ADDENDUM NO. 2 5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT 17-01 JUNE 9, 2017 OWNER City of Yuba City 1201 Civic Center Blvd Yuba City CA 95993 (530) 822-4626 (530) 822-4694 (Fax) GENERAL Scope A. This Addendum forms a part of the bidding and contract documents and modifies the Project Specifications and Project Plans described below. B. This Addendum consists of 54 pages. Acknowledgment A. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to acknowledge this addendum may result in rejection of bid. THE FOLLOWING PROJECT PLAN SHEETS ARE REVISED AND ATTACHED: Sheets 31, 107-111, 113-117, 202, and 238 Substitute for the like-numbered sheet. BOOK 1 BID BOOK IS MODIFIED AS FOLLOWS: Bid Items 114, 150, 152, 154, 168,196, 229, 241, and 249 are replaced. Bid item 33A is added. Replace the Bid Item List on pages 3-10 and pages 31-39 with:

ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

Embed Size (px)

Citation preview

Page 1: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

ADDENDUM NO. 2

5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT 17-01

JUNE 9, 2017

OWNER City of Yuba City 1201 Civic Center Blvd Yuba City CA 95993 (530) 822-4626 (530) 822-4694 (Fax) GENERAL Scope

A. This Addendum forms a part of the bidding and contract documents and modifies the Project Specifications and Project Plans described below.

B. This Addendum consists of 54 pages. Acknowledgment

A. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to acknowledge this addendum may result in rejection of bid.

THE FOLLOWING PROJECT PLAN SHEETS ARE REVISED AND ATTACHED: Sheets 31, 107-111, 113-117, 202, and 238 Substitute for the like-numbered sheet. BOOK 1 BID BOOK IS MODIFIED AS FOLLOWS:

Bid Items 114, 150, 152, 154, 168,196, 229, 241, and 249 are replaced. Bid item 33A is added.

Replace the Bid Item List on pages 3-10 and pages 31-39 with:

Page 2: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

2

5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT NO. 17-01

BID ITEM LIST

ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL

1 70030 LEAD COMPLIANCE PLAN LS 1

2 80050 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 1

3 100100 DEVELOP WATER SUPPLY LS 1 4 120090 CONSTRUCTION AREA SIGNS LS 1 5 120100 TRAFFIC CONTROL SYSTEM LS 1 6 120120 TYPE III BARRICADE EA 70 7 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5,523 8 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 140,227 9 120182 PORTABLE DELINEATOR EA 1,572

10 120300 TEMPORARY PAVEMENT MARKER EA 2,830

11 128605 PORTABLE TEMPORARY SIGNAL ( BRIDGE/EB ON RAMP TO 5th ST AND SECOND ST AND BRIDGE ST)

EA 2

12 128651 PORTABLE CHANGEABLE MESSAGE SIGN EA 9 13 129000 TEMPORARY RAILING (TYPE K) LF 14,051 14 129100 TEMPORARY CRASH CUSHION MODULE EA 164 15 129113 TEMPORARY ALTERNATIVE CRASH CUSHION EA 17 16 130100 JOB SITE MANAGEMENT LS 1

17 130300 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1

18 130310 RAIN EVENT ACTION PLAN EA 100 19 130320 STORM WATER SAMPLING AND ANALYSIS DAY EA 100 20 130330 STORM WATER ANNUAL REPORT EA 3 21 130550 TEMPORARY HYDROSEED SQYD 12,700 22 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 85 23 130640 TEMPORARY FIBER ROLL LF 20,000 24 130650 TEMPORARY GRAVEL BAG BERM LF 300 25 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 4 26 130730 STREET SWEEPING LS 1 27 130800 TEMPORARY ACTIVE TREATMENT SYSTEM LS 1 28 130900 TEMPORARY CONCRETE WASHOUT LS 1

29 131103 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 120

30 131104 WATER QUALITY MONITORING REPORT EA 120

VOID

Page 3: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

3

ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL

31 131105 WATER QUALITY ANNUAL REPORT EA 3 32 140003 ASBESTOS COMPLIANCE PLAN LS 1

33 146002 CONTRACTOR SUPPLIED QUALIFIED SWALLOW BIOLOGIST AND QUALIFIED BIRD EXCLUSION EXPERT

LS 1

33A 147001 AIR BUBBLE CURTAIN SYSTEM LS 1 34 150609 REMOVE BOLLARD EA 70 35 150811 REMOVE 4" PVC (WATER) LF 572 36 150840 REMOVE STOP LOG SYSTEM LF 90 37 150853 REMOVE CONCRETE PAVEMENT (SQYD) SQYD 522 38 153210 REMOVE CONCRETE SIGN FOUNDATION EA 1

39 153250 REMOVE STEEL AND CONCRETE (MISCELLANEOUS)(CY) CY 170

40 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 5,910 41 160201 RESIDENT ENGINEERS OFFICE LS 1 42 170102 REMOVE TREE (10"-24") EA 100 43 170103 CLEARING AND GRUBBING (LS) LS 1 44 170103 REMOVE TREE (25"-36") EA 20 45 170104 REMOVE TREE (> 36") EA 9 46 190101 ROADWAY EXCAVATION CY 54,496

47 190139 ROADWAY EXCAVATION (UNSUITABLE MATERIAL) CY 600

48 192003 F STRUCTURE EXCAVATION (BRIDGE) CY 7,068 49 192020 STRUCTURE EXCAVATION (TYPE D) CY 1,100 50 192037 F STRUCTURE EXCAVATION (RETAINING WALL) CY 2,709 51 192502 SAND BEDDING CY 32 52 193003 F STRUCTURE BACKFILL (BRIDGE) CY 841 53 193013 F STRUCTURE BACKFILL (RETAINING WALL) CY 4,048 54 193025 F STRUCTURE BACKFILL (LEVEE FILL) CY 5,740 55 193031 F PERVIOUS BACKFILL (RETAINING WALL) CY 23 56 193032 F 2"-4" GRAVEL CY 70 57 194001 DITCH EXCAVATION CY 2,660 58 198010 LEVEE MATERIAL IMPORT BORROW CY 4,132 59 200122 WEED GERMINATION SQYD 12,620 60 202004 IRON SULFATE (LB) LB 657 61 202006 SOIL AMENDMENT CY 6 62 202026 RELOCATE BACKFLOW PREVENTER ASSEMBLY EA 1 63 202038 PACKET FERTILIZER EA 6,390 64 202039 SLOW-RELEASE FERTILIZER LB 967

VOID

Page 4: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

4

ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL

65 204011 PLANT (GROUP K) 24" BOX EA 71 66 204035 PLANT (GROUP A) EA 2,432 67 204099 PLANT ESTABLISHMENT WORK (1 YEAR) LS 1 68 205032 ROCK MULCH (RETENTION BASIN) LS 1 69 205034 DECOMPOSED GRANITE SQFT 6,878 70 205035 WOOD MULCH CY 1,100 71 205036 RIVER COBBLE SET IN CONCRETE SQFT 4,890 72 205036 BOULDERS LS 1 73 205062 ROOT BARRIER LF 600 74 206560 CONTROL AND NEUTRAL CONDUCTORS LS 1 75 206562 1" REMOTE CONTROL VALVE EA 17 76 206564 1-1/2" REMOTE CONTROL VALVE EA 9 77 206565 2" REMOTE CONTROL VALVE EA 16

78 206749 8 STATION IRRIGATION CONTROLLER AND ENCLOSURE (ICC 'B') EA 1

79 206758 24 STATION IRRIGATION CONTROLLER AND ENCLOSURE (ICC 'A' & 'B') EA 2

80 207052 P-F 1" SUPPLY LINE (COPPER PIPE) LF 478 81 207055 P-F 2" SUPPLY LINE (COPPER PIPE) LF 148

82 208420 2" POTABLE WATER CONNECTION ASSEMBLY AND ENCLOSURE EA 2

83 208420 CONNECT TO EXISTING IRRIGATION MAILINE EA 1 84 208442 FLOW SENSOR EA 3 85 208445 TREE WELL SPRINKLER ASSEMBLY (C-2 Mod) EA 113

86 208446 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) (A-5, A-7, A-11) EA 19

87 208447 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) (A-6, A-8, A-12) EA 302

88 208449 POP-UP SPRINKLER ASSEMBLY (SHRUB SPRAY) (B-1) EA 154

89 208575 2" GATE VALVE EA 15 90 208591 P 8" GATE VALVE EA 18

91 208594 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 8,100

92 208595 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,400

93 208596 1-1/4"PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,150

94 208597 1-1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 360

95 208598 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,016 96 208598 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 900

VOID

Page 5: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

5

ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL

97 208606 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 4,300 98 208690 6" PVC PIPE CONDUIT (SLEEVE) LF 200 99 210350 FIBER ROLLS LF 10,890

100 210430 HYDROSEED SQFT 231,800 101 260203 CLASS 2 AGGREGATE BASE (CY) CY 20,361

102 270003 CEMENT TREATED BASE (ROAD-MIXED, CLASS A)(CY) CY 5,050

103 303000 PULVERIZED ROADBED SQYD 4,133 104 370110 HIGH FRICTION SURFACE TREATMENT SQYD 623 105 377501 SLURRY SEAL TON 52 106 390095 REPLACE ASPHALT CONCRETE PAVEMENT CY 400 107 390132 HOT MIX ASPHALT (TYPE A) TON 16,478 108 394073 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 25 109 394076 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 88 110 394091 PLACE HOT MIX ASPHALT OVERSIDE DRAIN EA 1

111 398001 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 58,086

112 398100 REMOVE ASPHALT CONCRETE DIKE LF 176 113 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 880

114 400050 CONTINUOUSLY REINFORCED CONCRETE PAVEMENT CY 221

115 410096 DRILL AND BOND (DOWEL BAR) EA 60 116 476000 F ROCKERY RETAINING WALL CY 139 117 480301 BRIDGE TRESTLE LS 1 118 480601 TEMPORARY SHORING (5TH STREET BRIDGE) LS 1 119 480602 TEMPORARY SHORING (2ND STREET UC) LS 1 120 480603 TEMPORARY SHORING (ROADWAY) LS 1 121 481010 TEMPORARY PEDESTRIAN STAIRCASE LS 1 122 490589 24" PERMANENT STEEL PILE CASING LF 880 123 490603 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 5,323

