ENGINEERS ARCHITECTS SURVEYORS T&L 726 Auburn Avenue Radford, Virginia 24141 tel: 540.633.1897 fax: 540.633.1896 www.T-L.com ADDENDUM NO. 002 TO: All Plan Holders RE: Hangar 4 Pavement and Drainage Repairs Project for Roanoke Regional Airport Commission T&L Project No. 15391 DATE: October 30, 2020 BIDS RECEIVED DATE: November 10, 2020 This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents Issued for Bid on October 14, 2020. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. This Addendum consists of 5 pages. CLARIFICATIONS AND ANSWERS TO PRE-BID QUESTIONS: 1. Coordinate potential phasing of work with the airport. Airport and Hangar tenant prefer work to begin with milling of asphalt on the southwest side of the hangar. 2. Hangar will remain operational. Coordination will be required with hangar tenant. Phasing may be required by work to accommodate hangar use. Hangar supervisors contact information can be obtained. a. Hangar supervisor contact information can be coordinated with the low bidder and airport upon award. 3. Grass / asphalt area on southwest side of hangar could be a place to store equipment, not materials. RRAC to determine. a. Area may be used for storage. Limits to be coordinated with Airport and Hangar tenant. Storage cannot impact hangar operations. 4. RRAC can provide flight schedule. a. Can be provided to low bidder. 5. Provide additional information on the asphalt spec? The referenced FAA Guideline appears to offer options for selection by the EOR. a. The details for Asphalt Overlay and Heavy-Duty Pavement have been revised to correspond with typical VDOT paving specifications. Please see revised Plan Sheet C300.

ADDENDUM NO. 002 - Roanoke-BlacksburgRegionalAirport

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ADDENDUM NO. 002 - Roanoke-BlacksburgRegionalAirport

ENGINEERS ARCHITECTS SURVEYORS

T&L 726 Auburn Avenue Radford, Virginia 24141 tel: 540.633.1897 fax: 540.633.1896 www.T-L.com

ADDENDUM NO. 002 TO: All Plan Holders RE: Hangar 4 Pavement and Drainage Repairs Project for Roanoke Regional Airport Commission T&L Project No. 15391 DATE: October 30, 2020 BIDS RECEIVED DATE: November 10, 2020 This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents Issued for Bid on October 14, 2020. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. This Addendum consists of 5 pages. CLARIFICATIONS AND ANSWERS TO PRE-BID QUESTIONS:

1. Coordinate potential phasing of work with the airport. Airport and Hangar tenant prefer work to begin with milling of asphalt on the southwest side of the hangar.

2. Hangar will remain operational. Coordination will be required with hangar tenant. Phasing may be required by work to accommodate hangar use. Hangar supervisors contact information can be obtained.

a. Hangar supervisor contact information can be coordinated with the low bidder and airport upon award.

3. Grass / asphalt area on southwest side of hangar could be a place to store equipment, not materials. RRAC to determine.

a. Area may be used for storage. Limits to be coordinated with Airport and Hangar tenant. Storage cannot impact hangar operations.

4. RRAC can provide flight schedule. a. Can be provided to low bidder.

5. Provide additional information on the asphalt spec? The referenced FAA Guideline appears to offer options for selection by the EOR.

a. The details for Asphalt Overlay and Heavy-Duty Pavement have been revised to correspond with typical VDOT paving specifications. Please see revised Plan Sheet C300.

Page 2: ADDENDUM NO. 002 - Roanoke-BlacksburgRegionalAirport

Addendum No. 002

Hangar 4 Pavement and Drainage Repairs Project

October 30, 2020

Page 2

T&L www.T-L.com

6. Is testing of the asphalt or concrete required? Who is responsible for the testing the stone backfill required to compacted to a certain level, does it need to be measured / tested?

a. Contractor shall perform contractor quality control program for asphalt placement in accordance with Section 315 of VDOT Road and Bridge Specification. Contractor shall provide asphalt density results and asphalt sample to Owner / Engineer. Compaction testing of the stone backfill at the inlets shall not be required; however, Contractor shall properly orient the stone in accordance with Note 3 on Plan Sheet C200.

