ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER TRASH PILE SMOLDERING APPROX 65’ FROM FUELLER – PILE CONTAINS CANISTERS AND OTHER DEBRI FUEL TRUCK FOUND UNATTENDED OUTSIDE THE WIRE MOTOR POOL OUTSIDE THE WIRE, WITH ONLY 3 SIDES C WIRE – OPEN TO LOCALS NO GUARDS POSTED AT MOTOR POOL RUN-DOWN RESIDENTIAL AREA IN THE VICINITY OF THE LSA & MOTOR POOL DERELICT/ABANDONED BUILDINGS IN THE AREA, OUTSIDE

ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

Embed Size (px)

Citation preview

Page 1: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE:

BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT

MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

TRASH PILE SMOLDERING APPROX 65’ FROM FUELLER – PILE CONTAINS CANISTERS AND OTHER DEBRI

FUEL TRUCK FOUND UNATTENDED OUTSIDE THE WIRE

MOTOR POOL OUTSIDE THE WIRE, WITH ONLY 3 SIDES C WIRE – OPEN TO LOCALS

NO GUARDS POSTED AT MOTOR POOL

RUN-DOWN RESIDENTIAL AREA IN THE VICINITY OF THE LSA & MOTOR POOL

DERELICT/ABANDONED BUILDINGS IN THE AREA, OUTSIDE THE PERIMETER

LSA IS OUTSIDE OF MAIN INSTALLATION AND EASY TO APPROACH FROM ALL SIDES

Page 2: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT

PLACEMENT OF ONE BOX FULL OF METALIC & OTHER DEBRI IS PRECISELY AT THE POINT DESIGNATED AS “U.S.” MOTOR POOL

A SECOND EMPTY BOX IS LOCATED OFF THE ROAD, NEAR AN ABANDONED BUILDING.

THE BOXES COULD BE OF NO IMPORTANCE, OR THEY COULD BE USED TO CONCEAL AN IED. THEY COULD HAVE BEEN PLACED BY PERSONS WITH NEFARIOUS INTENT, OR AS A TEST TO SEE HOW THE U.S. WOULD REACT.

NO REACTION TO POTENTIALLY THREATENING CIRCUMSTANCES COULD SIGNAL WEAKNESS ON OUR PART, AND EMBOLDEN TERRORISTS.

SUGGESTED MITIGATION: HN REMOVE THE BOXES IMMEDIATELY(NOT TO BE MOVED BY U.S. PERSONNEL, AS THERE IS NO K-9/EOD SUPPORT)

Page 3: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

BOX OF DEBRI AT U.S. MOTOR POOL ENTRANCE

Page 4: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

EMPTY BOX CLOSE TO MOTOR POOL ROAD

Page 5: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

LOCATION OF BOXES

Page 6: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER:THE LSA IS LOCATED SEPARATELY FROM THE MAIN INSTALLATION, AND IS ACCESSIBLE TO THE LOCAL POPULATION FROM ALL DIRECTIONS.

ON 2 JUNE THERE WERE ONLY 2 HN SECURITY GUARDS POSTED AT THE LSA ECP.

TREES PROVIDE CONCEALED MOVEMENT FOR UNAUTHORIZED PERSONS TO REACH THE PERIMETER.

THERE ARE MULTIPLE SEVERE BREACHES THAT A LARGE ADULT CAN EASILY FIT THROUGH (I DID).

SUGGESTED MITIGATION: HN EMPLACE C WIRE AROUND THE ENTIRE INSIDE PERIMETER. (NOT POSSIBLE OUTSIDE DUE TO TREES . NO STANDOFF AREA).

REQUEST HN INCREASE AREA PATROLS.

U.S. PERSONNEL CONDUCT REGULAR WALK AROUND INSIDE PERIMETER.

Page 7: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

NOT ALL HOLES & BREACH POINTS ARE DEPICTED. THERE ARE MANY.

Page 8: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER
Page 9: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

INCIDENT:

UNKNOWN PERSON(S) AT AN UNKNOWN TIME ACCESSED THE INTERIOR OF THE LSA AND SPRAY PAINTED GRAFFITI ON ONE OF THE TENTS. DISCOVERED DURING WALK AROUND THE PERIMETER ON 2 JUNE.

MITIGATION: REGULAR INSPECTIONS OF THE INTERIOR PERIMETER BY U.S. PERSONNEL AS A DETERRENT, AND TO LOOK FOR FURTHER ACTS OF VANDALISM.

