25&35 Bedford Street Hazardous Page 1 of 2 December 14, 2020
Materials Abatement Project
Addendum 1 University of Southern Maine
Portland, Maine
Date: December 14, 2020
25-35 Bedford Street Hazardous Materials Abatement Project
Prebid Attendance
Dirigo:
• Zachary Quinn • Thomas Perkins • Megan Cormier • Christina Cameron
Woodard and Curran:
• Robert Pelletier • Amy Martin
University of Southern Maine:
• Ann Vashon • Bob Adams • Lachelle Lackey • Tom Blanchard
PC Construction:
• Garret Bertolini
Questions and Answers
1. Q: Building envelope sealants shown with the red perimeter line on the 35 Bedford Street figure
are identified on this figure as asbestos-containing materials and with PCBs < 50 ppm – please
confirm if this is accurate.
a. The building envelope sealants contain asbestos but not PCBs. A revised figure 6 is
attached.
2. Q: Define how to remove the painted floor area of 25 Bedford maintenance area.
a. Paint on floor is no longer in this abatement scope of work. To be removing under
separate contract as part of building demolition. The lead specification 02 83 00
remains part of the project manual to accommodate potential uncovered conditions.
25&35 Bedford Street Hazardous Page 2 of 2 December 14, 2020
Materials Abatement Project
3. Q: Define how to cover potential window openings, wall openings, door openings, Skylights.
a. Use similar construction methods as shown in drawing package detail 1/A400
4. Q: What is the defined scope of work with the utilities. Demo to meter? Remove Meter? Etc.
a. Contractor is required to coordinate the utility disconnect with the utility company
and USM Facility Management and leave the building at a zero energy state at
completion.
5. Q: Will there be heat inside the building.
a. Yes. The contractor shall notify Facility Management when appropriate to disconnect
heat.
6. Did the exterior paint get tested for PCBs?
a. Yes, the exterior paint was non-detect for PCB’s.
Scope Clarification
Base Scope of Work:
• Subsequent to the pre-bid conference additional testing has determined that no Lead or PCB abatement is required in the base scope of work.
• Unit prices to be included for Lead and PCB as previously shown on bid form in the event these materials are uncovered during the course of asbestos abatement.
Bidding procedure
1. Scan all bid submission documents into PDF format
2. Attach to email
3. Email Subject line “25-35 Bedford Street Hazardous Materials Abatement Project”
4. Email To: [email protected] CC: [email protected] and [email protected]
5. University mail server clock will govern bid submission timestamp. Bids received after 2:00pm
on Monday, December 21,2020 will be rejected
6. Please email [email protected] to request meeting invitation link to virtual bid opening.
The link posted with bid advertisement is no longer functional
7. Paper originals of bidding documents will be required at contract execution from successful
bidder
Attachments
• Bid From – 00 41 13 • Figure 6 - from Woodward and Curran Hazardous Materials Survey Report – Woodbury Campus
Center – 02 26 00
00 41 13 Bid Form
25&35 Bedford Street Hazardous Page 1 of 2 December 14, 2020
Materials Abatement Project
BIDDER:
Physical/Street Address
City, State ZIP Attn: University of Maine Office of Facilities Management Ann Vashon, Project Manager Capital Planning and Project Management 25 Bedford Street Portland, Maine, 04104
Having carefully examined the form of contract, general conditions and plans and specifications contained therein for
25&35 Bedford Street Hazardous Materials Abatement Project, as well as the premises and conditions affecting the
work, we the undersigned propose to furnish all labor, equipment, and materials necessary for and reasonably incidental
to the construction and completion of this contract as follows:
BASE SCOPE OF WORK - FIXED FEE PROPOSAL
1. Asbestos-containing materials as identified in Section 02 82 00
2. Miscellaneous hazardous materials / universal waste materials as identified in the Hazardous Building Materials Survey Report. Subsequent to the pre-bid conference additional testing as determined that no Lead or PCB abatement is required in the base scope of work. Unit prices to be included as previously shown on bid form in
the event these materials are uncovered during the course of asbestos abatement.
