Addendum No: One (01)
Project: Sedalia Downtown Streetscape Phase IV
Project No. 2019-03
Date: June 27, 2019
The following changes, additions, modifications, information and clarification are hereby made to the
Specifications and/or plans dated June 3, 2019, and shall be incorporated in preparation of all Proposals
for the Work.
PLANS
1. CLARIFICATION – SHEET C-122: Transverse joints should be Type D and longitudinal should be
the choice of Type BS or Type C.
2. CLARIFICATION – SHEET C-130: Detail D1 should indicate a concrete slab thickness of 6” under
and adjacent to the brick pavers, not 8”.
3. DELETE Detail G5 on SHEET C-130 in its entirety and replace with the attached detail.
4. CLARIFICATION – SHEET C-132, Structural Steel Note 9: An inspector is not required if the
Contractor provides the structural steel fabricators proof of AISC certification and it is found
adequate in meeting all AWS D1.1 code requirements.
5. CLARIFICATION – SHEET C-310: All permanent signs shall be mounted on the proposed street
light poles. Mounting hardware shall be considered subsidiary to the installation of the signs.
6. DELETE SHEETS C-320 – C-325 in their entirety. There will no longer be traffic signals on this
project.
7. DELETE the following Sheets in their entirety and replace with the attached revised sheets:
a. C-000 - TITLE SHEET
i. Removed Traffic Signal Sheets from Index of Sheets.
b. C-001 - GENERAL NOTES & SUMMARY OF QUANTITIES
i. Removed Traffic Signal Bid Item and Decorative Metered Service Pedestal from
Summary of Quantities and added Bid Item “No Parking Zone Line”.
c. C-120 - INTERSECTION DETAIL – S. OHIO & 6TH ST.
i. Removed Traffic Signals.
d. C-310 - PAVEMENT MARKING AND SIGNING PLAN – S. OHIO AVE.
i. Added Stop Signs and Notes.
e. C-400 - STREET LIGHTING PLAN – S. OHIO AVE.
i. Removed Decorative Metered Service Pedestal. Added Pole Base Detail and
Notes.
8. CLARIFICATION – SHEET C-400 (Also applies to proposed Decorative Street Lights included in
Add Alternate 1, N. Ohio Ave. – SHEET C-311):
a. KCP&L Provides and Installs:
i. Decorative Light Poles
ii. Conductors
iii. Fixtures
b. KCP&L Provides and Contractor Installs
i. Galvanized Anchor Bolts (This item considered subsidiary to work included
with Bid Item, “Street Light Pole Base”.
ii. Pull Box (Class 1)
c. Contractor Provides and Installs:
i. Street Light Pole Bases
ii. 2” Sch. 40 PVC Conduit
iii. Pull String
PROJECT MANUAL
1. CLARIFICATION – Job Special Provision F. Brick Pavers 5.2: Payment for Brick Paver Crosswalks
shall include all materials and labor to install the 6” concrete slab, sand leveling course, and
pavers. Base rock to be paid for with “6” Type 1 Base” Bid Item.
2. CLARIFICATION – Job Special Provision F. Brick Pavers 5.2: Payment for Inlaid Brick Pavers at
Sidewalk shall include all materials and labor to install the 3” concrete slab (shown on the
attached Detail), sand leveling course, and pavers.
3. CLARIFICATION – Bid Item for Paver Installation (City Supplied Pavers): This Bid Item shall
include all materials and labor to install pavers including, but not limited to, picking up and
hauling the pavers to the job site from the Central Wastewater Treatment Plant on Main Street,
sand leveling course, and 3” concrete slab.
4. DELETE the Proposal, pgs. 14-16, in its entirety and replace with the attached Proposal.
SIDEWALK WITH BRICK INLAY BEHIND CURBG5NOT TO SCALE
3" CONCRETE
S O
hio
Ave
N O
hio
Ave
CITY OFSEDALIA
W 7th St
W 6th St
W 5th St
S O
sage
Ave
S K
entu
cky
Ave
S M
onite
au A
ve
W 4th St
S L
amin
e A
ve
S M
assa
chus
etts
Ave
W Broadway Blvd
W 3rd St
W 2nd St
Main St
C-000
TITLE SHEET
INDEX OF SHEETSC-000 TITLE SHEETC-001 GENERAL NOTES & SUMMARY OF QUANTITIESC-002 TYPICAL SECTIONSC-100 GENERAL LAYOUTC-110 PLAN & PROFILE - S OHIO AVEC-111 PLAN & PROFILE - S OHIO AVEC-112 PLAN & PROFILE - S OHIO AVEC-113 PLAN & PROFILE - 6TH STC-114 PLAN & PROFILE - N OHIO AVEC-120 INTERSECTION DETAIL - S OHIO & 6THC-121 INTERSECTION DETAIL - S OHIO & ALLEYC-122 JOINTING PLANC-130 ROADWAY DETAILSC-131 ROADWAY DETAILSC-132 ROADWAY DETAILSC-133 STORM SEWER DETAILSC-200 EROSION CONTROL PLANC-201 EROSION CONTROL DETAILSC-300 TRAFFIC CONTROL PLAN - S OHIO AVEC-301 TRAFFIC CONTROL PLAN - N OHIO AVEC-310 PAVEMENT MARKING AND SIGNING PLAN - S OHIO AVEC-311 PAVEMENT MARKING AND STREET LIGHTING PLAN - N OHIO AVEC-400 STREET LIGHTING PLAN - S OHIO AVEC-500 DRAINAGE AREA MAP AND CALCULATIONSC-600 CROSS SECTIONS S OHIO AVEC-601 CROSS SECTIONS S OHIO AVEC-602 CROSS SECTIONS S OHIO AVEC-603 CROSS SECTIONS S OHIO AVEC-610 CROSS SECTIONS 6TH STC-611 CROSS SECTIONS 6TH STC-620 CROSS SECTIONS N OHIO AVE
CITY OF SEDALIA, MISSOURIDOWNTOWN STREETSCAPE, PHASE IV
CITY PROJECT NO. 2019-03FEDERAL PROJECT NO. STP-5700(511)
PROJECTLOCATIONS OHIO AVEBASE BID
Not To Scale
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET NO:
SHEET TITLE
CO
NS
ULT
AN
TSS
EA
LP
RO
JEC
T N
AM
E
CITY
OF
SEDA
LIA,
MO
DOW
NTO
WN
STRE
ETSC
APE
CITY
PRO
JECT
NO
. 201
9-03
FEDE
RAL
PRO
JECT
NO
.ST
P-57
00(5
11)
RE
V.
