CHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations Addendum #1 June 29, 2020 Bid Package Clarification and Changes This Addendum dated June 29, 2020 for the Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations shall be included as part of the Contract Bid Documents. This Addendum shall supplement and clarify the current Contract Bid Documents. THIS ADDENDUM CONSISTS OF (TWENTY-FIVE PAGES). PLEASE ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY SIGNING BELOW AND EMAILING BACK IMMEDIATELY TO [email protected]. THIS IS MANDATORY!! If this email unclear, please call (856) 396-6200. If you are not bidding this project, please write ANo Bid@ and email this page back. Thank You. SIGNATURE COMPANY NAME 1. Work Schedule – All work to be completed during normal work hours (dayshift). Coordination of site-specific work and work outside the interior scope area is required with the District. 2. Permit/Review Fees – Any fees associated with permit/review fees shall be covered by the owner. 3. Special Inspections – Special inspections requirements for structural steel and concrete are to be verified and scheduled by the Contractor. All costs associated with special inspections shall be the responsibility of the owner. 4. See the attached “ERI Site Improvements Addenda #1” for Site related Addenda items. (6 pages). 5. See the attached Sketches: DS-1 Revision Number 1, DS-1 Revision Number 2, DS-1 Revision Number 3, DS-1 Revision Number 4, DS-2 Revision Number 1, GU-1 Revision 1, GU-1 Revision 2, GU-2 Revision 1, GU-2 Revision 2, SCS-1 Revision 1, SCS-1 Revision 2, SCS-1 Revision 3, SCS-2 Revision 1, SCS-2 Revision 2 as described in the “ERI Site Improvements Addenda #1) for drawing changes. (14 sketches) 6. In Specification Book Index – Change Section 05400 description to read ‘COLD FORMED METAL FRAMING’. 7. In Specification 10800 Toilet and Bath Accessories, 1.2 Products – Refer to accessory list provided on Drawing A7.0 for items to be included in this project. 8. Provide temporary fencing at/around new canopy construction. Fencing to accommodate debris dumpster, storage trailer, etc. Refer to sketch CSK-1 attached. Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations Page 1 of 25

Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

CHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School

New Main Entrance Security Vestibule and Main Office Alterations Addendum #1 June 29, 2020

Bid Package Clarification and Changes

This Addendum dated June 29, 2020 for the Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations shall be included as part of the Contract Bid Documents. This Addendum shall supplement and clarify the current Contract Bid Documents.

THIS ADDENDUM CONSISTS OF (TWENTY-FIVE PAGES). PLEASE ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY SIGNING BELOW AND EMAILING BACK IMMEDIATELY TO [email protected]. THIS IS MANDATORY!! If this email unclear, please call (856) 396-6200. If you are not bidding this project, please write ANo Bid@ and email this page back. Thank You.

SIGNATURE COMPANY NAME

1. Work Schedule – All work to be completed during normal work hours (dayshift). Coordination ofsite-specific work and work outside the interior scope area is required with the District.

2. Permit/Review Fees – Any fees associated with permit/review fees shall be covered by the owner.

3. Special Inspections – Special inspections requirements for structural steel and concrete are to beverified and scheduled by the Contractor. All costs associated with special inspections shall bethe responsibility of the owner.

4. See the attached “ERI Site Improvements Addenda #1” for Site related Addenda items. (6 pages).

5. See the attached Sketches: DS-1 Revision Number 1, DS-1 Revision Number 2, DS-1Revision Number 3, DS-1 Revision Number 4, DS-2 Revision Number 1, GU-1 Revision 1,GU-1 Revision 2, GU-2 Revision 1, GU-2 Revision 2, SCS-1 Revision 1, SCS-1 Revision 2,SCS-1 Revision 3, SCS-2 Revision 1, SCS-2 Revision 2 as described in the “ERI SiteImprovements Addenda #1) for drawing changes. (14 sketches)

6. In Specification Book Index – Change Section 05400 description to read ‘COLD FORMEDMETAL FRAMING’.

7. In Specification 10800 Toilet and Bath Accessories, 1.2 Products – Refer to accessory listprovided on Drawing A7.0 for items to be included in this project.

8. Provide temporary fencing at/around new canopy construction. Fencing to accommodate debrisdumpster, storage trailer, etc. Refer to sketch CSK-1 attached.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 1 of 25

Page 2: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

9. Provide temporary partition along Corridor B-100 during the duration of construction. Remove

when completed and restore corridor to original condition. Refer to CSK-1 attached.

10. On Drawing A1.1, Demolition Floor Plan Reference Notes, Note 10 – Add option to provide painted steel plates at each side of opening to be infilled in lieu of concrete masonry unit.

11. On Drawing A1.1, Demolition Floor Plan Reference Notes, Note 11 – Scope to include removing 1” insulated panel to be replaced with FIXED (not operable) 1” insulated glazing to match existing.

12. On Drawing 1/A1.1, ADD note at existing entrance alcove to read ‘COORDINATE SECURITY CAMERA AND STROBE LIGHT RELOCATION WITH OWNER’S VENDORS’.

13. On Drawing 2/A1.2 – Refer to mechanical plans for return grille locations and quantities in rooms B-107 and B-113.

14. On Drawing 1/A1.3 – Provide pitch pocket adjacent to new RTU for gas supply line. Refer to CSK-2 attached for detail.

15. On Drawing 1&2/A2.1 – Provide note at EIFS wall/soffit transition to read, ‘PROVIDE DRIP EDGE PROFILE & NOMINAL ¼” DRAINAGE GAP, TYPICAL’.

16. On Drawing 1/A3.0 – ADD note ‘TOOTH MASONRY UNITS INTO EXISTING WALL, REMOVE PORTIONS OF EXISTING WALL AS REQUIRED’.

17. On Drawing 15/A3.0 – DELETE requirement to scrape and paint existing louver.

18. On Drawing A4.0, Room and Finish Schedule – CHANGE room number for Security Vestibule from B-001A to B-100A.

19. On Drawing S-0 – CLARIFY Foundations are designed with an assumed 3000 PSF soil bearing capacity. The general contractor is responsible for contracting a geotechnical engineer to verify soil bearing capacity.

20. On Drawing 1/P-1 – ADD note at Work Room B-116, ‘TEMPORARILY REMOVE SINK AT COUNTER FOR NEW FLOOR INSTALLATION. REINSTALL WHEN COMPLETED’. Refer to note 25 on Drawing 1/A1.1.

21. On Drawing 1/M-2 – ADD low leak motorized damper in Work Room B-108. Refer to SKM-1 attached.

22. On Drawing 2/E1, Type EM/EX shall be Emergilite Catalog Number ELXN400R-2LED-R combination Exit/Emergency sign. Connect to local lighting circuit ahead of all switching.

23. On Drawing 1/E2, Change receptacle circuit # for Conference Room B-115 to PN-8.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 2 of 25

Page 3: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

815 East Gate Drive Suite 103 Mount Laurel New Jersey 08054 Telephone (856) 235-7170 Fax (856) 273-9239 www.erinj.com

ERI SITE IMPROVEMENTS ADDENDA #1

All revisions will be added to the final construction plans.

SHEET KN-1 REVISIONS AND CLAIRIFICATIONS

Notes to be added to the ‘General Construction Notes for Plans’: 1. Note 14. Contractor is required to protect all existing vegetation to remain.2. Note 15. Contractor shall obtain a County Road Opening Permit.3. Note 16. No on site subsurface utility investigations have been performed. Contractor is to verify any and all

on-site utilities, which shall include, but are not limited to; water, gas, electric, and telecommunications, prior tothe commencement of any construction activities. During construction the contractor shall protect any existingutility and associated infrastructure encountered during construction. Contractor shall also be responsible for therepairs of any utility or associated infrastructure damaged due to construction activities at their own expense andshall have it repaired immediately.

4. Note 17. Electric and conduits shown in the East parking lot are assumed locations based on originalconstruction plans.

5. Note 18. Electric and conduits shown in the Main parking lot is assumed locations based on originalconstruction plans.

6. Note 19. Roof drain collector pipes shown along the front of the building are assumed locations and sizingbased on a construction plan from 1992. There is a known tie in point at the man hole west of the secondentrance.

Special Notes: 7. Note 6 has to notes the second note shall be become note 7. and shall read Contractor is responsible for

removing and disposing all demolished material from the site for base bid and all alternates awarded.

8. Note 7, Becomes Note 8 shall be revised to shall say: 8. ‘DGA shall be installed under all concrete 4” and 6”thick’.

9. A Striping Legend will be added to this sheet:

PARKING SPACES 4" Wide WHITE EPOXY ACCESSIBLE PARKING 4" Wide BLUE EPOXY LOADING ZONE 6" Wide YELLOW EPOXY GORE STRIPING 6" Wide WHITE EPOXY CROSSWALK LINES 6" Wide WHITE THERMOPLASTIC CROSSWALK KEYS 24" Wide WHITE THERMOPLASTIC STOP BAR 24” Wide WHITE THERMOPLASTIC DIRECTIONAL ARROWS SIZE PER DETAIL WHITE THERMOPLASTIC

Christopher J. Noll, PE, CME, PP President & CEO

Barbara J Fegley, AICP, PP Sec./Treas. & Sr. Vice President

William H. Kirchner, PE, CME, N-2 Vice President

Rakesh R. Darji, PE, PP, CME, CFM, Vice President

Harry R. Fox, NICET III, CPSI

G. Jeffrey Hanson, PE, CME

Joseph R. Hirsh, PE, CME, CPWM

C. Jeremy Noll, PE, CME, CPWM

Joseph P. Orsino, CET

Marc H. Selover, LSRP, PG

Benjamin R. Weller, PE, CME, CPWM, S-3, C-3

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 3 of 25

Page 4: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

Environmental Resolutions, Inc. Page 2 of 6

815 East Gate Drive Suite 103 Mount Laurel New Jersey 08054 Telephone (856) 235-7170 Fax (856) 273-9239 www.erinj.com

SHEET DS-1 REVISIONS AND CLAIRIFICATIONS PLAN NOTES:

1. Base Bid Plan Note Revisions, Note #3 will be removed from the plan. In the Asphalt Paving Legend:

2. Parking Lot Mill and Transitional Overlay (Alt. A) 3. 1” Scratch Mill, shall be revised to read Scratch Mill.

Revisions not shown on attached plan enlargements:

1. On the SITE PLAN, MAIN PARKING LOT BASE BID AND ALTERNATE A – The ACCESSIBLE LOADING, ENTRANCE AND ROUTE SIGN, part of the Base Bid shown at the curb ramp, the leader should be pointing to the sign and shall consist of two signs on (one) 1 post. Accessible loading area sign shall be its own sign. The accessible entrance and route sign will be a directional sign.

2. The contractor shall install a new Accessible Entrance Sign (Non-directional) on the building façade and a new Accessible Entrance tactile touch sign with Braille at the buzzer under the canopy and shall be included as part of the Base Bid. Signs shall be attached with non-corrosive metal fashioners in a minimum or two locations. Refer to the architectural specifications for execution masonry.

3. ASPHALT RECONSTRUCTION COUNTY ROW notes shall be revised to ‘COUNTY ROW

RECONSTRUCTION’. DEMOILITION PLAN, MAIN PARKING LOT – BASE BID AND ALTERNATE A PLAN (See the attached, PLAN SHEET NUMBER: DS-1, Sheet Revision Number: 1)

1. Approximate location of electrical conduits will be shows on plan for reference; all locations are assumed based on reference plans.

2. Accessible entrance signs shall be removed from the building at both entrances as part of the BASE BID. Contractor shall be responsible for any repairs to the Masonry or Mortar. Materials shall match the building refer to Architectural specifications.

3. Exiting telecommunications location was not identified, it will be identified and state to remain. Accessible entrance signs shall be removed from the building at both entrances as part of the BASE BID. Contractor shall be responsible for any repairs to the Masonry or Mortar. Materials shall match the building refer to Architectural specifications.

