1 | P
a g e
AdPuGeEv Tao GEnergy3013 DRoseviU.S.A. VladimDecisiARGO9700 SArgonnUSA TechnEnergOctob DOE C
ANL C
djustaumpeeneraaluat
Guo, Guangy Exemplar, Douglas Blvdille, CA 9566
mir Koritaroon and Infor
ONNE NATIOS. Cass Avenne, IL 60439
nical Reportgy Exemplaber 30, 2013
Contract No.
Contract No.
able Sd-Sto
ator (tion bgjuan Liu, L
LLC d, Suite 12061
ov rmation ScieONAL LABOnue, DIS/2219
t r EE-2013-3
. DE-FOA-0
. 2F-3110
SpeeoragePSH)
by PLily Yu
ences DivisioORATORY 1
-10-30-01
0000486
ed e Hyd)
LEXO
on
dro-
OS
2 | P a g e
Acknowledgments ANL and EE gratefully acknowledge the support of DOE’s Office of Energy Efficiency and Renewable Energy for funding this work.
And many thanks go to the members of the Advisory Working Group for their insightful comments and assistance. The Advisory Working Group members include
Alan Soneda – Pacific Gas and Electric Company (PG&E) Ali Nourai – DNV KEMA Brendan Kirby – Kirby Consult Charlton Clark – U.S. Department of Energy (DOE) Christophe Nicolet – Power Vision Engineering Dave Harpman – U.S. Department of the Interior, Bureau of Reclamation (USBR) Elliot Mainzer – Bonneville Power Administration (BPA) Greg Brownell – Sacramento Municipal Utility District (SMUD) J. Douglas Divine – Eagle Crest Energy Company Jiri Koutnik – Voith Kim Johnson – RiverBank Power Klaus Engels – E.On Kyle L. Jones – US Army Corps of Engineers Landis Kannberg – Pacific Northwest National Laboratory (PNNL) Le Tang – ABB M. Jones – Bonneville Power Administration (BPA) Matthew Hunsaker – Western Electricity Coordinating Council (WECC) Maximilian Manderla – Voith Michael Manwaring –HDR Patrick O’Connor – U.S. Department of Energy (DOE) Paul Jacobson – Electric Power Research Institute (EPRI) Rachna Handa – U.S. Department of Energy (DOE)) Rahim Amerkhail – U.S. Federal Energy Regulatory Commission (FERC) Rajesh Dham – U.S. Department of Energy (DOE) Richard Gilker – U.S. Department of Energy (DOE) Rick Jones – HDR Rick Miller – HDR Rob Hovsapian – U.S. Department of Energy (DOE) Scott Flake – Sacramento Municipal Utility District (SMUD) Stan Rosinski – Electric Power Research Institute (EPRI) Steve Aubert – ABB Tuan Bui – California Dept. of Water Resources (CDWR) Xiaobo Wang – California Independent System Operator (CAISO) Zheng Zhou – Midwest Independent System Operator (MISO)
3 | P a g e
List of Acronyms ADI – Ace Diversity Interchange AGC – Automatic generation control ANL – Argonne National Laboratory AS PSH – Adjustable Speed Pumped-storage Hydro Generator AS – Ancillary Services BA – Balancing Area BAA – Balancing Area Authority BAU – Business as Usual BPA – Bonneville Power Administration CAISO – California Independent System Operator CPS – Control Performance Standards DA – Day-ahead DCS – Disturbance Control Standard DOE – U.S. Department of Energy DSM – Demand-side management DSS – Dynamic Scheduling System ECC – Enhanced Curtailment Calculator EDT – Efficient Dispatch Toolkit EIM – Energy Imbalance Market ERCOT – Electric Reliability Council of Texas EWITS – Eastern Wind Integration and Transmission Study FERC – Federal Energy Regulatory Commission FS PSH – Fixed Speed Pumped-storage Hydro Generator GW – Gigawatts HA – Hour-ahead ISO-NE – ISO New England ITAP – Intra-hour Transaction Accelerator Platform MISO – Midwest Independent Transmission System Operator NERC – North American Electric Reliability Corporation NREL – National Renewable Energy Laboratory NTTG – Northern Tier Transmission Group NWP – numerical weather prediction NYISO – New York Independent System Operator ORNL – Oak Ridge National Laboratory PNNL – Pacific Northwest National Laboratory RPS – renewable portfolio standards RT – Real Time RTO – Regional Transmission Organization SCED – Security Constrained Economic Dispatch SCUC – Security Constrained Unit Commitment SMUD – Sacramento Municipal Utility District SPP – Southwest Power Pool TEPPC – Transmission Expansion Planning and Policy Committee of the Western Electricity Coordinating Council VG – Variable Generation
4 | P a g e
WAPA – Western Area Power Administration WI – Western Interconnection WECC – Western Electricity Coordinating Council WWSIS – Western Wind and Solar Integration Study
5 | P
ExeEnergthrouto evaAdju
1
2
As thgeneroperacapacthe du
The agenerrenewThe P
a g e
ecutivegy Exemplar
ugh Argonnealuate the Fistable-speed
. Quantifyiand for disystem;
. Providingplants andprojects.
he renewableration variabation. Especcity adequacuck shape as
above diagraration hours.wable generaPSHs is an e
eSummr is engaged
e National Laixed-speed Pd Pumped-sto
ing the valueifferent level
g informationd recommen
e generation bility and unccially, the chcy. For exams the renewa
am illustrates. As the renation) rampsffective sink
maryin this proje
aboratory to Pumped-stororage Hydro
e of the FS anls of variable
n about the fdations for a
penetration certainty pre
hallenges mample, in CAIable generati
s the possiblewable gene up quickly
k to absorb th
ect sponsoreperform theage Hydro-g
o-generators
nd AS PSHse renewable
full range of appropriate b
increases, thesents the incanifest as theISO, the douon penetrati
le over-geneeration decrethat demandhe over-gene
d by the Depe power systegenerators (F(AS PSH) in
s under diffegeneration (
f benefits andbusiness mo
he accommocreasing cha
e issues of ovuble-peak daion increases
ration in theeases, the neds un-usuallyeration in th
partment of em operationFS PSH) andn the areas o
erent market (wind and so
d value of PSdels for futu
odation of theallenges to thver-generatioily load shaps.
e high renewt load (load y high ramp
he high renew
Energy n simulationd the of
conditions olar) in the
SH and CH ure PSH
e renewablehe system on and ramppe becomes
wable less the capacity.
wable
n
p
6 | P a g e
generation hours and provides the ramp capacity to accommodate the net load ramp demand.
Energy Exemplar performed Western Interconnection (WI) system simulation for year 2022 to evaluate the impact of the proposed adjustable-speed pumped storage hydro-generators (AS PSH) in the base renewable generation renewable (14% in WI) scenario and the high-wind renewable generation renewable (33% in WI) scenario. The proposed adjustable-speed PSHs include Swan Lake, Iowa Hill and Eagle Mountain. The existing FS PSHs and the proposed AS PSHs are listed in the following table.
PSH Location Region
Spinning Reserve Sharing Group
Regulation Reserve Sharing Group
Number of Units
Total Capacity (MW)
Generator Type
Cabin Creek PSC RMPP Colorado 2 324 Fixed‐speed
Castaic LDWP CALIF_SOUTH LDWP 6 1175 Fixed‐speed
Eastwood SCE CALIF_SOUTH SCE 1 199 Fixed‐speed
Elbert WACM RMPP Colorado 2 200 Fixed‐speed
Helms PG&E_VLY CALIF_NORTH PG&E Valley 3 1212 Fixed‐speed
Horse Mesa SRP AZNMNV Arizona 3 96 Fixed‐speed
Lake Hodge SDGE CALIF_SOUTH SDGE 2 40 Fixed‐speed
Mormon Flat SRP AZNMNV Arizona 1 50 Fixed‐speed
Eagle Mount SCE CALIF_SOUTH SCE 4 1400 Adjustable‐speed
Iowa Hill SMUD CALIF_NORTH SMUD 3 399 Adjustable‐speed
Swan Lake BPA NWPP NWPP 4 1380 Adjustable‐speed
Grand Total 31 6475
The simulations are performed for three focused areas of WI, California and the Balancing Authority of Northern California (BANC). The impacts of the PSHs to the entire WI, energy market (CAISO), and a portfolio (BANC) are examined. The value streams of the PSH and their impacts to the system operations are listed in the following table.
PSH Value Stream Matrix and
Item PSH Contribution
PLEXOS Simulation Notes
1 Regulation reserve PSH revenue
2 Flexibility reserve PSH revenue
3 Contingency spinning reserve PSH revenue
4 Contingency non‐spinning reserve PSH revenue
5 Replacement / Supplemental reserve PSH revenue
6 Load following PSH revenue
7 Load leveling / Energy arbitrage PSH revenue
8 Integration of variable energy resources (VER)
PSH revenue
9 Generating capacity Post process
7 | P a g e
PSH Value Stream Matrix and
Item PSH Contribution
PLEXOS Simulation Notes
10 Portfolio effects PSH revenue
11 Reduced cycling of thermal units Societal Benefit
12 Reduced transmission congestion Societal Benefit
13 Reduced environmental emissions Societal Benefit
14 Transmission deferral Societal Benefit
Also, the 3-stage sequential Day-ahead (DA), Hour-ahead (HA) and Real-time (RT) simulations are performed for the 4 typical weeks of year 2022 to examine the impacts of the PSHs to the sub-hourly system operation.
The following summarizes the findings in this study.
EnergyarbitragevaluesThe WI simulations for year 2022 show that, with the three proposed adjustable-speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain, the production cost saving is 1% of the total WI production cost in the base renewable scenario, and 1.8% in the high-wind renewable scenario. The PSH values of these three AS PSHs are $45.3/kw-year (i.e., total system production cost saving divided by the PSH capacity) in the base renewable scenario and $72.04/kw-year in the high-wind renewable scenario.
The California simulations for year 2022 show that, with the two proposed adjustable-speed PSH, Iowa Hill and Eagle Mountain, the production cost saving is 1.2% of the total production cost in California under the base renewable scenario, and 4.2% in the high-wind renewable scenario. The PSH values of these two PSHs are $33.35/kw-year in the base renewable scenario and $105.61/kw-year in the high-wind renewable scenario.
The BANC simulations for year 2022 show that, with the proposed adjustable-speed PSH, Iowa Hill, the production cost saving is 8.6% of the total BANC production cost in the base renewable scenario, and 16.45% in the high-wind renewable scenario. The PSH values of these two PSHs are $58.04/kw-year in the base renewable scenario and $126.83/kw-year in the high-wind renewable scenario.
The 3-stage simulations for four typical weeks in year 2022 in the high-wind renewable scenario show that the average production cost over four typical weeks can be reduced by
1. 1.6% from the WI RT simulations with the three proposed adjustable-speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain;
2. 2.4% from the CA RT simulations with the two proposed adjustable-speed PSHs, Iowa Hill and Eagle Mountain;
3. 14.9% from the BANC RT simulations with the proposed adjustable-speed PSHs, Iowa Hill.
Contributionstoreserves:contingency,flexibilityandregulationreserves
8 | P a g e
The WI simulations for year 2022 show that the three proposed adjustable-speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain, provide 1.7% ~ 8.19% of the total WI upward reserves and 12.0% ~ 12.9% of the total WI downward reserves in the base renewable scenario. The three adjustable-speed PSHs provide 0.6% ~ 4.2% of the total WI upward reserves and 10.6% ~ 12.3% of the total WI downward reserves for the high-wind renewable scenario.
The CA simulations for year 2022 show that the two proposed adjustable-speed PSHs, Iowa Hill and Eagle Mountain, provide 9.6% ~ 26.3% of the total CA upward reserves and 28.7% ~ 33.6% of the total CA downward reserves in the base renewable scenario. The two adjustable-speed PSHs provide 3.6% ~ 23.8% of the total CA upward reserves and 31.5% ~ 37.3% of the total CA downward reserves in the high-wind renewable scenario.
The BANC simulations for year 2022 show that the proposed adjustable-speed PSH, Iowa Hill, provides 3.4% ~ 15.8% of the total BANC upward reserves and 23.5% ~ 29.5% of the total BANC downward reserves in the base renewable scenario. The adjustable-speed PSH provides 2.0% ~ 17.6% of the total BANC upward reserves and 14.3% ~ 20.5% of the total BANC downward reserves in the high-wind renewable scenario.
The following table summarizes the reserve provisions from the PSHs in the base and high-wind renewable scenarios.
Reserve Provisions from Adjustable‐speed PSH in % of Total Reserve Requirements
WI Simulations CA Simulations BANC Simulations
Base Renewable
High‐wind Renewable
Base Renewable
High‐wind Renewable
Base Renewable
High‐wind Renewable
Non‐Spinning 8.1% 4.2% 9.6% 17.6% 15.8% 17.6%
Spinning 1.7% 0.6% 26.3% 2.4% 4.3% 2.4%
Flexi Down 12.9% 12.3% 33.6% 14.3% 29.5% 14.3%
Flexi Up 1.9% 0.4% 10.5% 2.0% 3.8% 2.0%
Reg Down 12.0% 10.6% 28.7% 20.5% 23.5% 20.5%
Reg Up 3.0% 1.3% 24.6% 1.9% 3.4% 1.9%
ContributiontotherenewablegenerationintegrationThe contribution of the adjustable-speed PSHs to the renewable generation integration includes the following two areas.
1. Reserve provisions to cover the renewable generation variability and uncertainty, and
2. The renewable generation curtailment due to the over-generation.
The reserve provisions from the adjustable-speed PSHs are listed in the above table.
With the three adjustable-speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain, the renewable generation curtailment from the WI simulations for year 2022 is reduced from 0.77% (1,356 GWh) to 0.55% (964 GWh) of the total renewable energy in the base renewable scenario; the renewable generation curtailment is reduced from 14% (48,403
9 | P a g e
GWh) to 13% (44,211 GWh) of the total renewable energy in the high-wind renewable scenario.
With the two adjustable-speed PSHs, Iowa Hill and Eagle Mountain, the renewable generation curtailment from the CA simulations for year 2022 is reduced from 46 GWh to 14 GWh in the base renewable scenario; the renewable generation curtailment is reduced from 380 GWh to 275 GWh in the high-wind renewable scenario.
There is no renewable curtailment in the base renewable scenario in the BANC system. With the adjustable-speed PSH, Iowa Hill, the renewable generation curtailment from the BANC simulations for year 2022 is reduced from 19 GWh to 1.0 GWh in the high-wind renewable scenario;
ContributiontothethermalgenerationcyclingreductionsThe WI simulations for year 2022 show that, with the three proposed adjustable-speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain, the total thermal startup cost is reduced by 15% (20 million $) in the base renewable scenario, and 10% (16 million $) in the high-wind renewable scenario. The ramp up and down in GW is reduced by 17% (1634 GW) and 16% (2257 GW) respectively in the base renewable scenario. The ramp up and down GW is reduced by 16% (1334 GW) and 15% (1904 GW) respectively in the high-wind renewable scenario.
The CA simulations for year 2022 show that, with the two proposed adjustable-speed PSHs, Iowa Hill and Eagle Mountain, the total thermal startup cost is reduced by 22% (10 million $) in the base renewable scenario, and 20% (9 million $) in the high-wind renewable scenario. The ramp up and down in GW is reduced by 19% (699 GW) and 20% (1095 GW) respectively in the base renewable scenario. The ramp up and down in GW is reduced by 22% (683 GW) and 21% (998 GW) respectively in the high-wind renewable scenario.