DE
SC
RIP
TIO
N
GJL, DJM
GJL, DJM
JCK, CDP
DA
TEB
Y
6/24
/201
9M
:\TRN
\14-
100-
509-
00\2
_Disc
iplin
es\_
SHEE
TS\2
_She
ets
- civi
l\141
5090
9 - S
treet
scap
e\14
1509
09-G
-001
Title
.dwg
14-100-509-09
Cer
t. of
Aut
horit
y #
2003
0075
99
6/3/2019
06/03/2019
PROJECTLOCATIONN OHIO AVEADD ALTERNATE 1
UTILITY CONTACTSWATER
SEDALIA WATER DEPARTMENTCHARLES BROSCHPO BOX 806SEDALIA, MISSOURI 65302(660) 826-1234
ELECTRICKCP&LERIK HARDING921 PARKHURST DRIVESEDALIA, MISSOURI 65301(877) 729-8696
GASEMPIRE DISTRICT GAS COMPANYJIM HARGRAVE1601 SEDALIA ROADSEDALIA, MISSOURI 65301(660) 827-3188
TELEPHONEAT&TSTEPHEN HARLAN220 E 5TH ST.SEDALIA, MISSOURI 65301(816) 325-5657
FIBER OPTICMISSOURI NETWORK ALLIANCE800 NW CHIPMAN ROAD, SUITE 5750LEE'S SUMMIT, MISSOURI 64063(888) 832-6662
TELEVISIONCHARTER COMMUNICATIONS210 W 7TH ST.SEDALIA, MISSOURI 65301(888) 438-2427
SANITARY SEWERALLIANCE WATER RESOURCESPHIL WEBSTER901 E 3RD ST.SEDALIA, MISSOURI 65301(660) 827-7830
STORM SEWERALLIANCE WATER RESOURCESPHIL WEBSTER901 E 3RD ST.SEDALIA, MISSOURI 65301(660) 827-7830
MoDOTKANSAS CITY AREA - MARSHALL OFFICEMIKE McGRATH1593 WEST ARROW ST.MARSHALL, MISSOURI 65340(660) 886-2115
DESIGN DESIGNATIONFUNCTIONAL CLASSIFICATIONDESIGN SPEED
BASE BIDOHIO BEGIN STATIONOHIO END STATIONPROJECT LENGTH
6TH BEGIN STATION6TH END STATIONPROJECT LENGTH
ADD ALTERNATE 1BEGIN STATIONEND STATIONPROJECT LENGTH
MINOR ARTERIAL25 MPH
11+00.0016+12.21512 FEET
20+35.0021+60.00125 FEET
50+10.0051+11.18101 FEET
CONCRETE PAVEMENT
CONCRETE SIDEWALK
BRICK PAVER
BRICK CROSSWALK PAVER
CONCRETE TRUNCATED DOME
GRAVEL DRIVEWAY
COAL CHUTE & BASEMENT OPENING
HATCH LEGEND
C-001
GENERAL NOTES &SUMMARY OFQUANTITIES
GENERAL NOTES1. The construction covered by these plans shall conform to the "Missouri Standard
Specifications for Highway Construction, 2018".
2. Construction of the improvements shown or implied by this set of plans shall not beinitiated or any part thereof undertaken until the City is notified of such intent and allrequired and properly executed bonds and contract agreements are received andapproved by same.
3. The Contractor shall have one (1) signed copy of the plans and one (1) copy of theappropriate Construction Specifications and Project Manual at the job site at alltimes. It is advisable that the Contractor become familiar with the Cityrequirements and standards in the event that there is a discrepancy between thisapproved plan and the city requirements. Advise the City's Representative of anydiscrepancy prior to bidding or working on this project.
4. The Contractor shall be responsible for obtaining all required permits, paying allfees and for otherwise complying with all applicable regulations governing the work.
5. The accuracy and adequacy of the alignments, dimensions, and elevations shall beconfirmed by the Contractor at the job site. If the Contractor finds any dimensionsto be in error or in question, the City's Representative shall be promptly contactedfor clarification prior to the continuation of the work. The engineering and geologicaldata shown on these plans are from studies made in the field and represents thebest information available prior to construction, at the time of testing.