124 490622 118" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 2,964

125 490780 P FURNISH PILING (CLASS 200) LF 4,575 126 490781 DRIVE PILE (CLASS 200) EA 97 127 500001 P PRESTRESSING CAST-IN-PLACE CONCRETE LS 1 128 510051 F STRUCTURE CONCRETE, BRIDGE FOOTING CY 563 129 510053 F STRUCTURAL CONCRETE, BRIDGE CY 12,429

130 510054 F STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) CY 4,175

VOID

Page 6: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

6

ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL

131 510060 F STRUCTURAL CONCRETE, RETAINING WALL CY 619 132 510080 F STRUCTURAL CONCRETE, APPROACH SLAB CY 66

133 510086 F STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N) CY 498

134 510092 F STRUCTURAL CONCRETE, HEADWALL CY 21 135 510502 F MINOR CONCRETE (MINOR STRUCTURE) CY 47 136 510526 F MINOR CONCRETE (BACKFILL) CY 32 137 511035 F ARCHITECTURAL TREATMENT SQFT 20738 138 511080 DECORATIVE STEEL LB 574 139 511106 DRILL AND BOND DOWEL LF 60

140 512268 F FURNISH PRECAST PRESTRESSED PRESTRESSED CONCRETE CA WIDE FLANGE GIRDER (140'-150')

EA 7

141 512269 F FURNISH PRECAST PRESTRESSED PRESTRESSED CONCRETE CA WIDE FLANGE GIRDER (150'-160')

EA 2

142 512401 F ERECT PRECAST CONCRETE GIRDER EA 9 143 515001 TEMPORARY HINGE DEAD WEIGHT LS 1 144 518050 PTFE BEARING EA 28 145 519095 P JOINT SEAL ASSEMBLY (MR 4") LF 128 146 519100 P JOINT SEAL (MR 2") LF 102 147 519101 JOINT SEAL (TYPE A) LF 125 148 519118 P JOINT SEAL ASSEMBLY (MR 9") LF 124 149 520102 P-F BAR REINFORCING STEEL (BRIDGE) LB 5,616,815 150 520103 P-F BAR REINFORCING STEEL (RETAINING WALL) LB 211,800 151 568062 PEDESTRIAN BARRICADE (TYPE A) EA 21

152 582000 RECONSTRUCT REMOVE RETAINING WALL (MASONRY WALL) SQFT 625

153 582001 F SOUND WALL (REINFORCED CONCRETE) SQFT 780 154 600002 VIBRATION MONITORING LS 1 155 600017 REMOVE RETAINING WALL (LF) LF 828 156 600105 BRIDGE REMOVAL (UPR No. 18C-0023) LS 1 157 600106 BRIDGE REMOVAL (UPR No. 18C-0018) LS 1 158 600107 BRIDGE REMOVAL (5th STREET No. 18C-0012) LS 1 159 600108 BRIDGE REMOVAL (2nd STREET No. 18C-0055) LS 1

160 600166 P-F MISCELLANEOUS METAL (RESTRAINER - CABLE TYPE) LB 8,050

161 640001 P 4" PLASTIC PIPE (SEWER) LF 691 162 640002 P 4" PLASTIC PIPE (WATER) LF 968 163 640003 P 4" PLASTIC PIPE (COMMUNICATIONS) LF 2,616

VOID

Page 7: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

7

ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL

164 650014 P 18" REINFORCED CONCRETE PIPE LF 6,217 165 650018 P 24" REINFORCED CONCRETE PIPE LF 185 166 650022 P 30" REINFORCED CONCRETE PIPE LF 331 167 650026 P 36" REINFORCED CONCRETE PIPE LF 23 168 680401 P 6" PERFORATED STEEL PIPE UNDERDRAIN LF 110

169 703239 36" CORRUGATED STEEL PIPE RISER (0.109" THICK) LF 35

170 703450 WELDED STEEL PIPE CASING (BRIDGE) LF 311 171 703461 36" WELDED STEEL PIPE CASING (BRIDGE) LF 20 172 703462 12" WELDED STEEL PIPE CASING (BRIDGE) LF 162 173 703515 P 8" WELDED STEEL PIPE (.134" THICK) LF 356

174 703760 P 12" COATED WELDED STEEL PIPE (0.25" THICK)(BRIDGE) LF 2,170

175 705204 18" CONCRETE FLARED END SECTION EA 6 176 707250 SHALLOW MANHOLE EA 6 177 707260 MANHOLE EA 14 178 710112 ABANDON MANHOLE EA 1 179 710114 ABANDON PIPELINE EA 21 180 710136 REMOVE PIPE (LF) LF 1,497 181 710150 REMOVE INLET EA 25 182 710152 REMOVE HEADWALL EA 2 183 710156 REMOVE MANHOLE EA 5 184 710157 REMODEL MANHOLE EA 3 185 710212 ADJUST MANHOLE TO GRADE EA 14 186 710218 ADJUST VALVE BOX EA 12 187 710764 REMOVE SEWER PIPE LF 650

188 720010 REMOVE AND REPLACE ROCK SLOPE PROTECTION LS 1

189 721015 F ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY) CY 1,660

190 721028 F ROCK SLOPE PROTECTION (NO. 2, METHOD B)(CY) CY 610

191 721430 CONCRETE (CHANNEL LINING) CY 28 192 721810 SLOPE PAVING (CONCRETE) CY 60 193 729011 P ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 5,260 194 729011 P FILTER FABRIC SY 165 195 730011 MINOR CONCRETE (TALL RETAINING CURB) LF 80 196 730020 F MINOR CONCRETE (CURB) (CY) CY 64 197 730040 MINOR CONCRETE (GUTTER) (LF) LF 160

VOID

Page 8: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

8

ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL

198 730045 F MINOR CONCRETE (GUTTER) (CY) CY 22 199 730070 DETECTABLE WARNING SURFACE SQFT 690 200 731504 F MINOR CONCRETE (CURB AND GUTTER) CY 421 201 731516 F MINOR CONCRETE (DRIVEWAY) CY 140 202 731521 F MINOR CONCRETE (SIDEWALK) CY 558 203 731530 MINOR CONCRETE (TEXTURED PAVING) CY 46 204 731623 F MINOR CONCRETE (CURB RAMP) CY 57 205 731710 REMOVE CONCRETE CURB (LF) LF 1,704 206 731840 REMOVE CONCRETE (CURB AND GUTTER) LF 5,947

207 731860 REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (LF) LF 4,228

208 750001 P-F MISCELLANEOUS IRON AND STEEL LB 27,574 209 750003 UNDERSIDEWALK DRAIN EA 10 210 750501 MISCELLANEOUS METAL (BRIDGE) LB 2,801 211 750505 P-F BRIDGE DECK DRAINAGE SYSTEM LB 60,342 212 760010 DESTROY WELL EA 2 213 770010 WATERLINE CRADLE EA 158 214 770020 DUCT BANK CRADLE EA 262 215 770100 CURED-IN-PLACE PIPELINER LF 321

216 770101 P 4" PLASTIC PIPE (COMMUNICATIONS) (IN BRIDGE) LF 21,880

217 770102 RESET FIRE HYDRANT EA 4 218 770103 P FIRE HYDRANT EA 1 219 770110 DOUBLE BALL EXPANSION JOINT EA 2 220 770111 ADJUST MONITORING WELL TO GRADE EA 11 221 770111 SINGLE BALL EXPANSION JOINT EA 2 222 770120 PIPE BOLLARD EA 12 223 770130 8" DUCTILE IRON PIPE LF 2,685 224 770131 12" DUCTILE IRON PIPE (APPROACH) LF 709 225 770140 AIR RELEASE VALVE EA 1 226 780500 PARKING BUMPER (PRECAST CONCRETE) EA 8 227 783001 CONTRACTOR SUPPLIED GENERATOR DAY 30 228 800000 PIPE FENCE LF 43 229 800103 TEMPORARY FENCE (TYPE CL-6) LF 2,077 230 800104 20' TEMPORARY GATE (TYPE CL-6) EA 2 231 800321 P CHAIN LINK FENCE (TYPE CL-4, VINYL-CLAD) LF 110 232 800361 P CHAIN LINK FENCE (TYPE CL-6, VINYL CLAD) LF 307 233 800366 P CHAIN LINK FENCE (TYPE CL-6, BREAK-AWAY) LF 1,172 234 801365 P PIPE GATE EA 2

VOID

Page 9: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

9

ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL

235 802501 P 4' CHAIN LINK GATE (TYPE CL-6) EA 5 236 802560 P 10' CHAIN LINK GATE (TYPE CL-6) EA 2 237 802601 P 14' CHAIN LINK GATE (TYPE CL-6) EA 2 238 803020 REMOVE FENCE LF 487 239 803060 REMOVE GATE EA 4 240 803100 P RECONSTRUCT FENCE LF 40

241 803101 RECONSTRUCT AND PAINT FENCE (PIPE RAILING) LF 625

242 810120 REMOVE PAVEMENT MARKER EA 1,710 243 810131 REMOVE CHANNELIZERS EA 55

244 810200 TEMPORARY DELINEATOR (CLASS 1)(SURFACE MOUNTED) EA 142

245 810230 P PAVEMENT MARKER (RETROREFLECTIVE) EA 1,072 246 820133 OBJECT MARKER (TYPE N) EA 2 247 820134 OBJECT MARKER (TYPE P) EA 2 248 820135 OBJECT MARKER (TYPE R) EA 4 249 820231 REMOVE RELOCATE MONUMENT SIGN EA 3 250 820250 REMOVE ROADSIDE SIGN EA 60 251 820530 RESET ROADSIDE SIGN EA 3

252 820750 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) SQFT 479

253 820840 ROADSIDE SIGN - ONE POST EA 37 254 820850 ROADSIDE SIGN - TWO POST EA 2

255 820860 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) EA 7

256 830001 BRIDGE PLAQUES EA 3 257 833084 STEEL PICKET RAILING LF 369 258 833085 P-F PIPE HANDRAILING LF 136 259 833086 P-F STAIRWAY RAILING LF 68 260 833088 P-F TUBULAR HAND RAILING LF 2,255 261 839543 P TRANSITION RAILING (TYPE WB-31) EA 1 262 839585 ALTERNATIVE FLARED TERMINAL SYSTEM EA 1 263 839607 CRASH CUSHION EA 5 264 839701 CONCRETE BARRIER (TYPE 60) LF 339 265 839702 F CONCRETE BARRIER (TYPE 60A) LF 2,386 266 839703 CONCRETE BARRIER (TYPE 60C) LF 241 267 839704 CONCRETE BARRIER (TYPE 60D) LF 140 268 839705 CONCRETE BARRIER (TYPE 60C MOD) LF 45 269 839734 F CONCRETE BARRIER (TYPE 736) LF 146