ALL INCIDENTS ARE TO BE IMMEDIATELY REPORTED TO THE ON-SIGHT COMMANDER, ON-SIGHT ATO, HIGHER COMMANDER AND ATO, AND HN SECURITY.

Page 10: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

GRAFFITI

Page 11: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

LOCATION OF GRAFFITI

Page 12: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

TRASH PILE SMOLDERING NEAR FUELLER:

THE FUELLER WAS LOCATED OUTSIDE THE PERIMETER WITH NO SECURITY.

IT WAS NEXT TO AN ABANDONED BUILDING, AND APPROXIMATELY 65’ FROM A PILE OF SMOLERING TRASH, WHICH CONTAINED CANNISTERS AND OTHER DEBRI.

THE CANNISTERS COULD BE OF NO IMPORTANCE, OR THEY COULD BE DANGEROUS. THEY COULD HAVE BEEN PLACED BY PERSONS WITH NEFARIOUS INTENT, OR AS A TEST TO SEE HOW THE U.S. WOULD REACT.

NO REACTION TO POTENTIALLY THREATENING CIRCUMSTANCES COULD SIGNAL WEAKNESS ON OUR PART, AND EMBOLDEN TERRORISTS.

THIS SITUATION WAS BROUGHT TO THE ATTENTION OF CPT ESCOFFERY, AND THE FUELLER WAS IMMEDIATELY MOVED TO A LOCATION CLOSER TO THE LSA, AND FAR AWAY FROM THE TRASH PILE.

Page 13: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

SMOLDERING TRASH PILE NEAR FUELLER

Page 14: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

TRASH PILE CONTINUED:

THERE IS A CONTINUED THREAT TO THE HEALTH OF U.S. PERSONNEL FROM THE TOXIC SMOKE. THE WIND CAN CARRY IT TO THE LSA, AND MOTOR POOL.

THE TRASH PILE IS OUTSIDE THE INSTALLATION, ACCESSIBLE TO THE LOCAL POPULATION.

MITIGATION: REQUEST HN TO EXTINGUISH THE TRASH PILE FIRE, AND PROHIBIT FURTHER DUMPING THERE FOR THE EXERCISE DURATION.

PROHIBIT U.S. PERSONNEL FROM APPROACHING THE TRASH PILE.

Page 15: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

LOCATION OF TRASH PILE

Page 16: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

FUEL TRUCK FOUND UNATTENDED OUTSIDE THE WIRE:

MITIGATION: WHILE THE FUELLER HAS BEEN MOVED AWAY FROM THE TRASH PILE, IT IS STILL OUTSIDE THE LSA PERIMETER.

THE ON-SITE ATO SHOULD EVALUATE THE NEW LOCATION OF THE FUELLER FOR STANDOFF DISTANCE TO U.S. PERSONNEL LIVING QUARTERS.

THE FUELLER SHOULD BE GUARDED AT ALL TIMES BY U.S. PERSONNEL.

Page 17: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

UNGUARDED MOTOR POOL OUTSIDE THE WIRE:

THE MOTOR POOL IS LOCATED OUTSIDE THE MAIN INSTALLATION, IN AN OPEN AREA ACCESSIBLE TO THE LOCAL POPULATION FROM ALL DIRECTIONS.

THERE IS C WIRE AROUND 3 SIDES OF THE MOTOR POOL, LEAVING THE MOTOR POOL COMPLETELY OPEN TO THE SIDE FACING THE ADJACENT ROAD.

THERE WERE NO GUARDS PRESENT.

MITIGATION: IF POSSIBLE, MOVE THE U.S. VEHICLES TO A MORE SECURE AREA.

IF IT IS NOT POSSIBLE TO MOVE THE VEHICLES , THEY SHOULD BE GUARDED 24/7.

REQUEST HN TO INCREASE SECURITY PATROLS AROUND THE MOTOR POOL AREA.

Page 18: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

C WIRE ONLY AROUND 3 SIDES

Page 19: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

RUN-DOWN RESIDENTIAL AREA:

DUE TO THE PROXIMITY TO THE LSA & MOTOR POOL, AND THE FACT THAT BOTH ARE LOCATED OFF THE MAIN INSTALLATION, IT IS REASONABLE TO ASSUME CURIOUS LOCALS OR CRIMINALS WILL TRY TO GAIN ACCESS.