6. Notify the City's Representative at least 48 hours prior to beginning any work. Forconstruction under driveways and streets, Contactor shall notify residents ofconstruction activities well in advance of the work, and shall provide and maintain atemporary surface for access until permanent restoration is completed.
7. The Contractor shall develop and implement proper traffic control in conformancewith the latest revision of the MUTCD.
8. During construction, access shall be maintained for emergency vehicles and localtraffic. Contractor shall notify the City 72 hours prior to any street closures orblockages to allow the City adequate time to notify the fire, police and ambulancedepartments, schools, school bus companies, and post office of upcoming work.Closures and traffic plans are subject to approval of the City's Representative.
9. Prior to commencement of work, the Contractor shall notify all those utilitycompanies which have facilities in the vicinity 72 hours prior to the construction tobe performed. The Contractor shall be held responsible for contacting all utilitycompanies for field location of all underground utility lines, whether shown on theseplans or not, prior to any excavation. All existing utility locations shown on theplans are taken from utility company records and are approximate only. Someservice lines from building to main have unknown locations and may conflict withthe plan. Relocation of said service lines required for the construction of thisproject shall be the responsibility of the Contractor and shall be at the Contractor'sexpense. The Contractor, prior to construction, shall verify the location and depthof all underground utilities. The repair of any damage to said utilities shall be at thecost to the Contractor. Any utilities found to be in conflict with the proposedconstruction, shall be brought to the immediate attention of the City'sRepresentative.
10. All utility and sanitary service lines shall be kept in service and protected duringconstruction operations. It shall be the Contractor's responsibility to locate allexisting service lines, and notify the City's Representative of any conflictsimmediately. Occasional adjustments to the work to accommodate theunanticipated presence or location of existing utilities may be required and will beconsidered a subsidiary obligation of the contract. The Contractor shall be heldresponsible for contacting all utility companies for field location of all undergroundutility lines prior to any excavation. Utilities damaged through the negligence of theContractor shall be repaired or replaced by the Contractor at his expense.
11. Contractor shall be responsible for all service line relocations and lowerings. Allservice line relocation and lowerings must be approved by the City prior torelocating or lowering service. Once the service has been relocated or lowered,the service line must be inspected by the City prior to backfilling.
12. The Contractor shall be responsible for supporting any water mains or gas mainshorizontally and vertically when crossing under the existing main(s). If applicable,the Contractor will be responsible for supporting any gas main or water mainlaterally when working alongside any main(s).
13. Contractor must coordinate the bracing of all utility poles with the Kansas CityPower and Light prior to any excavation within 10 feet of a pole.
14. All signs, mailboxes, and fencing in conflict with the proposed construction shall beremoved and reset. Temporary fencing shall be installed at locations where existingpermanent fencing exists; location shall be determined in the field. These itemsare considered incidental to the bid items.
15. Temporary erosion control shall be installed per the specifications, or as warrantedand determined in the field by the City's representative. Erosion controls must be inplace prior to any site work and must be maintained continuously throughout theproject. Payment for installation and continuous maintenance shall be incidental tothe erosion control pay items.
16. Clearing and grubbing operations and disposal of all debris there from shall beperformed by the Contractor in strict accordance with all local, state, and federallaws, codes, and ordinances. Open burning of debris shall not be permitted.
17. Driveways, sidewalk, and other areas inside and outside the construction limitsdamaged by the Contractor shall be restored to a condition equal to or better thanthat existed before damage occurred at the Contractor's expense. All catch basins,utility valves, hydrants, manholes, meter pits, etc. within grading limits shall beadjusted or rebuilt to grade as required. All inlets shall be graded to drain. Noseparate payment will be made for adjustments not noted in the plan notation andcallouts.
18. Existing trees not designated for removal shall be protected from damage duringconstruction. Trees damaged during construction shall be pruned and woundsprotected as approved by the City's Representative.
19. It is the Contractor's responsibility to determine earthwork quantities. Noclassification of excavated materials will be made. No additional payment will bemade for rock excavation. The Contractor is solely responsible for determining theamount of rock excavation, if any, to be included in his bid. Excavation work shallinclude the removal and subsequent handling of all materials excavated orotherwise removed in performance of the work, regardless of the type, character,composition, or condition thereof. All fill and backfill material shall consist of earthor other approved material free from organic matter with all undesirable materialremoved.
20. All Contractor stockpiling, staging and employee parking shall be confined to the
locations shown on the plans. If the Contractor believes that he requires moreworking room than is provided in the permanent easement or right-of-way, theContractor, at his expense, may obtain agreements with property owners foradditional temporary access. The Contractor shall be responsible for gaining anytemporary access required to complete the work. The Contractor shall provideOwner and City with copies of any agreements reached for said access.
21. The top 6" of all fill shall be top soil, and shall be approved by the City'sRepresentative prior to sod or seed installation. All back fill shall be tamped andorganic top soil placed thereafter followed by seeding or sod as required by thespecifications. No extra payment will be made for imported fill material required toconstruct fills to lines and grades indicated on the drawings.
22. All water required for the construction of this project shall be purchased from theSedalia Water Department through the use of a fire hydrant water meter. Meterscan be obtained from the Water Department for a fee, refundable upon return of themeter. All costs for water shall be the Contractor's responsibility, subsidiary toother contract payment items.
23. If water seepage is encountered during excavation, use of temporary dewateringtechniques may be necessary at no additional cost to the City.
24. The Contractor shall not be allowed to work Sunday. Holidays and Saturday workshall be approved by the City's Representative.
