11/25/2019 - Page 1 of 68 TABLE OF CONTENTS Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects of Similar Size and Complexity 44 4 Design-Build A/E Past Performance 64 5 Design-Build Construction Past Performance 66 6 Team’s Benefit and Integration into Project 68

Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 1 of 68    

TABLE OF CONTENTS 

Adaptive Reuse of Cove Church

Tab Technical Proposal Page 1 General Firm Information 3

2 Project Team Organization 22

3 Projects of Similar Size and Complexity 44

4 Design-Build A/E Past Performance 64

5 Design-Build Construction Past Performance 66

6 Team’s Benefit and Integration into Project 68 

Page 2: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 2 of 68  

November 25, 2019 Allison Hennie, RA City of Lakewood Planning and Development 12650 Detroit Avenue Lakewood, Ohio 44107 Dear Allison, We are happy to submit our qualifications for this unique repurposing of Cove Church. Our team is a union of Moody-Nolan (MN) leading the architectural, interior design and community engagement; and Infinity Construction Co, Inc. (Infinity) who will hold the design build contract and lead the field construction. Our specialty consultants include:

It is easy to get excited about the redevelopment potential of Cove Church. Re-envisioning the interior and exterior spaces sparks the imagination. Our review of your program reveals that there is no lack of vision and design energy. We see three key priorities. First, to transform the sense of solitude, twilight and restraint one feels today visiting the site, into a welcoming, bright and energized community center. Second, to align stakeholder expectations with very real budget constraints. Third, to engage the community in the design and budget process with the goal of achieving buy-in, long before we hammer the first nail.

We hope that the talent we have assembled, our past experience and our design vision earns us the opportunity to move ahead in your selection process.

Sincerely, Charles A. Izzo, DB Team Principal-in-Charge

Osborn Engineering Structural, Mechanical, Electrical, Plumbing & Technology

Moody Engineering LLC Civil Engineering Deru Landscape Architecture Landscape Architecture TriMark/SSKemp Food Service Designer

Page 3: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

Section 1 General Firm Information

YOUTH COLLABORATION AND ACTIVITY SPACE 

CMSD – Whitney Young K‐8 School 

Page 4: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 3 of 68  

1 ‐ GENERAL FIRM INFORMATION D/B Construction Manager 

Adaptive Reuse of Cove Church

CHARACTER We believe that every client has a vision that drives why they build or renovate their work space. Your vision, not ours, is the priority of every Infinity professional, so we have a commitment to unmatched customer service. Our lean corporate structure also makes us exceptionally flexible one of the most economically competitive providers of Class A construction services.

CAPACITY Infinity Incorporated in Ohio 11/20/96 as a C-Corp. Its corporate officers, and equal owners include: Charles A. Izzo – President, George F. Nemeth – Vice President, Secretary/Treasurer and Jim Fantozzi – Vice President. Infinity employs a 35-member professional staff and between 25-40 craft trades.

We provide General Contracting, Construction Management, and Design-Build services throughout the State of Ohio. Our major markets include Healthcare, Office, Public and Non-Profit, Sports/Recreation and Retail. Our headquarters is a 25,000-sf office and shop/warehouse facility in Warrensville Heights. We have a branch office in Toledo. Since its beginning in January 1997, Infinity has contracted for more than $850 million worth of work with average annual volumes currently at $80+ million.

Cleveland Office Toledo Office 18440 Cranwood Parkway

Warrensville Heights, Ohio 44128 216-663-3777 (Office)

216-663-3778 (Facsimile)

745 Capital Commons Drive, Suite A Toledo, Ohio 43615

419-865-7100 (Office) 419-865-7102 (Facsimile)

Page 5: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 4 of 68  

1 ‐ GENERAL FIRM INFORMATION D/B Construction Manager 

Adaptive Reuse of Cove Church

Page 6: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 5 of 68    

1 ‐ GENERAL FIRM INFORMATION D/B Architect, Interior Designer, Community Engagement Consultant 

Adaptive Reuse of Cove Church

Page 7: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 6 of 68    

1 ‐ GENERAL FIRM INFORMATION D/B Architect, Interior Designer, Community Engagement Consultant 

Adaptive Reuse of Cove Church

Page 8: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 7 of 68    

1 ‐ GENERAL FIRM INFORMATION D/B Architect, Interior Designer, Community Engagement Consultant 

Adaptive Reuse of Cove Church

Page 9: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 8 of 68  

1 ‐ GENERAL FIRM INFORMATION Civil Engineer 

Adaptive Reuse of Cove Church

Page 10: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 9 of 68  

1 ‐ GENERAL FIRM INFORMATION Civil Engineer 

Adaptive Reuse of Cove Church

Page 11: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 10 of 68  

1 ‐ GENERAL FIRM INFORMATION Civil Engineer 

Adaptive Reuse of Cove Church

Page 12: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 11 of 68  

1 ‐ GENERAL FIRM INFORMATION Civil Engineer 

Adaptive Reuse of Cove Church

Page 13: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 12 of 68  

1 ‐ GENERAL FIRM INFORMATION Structural, MEP, Fire Protection and Technology Engineers  

