P a g e | 1 of 3
ADDENDUM 2
107 W. Lawrence St. Helena, MT 59601 Phone: 406.457.0360 w ww.s la tea rch i tec tu re .c om
This Addendum is issued to inform bidders of clarifications to the plans & specifications. The additions, clarifications, and corrections contained herein shall be made to the Project Manual, Drawings, and Schedules for the above referenced project, and shall be included in the scope of work and proposals to be submitted. References made below to the Project Manual and Drawings shall be used as a general guide only. Bidder shall determine the extent of work affected by Addendum items. GENERAL NOTES:
1. There is an existing hose bib on the existing south exterior wall of the Museum that conflicts with the new addition. The plumbing contractor shall remove the existing hose bib and associated domestic cold water piping and cap the piping at the connection to the main. Coordinate any required wall patching with the general contractor.
2. The plumbing fixtures that are identified with demolition keynotes (D08, D09 & D10) and new construction keynotes (028, 029 & 030) are to be coordinated with the owner prior to any work being started on these items.
DRAWING MODIFICATIONS/CLARIFICATIONS: 1) Sheet C4.0 – GRADING AND DRAINAGE DETAILS
a. REVISE detail 2 – East Retention Basin, with the attached sketch ADD2.1
2) Sheet A2.0 – ARCHITECTURAL SITE PLAN a. REVISE the east storm water retention basin shown in detail 1 – SITE PLAN, with the attached
sketch ADD2.1
Date: June 14, 2016 Addendum #: 2 Project: Museum of the Rockies Collections & Storage Facility Project #: Slate Architecture # : 15056
MSU PPA #: 13-0093 To: All Plan Holders of Record
P a g e | 2 of 3
3) Sheet A6.1 – DOOR & WINDOW SCHEDULE, ELEVATIONS & DETAILS a. REPLACE the sheet in its entirety with the one attached.
4) Sheet A6.2 – DOOR DETAILS
a. Detail 5, REPLACE dimension 3 ¾” for adjacent walls with 4”
5) Sheet P0.1 – PLUMBING SCHEDULES & DETAILS a. REVISE the plumbing fixture schedule to include Hose Bib HB-2 see attached sketch SKP-01
6) Sheet P1.0 – LEVEL 1 PLUMBING AND PIPING PLAN
a. ADDED Hose Bib to Office 104, see sketch SKP-01.
7) Sheet P1.1 – LEVEL 2 PLUMBING AND PIPING PLAN a. ADDED note “3/4” DCW to Water Softener” see sketch SKP-01.
PRIOR APPROVALS Review for prior approval is for general conformance with the plans and specifications. This review does not take the place of shop drawing review. All requirements of the Plans and Specifications must be met. This review does not relieve the Contractor of the responsibility for furnishing equipment and materials that meet the requirements of the Contract Documents. Mechanical Prior Approvals
SECTION ITEM MANUFACTURER 23 3113 Round Spiral Ductwork Lewis & Lambert
Omni Duct None Roof Intake & Exhaust Hoods ACME
Electrical Prior Approvals
Section 265119 – The following manufacturers are approved for bidding purposes only. All products are subject to final approval during the submittal process. The Contractor is responsible for providing equipment that meets the project requirements and meets or exceeds the equipment specified in quality, appearance and performance:
Type Manufacturer Comments A1 LSI Industries SDL 8 LED LW WW UE CHS5 A1 Mercury Lighting LW4-8-6000-35K-HTA-SXX-UNI-90CRI A2 LSI Industries SDL 4 LED LW WW UE CHS5 A2 Mercury Lighting LW4-4-3800-35K-HTA-SXX-UNI-902CRI B1 LSI Industries LPASC22 LED SS WW UE W/INT OS 0-10V DIM
DAYLIGHTSENSOR B2 LSI Industries LPASC24 LED SS WW UE
P a g e | 3 of 3
B2 Mercury Lighting LR10-24G-4200-35K-SXX-UNI E1 Mule Lighting AR 28 B UNV E1 DUALLITE EVHC12I-06L V1 Deco Lighting DACH-LED-4’ 25 35 UNV R DM CSC MS (DIM TO 50%) V1 COLUMBIA LIGHTING LBIL4-35LW-EDU W1 Deco Lighting D444 LED 20 40 UNV T2 BL PC277V EMB W1 HUBBELL LNC2-12L4-4K-2-1-PC4-BBU X1 Mule Lighting SQC LED U R WW SD X1 COMPASS CCR LTG CTLS Leviton LEVITON IRC SERIES LTG CTLS HUBBELL NXRC-1R-UNV, NXRC-2R-UNV, NXRD-2RD-UNV, NXRC-
1RD-UNV/NXRC-2R-UNV
ATTACHMENTS:
1) Sketch ADD2.1 – Revision to East Retention Basin
2) SHEET A6.1 – Door & Window Schedule, Elevations & Details – Attached
3) Sketch SKP-01
4) PRE-BID SIGN-IN SHEET – Attached END OF ADDENDUM 2
AFTER WINDOWINSTALLATION
1
2
BEFOREWINDOWINSTALLATION
NOTES:1. WINDOW OPENING SHOWN. DOORS ARE SIMILAR.