25. The Contractor shall notify property owners a minimum of 48 hours prior to anyconstruction activities or as designated in the plans.
26. The Contractor shall be solely responsible for the safety of the construction workersand the public.
27. All benchmarks, control points, property markers and right-of-way monumentsdisturbed or destroyed shall be reset by a Missouri registered land surveyor at theContractor's expense.
28. All existing drain lines (sump pump, foundation drains, roof drains, etc.) shall beextended to the nearest inlet. All bends and fittings shall be considered subsidiaryto 6" HDPE drain pipe.
29. The Contractor shall be responsible for submitting a traffic control plan for eachproject location subject to the approval of the City's Representative prior to the startof construction. All work required for traffic control shall be subsidiary to other itemsof the bid.
30. All Riprap shall meet the requirements of Section 2600 of the APWA KCMetroSpecifications, latest edition.
31. MoDOT and FHWA may make inspections of the work and the contractor shallgrant them access to all parts of the work.
SUMMARY OF QUANTITIESSURVEY DATUMMissouri State Plane (Central Zone), NAVD88 Geoid 12A, US Survey Feet.
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET NO:
SHEET TITLE
CO
NS
ULT
AN
TSS
EA
LP
RO
JEC
T N
AM
E
CITY
OF
SEDA
LIA,
MO
DOW
NTO
WN
STRE
ETSC
APE
CITY
PRO
JECT
NO
. 201
9-03
FEDE
RAL
PRO
JECT
NO
.ST
P-57
00(5
11)
RE
V.
DE
SC
RIP
TIO
N
GJL, DJM
GJL, DJM
JCK, CDP
DA
TEB
Y
6/27
/201
9M
:\TRN
\14-
100-
509-
00\2
_Disc
iplin
es\_
SHEE
TS\2
_She
ets
- civi
l\141
5090
9 - S
treet
scap
e\14
1509
09-C
-001
Gen
eral
Not
es Q
uant
.dwg
14-100-509-09
Cer
t. of
Aut
horit
y #
2003
0075
99
6/3/2019
06/03/2019
STA. 20+69.83, 20.00' RTELEV: 904.89
STA. 20+64.83, 20.00' RTELEV: 905.01
STA. 21+34.83, 20.00' RTELEV: 905.63
STA. 21+29.58, 21.49' RTELEV: 905.96
STA. 21+34.83, 30.00' LTCURB RADIUS POINT
STA. 21+38.83, 20.00' LTELEV: 905.64
21+00
13+00
STA. 20+69.83, 25.00' RTELEV: 905.29
STA. 20+73.83, 30.00' RTCURB RADIUS POINT
STA. 20+79.09, 21.49' RTELEV: 905.46
STA. 21+38.83, 20.00' RTELEV: 905.70
STA. 21+43.83, 20.00' RTELEV: 905.93
STA. 21+38.83, 25.00' RTELEV: 905.95
STA. 21+38.83, 25.00' LTELEV: 905.99
R
STA. 21+45.83, 20.00' LTELEV: 906.12
R
STA. 21+29.83, 21.34' LTELEV: 906.07
STA. 12+97.27, 20.50' LTELEV: 905.30 STA. 12+95.27, 20.50' RT
ELEV: 905.62
STA. 13+02.27, 25.50' LTELEV: 905.41
STA. 13+02.27, 20.50' LTELEV: 905.01
STA. 13+12.27, 22.50' LTELEV: 905.47
STA. 13+06.27, 30.50' RTCURB RADIUS POINT
STA. 13+02.27, 24.50' RTELEV: 905.54
STA. 13+06.27, 20.50' RTELEV: 905.24
STA. 13+70.27, 24.50' RTELEV: 905.91
STA. 13+70.27, 20.50' RTELEV: 905.59
STA. 13+77.27, 20.50' RTELEV: 906.08
R R
2.13%
R
R
5.00'
STA. 13+12.27, 22.50' RTELEV: 905.86
2.61%
STA. 13+60.27, 22.50' RTELEV: 906.06
STA. 13+66.27, 24.50' RTELEV: 905.91
STA
. 20+35.00
STA. 21+34.83, 25.00' RTELEV: 905.88
STA
. 20+35.00
STA
. 21+60.002.48%
0.45%
STA. 21+34.83, 25.00' LTELEV: 905.97
STA. 13+06.27, 25.50' LTELEV: 905.43
STA. 13+06.27, 24.50' RTELEV: 905.56
STA. 20+73.83, 25.00' RTELEV: 905.35
STA
. 21+60.00
0.55%S
TA. 20+85.83
STA
. 20+85.83
0.55%S
TA. 21+22.83
STA
. 21+22.83
0.55%
0.55%
5.66'5.00'
5.66'5.00'
2" MOD. C&G 2" MOD. C&G
TYPE 1 C>YPE 1 C&G
TYPE 1 C&G
TYPE 1 C&G
2.00%3.00%
2.00%3.00%
STA. 13+06.27, 20.50' LTELEV: 905.03
STA. 20+73.83, 20.00' RTELEV: 904.95
STA. 13+66.27, 20.50' RTELEV: 905.59
STA. 21+34.83, 20.00' LTELEV: 905.62
STA. 20+69.83, 26.00' LTELEV: 905.15
STA. 20+80.59, 22.63' LTELEV: 905.53
STA. 20+62.83, 19.99' LTELEV: 905.16
STA. 20+69.83, 20.00' LTELEV: 904.73
STA. 20+73.83, 26.00' LTELEV: 905.19
STA. 13+76.27, 20.50' LTELEV: 905.88
STA. 13+70.27, 24.50' LTELEV: 905.69
STA. 13+70.27, 20.50' LTELEV: 905.41
STA. 13+62.30, 21.32' LTELEV: 905.70R
R
STA. 13+66.27, 24.50' LTELEV: 905.67
TYPE 1 C&G
2" MOD. C&G
STA. 20+73.83, 20.00' LTELEV: 904.77
STA. 13+66.27, 20.50' LTELEV: 905.39
7.00
%
7.00%
PROP. DECORATIVELIGHT (TYP.)