Adaptive Reuse of Cove Church

Page 14: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 13 of 68  

1 ‐ GENERAL FIRM INFORMATION Structural, MEP, Fire Protection and Technology Engineers  

Adaptive Reuse of Cove Church

Page 15: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 14 of 68  

1 ‐ GENERAL FIRM INFORMATION Structural, MEP, Fire Protection and Technology Engineers  

Adaptive Reuse of Cove Church

Page 16: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 15 of 68  

1 ‐ GENERAL FIRM INFORMATION Structural, MEP, Fire Protection and Technology Engineers  

Adaptive Reuse of Cove Church

Page 17: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 16 of 68  

1 ‐ GENERAL FIRM INFORMATION Landscape Engineer  

Adaptive Reuse of Cove Church

Page 18: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 17 of 68  

1 ‐ GENERAL FIRM INFORMATION Landscape Engineer  

Adaptive Reuse of Cove Church

Page 19: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 18 of 68  

1 ‐ GENERAL FIRM INFORMATION Landscape Engineer  

Adaptive Reuse of Cove Church

Page 20: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 19 of 68  

1 ‐ GENERAL FIRM INFORMATION Foodservice Equipment, Supplies & Design Consultant  

Adaptive Reuse of Cove Church

Page 21: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 20 of 68  

1 ‐ GENERAL FIRM INFORMATION Foodservice Equipment, Supplies & Design Consultant  

Adaptive Reuse of Cove Church

Page 22: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 21 of 68  

1 ‐ GENERAL FIRM INFORMATION Foodservice Equipment, Supplies & Design Consultant  

Adaptive Reuse of Cove Church

Page 23: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

Section 2 Project Team Organization

EDUCATIONAL SERVICES 

Reeb Avenue Community Center 

Page 24: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 22 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

In this section, you will find an organization chart on the next page, followed by one-page resumes for each of our key staff members. Below we answer your two additional questions.

ANTICIPATED WORKING RELATIONSHIP. Infinity will hold the design build contract and have the legal and financial responsibility for meeting its terms. Infinity has direct experience with all of the sub-consultants on this project with the exception of DERU Landscape Architects.

WORKLOAD CONSIDERATIONS. Combined, Infinity, MN and their consulting partners have more than 500 architectural, engineering and construction professionals available to service projects. Should schedule requirements change, we have the capacity to add professional staff as necessary to accelerate the schedule or to cover multiple shifts.

Page 25: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 23 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 26: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 24 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Charles Izzo  Recent and Relevant Projects  A l l  va lues   i n  2019  do l l a r s Warrensville Heights PK-5 School

117,500-sf New Construction $29.4 million CMR, completes 07/2020

St. Matthew’s Church

5,187-sf Great Hall Renovation $0.8 million CMR, completed 08/2019

Lakewood Urgent Care

Title  7,360-sf conversion D/B Principal-In-Charge $1.3 million, completed 01/2017 Experience  Parker Hannifin Downtown YMCA 40 years, 22 @ Infinity 40,045-sf conversion $10 million CMR, completed 03/2016 Education B. S. Civil Engineering Lakewood High School Villanova University 13,536-sf Cafeteria Renovation M.B.A. Cleveland State University $1 million, completed 01/2015 Role in Project Mr. Izzo, President of Infinity, is responsible for sales and marketing, finance, planning and forecasting, and general management of the firm. He manages all contractual business issues for the project on behalf of the company.

Lakewood Public Library 93,000-sf new and renovation

$11 million, completed 03/2013

Warrensville Heights YMCA 46,000-sf new construction

$11.5 million CMR, completed 04/2012

CCF - Lakewood Hospital 10 projects

$4 million, last completed 05/2010

Page 27: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 25 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

George Nemeth  Recent and Relevant Projects  A l l  va lues   i n  2019  do l l a r s Warrensville Heights PK-5 School

117,500-sf New Construction $29.4 million CMR, completes 07/2020

St. Matthew’s Church

5,187-sf Great Hall Renovation $0.8 million CMR, completed 09/2019

Lakewood Urgent Care

Title  7,360-sf conversion Vice President – Preconstruction Services $1.3 million, completed 01/2017 Experience  Parker Hannifin Downtown YMCA 33 years, 22 @ Infinity 40,045-sf conversion $10 million CMR, completed 03/2016 Education B. S. Construction Management Lakewood High School Bowling Green State University 13,536-sf Cafeteria Renovation $1 million, completed 01/2015 Role in Project As Vice President of Preconstruction Services, George manages a staff of six full-time estimators. His team provides GMP estimating services, value engineering, constructability, first cost v. long term cost benefit studies, and general contracting lump sum bidding efforts totaling more than $150 million annually.

