    Content

    BackgroundMain drivers of PBRCs in PNG

    Capacity building of domesticcontractors

    Main benefits after 1stpilot projects

    Role of ADB in 1stpilot project &future recommendations

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    3/21

    3

    Papua New Guinea (PNG)

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    4/21

    Road transport in PNG Past

    Implementation Challenges

    National Road Authority (NRA)

    Long-Term Performance

    Based Maintenance (LPTBM) -Present Future

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    5/21

    PNG joined ADB1971 1st project1972, Road Improvement

    PNG independent - 16 September 1975

    Road conditions deteriorating fast 1st road maintenance project in 1999

    (27 years from 1972)

    Traditional contracting (input-based)

    35% in good conditions

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    6/21

    Lack of funding

    Underdeveloped local contracting

    Dept. of Works (DOW) Capacity

    People & Market capability issue

    Long delay vs cost increase

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    7/21

    Kina (PGK), million % total expenditure

    0%

    5%

    10%

    15%

    20%

    0

    250

    500

    750

    1,000

    1974 79 84 89 94 99 04 09 14

    Land transport expenditure (PGK), lhs

    Land transport expenditure (% total), rhsrhs

    Contracting Hiatus1995 - PTBDissolved

    1975 -Independent

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    8/21Source: http://devpolicy.org/road-management-in-papua-new-guinea-part-1-the-maintenance-challenge-20140903/

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    9/21

    DOW budget appropriation and disbursements (2008-2014)

    0

    0.25

    0.5

    0.75

    1

    1.25

    0

    400

    800

    1,200

    1,600

    2,000

    08 09 10 11 12 13e 14p

    Recurrent Budget appropriation (Kina, million), lhs

    Capital Budget appropriation (Kina, million), lhs

    % Recurrent Budget disbursed, rhs

    % Capital Budget disbursed, rhs

    Source: National Budget Documents (various years), ADB calculations.

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    10/21

    NRA established by an Act 2003

    Road Fund was also established

    Main objectivesRaise Revenue thru RUC

    Plan, program and manage theroad network

    10

    Main Drivers of Testing PBRCs

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    11/21

    2,500km transferred by Works Dept. to NRAPBRC models

    Traditional input-based (Hybrid) Contracts

    (2009-2011- 6 Contracts)Trial PBRC 5 Years Duration - ADB MFF

    Programs 3 Contracts

    Service Level Contracts for 3 years -19Contracts

    10 Years PBRCin 2015 (ADB MFF Tranche 1)11

    Main Drivers of Testing PBRCs

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    12/21

    12

    Main Drivers of Testing PBRCs

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    13/21

    13

    Main Drivers of Testing PBRCs

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    14/21

    Contractor Development

    8 small to medium contractors throughout PNG

    New Players developed under PBRC

    Contracts all under $5m

    Paid monthly on LOS on fixed lump sum

    Variable outcomes

    Local economic conditions (rates,

    populations density) Contractor/People (Public Relations) issues

    Contractor submitting irregular claims

    o

    Less amount of work done 14

    Capacity Building of Domestic Contractors

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    15/21

    Source: ADB survey, 20143.

    0

    1

    2

    3

    4

    5

    6

    Largest Contract Size Completed in the last 5 Years

    >$7 mil

    $5 - 7 mil

    $3 - 5 milFirms

    Contract size (PGK)

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    16/21

    Population = > 7.3 million Population 15% urban, 85%

    rural/remote Circa 3% tertiary education

    Vocational trainingidem

    Land ownership 97%customary

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    17/21

    Examples of benefits

    Assets Management System

    improved

    PBRCs developed

    17

    Main Benefits after 1st Pilot Projects

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    18/21

    Dos & Donts from 1st Pilot Projects

    Dos

    Pilot Trials

    Initial Expert

    Support/Advisors

    Contractor

    Capacity

    Development

    Donts

    Avoid Short Sections.

    Go for networks

    Avoid roads with

    high maintenance

    needs

    Avoid Contractors

    without good

    reputation

    18

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    19/21

    Piloting LTPBM through MFF - T1&2

    Upgrade & maintain in one contract10

    years (2 ongoing)

    Bigger package = bigger & more bidders

    Contractors preference good news!

    Sustainability? Increase private sectorparticipation

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    20/21

    Improve LTPBM in MFF - T3&4

    Design, Build/upgrade & Maintenance

    (DBM) contract 10-15 years. Restructure project design with private

    sector inputs

    Longer road sections Network

    Big contractors build local capacity

  • 8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract

    21/21

    21

    Future focus Capacity Development

    Increase Revenue

    Maintain a Network on a PBRC

    basis

    Improve Procurement & Other

    Govt Agency Issues Involve more private sector