The BANC simulations for year 2022 show that, with the proposed adjustable-speed PSHs, Iowa Hill, the total thermal startup cost is reduced by 45% (2 million $) in the base renewable scenario, and 42% (2 million $) in the high-wind renewable scenario. The ramp up and down in GW is reduced by 37% (136 GW) and 39% (197 GW) respectively in the base renewable scenario. The ramp up and down in GW is reduced by 32% (119 GW) and 36% (174 GW) respectively in the high-wind renewable scenario.
The 3-stage simulations for four typical weeks in year 2022 in the high-wind renewable scenario show that the average startup cost over four typical weeks can be reduced by
1. 7% from the WI RT simulations with the three proposed adjustable-speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain,
2. 19% from the CA RT simulations with the two proposed adjustable-speed PSHs, Iowa Hill and Eagle Mountain,
3. 46% from the BANC RT simulations with the proposed adjustable-speed PSHs, Iowa Hill.
The start-up cost difference between the RT simulation and the DA simulation could be over 60% in some week. The higher startup cost in the RT simulations is due to the CT
10 | P a g e
commitment cost to accommodate the sub-hourly load and renewable generation variability and uncertainties.
The 3-stage simulations for four typical weeks in year 2022 in the high-wind renewable scenario show that the average thermal generator ramp up and down in MW over four typical weeks can be reduced by
1. About 19% from the WI RT simulations with the three proposed adjustable-speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain,
2. About 25% from the CA RT simulations with the two proposed adjustable-speed PSHs, Iowa Hill and Eagle Mountain,
3. About 25% from the BANC RT simulations with the proposed adjustable-speed PSHs, Iowa Hill.
The ramp up and down difference between the RT simulation and the DA simulation could be over 170% in some week. The higher thermal generator ramp up and down in the RT simulations indicates that the thermal generators are ramp more to meet the sub-hourly load and renewable generation variability and uncertainties.
ImpacttothemarketgeneratorparticipantsThe CA simulations show that the system generator profit (the generation and reserve revenue less the generation production cost) increases as more PSHs are introduced into the system in both the base and high-wind renewable scenarios. The profit increases are due to the LMP increases in the pumping hours, which yield higher generation revenues.
The generator profit is smaller in the high-wind renewable scenario as opposed to the base renewable scenario because of lower LMPs in the high-wind renewable scenario.
In the base renewable scenario, the reserve revenue is less than 10% of the total market revenue (energy revenue plus reserve revenue). The reserve revenue increases to 25% of the total market revenue in the high-wind renewable scenario due to higher flexibility and regulation reserve requirements.
ContributionstotheportfolioWith the adjustable-speed PSHs, Iowa Hill, the BANC simulations show substantial reductions in the BANC production cost, emission, thermal generator cycling, and the renewable generation curtailment, as opposed to the case of without the PSHs. The significant reductions in the production cost, emission, thermal generation cycling and the renewable curtailment are due to the higher ratio of the PSH capacity and the portfolio peak demand. The reduction is even higher with the higher renewable generation level.
ImpacttothetransmissioncongestionsIn the WI simulations, the WI average transmission congestion prices are reduced from $4/MWh in the case of no PSHs to $2/MWh in the cases of with FS and AS PSHs in the based renewable scenario. In both the base and high-wind renewable scenarios, the interface with the significant congestion price reduction is Intermountain Power Project DC-tie that is in the neighboring area of PSHs “Castaic” and “Eagle Mountain”.
11 | P a g e
In the CA simulations, the CA average transmission congestion prices are reduced from $3.51/MWh in the case of no PSHs to $0.4/MWh in the case of with AS PSHs, and further to $0.24/MWh in the case of with FS and AS PSHs in the based renewable scenario. The CA average transmission congestion prices are reduced from $1.79/MWh in the case of no PSHs to $0.56/MWh in the case of with FS PSHs, and further to $0.37/MWh in the case of with FS and AS PSHs in the high-wind renewable scenario. Again, in both the base and high-wind renewable scenarios, the interface with the significant congestion price reduction is Intermountain Power Project DC-tie that is the neighboring area of PSHs “Castaic” and “Eagle Mountain”.
The transmission congestion price is an indicator of transmission congestion in the transmission grid. The lower transmission congestion prices with PSHs indicate that PSHs helps mitigating the transmission congestion.
12 | P a g e
Table of Contents 1 Introduction ........................................................................................................................... 20 2 WI Database and Assumption Revisions .............................................................................. 21
2.1 Introduction of Western Interconnection Database ............................................ 21 2.2 Data readiness for the simulations ..................................................................... 23
2.2.1 Regional load representation ....................................................................... 23 2.2.2 Renewable Generation Profile Representations .......................................... 24 2.2.3 Contingency, Flexibility and Regulation Reserve Representations ............ 25
2.3 Adjustable Speed PSH Representation .............................................................. 27 2.4 Data Assumption Revisions ............................................................................... 29
3 Modeling Approaches ........................................................................................................... 33 3.1 PLEXOS SCUC/ED algorithm .......................................................................... 33 3.2 3-Stage DA-HA-RT Sequential Simulations ..................................................... 36 3.3 PSH Storage Modeling in 3-stage Sequential Simulations ................................ 37 3.4 Scope of Simulations .......................................................................................... 38
4 Simulation Results ................................................................................................................ 40 4.1 WI Simulation Results ....................................................................................... 40
4.1.1 WI System Production Costs ...................................................................... 40 4.1.2 WI System Reserve Provisions by PSHs .................................................... 43 4.1.3 WI System Emission Production ................................................................ 44 4.1.4 WI Thermal Generator Cycling .................................................................. 45 4.1.5 WI Regional LMPs ..................................................................................... 46 4.1.6 WI Transmission Congestions .................................................................... 47
4.2 California Simulation Results ............................................................................ 56 4.2.1 Power Market Bidding Prices ..................................................................... 56 4.2.2 California System Production Costs ........................................................... 58 4.2.3 California System Reserves and Provision by PSHs .................................. 62 4.2.4 California System Emission Production ..................................................... 63 4.2.5 California Thermal Generator Cycling ....................................................... 64 4.2.6 California Regional LMPs .......................................................................... 65 4.2.7 California Generator Energy and Ancillary Services Revenue .................. 66 4.2.8 California Transmission Congestions ......................................................... 73
4.3 SMUD Simulation Results ................................................................................. 78 4.3.1 SMUD System Production Costs ................................................................ 78 4.3.2 SMUD System Reserves ............................................................................. 81 4.3.3 SMUD System Emission Production .......................................................... 82 4.3.4 SMUD Thermal Generator Cycling ............................................................ 82 4.3.5 SMUD Regional LMPs ............................................................................... 83 4.3.6 SMUD Transmission Congestions .............................................................. 84
5 Three-Stage DA-HA-RT Sequential Simulations ................................................................. 85 5.1 Intermittent Renewable Generation Variability and Uncertainty ...................... 85 5.2 3-stage DA-HA-RT Simulation Results for California ...................................... 89
5.2.1 CA 3-stage Simulation Results for Four Typical Weeks in Year 2022 ...... 90 5.3 3-stage DA-HA-RT Simulation Results for WI ............................................... 102
5.3.1 WI 3-stage Simulation Results for Four Typical Weeks in Year 2022 .... 102
13 | P a g e
5.4 3-stage DA-HA-RT Simulation Results for SMUD ........................................ 110 5.4.1 SMUD 3-stage Simulation Results for Four Typical Weeks in Year 2022 110
6 Findings ............................................................................................................................... 118 6.1 Energy arbitrage values .................................................................................... 118 6.2 Contributions to reserves: contingency, flexibility and regulation reserves. ... 119 6.3 Contributions to the emission reductions ......................................................... 119 6.4 Contribution to the renewable generation integration ...................................... 120 6.5 Contributions to reserves: contingency, flexibility and regulation reserves .... 120 6.6 Contribution to the thermal generation cycling reductions .............................. 120 6.7 Impact to the market generator participants ..................................................... 122 6.8 Contributions to the portfolio ........................................................................... 122 6.9 Impact to the transmission congestions ............................................................ 122 6.10 Transmission Deferral ...................................................................................... 123
7 Appendix – Transmission Expansion Assumptions for High-wind Renewable Scenario....................................................................................................................................... 124 8 References ........................................................................................................................... 127
14 | P a g e
List of Figures Figure 2-1 Diagram of the WI Load Regions ................................................................................. 21 Figure 2-2 The Average Heat Rates for Coal, CC, CT and Gas Steam Generators [4]. .............. 32 Figure 3-1 PLEXOS Security Constrained Unit Commitment and Economic Dispatch Algorithm 33 Figure 3-2 DA-HA-RT 3-stage Sequential Simulations ................................................................. 36 Figure 4-1 Comparison of WI Generation in Three Cases by Generator Type for the Base Renewable Scenario in Year 2022 ................................................................................................ 41 Figure 4-2 Comparison of WI Generation in Three Cases by Generator Type for the High-wind Renewable Scenario in Year 2022 ................................................................................................ 42 Figure 4-3 Comparison of WI Generation Cost in Three Cases by Generator Type for the Base Renewable Scenario in Year 2022 ................................................................................................ 42 Figure 4-4 Comparison of WI Generation Cost in Three Cases by Generator Type for the High-wind Renewable Scenario in Year 2022 ....................................................................................... 43 Figure 4-5 Comparison of Regional LMP in Three Cases for the Selected Regions in Year 2022 for the Base Renewable Scenario ................................................................................................. 47 Figure 4-6 Comparison of Regional LMP in Three Cases for the Selected Regions in Year 2022 for the High-wind Renewable Scenario ......................................................................................... 47 Figure 4-7 Logic flow for the Transmission Expansion Using Congestion Shadow Price Approach ....................................................................................................................................................... 52 Figure 4-8 CAISO Energy Price-cost mark-up (2009-2012) ......................................................... 56 Figure 4-9 Comparison of CA Generation in Three Cases by Generator Type for the Base Renewable Scenario in Year 2022 ................................................................................................ 60 Figure 4-10 Comparison of CA Generation in Three Cases by Generator type for the High-wind Renewable Scenario in Year 2022 ................................................................................................ 60 Figure 4-11 Comparison of CA Generation Cost in Three Cases by Generator Type for the Base Renewable Scenario in Year 2022 ................................................................................................ 61 Figure 4-12 Comparison of CA Generation Cost in Three Cases by Generator Type for the High-wind Renewable Scenario in Year 2022 ....................................................................................... 62 Figure 4-13 Comparison of Regional LMP in Three Cases for the Selected Regions in CA in Year 2022 for the Base Renewable Scenario ........................................................................................ 65 Figure 4-14 Comparison of Regional LMP in Three Cases for the Selected Regions in CA in Year 2022 for the High-wind Renewable Scenario ................................................................................ 66 Figure 4-15 SCE LMP in Week of July 17, 2022, in Three Cases for the High-wind Renewable Scenario ......................................................................................................................................... 66 Figure 4-16 Comparison of SMUD Generation of Two Cases by Generator Type for the Base Renewable Scenario in Year 2022 ................................................................................................ 79 Figure 4-17 Comparison of SMUD Generation of Two Cases by Generator Type for the High-wind Renewable Scenario in Year 2022 ................................................................................................ 80 Figure 4-18 Comparison of SMUD Generation Cost of Two Cases by Generator Type for the Base Renewable Scenario in Year 2022 ....................................................................................... 80 Figure 4-19 Comparison of SMUD Generation Cost of Two Cases by Generator Type for the High-wind Renewable Scenario in Year 2022 ............................................................................... 81 Figure 4-20 Comparison of SMUD Regional LMP in Two Cases in Year 2022 for the Base Renewable Scenario ..................................................................................................................... 84 Figure 4-21 Comparison of SMUD Regional LMP in Two Cases in Year 2022 for the High-wind Renewable Scenario ..................................................................................................................... 84 Figure 5-1 5-minute Actual Solar Generation and Hourly DA / HA Forecasts in Southern California in a Typical Winter Week of Year 2022 ......................................................................................... 85
15 | P a g e
Figure 5-2 5-minute Actual Wind Generation and Hourly DA / HA Forecasts in Southern California in a Typical Winter Week of year 2022 .......................................................................................... 86 Figure 5-3 5-minute Actual Solar Generation and Hourly DA / HA Forecasts in Southern California in a Typical Summer Week of year 2022 ...................................................................................... 87 Figure 5-4 5-minute Actual Wind Generation and Hourly DA / HA Forecasts in Southern California in a Typical Summer Week of Year 2022 ...................................................................................... 87 Figure 5-5 Wind and Solar generation forecasted error from DA to HA and HA to RT in Southern California in a typical winter week of year 2022. ........................................................................... 88 Figure 5-6 Wind and Solar generation forecasted error from DA to HA and HA to RT in Southern California in a typical winter week of year 2022. ........................................................................... 89 Figure 5-7 California Production Cost ($000) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance Outages in the RT Simulations) ................................................................................................................................... 91 Figure 5-8 California Startup Cost ($000) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance Outages in the RT Simulations) ................................................................................................................................... 93 Figure 5-9 California Thermal Generator Ramp Up (MW) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance Outages in the RT Simulations) ..................................................................................................... 95 Figure 5-10 California Thermal Generator Ramp Down (MW) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance Outages in the RT Simulations) ..................................................................................................... 96 Figure 5-11 California Production Cost ($000) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ..................................................................................................... 98 Figure 5-12 California Startup Cost ($000) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ................................................................................................................... 99 Figure 5-13 California Thermal Generator Ramp Up (MW) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ...................................................................................... 100 Figure 5-14 California Thermal Generator Ramp Down (MW) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ...................................................................................... 101 Figure 5-15 WI Production Cost ($000) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ................................................................................................................. 104 Figure 5-16 WI Startup Cost ($000) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ........................................................................................................................... 106 Figure 5-17 WI Thermal Generator Ramp Up (MW) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ................................................................................................... 108 Figure 5-18 WI Thermal Generator Ramp Down (MW) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ................................................................................................... 109 Figure 5-19 SMUD Production Cost ($000) from 3-stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ................................................................................................................. 112