(See the attached, PLAN SHEET NUMBER: DS-1, Sheet Revisions Number: 2)

1. Overall length of Curb to be removed was extended and additional notes to remove existing curb were identified as part of the base bid.

2. Roof drain collector pipe to be will be shown on plans and a portion is shown to be removed for construction of the canopy footings.

SITE PLAN, MAIN PARKING LOT – BASE BID AND ALTERNATE A PLAN (See the attached, PLAN SHEET NUMBER: DS-1, Sheet Revision Number: 3)

1. COUNTY ROW RECONSTRUCTION, TYP. (ALT. A) Area was expanded to match the demolition plan.

2. The STOP BAR, TYP. Note was revised.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 4 of 25

Page 5: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

Environmental Resolutions, Inc. Page 3 of 6

815 East Gate Drive Suite 103 Mount Laurel New Jersey 08054 Telephone (856) 235-7170 Fax (856) 273-9239 www.erinj.com

(See the attached, PLAN SHEET NUMBER: DS-1, sheet Revision Number: 4 1. The COUNTY ROW RECONSTRUCTION was revised to TRANSITIONAL OVERLAY HATCH. The area

at the proposed COUNTY CURB shall be reconstructed per the COUNTY ROW RECONSTRUCTION.

2. The ACCESSIBLE ENTRANCE SIGN shown to the west of the access drive should be included as part of the base bid. Both the ACCESSIBLE ENTRANCE and the ACCESSIBLE ENTRANCE AND PARKING Signs shall be the ACCESSIBLE ENTRANCE, PARKING & LOADING Directional sign 18”x24”.

SHEET DS-2 REVISIONS AND CLAIRIFICATIONS DEMOILITION PLAN, EAST PARKING LOT – ALTERNATE B (See the attached, PLAN SHEET NUMBER: DS-2, SHEET REVISION NUMBER: 1)

1. The existing curb near the existing shed to be disposed of and concrete pad being removed is to be removed. 2. Approximate location of electrical conduits will be shows on plan for reference; all locations are assumed based

on reference plans. SITE PLAN, EAST PARKING LOT – ALTERNATE B

1. Where the plans call out curb ramp, it should state ‘CURB RAMP WITH DETECTIBLE WARNING SURFACE’.

2. ACCESSIBLE ENTRANCE AND PARKING Sign shall be the ACCESSIBLE ENTRANCE, PARKING &

LOADING Directional sign 18”x24”. SHEET DS-3 REVISIONS AND CLAIRIFICATIONS DEMOILITION PLAN, MAIN PARKING LOT – ALTERNATE C & D

1. The REMOVE, STORE AND REINSTALL (ALT A.) note pointing to the small statue and peace maker shall be included as part of ALTERNATE C.

2. The REMOVE EXISTING TREES note, shall be included as part of ALTERNATE C.

SITE PLAN, MAIN PARKING LOT – ALTERNATE C & D

1. The proposed CONCRETE 4” (ALT. D) between the two front doors shall be extended to match the demolition plan.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 5 of 25

Page 6: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

Environmental Resolutions, Inc. Page 4 of 6

815 East Gate Drive Suite 103 Mount Laurel New Jersey 08054 Telephone (856) 235-7170 Fax (856) 273-9239 www.erinj.com

SHEET GU-1 REVISIONS AND CLAIRIFICATIONS PLAN NOTES:

1. NEW NOTE #7 shall state, INVERTS OF ALL PIPES SHALL BE INSTALLED AT EXISTING INVERT ELEVATIONS, UNLESS OTHERWISE NOTED.

2. NEW NOTE #8 shall state, ROOF DRAIN COLLECTOR PIPE LOCATION AND SIZE ASSUMED BASED UPON A CONSTRUCTION PLAN FROM 1992. DEPTH OF COLLECTOR PIPE AT THIS LOCATION IS UNKNOWN. THE TIE-IN ELEVATION AT MAN HOLE IS ROUGHLY 4’ BELOW EXISTING GRADE. CONTRACTOR SHALL BE RESPONIBLE FOR REROUTING THE COLLECTOR PIPE TO FACILIATE INSTALLATION OF NEW CANOPY FOOTINGS. CONTACTOR SHALL INSTALL TWO CLEAN OUTS AND MATCH THE EXISTING PIPE SIZE AND MATERIALS. THIS WORK SHALL INCLUDE ALL NECESSARY JOINTS, CONNECTORS, PIPE AND MATERIAL TO PROVIDE A COMPLETE OPERATIONAL DRAINAGE SYSTEM FOR THE ROOF DRAINS.

GRADING PLAN – MAIN PARKING LOT

1. All the storm pipes shown on DS-3 will be shown on this plan. 2. Ex. roof drain collector pipe between the existing sidewalk and building will be shown on the plans. Spot

elevation shown in SEE ENLARGEMENT G box 66.90 at the curb ramp center is to be removed from the plans. The correct elevation is 64.80.

(See the attached, PLAN SHEET NUMBER: GU-1, SHEET REVISION NUMBER: 1)

1. Roof drain collector pipe reroute is shown on plans.

2. Spot Elevations provided in Enlargement Area A, will be removed and shown only in Enlargement A on the plans.

3. The RAISE ‘A’ INLET, GR=61.59, is revised to 61.81. The CONC. COLLAR = 61.65, is revised to 61.83

4. The RAISE ‘E’ INLET, GR=61.81, is revised to 62.28. The INV. = 57.2, is revised to 57.6

(See the attached, PLAN SHEET NUMBER: GU-1, SHEET REVISION NUMBER: 2)

1. Additional slope percentages and arrows will be added to Enlargement C. SHEET GU-2 REVISIONS AND CLAIRIFICATIONS PLAN NOTES:

1. NEW NOTE #7 shall state, INVERTS OF ALL PIPES SHALL BE INSTALLED AT EXISTING INVERT ELEVATIONS, UNLESS OTHERWISE NOTED.

EAST LOT – GRADING PLAN ALTERNATE B (See the attached, PLAN SHEET NUMBER: GU-2, SHEET REVISION NUMBER: 1)

1. Top of Curb (TC), Bottom of Curb (BC) elevations have been added at the entrance of Cropwell Road and Curb Ramp location new the 3 parking spaces.

2. Approximate location of electrical conduits will be shows on plan for reference; all locations are assumed based on reference plans.

ENLARGEMENT A (See the attached, PLAN SHEET NUMBER: GU-2, SHEET REVISION NUMBER: 2)

1. Spot elevations for the Curb Ramp have been revised.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 6 of 25

Page 7: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

Environmental Resolutions, Inc. Page 5 of 6

815 East Gate Drive Suite 103 Mount Laurel New Jersey 08054 Telephone (856) 235-7170 Fax (856) 273-9239 www.erinj.com

ENLARGEMENT B (See the attached, PLAN SHEET NUMBER: GU-2, SHEET REVISION NUMBER: 2)

1. Spot elevations for the Curb Ramp have been revised. SHEET CD-1 REVISIONS AND CLAIRIFICATIONS CONSTRUCTION DETAILS INLET TYPE ‘A’

1. Notes #2&3 will be combined; Grates and frame are to be heavy duty. INLET TYPE ‘E’

1. Note #5 will be removed TRAFFIC MARKINGS

1. Accessible Parking Space Marking, shall be Epoxy Resin Not Thermoplastic striping. SHEET CD-2 REVISIONS AND CLAIRIFICATIONS CONSTRUCTION DETAILS TRAFFIC CONTROL SIGNS

1. Note will be added, stating ‘THAT NOT ALL SIGNS WILL BE USED, FINAL DIRECTIONAL SIGNS TO BE DETERMINED. ALL COLORING SHALL MATCH THROUGH ALL SIGNS.

SHEET SCS-1 REVISIONS AND CLAIRIFICATIONS PLAN NOTES:

1. Note #39 Construction Sequence will be revised to the following: A. PHASE I 1. INSTALL SILT FENCE, HAY BALES AND INLET FILTERS. 2. INSTALL CONSTRUCTION ACCESS ROAD. 3. GRADE THE SITE TO CONTAIN ALL SURFACE WATER FLOWS THEREON. 4. STABILIZE ALL EXPOSED SOIL NOT SUBJECT TO TRAFFIC.

5. DEMOLISH AND REMOVE ALL PAVEMENTS, CURBING, AND MILL ASPHALT AS NECESSARY.

6. EXCAVATE AND REMOVE STORMWATER INFRASTRUCTURE. B. PHASE II 1. BRING SUBGRADE TO GRADE. 2. INSTALL INTERIOR LOT DRAINAGE. C. PHASE III 1. CONSTRUCT CURBING, PAVEMENT, AND SIDEWALKS. 2. TILL/LOOSEN SUBGRADE 6" PER SPECIFICATIONS, SPREAD TOPSOIL TO FINAL GRADE. D. PHASE IV (DEPENDENT UPON SEASON) 1. COMPLETE SEEDING

2. REMOVE SE&SC MEASURES.

2. Note #49 has been removed from the plan.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 7 of 25

Page 8: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

Environmental Resolutions, Inc. Page 6 of 6

815 East Gate Drive Suite 103 Mount Laurel New Jersey 08054 Telephone (856) 235-7170 Fax (856) 273-9239 www.erinj.com

3. Note #50 has been revised to Note #49 The approximate area of soil restoration will be revised to state ‘2,729 sf / .06 ac.’

4. OVERALL PROJECT AREA DISTURBANCE HAS BEEN REVISED TO 1.89 AC. 5. Scale of SOIL EROSION AND SEDIMENT CONTROL PLAN, MAIN PARKING LOT will be revised to

1”=20’. (See the attached, PLAN SHEET NUMBER: SCS-1, SHEET REVISION NUMBER: 1)

1. Silt fence and limit of disturbance areas have been adjusted. 2. Obvious Soil Restoration Areas have been shown.

(See the attached, PLAN SHEET NUMBER: SCS-1, SHEET REVISION NUMBER: 2)

1. Obvious Soil Restoration Areas have been shown. 2. An additional Inlet Protection Symbol will be added to the plan.

(See the attached, PLAN SHEET NUMBER: SCS-1, SHEET REVISION NUMBER: 3)

1. Obvious Soil Restoration Areas have been shown. 2. Additional Inlet Protection Symbols will be added to the plan. 3. Limit of disturbance areas have been adjusted.

SHEET SCS-2 REVISIONS AND CLAIRIFICATIONS PLAN NOTES:

1. OVERALL PROJECT AREA DISTURBANCE HAS BEEN REVISED TO 1.89 AC. (See the attached, PLAN SHEET NUMBER: SCS-2, SHEET REVISION NUMBER: 1)

1. Limit of disturbance areas have been adjusted. 2. Obvious soil restorations areas have been shown.

(See the attached, PLAN SHEET NUMBER: SCS-2, SHEET REVISION NUMBER: 2)

1. Limit of disturbance areas have been adjusted. 2. Obvious soil restorations areas have been shown.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 8 of 25

Page 9: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

REMOVE CONCRETE

CURB (ALT. A)

REMOVE CONCRETE,

4" (ALT. A)

FRAME AND GRATE

DEMOLISH AND REMOVE

ASPHALT AND SUBBASE,

TYP. (ALT A)

ASPHALT RECONSTRUCTION, TYP.REMOVE EXISTING

STONE PATH (ALT. A)

REMOVE EXISTING

INLET FRAME AND

GRATE (ALT. A)

REMOVE 15" PIPE

REMOVE PARKING

SIGNS, TYP. (ALT. A)

REMOVE ACCESSIBLE

ENTRANCE SIGN

REMOVE CURBREMOVE CURB REMOVE CURB

EXISTING TELECOMMUNICATIONS

TO REMAIN

1

1

REMOVE ACCESSIBLE

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

DS-1

1

DEMOLITION PLAN, BASE BID AND ALT. A

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 9 of 25

AutoCAD SHX Text
CONC.
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
STONE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
"PED. X-ING"
AutoCAD SHX Text
"NO IDLING"
AutoCAD SHX Text
"NURSE"
AutoCAD SHX Text
"TEACHER OF MONTH"
AutoCAD SHX Text
"TEACHER OF MONTH"
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"VISITOR"
AutoCAD SHX Text
"VISITOR"
AutoCAD SHX Text
UP#
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
CROPWELL ROAD
AutoCAD SHX Text
C.R. 675 (61.75' WIDE)
Page 10: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

REMOVE ACCESSIBLE

PARKING SIGNS (TYP.)