7. Can the limits of concrete and pavement repair around the inlets and manhole be identified on the plan?

a. The estimated limits of the concrete and pavement repair around inlets have been added to Plan Sheet C100. The Contractor shall be responsible for field verifying and performing their own estimate based on their planned installation / construction methods.

8. If the existing pipe connection to the drop inlets needs to be cut and a new piece of pipe installed to make the connection, is there a preferred tie-in method?

a. The Engineer has no preference provided that the connections are watertight. The contractor may utilize fernco type couplings or grout or other means to ensure a watertight connection.

9. Is flowable fill allowable for backfilling?

a. Yes. 10. Can you clarify where the concrete details “Control Joint” or “Construction Joint” should be used?

a. Control Joints will not be required. The detail for Construction Joints has been revised. Please see revised Plan Sheet C300.

11. Airport will determine if the asphalt millings can be transported to airport lot or if the contractor must dispose of.

a. Contractor will deliver asphalt milling to airport storage site along Thirlane Road. 12. Can tack coat be used in-lieu of grinding or milling of the concrete?

a. Addressed by the detail for Asphalt Overlay of Concrete Rigid Pavement. Please see revised Plan Sheet C300.

CHANGES TO DRAWINGS:

Sheet C100 – EXISTING / DEMOLITION SITE PLAN

1. REPLACE Sheet C100 in its entirety.

Sheet C200 – SITE PLAN 1. REPLACE Sheet C200 in its entirety.

Sheet C300 – MISCELLANEOUS DETAILS

1. REPLACE Sheet C300 in its entirety.

Enclosures: C100, C200, and C300, 3 pages

Page 3: ADDENDUM NO. 002 - Roanoke-BlacksburgRegionalAirport

HANGAR 4

EXISTING STORM SYSTEMDRAINAGE SUMMARY

STRUCTURE NAME DETAILS

CONTOUR INTERVAL =1" =

( IN FEET )

GRAPHIC SCALE

30'1'

10-02-2020

Date

No.

Purp

ose

of D

ocum

ent I

ssue

Date

Checked

Drawn

Designed

Sheet No.

Project No.

15391

T H O M P S O N& L I T T O N

HA

NG

AR 4

PAV

EMEN

T EV

ALU

ATIO

N

MAM

TCR

TCR

10/3

0/20

20AD

DEN

DUM

NO

. 001

1

ABBREVIATIONS:

C100

EXIS

TIN

G /

DEM

OLI

TIO

N S

ITE

PLAN

LEGENDSYMBOL DESCRIPTION

EXISTING PAVEMENT MILLING

EXISTING PAVEMENT

AutoCAD SHX Text
CP#2
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
BOLLARD (TYP. OF 6)
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
ELEC PANEL
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
NOTES: : 1. IF THE CONTRACTOR ENCOUNTERS CONTAMINATED GRAVEL DURING IF THE CONTRACTOR ENCOUNTERS CONTAMINATED GRAVEL DURING DEMOLITION OPERATIONS, THE CONTRACTOR SHALL DISPOSE OF THE CONTAMINATED GRAVEL AND REPLACE IN KIND.
AutoCAD SHX Text
COMM VAULT
AutoCAD SHX Text
SGR
AutoCAD SHX Text
SGR
AutoCAD SHX Text
SGR
AutoCAD SHX Text
STMH
AutoCAD SHX Text
30" RCP
AutoCAD SHX Text
30" RCP
AutoCAD SHX Text
30" RCP
AutoCAD SHX Text
STORM VAULT
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
18" RCP
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
18" RCP
AutoCAD SHX Text
CONC. DRAINAGE CHANNEL
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
TANK
AutoCAD SHX Text
CONC. APRON
AutoCAD SHX Text
SAW CUT FULL DEPTH EXISTING CONCRETE PAVEMENT.
AutoCAD SHX Text
SAW CUT FULL DEPTH EXISTING PAVEMENT.
AutoCAD SHX Text
SAW CUT FULL DEPTH EXISTING PAVEMENT.
AutoCAD SHX Text
SGR
AutoCAD SHX Text
4
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
6
AutoCAD SHX Text
SGR
AutoCAD SHX Text
STMH
AutoCAD SHX Text
SAW CUT FULL DEPTH EXISTING PAVEMENT.
AutoCAD SHX Text
EXISTING STRUCTURE (TO BE REMOVED)
AutoCAD SHX Text
EXISTING STRUCTURE (TO BE REMOVED)
AutoCAD SHX Text
EXISTING STRUCTURE (TO BE REMOVED)
AutoCAD SHX Text
EXISTING STRUCTURE (TO BE REMOVED)
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
5
AutoCAD SHX Text
1
AutoCAD SHX Text
STMH TOP = 1163.34' INV 30" RCP = 1154.10' (IN) INV 30" RCP = 1154.05' (OUT)
AutoCAD SHX Text
2
AutoCAD SHX Text
SGR TOP = 1161.88' INV 30" RCP = 1153.18' (IN) INV 24" RCP = 1155.23' (IN) INV 30" RCP = 1152.88' (OUT)
AutoCAD SHX Text
3
AutoCAD SHX Text
STORM VAULT TOP = 1163.20' COULD NOT OPEN LID TO OBTAIN PIPE INVERTS.
AutoCAD SHX Text
4
AutoCAD SHX Text
SGR TOP = 1166.21' INV 15" RCP = 1163.31' (OUT)
AutoCAD SHX Text
5
AutoCAD SHX Text
SGR TOP = 1166.92' INV 15" RCP = 1161.27' (IN) INV 15" RCP = 1160.47' (IN) INV 18" RCP = 1159.12' (IN) INV 24" RCP = 1159.02' (OUT)
AutoCAD SHX Text
6
AutoCAD SHX Text
STMH TOP = 1166.78' COULD NOT OPEN LID TO OBTAIN PIPE INVERTS.
AutoCAD SHX Text
7
AutoCAD SHX Text
SGR TOP = 1166.29' INV 15" RCP = 1160.64' (OUT)
AutoCAD SHX Text
8
AutoCAD SHX Text
SGR TOP = 1168.03' INV 18" RCP = 1163.63' (OUT)
AutoCAD SHX Text
INV = INVERT STMH = STORM MANHOLE SGR = STORM GRATE ELEC. = ELECTRICAL CONC. = CONCRETE CO = CLEANOUT CP = CONTROL POINT COMM = TELECOMMUNICATIONS RCP = REINFORCED CONCRETE PIPE FFE = FINISHED FLOOR ELEVATION
AutoCAD SHX Text
0
AutoCAD SHX Text
60'
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
30'
AutoCAD SHX Text
Virginia State Plane
AutoCAD SHX Text
Coordinate System
AutoCAD SHX Text
Grid North - South Zone
Page 4: ADDENDUM NO. 002 - Roanoke-BlacksburgRegionalAirport

HANGAR 4

CONTOUR INTERVAL =1" =

( IN FEET )

GRAPHIC SCALE

30'1'

10-02-2020

Date

No.

Purp

ose

of D

ocum

ent I

ssue

Date

Checked

Drawn

Designed

Sheet No.

Project No.