16 | P a g e
Figure 5-20 SMUD Startup Cost ($000) from 3-stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ........................................................................................................................... 114 Figure 5-21 SMUD Thermal Generator Ramp Up (MW) from 3-stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ................................................................................................... 116 Figure 5-22 SMUD Thermal Generator Ramp Down (MW) from 3-stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations) ...................................................................................... 117
17 | P a g e
List of Tables Table 2.1-1 Renewable Generation Assumptions by BA in WI and the USA part of WI in year 2022 ............................................................................................................................................... 23 Table 2.2-1 Comparison of the annual peaks of the load regions in years 2020 and 2022 .......... 24 Table 2.2-2 Number of renewable generators modeled in the base and high-wind renewable sceneries ....................................................................................................................................... 25 Table 2.2-3 Mapping of the load regions and the contingency reserve sharing groups ............... 26 Table 2.2-4 Mapping of the load regions and the regulation / flexibility reserve sharing groups .. 27 Table 2.3-1 Characteristics of three proposed adjustable speed PSHs ........................................ 28 Table 2.3-2 Locations and Installed Capacity of the Existing FS PHS and Proposed AS PSHs in WI .................................................................................................................................................. 29 Table 2.4-1 Assumptions revisions in the database ...................................................................... 30 Table 2.4-2 Generator Characteristic Revisions and Eligibility for the Reserve Provisions .......... 31 Table 3.4-1 Simulation Scenario Combinations ............................................................................ 38 Table 3.4-2 Three Focused Simulation Areas: WI, California and SMUD .................................... 39 Table 4.1-1 Comparison of WI Production Cost in Three Cases for the Base Renewable Scenario in Year 2022 .................................................................................................................................. 40 Table 4.1-2 Comparison of WI Production Cost in Three Cases for the High-Wind Renewable Scenario in Year 2022 ................................................................................................................... 40 Table 4.1-3 Comparison of WI Renewable Curtailment in the Base Renewable Scenario .......... 43 Table 4.1-4 Comparison of WI Renewable Curtailment in the High-wind Renewable Scenario .. 43 Table 4.1-5 Comparison of WI Reserve Requirements and Provisions by PSHs in Three Cases for the Base Renewable Scenario in Year 2022 ........................................................................... 44 Table 4.1-6 Comparison of WI Reserve Requirements and Provisions by PSHs in Three Cases for the High-wind Renewable Scenario in Year 2022.................................................................... 44 Table 4.1-7 Comparison of WI Emission Productions in Three Cases in Year 2022 for the Base Renewable Scenario ..................................................................................................................... 44 Table 4.1-8 Comparison of WI Emission Productions in Three Cases in Year 2022 for the High-Wind Renewable Scenario ............................................................................................................ 45 Table 4.1-9 Comparison of Number of Starts and Startup Costs of the WI Thermal Generators in Year 2022 for the Base Renewable Scenario ............................................................................... 45 Table 4.1-10 Comparison of Number of Starts and Startup Costs of the WI Thermal Generators in Year 2022 for the High-wind Renewable Scenario ....................................................................... 45 Table 4.1-11 Comparison of Thermal Generator Ramp Up and Down of the WI Thermal Generators in Year 2022 for the Base Renewable Scenario ........................................................ 46 Table 4.1-12 Comparison of Thermal Generator Ramp Up and Down of the WI Thermal Generators in Year 2022 for the High-Wind Renewable Scenario ................................................ 46 Table 4.1-13 Comparison of WI Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the Base Renewable Scenario in Year 2022 .................................................. 50 Table 4.1-14 Comparison of WI Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the High-wind Renewable Scenario in Year 2022 .......................................... 55 Table 4.2-1 Statistics of CAISO Historical NP15 LMP and AS Clearing Prices in Year 2012 ...... 57 Table 4.2-2 Correlation of CAISO Historical NP15 LMP and AS Clearing Prices in Year 2012 ... 57 Table 4.2-3 CA AS Bidding Price Scaling Factor by Generator Type ........................................... 58 Table 4.2-4 Comparison of CA Production Cost in Three Cases for the Base Renewable Scenario in Year 2022 .................................................................................................................................. 59 Table 4.2-5 Comparison of CA Production Cost in Three Cases for the High-Wind Renewable Scenario in Year 2022 ................................................................................................................... 59
18 | P a g e
Table 4.2-6 Comparison of CA Renewable Curtailment in the Base Renewable Scenario .......... 62 Table 4.2-7 Comparison of CA Renewable Curtailment in the High-wind Renewable Scenario .. 62 Table 4.2-8 Comparison of CA Reserve Requirements and Provisions by PSHs in Three Cases for the Base Renewable Scenario in Year 2022 ........................................................................... 62 Table 4.2-9 Comparison of CA Reserve Requirements and Provisions by PSHs in Three Cases for the High-wind Renewable Scenario in Year 2022.................................................................... 63 Table 4.2-10 Comparison of CA Emission Productions in Three Cases in year 2022 for the Base Renewable Scenario ..................................................................................................................... 63 Table 4.2-11 Comparison of CA Emission Productions in Three Cases in Year 2022 for the High-Wind Renewable Scenario ............................................................................................................ 63 Table 4.2-12 Comparison of Number of Starts and startup Costs of the CA Thermal Generators in Year 2022 for the Base Renewable Scenario ............................................................................... 64 Table 4.2-13 Comparison of Number of Starts and startup Costs of the CA Thermal Generators in Year 2022 for the high-wind Renewable Scenario ........................................................................ 64 Table 4.2-14 Comparison of Thermal Generator Ramp Up and Down of the CA Thermal Generators in Year 2022 for the Base Renewable Scenario ........................................................ 64 Table 4.2-15 Comparison of Thermal Generator Ramp Up and Down of the CA Thermal Generators in Year 2022 for the High-Wind Renewable Scenario ................................................ 65 Table 4.2-16 California Generator Generation, Generation Cost, Energy Revenue and Ancillary Service Revenue for the Base Renewable Scenario in Year 2022 ............................................... 68 Table 4.2-17 California Generator Generation, Generation Cost, Energy Revenue and Ancillary Service Revenue for the High-wind Renewable Scenario in Year 2022 ....................................... 69 Table 4.2-18 California PSH Net Operating Revenue for the Base Renewable Scenarios in Year 2022 from the Simulations with FS PSHs ..................................................................................... 70 Table 4.2-19 California PSH Net Operating Revenue for the Base Renewable Scenarios in Year 2022 from the Simulations with FS & AS PSHs ............................................................................ 71 Table 4.2-20 California PSH Net Operating Revenue for the High-Wind Renewable Scenarios in Year 2022 from the Simulation with FS PSHs ............................................................................... 72 Table 4.2-21 California PSH Net Operating Revenue for the High-Wind Renewable Scenarios in Year 2022 from the Simulation with FS&AS PSHs ....................................................................... 73 Table 4.2-22 Comparison of CA Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the Base Renewable Scenario in Year 2022 .................................................. 75 Table 4.2-23 Comparison of CA Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the High-wind Renewable Scenario in Year 2022 .......................................... 77 Table 4.3-1 Comparison of SMUD Production Cost in Two Cases for the Base Renewable Scenario in Year 2022 ................................................................................................................... 78 Table 4.3-2 Comparison of SMUD Production Cost in Two Cases for the High-Wind Renewable Scenario in Year 2022 ................................................................................................................... 78 Table 4.3-3 Comparison of SMUD Renewable Curtailment in the High-wind Renewable Scenario ....................................................................................................................................................... 81 Table 4.3-4 Comparison of SMUD Reserve Requirements and Provisions by PSH in Two Cases for the Base Renewable Scenario in Year 2022 ........................................................................... 81 Table 4.3-5 Comparison of SMUD Reserve Requirements and Provisions by PSH in Two Cases for the High-wind Renewable Scenario in Year 2022.................................................................... 82 Table 4.3-6 Comparison of SMUD Emission Productions in Two Cases in Year 2022 for the Base Renewable Scenario ..................................................................................................................... 82 Table 4.3-7 Comparison of SMUD Emission Productions in Two Cases in Year 2022 for the High-Wind Renewable Scenario ............................................................................................................ 82
19 | P a g e
Table 4.3-8 Comparison of Number of Starts and Startup Costs of the SMUD Thermal Generators in Year 2022 for the Base Renewable Scenario ........................................................................... 82 Table 4.3-9 Comparison of Number of Starts and Startup Costs of the SMUD Thermal Generators in Year 2022 for the High-wind Renewable Scenario .................................................................... 83 Table 4.3-10 Comparison of Thermal Generator Ramp Up and Down of the SMUD Thermal Generators in Year 2022 for the Base Renewable Scenario ........................................................ 83 Table 4.3-11 Comparison of Thermal Generator Ramp Up and Down of the SMUD Thermal Generators in Year 2022 for the High-wind Renewable Scenario ................................................ 83 Table 5.1-1 Max and Min Wind and Solar Forecast Errors in Southern California in a Typical Winter Week of year 2022 ............................................................................................................. 86 Table 5.1-2 Max and Min Wind and Solar Forecast Error in Southern California in a Typical Summer Week of Year 2022 ......................................................................................................... 88 Table 6.2-1 Reserve Provisions from Adjustable Speed PSH in % of Total Reserve Requirements ..................................................................................................................................................... 119 Table 6.9-1 Transmission line expansion for high-wind renewable scenario .............................. 126 Table 6.9-2 Transmission interface expansion for high-wind renewable scenario ..................... 126
20 | P a g e
1 Introduction
The work to be performed under this project is in response to the Funding Opportunity Announcement DE-FOA-0000486, which was issued by U.S. Department of Energy (DOE) on April 5, 2011. Argonne National Laboratory (Argonne) has teamed up with several project partners and submitted a proposal on June 6, 2011. In September 2011, DOE announced the selection of Argonne’s team for an award for Subtopic 2.2: Detailed Analysis to Demonstrate the Value of Advanced Pumped Storage Hydropower in the U.S.
Energy Exemplar is engaged in this project to perform the power system operation simulation to evaluate the Fixed Speed Pumped-storage Hydro-generators (FS PSH) and the Adjustable Speed Pumped-storage Hydro-generators (AS PSH) in the areas of
1. Quantifying the value of the FS and AS PSHs under different market conditions and for different levels of variable renewable generation (wind and solar) in the system;
2. Providing information about the full range of benefits and value of PSH and CH plants and recommendations for appropriate business models for future PSH projects.
This report describes the database used for the power system operation simulation, the algorithm modeling the power system, the simulation results for the different renewable generation scenarios, and the findings.
The report is organized in the following way: Section 2 describes WI Database and Assumption Revisions; Section 3 presents Modeling Approaches; Section 4 presents Simulation Results; Section 5 presents Three-Stage DA-HA-RT Sequential Simulations; Section 6 summarizes Findings.
21 | P
2 W
2.1
The RThe WpoweBritisnorth
Figure
The Bcommother
The W
The g
P a g e
WI Datab
1 Introduc
Region used WECC TEPPer systems insh Columbiahern Mexico
2‐1 Diagram of
Balancing Amitment meer.
WI network
Over 17,0Over 22,091 interfa
generation fa
Over 3,708 existing
base and
tion of Wes
for the simuPC 2022 dat
n 39 load rega and Albertaas shown in
the WI Load Re
Authority Areeting their de
is represente
000 buses 000 transmisaces (enforce
acilities cons
00 generatorg Pumped-St
d Assum
stern Interc
ulations in thtabase is trangions in the wa in Canada,
n Figure 2-1.
gions
eas (BAA) inemands whil
ed by
ssion lines (1ed) and 33 N
sist of
s (including torage Hydro
mption Re
onnection D
his study is tnslated into Pwest coast of and Comisi
n the WI opele performin
1045 lines arNomograms (
renewables)o Plants (20
evisions
Database
the Western PLEXOS. Tf United Station Federal d
erates indepeng the econom
re enforced)(enforced)
) units)
InterconnecThe database
tes, plus prode Electricid
endently in tmic exchang
tion (WI). covers
ovinces of dad (CFE) in
term of unit ge with each
n
h
22 | P a g e
3 New Pumped-Storage Hydro Plants (11 units)
The gas price is = $4.6/mmBTU.
The forecasted energy and peak for the WI in year 2022 are
Energy Demand for the WI = 985,457 GWh; Energy Demand for the USA part in the WI is 786,275 GWh;
Coincident Peak for the WI = 168,972 MW; Coincident Peak for the USA part in the WI is 146,718 MW.
The forecasted energy demand includes the transmission losses [1], [2].
Renewable Energy Mix Assumption in the USA part of the WI for year 2022 is
Based Renewable Generation Scenario: Wind and solar generation energy is 108,993 (GWh) that is 14% of the energy demand in the USA part of the WI;
High-wind Renewable Generation Scenario: Wind and solar generation energy is 273,842 (GWh) that is 34% of the energy demand in the USA part of the WI.
The renewable generations by BA for the base and high-wind renewable generation scenarios are listed in the following table.
Renewable Generation Assumptions by BA in WI and the USA part of WI in Year 2022
BA Sum of Net Load (GWh)
High‐wind Renewable Scenario Base Renewable Scenario
Wind and Solar Energy (GWh)
Ratio of Renewable Energy and
Load
Wind and Solar Energy (GWh)
Ratio of Renewable Energy and
Load
AESO 114,066 ‐ 0.0% ‐ 0.0%
APS 43,062 11,582 26.9% 5,355 12.4%
AVA 14,237 6,007 42.2% 5,566 39.1%
BANC 16,442 6,512 39.6% 536 3.3%
BCTC 66,095 ‐ 0.0% ‐ 0.0%
BPA 60,804 18,153 29.9% 9,848 16.2%
CAISO 222,675 45,771 20.6% 30,482 13.7%
CFE 19,021 709 3.7% 686 3.6%
CHPD 4,077 ‐ 0.0% ‐ 0.0%
DOPD 2,047 ‐ 0.0% ‐ 0.0%
EPE 11,161 583 5.2% 150 1.3%
GCPD 4,924 1,035 21.0% ‐ 0.0%
IID 4,541 4,835 106.5% 3,772 83.1%
IPC 21,031 2,528 12.0% 1,160 5.5%
LDWP 37,118 6,629 17.9% 5,461 14.7%
NEVP 28,523 7,118 25.0% 1,903 6.7%
NWMT 11,175 19,994 178.9% 2,338 20.9%
23 | P a g e
Renewable Generation Assumptions by BA in WI and the USA part of WI in Year 2022
BA Sum of Net Load (GWh)
High‐wind Renewable Scenario Base Renewable Scenario
Wind and Solar Energy (GWh)
Ratio of Renewable Energy and
Load
Wind and Solar Energy (GWh)
Ratio of Renewable Energy and
Load
PACE 56,175 24,830 44.2% 6,288 11.2%
PACW 21,128 9,607 45.5% 8,643 40.9%
PGN 23,163 55 0.2% ‐ 0.0%
PNM 16,695 18,066 108.2% 2,149 12.9%
PSC 39,347 11,330 28.8% 6,036 15.3%
PSE 26,308 2,813 10.7% 704 2.7%
SCL 10,926 118 1.1% ‐ 0.0%
SPP 12,927 8,575 66.3% 921 7.1%
SRP 34,546 7,795 22.6% 2,413 7.0%
TEP 15,087 3,244 21.5% 696 4.6%
TIDC 2,718 14 0.5% ‐ 0.0%
TPWR 5,605 28 0.5% ‐ 0.0%
WACM 31,332 45,541 145.3% 8,321 26.6%
WALC 7,664 9,696 126.5% 5,890 76.9%
WAUW 837 1,386 165.6% 361 43.1%
WI 985,457 274,551 27.9% 109,679 11.1%
WI‐USA 786,275 273,842 34.8% 108,993 13.9% Table 2.1‐1 Renewable Generation Assumptions by BA in WI and the USA part of WI in year 2022
2.2 Data readiness for the simulations
2.2.1 Regional load representation
The day-ahead (DA) and hour-ahead (HA) load forecasts and 5-min actual loads in year 2020 are received from PNNL for the WECC VGS study [6]. The load forecasts and actual loads in year 2020 are translated to year 2022 with the weekly patterns synchronized in these two years. Then the DA and HA load forecasts and the RT 5-minutes actual loads in year 2022 are scaled by the peak ratios between year 2022 and year 2020. The peak ratios are calculated using the load regional peaks in the WECC TEPPC 2020 and 2022 database documents [1], [2].
The forecasted peak loads in year 2020 and year 2022 are listed in the following table.