REMOVE PARKING

SIGNS, TYP. (ALT A)

REMOVE CONCRETE, 4"

REMOVE ACCESSIBLE

ROUTE SIGN (ALT. A)

REMOVE CONCRETE

CURB

REMOVE

CONCRETE, 4"

REMOVE

CONCRETE CURB

REMOVE CONCRETE

CURB (ALT. A)

REMOVE ACCESSIBLE

LOADING SIGN

REMOVE INLET

FRAME AND GRATE

DEMOLISH AND REMOVE

ASPHALT AND SUBBASE,

ASPHALT RECONSTRUCTION, TYP.

REMOVE INLET FRAME

AND GRATE

REMOVE 15" PIPE

REMOVE CONCRETE,

REMOVE CURB REMOVE CURB

EXISTING TELECOMMUNICATIONS

1

REMOVE ACCESSIBLE

ENTRANCE SIGN

REMOVE PORTION OF

ROOF DRAIN COLLECTOR

PIPE TO BE REMOVED

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

DS-1

2

DEMOLITION PLAN, BASE BID AND ALT. A

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 10 of 25

AutoCAD SHX Text
12"
AutoCAD SHX Text
12" CHERRY
AutoCAD SHX Text
18" OAK
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"H.C. LOADING UNLOADING"
AutoCAD SHX Text
BECK SCHOOL
AutoCAD SHX Text
"LEFT TURN AHEAD"
AutoCAD SHX Text
"VISITOR"
AutoCAD SHX Text
"VISITOR"
AutoCAD SHX Text
"VISITOR"
AutoCAD SHX Text
"SECRETARY"
AutoCAD SHX Text
"SECRETARY"
AutoCAD SHX Text
"SECRETARY"
AutoCAD SHX Text
"POLICE
AutoCAD SHX Text
"ASSIST. PRINCIPAL"
AutoCAD SHX Text
"ASSIST. PRINCIPAL"
AutoCAD SHX Text
"PRINCIPAL"
AutoCAD SHX Text
UPL#
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
F.P.
AutoCAD SHX Text
CORE-1
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
CANOPY
Page 11: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

4'

DETECTABLE WARNING

SURFACE (ALT. A)

DETECTABLE WARNING

SURFACE (ALT. A)

TRAFFIC CONTROL SIGN

(R1-1, R5-1) (ALT. A)

CONCRETE, 4" (ALT, A)

COUNTY ROW RECONSTRUCTION,

TYP. (ALT. A)

PARKING STALL STRIPING,

COUNTY CURB (ALT. A)

WIDEN RADIUS (ALT. A)

BASE REPAIR, TYP. (ALT. A)

BASE REPAIR, TYP.

(ALT. A)

CONCRETE, 4' (ALT. A)

COUNTY CURB (ALT. A)

STOP BAR, TYP.

CURB (ALT. A) AS

NECESSARY

CROSSWALK,

TYP. (ALT. A)

TRAFFIC CONTROL SIGN

(R1-1, R5-1) (ALT. A)

R

4

1

'

R

3

0

'

R

1

5

'

1

1

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

DS-1

3

SITE PLAN, BASE BID AND ALT. A

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 11 of 25

AutoCAD SHX Text
12"
AutoCAD SHX Text
18"
AutoCAD SHX Text
24"
AutoCAD SHX Text
24"
AutoCAD SHX Text
24"
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
"DNE/STOP"
AutoCAD SHX Text
"KEEP OFF GRASS"
AutoCAD SHX Text
UP# 67197DL
AutoCAD SHX Text
UPL# 62347DL
AutoCAD SHX Text
CONC.
Page 12: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

R

5

9

'

MATCHLINE

MATCHLINE

CONCRETE CURB

CURB

COUNTY ROW RECONSTRUCTION,

TYP. (ALT. A)

RAISE "E" INLET AND

CONSTRUCT 2'

CONCRETE COLLAR

DETECTABLE WARNING

SURFACE (ALT. A)

ACCESSIBLE ENTRANCE,

PARKING, AND LOADING SIGN

ACCESSIBLE ENTRANCE,

PARKING, AND LOADING SIGN

COUNTY CURB

(ALT. A)

COUNTY CURB (ALT. A)

CONCRETE, 4", TYP. (ALT. A)

PARKING LOT

TRANSITIONAL

OVERLAY, TYP. (ALT. A)

BASE REPAIR, TYP.

(ALT. A)

CONCRETE, 4",

TYP. (ALT. A)

CURB RAMP WITH

DETECTABLE

WARNING SURFACE

CONCRETE, 4", TYP.

2" HMA SURFACE

COURSE TYP. (ALT. A)

10

'

CURB AS

NECESSARY

(ALT. A)

ACCESSIBLE LOADING

ZONE STRIPING

R

1

5

'

R

3

6

'

1

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

DS-1

4

SITE PLAN, BASE BID AND ALT. A

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 12 of 25

AutoCAD SHX Text
12"
AutoCAD SHX Text
12" CHERRY
AutoCAD SHX Text
18"
AutoCAD SHX Text
18"
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
D
AutoCAD SHX Text
"NO TRESPASSING"
AutoCAD SHX Text
"1WAY"
AutoCAD SHX Text
"H.C. ENTRANCE"
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"H.C. ENTRANCE"
AutoCAD SHX Text
UPL#
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
F.P.
AutoCAD SHX Text
SHRUBS
AutoCAD SHX Text
SMALL STATUE
AutoCAD SHX Text
PEACE MARKER
Page 13: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

MATCHLINE

REMOVE CURB

RAMP

REMOVE CONCRETE

REMOVE TRAFFIC

CONTROL SIGN

(R1-1)

REMOVE

CONCRETE

REMOVE ACCESSIBLE

PARKING SIGN

MILL 4"

REMOVE CURB RAMP

REMOVE

CONCRETE

REMOVE

CONCRETE CURB

REMOVE CONCRETE CURB

COUNTY ROW

RECONSTRUCTION

REMOVE 4" WATER

SERVICE

DISPOSE OF

EXISTING SHED

REMOVE

EXISTING FENCE

REMOVE

CONCRETE CURB

1

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

DS-2

1

DEMOLITION PLAN, ALTERNATE B

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 13 of 25

AutoCAD SHX Text
66
AutoCAD SHX Text
66
AutoCAD SHX Text
65
AutoCAD SHX Text
63
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
INV.=59.1(15"CMP)
AutoCAD SHX Text
INV.=59.2(15"CMP)
AutoCAD SHX Text
E
AutoCAD SHX Text
F.F.=65.08
AutoCAD SHX Text
G.F.=64.96
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
G.F.=64.54
AutoCAD SHX Text
PK SET
AutoCAD SHX Text
ELEV.=66.86
AutoCAD SHX Text
RD:
AutoCAD SHX Text
"NO STOPPING"
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"STOP"
AutoCAD SHX Text
"H.C. ENTRANCE"
AutoCAD SHX Text
UP# A62344DL
AutoCAD SHX Text
DUMPSTER PAD
AutoCAD SHX Text
HEEVE
AutoCAD SHX Text
WATER CHAMBER
AutoCAD SHX Text
YARD DRAIN GR=62.52
AutoCAD SHX Text
(15" C.M.P.)
AutoCAD SHX Text
INV.(E)=58.6(15"CMP)
AutoCAD SHX Text
INV.(W)=58.5(15"CMP)
AutoCAD SHX Text
(12" P.V.C.)
AutoCAD SHX Text
INV.=59.2(12"PVC)
AutoCAD SHX Text
STORM M.H. RIM=63.85
AutoCAD SHX Text
CORE-5
Page 14: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

62.65

63.68

63.78

TC:63.07

BC:62.60

63.24

TC:62.71

BC:62.31

TC:62.73

BC:62.23

62.29

62.37

62.55

TC:62.64

BC:62.24

62.86

62.27

RAISE 'A' INLET

GR=61.81, INV. = 57.2,

CONC. COLLAR= 61.83

62.15

62.39

RAISE 'E' INLET

GR=62.28, INV. = 57.6

CONC. COLLAR= 62.30

SEE ENLARGEMENT G

SEE ENLARGEMENT F

63.10

63.3563.29

63.54

63.25

63.19

63.49

63.57

SEE ENLARGEMENT A

SEE ENLARGEMENT B

62.35

61.95

1

1

RE-ROUTE EXISTING ROOF

DRAIN COLLECTOR

ASSUMED 6" PVC.

INSTALL 2 CLEAN OUTS

1

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

GU-1

1

GRADING PLAN, MAIN PARKING LOT

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 14 of 25

AutoCAD SHX Text
12" CHERRY
AutoCAD SHX Text
18" OAK
AutoCAD SHX Text
(15" P.V.C.)
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
BW63.26
AutoCAD SHX Text
62.49
AutoCAD SHX Text
62.34
AutoCAD SHX Text
62.38
AutoCAD SHX Text
62.31
AutoCAD SHX Text
62.27
AutoCAD SHX Text
62.19
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
TW67.39
AutoCAD SHX Text
TW64.26
AutoCAD SHX Text
UPL#
AutoCAD SHX Text
64.0
AutoCAD SHX Text
64.3
AutoCAD SHX Text
62.5
AutoCAD SHX Text
63.0
AutoCAD SHX Text
63.8
AutoCAD SHX Text
63.10
AutoCAD SHX Text
64.04
AutoCAD SHX Text
63.09
AutoCAD SHX Text
62.52
AutoCAD SHX Text
62.28
AutoCAD SHX Text
63.06
AutoCAD SHX Text
62.76
AutoCAD SHX Text
62.31
AutoCAD SHX Text
62.06
AutoCAD SHX Text
63.82
AutoCAD SHX Text
63.44
AutoCAD SHX Text
63.15
AutoCAD SHX Text
63.00
AutoCAD SHX Text
62.69
AutoCAD SHX Text
62.57
AutoCAD SHX Text
62.25
AutoCAD SHX Text
62.49
AutoCAD SHX Text
62.55
AutoCAD SHX Text
63.29
AutoCAD SHX Text
63.06
AutoCAD SHX Text
62.75
AutoCAD SHX Text
62.26
AutoCAD SHX Text
62.73
AutoCAD SHX Text
63.24
AutoCAD SHX Text
63.15
AutoCAD SHX Text
63.19
AutoCAD SHX Text
63.11
AutoCAD SHX Text
63.06
AutoCAD SHX Text
63.14
AutoCAD SHX Text
63.13
AutoCAD SHX Text
62.38
AutoCAD SHX Text
62.26
AutoCAD SHX Text
64.10
AutoCAD SHX Text
63.89
AutoCAD SHX Text
63.58
AutoCAD SHX Text
63.16
AutoCAD SHX Text
63.04
AutoCAD SHX Text
62.75
AutoCAD SHX Text
62.62
AutoCAD SHX Text
62.34
AutoCAD SHX Text
63.09
AutoCAD SHX Text
63.00
AutoCAD SHX Text
63.03
AutoCAD SHX Text
62.95
AutoCAD SHX Text
63.17
AutoCAD SHX Text
63.53
AutoCAD SHX Text
63.52
AutoCAD SHX Text
63.08
AutoCAD SHX Text
62.90
AutoCAD SHX Text
62.93
AutoCAD SHX Text
62.25
AutoCAD SHX Text
62.88
AutoCAD SHX Text
62.86
AutoCAD SHX Text
62.82
AutoCAD SHX Text
62.27
AutoCAD SHX Text
62.83
AutoCAD SHX Text
62.48
AutoCAD SHX Text
62.41
AutoCAD SHX Text
62.33
AutoCAD SHX Text
63.02
AutoCAD SHX Text
62.99
AutoCAD SHX Text
63.48
AutoCAD SHX Text
62.66
AutoCAD SHX Text
62.89
AutoCAD SHX Text
63.04
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
F.P.
AutoCAD SHX Text
CROPWELL ROAD
AutoCAD SHX Text
INV.=57.2(15"PVC)
AutoCAD SHX Text
CORE-1
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
CANOPY
Page 15: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