VOID

Page 10: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

10

ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL

270 839735 F CONCRETE BARRIER (TYPE 742) (MOD) LF 2,232 271 839742 F CONCRETE BARRIER (TYPE 742B MOD) LF 192 272 839743 REMOVABLE BARRIER EA 4 273 839746 F CONCRETE BARRIER (C412B) LF 82 274 839746 F CONCRETE BARRIER (C412) LF 4,097 275 839752 REMOVE GUARDRAIL LF 269 276 840501 THERMOPLASTIC TRAFFIC STRIPE LF 50,835 277 840515 THERMOPLASTIC PAVEMENT MARKING SQFT 5,344 278 840656 PAINT TRAFFIC STRIPE (2 COAT) LF 13,105 279 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2,818

280 846035 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 756

281 870200 P BRIDGE AND STREET LIGHTING LS 1 282 870402 P TRAFFIC SIGNAL (5th St/J St) LS 1

283 870403 P TRAFFIC SIGNAL (Sutter St/5th St On-Off Ramp) LS 1

284 870404 P TRAFFIC SIGNAL (Second St /Bridge St) LS 1 285 871812 INTERCONNECTION CONDUIT AND CABLE (LS) LS 1

286 872000 TEMPORARY LIGHTING (SECOND STREET AND BRIDGE STREET) LS 1

287 999990 MOBILIZATION LS 1 Items designated with a "F" indicate final pay item. Items designated with a "P" indicate the item is eligible for progress payment

TOTAL AMOUNT BID =

THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THIS PROPOSAL SHALL ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH ARE A PART OF

THIS PROPOSAL VOID

Page 11: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Replaced per Addendum No. 2

11

Replace Sheet 27 and Exhibit 12-B on Sheet 28 with:

Page 12: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

Local Assistance Procedures Manual Exhibit 12-B

Bidder’s List of Subcontractors (DBE and NON-DBE)

Page 1 of 2

September 2016

Exhibit 12-B Bidder’s List of subcontractor (DBE and Non-DBE)

Part 1 As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts shall be registered with the State Division of Industrial Relations and

certified to bid on Public Works contracts. Please register at: https://efiling.dir.ca.gov/PWCR/ActionServlet?action=displayPWCRegistrationForm

In accordance with Title 49, Section 26.11 of the Code of Federal Regulations, and Section 4104 of the Public Contract Code of the State of California, as amended, the

following information is required for each sub-contractor who will perform work amounting to more than one half of one percent (0.5%) of the Total Base Bid or $10,000

(whichever is greater). Photocopy this form for additional firms.

Subcontractor Name and Location

Line Item & Description Subcontract Amount

Percentage of Bid Item Sub-

contracted

Contractor License Number

DBE (Y/N)

DBE Cert Number

Annual Gross Receipts

DIR Reg Number

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Distribution: 1) Original-Local Agency File 2) Copy-DLAE w/ Award Package

Page 13: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

Local Assistance Procedures Manual Exhibit 12-B

Bidder’s List of Subcontractors (DBE and NON-DBE)

Page 2 of 2

September 2016

Exhibit 12-B Bidder’s List of subcontractor (DBE and Non-DBE)

Part 2 In accordance with Title 49, Section 26 of the Code of Federal Regulations, the Bidder shall list all subcontractor who provide a quote or bid but were not selected to

participate as a subcontractor on this project. Photocopy this form for additional firms.

Subcontractor Name and Location

Line Item & Description Subcontract Amount

Percentage of Bid Item Sub-

contracted

Contractor License Number

DBE (Y/N)

DBE Cert Number

Annual Gross Receipts

DIR Reg Number

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Name: City, State:

<$1 million

<$5 million

<$10 million

<$15 million

Age of Firm: ___ yrs.

Distribution: 1) Original-Local Agency File 2) Copy-DLAE w/ Award Package

Page 14: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

14

BOOK 2 NOTICE TO BIDDERS AND SPECIAL PROVISIONS IS MODIFIED AS FOLLOWS:

Replace the Bid Item List on pages 21-29 with:

5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT NO. 17-01

BID ITEM LIST

ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY

1 70030 LEAD COMPLIANCE PLAN LS 1

2 80050 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 1

3 100100 DEVELOP WATER SUPPLY LS 1 4 120090 CONSTRUCTION AREA SIGNS LS 1 5 120100 TRAFFIC CONTROL SYSTEM LS 1 6 120120 TYPE III BARRICADE EA 70 7 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5,523 8 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 140,227 9 120182 PORTABLE DELINEATOR EA 1,572

10 120300 TEMPORARY PAVEMENT MARKER EA 2,830

11 128605 PORTABLE TEMPORARY SIGNAL ( BRIDGE/EB ON RAMP TO 5th ST AND SECOND ST AND BRIDGE ST)

EA 2

12 128651 PORTABLE CHANGEABLE MESSAGE SIGN EA 9 13 129000 TEMPORARY RAILING (TYPE K) LF 14,051 14 129100 TEMPORARY CRASH CUSHION MODULE EA 164 15 129113 TEMPORARY ALTERNATIVE CRASH CUSHION EA 17 16 130100 JOB SITE MANAGEMENT LS 1

17 130300 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1

18 130310 RAIN EVENT ACTION PLAN EA 100 19 130320 STORM WATER SAMPLING AND ANALYSIS DAY EA 100 20 130330 STORM WATER ANNUAL REPORT EA 3 21 130550 TEMPORARY HYDROSEED SQYD 12,700 22 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 85 23 130640 TEMPORARY FIBER ROLL LF 20,000 24 130650 TEMPORARY GRAVEL BAG BERM LF 300 25 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 4

Page 15: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

15

ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY

26 130730 STREET SWEEPING LS 1 27 130800 TEMPORARY ACTIVE TREATMENT SYSTEM LS 1 28 130900 TEMPORARY CONCRETE WASHOUT LS 1

29 131103 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 120

30 131104 WATER QUALITY MONITORING REPORT EA 120 31 131105 WATER QUALITY ANNUAL REPORT EA 3 32 140003 ASBESTOS COMPLIANCE PLAN LS 1

33 146002 CONTRACTOR SUPPLIED QUALIFIED SWALLOW BIOLOGIST AND QUALIFIED BIRD EXCLUSION EXPERT

LS 1

33A 147001 AIR BUBBLE CURTAIN SYSTEM LS 1 34 150609 REMOVE BOLLARD EA 70 35 150811 REMOVE 4" PVC (WATER) LF 572 36 150840 REMOVE STOP LOG SYSTEM LF 90 37 150853 REMOVE CONCRETE PAVEMENT (SQYD) SQYD 522 38 153210 REMOVE CONCRETE SIGN FOUNDATION EA 1

39 153250 REMOVE STEEL AND CONCRETE (MISCELLANEOUS)(CY) CY 170

40 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 5,910 41 160201 RESIDENT ENGINEERS OFFICE LS 1 42 170102 REMOVE TREE (10"-24") EA 100 43 170103 CLEARING AND GRUBBING (LS) LS 1 44 170103 REMOVE TREE (25"-36") EA 20 45 170104 REMOVE TREE (> 36") EA 9 46 190101 ROADWAY EXCAVATION CY 54,496

47 190139 ROADWAY EXCAVATION (UNSUITABLE MATERIAL) CY 600

48 192003 F STRUCTURE EXCAVATION (BRIDGE) CY 7,068 49 192020 STRUCTURE EXCAVATION (TYPE D) CY 1,100 50 192037 F STRUCTURE EXCAVATION (RETAINING WALL) CY 2,709 51 192502 SAND BEDDING CY 32 52 193003 F STRUCTURE BACKFILL (BRIDGE) CY 841 53 193013 F STRUCTURE BACKFILL (RETAINING WALL) CY 4,048 54 193025 F STRUCTURE BACKFILL (LEVEE FILL) CY 5,740 55 193031 F PERVIOUS BACKFILL (RETAINING WALL) CY 23 56 193032 F 2"-4" GRAVEL CY 70 57 194001 DITCH EXCAVATION CY 2,660 58 198010 LEVEE MATERIAL IMPORT BORROW CY 4,132

Page 16: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

16

ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY

59 200122 WEED GERMINATION SQYD 12,620 60 202004 IRON SULFATE (LB) LB 657 61 202006 SOIL AMENDMENT CY 6 62 202026 RELOCATE BACKFLOW PREVENTER ASSEMBLY EA 1 63 202038 PACKET FERTILIZER EA 6,390 64 202039 SLOW-RELEASE FERTILIZER LB 967 65 204011 PLANT (GROUP K) 24" BOX EA 71 66 204035 PLANT (GROUP A) EA 2,432 67 204099 PLANT ESTABLISHMENT WORK (1 YEAR) LS 1 68 205032 ROCK MULCH (RETENTION BASIN) LS 1 69 205034 DECOMPOSED GRANITE SQFT 6,878 70 205035 WOOD MULCH CY 1,100 71 205036 RIVER COBBLE SET IN CONCRETE SQFT 4,890 72 205036 BOULDERS LS 1 73 205062 ROOT BARRIER LF 600 74 206560 CONTROL AND NEUTRAL CONDUCTORS LS 1 75 206562 1" REMOTE CONTROL VALVE EA 17 76 206564 1-1/2" REMOTE CONTROL VALVE EA 9 77 206565 2" REMOTE CONTROL VALVE EA 16

78 206749 8 STATION IRRIGATION CONTROLLER AND ENCLOSURE (ICC 'B') EA 1

79 206758 24 STATION IRRIGATION CONTROLLER AND ENCLOSURE (ICC 'A' & 'B') EA 2

80 207052 P-F 1" SUPPLY LINE (COPPER PIPE) LF 478 81 207055 P-F 2" SUPPLY LINE (COPPER PIPE) LF 148

82 208420 2" POTABLE WATER CONNECTION ASSEMBLY AND ENCLOSURE EA 2

83 208420 CONNECT TO EXISTING IRRIGATION MAILINE EA 1 84 208442 FLOW SENSOR EA 3 85 208445 TREE WELL SPRINKLER ASSEMBLY (C-2 Mod) EA 113