Load Region 2022 Peak (MW)
2020 Peak (MW)
Peak Ratio of 2022/2020
AESO 15867 15,049 1.05
APS 9787 8,407 1.16
AVA 2720 2882 0.94
24 | P a g e
BCTC 11996 11393 1.05
BPA 10463 10377 1.01
CFE 3461 3250 1.06
CHPD 722 719 1.00
DOPD 424 458 0.93
EPEC 2244 2135 1.05
FAR EAST 725 555 1.31
GCPD 858 865 0.99
IID 1201 1242 0.97
LADWP 8200 6778 1.21
MAGIC 1382 1170 1.18
NEVP 6734 6583 1.02
NWMT 1833 1866 0.98
PACE_ID 862 834 1.03
PACE_UT 8487 8180 1.04
PACE_WY 1858 1871 0.99
PACW 4266 3904 1.09
PG&E_BAY 8940 9309 0.96
PG&E_VLY 12126 14593 0.83
PGN 4220 4294 0.98
PNM 2976 2852 1.04
PSCO 7954 9320 0.85
PSE 5322 5355 0.99
SCE 22311 26232 0.85
SCL 1909 1924 0.99
SDGE 4817 5033 0.96
SMUD 4303 4886 0.88
SPPC 2158 2137 1.01
SRP 7521 8800 0.85
TEP 3128 3660 0.85
TID 674 787 0.86
TPWR 1040 1031 1.01
TREAS 2777 2504 1.11
WACM 4724 4651 1.02
WALC 1600 1591 1.01
WAUM 153 118 1.30
Sum of Non‐coincident Peak 192,743 197,595 0.98
Sum of Coincident Peak 168,972 174,134 0.97 Table 2.2‐1 Comparison of the annual peaks of the load regions in years 2020 and 2022
2.2.2 Renewable Generation Profile Representations
The wind and solar hourly day-ahead (DA) and 4-hour-ahead (4-HA) generation forecasts and the real-time (RT) 5-min actual generations in year 2020 are received for
25 | P a g e
the base renewable generation scenario and the high-wind renewable generation scenario from the NREL WWSIS phase 2 study [5]. The wind and solar generation forecasts and actual generation profiles in year 2020 are translated into year 2022 with the weekly patterns synchronized in these two years.
The number of solar generators and wind generators for the base renewable scenario and the high-wind renewable scenario are listed in the following table.
Scenario Number of Wind Generators Number of Solar Generators
Base Renewable 79 60
High‐wind Renewable 151 405Table 2.2‐2 Number of renewable generators modeled in the base and high‐wind renewable sceneries
2.2.3 Contingency, Flexibility and Regulation Reserve Representations
2.2.3.1 Contingency Reserves
The requirements of contingency reserves, i.e. spinning and non-spinning reserves are defined for eight spinning reserve sharing groups. The mapping between the eight spinning reserve sharing groups and the thirty-nine load regions is specified in the following table.
Spinning Reserve Sharing Group
Load Region
AESO AESO
AZNMNV
APS
EPE
NEVP
PNM
SRP
TEP
WALC
BASIN
FAR EAST
MAGIC VLY
PACE_ID
PACE_UT
PACE_WY
SPP
TREAS VLY
BCH BCH
CALIF_NORTH
PG&E_BAY
PG&E_VLY
SMUD
TIDC
CALIF_SOUTH
CFE
IID
LDWP
26 | P a g e
SCE
SDGE
NWPP
AVA
BPA
CHPD
DOPD
GCPD
NWMT
PACW
PGN
PSE
SCL
TPWR
WAUW
RMPPPSC
WACM Table 2.2‐3 Mapping of the load regions and the contingency reserve sharing groups
The spinning reserve requirement in a contingency reserve sharing group is 3% of the load in the group. The spinning reserve is provided by the eligible on-line generators in the group. The eligible generators to provide the spinning reserve are specified by generator type in Table 2.4-2 Generator Characteristic Revisions.
The non-spinning reserve requirement in a contingency reserve sharing group is 3% of the load in the group. The non-spinning reserve is provided by the eligible on-line generators and the off-line quick startup generators in the group. The eligible generators to provide the non-spinning reserve are specified by generator type in Table 2.4-2 Generator Characteristic Revisions.
2.2.3.2 Flexibility and Regulation Reserves
The hourly flexibility and regulation reserve requirements for the DA, 4-HA simulations and the 5-min regulation reserve requirements for the 5-min RT simulations in year 2020 are received for the base and high-wind renewable scenarios from the NREL WWSIS phase 2 study [5]. The reserve requirements in year 2020 are translated to year 2022 with the weekly patterns synchronized in these two years.
The flexibility and regulation reserve requirements are defined for twenty flexibility / regulation reserve sharing groups. The mapping between the twenty flexibility / regulation reserve sharing groups and the thirty-nine load regions are specified in the following table.
Flex/regulation Reserve Sharing Group Load Region
Alberta AESO
Arizona
APS
SRP
TEP
27 | P a g e
WALC
British Columbia BCH
California, North
PG&E_VLY
TIDC
California, South SCE
Colorado
PSC
WACM
Idaho
FAR EAST
MAGIC VLY
PACE_ID
TREAS VLY
IID IID
LDWP LDWP
Mexico (CFE) CFE
Montana
NWMT
WAUW
Nevada, North SPP
Nevada, South NEVP
New Mexico
EPE
PNM
Northwest
AVA
BPA
CHPD
DOPD
GCPD
PACW
PGN
PSE
SCL
TPWR
San Diego SDGE
San Francisco PG&E_BAY
SMUD SMUD
Utah PACE_UT
Wyoming PACE_WY Table 2.2‐4 Mapping of the load regions and the regulation / flexibility reserve sharing groups
2.3 Adjustable Speed PSH Representation
There are eight existing Fixed Speed PSH (FS PSHs) plants in the WI. The existing PSHs can pump only at the full pumping capacity. Therefore, the existing FS PSHs cannot provide regulation reserve in the pumping mode. In the generating mode, the existing FS PSHs have the minimum generating capacity at 70% of their maximum generating capacity. Therefore the existing FS PSHs can provide reserves in the
28 | P a g e
dispatchable generating capacity range of 30% of the maximum generating capacity in the generating mode.
There are three proposed Adjustable Speed PSHs (AS PSHs) to be built in California and its adjacent areas. The table below provides key technical characteristics of the three PSH projects as they were specified in PLEXOS simulation runs. Please note that these projects are still in planning stage and final project characteristics may be different.
Properties IOWA HILL EAGLE MOUNTAIN SWAN LAKE North
Units 3 4 4
Max Cap per Unit (MW) 133 350 345
Min Cap per Unit (MW) 39.9 105 103.5
Max Pump Load (MW) 133 350 345
Min Pump Load (MW) 79.8 210 207
Upper Storage (GWh) 5 25.5 10
Lower Storage (GWh) 5 25.5 10
Cycle Efficiency 80.472% 80.472% 80.472%
Connected Bus 37001_CAMINO S
( 230KV) 28195_Red Bluff
(500KV) 45035_CAPTJACK
(500KV) Table 2.3‐1 Characteristics of three proposed adjustable speed PSHs
The AS PSHs have the minimum pumping capacity at 70% of the maximum pumping capacity. Therefore the AS PSHs can provide reserves in the dispatchable pumping capacity range of 30% of the maximum pumping capacity in the pumping mode. The AS PSHs have the minimum generating capacity at 30% of the maximum generating capacity. Therefore, the AS PSHs can provide reserves in the dispatchable generating capacity range of 70% of the maximum generating capacity in the generating mode.
The location and installed capacity of the existing FS and proposed AS PSHs are summarized in the following table.
PSH Location Region
Spinning Reserve Sharing Group
Regulation Reserve Sharing Group
Number of Units
Total Capacity (MW)
Generator Type
Cabin Creek PSC RMPP Colorado 2 324Fixed Speed
Castaic LDWP CALIF_SOUTH LDWP 6 1175Fixed Speed
Eastwood SCE CALIF_SOUTH SCE 1 199Fixed Speed
Elbert WACM RMPP Colorado 2 200Fixed Speed
Helms PG&E_VLY CALIF_NORTH PG&E Valley 3 1212Fixed Speed
Horse Mesa SRP AZNMNV Arizona 3 96Fixed Speed
Lake Hodge SDGE CALIF_SOUTH SDGE 2 40Fixed Speed
Mormon Flat SRP AZNMNV Arizona 1 50Fixed Speed
Eagle Mount SCE CALIF_SOUTH SCE 4 1400Adjustable Speed
Iowa Hill SMUD CALIF_NORTH SMUD 3 399Adjustable Speed
Swan Lake BPA NWPP NWPP 4 1380Adjustable Speed
29 | P a g e
Grand Total 31 6475 Table 2.3‐2 Locations and Installed Capacity of the Existing FS PHS and Proposed AS PSHs in WI
2.4 Data Assumption Revisions
The WI database of year 2022 is translated from the WECC TEPPC 2022. Per stakeholder meetings, a few data revisions were performed to ensure that the assumptions in the database are close to the real world. The data revisions are listed in the following table.
Items Revision Descriptions Notes
1 The existing FS PSHs are changed to be modeled by individual unit
2 The Min Pump Capacity is changed to be the Max Pump Capacity for the existing FS PSHs
The existing PSHs cannot provide regulation reserves in the pumping mode.
3 The Min Generating Capacity is changed to be 70% of the Max Generating Capacity for the existing FS PSHs
4 The Min Generating Capacity is changed to 90% of the Max Generating Capacity for the nuclear generators
5 The Economic Demand Responses are modeled as dispatchable with the dispatch prices in the range of $500/MWh and zero minimum capacity
6
The Interruptible Demand Responses are modeled as dispatchable with the dispatch prices in the range of $1,200~$1,872/MWh and zero minimum capacity
7 Un‐served energy penalty price is changed to $3,500/MWh. And the dump power price is changed to: ‐ $100/MWh
8 Regulation reserve shortfall penalty price is set to $1,100/MW
9 Spinning reserve shortfall penalty price is set to $900/MW
10 Non‐spinning reserve shortfall penalty price is set to $700/MW
11 Flexibility reserve shortfall penalty price is set to $600/MW
12 Transmission line and interface limit penalty price is changed to $6,000/MWh
13 All Co‐gen generators cannot provide reserves
14 Fixed hydro generation profiles and renewable generation profiles can be curtailed at the penalty price of: ‐$22/MWh
30 | P a g e
15
Three‐Block Heat Rate (HR) curves are created for generators of CC, Coal and CT, by escalating the HR curves from the NREL WWSIS Phase 2 study with the ratio of HR at Max Capacity in the TEPPC database over the HR at Max Capacity from NREL WWSIS phase 2 study.
See the rest of this subsection for details
16
The start cost of CCs and CTs is determined by only the start‐up fuel cost from the TEPPC database. The start cost of other thermal generators is determined by the start cost from the TEPPC database.
Table 2.4‐1 Assumptions revisions in the database
Further generator characteristic revisions are listed in the following table. Their eligibilities to provide different types of reserve are listed in the table as well. The yellow marked cells indicate the data revisions.
Generator Type
Minimum Operating Capacity (% of Max Cap)
Provide 5‐minute
Regulation
Provide 10‐minute Spinning and non‐Spinning Reserve
Provide 60‐min
Flexibility Reserve
Biomass RPS 31
CC Cogen 51.7
CC Frame F 53.2 Yes Yes Yes
CC Frame G 48.3 Yes Yes Yes
CC G + H 55.0 Yes Yes Yes
CC Old 57.1
CC Recent 53.2 Yes Yes Yes
Coal Cogen 55
Coal Large Old 80 Yes Yes Yes
Coal Large Recent 80 Yes Yes Yes
Coal Small 70
Coal Small Old 70
Coal Small Recent 70 Yes Yes Yes
Coal SuperC 80 Yes Yes Yes
Conventional Hydro ~44 Yes Yes Yes
Conventional Hydro_Fixeddispatch ‐
CT Cogen 43
CT Future
50
Yes Yes
CT Large Yes Yes
CT LM 6000 Yes Yes
CT Old Gas Yes Yes
CT Old Oil Yes Yes
31 | P a g e
CT Small Yes Yes
Demand CHP 99
Econ DR 0
Geothermal 50
IC 23 Yes Yes
Interrupt. DR 0 Yes Yes
Negative Bus Load ‐
Nuclear 90
Other Steam 34 Yes Yes
PC Cogen 50
PC Steam 8 Yes Yes
Fixed Speed Pumped Storage 70 Yes Yes Yes
Pumping Load ‐
Small Hydro RPS ‐
Small Hydro RPS_Fixeddispatch ‐
Solar ‐
Steam Cogen 30
Steam Large Old 80 Yes Yes
Steam Large Recent 80 Yes Yes
Steam Small Old 70 Yes Yes
Steam Small Recent 70 Yes Yes
Wind ‐
Adjustable Speed Pumped Storage 30 Yes Yes Yes
Table 2.4‐2 Generator Characteristic Revisions and Eligibility for the Reserve Provisions
For the generators of Coal, CC and CT, the heat rates are defined at the 50%, 80% and 100% of the max capacities. In the simulation, the heat rates are linearly interpolated for the load points at 50%, 80% and 100% of the max capacities. In reference [4], the typical average heat rate curves derived from the Continuous Emission Monitoring System (CEMS) are shown in the following diagram.
32 | P
Figure
Thesecapacheat r
The nchanggenerspinn
The mAdeqyear 2are geduratAnd t
P a g e
2‐2 The Average
e generator hcity from therates in the d
non-spinningged to 3% ofrators with thning off-line.
maintenancequacy modul2022 by usinenerated by tions. The mthe maintena
e Heat Rates for
heat rate cure WECC TEdatabase for
g reserve reqf the loads inhe max capa.
e outages arele (PASA) tong the user-dusing random
maintenance ance and for
r Coal, CC, CT an
rves are scaleEPPC 2022 d
this study.
quirements fon the contingacity equal to
e scheduled bo level the redefined mainm draws on outages will
rced outages
nd Gas Steam Ge
ed by the avdatabase befo
for eight contgency reservo or less than
by the PLEXegional capantenance ratethe user-def
l be modeledwill be mod
enerators [4].
erage heat raore being app
tingency resve sharing grn 100 MW c
XOS Projectecity reserve es and duratifined annuald for the DAdeled in the 5
ate at the maplied to the g
serve sharingroups. The Ccan provide t
ed Assessmemargin overions. The fol forced outa
A and 4-HA s5-min RT sim
aximum generator
g groups are CT the non-
ent of Supplyr the days inorced outageage rates andsimulations. mulations.
y n es d
33 | P
3 M
3.1
PLEXmajorAppl
Figure
The uoptimconstenerg
The rThe Nnomothe cotransmcontinsoluti
The s(som
One oconst
The Mbe ill
P a g e
Modeling
1 PLEXOS
XOS’ Securir logics: Uniications. Th
3‐1 PLEXOS Sec
unit commitmmization usintraints. The gy demand a
resource schNetwork Appograms. Theontingenciesmission liminues until alion of Energ
same algorithe ISO marke
of the advantraint in the M
MIP mathemustrated by t
g Approa
S SCUC/ED
ity Constrainit Commitm
he SCUC / E
curity Constraine
ment and econg Mixed IntUC/ED logi
and meet the
edules from plications loe Network As are definedits are passedll transmissiogy-AS-DC-O
hm for the Set scheduling
ntages of the MIP formula
matical formuthe followin
aches
D algorithm
ned Unit Comment using MED simulatio
ed Unit Commit
onomic dispteger Prograic commits asystem rese
the UC/ED ogic solves thApplications d. If there ard to the UC/on limit viol
OPF is reache
SCUC/ED is g software m
MIP algorita can be exa
ulation for thg formula.
mmitment (Sixed Integern algorithm
tment and Econo
patch (UC/EDmming enfo
and dispatcherve requirem
are passed the DC-OPF logic also pe
re any transm/ED logic forlations are reed.
used by manmay use AC-
thm is its tranamined and e
he Energy-A
SCUC) algorr Programmiis illustrated
omic Dispatch A
D) logic perforcing all reshes resourcesments.
to the Netwoto enforce therforms the
mission limitr the re-run oesolved. Thu
ny ISO mark-OPF in the N
nsparency. explained.
