Page 1 Addendum No. 2 FGUA Project No. PS 061 ADDENDUM NO. 2 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY, FLORIDA ADDENDUM DATE: August 22, 2017 Bidders on the Project are hereby notified that this Addendum shall be attached to and made a part of the above-named Contract Documents and Specifications. These items shall have full force and effect as the Contract Documents and Specifications and cost involved shall be included in the bid prices. Bids to be submitted on the specified bid date shall conform with the additions/deletions/revisions listed herein. LIST OF ATTACHMENTS 1. Revised Specification Section 0300, Article 5 (Basis of Bid), Bid Form 2. Electrical plans (Drawings E1 to E13) SPECIFICATIONS 1. Specification Section 01025 1.05.C.2. Delete the first bullet, “Grit Removal, dewatering, TCLIP and other required contamination testing, and proper disposal. Grit shall be dewatered such that it passes paint filter tests;”. 2. Specification Section 01025 1.05.D.2. Delete the first bullet, “Grit Removal, dewatering, TCLIP and other required contamination testing, and proper disposal. Grit shall be dewatered such that it passes paint filter tests;”. 3. Add Specification Section 01025 1.05.I as follows: I. Removal of Grit/Sludge/Debris Accumulation (Bid No. 9) 1. Periodic payments will be based on the unit price set forth in the Bid Proposal and based on the amount of grit/sludge/debris (in tons) measured in place, removed, weighted, and accepted by the approved Residual Management Facility, less retainage. 2. Bid Item No. 9 shall include the removal, dewatering, proper disposal, TCLIP, and other contamination testing of the grit as required by the approved Residual Management Facility. Grit/sludge/debris shall be dewatered such that it passes paint filter tests.

ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

 Page 1 Addendum No. 2    FGUA Project No. PS 061 

ADDENDUM NO. 2

TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017

FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061

SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS

PASCO COUNTY, FLORIDA

ADDENDUM DATE: August 22, 2017

Bidders on the Project are hereby notified that this Addendum shall be attached to and made a part of the above-named Contract Documents and Specifications. These items shall have full force and effect as the Contract Documents and Specifications and cost involved shall be included in the bid prices. Bids to be submitted on the specified bid date shall conform with the additions/deletions/revisions listed herein.

LIST OF ATTACHMENTS 

1. Revised Specification Section 0300, Article 5 (Basis of Bid), Bid Form 

2. Electrical plans (Drawings E‐1 to E‐13) 

SPECIFICATIONS 

1. Specification Section 01025 1.05.C.2.  Delete the first bullet, “Grit Removal, dewatering, TCLIP and 

other required contamination testing, and proper disposal.  Grit shall be dewatered such that it 

passes paint filter tests;”. 

 

2. Specification Section 01025 1.05.D.2.  Delete the first bullet, “Grit Removal, dewatering, TCLIP and 

other required contamination testing, and proper disposal.  Grit shall be dewatered such that it 

passes paint filter tests;”. 

 

3. Add Specification Section 01025 1.05.I as follows: 

 

I. Removal of Grit/Sludge/Debris Accumulation (Bid No. 9) 

 

1. Periodic payments will be based on the unit price set forth in the Bid Proposal and based 

on the amount of grit/sludge/debris (in tons) measured in place, removed, weighted, and 

accepted by the approved Residual Management Facility, less retainage. 

 

2. Bid Item No. 9 shall include the removal, dewatering, proper disposal, TCLIP, and other 

contamination testing of the grit as required by the approved Residual Management 

Facility.  Grit/sludge/debris shall be dewatered such that it passes paint filter tests.   

Page 2: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

 Page 2 Addendum No. 2    FGUA Project No. PS 061 

DRAWINGS  

1. See Questions/Responses 

2. In the Contract Drawings, the electrical plans were converted to pdf on a 50% scale.  Attached are 

the electrical plans with the corrected scale. 

3. Replace Note #3 on Drawing D‐1 with, “The Contractor shall be responsible for wash down, grit/ 

sludge/debris removal, and tank cleaning for the performance of their work to the satisfaction of 

the Engineer.  A source of non‐potable water will be designated by the Owner for use by the 

Contractor for the purpose of wash down and/or flushing.” 