TC:62.33

BC:61.95

61.82

TC:62.43

BC:62.00

TC:62.90

BC:62.40

TC:62.64

BC:62.31

61.55

62.57 63.04

63.08

62.79

63.50

63.61

62.47

TC:61.46

BC:61.15

TC:61.91

BC:61.58

63.08

4.5%

62.03

61.58

1.8%

61.92 62.02

7.5%

63.50

63.50

61.92

1.7% 4.5%

4.5

%

1.5%

1.5

%

1

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

GU-1

2

GRADING PLAN, ENLARGEMENT C

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 15 of 25

AutoCAD SHX Text
62
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
INV.=56.5(15"PVC)
AutoCAD SHX Text
INV.=56.5(21"CMP)
AutoCAD SHX Text
61.92
AutoCAD SHX Text
61.87
AutoCAD SHX Text
61.78
AutoCAD SHX Text
61.65
AutoCAD SHX Text
61.20
AutoCAD SHX Text
E-INLET GR=61.34
AutoCAD SHX Text
F.F.=63.61
AutoCAD SHX Text
G62.31
AutoCAD SHX Text
G62.24
AutoCAD SHX Text
G61.91
AutoCAD SHX Text
G61.66
AutoCAD SHX Text
G61.20
AutoCAD SHX Text
G61.08
AutoCAD SHX Text
K62.64
AutoCAD SHX Text
K62.65
AutoCAD SHX Text
K62.25
AutoCAD SHX Text
K62.05
AutoCAD SHX Text
K61.57
AutoCAD SHX Text
K61.33
AutoCAD SHX Text
RD:
AutoCAD SHX Text
61.62
AutoCAD SHX Text
62.01
AutoCAD SHX Text
61.72
AutoCAD SHX Text
61.51
AutoCAD SHX Text
61.65
AutoCAD SHX Text
62.79
AutoCAD SHX Text
62.78
AutoCAD SHX Text
63.50
AutoCAD SHX Text
62.87
AutoCAD SHX Text
61.57
AutoCAD SHX Text
62.38
AutoCAD SHX Text
62.10
AutoCAD SHX Text
61.68
AutoCAD SHX Text
61.26
AutoCAD SHX Text
61.58
AutoCAD SHX Text
61.69
AutoCAD SHX Text
61.97
AutoCAD SHX Text
61.69
AutoCAD SHX Text
61.84
AutoCAD SHX Text
61.87
AutoCAD SHX Text
G62.08
AutoCAD SHX Text
K62.46
AutoCAD SHX Text
63.58
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
(15" C.I.P.)
AutoCAD SHX Text
(18" R.C.P.)
AutoCAD SHX Text
(21" C.M.P.)
AutoCAD SHX Text
INV.=57.1(15"CIP)
AutoCAD SHX Text
INV.=57.1(18"RCP)
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
(12"P.V.C.)
AutoCAD SHX Text
STORM M.H. RIM=61.50
AutoCAD SHX Text
INV.=57.3(12"PVC)
Page 16: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

MATCHLINE

6

6

65.32

65.50

65.21

65.35

6

5

64.57

64.00

64.59

64.69

64.60

64.51

64.47

64.49

64.53

64.57

TC:64.93

BC:64.50

1.6

%

1

.

9

%

1

.

6

%

1

.

4

%

1

.

7

%

1

.

4

%

1.6%

1

.

6

%

SEE ENLARGEMENT A

SEE ENLARGEMENT B

SEE ENLARGEMENT C

64.00

TC:64.75

BC:64.25

TC:64.50

BC:64.00

TC:64.75

BC:64.25

64.55

64.67

TC:65.27

BC:64.77

TC:65.37

BC:64.87

TC:66.14

BC:65.73

TC:66.41

BC:65.91

65.96

66.16

TC:66.74

BC:66.24

TC:66.68

BC:66.18

TC:66.69

BC:66.19

66.23

TC:66.82

BC:66.32

6

6

1

1

HP

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

GU-2

1

GRADING PLAN, ALT. B

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 16 of 25

AutoCAD SHX Text
66
AutoCAD SHX Text
66
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
G.F.=64.96
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
G.F.=64.54
AutoCAD SHX Text
PK SET
AutoCAD SHX Text
ELEV.=66.86
AutoCAD SHX Text
RD:
AutoCAD SHX Text
"NO STOPPING"
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"STOP"
AutoCAD SHX Text
"H.C. ENTRANCE"
AutoCAD SHX Text
UP# A62344DL
AutoCAD SHX Text
DUMPSTER PAD
AutoCAD SHX Text
HEEVE
AutoCAD SHX Text
WATER CHAMBER
AutoCAD SHX Text
(15" C.M.P.)
AutoCAD SHX Text
INV.(E)=58.6(15"CMP)
AutoCAD SHX Text
INV.(W)=58.5(15"CMP)
AutoCAD SHX Text
(12" P.V.C.)
AutoCAD SHX Text
INV.=59.2(12"PVC)
AutoCAD SHX Text
STORM M.H. RIM=63.85
AutoCAD SHX Text
CROPWELL ROAD
Page 17: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

6

6

66.2666.19

66.70

66.68

66.68

66.64

66.20

66.13

66.33

66.39

66.29

66.37

66.39

66.45

6

6

HP

1

66.21

66.28

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

GU-2

2

GRADING EAST LOT - ENLARGEMENTS A & B

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 17 of 25

AutoCAD SHX Text
BRICK
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"STOP"
AutoCAD SHX Text
HEEVE
AutoCAD SHX Text
WATER CHAMBER
Page 18: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

4

'

10

'

R

3

0

'

62

.0

86

2.1

36

2.1

0

61

.0

6

61

.0

0

61

.1

8

61

.1

1

61

.3

36

1.2

96

1.2

96

1.3

16

1.2

76

1.4

06

1.3

1

61

.5

8

TC

:6

1.0

1

BC

:6

0.5

5

TC

:6

1.1

8

BC

:6

0.6

4

TC

:6

1.1

4

BC

:6

0.8

2

TC

:6

1.1

4

BC

:6

0.8

6

TC

:6

1.1

6

BC

:6

0.7

5

TC

:6

1.1

2

BC

:6

0.8

2

TC

:6

0.8

3

BC

:6

0.3

3

TC

:6

0.5

9

BC

:6

0.1

4

TC

:5

9.9

9

BC

:5

9.6

8

TC

:5

9.8

1

BC

:5

9.3

8

60

.1

5

60

.6

26

0.8

06

1.0

5

61

.4

46

1.4

06

1.2

86

1.5

06

1.7

2

60

.4

5

60

.7

5

61

.9

2

60

.8

9

60

.6

5

60

.0

5

59

.8

6

60

.5

5

61

.1

56

1.1

5

60

.9

2

61

.0

5

60

.6

36

1.0

3

TC

:5

9.8

9

BC

:5

9.4

4

TC

:5

9.0

7

BC

:5

8.5

7

59

.3

7

58

.9

2

TC

:5

9.9

7

BC

:5

9.6

4

TC

:5

9.4

0

BC

:5

9.0

7

62

.0

8

62

.0

1

62

.0

6

61

.9

0

61

.8

1

61

.4

5

60

.9

7

TC

:6

1.1

4

BC

:6

0.9

3

TC

:6

1.2

5

BC

:6

1.0

0

61

.4

5

61

.8

0

61

.9

06

1.8

7

61

.5

96

1.5

3

SIL

T F

EN

CE

1

SC

S-1

1

BE

CK

M

ID

DL

E S

CH

OO

L S

EC

UR

IT

Y V

ES

TIB

UL

E

& S

IT

E IM

PR

OV

EM

EN

TS

P

RO

JE

CT

BL

OC

K 513.51, L

OT

5

CH

ER

RY

H

IL

L T

OW

NS

HIP

CA

MD

EN

C

OU

NT

Y, N

EW

JE

RS

EY

SH

EE

T R

EV

IS

IO

N N

UM

BE

R:

PLA

N S

HE

ET

N

UM

BE

R:

En

vir

on

men

tal

Res

olu

tion

s8

15

East

Gate

Dri

ve,

Su

ite

10

3

Mt.

Lau

rel,

NJ

08

05

4

tel.

85

6.2

35

.71

70

fax

85

6.2

73

.92

39

PR

OJE

CT

# 31610 22

DA

TE

: 6/24/2020

SC

ALE

: 1"=

20'

DR

AW

N B

Y: B

JM

DE

SIG

NE

D B

Y: N

JW

RE

VIS

IO

NS

#1 06.24.20

SC

ALE

: 1"=

30'