AS-DCOPF-P
rithm consising and Netwd in the follo
Algorithm
forms the Ensource and ops to balance t
ork Applicathe power flocontingencyt violations, of UC/ED.
us the co-opt
ket schedulinNetwork Ap
Any cost co
PSH co-opti
sts of two work owing figure
nergy-AS coperation the system
ions logic. ow limits andy analysis if these The iterationtimization
ng software pplications).
omponent or
imization can
e.
o-
d
n
n
34 | P a g e
min ∙ ∙ , ∙ ,
Subject to
∙ ∀ ,
(Energy Balance Constraint) ∙ ∀ ,
PSHStorageBalanceConstraint
,, ∀ , ,
AS RequirementConstraints
,,
, ,, ∀ , , ,
Generator AScapacityConstraints
, ∙ , , ∙ ∀ , ,
(GenerationandASCapacityConstraints
,, ∙ ∀ , ,
GenerationandASRampCapacityConstraint
, , ∙ , ∀ , ,
Transmissionline LimitConstraints
, , ∙ ,
∈
, , ∀ , ,
Interface LimitConstraints Generator Chronological Constraints
Resource Constraints User-Defined Constraints
Where
- Generation from generator at interval ;
- Generation cost of generator at interval ;
- Unit commitment status of generator at interval ; 1=on-line, 0=off-line
- Startup / shut down cost of generator at interval ;
35 | P a g e
, - AS provision from generator to AS at interval ;
, - AS provision cost of generator to AS at interval ;
- PSH generating efficiency;
- PSH pumping efficiency;
- PSH generation at interval ;
- PSH pump at interval ;
- Load at bus at interval ;
- Transmission losses of line at interval ; , - Min capacity of generator at interval ;
, - Max capacity of generation at interval ; , - Max ramp up / down rate;
, - Min AS requirement for AS at interval ;
,, - Min AS provision of generator for AS at interval ;
,, - Max AS provision of generator for AS at interval ;
, - Power Transfer Distribution Factor of bus to transmission line for post-contingency network ( 0 is the pre-contingency network);
, - Line flow in transmission line at interval for post-contingency network ;
, , - Min line flow of transmission line at interval for post-contingency network ;
, , - Max line flow of transmission line at interval for post-contingency network ;
- Line coefficient of transmission line in interface ;
, , - Min interface flow of interface at interval for post-contingency network ; , , - Max interface flow of interface at interval for post- contingency
network ;
The PSH pumping and generating are incorporated in Constraints “(Energy Balance Constraint)” and “(PSHStorageBalanceConstraint ”. By so doing, the PSH operation is co-optimized with other variables: energy, ancillary services, power flow, etc. This formula is different from other legacy PSH dispatch algorithm: generating a thermal cost curve, then dispatching PSH against the thermal cost curve, and finally re-dispatching
36 | P
thermassumpricemark
3.2
PLEXvery variabin conthe reis des
Figure
D
H
P a g e
mal generatormes that PSHs. Actually,
ket energy an
2 3-Stage
XOS is capabuseful whenbility and unnjunction ofeal world mascribed as fo
3‐2 DA‐HA‐RT 3
DA simulatioo Day-ao The So The tro The co
modelHA simulatio
o The 4o The h
rs with the PH is a price-t PSH can pr
nd AS prices
DA-HA-RT
ble of simuln evaluating tncertainty. Uf the day-ahearket operatiollows.
3‐stage Sequent
on mimics tahead forecaSCUC/ED opransmission ontingency, led. on mimics t-hour-aheadour-ahead fo
PSH operatiotaker facilityrovide energy will be imp
T Sequentia
ating power the ramp cap
Usually, the ead (DA) andion. The 3-s
ial Simulations
he DA SCUasted load/wiptimization wnetwork is mflexibility u
the intra-dad forecasted worecasted loa
on frozen. Ty and its opery and ancilla
pacted by the
al Simulatio
markets at apacity adequsub-hourly ed hour-aheadstage DA-HA
UC/SCED ind/solar genwindow is 24modeled at thup/down, reg
ay SCUC/SCwind / solarad time serie
This legacy Pration does nary service se PSH operat
ons
a sub-hourlyuacy for the reconomic did (HA) unit A-RT sequen
neration time4 hours at hohe nodal lev
gulation up/d
CED generation t
es are used;
PSH dispatchnot impact thsimultaneoustion.
y interval. Trenewable gispatch capabcommitmenntial simulat
e series are uourly interva
vel; down reserve
time series a
h algorithm he system sly and the
This feature igeneration bility works
nt to mimic tion approach
used; al;
es are
are used;
s
h
37 | P a g e
o The SCUC/ED optimization window is 4-hour plus 20-hour look-ahead with 2-hour interval;
o The unit commitment patterns from the DA simulation are frozen for generators with Min Up/Down Time greater than 4 hours;
o The transmission network is modeled at the nodal level; o The contingency, flexibility up/down, regulation up/down reserves are
modeled. RT simulation mimics the 5-min real-time SCED
o The “Actual” 5-min load/wind/solar generation time series are used; o The SCED optimization window is twelve 5-min plus 23 look-ahead with
hourly interval; o The unit commitment patterns from the HA simulation are frozen; o The transmission network is modeled at the nodal level; o The contingency, regulation up/down reserves are modeled. However, the
flexibility up/down reserves are not modeled. The implication is that the capacity held in the HA simulation for the flexibility reserves is deployed to cover the load and renewable generation variability and uncertainty at the 5-min interval;
o CT with max capacity less than 100MW could be committed or de-committed in the 5-min RT simulation.
3.3 PSH Storage Modeling in 3-stage Sequential Simulations
In the DA simulation, the SCUC/ED is performed in a 24-hour window. The PSHs are dispatched by PLEXOS SCUC/ED according to the formulation in Section 3.1 PLEXOS SCUC/ED algorithm. The storage volume of a PSH at the end of the 24-hour optimization window is constrained to the storage volume at the beginning of the optimization window. A penalty price of $1,000/MWh is applied to the storage volume constraints.
In the HA simulation, the SCUC/ED is performed in a 4-hour plus 20-hour look-ahead window. The simulation solution in the first 4 hours is saved; then the SCUC/ED is performed for the next 4-hours in a 4-hour plus 20-hour look-ahead window, and so on. The PSHs are re-dispatched in the HA simulation according to the formulation in Section 3.1 PLEXOS SCUC/ED algorithm. The storage volume of a PSH at the end of the optimization window is constrained to the storage volume from the DA simulation. A penalty price of $1,000/MWh is applied to the storage volume constraints.
In the 5-min RT simulation, the SCUC/ED is performed in a twelve 5-minutes plus 23-hour look-ahead window. The simulation solution in the first twelve 5-minutes is saved; then the SCUC/ED is performed for the next twelve 5-minutes in a twelve 5-minutes plus 23-hour look-ahead window, and so on. The PSHs are re-dispatched in the RT simulation according to the formulation in Section 3.1 PLEXOS SCUC/ED algorithm. The storage volume of a PSH at the end of the optimization window is constrained to the storage volume from the HA simulation. A penalty price of $1,000/MWh is applied to the storage volume constraints.
38 | P a g e
3.4 Scope of Simulations
The simulation scope covers the base renewable generation scenario and the high-wind renewable generation scenario with and without fixed-speed PSHs or adjustable-speed PSHs modeled. The simulation scenario combinations are listed in the following table.
Case Renewable Scenario FS PSHs Modeled
AS PSHs Modeled
Base 1 Base No No
Base 2 Base Yes No
Base 3 Base Yes Yes
High‐wind 1 High‐wind No No
High‐wind 2 High‐wind Yes No
High‐wind 3 High‐wind Yes Yes Table 3.4‐1 Simulation Scenario Combinations
The DA simulations are performed for the full year 2022 for all cases. However, the three-stage simulations are performed for four typical weeks for the each case: the third weeks of January, April, July and October in year 2022 starting on Sunday.
This study focuses on three areas: WI, California and SMUD. In the WECC TEPPC database, the load region SMUD represents the Balancing Authority of Northern California (BANC) that includes
Sacramento Municipal Utility District (SMUD), Modesto Irrigation District (MID), Roseville Electric, and Redding Electric Utility.
For consistency, the name of SMUD is used in the remaining of this document for BANC.
The California footprint and the SMUD footprint are carved out from the WI database. The simulations for the above mentioned cases are repeated for the carved-out California and SMUD footprints. The carved-out California footprint will be simulated as a bid-based market. The system information of the entire WI, the carved-out California footprint and the carved-out SMUD footprint is listed in Table 3.4-2 Three Focused Simulation Areas: WI, California and SMUD
Model System WI CA SMUD
Load Regions 39 9 1
Buses over 17,000 over 4000 over 250
Transmission Lines over 22,000 over 5952 over 300
Interfaces 91 31 0
Generator over 3,700 0ver 700 over 60
Existing FS PSHs 8 4 0
New AS PSHs 3 2 1
Network Representation Nodal Nodal Zonal
DA Simulation Step 24‐hour 24‐hour 24‐hour
HA Simulation Step 4 hours plus 20‐ 4 hours plus 20‐ 4 hours plus 20‐
39 | P a g e
hour look‐ahead hour look‐ahead hour look‐ahead
RT Simulation Step 12 5‐minutes plus
23‐hour look‐ahead12 5‐minutes plus
23‐hour look‐ahead12 5‐minutes plus
23‐hour look‐ahead
Simulation Base Cost‐base Bid‐base Cost‐baseTable 3.4‐2 Three Focused Simulation Areas: WI, California and SMUD
40 | P a g e
4 Simulation Results
The simulation results for three focus areas, WI, California, and SMUD, are presented in this section for the cases of without PSHs, with FS PSHs and with additional AS PSHs, and the base and high-wind renewable scenarios.
4.1 WI Simulation Results
The assumptions and settings for the WI simulations are reiterated as follows.
1. DA forecasted load/wind/solar: 24 to 48 hours ahead 2. 24 hours SCUC/ED with hourly interval 3. Nodal network representation 4. Contingency, flexibility up down, regulation up/down reserves modeled 5. Three cases, without PSHs, with the existing FS PSHs, with the existing FS and
new AS PSHs, are simulated 6. The simulations are performed for the base and high-wind renewable scenarios 7. For the high-wind renewable scenario, the simplified transmission expansion is
performed to deliver the renewable generations to the load buses 8. The WI simulations are cost-based.
4.1.1 WI System Production Costs
The production cost of three cases for year 2022: without PSHs, with the existing FS PSHs, and with the additional AS PSHs, are listed in the following tables for both the base renewable scenario and the high-wind renewable scenario.
Base Renewable
Total Generation Energy
PSH Generation Energy
Production Cost
Annual Cost Reduction
Annual Cost Savings due to
PSHs
GWh GWh million $ million
$ % Capacity MW
$/kW‐year
No PSH 997,546 ‐ 14,737 ‐ ‐ ‐ ‐
With FS PSH 1,003,204 4,106 14,569 167 1.14% 3,296 50.82
With FS&AS PSH 1,008,135 8,244 14,426 311 2.11% 6,475 48.06
Table 4.1‐1 Comparison of WI Production Cost in Three Cases for the Base Renewable Scenario in Year 2022
High‐Wind Renewable
Total Generation Energy
PSH Generation Energy
Production Cost
Annual Cost Reduction
Annual Cost Savings due to PSHs
GWh GWh million $ million $ % Capacity (MW)
$/kw‐year
No PSH 997,538 ‐ 12,646 ‐ ‐ ‐ ‐
With FS PSH 1,007,140 6,925 12,398 248 1.96% 3,296 75.29
With FS&AS PSH 1,015,512 13,811 12,169 477 3.77% 6,475 73.67
Table 4.1‐2 Comparison of WI Production Cost in Three Cases for the High‐Wind Renewable Scenario in Year 2022
41 | P a g e
With the existing PSHs, the WI total production cost is saved by 1.14% and 1.96% for the base renewable scenario and the high-wind renewable scenario respectively. With the additional AS PSHs are introduced in the system, the WI total production cost saving increases further to 2.11% and 3.77% for the base renewable scenario and the high-wind renewable scenario respectively.
With the renewable generation penetration level increases to 33% of the WI demand, the production cost savings due to the PSHs operation increase. The PSHs are more valuable in the high renewable penetration level.
The comparisons of the generation by generator type for the base and high-wind renewable scenarios are shown in the following two charts.
In the base renewable scenario, The CC and CT generation is reduced as more PSHs are introduced into the system due to the fact that the PSHs generation replaces the CC and CT generation. However the Coal generation is increased to provide the PSHs pumping energy. Also the renewable generation is increased as more PSHs are introduced into the system due to less renewable generation being curtailed.
Figure 4‐1 Comparison of WI Generation in Three Cases by Generator Type for the Base Renewable Scenario in Year 2022
In the high-wind renewable scenario, both CC and Coal generations are reduced as more PSHs are introduced into the system due to the fact that the PSHs generation replaces the CC and Coal generation. Also the renewable generation is increased as more PSHs are introduced into the system due to less renewable generation being curtailed.
‐
50,000
100,000
150,000
200,000
250,000
300,000
GWh
Generation by Generator Type (GWh)‐Yearly for Base Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
42 | P a g e
Figure 4‐2 Comparison of WI Generation in Three Cases by Generator Type for the High‐wind Renewable Scenario in Year 2022
The comparisons of the production cost in the WI by generator type for the base and high-wind renewable scenarios are shown in the following two charts.
In the base renewable scenario, the CC and CT production cost is reduced as more PSHs are introduced into the system. And the Coal production cost is increased slightly as more PSHs introduced into the system.
Figure 4‐3 Comparison of WI Generation Cost in Three Cases by Generator Type for the Base Renewable Scenario in Year 2022
‐
50,000
100,000
150,000
200,000
250,000
300,000GWh
Generation by Generator Type (GWh)‐Yearly for High‐wind Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
‐
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Million $
Total Generation Cost by Generator Type ($M)‐Yearly for Base Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
43 | P a g e
In the high-wind renewable scenario, both CC and Coal production costs are reduced as more PSHs are introduced into the system.
Figure 4‐4 Comparison of WI Generation Cost in Three Cases by Generator Type for the High‐wind Renewable Scenario in Year 2022
Due to the PSHs operations, the renewable curtailments in the WI system are reduced as shown in the following two tables for the base and high-wind renewable scenarios.
WI Renewable Curtailment in the Base Renewable Scenario
Renewable Curtailment Reduction
Case GWh GWh %
No PSH 1,921 ‐ 0%
With FS PSH 1,356 565 29%
With FS&AS PSH 964 958 50%Table 4.1‐3 Comparison of WI Renewable Curtailment in the Base Renewable Scenario
WI Renewable Curtailment in the High‐wind Renewable Scenario
Renewable Curtailment Reduction
Case GWh GWh %
No PSH 56,885 ‐ 0%
With FS PSH 48,403 8,482 15%
With FS&AS PSH 44,211 12,675 22%Table 4.1‐4 Comparison of WI Renewable Curtailment in the High‐wind Renewable Scenario
4.1.2 WI System Reserve Provisions by PSHs
The system reserve requirements and provisions from the PSHs are compared with the three cases for the base renewable scenario and the high-wind renewable scenario in the following two tables.