15391

T H O M P S O N& L I T T O N

HA

NG

AR 4

PAV

EMEN

T EV

ALU

ATIO

N

MAM

TCR

TCR

10/3

0/20

20AD

DEN

DUM

NO

. 001

1

C200

SITE

PLA

N

LEGENDSYMBOL DESCRIPTION

NEW STORM STRUCTURE

ASPHALT OVERLAY

HEAVY DUTY PAVEMENT

CONCRETE RIGID PAVEMENT

1

1

1

1

1

AutoCAD SHX Text
CP#2
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
BOLLARD (TYP. OF 6)
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
ELEC PANEL
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
NOTES: : 1. THE CONTRACTOR SHALL ENSURE THAT NO EARTH IS THE CONTRACTOR SHALL ENSURE THAT NO EARTH IS DISTURBED DURING PAVING OPERATIONS. 2. IF THE CONTRACTOR ENCOUNTERS CONTAMINATED IF THE CONTRACTOR ENCOUNTERS CONTAMINATED GRAVEL DURING PAVING OPERATIONS, HE/SHE SHALL DISPOSE OF THE CONTAMINATED GRAVEL AND REPLACE WITH AGGREGATE AS ILLUSTRATED IN THE TYPICAL SECTION ON SHEET C300. 3. REPLACE STORM STRUCTURES 4, 5, 7, AND 8. SEE REPLACE STORM STRUCTURES 4, 5, 7, AND 8. SEE SHEET C300 FOR ELEVATIONS, ANGLES, AND DETAILS. 4. THE CONTRACTOR SHALL BACKFILL AROUND THE THE CONTRACTOR SHALL BACKFILL AROUND THE MANHOLES BEING REPLACED WITH VDOT #57 STONE OR FLOWABLE FILL. VDOT #57 STONE SHALL BE PROPERLY ORIENTED WITH A PLATE COMPACTOR, JUMPING JACK, OR OTHER VIBRATORY COMPACTION DEVICE. PROPER ORIENTATION SHALL BE VISUALLY OBSERVED AND VERIFIED AS COMPACTION TESTING WITH A NUCLEAR DENSITY GAUGE IS NOT POSSIBLE.
AutoCAD SHX Text
RIGID CONCRETE PAVEMENT (SEE TYPICAL SECTION ON SHEET C300)
AutoCAD SHX Text
ASPHALT OVERLAY OF RIGID CONCRETE PAVEMENT (SEE TYPICAL SECTION ON SHEET C300)
AutoCAD SHX Text
COMM VAULT
AutoCAD SHX Text
SGR
AutoCAD SHX Text
SGR
AutoCAD SHX Text
SGR
AutoCAD SHX Text
STMH
AutoCAD SHX Text
30" RCP
AutoCAD SHX Text
30" RCP
AutoCAD SHX Text
30" RCP
AutoCAD SHX Text
STORM VAULT
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
18" RCP
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
18" RCP
AutoCAD SHX Text
CONC. DRAINAGE CHANNEL
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
TANK
AutoCAD SHX Text
CONC. APRON
AutoCAD SHX Text
PAVEMENT REPLACEMENT THICKNESS SHALL MATCH THE THICKNESS OF THE "RIGID CONCRETE PAVEMENT" "RIGID CONCRETE PAVEMENT" DETAILS AS ILLUSTRATED ON SHEET C300.
AutoCAD SHX Text
PAVEMENT REPLACEMENT THICKNESS SHALL MATCH THE THICKNESS OF THE "HEAVY-DUTY PAVEMENT" SECTION AS ILLUSTRATED ON SHEET C300.
AutoCAD SHX Text
PAVEMENT REPLACEMENT THICKNESS SHALL MATCH THE THICKNESS OF THE "HEAVY-DUTY PAVEMENT" "HEAVY-DUTY PAVEMENT" SECTION AS ILLUSTRATED ON SHEET C300.
AutoCAD SHX Text
APPROXIMATE LIMITS OF RIGID CONCRETE UNDERLAYMENT
AutoCAD SHX Text
EXTEND REMEDIATION MIN. 4 FEET OUTSIDE LIMITS OF RIGID CONCRETE UNDERLAYMENT
AutoCAD SHX Text
SGR
AutoCAD SHX Text
4
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
6
AutoCAD SHX Text
SGR
AutoCAD SHX Text
STMH
AutoCAD SHX Text
REPLACE EXISTING STORM STRUCTURE (SEE DETAILS ON SHEET C300)
AutoCAD SHX Text
REPLACE EXISTING STORM STRUCTURE (SEE DETAILS ON SHEET C300)
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
REPLACE EXISTING STORM STRUCTURE (SEE DETAILS ON SHEET C300)
AutoCAD SHX Text
PAVEMENT REPLACEMENT THICKNESS SHALL MATCH THE THICKNESS OF THE "HEAVY-DUTY PAVEMENT" SECTION AS ILLUSTRATED ON SHEET C300. THE CONTRACTOR SHALL ENSURE A SMOOTH TRANSITION FROM THE TOP OF STRUCTURE 6 TO THE PAVEMENT SURROUNDING THE STRUCTURE.
AutoCAD SHX Text
REPLACE EXISTING STORM STRUCTURE (SEE DETAILS ON SHEET C300)
AutoCAD SHX Text
5
AutoCAD SHX Text
0
AutoCAD SHX Text
60'
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
30'
AutoCAD SHX Text
Virginia State Plane
AutoCAD SHX Text
Coordinate System
AutoCAD SHX Text
Grid North - South Zone
Page 5: ADDENDUM NO. 002 - Roanoke-BlacksburgRegionalAirport