SC

S P

LA

N, B

AS

E B

ID

A

ND

A

LT

ER

NA

TE

S A

, C

, A

ND

D

.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 18 of 25

AutoCAD SHX Text
61
AutoCAD SHX Text
61
AutoCAD SHX Text
61
AutoCAD SHX Text
60
AutoCAD SHX Text
60
AutoCAD SHX Text
BIT. CURB
AutoCAD SHX Text
BIT. CURB
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
STONE
AutoCAD SHX Text
H.C.
AutoCAD SHX Text
H.C.
AutoCAD SHX Text
H.C.
AutoCAD SHX Text
H.C.
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
A-INLET GR=60.48
AutoCAD SHX Text
B-INLET GR=60.61
AutoCAD SHX Text
B-INLET GR=58.57
AutoCAD SHX Text
61.65
AutoCAD SHX Text
61.20
AutoCAD SHX Text
60.89
AutoCAD SHX Text
60.64
AutoCAD SHX Text
60.68
AutoCAD SHX Text
60.77
AutoCAD SHX Text
60.83
AutoCAD SHX Text
60.75
AutoCAD SHX Text
60.58
AutoCAD SHX Text
60.37
AutoCAD SHX Text
59.21
AutoCAD SHX Text
60.02
AutoCAD SHX Text
STORM M.H. RIM=59.39
AutoCAD SHX Text
F.F.=62.12
AutoCAD SHX Text
F.F.=62.07
AutoCAD SHX Text
F.F.=62.01
AutoCAD SHX Text
F.F.=62.00
AutoCAD SHX Text
F.F.=62.07
AutoCAD SHX Text
G61.04
AutoCAD SHX Text
G61.06
AutoCAD SHX Text
G60.85
AutoCAD SHX Text
G59.94
AutoCAD SHX Text
G59.44
AutoCAD SHX Text
G59.35
AutoCAD SHX Text
G61.66
AutoCAD SHX Text
G61.20
AutoCAD SHX Text
G61.08
AutoCAD SHX Text
G61.00
AutoCAD SHX Text
G60.82
AutoCAD SHX Text
G60.75
AutoCAD SHX Text
G60.76
AutoCAD SHX Text
G60.82
AutoCAD SHX Text
G60.81
AutoCAD SHX Text
G60.55
AutoCAD SHX Text
G60.48
AutoCAD SHX Text
G58.92
AutoCAD SHX Text
G58.69
AutoCAD SHX Text
G58.72
AutoCAD SHX Text
G59.30
AutoCAD SHX Text
G59.29
AutoCAD SHX Text
G59.21
AutoCAD SHX Text
G59.17
AutoCAD SHX Text
G59.23
AutoCAD SHX Text
G59.27
AutoCAD SHX Text
G59.25
AutoCAD SHX Text
G59.28
AutoCAD SHX Text
G59.20
AutoCAD SHX Text
G59.15
AutoCAD SHX Text
G60.14
AutoCAD SHX Text
G59.68
AutoCAD SHX Text
G59.38
AutoCAD SHX Text
G59.07
AutoCAD SHX Text
G58.82
AutoCAD SHX Text
K61.47
AutoCAD SHX Text
K61.06
AutoCAD SHX Text
K61.33
AutoCAD SHX Text
K61.05
AutoCAD SHX Text
K60.40
AutoCAD SHX Text
K60.16
AutoCAD SHX Text
K59.89
AutoCAD SHX Text
K59.69
AutoCAD SHX Text
K62.05
AutoCAD SHX Text
K61.57
AutoCAD SHX Text
K61.33
AutoCAD SHX Text
K61.25
AutoCAD SHX Text
K61.12
AutoCAD SHX Text
K61.16
AutoCAD SHX Text
K61.14
AutoCAD SHX Text
K61.14
AutoCAD SHX Text
K61.18
AutoCAD SHX Text
K61.01
AutoCAD SHX Text
K60.89
AutoCAD SHX Text
K59.03
AutoCAD SHX Text
K59.20
AutoCAD SHX Text
K59.04
AutoCAD SHX Text
K59.41
AutoCAD SHX Text
K59.46
AutoCAD SHX Text
K59.58
AutoCAD SHX Text
K59.63
AutoCAD SHX Text
K59.61
AutoCAD SHX Text
K59.62
AutoCAD SHX Text
K59.60
AutoCAD SHX Text
K59.63
AutoCAD SHX Text
K59.25
AutoCAD SHX Text
K59.65
AutoCAD SHX Text
K60.59
AutoCAD SHX Text
K59.99
AutoCAD SHX Text
K59.81
AutoCAD SHX Text
K59.51
AutoCAD SHX Text
K59.31
AutoCAD SHX Text
M.H.
AutoCAD SHX Text
PK SET
AutoCAD SHX Text
ELEV.=60.30
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
"PED. X-ING"
AutoCAD SHX Text
"DNE/STOP"
AutoCAD SHX Text
"KEEP OFF GRASS"
AutoCAD SHX Text
"NURSE"
AutoCAD SHX Text
"NO IDLING"
AutoCAD SHX Text
TC=61.12
AutoCAD SHX Text
TC=59.09
AutoCAD SHX Text
UP# 67197DL
AutoCAD SHX Text
UPL# 62346CH
AutoCAD SHX Text
UPL# 62347DL
AutoCAD SHX Text
61.9
AutoCAD SHX Text
61.9
AutoCAD SHX Text
60.7
AutoCAD SHX Text
61.1
AutoCAD SHX Text
61.2
AutoCAD SHX Text
61.5
AutoCAD SHX Text
59.6
AutoCAD SHX Text
60.1
AutoCAD SHX Text
60.7
AutoCAD SHX Text
60.7
AutoCAD SHX Text
61.0
AutoCAD SHX Text
61.6
AutoCAD SHX Text
61.72
AutoCAD SHX Text
61.51
AutoCAD SHX Text
61.02
AutoCAD SHX Text
61.47
AutoCAD SHX Text
60.78
AutoCAD SHX Text
61.42
AutoCAD SHX Text
61.38
AutoCAD SHX Text
60.89
AutoCAD SHX Text
60.90
AutoCAD SHX Text
61.15
AutoCAD SHX Text
61.15
AutoCAD SHX Text
60.93
AutoCAD SHX Text
61.07
AutoCAD SHX Text
61.10
AutoCAD SHX Text
60.97
AutoCAD SHX Text
61.57
AutoCAD SHX Text
61.30
AutoCAD SHX Text
60.84
AutoCAD SHX Text
60.76
AutoCAD SHX Text
60.66
AutoCAD SHX Text
60.62
AutoCAD SHX Text
60.58
AutoCAD SHX Text
60.51
AutoCAD SHX Text
60.43
AutoCAD SHX Text
60.34
AutoCAD SHX Text
60.25
AutoCAD SHX Text
60.18
AutoCAD SHX Text
60.01
AutoCAD SHX Text
59.98
AutoCAD SHX Text
59.92
AutoCAD SHX Text
59.88
AutoCAD SHX Text
59.27
AutoCAD SHX Text
61.00
AutoCAD SHX Text
60.52
AutoCAD SHX Text
60.08
AutoCAD SHX Text
59.86
AutoCAD SHX Text
61.40
AutoCAD SHX Text
60.15
AutoCAD SHX Text
60.33
AutoCAD SHX Text
60.54
AutoCAD SHX Text
60.77
AutoCAD SHX Text
61.01
AutoCAD SHX Text
61.36
AutoCAD SHX Text
61.59
AutoCAD SHX Text
61.53
AutoCAD SHX Text
61.51
AutoCAD SHX Text
61.58
AutoCAD SHX Text
61.42
AutoCAD SHX Text
61.35
AutoCAD SHX Text
60.93
AutoCAD SHX Text
60.85
AutoCAD SHX Text
60.78
AutoCAD SHX Text
60.70
AutoCAD SHX Text
60.66
AutoCAD SHX Text
60.56
AutoCAD SHX Text
60.50
AutoCAD SHX Text
60.44
AutoCAD SHX Text
60.32
AutoCAD SHX Text
60.24
AutoCAD SHX Text
60.12
AutoCAD SHX Text
60.05
AutoCAD SHX Text
60.00
AutoCAD SHX Text
59.14
AutoCAD SHX Text
61.65
AutoCAD SHX Text
61.62
AutoCAD SHX Text
61.61
AutoCAD SHX Text
61.51
AutoCAD SHX Text
62.10
AutoCAD SHX Text
61.68
AutoCAD SHX Text
61.26
AutoCAD SHX Text
61.58
AutoCAD SHX Text
61.25
AutoCAD SHX Text
61.28
AutoCAD SHX Text
61.30
AutoCAD SHX Text
61.29
AutoCAD SHX Text
61.33
AutoCAD SHX Text
61.26
AutoCAD SHX Text
59.86
AutoCAD SHX Text
59.34
AutoCAD SHX Text
61.06
AutoCAD SHX Text
60.53
AutoCAD SHX Text
60.12
AutoCAD SHX Text
59.85
AutoCAD SHX Text
59.82
AutoCAD SHX Text
59.40
AutoCAD SHX Text
61.36
AutoCAD SHX Text
61.40
AutoCAD SHX Text
61.48
AutoCAD SHX Text
61.50
AutoCAD SHX Text
61.48
AutoCAD SHX Text
61.53
AutoCAD SHX Text
61.52
AutoCAD SHX Text
62.01
AutoCAD SHX Text
60.14
AutoCAD SHX Text
60.01
AutoCAD SHX Text
59.78
AutoCAD SHX Text
59.77
AutoCAD SHX Text
61.69
AutoCAD SHX Text
61.42
AutoCAD SHX Text
61.45
AutoCAD SHX Text
61.36
AutoCAD SHX Text
61.11
AutoCAD SHX Text
61.06
AutoCAD SHX Text
60.68
AutoCAD SHX Text
60.17
AutoCAD SHX Text
59.47
AutoCAD SHX Text
59.48
AutoCAD SHX Text
59.41
AutoCAD SHX Text
59.29
AutoCAD SHX Text
59.35
AutoCAD SHX Text
61.23
AutoCAD SHX Text
59.79
AutoCAD SHX Text
59.78
AutoCAD SHX Text
59.77
AutoCAD SHX Text
59.78
AutoCAD SHX Text
61.32
AutoCAD SHX Text
61.34
AutoCAD SHX Text
61.96
AutoCAD SHX Text
61.51
AutoCAD SHX Text
60.43
AutoCAD SHX Text
61.87
AutoCAD SHX Text
60.96
AutoCAD SHX Text
60.59
AutoCAD SHX Text
60.45
AutoCAD SHX Text
60.33
AutoCAD SHX Text
59.88
AutoCAD SHX Text
61.48
AutoCAD SHX Text
61.53
AutoCAD SHX Text
61.49
AutoCAD SHX Text
61.13
AutoCAD SHX Text
59.55
AutoCAD SHX Text
59.45
AutoCAD SHX Text
59.37
AutoCAD SHX Text
59.28
AutoCAD SHX Text
61.36
AutoCAD SHX Text
61.07
AutoCAD SHX Text
60.66
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CROPWELL ROAD
AutoCAD SHX Text
(15" C.I.P.)
AutoCAD SHX Text
(18" R.C.P.)
AutoCAD SHX Text
(21" C.M.P.)
AutoCAD SHX Text
(24" C.M.P.)
AutoCAD SHX Text
(24" C.M.P.)
AutoCAD SHX Text
INV.=53.5(24"CMP)
AutoCAD SHX Text
INV.=53.9(24"CMP)
AutoCAD SHX Text
INV.=54.1(24"CMP)
AutoCAD SHX Text
INV.=53.2(42"RCP)
AutoCAD SHX Text
STORM M.H. RIM=61.34 INV.=57.3(8"RCP) INV.=56.5(18"RCP) INV.=55.7(21"CMP) INV.=55.5(24"CMP)
AutoCAD SHX Text
D
AutoCAD SHX Text
(42"R.C.P.)
AutoCAD SHX Text
D
AutoCAD SHX Text
(8"R.C.P.)
AutoCAD SHX Text
(12"P.V.C.)
AutoCAD SHX Text
(12"P.V.C.)
AutoCAD SHX Text
INV.=57.3(8"RCP)
Page 19: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

10'

TC

:62.71

BC

:62.31

61.27

61.40

61.58

62.05

TC

:61.16

BC

:60.75

TC

:61.12

BC

:60.82

60.62

61.44

61.50

61.72

61.92

62.19

62.41

TC

:62.57

BC

:62.18

TC

:62.64

BC

:62.24

62.72

62.79

62.86

60.55

60.63

61.03

61.73

61.61

61.96

62.27

RA

IS

E 'E

' IN

LE

T

GR

=61.59, IN

V=

56.5,

IN

V=

56.5, C

ON

C.

CO

LLA

R =

61.65

GR

=61.81, IN

V. =

57.2,

CO

NC

. C

OLLA

R=

61.83

62.01

61.90

61.81

61.45

TC

:61.25

BC

:61.00

61.67

61.63

61.45

61.80

61.90

61.87

61.59

61.53

LIM

IT

O

F D

IS

TU

RB

AN

CE

IN

LE

T

PR

OT

EC

TIO

N

(T

YP

.)

1

1

2

BE

CK

M

ID

DL

E S

CH

OO

L S

EC

UR

IT

Y V

ES

TIB

UL

E

& S

IT

E IM

PR

OV

EM

EN

TS

P

RO

JE

CT

BL

OC

K 513.51, L

OT

5

CH

ER

RY

H

IL

L T

OW

NS

HIP

CA

MD

EN

C

OU

NT

Y, N

EW

JE

RS

EY

SH

EE

T R

EV

IS

IO

N N

UM

BE

R:

PLA

N S

HE

ET

N

UM

BE

R:

En

vir

on

men

tal

Res

olu

tion

s8

15

East

Gate

Dri

ve,

Su

ite

10

3

Mt.

Lau

rel,

NJ

08

05

4

tel.