‐
1,000
2,000
3,000
4,000
5,000
6,000
Million $
Total Generation Cost by Gnerator Type ($M)‐Yearly for High‐wind Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
44 | P a g e
Base Renewable
Base ‐ No PSH With FS PSH With FS&AS PSH
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Non‐Spinning Reserve 29,564 ‐ 29,564 1,364 29,564 3,757
Spinning Reserve 29,564 ‐ 29,564 182 29,564 679
Flexibility Down 10,732 ‐ 10,732 74 10,732 1,463
Flexibility Up 10,732 ‐ 10,732 100 10,732 299
Regulation Down 12,423 ‐ 12,423 163 12,423 1,652
Regulation Up 12,441 ‐ 12,441 205 12,441 580Table 4.1‐5 Comparison of WI Reserve Requirements and Provisions by PSHs in Three Cases for the Base Renewable Scenario in Year 2022
High‐wind Renewable
Base ‐ No PSH With FS PSH With FS&AS PSH
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Non‐Spinning Reserve 29,564 ‐ 29,564 766 29,564 2,017
Spinning Reserve 29,564 ‐ 29,564 22 29,564 187
Flexibility Down 23,062 ‐ 23,062 240 23,062 3,072
Flexibility Up 23,062 ‐ 23,062 35 23,062 119
Regulation Down 17,487 ‐ 17,487 485 17,487 2,333
Regulation Up 17,448 ‐ 17,448 95 17,448 319 Table 4.1‐6 Comparison of WI Reserve Requirements and Provisions by PSHs in Three Cases for the High‐wind Renewable Scenario in Year 2022
The reserve provisions from the adjustable speed PSHs increases substantially as opposed to the reserve provisions from the fixed speed PSHs. The reserve provision increase from the adjustable speed PSHs is due to
1. The larger dispatchable capacity in the generating mode. 2. The reserve provision in the pumping mode.
4.1.3 WI System Emission Production
The system emission productions for the three cases in the base renewable scenario and the high-wind renewable scenario are listed in the following two tables.
Base Renewable
CO2 NOx SO2 Emission Reduction (ton)Emission
Reduction (%)
ton ton ton CO2 NOx SO2 CO2 NOx SO2
No PSH 388,463,385 573,025 410,404 ‐ ‐ ‐ 0.0% 0.0% 0.0%
With FS PSH 391,262,476 581,329 417,728 ‐2,799,091 ‐8,304 ‐7,324 ‐0.7% ‐1.4% ‐1.8%
With FS&AS PSH 393,954,399 589,914 425,151 ‐5,491,014 ‐16,888 ‐14,747 ‐1.4% ‐2.9% ‐3.6%Table 4.1‐7 Comparison of WI Emission Productions in Three Cases in Year 2022 for the Base Renewable Scenario
45 | P a g e
High‐wind Renewable
CO2 NOx SO2 Emission Reduction (ton)Emission
Reduction (%)
ton ton ton CO2 NOx SO2 CO2 NOx SO2
No PSH 318,768,466 467,931 326,318 ‐ ‐ ‐ 0.0% 0.0% 0.0%
With FS PSH 312,657,135 458,360 320,234 6,111,331 9,571 6,084 1.9% 2.0% 1.9%
With FS&AS PSH 311,549,087 459,379 322,211 7,219,379 8,552 4,107 2.3% 1.8% 1.3%Table 4.1‐8 Comparison of WI Emission Productions in Three Cases in Year 2022 for the High‐Wind Renewable Scenario
In the base renewable scenario, the coal generation is increased to provide pumping energy so that the emission production is increased. In the high-wind renewable scenario, the coal generation is decreased so that the emission production is decreased. However, the allover emission production is reduced from the base renewable scenario to the high-wind renewable scenario.
4.1.4 WI Thermal Generator Cycling
The number of starts and startup cost of the thermal generators in the three cases for the base renewable scenario and the high-wind renewable scenario are listed in the following two tables.
Base Renewable
Total Number of Thermal Starts
Total Thermal Start Cost Cost Reduction
million $ million $ %
No PSH 37,804 153 ‐ ‐
With FS PSH 31,797 130 24 15.46%
With FS&AS PSH 27,548 109 44 28.57%Table 4.1‐9 Comparison of Number of Starts and Startup Costs of the WI Thermal Generators in Year 2022 for the Base Renewable Scenario
High‐Wind Renewable
Total Number of Thermal Starts
Total Thermal Start Cost Cost Reduction
million $ million $ %
No PSH 40,852 176 ‐ ‐
With FS PSH 36,024 161 15 8.48%
With FS&AS PSH 31,925 145 31 17.70%Table 4.1‐10 Comparison of Number of Starts and Startup Costs of the WI Thermal Generators in Year 2022 for the High‐wind Renewable Scenario
In both the base and high-wind renewable scenarios, the number of starts and startup costs of the thermal generators are reduced substantially as more PSHs are introduced into the system. However, the allover number of starts and startup costs are increased from the base renewable scenario to the high-wind renewable scenario.
The comparisons of the ramp up and down of thermal generators in the three cases for the base and high-wind renewable scenarios are listed in the following two tables.
46 | P a g e
Base Renewable
Total Thermal Generator Ramp Up
Total Thermal Generator Ramp Down Ramp Up Reduction
Ramp Down Reduction
GW GW GW % GW %
No PSH 11,501 16,508 ‐ ‐ ‐ ‐
With FS PSH 9,716 13,948 1,786 15.53% 2,560 15.51%
With FS&AS PSH 8,081 11,691 3,420 29.74% 4,817 29.18%Table 4.1‐11 Comparison of Thermal Generator Ramp Up and Down of the WI Thermal Generators in Year 2022 for the Base Renewable Scenario
High‐Wind Renewable
Total Thermal Generator Ramp Up
Total Thermal Generator Ramp Down Ramp Up Reduction
Ramp Down Reduction
GW GW GW % GW %
No PSH 9,325 14,188 ‐ ‐ ‐ ‐
With FS PSH 8,394 12,682 931 9.98% 1,506 10.62%
With FS&AS PSH 7,060 10,778 2,265 24.29% 3,410 24.04%Table 4.1‐12 Comparison of Thermal Generator Ramp Up and Down of the WI Thermal Generators in Year 2022 for the High‐Wind Renewable Scenario
In both the base and high-wind renewable scenarios, the thermal generator ramp up and down are reduced substantially as more PSHs are introduced into the system.
4.1.5 WI Regional LMPs
The comparisons of the average regional LMP for the selected regions for the base renewable scenario is shown in following chart. As more PSHs are introduced into the system, the average regional LMP is reduced uniformly for all selected regions.
‐
10.00
20.00
30.00
40.00
50.00
APS BPA PG&E_VLY SCE SDGE
$/M
Wh
Average Regional Price‐Year 2022 for Base Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
47 | P a g e
Figure 4‐5 Comparison of Regional LMP in Three Cases for the Selected Regions in Year 2022 for the Base Renewable Scenario
The comparisons of the average regional LMP for the selected regions for the high-wind renewable scenario is shown in following chart. Some regional price increases and some regional price decreases as more PSHs are introduced into the system. However, overall, the regional LMP in the high-wind renewable scenario is reduced substantially as opposed to the base renewable scenario.
For the analysis of the higher LMP with more PSHS introduced into the system for the high-wind renewable scenario, please refer to subsection 4.2.6 California Regional LMPs.
Figure 4‐6 Comparison of Regional LMP in Three Cases for the Selected Regions in Year 2022 for the High‐wind Renewable Scenario
4.1.6 WI Transmission Congestions
4.1.6.1 WI Transmission Congestions in the Base Renewable Scenario
The annual transmission interface congestion hours and average congestion prices for the base renewable scenario are listed in Table 4.1-13 Comparison of WI Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the Base Renewable Scenario in Year 2022.
The average WI interface forward congestion shadow price is reduced from $4/MWh to $2/MWh as the FS and AS PSHs are introduced into the system. The average WI interface backward congestion shadow price is reduced from $2/MWh to $1/MWh as the FS and AS PSHs are introduced into the system.
The most congested interfaces include
“Interstate WA-BC East”, “Intrastate AB DC2”, “P18 Montana-Idaho”, “P27 Intermountain Power Project DC Line”, “P45 SDG&E-CFE”,
‐
10.00
20.00
30.00
40.00
50.00
APS BPA PG&E_VLY SCE SDGE
$/M
Wh
Average Regional Price‐Year 2022 for High‐wind Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
48 | P a g e
“P52 Silver Peak-Control 55 kV”.
Comparing the congestion prices of the three cases, No PSHs, with FS PSHs and with FS&AS PSHs, the most transmission congestion price reduction happens in Interfaces
“P27 Intermountain Power Project DC Line”, “P45 SDG&E-CFE”, and “P52 Silver Peak-Control 55 kV”.
These interfaces are in the neighboring areas where PSHs “Castaic”, “Lake Hodge”, and “Eagle Mountain” are located.
49 | P a g e
No PSH With FS PSH With FS&AS PSH
Interfaces
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back ($/MW)
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
Interstate WA‐BC East 1,395 0 15 0 1,413 0 12 0 1,489 0 15 0
Interstate WA‐BC West 0 1,171 0 5 0 1,201 0 4 0 1,238 0 3
Intrastate AB DC1 6,873 1,887 0 0 7,386 1,374 0 0 7,440 1,320 0 0
Intrastate AB DC2 8,760 0 17 0 7,862 898 0 0 8,083 677 0 0
Intrastate AZ Palo Verde East 51 0 0 0 49 0 0 0 79 0 1 0
Intrastate WA North of Hanford 0 2 0 0 1 1 0 0 2 2 0 0
P01 Alberta‐British Columbia 5 2,094 0 32 7 2,089 0 32 8 2,098 0 32
P03 Northwest‐British Columbia 0 87 0 0 0 76 0 0 0 63 0 0
P08 Montana to Northwest 132 0 0 0 187 0 0 0 272 0 0 0
P09 West of Broadview 3 0 0 0 5 0 0 0 7 0 0 0
P14 Idaho to Northwest 0 18 0 0 0 23 0 0 0 13 0 0
P18 Montana‐Idaho 428 0 12 0 435 0 11 0 389 0 9 0P23 Four Corners 345/500 Qualified Path 0 0 0 0 0 1 0 0 0 0 0 0
P24 PG&E‐Sierra 84 0 2 0 115 0 3 0 132 0 2 0P25 PacifiCorp/PG&E 115 kV Interconnection 0 111 0 19 0 117 0 26 0 128 0 15
P26 Northern‐Southern California 42 321 0 1 49 318 0 1 39 362 0 0P27 Intermountain Power Project DC Line 6,096 0 36 0 5,617 0 3 0 6,096 0 3 0
P30 TOT 1A 142 0 1 0 142 0 1 0 164 0 0 0
P31 TOT 2A 8 10 0 0 2 7 0 0 2 4 0 0
P33 Bonanza West 59 0 0 0 77 0 0 0 74 0 0 0
P36 TOT 3 74 0 2 0 73 0 1 0 50 0 1 0
P39 TOT 5 32 0 0 0 27 0 0 0 16 0 0 0
50 | P a g e
No PSH With FS PSH With FS&AS PSH
Interfaces
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back ($/MW)
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
P40 TOT 7 15 0 0 0 5 0 0 0 3 0 0 0
P41 Sylmar to SCE 0 0 0 0 0 0 0 0 0 1 0 0
P42 IID‐SCE 39 0 0 0 46 0 0 0 81 0 0 0
P45 SDG&E‐CFE 7,274 0 166 0 7,279 0 159 0 7,304 0 139 0
P47 Southern New Mexico (NM1) 247 0 9 0 201 0 7 0 196 0 5 0
P52 Silver Peak‐Control 55 kV 0 1,341 0 86 0 1,112 0 83 0 1,017 0 68
P55 Brownlee East 2 0 0 0 0 0 0 0 1 0 0 0P59 WALC Blythe ‐ SCE Blythe 161 kV Sub 146 0 1 0 151 0 0 0 107 0 0 0
P61 Lugo‐Victorville 500 kV Line 2 0 0 0 7 0 0 0 6 0 0 0
P66 COI 232 0 1 0 366 0 1 0 245 0 0 0
P73 North of John Day 0 0 0 0 0 0 0 0 1 0 0 0
P75 Hemingway‐Summer Lake 0 223 0 9 0 222 0 5 0 286 0 5
P80 Montana Southeast 9 0 0 0 6 0 0 0 4 0 0 0
Grand Total 40,910 7,265 4 2 40,268 7,439 2 2 41,050 7,209 2 1Table 4.1‐13 Comparison of WI Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the Base Renewable Scenario in Year 2022
51 | P a g e
4.1.6.2 Transmission Expansion for the High-wind Renewable Scenario
The transmission in the existing TEPPC 2022 network was not adequate to accommodate the High-wind renewable Scenario, so some transmission expansion assumptions had to be made. The transmission expansion assumptions were added to allow the simulations to deliver the renewable energy at the high-wind renewable level. Without the transmission expansion assumptions, the simulation would not have been able to generate results for the High-wind renewable scenario.
Given that this study is not a transmission expansion study, it is important to note that the transmission expansion methodology was simplistic. And the transmission expansion methodology did not include detailed economic or reliability analyses. Nor did it take into account issues such as rights of way, environmental concerns, policy constraints, or any other factor that might normally be considered in detailed transmission planning activities.
The following steps were taken to generate the transmission expansion assumptions:
1. Perform PLEXOS nodal simulation with the renewable generation at the high-wind renewable penetration level,
2. For any congested transmission line with the yearly average shadow price greater than $10/MWh, build a parallel transmission with the exact same characteristics of the congested transmission line,
3. For a congested transmission interface with the yearly average shadow price greater than $10/MWh, increase the transmission interface rating by 500 MW and build a parallel transmission line in the transmission interface if necessary,
4. Perform PLEXOS nodal simulation again and repeat the process until all monitored transmission lines and interfaces have the congestion prices less than $10/MWh.
The transmission expansion steps can be illustrated in the following diagram.
52 | P
Figure
The tin Ap
The sneederenew
The ahigh-InterfRene
The m
CompFS&A“P27 wher
P a g e
4‐7 Logic flow f
transmissionppendix – Tr
solutions of ted to deliverwable scenar
4.1.6.3 W
annual transm-wind renewface Congeswable Scena
most congest
“P08 Mon“P27 Inte“P30 TOT“P33 Bon
paring the coAS PSHs, thIntermounta
e PSHs “Cas
or the Transmis
n expansion aransmission
the transmisr the renewabrio.