Lakewood Public Library

93,000-sf new and renovation $11 million, completed 03/2013

Warrensville Heights YMCA

46,000-sf new construction $11.5 million CMR, completed 04/2012

CCF - Lakewood Hospital

10 projects $4 million, last completed 05/2010

Page 28: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 26 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Josh Williams  Recent and Relevant Projects  A l l  va lues   i n  2019  do l l a r s Warrensville Heights PK-5 School

117,500-sf new construction $29.4 million CMR, completes 07/2020

City of Green

13,344-sf new fire station $4.1 million CMR, completes 05/2020

Greater Cleveland Partnership

Title  5,984-sf office renovation Senior Project Estimator $0.6 million, completed 07/2019 Experience  City of North Ridgeville 15 years, 11 @ Infinity 23,767-sf new fire station $6.9 million, completed 07/2019 Education B. S. Construction Eng. Technology McDonald’s Corporation University of Akron 9,050-sf office renovation $1.3 million CMR, completed 02/2019 Certifications / Affiliations OSHA-30, CPR/AED Echo Health, Inc. 17,111-sf office renovation Role in Project Drawing on his experience and our database of previous projects, Josh creates the first reconciliation estimate, updates at each drawing milestone, value engineering, constructability assessment, and cost studies to help the Project Team make informed decisions about different design and construction options.

$3.5 million CMR, completed 11/2018

City of Beachwood 25,000-sf new fire station #2

$10 million, last completed 08/2018

Buckingham Doolittle & Burroughs 25,755-sf office renovation

$1.6 million CMR, completed 05/2018

Page 29: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 27 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Tim Boyle  Recent and Relevant Projects  A l l  va lues   i n  2019  do l l a r s Village of Woodmere

6,410-sf police and fire renovation $0.7 million CMR, completes 11/2019

St. Matthew’s Church

5,187-sf Great Hall Renovation $0.8 million CMR, completed 08/2019

Minc, LLC

Title  5,569-sf office renovation Senior Project Manager $0.8 million, completed 07/2019 Experience  Greater Cleveland Partnership 24 years, 10 @ Infinity 5,984-sf office renovation $0.6 million, completed 07/2019 Education B. S. Construction Management Victory Capital Management Bowling Green State University 6,800-sf office renovation $0.5million CMR, completed 02/2019 Certifications / Affiliations OSHA-30, CPR/AED, ICRA-Certified(2022) Merrill Lynch 21,818-sf office renovation Role in Project Tim is responsible for meeting the budget and schedule and all staff performance. He leads the purchasing effort, administers the trade contracts, conducts all Owner-Architect-Construction Manager meetings, and prepares all project reports.

$0.5 million CMR, completed 03/2018

World Shipping, Inc. 131,500-sf office renovation

$3.6 million CMR, completed 01/2018

Ohio Operating Engineers 17,230-sf new training center

$1.9 million, completed 01/2017

Page 30: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 28 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Joe Notarberardino  Recent and Relevant Projects  A l l  va lues   i n  2019  do l l a r s

City of Green 13,344-sf new fire station

$4.1 million CMR, completes 05/2020

City of North Ridgeville 23,767-sf new fire station

$6.9 million, completed 07/2019

Wooster Community Hospital Title  89,200-sf new cancer center Project Superintendent $26.2 million, completed 12/2017 Experience  UH - Kent Urgent Care 24 years, 9 @ Infinity 15,600-sf ED renovation $4.5 million, completed 06/2017 Education B. S. Construction Mgmt. Technology Choice One Development Bowling Green State University 32,575-sf new dialysis center $8.9 million, completed 08/2016 Certifications / Affiliations OSHA-30, CPR/AED (2020) Parker Hannifin Downtown YMCA 40,045-sf conversion Role in Project Joe oversees subcontractor, scheduling material and labor, inspection of materials and workmanship, providing field safety training, and coordinating on-site operations. He communicates daily with the City to stage and coordinate daily work activities to complete safely, on-schedule and within budget.

$10 million CMR, completed 03/2016

Cuyahoga Community College 23,000-sf Mandel Humanities Center reno.

$1.5 million, completed 01/2016

Oberlin College 16,900-sf Knowlton Athletic Center

$13.3 million, completed 08/2014

Page 31: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 29 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Jennifer Kless  Recent and Relevant Projects  A l l  va lues   i n  2019  do l l a r s

Warrensville Heights PK-5 School 117,500-sf New Construction

$29.4 million CMR, completes 07/2020

St. Matthew’s Church 5,187-sf Great Hall Renovation

$0.8 million CMR, completed 09/2019

Lakewood Urgent Care Title  7,360-sf conversion Subcontracts Administrator $1.3 million, completed 01/2017 Experience  Parker Hannifin Downtown YMCA 23 years, 16 @ Infinity 40,045-sf conversion $10 million CMR, completed 03/2016 Role in Project Jennifer is responsible specifically for managing the administrative interactions with subcontractors including their subcontracts, sub-subcontracts, maintaining current insurance, bonding, worker compensation requirements, processing requests for payment, purchase orders, requests for information and other submittals.