3. Utility coordination to leave building in a zero-energy state following abatement
4. Security Barricades Breakout Pricing for Above
Total proposed sum of _____________________________________________________________Dollars
($__________________________________________________)
ADD-ALTERNATE UNIT PRICING Please provide unit pricing for test pits and other exploratory work associated with this work scope per the table below:
Item Fully Burdened Unit Price
Laborer Per hour
Crew Lead person Per hour
Small excavator/backhoe Per hour
Small dump truck Per hour
Imported common borrow backfill Per cubic yard
Imported common borrow gravel Per cubic yard
Pavement patching – sidewalk/parking lot (non-base contract work areas)
Per square yard
Building Base Work Scope
25 Bedford Street $
35 Bedford Street $
00 41 13 Bid Form
25&35 Bedford Street Hazardous Page 2 of 2 December 14, 2020
Materials Abatement Project
Please provide unit pricing for additional abatement that may be required per the table below:
Item Fully Burdened Unit Price
PCB-containing materials as identified in Section 028400
Per Square Foot
Asbestos-containing vapor barrier / damp proofing materials
Per Square Foot
Asbestos-containing pipe insulation, asbestos-cement pipe, or other ACM related to subsurface utilities
Per Linear Foot
Asbestos-containing gaskets, switches, wire insulation, or other mechanical system / electrical component ACMs
Per Each
Asbestos-containing gypsum wallboard and joint compound
Per Square Foot
Asbestos-containing adhesives associated with floor drains
Per Each
Asbestos-containing insulation or vapor barriers associated with refrigerator/freezer walls/doors
Per Square Foot
Asbestos-containing sealants, adhesives, insulation, or flashing mastic associated with infilled windows
Per Square Foot
This proposal includes the cost of 100% Performance Bond plus 100% Payment Bond. The receipt of the following addenda to plans and specifications is hereby acknowledged: ADDENDUM # DATED ADDENDUM # DATED
ADDENDUM # DATED ADDENDUM # DATED Bidder hereby acknowledges attendance to the pre-bid conference held virtually on December 3rd, 2020.
INITIAL____________ DATE___________
Any material or materials not specified in the bidding document but worthy of consideration may be introduced by the bidder by a separate letter attached to this Bid. A cost comparison must be included giving the comparison with the Material specified and the reason for the suggested substitution. The basic bid shall be as specified. The undersigned agrees, if this Bid is accepted to sign a contract and deliver it, along with the bonds and affidavits for all insurance specified within twelve (12) calendar days after the date of notification of such acceptance, except if the 12th day falls on a Saturday, Sunday or holiday, then the conditions will be fulfilled if the required documents are received before 12 o’clock noon on the day following the holiday, or the Monday following the Saturday or Sunday, and as a guarantee thereof, herewith submits a bid bond as required. The undersigned agrees, if awarded the Contract, to complete the work on or before February 26th, 2021. The undersigned also agrees, if awarded the Contract, that no more than 80% of the contract amount will be sublet to other contractors. Signed (by individual authorized to sign contract) By (printed name & title) Phone PO Box (if applicable) Email NOTE: If bidder is a corporation, write State of Incorporation, and if a partnership, give full names of all partners.