WI Transmiss
mission interable scenarition Hours aario in Year
ted interface
ntana to Norrmountain PT 1A”, nanza West”,
ongestion prhe most transain Power Prstaic”, “Lake
ssion Expansion
assumptionsExpansion A
sion expansible generatio
ion Congest
rface congeso are listed i
and Congesti2022.
es include
rthwest”, Power Projec
,
rices of the thsmission conroject DC Lie Hodge”, an
Using Congestio
for the highAssumptions
ion indicate on to the loa
tions in the H
stion hours ain Table 4.1-ion Prices in
ct DC Line”,
hree cases, Nngestion pricine”. This innd “Eagle M
on Shadow Pric
h-wind renews for High-w
that there isad centers un
High-wind R
and average -14 Comparin Three Case
,
No PSHs, wice reduction nterface is in
Mountain” ar
e Approach
wable scenarwind Renewa
s more transfnder the High
Renewable Sc
congestion pison of WI Tes for the Hi
ith FS PSHshappens in I
n the neighbore located.
rio are listedable Scenario
fer capacity h-wind
cenario
prices for theTransmissiongh-wind
s and with Interface oring area
d o.
e n
53 | P a g e
No PSH With FS PSH With FS&AS PSH
Interface
Hours Congested (hrs)
HoursCongested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back($/MW)
Hours Congested (hrs)
HoursCongested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back($/MW)
Hours Congested (hrs)
HoursCongested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back($/MW)
Interstate WA‐BC East ‐ 556 ‐ 4.64 ‐ 539 ‐ 4.51 ‐ 540 ‐ 3.96
Interstate WA‐BC West ‐ 91 ‐ 0.16 ‐ 90 ‐ 0.17 ‐ 102 ‐ 0.13
Intrastate AB DC1 8,284 476 ‐ ‐ 8,248 512 0.00 ‐ 7,766 994 ‐ ‐
Intrastate AB DC2 8,358 402 0.00 ‐ 8,637 123 20.13 ‐ 8,760 ‐ 0.01 ‐
Intrastate Aeolus South ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1 ‐ 0.00 ‐
Intrastate AZ Palo Verde East 11 ‐ 0.65 ‐ 8 ‐ 0.07 ‐ 14 ‐ 0.06 ‐
Intrastate WA North of Hanford ‐ 39 ‐ 0.02 ‐ 30 ‐ 0.02 ‐ 34 ‐ 0.03
P01 Alberta‐British Columbia 3 382 0.00 0.14 2 334 0.00 0.13 ‐ 224 ‐ 0.06
P03 Northwest‐British Columbia 74 213 0.02 0.60 58 197 0.02 0.31 24 161 0.01 0.33
P08 Montana to Northwest 5,102 ‐ 21.82 ‐ 5,249 ‐ 23.65 ‐ 5,443 ‐ 25.83 ‐
P09 West of Broadview 238 ‐ 0.29 ‐ 306 ‐ 0.36 ‐ 247 ‐ 0.27 ‐
P14 Idaho to Northwest 1 66 0.00 1.60 ‐ 65 ‐ 1.14 2 63 0.00 0.71
P15 Midway‐LosBanos 334 13 0.93 0.02 302 20 0.79 0.03 288 23 0.76 0.03
P16 Idaho‐Sierra 18 105 0.39 1.09 38 111 0.80 1.00 35 121 0.31 0.91
P18 Montana‐Idaho ‐ ‐ ‐ ‐ ‐ 1 ‐ 0.00 ‐ 2 ‐ 0.02
P19 Bridger West 76 ‐ 0.14 ‐ 119 ‐ 0.21 ‐ 150 ‐ 0.26 ‐
P20 Path C ‐ 46 ‐ 0.70 ‐ 51 ‐ 0.37 ‐ 47 ‐ 0.30
P22 Southwest of Four Corners 27 ‐ 0.07 ‐ 83 ‐ 0.23 ‐ 115 ‐ 0.36 ‐P23 Four Corners 345/500 Qualified Path 248 10 1.77 0.01 321 17 1.94 0.04 358 17 1.79 0.10
P24 PG&E‐Sierra 2 56 0.01 0.37 3 97 0.14 0.65 1 190 0.00 1.56P25 PacifiCorp/PG&E 115 kV Interconnection ‐ 147 ‐ 16.40 ‐ 104 ‐ 11.03 ‐ 65 ‐ 6.54
P26 Northern‐Southern California 594 197 1.45 0.26 600 181 1.77 0.22 576 176 0.90 0.24
P27 Intermountain Power Project 3,216 ‐ 42.50 ‐ 3,216 ‐ 35.08 ‐ 6,072 ‐ 26.24 ‐
54 | P a g e
No PSH With FS PSH With FS&AS PSH
Interface
Hours Congested (hrs)
HoursCongested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back($/MW)
Hours Congested (hrs)
HoursCongested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back($/MW)
Hours Congested (hrs)
HoursCongested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back($/MW)
DC Line
P28 Intermountain‐Mona 345 kV ‐ 54 ‐ 0.07 ‐ 38 ‐ 0.69 ‐ 33 ‐ 0.24
P29 Intermountain‐Gonder 230 kV 52 417 1.42 2.14 33 432 0.79 2.63 40 423 0.80 2.60
P30 TOT 1A 1,524 ‐ 10.19 ‐ 1,516 9 9.82 2.00 1,565 ‐ 9.60 ‐
P31 TOT 2A ‐ 37 ‐ 1.18 ‐ 62 ‐ 3.77 ‐ 38 ‐ 1.23P32 Pavant‐Gonder InterMtn‐Gonder 230 kV 19 ‐ 0.10 ‐ 12 ‐ 0.06 ‐ 21 ‐ 0.12 ‐
P33 Bonanza West 3,275 ‐ 27.05 ‐ 3,506 ‐ 26.97 ‐ 3,840 ‐ 28.88 ‐
P35 TOT 2C ‐ 2 ‐ 0.01 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
P36 TOT 3 1,025 ‐ 1.18 ‐ 1,284 ‐ 1.91 ‐ 1,329 ‐ 1.48 ‐
P37 TOT 4A 292 ‐ 0.87 ‐ 288 ‐ 0.77 ‐ 315 ‐ 0.78 ‐
P39 TOT 5 35 224 0.01 0.11 36 311 0.62 0.11 25 355 0.09 0.14
P40 TOT 7 2 ‐ 0.00 ‐ 1 2 0.00 0.00 7 ‐ 0.00 ‐
P41 Sylmar to SCE ‐ 4 ‐ 0.04 ‐ 7 ‐ 0.04 ‐ 1 ‐ 0.01
P42 IID‐SCE 138 ‐ 0.27 ‐ 150 ‐ 0.24 ‐ 168 ‐ 0.21 ‐
P45 SDG&E‐CFE 52 ‐ 0.59 ‐ 37 ‐ 0.68 ‐ 50 ‐ 0.59 ‐
P47 Southern New Mexico (NM1) 701 ‐ 6.07 ‐ 632 ‐ 7.34 ‐ 605 ‐ 5.72 ‐
P48 Northern New Mexico (NM2) ‐ 121 ‐ 0.12 ‐ 214 ‐ 0.18 ‐ 221 ‐ 0.22
P52 Silver Peak‐Control 55 kV 5 ‐ 0.15 ‐ 2 ‐ 0.06 ‐ 4 ‐ 0.09 ‐
P61 Lugo‐Victorville 500 kV Line 37 ‐ 1.18 ‐ 80 ‐ 0.45 ‐ 58 ‐ 0.24 ‐
P65 Pacific DC Intertie (PDCI) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0.81 ‐
P66 COI 1,148 ‐ 4.17 ‐ 1,446 ‐ 5.01 ‐ 1,675 ‐ 5.06 ‐
P73 North of John Day 8 ‐ 0.76 ‐ 4 ‐ 0.83 ‐ 16 ‐ 0.90 ‐
P75 Hemingway‐Summer Lake ‐ 196 0.19 8.02 2 212 0.25 8.30 1 227 0.29 4.34
55 | P a g e
No PSH With FS PSH With FS&AS PSH
Interface
Hours Congested (hrs)
HoursCongested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back($/MW)
Hours Congested (hrs)
HoursCongested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back($/MW)
Hours Congested (hrs)
HoursCongested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back($/MW)
P76 Alturas Project ‐ 826 0.15 4.03 ‐ 997 0.31 4.69 ‐ 1,211 0.40 5.58
P78 TOT 2B1 ‐ 5 ‐ 0.05 ‐ 3 ‐ 0.02 ‐ ‐ ‐ ‐
P79 TOT 2B2 17 2 1.13 0.01 14 ‐ 0.69 ‐ 20 ‐ 0.85 ‐
P80 Montana Southeast 213 5 4.01 0.01 227 4 3.75 0.01 187 4 1.56 0.01
Grand Total 43,889 4,692 2.22 0.46 45,220 4,763 2.11 0.46 48,538 5,272 2.27 0.32Table 4.1‐14 Comparison of WI Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the High‐wind Renewable Scenario in Year 2022
56 | P
4.2
In thiCaliftransmfor th
Thenbetwe
The pderegCAISclose
4
A cripricebiddifrom
The C2.2 “Opricemonimarkmark
Figure
P a g e
2 Californi
is simulationfornia footprimission line
he base renew
n the Californeen Californ
purpose of thgulated markSO, the entirly interming
4.2.1 Powe
tical factor is for the gening price detthe simulati
4.2.1.1 En
CAISO 2012Overall Mars are close totoring. The
ket marginal ket clearing p
4‐8 CAISO Energ
ia Simulatio
n task, the Caint, the entirs at the bordwable scenar
nia grid is cania and the re
he Californiaket. Though re California gled with the
er Market Bi
in the powernerator energermination aions against
nergy Marke
2 annual marrket Competio the cost-baprice-cost mcost. The ne
price is lowe
gy Price‐cost ma
on Results
alifornia foore WI is simuder of Califorrio and the h
arved out froest of the WI
a simulation a few utilitifootprint is
e CAISO grid
idding Price
r market simugy and ancilladopted in ththe CAISO h
et Bidding Pr
rket report [3itiveness” ofased simulatmark-up is thegative pricer than the av
ark‐up (2009‐20
otprint is simulated to prornia with the
high-wind re
om the WI grI is frozen in
is to examinies, such as Smodeled sind.
es
ulation is to lary serviceshis study is thistorical ma
rices
3] is reviewef the report sions by the C
he differencee-cost mark-verage marke
012)
mulated. Befoduce the poe rest of the enewable sce
rid. The pown the Califor
ne the PSHs SMUD, LADnce the grid o
determine ths. The approto benchmarkarket prices.
ed. The charshows that thCAISO depae of the mark-up indicateset marginal
fore simulatiwer flows foWI. The WI
enario.
wer flow excrnia simulati
impact to thDWP, etc., aof these utili
he generatoroach of the gk the region.
rt extracted fhe average eartment of mket clearing ps the averagecost.
ing the or all I is simulated
changes ons.
he are not part oities are
r bidding generator al prices
from sectionenergy markemarket
price and thee CAISO
d
of
n et
e
57 | P a g e
Therefore, for the energy market simulation, the generator marginal cost price is used as the energy bidding price.
4.2.1.2 Ancillary Service Market Bidding Prices
The historical AS market clearing prices in year 2012 are analyzed. The analysis shows that the AS market clearing price is closely correlated with the energy market LMP that, in turn, is closely correlated with the regional load. The statistics and correlation of the CAISO NP15 LMP and AS clearing prices in year 2012 are shown in the following table.
Statistics of CAISO Historical NP15 LMP and AS Clearing Price in Year 2012
NP15 LMP
AS Clearing Prices
Non‐Spinning Spinning
Regulation Down Regulation Up
Mean 36.77 0.60 4.07 4.98 5.62
Max 113.15 66.36 66.36 74.75 66.36
Min (10.45) ‐ ‐ ‐ ‐
STDEV 10.49 2.45 4.80 4.13 5.28
STDEV % 29% 410% 118% 83% 94%Table 4.2‐1 Statistics of CAISO Historical NP15 LMP and AS Clearing Prices in Year 2012
The following table shows strong correlations between the ancillary service prices and NP15 LMP.
Correlation of CAISO Historical NP15 LMP and AS Clearing Prices in Year 2012
NP15 LMP
AS Clearing Prices
Non‐Spinning Spinning
Regulation Down
Regulation Up
NP15 LMP 0.93 0.34 0.28 (0.43) 0.24
AS Clearing
Prices
Non‐Spinning 0.71 0.49 (0.05) 0.43
Spinning 0.71 0.13 0.91
Regulation Down 0.69 0.17
Regulation Up 0.67Table 4.2‐2 Correlation of CAISO Historical NP15 LMP and AS Clearing Prices in Year 2012
From the analysis, the following approach is adopted to mimic the generator AS bidding price in the simulations.
1. The hourly upward AS bidding prices follow the hourly California load profiles, and the hourly downward AS bidding prices follows the inverse of the hourly California load profiles;
2. The generators with a higher generation marginal cost will have lower AS bidding prices and the generators with a lower generation marginal cost will have higher AS bidding prices. The reason so doing is that the generators with higher generation marginal cost have lower energy profit margin, and the generators with lower generation marginal cost have higher energy profit margin.
3. The final hourly AS bidding price for a generator is the normalized hourly AS bidding price profiles times the AS bidding price scaling factor. The normalized hourly AS bidding price profiles is the normalized hourly California load profile
58 | P a g e
for the upward AS, and the inverse of the normalized hourly California load profile for the downward AS.
4. The generator AS bidding price scaling factor has a higher value for higher quality reserves.
5. Hydro generators and PSHs have fast ramp capability, and are assumed to provide the AS before the thermal generators.
The AS bidding price scaling factors, proportional to the generator energy profit margin, by generator type and by AS type are shown in the following table.
AS Bidding Price Scaling Factor by Generator Type ($/MW)
Generator Type Non‐Spin Spin Flex Dn Flex Up Reg Dn Reg Up
CC 3 9 15 15 30 30
Coal 5 15 35 35 60 60
CT 2 6 10 10
DR 2 6 10 10
Hydro 1 3 5 5 10 10
IC 2 6 10 10
PSH 1 3 5 5 10 10
STEAM 2 6 10 10 Table 4.2‐3 CA AS Bidding Price Scaling Factor by Generator Type
The assumptions and settings for the California simulations are reiterated as follows.
1. DA forecasted load/wind/solar: 24 to 48 hours ahead 2. 24 hours SCUC/ED with hourly interval 3. Nodal network representation 4. Contingency, flexibility up/down, regulation up/down reserves modeled 5. Three cases, no PSH, with the existing PSH, with existing and new PSH, are
simulated 6. The simulations are performed for the base and high-wind renewable scenarios 7. For the high-wind renewable scenario, the simplified transmission expansion is
performed to deliver the renewable generations to the load buses 8. The California simulations are bid-based.
Since the exchange powers between California and the rest of WI are frozen in the simulations, the exchanges powers are not included in the following simulation results.
4.2.2 California System Production Costs
The production cost of three cases for year 2022: No PSHs, with the existing FS PSHs, and with the additional AS PSHs, are listed in the following two tables for the base renewable scenario and the high-wind renewable scenario.
Base Renewable
Total Generation Energy
PSH Generation Energy
Production Cost
Annual Cost Reduction
Annual Cost Savings due to PSHs
GWh GWh million $ million $ % Capacity MW
$/kW‐year
59 | P a g e
No PSH 265,538 ‐ 5,078 ‐ ‐ ‐ ‐
With FS PSH 267,001 2,725 4,967 111 2.18% 2626 42.10
With FS&AS PSH 269,374 5,313 4,907 171 3.36% 4425 38.60
Table 4.2‐4 Comparison of CA Production Cost in Three Cases for the Base Renewable Scenario in Year 2022
High‐Wind Renewable
Total Generation Energy
PSH Generation Energy
Production Cost
Annual Cost Reduction
Annual Cost Savings due to PSHs
GWh GWh million $ million $ % Capacity (MW)
$/kw‐year
No PSH 253,872 ‐ 4,120 ‐ ‐ ‐ ‐
With FS PSH 256,069 5,299 3,934 186 4.52% 2626 70.91
With FS&AS PSH 257,018 9,456 3,745 376 9.12% 4425 84.97
Table 4.2‐5 Comparison of CA Production Cost in Three Cases for the High‐Wind Renewable Scenario in Year 2022
With the FS PSHs, the California system production cost is reduced by 2.18% and 4.52% for the base renewable scenario and the high-wind renewable scenario respectively. With the additional AS PSHs, the California system production cost is reduced further by 3.36% and 9.12% for the base renewable scenario and the high-wind renewable scenario respectively.