SEE ASSOCIATED DETAILS.2. THE FOLLOWING NOTES OCCUR IN
CORRESPONDING NUMBER INSTALLATIONSEQUENCE.
3
5
6
7
9
8
1. WEATHER BARRIER BENEATH WINDOWAS SHOWN
2. FLEXIBLE MEMBRANE SILL PAN COVERINGSILL AND EXTENDING UP JAMB 4" TO 6"AS SHOWN
3. WEATHER BARRIER AROUND JAMBS ANDHEADER OVERLAPPING FLEXIBLEMEMBRANE SILL PAN 2" AS SHOWN
4. CAULK BEHIND NAILING FLANGE (EXCEPTAT SILL FLANGE) PRIOR TOINSTALLATION. LAP EXTERIOR FACE OFFLANGE.
5. WINDOW OR DOOR - WINDOW FLANGEUNDER FLEXIBLE MEMBRANE FLASHINGAS SHOWN.
6. FLEXIBLE MEMBRANE FLASHING.7. METAL DRIP FLASHING @ HEAD8. FLEXIBLE MEMBRANE FLASHING AT
HEADER OVERLAPPING JAMB FLEXIBLEMEMBRANE BY 2"
9. BUILDING PAPER BIB TUCKED UNDERSEAM IN PRIMARY BUILDING PAPERCOURSE & LAPPED OVER METALFLASHING
2"
SCHEDULE
SEE 2"
2"
SC
HE
DU
LE
SE
E
TYPE 'A'
SC
HE
DU
LE
SE
E
SCHEDULE
SEE
SC
HE
DU
LE
SE
E
SCHEDULE
SEE
TYPE 'B'
2"
SCHEDULE
SEE 2"
SC
HE
DU
LE
SE
E2"
TYPE 'C' TYPE 'D' TYPE 'E'
2"
SCHEDULE
SEE 2"
2"
SC
HE
DU
LE
SE
E
TYPE 'F'
2"
SCHEDULE
SEE 2"
SC
HE
DU
LE
SE
E2"
6" 6" 6"6" 6"
6"
1' -
0"
6"
6"
1' -
0"
2
8' - 6"
6' -
0"
2"
2' - 9"
2"
2' - 9"
2"
2' - 4"
2"
2"
3' -
9"
2"
1' -
9"
2"
6' -
0"
2"
5' -
8"
2"
3' -
0"
TYPE 'C'
5' -
6"
UN
O
1' -
8"
TYPE 'A'
6' -
0"
1' -
2"
TYPE 'B'
4' - 0"
2" 3' - 8" 2"
4' - 0"
2" 3' - 8" 2"
13' -
0"
TO
LA
ND
ING
3' -
0"
2"
4' -
1"
2"
4' -
2"
2"
4' -
1"
2"
TYPE 'D'
4' - 0"
2" 3' - 8" 2"
ALUMINUM WINDOWASSEMBLY
FACE BRICK BEYOND
SEALANT
FACE BRICK(SOLDIER COURSE
THRU-WALL FLASHING
WEEPS @ 24" O.C.
AIR SPACE
DRAINAGE MATERIAL
LEDGER ANGLE - SECURETO HEADER PER STRUCT.
ANCHOR ASSEMBLY -SECURED W/ SELFSEALING FASTENER
NOTCH BRICK
TOOLED MORTAR JOINT, TYP.
COMPRESSIBLEMATERIAL BEYOND
ICF BLOCK
5/8" GYPSUM WALL BOARD
SEALANT
TREATED 2X WINDOW BUCK
ANCHOR ASSEMBLY -SECURE W/ SELFSEALING FASTENERS
FACE BRICK
SEALANT
WINDOW ASSEMBLYFACE BRICK BEYOND
SEALANT & BACKER ROD
THRU-WALL FLASHING
SLOPED PRECASTSILL - 15° MIN.