86 208446 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) (A-5, A-7, A-11) EA 19

87 208447 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) (A-6, A-8, A-12) EA 302

88 208449 POP-UP SPRINKLER ASSEMBLY (SHRUB SPRAY) (B-1) EA 154

89 208575 2" GATE VALVE EA 15 90 208591 P 8" GATE VALVE EA 18

91 208594 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 8,100

Page 17: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

17

ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY

92 208595 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,400

93 208596 1-1/4"PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,150

94 208597 1-1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 360

95 208598 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,016 96 208598 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 900 97 208606 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 4,300 98 208690 6" PVC PIPE CONDUIT (SLEEVE) LF 200 99 210350 FIBER ROLLS LF 10,890

100 210430 HYDROSEED SQFT 231,800 101 260203 CLASS 2 AGGREGATE BASE (CY) CY 20,361

102 270003 CEMENT TREATED BASE (ROAD-MIXED, CLASS A)(CY) CY 5,050

103 303000 PULVERIZED ROADBED SQYD 4,133 104 370110 HIGH FRICTION SURFACE TREATMENT SQYD 623 105 377501 SLURRY SEAL TON 52 106 390095 REPLACE ASPHALT CONCRETE PAVEMENT CY 400 107 390132 HOT MIX ASPHALT (TYPE A) TON 16,478 108 394073 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 25 109 394076 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 88 110 394091 PLACE HOT MIX ASPHALT OVERSIDE DRAIN EA 1

111 398001 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 58,086

112 398100 REMOVE ASPHALT CONCRETE DIKE LF 176 113 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 880

114 400050 CONTINUOUSLY REINFORCED CONCRETE PAVEMENT CY 221

115 410096 DRILL AND BOND (DOWEL BAR) EA 60 116 476000 F ROCKERY RETAINING WALL CY 139 117 480301 BRIDGE TRESTLE LS 1 118 480601 TEMPORARY SHORING (5TH STREET BRIDGE) LS 1 119 480602 TEMPORARY SHORING (2ND STREET UC) LS 1 120 480603 TEMPORARY SHORING (ROADWAY) LS 1 121 481010 TEMPORARY PEDESTRIAN STAIRCASE LS 1 122 490589 24" PERMANENT STEEL PILE CASING LF 880 123 490603 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 5,323

124 490622 118" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 2,964

125 490780 P FURNISH PILING (CLASS 200) LF 4,575

Page 18: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

18

ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY

126 490781 DRIVE PILE (CLASS 200) EA 97 127 500001 P PRESTRESSING CAST-IN-PLACE CONCRETE LS 1 128 510051 F STRUCTURE CONCRETE, BRIDGE FOOTING CY 563 129 510053 F STRUCTURAL CONCRETE, BRIDGE CY 12,429

130 510054 F STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) CY 4,175

131 510060 F STRUCTURAL CONCRETE, RETAINING WALL CY 619 132 510080 F STRUCTURAL CONCRETE, APPROACH SLAB CY 66

133 510086 F STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N) CY 498

134 510092 F STRUCTURAL CONCRETE, HEADWALL CY 21 135 510502 F MINOR CONCRETE (MINOR STRUCTURE) CY 47 136 510526 F MINOR CONCRETE (BACKFILL) CY 32 137 511035 F ARCHITECTURAL TREATMENT SQFT 20738 138 511080 DECORATIVE STEEL LB 574 139 511106 DRILL AND BOND DOWEL LF 60

140 512268 F FURNISH PRECAST PRESTRESSED PRESTRESSED CONCRETE CA WIDE FLANGE GIRDER (140'-150')

EA 7

141 512269 F FURNISH PRECAST PRESTRESSED PRESTRESSED CONCRETE CA WIDE FLANGE GIRDER (150'-160')

EA 2

142 512401 F ERECT PRECAST CONCRETE GIRDER EA 9 143 515001 TEMPORARY HINGE DEAD WEIGHT LS 1 144 518050 PTFE BEARING EA 28 145 519095 P JOINT SEAL ASSEMBLY (MR 4") LF 128 146 519100 P JOINT SEAL (MR 2") LF 102 147 519101 JOINT SEAL (TYPE A) LF 125 148 519118 P JOINT SEAL ASSEMBLY (MR 9") LF 124 149 520102 P-F BAR REINFORCING STEEL (BRIDGE) LB 5,616,815 150 520103 P-F BAR REINFORCING STEEL (RETAINING WALL) LB 211,800 151 568062 PEDESTRIAN BARRICADE (TYPE A) EA 21

152 582000 RECONSTRUCT REMOVE RETAINING WALL (MASONRY WALL) SQFT 625

153 582001 F SOUND WALL (REINFORCED CONCRETE) SQFT 780 154 600002 VIBRATION MONITORING LS 1 155 600017 REMOVE RETAINING WALL (LF) LF 828 156 600105 BRIDGE REMOVAL (UPR No. 18C-0023) LS 1 157 600106 BRIDGE REMOVAL (UPR No. 18C-0018) LS 1 158 600107 BRIDGE REMOVAL (5th STREET No. 18C-0012) LS 1

Page 19: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

19

ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY

159 600108 BRIDGE REMOVAL (2nd STREET No. 18C-0055) LS 1

160 600166 P-F MISCELLANEOUS METAL (RESTRAINER - CABLE TYPE) LB 8,050

161 640001 P 4" PLASTIC PIPE (SEWER) LF 691 162 640002 P 4" PLASTIC PIPE (WATER) LF 968 163 640003 P 4" PLASTIC PIPE (COMMUNICATIONS) LF 2,616 164 650014 P 18" REINFORCED CONCRETE PIPE LF 6,217 165 650018 P 24" REINFORCED CONCRETE PIPE LF 185 166 650022 P 30" REINFORCED CONCRETE PIPE LF 331 167 650026 P 36" REINFORCED CONCRETE PIPE LF 23 168 680401 P 6" PERFORATED STEEL PIPE UNDERDRAIN LF 110

169 703239 36" CORRUGATED STEEL PIPE RISER (0.109" THICK) LF 35

170 703450 WELDED STEEL PIPE CASING (BRIDGE) LF 311 171 703461 36" WELDED STEEL PIPE CASING (BRIDGE) LF 20 172 703462 12" WELDED STEEL PIPE CASING (BRIDGE) LF 162 173 703515 P 8" WELDED STEEL PIPE (.134" THICK) LF 356

174 703760 P 12" COATED WELDED STEEL PIPE (0.25" THICK)(BRIDGE) LF 2,170

175 705204 18" CONCRETE FLARED END SECTION EA 6 176 707250 SHALLOW MANHOLE EA 6 177 707260 MANHOLE EA 14 178 710112 ABANDON MANHOLE EA 1 179 710114 ABANDON PIPELINE EA 21 180 710136 REMOVE PIPE (LF) LF 1,497 181 710150 REMOVE INLET EA 25 182 710152 REMOVE HEADWALL EA 2 183 710156 REMOVE MANHOLE EA 5 184 710157 REMODEL MANHOLE EA 3 185 710212 ADJUST MANHOLE TO GRADE EA 14 186 710218 ADJUST VALVE BOX EA 12 187 710764 REMOVE SEWER PIPE LF 650

188 720010 REMOVE AND REPLACE ROCK SLOPE PROTECTION LS 1

189 721015 F ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY) CY 1,660

190 721028 F ROCK SLOPE PROTECTION (NO. 2, METHOD B)(CY) CY 610

191 721430 CONCRETE (CHANNEL LINING) CY 28 192 721810 SLOPE PAVING (CONCRETE) CY 60

Page 20: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

20

ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY

193 729011 P ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 5,260 194 729011 P FILTER FABRIC SY 165 195 730011 MINOR CONCRETE (TALL RETAINING CURB) LF 80 196 730020 F MINOR CONCRETE (CURB) (CY) CY 64 197 730040 MINOR CONCRETE (GUTTER) (LF) LF 160 198 730045 F MINOR CONCRETE (GUTTER) (CY) CY 22 199 730070 DETECTABLE WARNING SURFACE SQFT 690 200 731504 F MINOR CONCRETE (CURB AND GUTTER) CY 421 201 731516 F MINOR CONCRETE (DRIVEWAY) CY 140 202 731521 F MINOR CONCRETE (SIDEWALK) CY 558 203 731530 MINOR CONCRETE (TEXTURED PAVING) CY 46 204 731623 F MINOR CONCRETE (CURB RAMP) CY 57 205 731710 REMOVE CONCRETE CURB (LF) LF 1,704 206 731840 REMOVE CONCRETE (CURB AND GUTTER) LF 5,947

207 731860 REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (LF) LF 4,228

208 750001 P-F MISCELLANEOUS IRON AND STEEL LB 27,574 209 750003 UNDERSIDEWALK DRAIN EA 10 210 750501 MISCELLANEOUS METAL (BRIDGE) LB 2,801 211 750505 P-F BRIDGE DECK DRAINAGE SYSTEM LB 60,342 212 760010 DESTROY WELL EA 2 213 770010 WATERLINE CRADLE EA 158 214 770020 DUCT BANK CRADLE EA 262 215 770100 CURED-IN-PLACE PIPELINER LF 321

216 770101 P 4" PLASTIC PIPE (COMMUNICATIONS) (IN BRIDGE) LF 21,880

217 770102 RESET FIRE HYDRANT EA 4 218 770103 P FIRE HYDRANT EA 1 219 770110 DOUBLE BALL EXPANSION JOINT EA 2 220 770111 ADJUST MONITORING WELL TO GRADE EA 11 221 770111 SINGLE BALL EXPANSION JOINT EA 2 222 770120 PIPE BOLLARD EA 12 223 770130 8" DUCTILE IRON PIPE LF 2,685 224 770131 12" DUCTILE IRON PIPE (APPROACH) LF 709 225 770140 AIR RELEASE VALVE EA 1 226 780500 PARKING BUMPER (PRECAST CONCRETE) EA 8 227 783001 CONTRACTOR SUPPLIED GENERATOR DAY 30 228 800000 PIPE FENCE LF 43 229 800103 TEMPORARY FENCE (TYPE CL-6) LF 2,077

