6
25&35 Bedford Street Hazardous Page 1 of 2 December 14, 2020 Materials Abatement Project Addendum 1 University of Southern Maine Portland, Maine Date: December 14, 2020 25-35 Bedford Street Hazardous Materials Abatement Project Prebid Attendance Dirigo: Zachary Quinn Thomas Perkins Megan Cormier Christina Cameron Woodard and Curran: Robert Pelletier Amy Martin University of Southern Maine: Ann Vashon Bob Adams Lachelle Lackey Tom Blanchard PC Construction: Garret Bertolini Questions and Answers 1. Q: Building envelope sealants shown with the red perimeter line on the 35 Bedford Street figure are identified on this figure as asbestos-containing materials and with PCBs < 50 ppm – please confirm if this is accurate. a. The building envelope sealants contain asbestos but not PCBs. A revised figure 6 is attached. 2. Q: Define how to remove the painted floor area of 25 Bedford maintenance area. a. Paint on floor is no longer in this abatement scope of work. To be removing under separate contract as part of building demolition. The lead specification 02 83 00 remains part of the project manual to accommodate potential uncovered conditions.

Addendum 1...Yes, the exterior paint was non-detect for PCB’s. Scope Clarification Base Scope of Work: • Subsequent to the pre-bid conference additional testing has determined

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • 25&35 Bedford Street Hazardous Page 1 of 2 December 14, 2020

    Materials Abatement Project

    Addendum 1 University of Southern Maine

    Portland, Maine

    Date: December 14, 2020

    25-35 Bedford Street Hazardous Materials Abatement Project

    Prebid Attendance

    Dirigo:

    • Zachary Quinn • Thomas Perkins • Megan Cormier • Christina Cameron

    Woodard and Curran:

    • Robert Pelletier • Amy Martin

    University of Southern Maine:

    • Ann Vashon • Bob Adams • Lachelle Lackey • Tom Blanchard

    PC Construction:

    • Garret Bertolini

    Questions and Answers

    1. Q: Building envelope sealants shown with the red perimeter line on the 35 Bedford Street figure

    are identified on this figure as asbestos-containing materials and with PCBs < 50 ppm – please

    confirm if this is accurate.

    a. The building envelope sealants contain asbestos but not PCBs. A revised figure 6 is

    attached.

    2. Q: Define how to remove the painted floor area of 25 Bedford maintenance area.

    a. Paint on floor is no longer in this abatement scope of work. To be removing under

    separate contract as part of building demolition. The lead specification 02 83 00

    remains part of the project manual to accommodate potential uncovered conditions.

  • 25&35 Bedford Street Hazardous Page 2 of 2 December 14, 2020

    Materials Abatement Project

    3. Q: Define how to cover potential window openings, wall openings, door openings, Skylights.

    a. Use similar construction methods as shown in drawing package detail 1/A400

    4. Q: What is the defined scope of work with the utilities. Demo to meter? Remove Meter? Etc.

    a. Contractor is required to coordinate the utility disconnect with the utility company

    and USM Facility Management and leave the building at a zero energy state at

    completion.

    5. Q: Will there be heat inside the building.

    a. Yes. The contractor shall notify Facility Management when appropriate to disconnect

    heat.

    6. Did the exterior paint get tested for PCBs?

    a. Yes, the exterior paint was non-detect for PCB’s.

    Scope Clarification

    Base Scope of Work:

    • Subsequent to the pre-bid conference additional testing has determined that no Lead or PCB abatement is required in the base scope of work.

    • Unit prices to be included for Lead and PCB as previously shown on bid form in the event these materials are uncovered during the course of asbestos abatement.

    Bidding procedure

    1. Scan all bid submission documents into PDF format

    2. Attach to email

    3. Email Subject line “25-35 Bedford Street Hazardous Materials Abatement Project”

    4. Email To: [email protected] CC: [email protected] and [email protected]

    5. University mail server clock will govern bid submission timestamp. Bids received after 2:00pm

    on Monday, December 21,2020 will be rejected

    6. Please email [email protected] to request meeting invitation link to virtual bid opening.

    The link posted with bid advertisement is no longer functional

    7. Paper originals of bidding documents will be required at contract execution from successful

    bidder

    Attachments

    • Bid From – 00 41 13 • Figure 6 - from Woodward and Curran Hazardous Materials Survey Report – Woodbury Campus

    Center – 02 26 00

  • 00 41 13 Bid Form

    25&35 Bedford Street Hazardous Page 1 of 2 December 14, 2020

    Materials Abatement Project

    BIDDER:

    Physical/Street Address

    City, State ZIP Attn: University of Maine Office of Facilities Management Ann Vashon, Project Manager Capital Planning and Project Management 25 Bedford Street Portland, Maine, 04104