MORTAR BED
AIR SPACE
TOOLED MORTAR JOINT
WEEPS @ 24" O.C.
SILL FLASHING
3/4" SOLID MATERIAL SILL
ICF BLOCK
TREATED 2X WINDOW BUCK
ALUMINUM WINDOW ASSEMBLY
SEALANT
DRIP EDGE WITHDIVERTER CHANNEL
ICF BLOCK
METAL PANEL SIDING,SEE ELEVATIONS
TREATED 2X WINDOW BUCK
5/8" GYPSUM BOARD
DRIP EDGE
SELF ADHESIVE ICE &WATER SHIELD
SEALANT
ICF BLOCK
METAL SIDING, SEE ELEVATIONS
J TRIM
THRU WALL FLASHINGDRIP EDGE
WINDOW ASSEMBLY
SELF ADHESIVE WEATHERMEMBRANE
SEALANT
3/4" SOLID MATERIAL SILL
TREATED 2X WINDOW BUCK
SEALANT
206
6"
6"
EXIT
6"
EXIT STAIRS
SN-3: ROOM NUMBER & WINDOW SN-4: ROOM NUMBER AND NAMESN-2: EXITSN-1: EXIT STAIRS
206
6"
6"
CONFERENCEROOM
6"
6"
6"
NOTE: COORDINATE WITH OWNER AND UNIVERSITY FOR ACTUAL STYLE AND FINAL APPROVAL
2 1
/2"
3/4
"
WINDOW FOR ROOM ID, SEE SPECS
THIS PLAN SET ISINTENDED FOR BID
TAKE-OFF/ESTIMATIONPURPOSES ONLY. NOTFOR CONSTRUCTION.
MO
NTA
NA
STA
TE U
NIV
ERSI
TY
Printe
d O
n:
PPA#13-0093
REV. DESCRIPTION DATEREVIEWED BY:DRAWN BY :
MU
SEU
M O
F T
HE
RO
CK
IES
NE
W C
OLL
ECT
ION
S +
STO
RAG
E F
ACI
LITY
DATE
100%
CO
NST
RUC
TIO
N D
OCU
MEN
TS
SHEET
SHEET TITLESLATE#15056
SLAT
E AR
CHIT
ECTU
RE, I
NC.
107
W. L
AWRE
NCE
STR
EET
HEL
ENA,
MON
TAN
A 59
601
T |
406.
457.
0360
WW
W.S
LATE
ARCH
ITEC
TURE
.COM
6/1
4/2
016 1
0:2
1:2
1 A
M
A6.1
MAY 27, 2016
DOOR & WINDOWSCHEDULE,
ELEVATIONS &DETAILS
JPASWC
3" = 1'-0"1 TYPICAL EXTERIOR FLASHING DETAIL
DOOR SCHEDULE
DOORNO.
ELEVATIONTYPE
DOOR FRAME GLAZINGTYPE
FIRERATING
HARDWARE(PER SPECS)
DETAILS
COMMENTSWIDTH HEIGHT THICKNESS MATERIAL FINISH MATERIAL FINISH WIDTH HEAD JAMB SILL
101 C 12' - 0" 10' - 0" COILINGDOOR
FACTORY METALTRACK
FACTORY 3 HR H13 8/A6.2 9/A6.2 10/A6.2
103 E 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 8 3/8" G-3 H8 4/A6.2 5/A6.2 NA
104 E 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 6" G-3 H8 4/A6.2 5/A6.2 NA
105 E 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 6" G-3 H8 4/A6.2 5/A6.2 NA
107 E 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 8 3/8" G-3 H8 4/A6.2 5/A6.2 NA
108A A 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 8 3/8" 1 HR H9 4/A6.2 5/A6.2 NA
108B A 3' - 0" 7' - 0" 0' - 1 3/4" HM/GALV PNT-3 HM/GALV PNT-3 0' - 5 3/4" H1 5/A6.3 5/A6.3 6/A6.2
109A D 12' - 0" 10' - 0" 0' - 2" SECTIONAL FACTORY STEEL OHDOOR
FACTORY H11 6/A6.3 7/A6.3 NA
109B A 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 5 3/4" H3 8/A6.3 8/A6.3 9/A6.3
109C A 3' - 0" 7' - 0" 0' - 1 3/4" HM/GALV PNT-3 HM/GALV PNT-3 0' - 5 3/4" H1 5/A6.3 5/A6.3 6/A6.2
110 F 6' - 0" 8' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 6" G-3 H7 4/A6.2 5/A6.2 NA
111A A 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 7 3/8" 3 HR H4 4/A6.2 5/A6.2 6/A6.2
111B A 3' - 0" 7' - 0" 0' - 1 3/4" HM/GALV PNT-3 HM/GALV PNT-3 0' - 5 3/4" H2 5/A6.3 5/A6.3 6/A6.2
111C EXISTING 3' - 0" 7' - 0" 0' - 1 3/4" EXISTING EXISTING EXISTING EXISTING H10 NA NA NA REUSING EXISTING DOOR, BUTREPLACE HARDWARE.