Lakewood High School

13,536-sf Cafeteria Renovation $1 million, completed 01/2015

Lakewood Public Library

93,000-sf new and renovation $11 million, completed 03/2013

Warrensville Heights YMCA

46,000-sf new construction $11.5 million CMR, completed 04/2012

CCF - Lakewood Hospital

10 projects $4 million, last completed 05/2010

Page 32: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 30 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 33: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 31 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 34: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 32 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 35: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 33 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 36: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 34 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 37: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 35 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 38: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 36 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 39: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 37 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 40: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 38 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 41: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 39 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 42: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 40 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 43: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 41 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 44: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 42 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 45: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 43 of 68  

2 – PROJECT TEAM ORGANIZATION 

Adaptive Reuse of Cove Church

Page 46: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

Section 3 Projects of Similar Scope and Complexity

GREAT HALL – 

GATHERING SPACE 

St. Matthew’s Church

Page 47: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 44 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

DESCRIPTION. As architect, Moody Nolan provided design and engineering services while as construction manager, Infinity completed interior demolition and reconstruction of an occupied two-story retail mall space attached to the 40-story Tower at Erieview office building. This new Parker Hannifin Downtown YMCA includes a first-floor aquatics suite and three-lane pool over an existing underground parking garage, two levels of work-out facilities with natural daylight, a spa, sauna, massage therapy, locker rooms and administrative space. It also includes a MetroHealth on-site sports clinic. New infrastructure included new mechanical systems, including a Dextron pool system, new rooftop chiller and air handling units with complete ductwork distribution and piping.

PARKER HANNIFIN DOWNTOWN YMCA

$10 million 40,045 square feet

Completed March 2016

Page 48: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 45 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. This project required an entire year of preconstruction services to arrive at a scope that met the Owner’s budget requirements. Despite extensive complications with existing conditions and unknowns, we delivered the project on time after 12-months of construction.

Recognizing its quality, The Cleveland Engineering Society named the project as a 2016 Award of Excellence finalist and it received a 2017 Commercial Development Award from Smart Business magazine. We exceeded owner’s goal by achieving 15.9% diverse contracting. Infinity self-performed the carpentry trade package.

BUDGET AND SCHEDULE PERFORMANCE. This project completed within the guaranteed maximum price provided before documents were 100% complete. The project completed one-month beyond the original schedule due to extensive unknown conditions that required collaborative solutions by the Project Team. Letter of reference available upon request.

CLIENT CONTACT. Mr. Timothy Hilk CEO and President 216-263-6837

Page 49: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 46 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

DESCRIPTION. Moody Nolan provided architectural and engineering services and Infinity served as Construction Manager, to complete this building concurrently with the Warrensville Heights Public Library. This family recreation center includes an indoor natatorium, full basketball court gymnasium, exercise and fitness facilities with supporting locker rooms, a child watch center, a teen recreation center, an outdoor patio, and an outdoor playground. Site work includes construction of new entrance drive, parking lots, sidewalks and landscaping with bioswales for stormwater detention. The main entrance includes two drive under canopies.

The facility is owned by the City of Warrensville Heights and operated by the YMCA of Greater Cleveland. It is located on a 16-acre master planned ‘City Center’ site that includes the new public library, park facilities and other future municipal or private commercial development projects.

WARRENSVILLE HEIGHTS YMCA $11.3 million

46,000 square feet Completed May 2012

Page 50: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 47 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. This was the City’s first and one of Ohio’s first public sector construction management at risk projects. The city was able to invoke “home-rule” prior to legislation being passed, making this endeavor truly cutting-edge from a delivery standpoint. The project achieved 29.5% diverse subcontracting participation. There were no accidents or claims.

BUDGET AND SCHEDULE PERFORMANCE. Joining the Project Team at the start of design Infinity led all Project Team meetings throughout the 6-month pre-construction process. This effort saved more than $450,000 so that the YMCA and City could increase the building square footage from 36,000-sf to 45,000-sf and attain additional program requirements. This project completed within its guaranteed maximum price provided before documents were 100% complete. However, the City eventually added scope that increased the budget by more than $1 million.

CLIENT CONTACT. Mayor Brad Sellers 216-587-1171.

Page 51: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 48 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

  

 

 

DESCRIPTION. Rob Donaldson who would be the lead designer for the Cove Church project (now of Moody Nolan) provided design and engineering of this project while at his previous firm. Infinity serviced as construction manager. This project converted a former single-story retail building, into a two-story clinic. The project began with gut demolition followed by new interior construction consisting of an Imaging Suite, Primary Care Exam Rooms, Audiology Testing, Physical Therapy, and supporting office spaces.