STRUCTURE NO. 4 STRUCTURE NO. 5

STRUCTURE NO. 7

STRUCTURE NO. 8

SECTION

STORMWATER PRECAST STANDARD MANHOLE

STORM STRUCTURES

TYPICAL SECTION - HEAVY DUTY PAVEMENT

TYPICAL DETAIL - CONSTRUCTION JOINT FOR

CONCRETE RIGID PAVEMENTTYPICAL DETAIL - CONCRETE RIGID PAVEMENT

10-02-2020

Date

No.

Purp

ose

of D

ocum

ent I

ssue

Date

Checked

Drawn

Designed

Sheet No.

Project No.

15391

T H O M P S O N& L I T T O N

HA

NG

AR 4

PAV

EMEN

T EV

ALU

ATIO

N

MAM

TCR

TCR

10/3

0/20

20AD

DEN

DUM

NO

. 001

1

C300

MIS

CELL

ANEO

US

DETA

ILS

TYPICAL DETAIL - ASHALT OVERLAY OF CONCRETERIGID PAVEMENT

1

1

1

1

1

1

1

AutoCAD SHX Text
15" RCP (INV. OUT = 1163.31)
AutoCAD SHX Text
15" RCP (INV. IN = 1160.47)
AutoCAD SHX Text
24" RCP (INV. OUT = 1159.02)
AutoCAD SHX Text
15" RCP (INV. IN = 1161.27)
AutoCAD SHX Text
18" RCP (INV. IN = 1159.12)
AutoCAD SHX Text
15" RCP (INV. OUT = 1160.64)
AutoCAD SHX Text
18" RCP (INV. OUT = 1163.63)
AutoCAD SHX Text
GRATE EL. = 1166.80 TOP = VDOT ST'D. T-DI-1 BASE = 5' DIA. VDOT ST'D. MONOLITHIC OR DOGHOUSE B-1 NOTE: THE CONTRACTOR SHALL VERIFY IF THE PIPE DIAMETERS AND ANGLES WILL ALLOW FOR A DOGHOUSE BASE.
AutoCAD SHX Text
GRATE EL. = 1166.25 TOP = VDOT ST'D. T-DI-1 BASE = 4' DIA. VDOT ST'D. MONOLITHIC B-1
AutoCAD SHX Text
GRATE EL. = 1166.30 TOP = VDOT ST'D. T-DI-1 BASE = 4' DIA. VDOT ST'D. MONOLITHIC B-1
AutoCAD SHX Text
GRATE EL. = 1168.05 TOP = VDOT ST'D. T-DI-1 BASE = 4' DIA. VDOT ST'D. MONOLITHIC B-1
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
15" RCP (INV. OUT = 1163.31)
AutoCAD SHX Text
15" RCP (INV. IN = 1160.47)
AutoCAD SHX Text
24" RCP (INV. OUT = 1159.02)
AutoCAD SHX Text
15" RCP (INV. IN = 1161.27)
AutoCAD SHX Text
18" RCP (INV. IN = 1159.12)
AutoCAD SHX Text
15" RCP (INV. OUT = 1160.64)
AutoCAD SHX Text
18" RCP (INV. OUT = 1163.63)
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
MONOLITHIC BASE
AutoCAD SHX Text
WATER-TIGHT GASKET OR GROUT.
AutoCAD SHX Text
CONNECT PIPE TO SECTION WITH APPROVED FLEXIBLE
AutoCAD SHX Text