112A C 12' - 0" 10' - 0" COILINGDOOR
FACTORY METALTRACK
FACTORY 1 HR H12 3/A6.3 4/A6.3 NA
112B C 12' - 0" 10' - 0" COILINGDOOR
FACTORY METALTRACK
FACTORY 1 HR H13 11/A6.2 12/A6.2 13/A6.2
112C C 12' - 0" 10' - 0" COILINGDOOR
FACTORY METALTRACK
FACTORY 1 HR H12 3/A6.3 4/A6.3 NA
113A D 12' - 0" 10' - 0" 0' - 2" SECTIONAL FACTORY STEEL OHDOOR
FACTORY H11 1/A6.3 2/A6.3 1/A8.1
113B A 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 5 3/4" 3 HR H4 10/A6.3 11/A6.3 12/A6.3
114 A 4' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 8 3/8" H6 4/A6.2 5/A6.2 NA
200A B 10' - 0" 10' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 5 3/4" H5 1/A6.2 2/A6.2 3/A6.2
200B C 10' - 4" 10' - 0" COILINGDOOR
FACTORY METALTRACK
FACTORY 3 HR H14 1/A6.2 2/A6.2 3/A6.2
201 F 6' - 0" 8' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 8 3/8" G-3 H7 4/A6.2 5/A6.2 NA
203 A 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 8 3/8" 1 HR H9 4/A6.2 5/A6.2 NA
204A D 12' - 0" 10' - 0" 0' - 2" SECTIONAL PNT-3 STEEL OHDOOR
FACTORY H11 6/A6.3 7/A6.3 NA
204B A 3' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 5 3/4" H3 8/A6.3 8/A6.3 NA
204C A 3' - 0" 7' - 0" 0' - 1 3/4" HM/GALV PNT-3 HM/GALV PNT-3 0' - 5 3/4" H1 5/A6.3 5/A6.3 6/A6.2 NO EXTERIOR HARDWARE
205 A 4' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 6" H6 4/A6.2 5/A6.2 NA
206 A 4' - 0" 7' - 0" 0' - 1 3/4" HM PNT-3 HM PNT-3 0' - 6" H6 4/A6.2 5/A6.2 NA
207 C 12' - 0" 10' - 0" COILINGDOOR
FACTORY METALTRACK
FACTORY 1 HR H12 3/A6.3 4/A6.3 NA
WINDOW SCHEDULE
MARK
FRAME DETAILS GLAZINGTYPE COMMENTSMATERIAL FINISH HEAD/JAMB SILL
A-1 ALUM WINDOW FACTORY 4/A6.1 5/A6/1 IG-1
A-2 ALUM WINDOW FACTORY 2/A6.1 3/A6/1 IG-1
B ALUM WINDOW FACTORY 4/A6.1 5/A6/1 IG-1
C ALUM STORE FRONT FACTORY 2/A6.1 3/A6/1 IG-1
D ALUM STORE FRONT FACTORY 4/A6.1 5/A6/1 IG-1
DOOR AND FRAME ELEVATION
WINDOW ELEVATIONS
3" = 1'-0"4 WINDOW HEAD DETAIL (JAMB SIM.)