LAKEWOOD URGENT CARE $1.3 million

5,740 square feet Completed January 2017

(left) before, (right) after 

Rob Donaldson, Lead Architect (now with Moody Nolan) 

Page 52: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 49 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. To manage logistics in this very tight urban site facing a very busy city intersection, Infinity staggered start times for subcontractors on a daily basis. One challenge was a more complicated stormwater utility tie-in than the engineers indicated. The severe winter that year slowed progress on the building façade, roof and interiors. The City Building Inspector also required a re-design of the back stair and relocation of the exterior exit door due to the significant elevation change of more than six feet between the building and the parking lot. Re-sequencing of the schedule allowed us to recover lost time. Using temporary heating we accelerated start of the interiors work to create some float for the exterior work delayed by weather. Self-performed rough and finish carpentry. Achieved 15% diverse subcontracting participation. Letter of reference available upon request.

BUDGET AND SCHEDULE PERFORMANCE. Despite all of the unexpected conditions, this project completed within 2% of the original budget. The project completed on time in 5-months.

CLIENT CONTACT. Jennifer Ilgauskas 216-577-8627

Rob Donaldson, Lead Architect (now with Moody Nolan) 

Page 53: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 50 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DESCRIPTION. As general contractor, Infinity completed all demolition, carpentry, and MEP on this project. Phase 1 was 53,000-sf renovation completing June 2007. Phase II was the 40,000-sf addition. World renowned New York Architect Robert A. M. Stern was the project architect. The addition includes a new two-story sky lit lobby at the building’s center. At the end of the main hall there is a grand stair with another skylight to bring natural light down to the main level. The main level includes a major expansion to children’s library. Upstairs are quiet reading rooms, and an 80-station technology center, along with a large audiovisual department to accommodate the library’s large collection of videos, CDs and DVDs. The original building’s MEP systems were entirely replaced by energy-efficient systems. The project was designed using LEED® certifiable principles, but did not seek formal certification.

NEW LAKEWOOD MAIN LIBRARY $11 million

93,000 square feet Completed April 2008

Page 54: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 51 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. One challenge of this project included how to tie in the new addition to the existing library in a seamless way and avoiding water intrusion. Infinity completed this work while the existing library remained occupied. We reused a significant amount of material from the old building including steel, concrete, stone and brick. A complex craft challenge was to extend the grand staircase in the older buidling to the new additon. This was accomplished using precast stone panels and the result is a seamless connection. We installed temporary walls around the starircase while completing the work to protect the public. The project is located on a very busy street that required a careful logistics plan both to control traffic and make deliveries of large construction materials. The project completed with no accidents.

BUDGET AND SCHEDULE PERFORMANCE. We completed this fixed price project on budget and on schedule. The project completed on time in 11-months.

CLIENT CONTACT. James Crawford Library Director 216-226-5100 (Mr. Crawford was not Director when Infinity completed this project)

Page 55: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 52 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

  

 

DESCRIPTION. This was an enabling project that allowed for the eventual reconstruction of Lakewood High School. As general contractor, Infinity provided asbestos abatement, selective demolition, new window and door openings and ADA improvements, as well as the replacement of ceilings and flooring, rooftop HVAC, plumbing, fire protection, and electrical upgrades in the existing Garfield commercial service kitchen, cafeteria, storage areas, Civic auditorium and gymnasium. Additional work included the installation of new service equipment in the kitchen. This project created swing space that allowed reconstruction to take place while the high school remained partially occupied.

TRANSITION PROJECT $1 million

13,536 square feet Completed January 2015

Page 56: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 53 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. We completed our work while the high school remained occupied. Self-performed drywall and ceilings. Exceeded the client’s diverse contracting goal of 15% by achieving 22.3%. The project achieved LEED® Silver certification.

BUDGET AND SCHEDULE PERFORMANCE. We delivered this project $22,180 under its budget and on schedule. The project completed on time in 3.5-months.

CLIENT CONTACT. Robert Klann Architect 216-861-8195 (Mr. Klann was with his previous firm when Infinity completed project)

Page 57: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 54 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

  

 

 

DESCRIPTION. The 55,000 sq. ft. community center is situated on the active east edge of Linden Park next to basketball courts, futsal, tennis and pickleball, playgrounds and a spray ground. Buffering the east active end of the park and the west passive end of the park are the open recreation fields. At the west end of the park are nature trails, an event pavilion and open lawn. Anchoring the southwest edge of the park is a revamped pond.

LINDEN PARK COMMUNITY CENTER $15.7 million

55,000 square feet Completed September 2020

Page 58: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 55 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. Bridging recreation and neighborhood services is the driving force behind the new legacy landmark for the Linden Neighborhood. The new facility will be a center for opportunity – an initiative spearheaded by the mayor which is focused on providing wellness and education for underserved communities. Through the Columbus Recreation and Parks Department’s progressive programming initiatives, the project team of Moody Nolan and MKSK Studios designed the new transformational facility and park with a sensitivity to community needs and with innovative trends in architecture, planning and landscape design. Thoughtful planning of locating passive and active recreation and wellness sets a framework for maximizing outreach and advocacy for the growing community. The new facility will be a hub for many activities, including a gymnasium, teaching kitchen, and game room among many other amenities. The architecture aesthetically expresses the progressive programming, while being attuned to the neighbor’s input. Community members will enjoy the new Linden Park for their recreation and wellness needs.