    Having carefully examined the form of contract, general conditions and plans and specifications contained therein for

    25&35 Bedford Street Hazardous Materials Abatement Project, as well as the premises and conditions affecting the

    work, we the undersigned propose to furnish all labor, equipment, and materials necessary for and reasonably incidental

    to the construction and completion of this contract as follows:

    BASE SCOPE OF WORK - FIXED FEE PROPOSAL

    1. Asbestos-containing materials as identified in Section 02 82 00

    2. Miscellaneous hazardous materials / universal waste materials as identified in the Hazardous Building Materials Survey Report. Subsequent to the pre-bid conference additional testing as determined that no Lead or PCB abatement is required in the base scope of work. Unit prices to be included as previously shown on bid form in

    the event these materials are uncovered during the course of asbestos abatement.

    3. Utility coordination to leave building in a zero-energy state following abatement

    4. Security Barricades Breakout Pricing for Above

    Total proposed sum of _____________________________________________________________Dollars

    ($__________________________________________________)

    ADD-ALTERNATE UNIT PRICING Please provide unit pricing for test pits and other exploratory work associated with this work scope per the table below:

    Item Fully Burdened Unit Price

    Laborer Per hour

    Crew Lead person Per hour

    Small excavator/backhoe Per hour

    Small dump truck Per hour

    Imported common borrow backfill Per cubic yard

    Imported common borrow gravel Per cubic yard

    Pavement patching – sidewalk/parking lot (non-base contract work areas)

    Per square yard

    Building Base Work Scope

    25 Bedford Street $

    35 Bedford Street $

  • 00 41 13 Bid Form

    25&35 Bedford Street Hazardous Page 2 of 2 December 14, 2020

    Materials Abatement Project

    Please provide unit pricing for additional abatement that may be required per the table below:

    Item Fully Burdened Unit Price

    PCB-containing materials as identified in Section 028400

    Per Square Foot

    Asbestos-containing vapor barrier / damp proofing materials

    Per Square Foot

    Asbestos-containing pipe insulation, asbestos-cement pipe, or other ACM related to subsurface utilities

    Per Linear Foot

    Asbestos-containing gaskets, switches, wire insulation, or other mechanical system / electrical component ACMs

    Per Each

    Asbestos-containing gypsum wallboard and joint compound

    Per Square Foot

    Asbestos-containing adhesives associated with floor drains

    Per Each

    Asbestos-containing insulation or vapor barriers associated with refrigerator/freezer walls/doors

    Per Square Foot

    Asbestos-containing sealants, adhesives, insulation, or flashing mastic associated with infilled windows

    Per Square Foot

    This proposal includes the cost of 100% Performance Bond plus 100% Payment Bond. The receipt of the following addenda to plans and specifications is hereby acknowledged: ADDENDUM # DATED ADDENDUM # DATED

    ADDENDUM # DATED ADDENDUM # DATED Bidder hereby acknowledges attendance to the pre-bid conference held virtually on December 3rd, 2020.

    INITIAL____________ DATE___________

    Any material or materials not specified in the bidding document but worthy of consideration may be introduced by the bidder by a separate letter attached to this Bid. A cost comparison must be included giving the comparison with the Material specified and the reason for the suggested substitution. The basic bid shall be as specified. The undersigned agrees, if this Bid is accepted to sign a contract and deliver it, along with the bonds and affidavits for all insurance specified within twelve (12) calendar days after the date of notification of such acceptance, except if the 12th day falls on a Saturday, Sunday or holiday, then the conditions will be fulfilled if the required documents are received before 12 o’clock noon on the day following the holiday, or the Monday following the Saturday or Sunday, and as a guarantee thereof, herewith submits a bid bond as required. The undersigned agrees, if awarded the Contract, to complete the work on or before February 26th, 2021. The undersigned also agrees, if awarded the Contract, that no more than 80% of the contract amount will be sublet to other contractors. Signed (by individual authorized to sign contract) By (printed name & title) Phone PO Box (if applicable) Email NOTE: If bidder is a corporation, write State of Incorporation, and if a partnership, give full names of all partners.