4. Replace Note #4 on Drawing D‐1 with, “For bidding purposes, Contractor shall assume 1,125 tons of 

grit, sludge, and debris to be removed from the South Train Phase 1 and 2 tanks. Tons refer to the 

weight recorded and accepted by the approved Residual Management Facility.” 

CLARIFICATION 

1. None 

IN THE CONTRACT DOCUMENTS 

1. Specification Section 0300, Article 5 (Basis of Bid), Bid Form has been revised.  See attached. 

2. Deadline for questions has been extended to the close of business on Wednesday, August 23, 2017. 

QUESTIONS/RESPONSES 

Q1.  What equipment is currently installed and to be removed in Phase 1 (south tanks)? 

 

See Drawings D‐3, D‐4 and D‐5 for items to be removed in the South Train Phase 1 tanks. 

 

Q2.  On the valve schedule CK‐PS‐01 is listed but not shown in the drawings. Please advise if required. 

 

See response to Question 10 of Addendum #1. 

 

Q3.  Drawing P‐7 shows a 6” Gate Valve at the pump out connection, but the valve description and 

valve schedule shows it as a plug valve (PV‐15‐01). Please clarify. 

 

The note in Drawing P‐7 is incorrect.  Revise note for PV‐15‐01 to state “6‐inch Plug Valve and Quick 

Connect Thickened Sludge Pump Out Connection”. 

 

Q4.  Section 3/P‐3 doesn’t match the plan view on Drawing P‐2. Drawing P‐3 shows removing piping 

and patching holes, but P‐2 seems to show new piping through those holes. Please clarify. 

 

Section 3/P‐3 is correct.  Revise plan view on Drawing P‐2 so that it is consistent with Section 3 on 

Drawing P‐3. 

 

Q5.  Drawing P‐2 where the 4” WAS line enters Tank #10 on the west side of the tank it is shown with 

a 90 bend, but section H/P‐5 shows a tee with blind flange. Please clarify. 

 

Drawing P‐2 is correct.  Revise Section H on Drawing P‐5 so that it is consistent with Drawing P‐2. 

Page 3: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

 Page 3 Addendum No. 2    FGUA Project No. PS 061 

Q6.  In 01025 1.05 A.2. states that final restoration and sodding is to be included in Mobilization/ 

Demobilization bid item, but this bid item is being limited to a percentage basis. Seeding/Sodding and 

restoration is a fixed cost unlike general conditions, mobilization and demobilization which could be 

greatly affected by completion time. Please consider removing restoration from the mobilization bid 

item. 

 

Remove final restoration/grading and seeding/sodding from Bid Item No. 1 and include them in other 

lump sum bid items that are not limited to a percentage basis. 

Q7.  RAS/WAS Air Lifts Replacement Specifications, Section 11210 Submersible Pumps, Part 3 – Execution, 3.04 Pump Schedule, Item A., Page 11210‐5: Are these spec’s the correct ones for the new proposed pumps shown on drawings P‐3 and P‐5 for Tank #3?  Revise Specification Section 11210 3.04A to state that the proposed RAS/WAS pumps are to be 460V, 3 Phase.    Q8.  RAS/WAS Air Lifts Replacement Specifications, Section 11210 Submersible Pumps, Part 3 – Execution, 3.04 Pump Schedule, Item A., Page 11210‐5: The 2 RAS/WAS pumps listed here are 5 HP, 230V, 1 Phase and if so, is the VFD being used to convert 1 to 3 phase so that 3 phase pumps can be used?   The pumps are to be 460V, 3 Phase.  That is the power available at the site.  Q9.  RAS Pump Station Drawings E3: The 2 RAS pumps shown in the upper left hand corner of the drawing and in both the “One Line Diagram” and “Cable Schedule,” which are shown as 7.5 HP, 460V, 3 Phase pumps appear to be existing pumps that only need a new control panel, please confirm they are indeed existing pumps that need a new control panel and not the new proposed pumps listed in the RAS/WAS Air Lifts Replacement Specifications, Section 11210 Submersible Pumps, Part 3 – Execution, 3.04 Pump Schedule, Item A., Page 11210‐5 that are different horsepower, voltage, and phase.  Both the pumps and control panel are new (proposed).  Both the pumps and the VFDs need to be 

provided for use on a 460V, 3 Phase power supply. 