5.30
'
5.06'
6.00
'
4.00'
7.00'
6.00
'
5.31
'
5.08'
5.31'
5.53
'
5.84
'
5.85'
8.00
%5.
00'
8.00%5.00'
8.00%4.00'
5.00
%5.
00'
8.00%4.00'
PROP. DECORATIVELIGHT (TYP.)
STA. 13+02.27, 20.50' RTELEV: 905.22
5.00
'
7.00
'
5.00'
7.00
%5.
00'
7.00
'
7.00'
C-120
INTERSECTIONDETAIL - S OHIO &
6TH
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET NO:
SHEET TITLE
CO
NS
ULT
AN
TSS
EA
LP
RO
JEC
T N
AM
E
CITY
OF
SEDA
LIA,
MO
DOW
NTO
WN
STRE
ETSC
APE
CITY
PRO
JECT
NO
. 201
9-03
FEDE
RAL
PRO
JECT
NO
.ST
P-57
00(5
11)
RE
V.
DE
SC
RIP
TIO
N
GJL, DJM
GJL, DJM
JCK, CDP
DA
TEB
Y
6/24
/201
9M
:\TRN
\14-
100-
509-
00\2
_Disc
iplin
es\_
SHEE
TS\2
_She
ets
- civi
l\141
5090
9 - S
treet
scap
e\14
1509
09-In
ters
ectio
n De
tails
.dwg
14-100-509-09
Cer
t. of
Aut
horit
y #
2003
0075
99
6/3/2019
06/03/2019
SOUTH OHIO AVENUE & 6TH STREET INTERSECTION DETAILA100 5'2.5'
LEGEND
R RAMP
CURB TRANSITION
2' WIDE DETECTABLEWARNING
CL 6TH ST
CL S OHIO AVE
BUILDING LINE
BUILDING LINE
BUILDING LINE
BUILDING LINE
TYPICAL HANDICAP RAMPLAYOUT. SEE SH. NO. C-130
PROPOSED STREET LIGHTSEE SHEET C-400.
P
GG
G
G
G
G
G
RD
RD
RD
RD
RD
R
R
R
G
P
P
M
20+0
021
+00
22+0
0
11+00 12+00 13+00 14+00 15+00 16+00
STA
:11+
17.5
6S
TA:1
1+17
.56
STA
:12+
33.2
7
STA
:11+
91.2
75 SPACES @ 21' = 105.0'2 SPACES @ 23' = 46.0'
2 SPACES @ 21' = 42.0'
4 SPACES @ 21' = 84.0'
2 SPACES @ 23' = 46.0'
STA:21+46.83
STA:20+61.83
STA:11+65.25
STA:12+95.25
STA:12+95.25 STA:13+77.27
STA:13+77.27
4.0'
TY
P.
5 SPACES @ 21' = 105.0'
8.0'
(TY
P.)
2HR PAR
KING
8:30 AM
TO 5:30 P
M
R7-
108
(8:3
0AM
TO 5
:30P
M)
12" X
18"
NOPAR
KING
2:00 AM TO 6:00 AM
R7-
2a (2
AM
-6A
M)
12" X
18"
NOPAR
KING
2:00 AM TO 6:00 AM R1-
1 w
/R1-
4p30
" X 3
0", 1
8" X
6"
R7-
2a (2
AM
-6A
M)
12" X
18"
NOPARKING
2:00 AMTO
6:00 AM
R1-1 w
/R1-4p
30" X 30", 18" X
6"R
7-2a (2AM
-6AM
)12" X
18"
2HR
PARKING 8:30 AMTO 5:30 PM
R7-108 (8:30A
MTO
5:30PM
)12" X
18"
W 6th
St
E 6th St
S Ohio Ave
S Ohio Ave
D3-136" X 9"
D3-
130
" X 9
"
D3-1
36" X 9"
D3-1
30" X 9"
4" SOLID WHITE STRIPE (TYP.)
4" SOLID WHITE STRIPE (TYP.)
EXIST. PARKING STRIPE (TYP.)
STA:20+44.83
5 SPACES @ 21' = 105.0'
5 SPACES @ 21' = 105.0'
STA
:14+
81.2
7S
TA:1
4+81
.27
STA
:15+
09.3
0
STA
:15+
15.9
9
STA
:16+
14.3
0
STA
:12+
96.2
7
STA
:11+
63.5
6
STA
:13+
76.2
7
STA
:12+
96.2
7
STA
:13+
76.2
7
STA
:11+
63.5
6
4" SOLID WHITE STRIPE (TYP.)
4" SOLID WHITE STRIPE (TYP.)