ONE KNOWN ACT OF VANDALISM ON THE LSA HAS ALREADY OCCURRED.

MITIGATION: REQUEST HN INCREASE SECURITY OF THE LSA AND MOTOR POOL.

REQUEST HN POST “KEEP OUT” TYPE SIGNS AROUND THE LSA AND MOTOR POOL.

THE VISIBLE PRESENCE OF U.S. PERSONNEL GUARDING THE MOTOR POOL & FUELLER, AND CONDUCTING INTERIOR PERIMETER INSPECTIONS WILL ACT AS A DETERRANT TO UNAUTHORIZED PERSONS.

Page 20: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

DERELICT/ABANDONED BUILDINGS:

POTENTIAL HIDING PLACES FOR UNAUTHORIZED PERSONS.

PHYSICAL DANGER TO CURIOUS U.S. PERSONNEL.

MITIGATION: PROHIBIT U.S. PERSONNEL FROM ENTERING THE BUILDINGS.

Page 21: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

POTENTIAL FOR OBSERVATION OF U.S. BY UNAUTHORIZED PERSONS

Page 22: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

LOCATION OF DERELICT BLDGS IN ADDITION TO ALL LSA BLDGS

Page 23: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

ADAZI MAIN INSTALLATION AT/FP ISSUES:

MAIN GATE:

HAS ONLY DROP BAR BARRIER

POV’S PARKED IMMEDIATELY OUTSIDE THE GATE

NO SERPENTINE TO SLOW TRAFFIC

NO SEPARATE VEHICLE SEARCH LANE

INTERIOR:

ORDINANCE USED AS DECORATION THROUGHOUT THE INSTALLATION

Page 24: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

MITIGATION:

MAIN GATE: REQUEST HN RESTRICT POV PARKING.

REQUEST HN SEARCH NON-MILITARY VEHICLES ENTERING THE INSTALLATION.

REQUEST HN EMPLACE BARRIERS TO SLOW IN-COMING TRAFFIC.

Page 25: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

MITIGATION:

INSTALLATION INTERIOR:

ADVISE U.S. PERSONNEL TO STAY AWAY FROM ORDINANCE.

ASK HN TO DETERMINE THE STATUS OF THE ORDINANCE.

Page 26: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

DIRECTION TO ON-SITE ATO:

IMMEDIATELY REQUEST HN REMOVE THE BOXES NEAR THE MOTOR POOL.

REQUEST HN EMPLACE C WIRE AROUND THE ENTIRE INSIDE LSA PERIMETER.

REQUEST HN INCREASE LSA AREA AND MOTOR POOL PATROLS.

DIRECT U.S. PERSONNEL TO CONDUCT REGULAR WALKS AROUND THE INSIDE LSA PERIMETER.

REQUEST HN EXTINGUISH THE TRASH PILE FIRE, AND PROHIBIT FURTHER DUMPING THERE FOR THE EXERCISE DURATION.

PROHIBIT U.S. PERSONNEL FROM APPROACHING THE TRASH PILE.

Page 27: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

DIRECTION TO ON-SITE ATO CONTINUED:

EVALUATE THE NEW LOCATION OF THE FUELLER FOR STANDOFF DISTANCE TO U.S. PERSONNEL LIVING QUARTERS. ASSIST WITH APPROPRIATE RELOCATION IF NECESSARY.

ENSURE THE FUELLER IS GUARDED AT ALL TIMES BY U.S. PERSONNEL.

DETERMINE IF IT IS POSSIBLE TO MOVE THE U.S. VEHICLES TO A MORE SECURE AREA.

ENSURE THE VEHICLES ARE GUARDED 24/7.

REQUEST HN POST “KEEP OUT” TYPE SIGNS AROUND THE LSA AND MOTOR POOL.

PROHIBIT U.S. PERSONNEL FROM ENTERING DERELICT/ABANDONED BUILDINGS.

Page 28: ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER

DIRECTION TO ON-SITE ATO CONTINUED:

COORDINATE WITH HN REGARDING MAIN GATE CONCERNS.

ADVISE U.S. PERSONNEL TO STAY AWAY FROM ORDINANCE.

ASK HN TO DETERMINE THE STATUS OF ORDINANCE ON THE INSTALLATION .

ASK HN TO INTERPRET THE GRAFFITI ON THE TENT. IS IT ANTI-US?

FOLLOW UP WITH HIGHER ATO & REQUEST ASSISTANCE AS NECESSARY.