BUDGET AND SCHEDULE PERFORMANCE. This project completed on time in September 2020 and within its budget.

CLIENT CONTACT. Justin Loesch Department of Recreation and Parks 614-645-3300    

Page 59: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 56 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church  

 

 

DESCRIPTION. The revitalization of this former Columbus City Schools elementary began with an initial feasibility study and resulted in a complete renovation of the 51,894 sq. ft. historic facility as well as a 15,658 sq. ft. addition. The Reeb Avenue Center serves as a multipurpose community center for Southern Gateway neighborhood of Columbus, providing early childhood education, other educational services, support services for families, job training and workforce development.

REEB AVENUE COMMUNITY CENTER $12.1 million

68,552 square feet Completed July 2015

Page 60: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 57 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. Serving as inspiration for further growth and development in the area, the center brings much-needed social services to the area and houses the South Side Learning and Development Center. Other tenants and partners include the Boys & Girls Clubs of Columbus, Connect Ohio, Godman Guild, Lutheran Social Services, Mid-Ohio Foodbank, St. Stephen’s Community House and more.

The City of Columbus acquired the building as part of an exchange with the Columbus City Schools, and funding for the construction was provided through public-private partnerships.

BUDGET AND SCHEDULE PERFORMANCE. This project completed within 10-days of the original schedule on June 30, 3016 and within its budget.

CLIENT CONTACT. John Hansen FinanceCM 614-645-4822

Page 61: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 58 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church  

 

 

DESCRIPTION. This project involves a complete renovation and addition to the existing Driving Park Recreation Center as well as a new 8,500 sq. ft. outdoor pool. The existing site had a small bunker style recreation center, connected via a walking path to a second park where an existing pool had been closed since 2008. Moody Nolan conducted a feasibility study and determined that combining the building and the pool on the recreation center site allowed the center to become multi-generational serving all ages, greater savings for cost efficiency, allowing pool locker rooms to be used during winter basketball events, as well as savings on utilities, staffing and parking. The project adds 19,000 sq. ft. of new space, with a new high school regulation gymnasium with spectator seating, fitness spaces, offices, day-lit entrance, activity rooms and pool support spaces with much more openness and natural light. The new gym connects neighborhoods as well as the suburbs. Additionally, the existing undersized gym was renovated into a new dance room and meeting room plus storage.

DRIVING PARK COMMUNITY CENTER $10.5 million

32,500 square feet Completed June 2016

Page 62: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 59 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. Key challenges included getting buy-in from the community through public meetings. A second major challenge was changing the mind set of maintenance staff that insisted on simplicity, durability and closed prison-like boxes, to provide an efficient, open and inviting building that creates a sense of activity and excitement while maintaining durability and ease of maintenance.

BUDGET AND SCHEDULE PERFORMANCE. This project completed on schedule in July 2015, and within $20,000 of its original budget.

CLIENT CONTACT. James Miller Project Manager 614-645-8941

Page 63: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 60 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church  

 

 

DESCRIPTION. Infinity served as Construction Manager on this project. St. Matthew's Church suffered a fire that destroyed its temple and damaged its great hall. After demolition of the temple, Phase I renovates the 5,187-sf great hall. The building includes brick veneer on the front and vinyl siding on the sides and back of the building. Scope includes a new covered main entry vestibule, a congregational meeting area, new restrooms, classrooms, and a full-service commercial quality serving kitchen.

ST. MATTHEW’S – GREAT HALL $0.8 million

5,187 square feet Completed August 2019

Page 64: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 61 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. Infinity started on this project before the selection of the architect. We worked with an initial architect who was replaced and then a second architect who completed the design and engineering documents for this project. We provided almost a year of preconstruction services working closely with the Owner and Architect to achieve a guaranteed maximum price that meet the owner's budget. Achieved 24.75% diverse subcontracting participation. Letter of reference available upon request.

BUDGET AND SCHEDULE PERFORMANCE. The project was completed on a fast-track basis with construction starting before the documents were 100% complete. It was delivered on time in four-months. The budget was delivered within its guaranteed maximum price.

CLIENT CONTACT. Thomas J. George Parish Council Member and Building Committee Chair 216-849-0457

Page 65: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 62 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church  

  

 

 

Infinity is serving as Construction Manager at Risk on this new PK-5 school. The project began with abatement and demolition of an existing vacant school building on site at 21865 Clarkwood Parkway. The new building will feature 21st century learning classrooms, an enlarged gymnasium and commercial kitchen. The new facility will secure LEED® certification of at least Silver or greater.