Page 21: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

21

ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY

230 800104 20' TEMPORARY GATE (TYPE CL-6) EA 2 231 800321 P CHAIN LINK FENCE (TYPE CL-4, VINYL-CLAD) LF 110 232 800361 P CHAIN LINK FENCE (TYPE CL-6, VINYL CLAD) LF 307 233 800366 P CHAIN LINK FENCE (TYPE CL-6, BREAK-AWAY) LF 1,172 234 801365 P PIPE GATE EA 2 235 802501 P 4' CHAIN LINK GATE (TYPE CL-6) EA 5 236 802560 P 10' CHAIN LINK GATE (TYPE CL-6) EA 2 237 802601 P 14' CHAIN LINK GATE (TYPE CL-6) EA 2 238 803020 REMOVE FENCE LF 487 239 803060 REMOVE GATE EA 4 240 803100 P RECONSTRUCT FENCE LF 40

241 803101 RECONSTRUCT AND PAINT FENCE (PIPE RAILING) LF 625

242 810120 REMOVE PAVEMENT MARKER EA 1,710 243 810131 REMOVE CHANNELIZERS EA 55

244 810200 TEMPORARY DELINEATOR (CLASS 1)(SURFACE MOUNTED) EA 142

245 810230 P PAVEMENT MARKER (RETROREFLECTIVE) EA 1,072 246 820133 OBJECT MARKER (TYPE N) EA 2 247 820134 OBJECT MARKER (TYPE P) EA 2 248 820135 OBJECT MARKER (TYPE R) EA 4 249 820231 REMOVE RELOCATE MONUMENT SIGN EA 3 250 820250 REMOVE ROADSIDE SIGN EA 60 251 820530 RESET ROADSIDE SIGN EA 3

252 820750 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) SQFT 479

253 820840 ROADSIDE SIGN - ONE POST EA 37 254 820850 ROADSIDE SIGN - TWO POST EA 2

255 820860 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) EA 7

256 830001 BRIDGE PLAQUES EA 3 257 833084 STEEL PICKET RAILING LF 369 258 833085 P-F PIPE HANDRAILING LF 136 259 833086 P-F STAIRWAY RAILING LF 68 260 833088 P-F TUBULAR HAND RAILING LF 2,255 261 839543 P TRANSITION RAILING (TYPE WB-31) EA 1 262 839585 ALTERNATIVE FLARED TERMINAL SYSTEM EA 1 263 839607 CRASH CUSHION EA 5 264 839701 CONCRETE BARRIER (TYPE 60) LF 339

Page 22: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

22

ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY

265 839702 F CONCRETE BARRIER (TYPE 60A) LF 2,386 266 839703 CONCRETE BARRIER (TYPE 60C) LF 241 267 839704 CONCRETE BARRIER (TYPE 60D) LF 140 268 839705 CONCRETE BARRIER (TYPE 60C MOD) LF 45 269 839734 F CONCRETE BARRIER (TYPE 736) LF 146 270 839735 F CONCRETE BARRIER (TYPE 742) (MOD) LF 2,232 271 839742 F CONCRETE BARRIER (TYPE 742B MOD) LF 192 272 839743 REMOVABLE BARRIER EA 4 273 839746 F CONCRETE BARRIER (C412B) LF 82 274 839746 F CONCRETE BARRIER (C412) LF 4,097 275 839752 REMOVE GUARDRAIL LF 269 276 840501 THERMOPLASTIC TRAFFIC STRIPE LF 50,835 277 840515 THERMOPLASTIC PAVEMENT MARKING SQFT 5,344 278 840656 PAINT TRAFFIC STRIPE (2 COAT) LF 13,105 279 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2,818

280 846035 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 756

281 870200 P BRIDGE AND STREET LIGHTING LS 1 282 870402 P TRAFFIC SIGNAL (5th St/J St) LS 1

283 870403 P TRAFFIC SIGNAL (Sutter St/5th St On-Off Ramp) LS 1

284 870404 P TRAFFIC SIGNAL (Second St /Bridge St) LS 1 285 871812 INTERCONNECTION CONDUIT AND CABLE (LS) LS 1

286 872000 TEMPORARY LIGHTING (SECOND STREET AND BRIDGE STREET) LS 1

287 999990 MOBILIZATION LS 1

Add to section 1-1.07B: River Bed: Area that is physically under water

River Bank: The land directly adjacent to the edge of the water (commonly unvegetated sandy or sediment deposited area)

Riparian Area: This is a buffer zone around the river that has vegetative habitats which are directly dependent on the waterway

Floodplain: Area that is outside of the river banks that only floods during events of high water

Channel: the definition of channel within the permits is defined by the agency issuing the permit. As those definitions may vary, specific reference to the permit where “channel” is used is needed to provide an accurate definition of the word

Page 23: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

23

Add section 2-1.06B: As-builts of the levee modifications in the west levee and test results for the embankments within the former UPRR alignment on the Yuba City side of the 5th Street Bridge are included in the Information Handout.

Replace the table in section 2-1.33B(2)(b)(ii) of the RSS with:

Bid Form Submittal Schedule for a

Non-Informal Bid Federal-Aid Contract with a DBE Goal Form Submittal deadline

Bid to the Department of Transportation Time of bid except for the public works contractor registration number

Copy of the Bid to the Department of Transportation as submitted at the time of bid with the public works contractor registration number

10 days after bid opening

Subcontractor List Time of bid except for the public works contractor registration number

Copy of the Subcontractor List as submitted at the time of bid with the public works contractor registration number

10 days after bid opening

Small Business Status Time of bid Opt Out of Payment Adjustments for Price Index Fluctuationsa Time of bid

DBE Commitment No later than 4 p.m. on the 4th day after bid openingb

DBE Confirmation No later than 4 p.m. on the 4th day after bid openingb

DBE Good Faith Efforts Documentation No later than 4 p.m. on the 4th day after bid openingb

aSubmit only if you choose the option. bIf the last day for submitting the bid form falls on a Saturday or holiday, it may be submitted on the next business day with the same effect as if it had been submitted on the day specified.

Add to the table between the 2nd and 3rd paragraphs of the RSS for section 5-1.36C(3):

PG&E power pole 51 feet left of Sta 40+76 "F" Line August 30, 2017 PG&E power pole 60 feet left of Sta 44+26 "F" Line August 30, 2017 PG&E power pole** 27 feet right of Sta 48+31 "F" Line August 30, 2017 Underground lighting conduit*** Left and right of Sta 42 + 50 "F" Line August 30, 2017

**Construction of Pier 7 and 8 of the 5th Street Bridge will be hindered until this pole is relocated. ***Construction of Pier 5 of the 5th Street Bridge will be hindered until this utility is relocated.

Page 24: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

24

Add to section 10-1.03: Permit extensions will be obtained to allow construction between the levees to continue 4 weeks beyond November 1. This does not include extensions of the in-water work windows.

Do not begin construction of the project in the west levee of the Feather River or to the west of it before January 8, 2018 with the exception of the installation of the trestle and Pier 2. Trestle construction and Pier 2 construction do not have this time restriction.

Replace the 2nd and 3rd paragraph of section 12-4.01C with: For bridges, temporary trestles, embankments, falsework, or other temporary work constructed within the limits of the usable channel of the Feather River provide 1 opening for the passage of small boats. The opening must have a horizontal clearance of at least 40 feet measured normal to the direction of flow.

The minimum vertical clearance is 10.0 feet from the trestle soffit to the water surface elevation. You may assume the maximum water surface elevation between June 1 and November 1 to be a maximum of 46.0 feet. The trestle deck above the opening providing passage for boats will have to be removed between November 1 and June 1 if the vertical clearance to the trestle soffit is less than 10 feet due to changing water surface elevation. You may place the trestle at a higher elevation to extend the time before the deck over the opening providing passage for boats will need to be removed.

Replace items 8, 9 and 14 in the list describing the protection measures within Species Protection

Area 1 in section 14-6.03A with:

8. Any piles driven into the river channel for use in the temporary construction trestle must be installed using vibratory driving to the greatest extent possible. If use of an impact hammer cannot be avoided, monitoring will be performed to ensure thresholds are not exceeded. If thresholds are exceeded, a bubble curtain is required. Stop work if observed migrating fish are stunned or otherwise directly impacted by noise and vibration from pile driving. Work must not resume until the fish clears the construction area under its own power, or through collection and release by the City’s qualified fish biologist.

Thresholds for underwater sound levels during pile installation are:

Un-Attenuated Trestle Piles in Water Noise Threshold Distance 206 dB peak SPL 14 m

187 dB cumulative SEL 209 m 183 dB cumulative SEL 386 m

150 dB RMS 2929 m

Un-Attenuated Trestle Piles on Land Noise Threshold Distance 206 dB peak SPL 3 m

187 dB cumulative SEL 71 m 183 dB cumulative SEL 132 m

150 dB RMS 464 m 9. A bubble curtain must be utilized to attenuate noise and vibration during the placement of 10-foot

diameter shafts when construction is in water and when other, more effective attenuation cannot be

Page 25: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

25

provided (such as a dewatered coffer dam). Stop work if observed migrating fish are stunned or otherwise directly impacted by noise and vibration from pile driving. Work must not resume until the fish clears the construction area under its own power, or through collection and release by the City’s qualified fish biologist.

Thresholds for underwater sound levels during pile installation are:

Attenuated Large Diameter Shafts in Water Noise Threshold Distance 206 dB peak SPL 1 m

187 dB cumulative SEL 43 m 183 dB cumulative SEL 79 m

150 dB RMS 171 m

Un-Attenuated Large Diameter Shafts on Land Noise Threshold Distance 206 dB peak SPL 7 m

187 dB cumulative SEL 43 m 183 dB cumulative SEL 80 m

150 dB RMS 5857 m 14. Over-sized casing installed for the purpose of de-watering do not require an attenuation system

unless the thresholds below are exceeded. Stop work if observed migrating fish are stunned or otherwise directly impacted by noise and vibration from pile driving. Work must not resume until the fish clears the construction area under its own power, or through collection and release by the City’s qualified fish biologist.

Thresholds for underwater sound levels during pile installation are:

Un-Attenuated Over-sized Casings in Water Noise Threshold Distance 206 dB peak SPL 1 m

187 dB cumulative SEL 43 m 183 dB cumulative SEL 79 m

150 dB RMS 171 m

Replace section 14-8.03:

14-8.03 AIR BUBBLE CURTAIN SYSTEM 14-8.03A General 14-8.03A(1) Summary Section 14-8.03 includes specifications for designing, furnishing, installing, operating, monitoring, maintaining, and removing air bubble curtain system to reduce underwater acoustic waves generated by pile driving in water.