85

6.2

35

.71

70

fax

85

6.2

73

.92

39

PR

OJE

CT

# 31610 22

DA

TE

: 6/24/2020

SC

ALE

: 1"=

20'

DR

AW

N B

Y: B

JM

DE

SIG

NE

D B

Y: N

JW

RE

VIS

IO

NS

#1 06.24.20

SC

S-1

SC

S P

LA

N, B

AS

E B

ID

A

ND

A

LT

ER

NA

TE

S A

, C

, A

ND

D

.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 19 of 25

AutoCAD SHX Text
63
AutoCAD SHX Text
62
AutoCAD SHX Text
62
AutoCAD SHX Text
61
AutoCAD SHX Text
(15" P.V.C.)
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
STONE
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
INV.=56.5(15"PVC)
AutoCAD SHX Text
INV.=56.5(21"CMP)
AutoCAD SHX Text
A-INLET GR=60.48
AutoCAD SHX Text
62.19
AutoCAD SHX Text
62.11
AutoCAD SHX Text
61.92
AutoCAD SHX Text
61.87
AutoCAD SHX Text
61.78
AutoCAD SHX Text
61.65
AutoCAD SHX Text
61.20
AutoCAD SHX Text
60.89
AutoCAD SHX Text
60.64
AutoCAD SHX Text
60.68
AutoCAD SHX Text
E-INLET GR=61.34
AutoCAD SHX Text
F.F.=63.61
AutoCAD SHX Text
G62.24
AutoCAD SHX Text
G62.18
AutoCAD SHX Text
G62.31
AutoCAD SHX Text
G62.24
AutoCAD SHX Text
G61.91
AutoCAD SHX Text
G61.66
AutoCAD SHX Text
G61.20
AutoCAD SHX Text
G61.08
AutoCAD SHX Text
G61.00
AutoCAD SHX Text
G60.82
AutoCAD SHX Text
G60.75
AutoCAD SHX Text
K62.64
AutoCAD SHX Text
K62.57
AutoCAD SHX Text
K62.64
AutoCAD SHX Text
K62.65
AutoCAD SHX Text
K62.25
AutoCAD SHX Text
K62.05
AutoCAD SHX Text
K61.57
AutoCAD SHX Text
K61.33
AutoCAD SHX Text
K61.25
AutoCAD SHX Text
K61.12
AutoCAD SHX Text
K61.16
AutoCAD SHX Text
PK SET
AutoCAD SHX Text
ELEV.=62.48
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
"NO IDLING"
AutoCAD SHX Text
"NURSE"
AutoCAD SHX Text
"TEACHER OF MONTH"
AutoCAD SHX Text
"TEACHER OF MONTH"
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
61.9
AutoCAD SHX Text
61.9
AutoCAD SHX Text
62.0
AutoCAD SHX Text
61.2
AutoCAD SHX Text
61.5
AutoCAD SHX Text
62.1
AutoCAD SHX Text
62.5
AutoCAD SHX Text
62.06
AutoCAD SHX Text
62.35
AutoCAD SHX Text
62.12
AutoCAD SHX Text
61.73
AutoCAD SHX Text
61.62
AutoCAD SHX Text
62.01
AutoCAD SHX Text
61.72
AutoCAD SHX Text
61.51
AutoCAD SHX Text
61.02
AutoCAD SHX Text
61.47
AutoCAD SHX Text
60.78
AutoCAD SHX Text
61.42
AutoCAD SHX Text
62.57
AutoCAD SHX Text
62.27
AutoCAD SHX Text
62.25
AutoCAD SHX Text
62.49
AutoCAD SHX Text
62.03
AutoCAD SHX Text
61.83
AutoCAD SHX Text
61.70
AutoCAD SHX Text
61.57
AutoCAD SHX Text
61.30
AutoCAD SHX Text
60.84
AutoCAD SHX Text
60.76
AutoCAD SHX Text
61.59
AutoCAD SHX Text
62.62
AutoCAD SHX Text
62.34
AutoCAD SHX Text
62.04
AutoCAD SHX Text
61.85
AutoCAD SHX Text
61.74
AutoCAD SHX Text
61.58
AutoCAD SHX Text
61.42
AutoCAD SHX Text
61.35
AutoCAD SHX Text
60.93
AutoCAD SHX Text
60.85
AutoCAD SHX Text
61.65
AutoCAD SHX Text
61.61
AutoCAD SHX Text
62.83
AutoCAD SHX Text
62.79
AutoCAD SHX Text
62.77
AutoCAD SHX Text
62.79
AutoCAD SHX Text
62.78
AutoCAD SHX Text
63.50
AutoCAD SHX Text
62.87
AutoCAD SHX Text
61.57
AutoCAD SHX Text
62.38
AutoCAD SHX Text
62.10
AutoCAD SHX Text
61.68
AutoCAD SHX Text
61.26
AutoCAD SHX Text
61.58
AutoCAD SHX Text
61.25
AutoCAD SHX Text
61.28
AutoCAD SHX Text
61.69
AutoCAD SHX Text
61.45
AutoCAD SHX Text
61.36
AutoCAD SHX Text
61.97
AutoCAD SHX Text
61.69
AutoCAD SHX Text
61.84
AutoCAD SHX Text
61.87
AutoCAD SHX Text
61.48
AutoCAD SHX Text
61.53
AutoCAD SHX Text
61.49
AutoCAD SHX Text
G62.08
AutoCAD SHX Text
K62.46
AutoCAD SHX Text
63.58
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
(15" C.I.P.)
AutoCAD SHX Text
(18" R.C.P.)
AutoCAD SHX Text
(21" C.M.P.)
AutoCAD SHX Text
INV.=57.1(15"CIP)
AutoCAD SHX Text
INV.=57.1(18"RCP)
AutoCAD SHX Text
STORM M.H. RIM=61.34 INV.=57.3(8"RCP) INV.=56.5(18"RCP) INV.=55.7(21"CMP) INV.=55.5(24"CMP)
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
(8"R.C.P.)
AutoCAD SHX Text
(12"P.V.C.)
AutoCAD SHX Text
(12"P.V.C.)
AutoCAD SHX Text
STORM M.H. RIM=61.50
AutoCAD SHX Text
INV.=57.3(12"PVC)
AutoCAD SHX Text
INV.=57.3(8"RCP)
Page 20: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

MATCHLINE

MATCHLINE

4

'

10

'

62

.6

5

63

.6

8

63

.7

86

3.6

8

63

.5

7

63

.5

0

TC

:6

3.4

7

BC

:6

3.0

0

TC

:6

3.1

7

BC

:6

2.7

7

TC

:6

3.0

7

BC

:6

2.6

0

63

.3

16

3.2

4

TC

:6

2.7

1

BC

:6

2.3

1

TC

:6

2.7

3

BC

:6

2.2

3

62

.2

9

62

.3

7

62

.5

5

TC

:6

2.6

4

BC

:6

2.2

4

62

.8

6

TC

:6

3.2

3

BC

:6

2.8

0

BC

:6

3.0

63

.2

7

TC

:6

4.2

5

BC

:6

3.8

8

63

.9

1

TC

:6

4.5

4

BC

:6

4.1

7

TC

:6

4.9

5

BC

6

4.5

1

64

.4

2

TC

6

4.7

5

BC

6

4.2

5

BC

:6

3.5

5

TC

:6

3.2

0

63

.5

4

63

.6

6

63

.8

2

63

.9

2

64

.2

1

64

.3

4

64

.4

5

64

.6

66

3.4

1

TC

:6

3.6

9

BC

:6

3.2

8

63

.7

3

62

.2

7

RA

IS

E 'A

' IN

LE

T

GR

=6

1.8

1, IN

V. =

5

7.2

,

CO

NC

. C

OL

LA

R=

6

1.8

3

TC

:6

5.0

BC

:6

4.6

4

66

.9

0

TC

:6

5.2

5

BC

:6

4.9

2

64

.2

3

62

.1

5

62

.3

9

TC

:6

4.5

5

BC

:6

4.0

5

RA

IS

E 'E

' IN

LE

T

GR

=6

2.2

8, IN

V. =

5

7.6

CO

NC

. C

OL

LA

R=

6

2.3

0

64

.8

0

63

.1

0

63

.3

56

3.2

9

63

.5

4

63

.4

7

63

.5

4

63

.2

5

63

.1

9

63

.4

9

63

.5

7

65

.0

1

64

.6

0

64

.3

1

62

.3

5

61

.9

5

MATCHLINE

MATCHLINE

LIM

IT

O

F D

IS

TU

RB

AN

CE 1

1

1

1

1

BE

CK

M

ID

DL

E S

CH

OO

L S

EC

UR

IT

Y V

ES

TIB

UL

E

& S

IT

E IM

PR

OV

EM

EN

TS

P

RO

JE

CT

BL

OC

K 513.51, L

OT

5

CH

ER

RY

H

IL

L T

OW

NS

HIP

CA

MD

EN

C

OU

NT

Y, N

EW

JE

RS

EY

SH

EE

T R

EV

IS

IO

N N

UM

BE

R:

PLA

N S

HE

ET

N

UM

BE

R:

En

vir

on

men

tal

Res

olu

tion

s8

15

East

Gate

Dri

ve,

Su

ite

10

3

Mt.

Lau

rel,

NJ

08

05

4

tel.

85

6.2

35

.71

70

fax

85

6.2

73

.92

39

PR

OJE

CT

# 31610 22

DA

TE

: 6/24/2020

SC

ALE

: 1"=

20'

DR

AW

N B

Y: B

JM

DE

SIG

NE

D B

Y: N

JW

RE

VIS

IO

NS

#1 06.24.20

3

SC

S-1

SC

ALE

: 1"=

30'

SC

S P

LA

N, B

AS

E B

ID

A

ND

A

LT

ER

NA

TE

S A

, C

, A

ND

D

.