NEW PRE K-5 SCHOOL $28 million

101,950 square feet Completes July 2020

Page 66: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 63 of 68  

3 – PROJECTS OF SIMILAR SIZE AND COMPLEXITY 

Adaptive Reuse of Cove Church

VALUE ADDED. Infinity provided three GMP’s for the project. The first for abatement, demolition and site work. The second for new building structure. The third for building interiors. CMR team is a joint-venture to maximize diverse participation of more than 35% at the partner and subcontracting levels. Infinity participated in a series of community meetings over the 12-month preconstruction phase prior to the start of construction. Core meetings continue during construction. This is an OFCC-administered project and we are using the OAKS-CI system for all project reporting.

BUDGET AND SCHEDULE PERFORMANCE. The project is being completed fast-track basis with construction starting before the documents were 100% complete. It is ahead of schedule to be delivered in eighteen-months. The budget is being delivered under its guaranteed maximum price.

CLIENT CONTACT. Donald Jolly Superintendent 216-865-4736

11/13/2019 ‐ Topping Off Ceremony

Page 67: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

Section 4 Design-Build A/E Past Performance

COMMUNITY ENGAGEMENT Meetings moderated by Moody‐Nolan 

Page 68: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 64 of 68  

4 – D/B A/E PAST PERFORMANCE 

Adaptive Reuse of Cove Church

PAST PERFORMANCE. Infinity and MN have worked together on several projects from initial design concept through construction. These include civic, community, healthcare, and K-12 education projects over the course of several years.

COST AND CONSTRUCTABILITY PLANNING. We embrace an active, collaborative dialogue with our Clients to achieve a design vision within budget and on-schedule. This occurs at community meetings, design charettes, and through constructability and value optimization exercises at each issue of design documents.

ISSUES AND PROBLEMS ON SIMILAR PROJECTS. Two noteworthy projects in our shared portfolio required the re-purposing of existing buildings. Each required creative thinking to resolve design complexities or overcome unexpected field engineering options. We do not present “take it or leave it” solutions, but a range of options so the City can make informed decisions.

Design and construction of the Parker Hannifin YMCA converted former retail spaces of the Galleria Mall in Downtown Cleveland. Construction sequencing avoided disruption to other tenants and services within the mall. Our team identified and researched critical lead times. We broke out costs for unique design elements to support the YMCA’s decision making. Where design elements exceeded the project’s budget, we offered cost-savings options that preserved the design intent.

More recently, Infinity, Osborn Engineering, and Rob Donaldson (before he joined MN) collaborated to re-purpose the former Payless Shoe Store at West 117th Street and Detroit Road in Lakewood. While constructing the addition we sequenced the work to minimize disturbance to the main building. The team’s close working relationship with the City of Lakewood assured that reviews were completely time (ABR review of the project was approved on the first presentation of the project). The project involved partnering with the City to receive rebates offered through the Commercial Property Revitalization Program.

Page 69: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 65 of 68  

4 – D/B A/E PAST PERFORMANCE 

Adaptive Reuse of Cove Church

At Lakewood Urgent Care, we discovered an unreinforced floor slab. The team collaborated with the Owner to develop an acceptable solution to stabilize and reinforce the slab, in the span of few days. Quickly resolving the matter kept the project on schedule with contingency funds used to resolve undocumented existing conditions. There is no question that we will discover similar unexpected surprises at Cove Church. How we keep the City informed, and provide creative solutions, is a proven strength of the Infinity/MN team.

Commitment to sustainable design and construction is another team differentiator. We will design, specify, and build sustainably, whether the City seeks formal LEED® certification or not. Our standard practices include the use of low VOC items (paint, flooring, and adhesives), promoting opportunities for recycling and compost collection in the building’s program, and diverting construction waste from landfills through recycling or material reuse. The lifecycle payback of the higher efficiency mechanical and electrical systems that we will propose will lower utility and maintenance costs.

Additionally, we will offer unique sustainable strategies that derive from the WELL Building Standard, Living Building Challenge, and FitWel Building Certification. These include ideas such as encouraging greater movement and activity within the building, promoting healthy eating and lifestyles, and looking to potential forward-thinking strategies, such as Net Zero and stormwater diversion strategies, of which the City is a strong proponent.

LITIGATION HISTORY. Infinity-MN currently has no pending litigation or binding arbitration.

Page 70: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

Section 5 D/B Construction Past Performance

NEIGHBORHOOD 

RESOURCE CENTER 

Huntington Empowerment Center 

Page 71: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 66 of 68  

5 – D/B CONSTRUCTION PAST PERFORMANCE 

Adaptive Reuse of Cove Church

PAST PERFORMANCE WITH MANAGEMENT AND CONSTRUCTION. What is Infinity’s role, in an integrated project delivery approach, when it joins the Project Team concurrent with the architect? In a short phrase, it is to remove uncertainty. Uncertainly breeds wariness and skepticism at best, and mistrust at worst among the community and project stakeholders.