14-8.03A(2) Submittals 14-8.03A(2)(a) Air Bubble Curtain System Working Drawings with Supplement

Page 26: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

26

Submit air bubble curtain system working drawings with supplement prepared and signed by an engineer who is registered as a mechanical engineer in the State.

Within 15 days of Contract approval or at preconstruction conference, whichever comes first:

1. Submit 5 copies of air bubble curtain system working drawings with supplement for review. Allow 10 days for the Department’s review. The Engineer provides comments and specifies the date when the review stopped if revisions are required.

2. Change and resubmit a revised air bubble curtain system working drawings with supplement within 5 days of receiving the Engineer's comments. The Department’s review resumes when a complete air bubble curtain system working drawings with supplement is resubmitted. Allow 10 days for review of the resubmittal.

3. When the Engineer authorizes the air bubble curtain system working drawings with supplement, submit an electronic copy and 5 printed copies of the authorized air bubble curtain system working drawings with supplemental information.

The air bubble curtain system working drawings with supplement must include:

1. Working drawings:

1.1. Complete details of the system including mechanical and structural details

1.2. Details of anchorage components, air compressors, supply lines, distribution manifolds, aeration pipes and frame

1.3. Details of proposed means of isolating noise-producing systems on the pile-driving barge

1.4. Details of meters, gauges, and recording devices

1.5. Description of measures taken to avoid shining light into the water during pile driving operations

1.6. Details of the manufacturer's recommendations for installation of the flow meters in conditions of laminar flow and non-laminar flow

2. Supplement to the working drawing:

2.1. Independently checked design calculations

2.2. Materials list including the name of the manufacturer and the source, model number, description, and standard of manufacture

2.3. Manufacturer's descriptive data and catalog cuts for all products proposed for the system including air compressors

2.4. Calculations showing pressure loss in the piping system and estimated flows from the most removed orifice of the aeration piping

14-8.03B Materials Air bubble curtain system must include the following:

1. Air bubble curtain system consists of multiple and concentric layers of perforated aeration pipes stacked vertically in accordance with the following:

Water Depth (ft) No. of Layers 0 to less than 15 2 15 to less than 30 4

Page 27: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

27

2. Pipes must be arranged in layers in a geometric pattern, which allow for the pile driving operation to be completely enclosed by bubbles for the full depth of the water column and for a radial dimension of no more than 1.5 feet as measured from the outside surface of the pile.

3. The lowest layer of perforated aeration pipes must be designed to ensure contact with the mudline without sinking into the mud.

4. The system must be able to provide a bubble flux of 22 cubic feet per minute per linear feet of pipe in each layer. Air holes must be of 0.06 inch in diameter and spaced approximately 0.8 inch apart. Air holes must be placed in four adjacent rows along the pipe to provide uniform bubble flux.

5. Meters:

5.1. Install pressure meters at all inlets to aeration pipelines (manifolds) and at points of lowest pressure in each branch of the aeration pipeline pipelines (manifolds).

5.2. Install flow meters in the main line at each compressor and at each branch of the aeration pipelines (manifold). The flow meter at the compressor may be eliminated if the feedline from the compressor is continuous to the aeration pipe inlet.

5.3. Install flow meters according to the manufacturer’s recommendation based on either laminar flow or non-laminar flow, which ever applies.

14-8.03C Construction Inspect the air bubble curtain system for proper operation before each deployment and as necessary during deployment. Proper operation during deployment is determined by observation of the digital meters (air flow) and analog gauges (pressure) in the monitoring station and by other methods authorized by the Engineer.

Do not drive piles requiring air bubble curtain if air bubble curtain system is not authorized. Start the air bubble curtain system before driving piles. Conduct performance test of the air bubble curtain system before any pile driving operation to confirm the pressures and flow rates at each manifold ring meet the calculated values. Submit inspection and performance reports within 72 hours following the inspection or performance test.

Install gauges above the water line that are easily accessible. Log readings every 15 minute and at other times, as determined by the Engineer. Maintain a graphical plot showing the variation of the meter readings with time.

Monitor the condition of the air bubble curtain system and prepare inspection reports daily during pile driving operations and no less than every other day during periods of no activity.

Following constitutes failure of air bubble curtain system:

1. The pressure or flow rate in any meter falls below 90 percent of its determined operating value during the pile driving operation. Operating values based on calculated data are determined during the performance test.

2. Inspection of the perforated pipe indicates erosion of the holes or debris has clogged the holes.

If the air bubble curtain system fails, stop the pile driving immediately. Do not resume pile driving at any given location until the air bubble curtain system at that location is again operating as specified or as authorized by the Engineer.

Remove air bubble curtain system when no longer needed as authorized by the Engineer.

14-8.03D Payment Not Used

Page 28: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

28

Add to the 3rd paragraph of section 48-6.01: The review time for shop drawings for the trestle is 10 working days.

Replace the last two paragraphs of section 49-3.02C(1) with: Remove any oversized casings installed for construction to the long term scour elevation shown.

Replace section 70-3.02B(1) with: Coat the interior and exterior portions of the welded steel pipe with epoxy. The epoxy coating must be applied to the interior and exterior surfaces of welded steel pipe under ANSI/AWWA C210-03.

Repair of internal and external wall coatings must comply with the following:

1. Breaks or scuffs in the epoxy coating that are less than 36 square inches must be repaired by the application of epoxy material similar to and compatible with the durability, adhesion and appearance of the original epoxy coating

2. Repair coating must be a minimum thickness of 0.016 inch, 16 mils, after drying 3. Department rejects a pipe section if individual breaks exceed 36 square inches or if the total area of

breaks exceeds 0.5 percent of the total surface area of the pipe section

Coat all field welds with epoxy with a minimum thickness of 0.016 inch, 16 mils, after drying. Coat the welds in the interior and exterior of the pipe.

Add to Appendix L: The Section 408 Permit requirements are included in other permits. No separate 408 Permit will be included in the special provisions.

Add to Appendix N: The following is a draft of the CVFPB Encroachment Permit. The final permit is pending and will be made available prior to the bid opening. No significant changes are anticipated between the draft and final permit.

Page 29: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

Page 1 of 4 DWR 3784 (Rev. 9/85)

DRAFT STATE OF CALIFORNIA

THE RESOURCES AGENCY

THE CENTRAL VALLEY FLOOD PROTECTION BOARD

PERMIT NO. 19111 BD This Permit is issued to:

City of Yuba City 1201 Civic Center Blvd Yuba City, California 95993

The 5th Street Bridge Replacement Project includes removal of the existing two-lane 5th Street Bridge (Bridge No. 18C-0012) over the Feather River, between Yuba City and Marysville, and reconstruction to a four-lane bridge with a ten-foot wide Class 1 multi-use path. The project includes reconstruction of the approach roadways to the bridge in both cities, relocation of existing utilities (under separate permits), improvements to adjacent pedestrian, bicycle trails, and levee access ramps, and removal and replacement of trees in the floodway.

5th Street Bridge connects Bridge Street in Yuba City to Fifth Street in Marysville, at 39.13890˚N -121.60610˚W, Feather River, Yuba County, CA.

NOTE: Special Conditions have been incorporated herein which may place limitations on and/or require modification of your proposed project as described above.

(SEAL)

Dated: _________________________ ______________________________________________ Executive Officer

GENERAL CONDITIONS:

ONE: This permit is issued under the provisions of Sections 8700 – 8723 of the Water Code.

TWO: Only work described in the subject application is authorized hereby.

THREE: This permit does not grant a right to use or construct works on land owned by the Sacramento and San Joaquin Drainage District or on any other land.

FOUR: The approved work shall be accomplished under the direction and supervision of the State Department of Water Resources, and the

ATTACHMENT B - Draft Permit No. 19111

29

Page 30: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

Page 2 of 4 DWR 3784 (Rev. 9/85)

permittee shall conform to all requirements of the Department and The Central Valley Flood Protection Board.

FIVE: Unless the work herein contemplated shall have been commenced within one year after issuance of this permit, the Board reserves the right to change any conditions in this permit as may be consistent with current flood control standards and policies of The Central Valley Flood Protection Board.

SIX: This permit shall remain in effect until revoked. In the event any conditions in this permit are not complied with, it may be revoked on 15 days’ notice.

SEVEN: It is understood and agreed to by the permittee that the start of any work under this permit shall constitute an acceptance of the conditions in this permit and an agreement to perform work in accordance therewith.

EIGHT: This permit does not establish any precedent with respect to any other application received by The Central Valley Flood Protection Board.

NINE: The permittee shall, when required by law, secure the written order or consent from all other public agencies having jurisdiction.

TEN: The permittee is responsible for all personal liability and property damage which may arise out of failure on the permittee’s part to perform the obligations under this permit. If any claim of liability is made against the State of California, or any departments thereof, the United States of America, a local district or other maintaining agencies and the officers, agents or employees thereof, the permittee shall defend and shall hold each of them harmless from each claim.

ELEVEN: The permittee shall exercise reasonable care to operate and maintain any work authorized herein to preclude injury to or damage to any works necessary to any plan of flood control adopted by the Board or the Legislature, or interfere with the successful execution, functioning or operation of any plan of flood control adopted by the Board or the Legislature.

TWELVE: Should any of the work not conform to the conditions of this permit, the permittee, upon order of The Central Valley Flood Protection Board, shall in the manner prescribed by the Board be responsible for the cost and expense to remove, alter, relocate, or reconstruct all or any part of the work herein approved.

SPECIAL CONDITIONS FOR PERMIT NO. 19111 BD

LIABILITY AND INDEMNIFICATION

THIRTEEN: The permittee shall defend, indemnify, and hold the Levee District No. 1 of Sutter County, the Marysville Levee District, the Central Valley Flood Protection Board (Board), and the State of California, including its agencies, departments, boards, commissions, and their respective officers, agents, employees, successors and assigns (collectively, the "State"), safe and harmless, of and from all claims and damages related to the Board's approval of this permit, including but not limited to claims filed pursuant to the California Environmental Quality Act. The State expressly reserves the right to supplement or take over its defense, in its sole discretion.

FOURTEEN: The permittee is responsible for all liability associated with construction, operation, and maintenance of the permitted facilities and shall defend, indemnify, and hold the Levee District No. 1 of Sutter County, the Marysville Levee District, the Board and the State, safe and harmless, of and from all claims and damages arising from the project undertaken pursuant to this permit, all to the extent allowed by law. The State expressly reserves the right to supplement or take over its defense, in its sole discretion.

