Adam Airbase Package 2 Facts Project Description Construction of parallel taxiway, apron, substation, airfield lighting, sunshade for typhoon City/Country Client Ministry of Defence, Muscat Contract Value € 52,08 Mio. Construction Period 11/2014 - 05/2016 (18 Months) .

Adam Airbase Package 2 - STRABAG International...Adam Airbase Package 2 Facts Project Description Construction of parallel taxiway, apron, substation, airfield lighting, sunshade for

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • Adam Airbase Package 2

    Facts Project DescriptionConstruction of parallel taxiway, apron, substation, airfield lighting, sunshade for typhoon

    City/Country

    Client

    Ministry of Defence, Muscat

    Contract Value

    € 52,08 Mio.

    Construction Period

    11/2014 - 05/2016 (18 Months)

    .