BOOKSTORE
NORTH
VESTIBULE
MECH
MAIN LOBBY
ATM
East
Vestibule
RAMP
LANDING
STUDENT
INVOLVEMENT
MEETING
ROOM
OFFICE
CLOSET
OFFICEOFFICE OFFICE
OFFICE/RECEPTION
OFFICE OFFICE OFFICE
OFFICE
OFFICE
HALL
JANITOR
WOMEN'S
HALL
MEN'S
HALL
CLOSET
MEETING
ROOM "A"
MEETING
ROOM "B"
MEETING
ROOM "C"
HC BATH
MECH
ROOM
KITCHEN
Hall
FOOD
COURT
FOOD SERVICE
Serving line counter
OFFICE
OFFICE
FREEZER
COOLER
COOLER
STORE ROOM
TOILET
STOREROOM
DINING ROOM
HALL
LOUNGE
HALL
STAIR 1
STAIR 2
STAIR 3
STADIUM
SEATING
STAIR 4
RAMP
STAIR 5
UP
190Stair 6
AMPHITHEATER
Added in
1987
Private
HALL
Bookstore
Open Office
SOUTH
VESTIBULE
Southwest
Vestibule
RAMP / DOCK
Loading
Dock
Uncovered
VETERANS
HALLWAY
(private)
CORRIDOR
Toilet
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LOBBY
CORRIDOR
STOREROOM
MEETING
AREA
101227 sf
110A80 sf
130M34 sf
1104753 sf
130794 sf
130A1166 sf
122413 sf
122A164 sf
19665 sf
131282 sf
132157 sf
13351 sf
116A17 sf
11839 sf
116472 sf
135243 sf
11981 sf
12093 sf
135F93 sf
135G70 sf
135H70 sf
135I96 sf
135J114 sf
135A112 sf
135B82 sf
135C85 sf
135D92 sf
135E196 sf
137105 sf
139A42 sf
13864 sf
139158 sf
140158 sf
140A38 sf
14215 sf
141126 sf
145291 sf
19752 sf
134282 sf
130D1616 sf
130B1180 sf
199265 sf
130C276 sf
143A393 sf
143B648 sf 19535 sf
143C492 sf
102A26 sf 102
181 sf
150448 sf
152286 sf
1551257 sf
1703107 sf
174530 sf 103
56 sf
175453 sf
155B157 sf
155A94 sf
154226 sf156A
79 sf
156824 sf
158221 sf
16069 sf
15984 sf157
129 sf
164137 sf163168 sf162
52 sf16159 sf
213A
21
3A
213A
213A
21
3A
21
3A
11
0N
11
0N
1
1
0
N
11
0N
W01
2
7
6
N
2
1
6
A
213A
W0
1
2
1
3
A
11
2N
11
0N
110B
116A
110A
116B
116C
119
120
118
135F 135G 135H 135I 135J
135A 135B 135C135D
135E-B
135A
135E-A
137-A
137-B
139
139-A
138140A
140
141
142
144-A
145
145
194226 sf
143C-B
194
156A
154-A
154-B
161162
163
156
191
164
158
159
160
155A
155B
174
175
103
170
143B-C
155
152
130C
102A
102-A-2
102-A-1
102-B
102-C
143A
143B-A
143B-B
143C-A
133-A
133-B
132
134
131
110-A
130M
101-D
110-C
101-C
101-B101-A-2
101-A-1
144164 sf
STORAGE
144
144A36 sf
144A
FT4525201053 500 60 70 80 90 100
Last Export: Report Date:
-See Chart For Additional Annotation*
9-24-189-4-180007-6P007FIRST FLOORWOODBURY CAMPUS CENTER
PROJECT NORTH
- Original building envelope sealants, including facade window caulking and glazing, masonry caulking, miscellaneous sealants(e.g., around the coolers) to be managed as ACM.
- Rolled roofing on eastern low roof to be managed as ACM.
- Area contains end seam sealants associated with fiberglass insulation and glazing sealants in metal and wooden partition doorsthroughout interior building and is to be managed as ACM
-Interior paint on CMU facade (Tan over light blue) to be managed as PCB < 50 ppm. Excluded from abatement scope of work.
LEGEND
Roofing skylight glazing sealantscontain trace asbestos (typ.)
RED AND YELLOWNOTES REVISED BY
WOODARD & CURRANON 12/11/20
cage
cage
Serving line counter
UP
UP
UP
UP
UP
LOT P2
232M629 sf
Last Export: Report Date:
-See Chart For Additional Annotation*
9-24-189-24-180007-6P007MEZZANINEWOODBURY CAMPUS CENTER
PROJECT NORTH