STA:16+00.16
2HR PAR
KING
8:30 AM
TO 5:30 P
M
R7-
108
12" X
18"
EXIST. 24" STOP BAR
NOPARKING
ZONE
NO
PA
RK
ING
ZON
E
STA:20+62.83R1-
1 w
/R1-
4p30
" X 3
0", 1
8" X
6"
STOP
STA:21+45.85
R1-
1 w
/R1-
4p30
" X 3
0", 1
8" X
6"
STOP
STOP
STOP
NO
PA
RK
ING
ZON
E
ALL WAY
ALL WAY
ALL WAY
ALL WAY
NOPARKING
ZONE
STA
:16+
14.3
0
2HR
PARKING 8:30 AM
TO 5:30 PM
R7-108 (8:30A
MTO
5:30PM
)12" X
18"
STA:10+93.01
00 20'10'
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET NO:
SHEET TITLE
CO
NS
ULT
AN
TSS
EA
LP
RO
JEC
T N
AM
E
CITY
OF
SEDA
LIA,
MO
DOW
NTO
WN
STRE
ETSC
APE
CITY
PRO
JECT
NO
. 201
9-03
FEDE
RAL
PRO
JECT
NO
.ST
P-57
00(5
11)
RE
V.
DE
SC
RIP
TIO
N
GJL, DJM
GJL, DJM
JCK, CDP
DA
TEB
Y
6/27
/201
9M
:\TRN
\14-
100-
509-
00\2
_Disc
iplin
es\_
SHEE
TS\2
_She
ets
- civi
l\141
5090
9 - S
treet
scap
e\14
1509
09-P
avem
ent M
arkin
gs.d
wg
14-100-509-09
Cer
t. of
Aut
horit
y #
2003
0075
99
6/3/2019
06/03/2019
PAVEMENT MARKINGS AND SIGNING PLANC1
PAVEMENTMARKING AND
SIGNING PLAN -S OHIO AVE
C-310
S OHIO AVE
6TH
ST
SCALE: 1" = 20'
24" STOP BAR(TYP.)
ALL
EY
ALL
EY
NOTES1. ALL PROPOSED PAVEMENT MARKINGS AND SIGNAGE SHALL BE
PLACED IN ACCORDANCE TO THE LATEST EDITION OF THEMUTCD MANUAL.
2. ALL SIGNS SHALL BE MOUNTED ON PROPOSED STREET LIGHTSAS SHOWN. ALL MOUNTING HARDWARE FOR PROPOSED SIGNSSHALL BE CONSIDERED SUBSIDIARY TO BID ITEM, "PERMANENTSIGNS". STOP SIGNS SHALL BE PLACED A MINIMUM OF 7' ABOVETHE TOP OF THE ADJACENT CURB. SECONDARY SIGNS SHALLBE PLACED IN THE ORDER AS SHOWN ON THIS SHEET.
3. CONTRACTOR SHALL PAINT CURB YELLOW WITHIN ALL AREASDESIGNATED AS "NO PARKING ZONE" AS WELL AS ANY CURBBETWEEN THE LAST PARKING STALL OF A ROW AND ANY CURBRAMP OR ALLEY ENTRANCE.
4. REMOVAL OF EXISTING TRAFFIC SIGNALS (4) SHALL BEINCLUDED IN BID ITEM, "DEMOLITION AND SITE PREPARATION".CONTRACTOR SHALL SALVAGE EXISTING SIGNALS TO THE CITYAND BE DELIVERED BY THE CONTRACTOR TO THE STREETDEPARTMENT AT 901 E. 3RD TO BE STORED.
PROPOSED STREET LIGHT (TYP.)
SDSD
SDSD
SDSD
SD
SD
SD
SD SD SD SD SD SD
SSSS
SSSS
SS
W W
SD
SDSD
SDSD SD SD SD
SD
SD
G
ST
CB
ST
ST
W
ST
P
PB
W
PB
GG
G
PB
G
S
G
W
PB
G
CB
W
W
W
G
G
G
RD
S
RD
RD
RD
RD
R
W
W
R
R
W
W
W
W
G
W
P
P
PB
PB
M
GG
G G G G G G G G G
G
GG
GG
GG
G
GG GG
GG
UGE UGE UGE UGE UGEUGE UGE UGE UGE UGE UGE UGE UGE UGE
UGEUGEUGEUGE
W W W
W
W
W W W W W W W W W W
W
W
WGGGGGGG
G
UGE UGE UGE UGE UGE UGE UGE UGE UGE
OH
EO
HE
OH
EO
HE
OH
E
GSSSS
SS
W
W W W W W W W W W W W
W
G G G G G
GUGE UGE UGE UGE UGE UGE UGE
OH
EO
HE
OH
E
20+0
021
+00
22+0
0
11+00 12+00 13+00 14+00 15+00 16+00
STA:11+05.25, 21.46' LT INSTALLDECORATIVE LIGHT POLE
STA:11+65.34, 21.58' LT INSTALLDECORATIVE LIGHT POLE
STA:11+65.25, 21.50' RT INSTALLDECORATIVE LIGHT POLE
STA:12+35.25, 21.49' LT INSTALLDECORATIVE LIGHT POLE
STA:12+35.25, 21.50' RT INSTALLDECORATIVE LIGHT POLE
STA:12+95.25, 21.50' RT INSTALLDECORATIVE LIGHT POLE
STA:12+95.25, 21.50' LT INSTALLDECORATIVE LIGHT POLE
STA:13+77.27, 21.50' LT INSTALLDECORATIVE LIGHT POLE