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 20 of 25

AutoCAD SHX Text
66
AutoCAD SHX Text
65
AutoCAD SHX Text
64
AutoCAD SHX Text
64
AutoCAD SHX Text
63
AutoCAD SHX Text
63
AutoCAD SHX Text
63
AutoCAD SHX Text
(15"C.M.P. TO 12" D.I.P. TRANSITION?)
AutoCAD SHX Text
(15" P.V.C.)
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
H.C.
AutoCAD SHX Text
H.C.
AutoCAD SHX Text
H.C.
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
INV.(E)=57.8(12"DIP)
AutoCAD SHX Text
INV.(W)=57.6(15"PVC)
AutoCAD SHX Text
A-INLET GR=61.56
AutoCAD SHX Text
B-INLET GR=62.24
AutoCAD SHX Text
B-INLET GR=62.24
AutoCAD SHX Text
BW63.26
AutoCAD SHX Text
64.55
AutoCAD SHX Text
64.45
AutoCAD SHX Text
64.06
AutoCAD SHX Text
62.77
AutoCAD SHX Text
62.49
AutoCAD SHX Text
62.34
AutoCAD SHX Text
62.38
AutoCAD SHX Text
62.31
AutoCAD SHX Text
62.27
AutoCAD SHX Text
62.19
AutoCAD SHX Text
D
AutoCAD SHX Text
E-INLET GR=61.78
AutoCAD SHX Text
F.F.=65.08
AutoCAD SHX Text
F.F.=63.53
AutoCAD SHX Text
F.F.=63.56
AutoCAD SHX Text
F.F.=63.63
AutoCAD SHX Text
G62.73
AutoCAD SHX Text
G65.34
AutoCAD SHX Text
G64.92
AutoCAD SHX Text
G64.84
AutoCAD SHX Text
G64.86
AutoCAD SHX Text
G63.20
AutoCAD SHX Text
G62.97
AutoCAD SHX Text
G62.79
AutoCAD SHX Text
G62.74
AutoCAD SHX Text
G62.55
AutoCAD SHX Text
G62.57
AutoCAD SHX Text
G62.53
AutoCAD SHX Text
G62.55
AutoCAD SHX Text
G62.54
AutoCAD SHX Text
G62.43
AutoCAD SHX Text
G64.24
AutoCAD SHX Text
G64.05
AutoCAD SHX Text
G63.82
AutoCAD SHX Text
G63.65
AutoCAD SHX Text
G63.35
AutoCAD SHX Text
G62.91
AutoCAD SHX Text
G62.41
AutoCAD SHX Text
G62.21
AutoCAD SHX Text
G62.42
AutoCAD SHX Text
G62.38
AutoCAD SHX Text
G62.33
AutoCAD SHX Text
G62.31
AutoCAD SHX Text
G62.24
AutoCAD SHX Text
G.F.=64.96
AutoCAD SHX Text
G64.76
AutoCAD SHX Text
G64.76
AutoCAD SHX Text
G64.59
AutoCAD SHX Text
G64.37
AutoCAD SHX Text
G64.17
AutoCAD SHX Text
G63.88
AutoCAD SHX Text
G63.75
AutoCAD SHX Text
G63.56
AutoCAD SHX Text
G63.28
AutoCAD SHX Text
G62.69
AutoCAD SHX Text
G64.25
AutoCAD SHX Text
G64.23
AutoCAD SHX Text
K63.03
AutoCAD SHX Text
K65.64
AutoCAD SHX Text
K65.29
AutoCAD SHX Text
K65.16
AutoCAD SHX Text
K63.55
AutoCAD SHX Text
K63.29
AutoCAD SHX Text
K63.21
AutoCAD SHX Text
K63.09
AutoCAD SHX Text
K62.89
AutoCAD SHX Text
K62.63
AutoCAD SHX Text
K62.83
AutoCAD SHX Text
K62.88
AutoCAD SHX Text
K62.87
AutoCAD SHX Text
K62.86
AutoCAD SHX Text
K64.47
AutoCAD SHX Text
K64.43
AutoCAD SHX Text
K64.05
AutoCAD SHX Text
K63.69
AutoCAD SHX Text
K63.56
AutoCAD SHX Text
K63.25
AutoCAD SHX Text
K62.70
AutoCAD SHX Text
K62.41
AutoCAD SHX Text
K62.78
AutoCAD SHX Text
K62.73
AutoCAD SHX Text
K62.73
AutoCAD SHX Text
K62.71
AutoCAD SHX Text
K62.64
AutoCAD SHX Text
K64.88
AutoCAD SHX Text
K65.21
AutoCAD SHX Text
K65.03
AutoCAD SHX Text
K64.79
AutoCAD SHX Text
K64.54
AutoCAD SHX Text
K64.25
AutoCAD SHX Text
K64.05
AutoCAD SHX Text
K63.80
AutoCAD SHX Text
K63.69
AutoCAD SHX Text
K63.10
AutoCAD SHX Text
K64.60
AutoCAD SHX Text
K64.34
AutoCAD SHX Text
PK SET
AutoCAD SHX Text
ELEV.=62.48
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
"NO TRESPASSING"
AutoCAD SHX Text
"1WAY"
AutoCAD SHX Text
"H.C. ENTRANCE"
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"H.C. LOADING UNLOADING"
AutoCAD SHX Text
"H.C. ENTRANCE"
AutoCAD SHX Text
BECK SCHOOL
AutoCAD SHX Text
"LEFT TURN AHEAD"
AutoCAD SHX Text
"TEACHER OF MONTH"
AutoCAD SHX Text
"H.C. PARKING"
AutoCAD SHX Text
"VISITOR"
AutoCAD SHX Text
"VISITOR"
AutoCAD SHX Text
"VISITOR"
AutoCAD SHX Text
"SECRETARY"
AutoCAD SHX Text
"SECRETARY"
AutoCAD SHX Text
"SECRETARY"
AutoCAD SHX Text
"POLICE
AutoCAD SHX Text
"ASSIST. PRINCIPAL"
AutoCAD SHX Text
"ASSIST. PRINCIPAL"
AutoCAD SHX Text
"PRINCIPAL"
AutoCAD SHX Text
TC=62.87
AutoCAD SHX Text
TC=62.89
AutoCAD SHX Text
TW67.39
AutoCAD SHX Text
TW64.26
AutoCAD SHX Text
UP# A62344DL
AutoCAD SHX Text
UPL#
AutoCAD SHX Text
DUMPSTER PAD
AutoCAD SHX Text
65.5
AutoCAD SHX Text
64.8
AutoCAD SHX Text
64.1
AutoCAD SHX Text
63.6
AutoCAD SHX Text
64.3
AutoCAD SHX Text
64.0
AutoCAD SHX Text
64.3
AutoCAD SHX Text
62.5
AutoCAD SHX Text
63.0
AutoCAD SHX Text
63.8
AutoCAD SHX Text
65.36
AutoCAD SHX Text
64.21
AutoCAD SHX Text
63.82
AutoCAD SHX Text
65.22
AutoCAD SHX Text
65.28
AutoCAD SHX Text
65.23
AutoCAD SHX Text
65.08
AutoCAD SHX Text
64.86
AutoCAD SHX Text
64.59
AutoCAD SHX Text
64.36
AutoCAD SHX Text
64.13
AutoCAD SHX Text
63.94
AutoCAD SHX Text
63.73
AutoCAD SHX Text
63.54
AutoCAD SHX Text
63.25
AutoCAD SHX Text
63.10
AutoCAD SHX Text
64.04
AutoCAD SHX Text
63.09
AutoCAD SHX Text
62.52
AutoCAD SHX Text
62.28
AutoCAD SHX Text
63.06
AutoCAD SHX Text
62.76
AutoCAD SHX Text
62.31
AutoCAD SHX Text
62.06
AutoCAD SHX Text
63.82
AutoCAD SHX Text
63.44
AutoCAD SHX Text
63.15
AutoCAD SHX Text
63.00
AutoCAD SHX Text
62.69
AutoCAD SHX Text
62.57
AutoCAD SHX Text
62.25
AutoCAD SHX Text
62.49
AutoCAD SHX Text
62.55
AutoCAD SHX Text
64.53
AutoCAD SHX Text
64.44
AutoCAD SHX Text
64.98
AutoCAD SHX Text
64.33
AutoCAD SHX Text
64.53
AutoCAD SHX Text
64.51
AutoCAD SHX Text
65.46
AutoCAD SHX Text
64.34
AutoCAD SHX Text
63.92
AutoCAD SHX Text
64.35
AutoCAD SHX Text
64.70
AutoCAD SHX Text
65.34
AutoCAD SHX Text
63.56
AutoCAD SHX Text
63.41
AutoCAD SHX Text
63.29
AutoCAD SHX Text
63.34
AutoCAD SHX Text
63.18
AutoCAD SHX Text
63.27
AutoCAD SHX Text
63.06
AutoCAD SHX Text
62.75
AutoCAD SHX Text
62.26
AutoCAD SHX Text
62.73
AutoCAD SHX Text
63.24
AutoCAD SHX Text
63.15
AutoCAD SHX Text
63.19
AutoCAD SHX Text
63.11
AutoCAD SHX Text
63.06
AutoCAD SHX Text
63.14
AutoCAD SHX Text
63.13
AutoCAD SHX Text
62.38
AutoCAD SHX Text
62.72
AutoCAD SHX Text
62.26
AutoCAD SHX Text
64.32
AutoCAD SHX Text
64.37
AutoCAD SHX Text
64.10
AutoCAD SHX Text
63.89
AutoCAD SHX Text
63.58
AutoCAD SHX Text
63.16
AutoCAD SHX Text
63.04
AutoCAD SHX Text
62.75
AutoCAD SHX Text
62.62
AutoCAD SHX Text
62.34
AutoCAD SHX Text
63.09
AutoCAD SHX Text
63.00
AutoCAD SHX Text
63.03
AutoCAD SHX Text
62.95
AutoCAD SHX Text
63.17
AutoCAD SHX Text
63.53
AutoCAD SHX Text
63.52
AutoCAD SHX Text
63.08
AutoCAD SHX Text
62.90
AutoCAD SHX Text
62.93
AutoCAD SHX Text
62.25
AutoCAD SHX Text
62.88
AutoCAD SHX Text
62.86
AutoCAD SHX Text
62.82
AutoCAD SHX Text
62.27
AutoCAD SHX Text
62.83
AutoCAD SHX Text
65.95
AutoCAD SHX Text
65.77
AutoCAD SHX Text
64.74
AutoCAD SHX Text
64.60
AutoCAD SHX Text
62.48
AutoCAD SHX Text
62.41
AutoCAD SHX Text
62.33
AutoCAD SHX Text
63.02
AutoCAD SHX Text
62.99
AutoCAD SHX Text
64.56
AutoCAD SHX Text
64.58
AutoCAD SHX Text
64.39
AutoCAD SHX Text
63.48
AutoCAD SHX Text
65.90
AutoCAD SHX Text
65.67
AutoCAD SHX Text
64.65
AutoCAD SHX Text
64.45
AutoCAD SHX Text
62.66
AutoCAD SHX Text
62.89
AutoCAD SHX Text
63.04
AutoCAD SHX Text
64.67
AutoCAD SHX Text
64.51
AutoCAD SHX Text
64.34
AutoCAD SHX Text
K64.93
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
F.P.
AutoCAD SHX Text
CROPWELL ROAD
AutoCAD SHX Text
(61.75' WIDE)
AutoCAD SHX Text
C.R. 675
AutoCAD SHX Text
(12" D.I.P.)
AutoCAD SHX Text
(12" D.I.P.)
AutoCAD SHX Text
(15" C.M.P.)
AutoCAD SHX Text
(15" C.M.P.)
AutoCAD SHX Text
SHRUBS
AutoCAD SHX Text
INV.(N)=58.5(12"DIP)
AutoCAD SHX Text
INV.(E)=58.6(15"CMP)
AutoCAD SHX Text
INV.(W)=58.5(15"CMP)
AutoCAD SHX Text
SMALL STATUE
AutoCAD SHX Text
PEACE MARKER
AutoCAD SHX Text
(12" P.V.C.)
AutoCAD SHX Text
INV.=59.2(12"PVC)
AutoCAD SHX Text
INV.=57.2(15"PVC)
AutoCAD SHX Text
STORM M.H. RIM=63.85
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
CANOPY
Page 21: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

MATCHLINE

MATCHLINE

INLET PROTECTION

(TYP)

6

6

65.32

65.50

65.21

65.35

6

5

64.00

64.59

64.69

64.60

64.51

64.47

64.49

64.53

64.57

TC:64.93

BC:64.50

1.6

%

1

.

9

%

1

.

6

%

64.84

64.85

64.97

1

.

4

%

1

.

7

%

1

.

4

%

1.6%

1

.

6

%

3

.5

%

64.00

64.00

TC:64.75

BC:64.25

TC:64.50

BC:64.00

TC:64.75

BC:64.25

64.55

64.67

TC:65.27

BC:64.77

TC:65.37

BC:64.87

TC:66.14

BC:65.73

TC:66.41

BC:65.91

65.96

66.16

TC:66.74

BC:66.24

TC:66.69

BC:66.19

66.23

TC:66.82

BC:66.32

6

6

HP

1

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

SCS-2

1

SCS PLAN, ALTERNATE B

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 21 of 25

AutoCAD SHX Text
66
AutoCAD SHX Text
65
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
INV.=59.1(15"CMP)
AutoCAD SHX Text
INV.=59.2(15"CMP)
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
G.F.=64.96
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
G.F.=64.54
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
"STOP"
AutoCAD SHX Text
"NO TRESPASSING"
AutoCAD SHX Text
"1WAY"
AutoCAD SHX Text
"H.C. ENTRANCE"
AutoCAD SHX Text
UP# A62344DL
AutoCAD SHX Text
DUMPSTER PAD
AutoCAD SHX Text
HEEVE
AutoCAD SHX Text
WATER CHAMBER
AutoCAD SHX Text
YARD DRAIN GR=62.52
AutoCAD SHX Text
(15" C.M.P.)
AutoCAD SHX Text
SHRUBS
AutoCAD SHX Text
INV.(E)=58.6(15"CMP)
AutoCAD SHX Text
INV.(W)=58.5(15"CMP)
AutoCAD SHX Text
SMALL STATUE
AutoCAD SHX Text
PEACE MARKER
AutoCAD SHX Text
(12" P.V.C.)
AutoCAD SHX Text
INV.=59.2(12"PVC)
AutoCAD SHX Text
STORM M.H. RIM=63.85
AutoCAD SHX Text
CORE-5
AutoCAD SHX Text
CROPWELL ROAD
Page 22: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

TEMPORARY

STOCKPILE

INLET PROTECTION

(TYP)

64.57

64.53

64.41

64.50

64.00

64.47

64.49

64.53

64.57

64.30

64.20

64.41

64.35

64.27 64.63

64.84

64.85

64.97

64.98

64.98

64.85

64.77

64.56

64.63

64.75

64.69

1

.

4

%

1

.

7

%

64.51

64.47

64.49

64.51

64.52

64.50

64.10

64.38

64.58

63.7663.95

63.8163.8063.79

1.1%

1.8

%

1

.

