Upload
holly-cordry
View
216
Download
0
Embed Size (px)
Citation preview
Adaptive Re-use of the Former Denmark Hospital.
Tom Stevens H+H Architects
INTRODUCTION
DENMARK HOSPITAL 1924
1924 FLOOR PLAN
PUSH FOR A NEW HOSPITAL
DENMARK HOSPITAL 2008
ZONES OF SIGNIFICANCE
PROPOSED WORKS
ADAPTIVE RE-USE WORKSRevealing significance
ADAPTIVE RE-USE WORKSRemoving intrusive elements
ADAPTIVE RE-USE WORKSReinstating facade
ADAPTIVE RE-USE WORKSCreating flexible spaces
RE-USE CHALLENGES
FITTING USES INTO AVAILABLE SPACE
MEETING ACCESS REQUIREMENTS
MEETING ENERGY REQUIREMENTS
SERVICES UPGRADES