  • BOOKSTORE

    NORTH

    VESTIBULE

    MECH

    MAIN LOBBY

    ATM

    East

    Vestibule

    RAMP

    LANDING

    STUDENT

    INVOLVEMENT

    MEETING

    ROOM

    OFFICE

    CLOSET

    OFFICEOFFICE OFFICE

    OFFICE/RECEPTION

    OFFICE OFFICE OFFICE

    OFFICE

    OFFICE

    HALL

    JANITOR

    WOMEN'S

    HALL

    MEN'S

    HALL

    CLOSET

    MEETING

    ROOM "A"

    MEETING

    ROOM "B"

    MEETING

    ROOM "C"

    HC BATH

    MECH

    ROOM

    KITCHEN

    Hall

    FOOD

    COURT

    FOOD SERVICE

    Serving line counter

    OFFICE

    OFFICE

    FREEZER

    COOLER

    COOLER

    STORE ROOM

    TOILET

    STOREROOM

    DINING ROOM

    HALL

    LOUNGE

    HALL

    STAIR 1

    STAIR 2

    STAIR 3

    STADIUM

    SEATING

    STAIR 4

    RAMP

    STAIR 5

    UP

    190Stair 6

    AMPHITHEATER

    Added in

    1987

    Private

    HALL

    Bookstore

    Open Office

    SOUTH

    VESTIBULE

    Southwest

    Vestibule

    RAMP / DOCK

    Loading

    Dock

    Uncovered

    VETERANS

    HALLWAY

    (private)

    CORRIDOR

    Toilet

    OFFICE

    OFFICE

    OFFICE

    OFFICE

    OFFICE

    LOBBY

    CORRIDOR

    STOREROOM

    MEETING

    AREA

    101227 sf

    110A80 sf

    130M34 sf

    1104753 sf

    130794 sf

    130A1166 sf

    122413 sf

    122A164 sf

    19665 sf

    131282 sf

    132157 sf

    13351 sf

    116A17 sf

    11839 sf

    116472 sf

    135243 sf

    11981 sf

    12093 sf

    135F93 sf

    135G70 sf

    135H70 sf

    135I96 sf

    135J114 sf

    135A112 sf

    135B82 sf

    135C85 sf

    135D92 sf

    135E196 sf

    137105 sf

    139A42 sf

    13864 sf

    139158 sf

    140158 sf

    140A38 sf

    14215 sf

    141126 sf

    145291 sf

    19752 sf

    134282 sf

    130D1616 sf

    130B1180 sf

    199265 sf

    130C276 sf

    143A393 sf

    143B648 sf 19535 sf

    143C492 sf

    102A26 sf 102

    181 sf

    150448 sf

    152286 sf

    1551257 sf

    1703107 sf

    174530 sf 103

    56 sf

    175453 sf

    155B157 sf

    155A94 sf

    154226 sf156A

    79 sf

    156824 sf

    158221 sf

    16069 sf

    15984 sf157

    129 sf

    164137 sf163168 sf162

    52 sf16159 sf

    213A

    21

    3A

    213A

    213A

    21

    3A

    21

    3A

    11

    0N

    11

    0N

    1

    1

    0

    N

    11

    0N

    W01

    2

    7

    6

    N

    2

    1

    6

    A

    213A

    W0

    1

    2

    1

    3

    A

    11

    2N

    11

    0N

    110B

    116A

    110A

    116B

    116C

    119

    120

    118

    135F 135G 135H 135I 135J

    135A 135B 135C135D

    135E-B

    135A

    135E-A

    137-A

    137-B

    139

    139-A

    138140A

    140

    141

    142

    144-A

    145

    145

    194226 sf

    143C-B

    194

    156A

    154-A

    154-B

    161162

    163

    156

    191

    164

    158

    159

    160

    155A

    155B

    174

    175

    103

    170

    143B-C

    155

    152

    130C

    102A

    102-A-2

    102-A-1

    102-B

    102-C

    143A

    143B-A

    143B-B

    143C-A

    133-A

    133-B

    132

    134

    131

    110-A

    130M

    101-D

    110-C

    101-C

    101-B101-A-2

    101-A-1

    144164 sf

    STORAGE

    144

    144A36 sf

    144A

    FT4525201053 500 60 70 80 90 100

    Last Export: Report Date:

    -See Chart For Additional Annotation*

    9-24-189-4-180007-6P007FIRST FLOORWOODBURY CAMPUS CENTER

    PROJECT NORTH

    - Original building envelope sealants, including facade window caulking and glazing, masonry caulking, miscellaneous sealants(e.g., around the coolers) to be managed as ACM.

    - Rolled roofing on eastern low roof to be managed as ACM.

    - Area contains end seam sealants associated with fiberglass insulation and glazing sealants in metal and wooden partition doorsthroughout interior building and is to be managed as ACM

    -Interior paint on CMU facade (Tan over light blue) to be managed as PCB < 50 ppm. Excluded from abatement scope of work.

    LEGEND

    Roofing skylight glazing sealantscontain trace asbestos (typ.)

    RED AND YELLOWNOTES REVISED BY

    WOODARD & CURRANON 12/11/20

  • cage

    cage

    Serving line counter

    UP

    UP

    UP

    UP

    UP

    LOT P2

    232M629 sf

    Last Export: Report Date:

    -See Chart For Additional Annotation*

    9-24-189-24-180007-6P007MEZZANINEWOODBURY CAMPUS CENTER

    PROJECT NORTH