8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
1/21
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
2/21
2
Content
BackgroundMain drivers of PBRCs in PNG
Capacity building of domesticcontractors
Main benefits after 1stpilot projects
Role of ADB in 1stpilot project &future recommendations
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
3/21
3
Papua New Guinea (PNG)
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
4/21
Road transport in PNG Past
Implementation Challenges
National Road Authority (NRA)
Long-Term Performance
Based Maintenance (LPTBM) -Present Future
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
5/21
PNG joined ADB1971 1st project1972, Road Improvement
PNG independent - 16 September 1975
Road conditions deteriorating fast 1st road maintenance project in 1999
(27 years from 1972)
Traditional contracting (input-based)
35% in good conditions
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
6/21
Lack of funding
Underdeveloped local contracting
Dept. of Works (DOW) Capacity
People & Market capability issue
Long delay vs cost increase
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
7/21
Kina (PGK), million % total expenditure
0%
5%
10%
15%
20%
0
250
500
750
1,000
1974 79 84 89 94 99 04 09 14
Land transport expenditure (PGK), lhs
Land transport expenditure (% total), rhsrhs
Contracting Hiatus1995 - PTBDissolved
1975 -Independent
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
8/21Source: http://devpolicy.org/road-management-in-papua-new-guinea-part-1-the-maintenance-challenge-20140903/
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
9/21
DOW budget appropriation and disbursements (2008-2014)
0
0.25
0.5
0.75
1
1.25
0
400
800
1,200
1,600
2,000
08 09 10 11 12 13e 14p
Recurrent Budget appropriation (Kina, million), lhs
Capital Budget appropriation (Kina, million), lhs
% Recurrent Budget disbursed, rhs
% Capital Budget disbursed, rhs
Source: National Budget Documents (various years), ADB calculations.
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
10/21
NRA established by an Act 2003
Road Fund was also established
Main objectivesRaise Revenue thru RUC
Plan, program and manage theroad network
10
Main Drivers of Testing PBRCs
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
11/21
2,500km transferred by Works Dept. to NRAPBRC models
Traditional input-based (Hybrid) Contracts
(2009-2011- 6 Contracts)Trial PBRC 5 Years Duration - ADB MFF
Programs 3 Contracts
Service Level Contracts for 3 years -19Contracts
10 Years PBRCin 2015 (ADB MFF Tranche 1)11
Main Drivers of Testing PBRCs
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
12/21
12
Main Drivers of Testing PBRCs
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
13/21
13
Main Drivers of Testing PBRCs
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
14/21
Contractor Development
8 small to medium contractors throughout PNG
New Players developed under PBRC
Contracts all under $5m
Paid monthly on LOS on fixed lump sum
Variable outcomes
Local economic conditions (rates,
populations density) Contractor/People (Public Relations) issues
Contractor submitting irregular claims
o
Less amount of work done 14
Capacity Building of Domestic Contractors
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
15/21
Source: ADB survey, 20143.
0
1
2
3
4
5
6
Largest Contract Size Completed in the last 5 Years
>$7 mil
$5 - 7 mil
$3 - 5 milFirms
Contract size (PGK)
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
16/21
Population = > 7.3 million Population 15% urban, 85%
rural/remote Circa 3% tertiary education
Vocational trainingidem
Land ownership 97%customary
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
17/21
Examples of benefits
Assets Management System
improved
PBRCs developed
17
Main Benefits after 1st Pilot Projects
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
18/21
Dos & Donts from 1st Pilot Projects
Dos
Pilot Trials
Initial Expert
Support/Advisors
Contractor
Capacity
Development
Donts
Avoid Short Sections.
Go for networks
Avoid roads with
high maintenance
needs
Avoid Contractors
without good
reputation
18
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
19/21
Piloting LTPBM through MFF - T1&2
Upgrade & maintain in one contract10
years (2 ongoing)
Bigger package = bigger & more bidders
Contractors preference good news!
Sustainability? Increase private sectorparticipation
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
20/21
Improve LTPBM in MFF - T3&4
Design, Build/upgrade & Maintenance
(DBM) contract 10-15 years. Restructure project design with private
sector inputs
Longer road sections Network
Big contractors build local capacity
8/11/2019 ADBTF14_C1 PNG Experience on Long Term Performance Based Maintenance Contract
21/21
21
Future focus Capacity Development
Increase Revenue
Maintain a Network on a PBRC
basis
Improve Procurement & Other
Govt Agency Issues Involve more private sector
participation