The greatest challenge at Cove Church is not the technical complexity of the work, the published schedule or even achieving the City’s intent through collaboration and community engagement. A detailed read of the RFQ documents reveals no shortage of creativity or design energy. The challenge will be to balance the City’s wants and desires against the project’s very real budgetary constraints.

The scope as outlined in the RFQ indicates complete replacement of the MEP systems, which will consume up to 40% of the available budget. It also indicates that an unspecified percentage of the budget will be devoted to furniture, fixtures and equipment. You will need a design-builder that is committed to your vision, professionals that are creative problem solvers, and collaborators that never present a problem without a menu of options. Our goal is to provide our best advice to help City officials make informed decisions.

PERFORMANCE REQUIRMENTS How do we help remove uncertainty and deliver a better project? By putting project goals ahead of construction goals. No construction manager has enough talent to develop a valid construction plan by themselves. No Project Team has enough talent to develop a plan that can accurately anticipate every issue many months before the date that you take occupancy. So, we promote open communication. We believe in bringing issues to the Project Team to solve collaboratively. As Infinity has progressed and grown, we have become strong proponents of Lean Construction principles as the best way to protect our clients. For us that means three things.

Page 72: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

    

11/25/2019 - Page 67 of 68  

5 – D/B CONSTRUCTION PAST PERFORMANCE 

Adaptive Reuse of Cove Church

SEQUENCING CONSTRUCTION ACTIVITIES. 1. Prioritize – Throughout the life of project, give the client what it most wants as

soon as it is possible to do so. Recognize that client priorities change frequently. 2. Anticipate – With so many moving parts, every experienced construction

professional knows that changes to the best laid plans are inevitable. As construction managers it is our duty to shield our clients from risk.

3. Improve – Construction has seen the smallest gain in productivity of almost every U.S. industry over the last 50-years. Part of risk mitigation is a continuous commitment to improving our skills, systems and processes.

Early involvement allows us to share best practices and lessons learned from previous projects. As the design develop, several opportunities become possible. We:

• Collaborate with stakeholders to develop complete early bid packages (for example, foundations and steel) to minimize winter weather protection costs and schedule delays, as necessary.

• Identify long-lead items to assure materials are on site when needed. • Take advantage of bulk purchasing opportunities. • Have a greater impact on value engineering and constructability to

generate meaningful cost savings. Finding issues after design complete sis costly, time consuming, and contentious.

• Perform detailed cost/benefit analysis to deliver a more precise guaranteed maximum price with minimal contingencies or allowances.

• Pre-qualify subcontractors based upon their ability to meet the unique requirements of this project such as diverse participation.

CHANGE ORDERS. When we provide a guaranteed maximum price, change orders do not originate from Infinity or its subcontractors.

COMMISSIONING AND TESTING. We employ a systematic process to assure that a building’s installed systems operate efficiently and effectively. If it fails to operate correctly at turnover, there is little hope for maintenance staff to achieve future success.

Page 73: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

Section 6 Team’s Benefit and Integration into Project

DINING SPACE Reeb Avenue Community Center 

Page 74: Adaptive Reuse of Cove Church TABLE OF CONTENTS€¦ · Adaptive Reuse of Cove Church Tab Technical Proposal Page 1 General Firm Information 3 2 Project Team Organization 22 3 Projects

11/25/2019 - Page 68 of 68

6 – TEAM’S BENEFIT AND INTEGRATION INTO THE PROJECT

Adaptive Reuse of Cove Church

REASON FOR INTEREST. As one of the most diverse inner ring cities in Northeastern Ohio, Lakewood attracts several ethnicities and ages together into the most densely populated city between New York and Chicago. Lakewood attracts young families with children – with its new schools, walkable community, and dynamic culture. It is also a city that nobody wants to leave, be it empty nesters or lifelong residents who want to age in place.

Cove Church presents a unique design opportunity to transform a currently subdued location into an energetic center of activity. It is an exciting urban planning opportunity to improve the quality of life for vulnerable groups. Finally, it is a progressive civic opportunity to promote healthy collaborations across Lakewood’s full spectrum of generations and cultures.

ANTICIPATED ADDED VALUE. Listening is at the root of community engagement. As we work to design and build a solution is Responsive Architecture. Members of our design team who are Lakewood residents will use several methodologies to obtain community feedback to assist the design. Their approach will be similar to the case studies listed in Section 3 of this submittal.

APPROACH TO COMMUNITY ENGAGEMENT AND INCLUSIVITY. The Infinity/MN team is one that reflects the diversity of the community that we serve. Participating design firms include Minority Business Enterprises (MBE) and a Women Business Enterprise (WBE).

Similarly, Infinity makes great efforts and strives to encourage MBE, WBE, and SBE participation amongst all its subcontractors during review and award of Guaranteed Maximum Price (GMP) contracts. Over the past 5-years, 32.9% of its total construction work-in-place has been awarded to diverse subcontractors.