 46+615 Syphon 12.5 --00--
21 46+940 Slab Culvert 7.8 --00--
22 47+645 Syphon 12.5 --00--
23 48+040 Slab Culvert 10 --00--
24 48+115 Syphon 12.5 --00--
25 50+575 Slab Culvert 7.8 --Do--
* * * * * * * * * * * * * * * * * *Length (Km)
* * * * * * * * * * * * * * * * * *
Include TCS -3
19 Schedule - B,R-9 (Kheria Mod - UPBorder), Appendix B-1,
Typical Road Cross Sectionand A_0ilication
.20 Schedule - B,R-9 (Kheria Mod - UPBorder), Appendix B-1
res ·1S1'RE:'<GTIlINGor EX[SmG 2 - L.".NECARRIAGE WAY TO 2 - L.'\]\E AND WIDDIING
WITH (ORA\lULAil. SHOULDER
21 Schedule - B,R-10 (Nagar - Nadbai -
Halana - Wer
* * * * * * * * * * * * * * * * * *Table B-3 Type of Pavement
~gn Chainage Length of section.(m1S. No. Type of PavementFrom To
0+000 0+500 500 Rigid
pg. 10
Addendum No.1 to the
Request for Proposal
2 5+000 5+600 600Rigid
3 6+900 7+300 400Rigid
4 14+100 14+400 300 Rigid5 19+500 20+000 500
Rigid6 24+200 25+500 1300
Rigid7 25+500 27+100 1600 Rigid
8 29+300 30+000 700 Rigid
2 35+300 35+600 300 Rigid
9-lQ 37+200 37+700 500 Rigid
-W-ll 38+500 38+800 300 Rigid
-1+11 44+300 44+400 100 Rigid
g_.ll 44+400 44+900 500 Rigid
-l-JH 44+900 45+000 100 Rigid-14-.12 45+500 45+900 400 Rigid~l§. 49+000 49+900 900 Rigid+6-11 49+900 50+400 500 Rigid22 Schedule - D, J. Gald Mill;Ree~'eling
R-7 (Deeg Kaman), 3. Cold Gela mill Fes}'slingas sli)3Hlaleain GlaHse7J et:IAe IRG 12{l2{ll!i allesaliensMix Recycling and inaisalea in sSAeaHle8 at A)3penai)18 I.R-9 (Kheria Mod - UP 3. Cold in Place Rec}:clin2
Border) Cold in Place Recl:cling as QerIRC 120-2015 (Recommended Practice forRecxcling of Bituminous Pavements) at locations indicated in Schedule B atTable B-3
23 Schedule - B, * * * * * * * * * * * * * * * * * *All Roads in Clause As per Manual requirement, a minimum thickness (in 111m)shall be adopted for4.8(Pavement Design) pavement design"* * * * * * * * * * * * * * * * * *
24 Schedule - B, Details of Stretches Proposed for Reconstruction a~ flnible PlwemenlR-2 (Ramgarh-Sikri),Design ChainageAppendix B-1! SI. No. Length (m)
From To1 Q 200 200
.J-~ 200 525 325
;!-1 2175 2400 225
J1 2600 2750 150
4-~ 3950 4100 150
~ 8425 8475 50
&1 8475 27745 Not in Scope due toProposed under
~(PO, ~Lwo...L)
pg.11
lnd!Bf 'uB41sB!B}l GMd(ddd) 1;);)U!'3U3 j;)!4') [BUO!ll pv
OLOfim"t : (w) uO!pnJISuoJaH JO qlllua'l (1110.1.
orr O(~Z£ OOZZ£ ITOOr oour 0081£ IT0001 0081£ 0080£ ITitto£ ~ZI6Z ~606Z OI-u~L ~LZ8Z OOZ8Z 6-8~~I 006LZ ~PLLZ '8--t
Hd1DN
..