FIFTEEN: The Board, Department of Water Resources, and the Levee District No. 1 of Sutter County, and the Marysville Levee District shall not be held liable for any damages to the permitted encroachment(s) resulting from releases of water from reservoirs, flood fight, operation, maintenance, inspection, or emergency repair.

ATTACHMENT B - Draft Permit No. 19111

30

Page 31: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

Page 3 of 4 DWR 3784 (Rev. 9/85)

AGENCY CONDITIONS

SIXTEEN: All work approved by this permit shall be in accordance with the submitted drawings and specifications dated August 11, 2016 except as modified by special permit conditions herein. No further work, other than that approved by this permit, shall be done in the area without prior approval of the Central Valley Flood Protection Board.

SEVENTEEN: Permittee shall pay to the Board, an inspection fee(s) to cover inspection cost(s), including staff and/or consultant time and expenses, for any inspections before, during, post-construction, and regularly thereafter as deemed necessary by the Board.

EIGHTEEN: The permittee shall be responsible for the repair of any damages to the project levee, channel, banks, floodway, or other flood control facilities due to construction, operation, or maintenance of the proposed project.

NINETEEN: The permittee shall comply with all conditions set forth in the letter from the Department of the Army (U.S. Army Corps of Engineers, Sacramento District) dated __________, which is attached to this permit as Exhibit__ and is incorporated by reference.

PRE-CONSTRUCTION

TWENTY: Upon receipt of a signed copy of the issued permit the permittee shall contact the Board by telephone at (916) 574-0609, and submit the enclosed postcard, to schedule a preconstruction conference with the inspector that is assigned to your project. Failure to do so at least 10 working days prior to start of work may result in a delay of the project.

CONSTRUCTION

TWENTY-ONE: No construction work of any kind shall be done during the flood season from November 1 to April 15 without prior approval of the Board. Failure to submit a Time Variance Request to the Board at least 10 working days prior to November 1 may result in a delay of the project.

TWENTY-TWO: All cleared trees and brush shall be completely removed from the floodway, and downed trees or brush shall not remain in the floodway during the flood season from November 1 to April 15.

TWENTY-THREE: The abandoned or dismantled bridge shall be completely removed and disposed of outside the limits of the levee section and floodway.

TWENTY-FOUR: Piers, bents, and abutments being dismantled shall be removed to at least 1 foot below the natural ground line and at least 3 feet below the bottom of the low-water channel.

VEGETATION / ENVIRONMENTAL MITIGATION

ATTACHMENT B - Draft Permit No. 19111

31

Page 32: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

Page 4 of 4 DWR 3784 (Rev. 9/85)

TWENTY-FIVE: The mitigation measures approved by the CEQA lead agency and the permittee are found in its Mitigation and Monitoring Reporting Program (MMRP) adopted by the CEQA lead agency. The permittee shall implement all such mitigation measures.

POST-CONSTRUCTION

TWENTY-SIX: The work area shall be restored to the condition that existed prior to start of work.

TWENTY-SEVEN: Within 120 days of completion of the project, the permittee shall submit to the Board and DWR an electronic copy of as-built drawings, stamped and signed by a licensed civil engineer registered in the State of California, certifying the work was performed and inspected in accordance with the Board permit conditions and submitted drawings and specifications.

OPERATIONS AND MAINTENANCE

TWENTY-EIGHT: The permittee shall maintain the permitted encroachment(s) and the project works within the utilized area in the manner required and as requested by the authorized representative of the Central Valley Flood Protection Board, the Department of Water Resources, or any other agency responsible for maintenance and shall, at all times, allow officials from these agencies to access the levee, levee slope, and any adjacent areas as necessary for flood control.

END OF CONDITIONS

ATTACHMENT B - Draft Permit No. 19111

32

Page 33: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

33

CLARIFICATIONS AS FOLLOWS:

Question Answer

Column elevations are missing for both the abutments and piers. Please provide both top and bottom elevations for all columns at each pier and abutment. Please reference Sheet 301-304 of the contract drawings.

Top of column elevations are per the profile and cross section of the bridge shown on sheets 299 and 305. Bottom of column elevations are per the pile cutoff elevations shown on sheet 315.

On page 3 of the streambed alteration agreement paragraph H states that the 7 foot CMP will be installed from the construction joint to just below ground level. Construction drawings on sheet 33 of 80 detail limits of architectural treatment shows treatment to be 5’0” below ground level. Please verify what the definition for just below ground level is in the elevation.

The architectural treatment shall extend 5 feet below original ground, which is the elevation prior to beginning construction.

For work within the City of Marysville limits are we to follow City of Marysville standard specifications and plans? Or only the provided Yuba City and Caltrans standard specifications and plans.

Work in Marysville must be constructed as shown in the plans, Yuba City and Caltrans Standards are used in Marysville.

Please provide all of the as-build drawings for the structures to be removed including bridges and retaining walls.

As-built drawing for the bridges are in the Information Handout available on the Yuba City website at: http://www.yubacity.net/publicworksbids. We do not have as-builts for the retaining walls.

The Union Pacific Right of Entry agreement in Appendix C of Spec Book 2 requires railroad protective insurance. Please confirm if the required insurance is for both the multiuse train trestle/track running parallel to the 5th street bridge and the bridge that the 5th street traffic crosses under on the Marysville side.

Insurance is only required for the bridge that the 5th street traffic crosses under. No construction is anticipated below the railroad bridge parallel to the 5th Street bridge.

The contractor supplied generator location is not shown on the project drawings and the installation details are not provided. Please confirm the location of this generator and if the generator is only to be delivered, or if the generator must be connected to the sewer lift system electrical feed. Reference Spec Book 2 78-3 Contractor supplied generator.

The generator must be connected at either the sewer lift system power source or the sewer lift station as directed by the Engineer and maintained in service for the sewer lift system until the electrical service feed has been restored to the sewer lift system.

Page 34: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

34

There are multiple existing and new underground and overhead electrical and electrical/TV utilities on drawings U4 thru U7, U9, and U10 that are not clearly shown to be removed or installed by others or the specific utility owner. Are these assumed to be installed by the respective utility owner or by the contractor?

Further clarification has been added to the plans. Plans will be included in Addendum 2.

There are multiple locations where a utility pole is to be removed or installed by a utility owner. Are the existing or new utility lines also to be removed or installed by the pole owner?

The new utility lines will be installed/moved by the utility owner.

The bid invitation states: "THIS PROJECT IS SUBJECT TO THE 'BUY AMERICA' PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991." Domestic steel pipe producers and fabricators manufacture pipe and fittings conforming to “American Iron and Steel” (AIS) standards since most water and wastewater projects are funded through state revolving funds which get their money from federal Clean Water or Safe Drinking Water Act funds. This funding requires the use of material conforming to AIS . Will the use of AIS compliant materials also meet the requirements of “Buy America” provisions in the STAA Act?

The project is subject to the "BUY AMERICA" PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991 and Section 6-1.04 "BUY AMERICA" requirements of the Special Provisions. We are not certain if AIS compliant materials meet the "Buy America" requirements.

Will the City have a bidders list available for suppliers to provide pricing to?

Yes. The bidders list is available on the City's website at: www.yubacity.net/publicworksbids

Plan sheet 305 of 387 “ 118” CIDH type II or CISS Pile, typ” – makes absolutely no sense as there are no details or specifications for the CISS pile. Please provide a CISS plan and specifications or eliminate the note.

CISS piles are not part of this contract. The note has been eliminated.

Page 35: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

35

Page 93 of the specifications: CIDH piles must be installed by either: 1. Oscillating in temporary casings full length of the pile. 2. Vibrating in a temporary casing, the length of the temporary casing is determined by you. 3. Rotating a temporary casing, the length of temporary casing is determined by you. If you choose to install the temporary casing by vibrating at piers 2.3.or 4. Oscillate in a temporary oversize casing. Clean out the casing and dewater before placing the 10 foot temporary casing. The above makes no sense – you are specifying several means and methods. You need to specify what you want here or better yet – eliminate the words completely and let the contractor come up with the installation method.

Paragraph has been deleted via Addendum #2.

Page 34 -why does the city only pay half of the Rail Road flagging cost – generally this is paid by the owner.

The Contractor controls the number of days flagging is needed. Therefore, you share in the cost to make sure each flagging day is appropriately utilized.

Page 41 – Working says is based on work continuing year-round with no winter suspensions. Why state this? What if a suspension is warranted – IE flooding.?? Also bird specification requires suspended work and radius of suspensions when nesting birds found.

Working days is based on work continuing year-round with no winter suspensions but the Engineer may suspend work wholly or in part due to conditions unsuitable for work progress in accordance with Section 8-1.06 SUSPENSIONS of the Standard Specifications.

Page 43 – 10-1.03; you need to specify what the “channel” means, what within the “bank” means, “floodplain, and what the “riparian” area is – can you show these areas on the plans>

Defintions were added to section 1-1.07B via Addendum #2.

Throughout the spec’s the use of an impact hammer is allowed – in one section is it stated that the impact hammer be a “hydraulic” impact -Why? This needs to be defined, or note eliminated. Note 8 on page 62 requires the hydraulic hammer “reducing the impact force would reduce the intensity of the resulting sound” – it is not sound, but wavelengths that impact the fish. Further – if you want to reduce the intensity and wavelengths – the biggest hammer available would be best to use as blows per foot are reduced for a given pile capacity and length of driving time also reduced.

Reference to "Hydraulic" Impact hammer was deleted via Addendum #2..

Page 36: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

36

Why are 22” “max” diameter trestle pile referred to? Should be left up to the contractor. Would 24” be acceptable?

The trestle shown is approximate. Minor variations are expected including the use of 24" diameter pipe piles or H piles of similar size.

Fish and Game permit also (page 3 of 21 note e.) also talks about the temporary 10’ steel casing – this is in conflict with the spec’s on page 93 (see above question) . Note g. is also confusing and inferring a construction method which is in conflict with page 93 of the spec’s and with the other notes in the F&G permit.

Methods were removed from specs in Addendum #2. The design includes CIDH piles. CISS piles were eliminated from final design. Various methods were included in the permits to allow flexibilty during construction.