WITH ASTM C478, TOP WIL BE VDOT STANDARD DI-1.
AutoCAD SHX Text
NOTE: MATERIALS AND FABRICATION IN ACCORDANCE
AutoCAD SHX Text
8" MIN 57 BASE STONE
AutoCAD SHX Text
2500 PSI CONCRETE
AutoCAD SHX Text
3"/FT. SLOPE
AutoCAD SHX Text
OF PIPE TO WALL
AutoCAD SHX Text
BENCH FROM CROWN
AutoCAD SHX Text
BETWEEN SECTIONS
AutoCAD SHX Text
CONTINUOUS ALIGNMENT
AutoCAD SHX Text
STEPS SHALL HAVE
AutoCAD SHX Text
SEALER, AASHTO M-198
AutoCAD SHX Text
BUTYL RUBBER ROPE
AutoCAD SHX Text
SEAL ALL JOINTS WITH
AutoCAD SHX Text
FINISH GRADE
AutoCAD SHX Text
FLUSH WITH TOP
AutoCAD SHX Text
DI-1 FRAME AND GRATE
AutoCAD SHX Text
BE #57 STONE
AutoCAD SHX Text
ALL BACKFILL SHALL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
STRUCTURE NO. 7 NOTES: : 1. IF CONTRACTOR ELECTS TO UTILIZE A SQUARE GRATE OR SQUARE CONCRETE IF CONTRACTOR ELECTS TO UTILIZE A SQUARE GRATE OR SQUARE CONCRETE STRUCTURE FOR STRUCTURE 7 THE CONTRACTOR SHALL PLACE RE-ENTRANT CORNER BARS AT EACH CORNER OF THE STRUCTURE. 2. RE-ENTRANT CORNER BARS SHALL CONSIST OF TWO (2) #4 BARS, 4' LONG, RE-ENTRANT CORNER BARS SHALL CONSIST OF TWO (2) #4 BARS, 4' LONG, SPACED 2' ON CENTER, WITH THE BARS NEAREST TO THE STRUCTURE BEING PLACED 4" FROM THE CORNER AND 2" FROM TOP OF THE SLAB.
AutoCAD SHX Text
8" AGGREGATE SUBBASE COURSE (TYPE 1, SIZE NO. 21A)
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FINAL GRADE
AutoCAD SHX Text
4" BASE COURSE (BM-25.0D)
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
PER SPECIFICATIONS
AutoCAD SHX Text
FORMED JOINT AND SEAL
AutoCAD SHX Text
DOWEL BASKET
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
8" AGGREGATE (TYPE 1, SIZE NO. 21A)
AutoCAD SHX Text
#4 @ 12" EW
AutoCAD SHX Text
CONCRETE SLAB-ON-GRADE (FAA P-501)
AutoCAD SHX Text
REINFORCEMENT STOPPED 2" FROM JOINT
AutoCAD SHX Text
1" DIA. X 1'-6" SMOOTH DOWEL @ 24" GREASE ONE END TO PREVENT BOND
AutoCAD SHX Text
8" SURFACE COURSE, PLACED IN FOUR (4) 2" LIFTS (SM-9.5D)
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
EXISTING AGGREGATE SUBBASE COURSE
AutoCAD SHX Text
2" THICK ASPHALT OVERLAY (SM-9.5D)