Q10.  Question, is 3.07 as shown below to be included in this bid. This alone is several hundred thousand dollars   3.07 SHORT CIRCUIT ANALYSIS AND COORDINATION STUDY  The CONTRACTOR shall provide a complete short circuit study and a protective device coordination study for the electrical distribution system. The study shall include all portions of the electrical distribution system throughout the low voltage distribution system.  The study shall be submitted to the ENGINEER prior to granting final approval of the distribution equipment shop drawings.   A. Short Circuit Study  The study shall be performed in accordance with ANSI C37.5 and corresponding IEEE  publications. Short circuit momentary duties and interrupting duties shall be calculated on the basis of maximum available fault current at each switchgear bus, switchboard, motor control center and, 

Page 4: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

 Page 4 Addendum No. 2    FGUA Project No. PS 061 

distribution panelboard.  Based upon the calculated short circuit and interrupting duties, the CONTRACTOR shall determine the adequacy of the distribution equipment.   B. Protective Device Coordination Study  The CONTRACTOR shall perform a protective device coordination study to check the  selection of circuit breakers and power fuses ratings, protective relays settings, low voltage  breaker trip characteristics and settings.  The coordination study shall include all voltage classes of equipment from the utility's incoming line protective device down each motor control center and panelboard.  The time‐circuit characteristics of the protective devices shall be plotted on the appropriate log paper.  These plots shall indicate the types of protective devices selected, time delay and instantaneous trip settings.  C. Study Report  The results of the short circuit and protective device coordination study shall be summarized  in a final report. The report shall be submitted to the ENGINEER. 

The short circuit analysis and coordination study in specification section 16010, 3.07 are not required. 

Page 5: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

FGUA Project No. PS 061

Seven Springs Wastewater Treatment Facility Improvements

Bid Form (Revised 08/22/17)

BID ITEM DESCRIPTION QUANT. UNIT UNIT TOTALNO. AMOUNT AMOUNT

1- General Conditions, Mobilization, & Demobilization (Max 5% of Bid)

General Conditions, Mobilization, & Demobilization 1 LS

2 - Electrical and SCADA

Electrical and SCADA 1 LS

3 - South Train Phase I Tanks Improvements

South Train Phase I Tank Improvements 1 LS

4 - South Train Phase II Tanks Improvements

South Train Phase II Tank Improvements 1 LS

5 - Filter Replacement

Filter Replacement 1 LS

6 - Aeration Blower Replacement and Piping ModificationAeration Blower Replacement and Piping Modification 1 LS

7 - Intermediate Pump Station Gravity Line

Intermediate Pump Station Gravity OF Line 1 LS

8 - Contingency Allowance

Contingency Allowance 1 LS 300,000$ 300,000$

300,000$

9 - Removal of Grit/Sludge/Debris Accumulation

Removal of Grit/Sludge/Debris Accumulation 1125 Ton

Subtotal

Subtotal

TOTAL BID (in words) TOTAL BID (in dollars)

Subtotal

Subtotal

Subtotal

Subtotal

Subtotal

Subtotal

Subtotal

Page 6: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

Page 7: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

Page 8: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

ONE LINE DIAGRAM

N.T.S.

CABLE SCHEDULE

N.T.S.

Page 9: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

CABLE SCHEDULE

N.T.S.

N.T.S.

CENTRIFUGE DISCONNECT SWITCH

ONE LINE DIAGRAM

Page 10: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

CABLE SCHEDULE

N.T.S.

Page 11: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

CABLE SCHEDULE

N.T.S.

Page 12: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

Page 13: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

CABLE SCHEDULE

N.T.S.

ONE LINE DIAGRAM

N.T.S.

Page 14: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

Page 15: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

Page 16: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

Page 17: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5

Page 18: ADDENDUM NO. 2 - FGUA · valve schedule shows it as a plug valve (PV ‐15‐ ... Are these spec’s the correct ones for the new ... 3952 ONE LINE DIAGRAM N.T.S. CABLE SCHEDULE N.T.S

ww

w.w

ad

etrim

.co

mB

uild

in

g re

la

tio

nsh

ip

s o

n a

fo

un

dation

of e

xce

lle

nce

37

90

D

ixie

H

igh

wa

y N

E, S

uite D

32

1.7

28

.3

38

9 F

AX

: 3

21

.7

28

.3

39

3

Ce

rtifica

te

o

f A

uth

oriza

tio

n N

o.: 3

95

2

Pa

lm

B

ay, F

L 32

90

5