3" = 1'-0"5 WINDOW SILL DETAIL
3" = 1'-0"2 WINDOW HEAD DETAIL METAL SIDING (JAMB SIM)
3" = 1'-0"3 WINDOW SILL DETAIL METAL SIDING
SIGNAGE SCHEDULE
DOOR NO.ROOM
NO. ROOM NAME TYPE SIGN TEXT BRAILLE SIGN COMMENTS
103 103 OFFICE SN-3 Yes PROVIDE CLEAR VIEW ROOM NAME INSERT
104 104 OFFICE SN-3 Yes PROVIDE CLEAR VIEW ROOM NAME INSERT
105 105 OFFICE SN-3 Yes PROVIDE CLEAR VIEW ROOM NAME INSERT
107 107 OFFICE SN-3 Yes PROVIDE CLEAR VIEW ROOM NAME INSERT
108A 108 STAIR SN-1 EXIT STAIR Yes
108B 108 STAIR SN-2 EXIT Yes
109B 109 COLLECTIONS SN2 & SN-4 COLLECTIONS Yes
109C 109 COLLECTIONS SN-2 EXIT Yes
110 110 SECURE WORK SN-4 SECURE WORK Yes
111A 111 VEST. SN-2 EXIT Yes
111B 111 VEST. SN-2 EXIT Yes
113B 113 LOADING DOCK VESTIBULE SN-4 LOADING DOCK Yes
114 114 MECHANICAL SN-4 MECHANICAL Yes
201 201 SECURE WORK SN-4 SECURE WORK Yes
203 203 STAIR SN-1 EXIT STAIR Yes
204B 204 COLLECTIONS SN2 & SN-4 COLLECTIONS Yes
204C 204 COLLECTIONS SN-2 EXIT Yes
205 205 MECHANICAL ROOM SN-4 MECHANICAL Yes
206 206 STORAGE SN-4 STORAGE Yes
SIGN TYPES
1
1 ADDENDUM #1 6/9/16
2 ADDENDUM #2 6/14/16
2
PLUMBING FIXTURE SCHEDULE
MARK MFGRMODEL
NUMBERDESCRIPTION MATERIAL & FINISH TRIM
ROUGH-IN SIZEREMARKS
RL/ORL WASTE VENT COLD HOT
DS-1 JR SMITH 1771 ROOF DRAIN DOWN SPOUT NOZZLE POLISHED BRONZE NASEE
PLANS- - - - - - - -
PROVIDE CAST BRASS UNIT WITH MACHINED OUTLET WITH SET SCREWS, FLANGE, ANDJR SMITH QUAD CLOSE TRAP SEAL.
FS-1 ZURN Z1901 12"X12"X8" DEEP FLOOR SINK
PORCELAIN ENAMEL LINED CASTIRON BODY WITH NICKEL BRONZE
GRATENA - -
SEEPLANS
SEEPLANS
- - - -
PROVIDE COMPLETE WITH NO-HUB OUTLET, CAST IRON BODY WITH WHITE A.R.E.INTERIOR, 3_
4 GRATE, ALUMINUM DOME STRAINER AND JR SMITH QUAD CLOSE TRAP
SEAL.
HB-1 WOODFORD MODEL 24 ANTI-SIPHON WALL HYDRANT CHROME NA - - - - - - 3_4" - - COORDINATE MOUNTING HEIGHT IN FIELD
HB-2 WOODFORD MODEL 65ANTI-SIPHON, FREEZELESS WALL
HYDRANTCHROME NA - - - - - - 3_
4" - - COORDINATE MOUNTING HEIGHT AND STEM LENGTH IN FIELD
RD-1 JR SMITH 1800YROOF DRAIN AND OVER FLOW
DRAIN ASSEMBLYCAST IRON BODY WITH GALVANIZED
CAST IRON DOMENA
SEEPLANS
- - - - - - - -PRIMARY AND SECONDARY ROOF DRAIN ASSEMBLY WITH DECK PLATE, CAST IRON
DOME STRAINERS AND EXPANSION JOINTS ON OUTLETS. INSULATE DRAIN SUMPS ANDINTERIOR SIDE OF DECK PLATE.
SK-1 ELKAY DLRS332210PD33"X22"X10" SINGLE BOWL, TOP
MOUNT, SINK18 GAUGE 304 STAINLESS STEEL
MOEN MODEL#8289 FAUCET
- - 1-1/2" 1-1/2" 1_2" 1_
2"
PROVIDE COMPLETE 3 FAUCET MOUNTING HOLES, CHROME P-TRAP, QUARTER TURNSTOP VALVES AND ELKAY MODEL # LK335 REMOVABLE CONICAL BASKET STRAINER.