Note 14 page 62 – bubble curtains are ineffective and expensive (and by their nature cause a lot of turbidity) . Requiring the use of them for vibrating in piles is not normally done, and will do no good – why have these words in the spec (unless your desire is a high price – or claim) . The size of a bubble curtain for the demo of the existing piers would be immense. For vibrated pile – the fish are not impacted as they are with impact driven pile. Please consider eliminating this note.

Requirements for when bubble curtains are needed and bubble curtains specification are included in Addendum No. 2

Pier #4 CIDH has deep cutoff (assumed as part of Frame 1 part of Piles #2 & #3) which is customarily to utilize isolation columns. Why isn't permanent casing specified?

Response Pending

There is confusion on bubble curtain / coffer dam requirement; this is a constructability issue, please clarify.

Requirements for when bubble curtains are needed and bubble curtains specification are included in Addendum No. 2

In addition to bubble curtain response, Pier #4 in Special Provisions states "can't vibrate unless you rotate a casing". Can Pier #4 be relieved of this requirement (specs also say Piers #2 & #3 have same requirements as Pier #4) ?

The bubble curtain requirements for pile installations are updated in Addendum No.2.

The largest trestle permitted in the permit / specifications is 22". Would a 24" Trestle be approved for use also?

The trestle shown is approximate. Minor variations are expected including the use of 24" diameter pipe piles or H piles of similar size.

Page 37: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

37

Is it necessary to remove the existing bridge piles for the full length of the bridge?

The environmental requirement is to remove the existing bridge in its entirety as shown on Sheet 254. State Land Lease, item 13 (in the informational handout) addresses the possibility that the piles may break off during attempts to remove them. The desire is to avoid the possibility of scour leaving piles sticking out of the ground. See also plan sheets 253 to 257.

The 6-22-17 bid date and expedited trestle review timeline is demanding of this season. Would the City consider a postponed bid date?

No, the City is not considering postponing the bid date.

Working Days follow up question; the specifications call for 2 working seasons in the water?

The seasons available are what you can complete this year, plus 2 additional seasons thereafter.

Is the funding for the project secured? Yes

Regarding the permits for in water work, when do you expect to have in place and executed copies?

We plan to have permits at least 1 week prior to bid. The 2081 Incidental Take Permit will be issued in Addendum #1 and the DRAFT Central Valley Flood Protection Board Permits will be issued in Addendum #2.

When do bidder inquiries close, date? The cut off date for bidder inquiries is June 15, 2017 at 5 pm

Please consider allowing Bid Form Exhibit 12-B Bidder’s List of Subcontractors (DBE and Non-DBE) to be submitted with the Good Faith Effort Documentation. The value of this project will generate a lot of interest and trying to manage these forms during bid closing is difficult and increases the potential for errors. There are always subcontractors, especially DBE’s who are limited on resources, who bid the project last minute and the use of these forms will make it difficult to use their potential low bid.

Exhibit 12-B will be replaced with an updated version via addendum. Part 1 of the revised Exhibit 12-B must be submitted with the proposal. Part 2 of the revised Exhibit 12-B may be submitted with the Good Faith Effort documentation..

Page 38: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

38

Locations for the resident engineer's office, contractors office, and contractor's laydown area are not shown on the project plans or defined within the projects specifications. Please provide the locations for these offices and lay down area(s). Will utility power connections be provided for the office or laydown area(s)?

Per section 16-2, the exact location of the RE Office is to be determined by you. It must be in the Yuba City city limits. The project limits cleared environmentally for the contractor's office and laydown area are shown on sheet 10 within the APE line. You may use the area between the existing 5th and Bridge Streets, the area under the new and existing 5th Street Bridge(in compliance with work windows), the lot at the corner of 5th and J in Marysville. Some areas within the APE are outside of the acquired ROW for the project (shown on the L-sheets). You will have to negotiate with the owners of these properties to utilize these areas. Utility connections will not be provided for the office or laydown areas.

On drawings E-1 - E-7, sheets 229 - 235, there is signage shown on the traffic signal poles and mast arms that are not shown on the signage drawings. Please confirm that the cost for these signs will be carried in the applicable traffic signal bid item.

Correct, the cost of the signs shown on the traffic signal sheets is included in the cost of signal bid item.

During the pre-bid meeting the group asked a question regarding the use of 24" piles at the trestle. Please confirm that permits would not need to be reapplied for to be able to use 24" pile.

The trestle shown is approximate. Minor variations are expected including the use of 24" diameter pipe piles or H piles of similar size.

In at least two places in Book 1 of 3, Bid Book, a form requires us to identify a “place of residence” (e.g., Page 1, Proposal to the Department of Public Works form). What are we to put there? We are not a sole proprietor with a “residence”, and the form already includes our business address. Do we insert N/A?

The "place of residence" is typically the place of residence for the person signing the Proposal. However, Bidders can insert "Refer to Business Address" if desired.

In Book 1 of 3, Bid Book, page 21, Exhibit 15-G Construction Contract DBE Commitment form, in the lower right box that begins with “IMPORTANT”, what is meant by “Written confirmation of each listed DBE is required.”? Written confirmation from whom, confirming what? Depending on your response, if we receive a bid from a DBE that we accept just a few minutes before bid opening, will we have time to meet this requirement?

Written confirmation is intended to mean confirmation from each DBE that they will be participating inthe contract. A written bid from the DBE (electronic copy of a signed bid is fine), along with the DBE certification number, will suffice. Bidders are advised to verify DBE certifications for their subcontractors are valid. If a Bidder lists a DBE that turns out to not be certified, this could be a reason for rejecting a bid for incorrect or false information. Refer to Section 2-1.33B(2) for the timing of submitting this information.

Page 39: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

39

Can you tell me why bid item #286-Temporary Lighting (Second Street and Bridge Street) was omitted off of page 10 and left on page 39?

Items #286 and #287 were omitted by mistake. New bid items pages will be included in Addendum #2.

Addendum 1 revised Section 10-1.03 channel work window duration to the following: “You may work within the channel of the Feather River only from June 1 to October 1”. Please confirm that this work window only applies to “in-water work” (i.e. pile driving for trestle, trestle installation, CIDH pile installation, falsework pile installation). Please confirm that all “over-water work” can continue outside the June 1 to October 1 window. This includes staging of equipment on and working from the trestle.

Yes, you may work on the trestle outside of the water outside of the June 1 to October 1 window. Other work windows including those limiting work between the levees still apply.

Addendum 1 revised Section 10-1.03 work within the levees duration to the following: “You may work in the levees and between them in the floodplain only from April 15 to November 1”. Please confirm that this work window only applies to work on grade (i.e. pile driving, CIDH pile installation, falsework pile installation and falsework installation). Please also confirm that work “over the floodplain” can continue outside the April 15 to November 1 window.

All construction equipment must be removed between the levees. The frame 2 falsework may remain in place and you may work on it beyond November 1 if access is available.

Section 10-1.03 also states: “You may keep the trestle and the falsework for frame 2 of the 5th Street Bridge in place if it is properly secured and has been designed for the 100 year flood event”. Please confirm that the falsework for frame 1 and frame 3 can also be kept in place based on the aforementioned parameters.

Allowing the falsework for frame 2 to stay in the river was permitted after hydraulic analysis was performed. To keep frame 1 or frame 3 falsework over the winter will require approval from CVFPB. Due to the impact of the obstruction on the water surface elevation of the river, it is anticipated only one frame will be allowed to have falsework at any given time.

Page 40: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,

City of Yuba City Proposal 5th Street Bridge Replacement Project Contract No. 17-01

Addendum No. 2

40

Reference Plan Sheet 139 of 387. Note 2 requires that work in stages 1 through 9 in Marysville be completed within 100 consecutive working days. As the work listed in the various stages to be completed in Marysville is contingent upon the construction of the 5th Street Bridge and removal of the old bridge, this work will realistically last the entire duration of the 600 working days allotted for the project. Special Provisions Section 8-1.10B also places a 120 calendar day completion requirement on certain work at the intersection of 5th Street and J Street in Marysville. Were these two time restrictions meant to be the same? Please clarify.

The time restrictions were meant to be the same. Plan Sheet 139 was replaced with Addendum #1 to state 120 consecutive working days. You are not expected to complete the roadway all the way to the new bridge abutment in this timeframe because as you correctly indicated, the existing bridge may still be in service. You must complete the work east of the UPRR lines in 120 days.

Reference Special Provisions Section 10-1.03. Paragraph 2 states that you may work in the levees and between them in the floodplain only from June 1 to November 1 of any year. This will limit the work on the 5th Street Bridge to this time period. This is inconsistent with the following: a. The Department of Fish and Wildlife Streambed Alteration Agreement, in paragraph i under Project Description, allows for work to continue through the rainy season (October 2 through May 31) from the trestle on bridge spans above the live river channel. b. The Department of Fish and Wildlife Streambed Alteration Agreement, in paragraphs j-m under Project Description, describe the water diversion for removal of the old bridge and removal of the trestle in the second season (June 1 through October 1). Is the restriction described in Section 10-1.03 being imposed by some jurisdictional requirement of an outside agency? c. Additionally, the restriction described in Section 10-1.03 is inconsistent with the statement made in Special Provisions Section 8-1.06, which states that working days are based on work continuing year-round with no winter suspensions. The construction of the 5th Street Bridge will likely be the controlling operation in the CPM schedule. The prohibition of working between November 2 and May 31 would render these days as non-working days. Thus the project could take 5 years or more to construct. Is this what is intended?

a.-b. Please see the update to Section 10-1.03 included in Addendum #1. You must meet the conditions of all permits. You cannot use language in a more lenient permit to override language in a more a restrictive permit. All work window restrictions are being imposed by outside agencies.The draft CVFPB Permit which will be included in Addendum 2 establishes the work windows between the levees as April 15 to November 1. c. You are provided 600 working days to complete the project with no winter suspensions. The project must be completed in late 2019. Working days will continue even though the work windows will be closed for a portion of the year within the levees. Therefore, it is in your best interest to seek opportunities to work within the levees via permit extensions and to get substructure and falsework in place such that winter work may continue.

Page 41: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 42: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 43: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 44: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 45: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 46: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 47: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 48: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 49: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 50: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 51: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,
Page 52: ADDENDUM NO. 2 - Yuba City, California Works... · Replaced per Addendum No. 2 2 5TH STREET BRIDGE ... City of Yuba City Proposal 5th Street Bridge ... 128 510051 F STRUCTURE CONCRETE,