AutoCAD SHX Text
DEMOLISH EXISTING ASPHALT OVERLAY COURSE
AutoCAD SHX Text
EXISTING CONCRETE RIGID BASE COURSE
AutoCAD SHX Text
DEPTH OF EXISTING COURSES VARIES
AutoCAD SHX Text
NOTES: 1. THE EDGES OF THE ASPHALT OVERLAY TO REMAIN SHALL HAVE A SMOOTH VERTICAL FACE THE EDGES OF THE ASPHALT OVERLAY TO REMAIN SHALL HAVE A SMOOTH VERTICAL FACE OBTAINED BY MILLING OR CUTTING. 2. AFTER DEMOLITION OF EXISTING ASPHALT OVERLAY, EXISTING CONCRETE PAVEMENT SHALL AFTER DEMOLITION OF EXISTING ASPHALT OVERLAY, EXISTING CONCRETE PAVEMENT SHALL BE INSPECTED FOR SUBSTANTIAL CRACKING AND STRUCTURAL DEFECTS. 3. CONCRETE CORING SHALL BE PERFORMED IN AREAS OF SIGNIFICANT DAMAGE TO DETERMINE CONCRETE CORING SHALL BE PERFORMED IN AREAS OF SIGNIFICANT DAMAGE TO DETERMINE IF A REPAIR MORE EXTENSIVE THAN OVERLAY REPLACEMENT IS NEEDED. 4. AN ASPHALT OVERLAY OF 2" SHALL BE PLACED IN ALL AREAS WHERE ASPHALT CAN BE AN ASPHALT OVERLAY OF 2" SHALL BE PLACED IN ALL AREAS WHERE ASPHALT CAN BE MILLED 2". IN AREAS WHERE ONLY 1.75" TO 2.0" OF ASPHALT IS MILLED PRIOR TO ENCOUNTERING THE CONCRETE IT IS ACCEPTABLE TO REDUCE THE ASPHALT OVERLAY TO 1.75" TO 2.0". IN AREAS WHERE LESS THAN 1.75" OF ASPHALT IS MILLED PRIOR TO ENCOUNTERING THE CONCRETE SLAB, THE CONCRETE SLAB SHALL BE MILLED/GROUND TO ACCEPT THE FULL 2" ASPHALT OVERLAY. A TACK COAT SHALL BE PROVIDED TO ALL EXISTING CONCRETE SURFACES PRIOR TO PLACING THE ASPHALT OVERLAY. 5. THE SURFACE OF THE CONCRETE PAVEMENT SHALL BE THOROUGHLY CLEANED BY SWEEPING THE SURFACE OF THE CONCRETE PAVEMENT SHALL BE THOROUGHLY CLEANED BY SWEEPING OR WASHING. EXISTING CRACKS SHOULD BE CLEANED OUT WITH PRESSURIZED AIR OR OTHER MEANS, AND FILLED WITH CRACK-SEALING MATERIAL. 6. A TACK COAT SHALL BE PLACED ON THE CLEAN AND DRY CONCRETE SURFACE ALONG WITH A TACK COAT SHALL BE PLACED ON THE CLEAN AND DRY CONCRETE SURFACE ALONG WITH AREAS OF UNDERLING ASPHALT COURSE AND THE VERTICAL JOINT TO EXISTING OVERLAY. THE APPLICATION RATE OF AN UNDILUTED EMULSION SHALL BE 0.10 TO 0.13 GALLONS PER SQUARE YARD FOR A 95%+ COVERAGE.