NOTES: PROVIDE ALL FIXTURE WITH APPROPRIATE COMMERCIAL GRADE SUPPORTS/CARRIERS, P-TRAPS, STOP VALVES, BRAIDED FLEXIBLE SUPPLIES, UNDER FIXTURE PIPING INSULATION AND HAMMER ARRESTORS. PROVIDE AND INSTALL TRAP PRIMERS FOR ALL FLOOR DRAINS ANDFLOOR SINKS UNLESS OTHERWISE INDICATED. INSTALL ALL TRAP PRIMERS IN RECESSED WALL MOUNTED BOXES IN AN ACCESSIBLE LOCATION. FIELD COORDINATE INSTALLATION LOCATION OF TRAP PRIMER WALL BOXES WITH ARCHITECT/ENGINEER.
5
AB
OF
FIC
E
103
OF
FIC
E
104
FC
-1
FC
-2
VE
ST
.
111
EW
H-1
2" S
AN
UP
2" S
AN
DN
3/4
" DC
W &
1/2
" DS
W U
P
4" R
OO
F D
RA
INO
VE
RF
LO
W O
UT
LE
T
4" R
WL T
OB
ELO
W G
RA
DE
DS
-1
HR
-1
HB
-2
3/4"ø DCW
1
AB
2
HR
V-1
HV
AC
-2
HP
-1
P-1
P-2
FS
-1
FS
-1
HB
-1
HE
LLE
NB
RA
ND
PR
OM
AT
E 7
.0T
AW
AT
ER
SO
FT
EN
ER
- INS
TA
LL P
ER
MA
NU
FA
CT
UR
ER
S IN
ST
RU
CT
ION
S
AS
-12"ø
HP
S2"ø
HP
R
1/2
"ø D
SW
3/4
"ø D
CW
3"ø
HP
R3"ø
HP
S1/2
"ø D
SW
3/4
"ø D
CW
HC
CC
-1
3/4
" DC
W T
O W
AT
ER
SO
FT
EN
ER
HPSHPR
DR
AW
N B
Y:
CH
K'D
BY
:
AP
PR
. BY
:
DA
TE
:
NE
W C
OL
LE
CT
ION
S +
ST
OR
AG
E F
AC
ILIT
Y
2880 Techno
logy Blvd W
Bozem
an, MT
59718
Phone: (406
) 587-0721F
ax: (406) 922-6702
©C
OP
YR
IGH
T M
OR
RIS
ON
-MA
IER
LE
, INC
.,
SK
P-01
MS
U P
PA
# 13-0
093
MU
SE
UM
OF
TH
E R
OC
KIE
S
AD
DE
ND
UM
#2
EC
R
EC
R
6-14-16
EC
R
N
1/8
" = 1
'-0"
2R
evis
ed L
eve
l 1 P
lum
bin
g S
KP
-01
N
1/8
" = 1
'-0"
3R
evis
ed L
eve
l 2 P
lum
bin
g S
KP
-01
Phone: 406-542-9150 P.O. Box 967 Missoula, MT 59806 Fax: 406-542-3515
Phone: 406-577-2772
Phone: 406-234-5565
P.O. Box 6581
P.O. Box 1298
Bozeman, MT 59771
Miles City, MT 59301
Fax: 406-587-4282
Fax: 406-234-5566
Museum of the Rockies: Pre-Bid Walk-Through Sign-In
Name Company Email Phone
Brian Beck Jackson [email protected] (406) 493-4389
Taylor Erskine Jackson [email protected] (406) 880-3368
Jeff Geiger Precision Plumbing [email protected] (406) 589-7075
Sandi Bocher Townsend Electric [email protected] (406) 266-5279
Ben Ehlers Valley Electric [email protected] (406) 546-1671
James Clore Peak Painting & Drywall [email protected] (406) 580-5271
Jacob Augeustein Slate Architecture [email protected] (406) 457-0365
John Collet The Third Element [email protected] (406) 465-6945
Scott Cromwell Slate Architecture [email protected] (406) 459-1768
Scot Horning Williams Plumbing [email protected] (406) 922-3124
Dan Bokma Williams Plumbing [email protected] (406) 922-3136
Joe Dolan Central Excavation [email protected] (406) 570-5615
Erik Renna MMI [email protected] (406) 922-6841
Mike Hickman MMI [email protected] (406) 922-6829
Jamie Bigson S Conley [email protected] (406) 585-7333
Jay Fischer MMI [email protected] (406) 581-6603
Austin Hagel CK May Excavating [email protected] (406) 314-2962
Dave Yaggy Western States Fire Protection [email protected] (406) 539-5121