STA:13+77.27, 21.50' RT INSTALLDECORATIVE LIGHT POLE
STA:20+62.83, 20.96' LT INSTALLDECORATIVE LIGHT POLE
STA:20+62.83, 21.00' RT INSTALLDECORATIVE LIGHT POLE
STA:21+45.95, 20.97' RT INSTALLDECORATIVE LIGHT POLE
STA:21+45.85, 21.00' LT INSTALLDECORATIVE LIGHT POLE
STA:11+59.65, 25.78' LT INSTALLPULL BOX
STA:11+59.70, 26.15' RT INSTALLPULL BOX
STA:20+55.27, 25.49' RT INSTALLPULL BOX
STA:20+55.93, 24.56' LT INSTALLPULL BOX
STA:21+54.51, 25.29' RT INSTALLPULL BOX
STA:21+54.35, 24.56' LT INSTALLPULL BOX
STA:14+48.00, 21.50' LT REMOVE ANDREPLACE DECORATIVE LIGHT POLE
STA:14+48.00, 21.50' RT INSTALLDECORATIVE LIGHT POLE
STA:15+26.50, 21.50' RT INSTALLDECORATIVE LIGHT POLE
STA:15+26.50, 21.50' LT INSTALLDECORATIVE LIGHT POLE
STA:16+00.00, 21.50' LT INSTALLDECORATIVE LIGHT POLE
STA:16+00.00, 21.50' RT INSTALLDECORATIVE LIGHT POLE
1-1
1-2
1-4
1-3
1-5
1-6
1-7
1-91-11
1-13
1-151-171-19
1-18 1-16 1-14
1-12 1-10
1-8
1-5
1-3
1-1
1-2
1-41-6
PROPOSED LIGHTING
EXISTING LIGHTING
PULL BOX
CONDUIT
POWER SOURCE
PROPOSED LIGHTING LABEL
PROPOSED PULL BOX LABEL
METERED SERVICE PEDESTAL
LEGEND
1-1
1-1
E
C-400
STREET LIGHTINGPLAN - S OHIO AVE
DECORATIVE LIGHT POLE DETAILC8
00 20'10'SCALE: 1" = 20'
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET NO:
SHEET TITLE
CO
NS
ULT
AN
TSS
EA
LP
RO
JEC
T N
AM
E
CITY
OF
SEDA
LIA,
MO
DOW
NTO
WN
STRE
ETSC
APE
CITY
PRO
JECT
NO
. 201
9-03
FEDE
RAL
PRO
JECT
NO
.ST
P-57
00(5
11)
RE
V.
DE
SC
RIP
TIO
N
GJL, DJM
GJL, DJM
JCK, CDP
DA
TEB
Y
6/27
/201
9M
:\TRN
\14-
100-
509-
00\2
_Disc
iplin
es\_
SHEE
TS\2
_She
ets
- civi
l\141
5090
9 - S
treet
scap
e\14
1509
09-S
treet
Lig
htin
g.dw
g
14-100-509-09
Cer
t. of
Aut
horit
y #
2003
0075
99
6/3/2019
06/03/2019
STREET LIGHTING PLANC1
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET NO:
SHEET TITLE
CO
NS
ULT
AN
TSS
EA
LP
RO
JEC
T N
AM
E
CITY
OF
SEDA
LIA,
MO
DOW
NTO
WN
STRE
ETSC
APE
CITY
PRO
JECT
NO
. 201
9-03
FEDE
RAL
PRO
JECT
NO
.ST
P-57
00(5
11)
RE
V.
DE
SC
RIP
TIO
N
GJL, DJM
GJL, DJM
JCK, CDP
DA
TEB
Y
6/27
/201
9M
:\TRN
\14-
100-
509-
00\2
_Disc
iplin
es\_
SHEE
TS\2
_She
ets
- civi
l\141
5090
9 - S
treet
scap
e\14
1509
09-S
treet
Lig
htin
g.dw
g
14-100-509-09
Cer
t. of
Aut
horit
y #
2003
0075
99
6/3/2019
06/03/2019
S. OHIO AVE
6TH
STR
EE
TREMOVE EXIST.DECORATIVE LIGHT POLE
REMOVE EXIST.DECORATIVE LIGHT POLE
EXIST.COBRA LUMINAIRE
LIGHT POLE
EXIST.COBRA LUMINAIRE
LIGHT POLE
POWER SOURCE
SAVE EXIST.DECORATIVE LIGHT POLE
SAVE EXIST.DECORATIVE LIGHT POLE
REMOVE EXIST.DECORATIVE LIGHT POLE
REMOVE EXIST.DECORATIVE LIGHT POLE
REMOVE EXIST.DECORATIVE LIGHT POLE
NOT TO SCALE
19
NOTES1. CONTRACTOR FOR THIS PROJECT SHALL PROVIDE AND INSTALL
LIGHT POLE BASES, 2" SCH. 40 PVC CONDUIT, AND PULL STRINGAS SHOWN ON THIS SHEET. KCPL TO PROVIDE GALVANIZEDANCHOR BOLTS AND PULL BOXES FOR THE CONTRACTOR TOINSTALL AS WELL. KCPL TO PROVIDE AND INSTALL PROPOSEDDECORATIVE LIGHT POLES, CONDUCTORS, AND FIXTURES.COORDINATE ALL SITE LIGHTING WORK WITH KCPL AND THECITY.