9

%

2

%

1

.

4

%

2

%

2

.

1

%

3

.5

%

1

.

7

%

1

%

1

%

64.00

64.00

64.00

64.00

64.00

64.00

64.00

TC:64.75

BC:64.25

1

BECK MIDDLE SCHOOL SECURITY

VESTIBULE & SITE IMPROVEMENTS PROJECT

BLOCK 513.51, LOT 5

CHERRY HILL TOWNSHIP

CAMDEN COUNTY, NEW JERSEY

SHEET REVISION NUMBER:

PLAN SHEET NUMBER:

Environmental Resolutions815 East Gate Drive, Suite 103

Mt. Laurel, NJ 08054

tel. 856.235.7170 fax 856.273.9239

PROJECT # 31610 22

DATE: 6/24/2020

SCALE: 1"=20'

DRAWN BY: BJM

DESIGNED BY: NJW

REVISIONS

#1 06.24.20

SCS-2

2

SCS PLAN, ALTERNATE B

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations 22 of 25

AutoCAD SHX Text
65
AutoCAD SHX Text
64
AutoCAD SHX Text
64
AutoCAD SHX Text
63
AutoCAD SHX Text
63
AutoCAD SHX Text
(15" C.M.P.)
AutoCAD SHX Text
C/L FENCE
AutoCAD SHX Text
C/L FENCE
AutoCAD SHX Text
C/L FENCE
AutoCAD SHX Text
E.O.P.
AutoCAD SHX Text
GATE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
YELLOW LINE
AutoCAD SHX Text
INV.=59.1(15"CMP)
AutoCAD SHX Text
INV.=59.2(15"CMP)
AutoCAD SHX Text
INV.=60.3(15"CMP)
AutoCAD SHX Text
E
AutoCAD SHX Text
F.F.=65.05
AutoCAD SHX Text
F.F.=65.04
AutoCAD SHX Text
F.F.=65.08
AutoCAD SHX Text
BOX
AutoCAD SHX Text
BOX
AutoCAD SHX Text
G.F.=64.96
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
G.F.=64.54
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
RD:
AutoCAD SHX Text
"NO PARKING"
AutoCAD SHX Text
DUMPSTER PAD
AutoCAD SHX Text
YARD DRAIN GR=62.52
AutoCAD SHX Text
YARD DRAIN GR=62.65
AutoCAD SHX Text
(12" D.I.P)
AutoCAD SHX Text
CORE-5
Page 23: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

CSK-1

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 23 of 25

AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
B-152
AutoCAD SHX Text
B-128
AutoCAD SHX Text
REST
AutoCAD SHX Text
B-129
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
B-130
AutoCAD SHX Text
REST
AutoCAD SHX Text
B-131
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
B-127
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
B-126
AutoCAD SHX Text
NURSE
AutoCAD SHX Text
B-122
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
B-121
AutoCAD SHX Text
GUIDANCE
AutoCAD SHX Text
B-120
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
B-115
AutoCAD SHX Text
GENERAL OFFICE
AutoCAD SHX Text
B-107
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
B-108
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
B-125
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
B-123
AutoCAD SHX Text
B-124
AutoCAD SHX Text
B-119
AutoCAD SHX Text
PASSAGE
AutoCAD SHX Text
B-118
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
B-116
AutoCAD SHX Text
WORK ROOM
AutoCAD SHX Text
B-117
AutoCAD SHX Text
COPY
AutoCAD SHX Text
B-113
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
B-114
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
B-112
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
B-111
AutoCAD SHX Text
HALLWAY
AutoCAD SHX Text
B-110
AutoCAD SHX Text
M.TOILET
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
B-100
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
B-167
AutoCAD SHX Text
GUIDANCE CONFERENCE
AutoCAD SHX Text
B-165
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
B-163
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
B-153
AutoCAD SHX Text
TEACHERS
AutoCAD SHX Text
B-166A
AutoCAD SHX Text
PASSAGE
AutoCAD SHX Text
B-166
AutoCAD SHX Text
PASSAGE
AutoCAD SHX Text
W.TOILET
AutoCAD SHX Text
B-109
AutoCAD SHX Text
B-001
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
EXISTING COPY MACHINE
AutoCAD SHX Text
A Professional Corporation of Architects and Planners
AutoCAD SHX Text
713 CREEK ROAD, BELLMAWR, NEW JERSEY 08031 (856) 396-6200
AutoCAD SHX Text
1
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
PARTIAL FLOOR/SITE PLAN
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
PROJECT NAME:
AutoCAD SHX Text
CHERRY HILL PUBLIC SCHOOLS HENRY C. BECK MIDDLE SCHOOL NEW MAIN ENTRANCE SECURITY VESTIBULE & MAIN OFFICE ALTERATIONS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
20-11
AutoCAD SHX Text
6/26/2020
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
SHEET NOTES: 1. TEMPORARY PARTITION WALL - PROVIDE AS INDICATED ON PLAN. TEMPORARY WALL TO BE TEMPORARY PARTITION WALL - PROVIDE AS INDICATED ON PLAN. TEMPORARY WALL TO BE CONSTRUCTED OF METAL STUDS AND GYPSUM BOARD. BRACE WALL AS REQUIRED TO EXISTING CONSTRUCTION. SEAL WALL TO EXISTING CEILING & WALLS, TAPE & SPACKLE ALL SEAMS FOR DUST CONTROL. 2. TEMPORARY EGRESS - PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR ALTERNATE EGRESS TEMPORARY EGRESS - PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR ALTERNATE EGRESS ROUTES. BLANK OFF ANY EXIT SIGNS ASSOCIATED WITH TEMPORARILY INACCESSIBLE EGRESS DOORS. PROVIDE TEMPORARY 'MAIN ENTRANCE' SIGN IN COORDINATION WITH OWNER. 3. TEMPORARY CONSTRUCTION FENCING - PROVIDE TEMPORARY FENCING WITH SECURED ACCESS TEMPORARY CONSTRUCTION FENCING - PROVIDE TEMPORARY FENCING WITH SECURED ACCESS AT ASSIGNED AREA AS INDICATED ON PLAN FOR SECURE CONSTRUCTION MOBILIZATION & CONSTRUCTION MOBILIZATION & LAY-DOWN AREA. PORTION OF SIDEWALK (5'-0" MIN.) TO REMAIN ACCESSIBLE LOCATE ALL TEMPORARY FACILITIES WITHIN THE FENCED AREA. PROTECT ALL EXISTING SURFACES & RESTORE ANY DAMAGED WHEN COMPLETED
AutoCAD SHX Text
PRIMARY ACCESS POINT TO WORK AREA.
AutoCAD SHX Text
TEMPORARY MAIN ENTRANCE
AutoCAD SHX Text
3
Page 24: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

CSK-2

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 24 of 25

AutoCAD SHX Text
80 MIL BASE SHEET
AutoCAD SHX Text
1/2" RECOVERY BOARD(TYP.)
AutoCAD SHX Text
METAL DECK
AutoCAD SHX Text
OR STEEL& CONCRETE
AutoCAD SHX Text
[76.2mm] ON FIELD
AutoCAD SHX Text
SBS MODIFIED MEMBRANE FLASHING
AutoCAD SHX Text
PLY, 6" MIN. [152.4mm] ON FIELD
AutoCAD SHX Text
BASE FLASHING PLY 3" MIN.
AutoCAD SHX Text
FLEX CONDUIT
AutoCAD SHX Text
FOR CABLE & WIRE
AutoCAD SHX Text
160 MIL SBS MODIFIED MEMBRANE W/ MINERAL FINISH
AutoCAD SHX Text
ROOF CEMENT
AutoCAD SHX Text
PRIME FLANGE
AutoCAD SHX Text
PRE-FAB COPPER PITCH PAN
AutoCAD SHX Text
SET IN MASTIC
AutoCAD SHX Text
FILL W/ POURABLE SEALER
AutoCAD SHX Text
(BY ELECTRICAL CONTR.)
AutoCAD SHX Text
INSULATION, STAGGER ALL JOINTS, FASTEN PER SPECIFICATIONS SEE ROOF PLAN FOR THICKNESS OF INSULATION
AutoCAD SHX Text
80 MIL SBS BASE SHEET
AutoCAD SHX Text
SBS FLASHING MEMBRANE
AutoCAD SHX Text
(BY STEEL CONTR.)
AutoCAD SHX Text
OR GAS PIPE THRU-ROOF
AutoCAD SHX Text
(BY PLUMBING CONTR.)
AutoCAD SHX Text
A Professional Corporation of Architects and Planners
AutoCAD SHX Text
713 CREEK ROAD, BELLMAWR, NEW JERSEY 08031 (856) 396-6200
AutoCAD SHX Text
1
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
TYPICAL PITCH POCKET DETAIL
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
PROJECT NAME:
AutoCAD SHX Text
CHERRY HILL PUBLIC SCHOOLS HENRY C. BECK MIDDLE SCHOOL NEW MAIN ENTRANCE SECURITY VESTIBULE & MAIN OFFICE ALTERATIONS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
20-11
AutoCAD SHX Text
6/26/2020
Page 25: Addendum #1 Cherry Hill Beck MS GA# 20-11 06-29-20alianoconstruction.com/wp...1-Cherry-Hill...FINAL.pdfCHERRY HILL BOARD OF EDUCATION Henry C. Beck Middle School New Main Entrance

JOB NUMBER

JOB

SCALE

SHEET NO.

DATE

TITLE

SKM-1

06/26/2020

1/4" = 1'-0"

OF

LOW LEAKAGE MOTORIZED DAMPER

-

5974

25 Bala Avenue, Suite 204 , PO Box 120Bala Cynwyd, Pennsylvania 19004Phone: 610-664-0855 Fax 610-664-7150web: www.jfoxhvac.comemail: [email protected]

CHERRY HILL PUBLIC SCHOOLSHENRY C. BECK MIDDLE SCHOOL

MAIN ENTRANCE SECURITY VESTIBULE & MAIN OFFICE ALTERATIONS

Addendum #1 Henry C. Beck Middle School New Main Entrance Security Vestibule and Main Office Alterations

Page 25 of 25

AutoCAD SHX Text
251 S.F.
AutoCAD SHX Text
B-108
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
B-110
AutoCAD SHX Text
M.TOILET
AutoCAD SHX Text
W.TOILET
AutoCAD SHX Text
B-109
AutoCAD SHX Text
WARDROBE
AutoCAD SHX Text
3'x6' COPY MACHINE FOOTPRINT
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
B-109
AutoCAD SHX Text
WORK RM.
AutoCAD SHX Text
B-108
AutoCAD SHX Text
104 S.F.
AutoCAD SHX Text
20X14 (1935)
AutoCAD SHX Text
6X4
AutoCAD SHX Text
8X6
AutoCAD SHX Text
10
AutoCAD SHX Text
RG
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
VAV
AutoCAD SHX Text
5
AutoCAD SHX Text
165
AutoCAD SHX Text
EF
AutoCAD SHX Text
1
AutoCAD SHX Text
100
AutoCAD SHX Text
6
AutoCAD SHX Text
CD
AutoCAD SHX Text
1
AutoCAD SHX Text
115
AutoCAD SHX Text
6"
AutoCAD SHX Text
CD
AutoCAD SHX Text
1
AutoCAD SHX Text
50
AutoCAD SHX Text
6"
AutoCAD SHX Text
T
AutoCAD SHX Text
16
AutoCAD SHX Text
6"
AutoCAD SHX Text
DUCT UP TO GOOSENECK ON ROOF
AutoCAD SHX Text
17
AutoCAD SHX Text
18X16
AutoCAD SHX Text
14"
AutoCAD SHX Text
16x10
AutoCAD SHX Text
LOW LEAKAGE MOTORIZED DAMPER
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
FOX & ASSOCIATES
AutoCAD SHX Text
INCORPORATED
AutoCAD SHX Text
MECHANICAL NEW WORK FLOOR PLAN
AutoCAD SHX Text
SCALE: "=1'-0"14"=1'-0"