2. EXISTING LIGHT POLES TO BE REMOVED BY CONTRACTORSHALL BE INCLUDED IN BID ITEM, "DEMOLITION AND SITEPREPARATION". EXISTING POLES SHALL BE SALVAGED TO KCPLTO RETIRE.
3. CATALOG CUTS AND FINAL LOCATION SHALL BE APPROVED BYTHE CITY PRIOR TO PROCUREMENT AND INSTALLATION.
TYPICAL POLE BASE DETAILNOT TO SCALE
BASE TO BE CONSTRUCTED WITH AMINIMUM OF 3000 PSI CONCRETE
6 - #6 VERTICAL REBARSPACED EVENLY
POLE TO MATCHFIXTURE
1-1/2" MIN. CLEARCOVER THROUGHOUT
ANCHOR BOLTSPROVIDED BYOTHERS AND
INSTALLED PERMANUFACTURERSPECIFICATIONS.
2"
C7
14
PROPOSAL
TO THE CITY OF SEDALIA, MISSOURI: Pursuant to and in compliance with the Notice to Contractors and having examined the plans and
specifications with related documents and the site(s) of the proposed work, the undersigned bidder proposes
and agrees, if this proposal is accepted, to furnish all labor, materials, tools, supplies, equipment and
supervision and to do all other work necessary for the DOWNTOWN STREETSCAPE, PHASE IV,
City Project No. 2019-03, Federal Project No. STP-5700(511), as noted in these contract documents
for the following price(s):
NOTE: IN THE EVENT OF DISCREPANCY, UNIT PRICE SHALL GOVERN
BID FORM
Sedalia Downtown Streetscape, Phase IV July 11, 2019
ITEM
NO. DESCRIPTION QUANTITY UNIT UNIT PRICE
TOTAL
PRICE
Roadway (Base Bid)
1 Mobilization 1 LS
2 Demolition and Site Preparation 1 LS
3 Construction Staking 1 LS
4 Construction Signs 203 SF
5 Type III Movable Barricades 16 EACH
6 Inlet Protection 11 EACH
7 Erosion Control Log 25 LF
8 Construction Entrance 3 EACH
9 Unclassified Excavation 2023 CY
10 Concrete Coal Chute Backfill 20 CY
11 Basement Opening Structural Slab 264 SF
12 6" Fiber Reinforced Concrete Pavement 2342 SY
13 6" Type 1 Base 2909 SY
14 Subgrade Fabric 2909 SY
15 2” Cold Milling 120 SY
16 2” Asphaltic Concrete Surface (Type 5-
01) 120 SY
17 Brick Paver Crosswalks 1169 SF
18 Concrete Curb and Gutter 1092 LF
19 4" Concrete Sidewalk 5753 SF
20 Inlaid Brick Pavers at Sidewalk 1584 SF
21 Brick Paver Installation (City Provided
Pavers) 150 SF
22 Sidewalk Ramp 9 EACH
23 4" Type 1 Base 925 SY
24 8" Concrete Driveway 126 SY
25 6'x4' Curb Inlet (Special) 7 EACH
15
26 6'x6' Curb Inlet (Special) 1 EACH
27 4'x4' Junction Box 1 EACH
28 6" HDPE 42 LF
29 15" HDPE 272 LF
30 24" HDPE 209 LF
31 30" HDPE 75 LF
32 4" Solid White Line 304 LF
33 24" Stop Bar 73 LF
34 No Parking Zone Line 132 LF
35 Permanent Signs 19 EACH
Subtotal:
Street Lighting (Base Bid)
36 Street Light Pole Base 19 EACH
37 Pull Box Installation (Class 1) (KCPL
Provided) 6 EACH
38 Conduit, 2" Sch. 40 PVC 1078 LF
39 Pull String 1078 LF
Subtotal:
Add Alternate 1
1 Mobilization 1 LS
2 Demolition and Site Preparation 1 LS
3 Construction Staking 1 LS
4 Construction Signs 109 SF
5 Type III Movable Barricades 6 EACH
6 Construction Entrance 1 EACH
7 Unclassified Excavation 323 CY
8 6" Fiber Reinforced Concrete Pavement 420 SY
9 6" Type 1 Base 442 SY
10 Subgrade Fabric 442 SY
11 Concrete Curb and Gutter 99 LF
12 4" Concrete Sidewalk 557 SF
13 Inlaid Brick Pavers at Sidewalk 192 SF
14 4" Type 1 Base 83 SY
15 24" Stop Bar 56 LF
16 4" Double Solid Yellow Line 98 LF
17 Railroad Crossing Symbol 1 EACH
18 Street Light Pole Base 2 EACH
19 Conduit, 2" Sch. 40 PVC 102 LF
20 Pull String 102 LF
Subtotal:
16
TOTAL BASE BID: $_________________________________________________________
TOTAL ADD ALTERNATE 1: $________________________________________________
GRAND TOTAL (BASE + ALTERNATE): $______________________________________
Bidder acknowledges receipt of the following addenda, which has been considered in the preparation
of this bid:
Addendum No. ______ Dated: __________
Addendum No. ______ Dated: __________
Addendum No. ______ Dated: __________
The undersigned agrees, if this proposal is accepted, to complete the work within a period of 120
calendar days from the date of the Notice to Proceed.
NAME OF BIDDER: ______________________________________
BY: ______________________________________
TITLE: ______________________________________
ADDRESS: ______________________________________
DATE: __________________