With the renewable generation increases to 33%, the production cost savings due to the PSHs operation increases. The PSHs are more valuable in the high renewable penetration level.
The comparisons of the generation by generator type for the base and high-wind renewable scenarios are shown in the following two charts.
In the base renewable scenario, both CC and CT generations are reduced as more PSHs are introduced into the system due to the fact that the PSHs generation replaces the CC and CT generation. However the Coal generation is slightly increased to provide the PSHs pumping energy. Also the renewable generation is increased as more PSHs are introduced into the system due to less renewable generation being curtailed.
60 | P a g e
Figure 4‐9 Comparison of CA Generation in Three Cases by Generator Type for the Base Renewable Scenario in Year 2022
In the high-wind renewable scenario, The CC, CT and Coal generations are reduced as more PSHs are introduced into the system due to the fact that the PSHs generation replaces the CC, CT and Coal generation. Also the renewable generation is increased as more PSHs are introduced into the system due to less renewable generation being curtailed.
Figure 4‐10 Comparison of CA Generation in Three Cases by Generator type for the High‐wind Renewable Scenario in Year 2022
‐
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000GWh
Generation by Generator Type (GWh)‐Yearly for Base Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
‐ 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000
100,000
GWh
Generation by Generator Type (GWh)‐Yearly for High‐wind Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
61 | P a g e
The comparisons of the production cost in California by generator type for the base and high-wind renewable scenarios are shown in the following two charts.
In the base renewable scenario, the CC and CT production cost is reduced as more PSHs are introduced into the system. And the Coal production cost is increased slightly as more PSHs introduced into the system.
Figure 4‐11 Comparison of CA Generation Cost in Three Cases by Generator Type for the Base Renewable Scenario in Year 2022
In the high-wind renewable scenario, the CC, CT and Coal production cost is reduced as more PSHs are introduced into the system.
‐
500
1,000
1,500
2,000
2,500
3,000
3,500
Million $
Total Generation Cost by Generator Type ($M)‐Yearly for Base Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
‐
500
1,000
1,500
2,000
2,500
Million $
Total Generation Cost by Generator Type ($M)‐Yearly for High‐wind Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
62 | P a g e
Figure 4‐12 Comparison of CA Generation Cost in Three Cases by Generator Type for the High‐wind Renewable Scenario in Year 2022
Due to the PSHs operations, the California renewable curtailments are reduced as shown in the following two tables for the base and high-wind renewable scenarios.
CA Renewable Curtailment in the Base Renewable Scenario
Renewable Curtailment Reduction
Case GWh GWh %
No PSH 155 ‐ 0%
With FS PSH 46 108 70%
With FS&AS PSH 14 141 91%Table 4.2‐6 Comparison of CA Renewable Curtailment in the Base Renewable Scenario
CA Renewable Curtailment in the High‐wind Renewable Scenario
Renewable Curtailment Reduction
Case GWh GWh %
No PSH 618 ‐ 0%
With FS PSH 380 238 39%
With FS&AS PSH 275 343 55%Table 4.2‐7 Comparison of CA Renewable Curtailment in the High‐wind Renewable Scenario
4.2.3 California System Reserves and Provision by PSHs
The system reserve requirements and provisions from the PSHs are compared in the three cases for the base and high-wind renewable scenarios in the following two tables.
Base Renewable
Base ‐ No PSH With FS PSH With FS&AS PSH
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Non‐Spinning Reserve 8,505 ‐ 8,505 7,090 8,505 7,905
Spinning Reserve 8,505 ‐ 8,505 224 8,505 2,463
Flexibility Down 3,130 ‐ 3,130 47 3,130 1,098
Flexibility Up 3,130 ‐ 3,130 13 3,130 341
Regulation Down 3,810 ‐ 3,810 171 3,810 1,264
Regulation Up 3,839 ‐ 3,839 164 3,839 1,109Table 4.2‐8 Comparison of CA Reserve Requirements and Provisions by PSHs in Three Cases for the Base Renewable Scenario in Year 2022
High‐wind Renewable
Base ‐ No PSH With FS PSH With FS&AS PSH
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Non‐Spinning Reserve 8,505 ‐ 8,505 4,774 8,505 5,492
Spinning Reserve 8,505 ‐ 8,505 247 8,505 2,022
63 | P a g e
Flexibility Down 4,804 ‐ 4,804 141 4,804 1,934
Flexibility Up 4,804 ‐ 4,804 26 4,804 200
Regulation Down 4,394 ‐ 4,394 377 4,394 1,761
Regulation Up 4,442 ‐ 4,442 144 4,442 1,201Table 4.2‐9 Comparison of CA Reserve Requirements and Provisions by PSHs in Three Cases for the High‐wind Renewable Scenario in Year 2022
In both the base renewable scenario and the high-wind renewable scenario, the FS and AS PSHs provide around ¼ of the AS requirements for most AS. The reserve provisions from the adjustable speed PSHs increases substantially as opposed to the reserve provisions from the fixed speed PSHs. The reserve provision increase from the adjustable speed PSHs is due to
1. The larger dispatchable capacity in the generating mode. 2. The reserve provision in the pumping mode.
4.2.4 California System Emission Production
The system emission productions in the three cases for the base and high-wind renewable scenarios are listed in the following two tables.
Base Renewable CO2 NOx SO2 Emission Reduction (ton)
Emission Reduction (%)
Ton ton ton CO2 NOx SO2 CO2 NOx SO2
No PSH 65,429,529 53,681 6,006 ‐ ‐ ‐ 0.0% 0.0% 0.0%
With FS PSH 64,741,362 53,512 6,093 688,166 170 (87) 1.1% 0.3% ‐1.5%
With FS&AS PSH 64,625,964 53,568 6,165 803,565 113 (160) 1.2% 0.2% ‐2.7%Table 4.2‐10 Comparison of CA Emission Productions in Three Cases in year 2022 for the Base Renewable Scenario
High‐wind Renewable CO2 NOx SO2 Emission Reduction (ton)
Emission Reduction (%)
Ton ton ton CO2 NOx SO2 CO2 NOx SO2
No PSH 51,515,736 44,936 5,334 ‐ ‐ ‐ 0.0% 0.0% 0.0%
With FS PSH 49,692,105 44,010 5,350 1,823,631 925 (16) 3.5% 2.1% ‐0.3%
With FS&AS PSH 47,904,187 43,177 5,427 3,611,549 1,759 (93) 7.0% 3.9% ‐1.7%Table 4.2‐11 Comparison of CA Emission Productions in Three Cases in Year 2022 for the High‐Wind Renewable Scenario
In both the base renewable scenario and the high-wind renewable scenario, Emission CO2 and NOx are reduced and Emission SO2 is increased. However, the allover emission production is reduced from the base renewable scenario to the high-wind renewable scenario.
64 | P a g e
4.2.5 California Thermal Generator Cycling
The number of starts and startup cost of the thermal generators in the three cases for the base and high-wind renewable scenarios are listed in the following two tables.
Base Renewable Total Number of Thermal Starts
Total Thermal Start Cost Cost Reduction
million $ million $ %
No PSH 18,514 56 ‐ ‐
With FS PSH 14,646 46 10 17.35%
With FS&AS PSH 12,134 36 20 35.40%Table 4.2‐12 Comparison of Number of Starts and startup Costs of the CA Thermal Generators in Year 2022 for the Base Renewable Scenario
High‐Wind Renewable Total Number of Thermal Starts
Total Thermal Start Cost Cost Reduction
million $ million $ %
No PSH 17,862 54 ‐ ‐
With FS PSH 14,351 44 11 19.56%
With FS&AS PSH 11,864 35 20 36.42%Table 4.2‐13 Comparison of Number of Starts and startup Costs of the CA Thermal Generators in Year 2022 for the high‐wind Renewable Scenario
In both the base and high-wind renewable scenarios, the number of starts and startup costs of the thermal generators are reduced substantially as more PSHs are introduced to the system.
The comparisons of the ramp up and down of thermal generators in the three cases for the base and high-wind renewable scenarios are listed in the following two tables.
Base Renewable
Total Thermal Generator Ramp Up
Total Thermal Generator Ramp Down Ramp Up Reduction
Ramp Down Reduction
GW GW GW % GW %
No PSH 4,273 6,603 ‐ ‐ ‐ ‐
With FS PSH 3,623 5,552 650 15.20% 1,052 15.93%
With FS&AS PSH 2,924 4,456 1,349 31.56% 2,147 32.51%Table 4.2‐14 Comparison of Thermal Generator Ramp Up and Down of the CA Thermal Generators in Year 2022 for the Base Renewable Scenario
High‐Wind Renewable
Total Thermal Generator Ramp Up
Total Thermal Generator Ramp Down Ramp Up Reduction
Ramp Down Reduction
GW GW GW % GW %
65 | P a g e
No PSH 3,609 5,681 ‐ ‐ ‐ ‐
With FS PSH 3,078 4,737 531 14.71% 945 16.63%
With FS&AS PSH 2,396 3,738 1,214 33.63% 1,943 34.20%Table 4.2‐15 Comparison of Thermal Generator Ramp Up and Down of the CA Thermal Generators in Year 2022 for the High‐Wind Renewable Scenario
In both the base and high-wind renewable scenarios, the thermal generator ramp up and down are reduced substantially as more PSHs are introduced into the system.
4.2.6 California Regional LMPs
The comparisons of the average regional LMP for the selected regions for the base renewable scenario is shown in following chart. As more PSHs are introduced into the system, the average regional LMP is increased for all selected regions.
Figure 4‐13 Comparison of Regional LMP in Three Cases for the Selected Regions in CA in Year 2022 for the Base Renewable Scenario
The comparisons of the average regional LMP for the selected regions for the high-wind renewable scenario is shown in following chart. For all selected regions, the regional price increases as more PSHs introduced into the system. However, overall, the regional LMP in the high-wind renewable scenario is reduced substantially as opposed to the base renewable scenario.
‐
5.00
10.00
15.00
20.00
25.00
30.00
35.00
PG&E_VLY SCE SDGE
$/M
Wh
Average Regional Price‐Year 2022 for Base Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
66 | P a g e
Figure 4‐14 Comparison of Regional LMP in Three Cases for the Selected Regions in CA in Year 2022 for the High‐wind Renewable Scenario
By examining the hourly LMP in SCE in the week of July 17, 2022 from the simulation shown in the following diagram, it is observed that PSHs pump in the low LMP hours and drive the LMP up in these pumping hours. There are some price reductions in the high LMP hours due to the generation from PSHs. However the magnitude of the price increase in the low LMP hours is much higher than the magnitude of the price reduction in the high LMP hours. This observation explains the reason that the average regional LMP increases as more PSHs are introduced into the system.
Figure 4‐15 SCE LMP in Week of July 17, 2022, in Three Cases for the High‐wind Renewable Scenario
4.2.7 California Generator Energy and Ancillary Services Revenue
The impacts of PSHs to the California generation and Ancillary Service Revenue for the base and high-wind renewable scenarios are shown in the following two tables.
‐
5.00
10.00
15.00
20.00
PG&E_VLY SCE SDGE
$/M
Wh
Average Regional Price‐Year 2022 for High‐wind Renewable Scenario
Base ‐ No PSH
With FS PSH
With FS&AS PSH
‐30
‐20
‐10
0
10
20
30
40
50
1
10
19
28
37
46
55
64
73
82
91
100
109
118
127
136
145
154
163
$/M
Wh
SCE LMP in Week of July 17, 2022 in High‐wind Renewable Scenario
No PSH
With FS PSH
With FS&AS PSH
67 | P a g e
The power exchanges between California and the rest of WI are not included in the following tables. The ancillary service revenue may be higher than in the real world due to the introduction of the flexibility up and down reserves.
The simulations are performed for the entire California footprint. The revenues and profits include the non-CAISO utilities in California footprint. The forecasted generation costs and revenues should be treated an indicator how PSHs can impact a bid-based market.
It can be observed from the tables that
1. Overall, the CA system Net Operating Revenue (the energy and AS revenues less the generation cost) increases as more PSHs are introduced to the system in both the base and high-wind renewable scenarios.
2. The energy revenue increases as more PSHs are introduced into the system due to the fact that the LMP increase as more PSHs are introduced into the system as shown in the previous subsection.
3. The AS revenue does not show a pattern as more PSHS are introduced into the system.
4. The energy revenues are reduced in the high-wind renewable scenario as opposed to the base renewable scenario due to the fact that the LMPs are reduced in the high-wind renewable scenario.
5. The reserve revenues are increased in the high-wind renewable scenario as opposed to the base renewable scenario due to the fact the higher flexibility and regulation requirements in the high-wind renewable scenario yield higher AS prices.
6. In the base renewable scenario, the reserve revenue is less than 10% of the total market revenue (energy revenue plus reserve revenue). The reserve revenue increased to 25% of the total market revenue in the high-wind renewable scenario due to the fact of higher flexibility and regulation reserve requirements in the high-wind renewable scenario.
7. It should be pointed out that there are many generators that have negative profit, such as CCs, CTs, Steams, and even Nuclear in the high-wind renewable scenario cases. There are many hours that the over-generations and negative LMPs occur, especially in the high-wind renewable scenario. Also the LMPs do not reflect the generator startup cost and no-load cost. CAISO compensates these generators for the startup and no-load cost [3]. The profits in the following tables do not include this type of compensations.
Please note that, in Table 4.2-16 California Generator Generation, Generation Cost, Energy Revenue and Ancillary Service Revenue for the Base Renewable Scenario in Year 2022and Table 4.2-17 California Generator Generation, Generation Cost, Energy Revenue and Ancillary Service Revenue for the High-wind Renewable Scenario in Year 2022, the pumping cost is not subtracted from the PSH profit. However, the pumping cost is subtracted from the PSH profit in Table 4.2-18 to Table 4.2-21.
68 | P a g e
California Generator Generation, Generation Cost, Energy Revenue and Ancillary Service Revenue for the Base Renewable Scenario
No PSH With FS PSH With FS&AS PSH
Generator Type
Generation
(GWh)
Total Generation Cost ($000)
Energy Revenue ($000)
Reserves Revenue ($000)
Net Operatin
g Revenue($000)
Generation
(GWh)
Total Generation Cost ($000)
Energy Revenue ($000)
Reserves Revenue ($000)
Net Operatin
g Revenue($000)
Generation
(GWh)
Total Generation Cost ($000)
Energy Revenue ($000)
Reserves Revenue ($000)
Net Operatin
g Revenue($000)
CC 76,184 2,889,437 2,398,856 449,040 (41,541) 74,151 2,785,726 2,384,914 461,270 60,458 73,279 2,725,054 2,388,034 411,989 74,969
Coal 15,459 192,999 605,524 7,925 420,450 15,588 194,690 918,118 7,860 731,289 15,632 195,320 800,265 8,865 613,810
CoGen 8,134 246,545 237,723 ‐ (8,822) 8,185 247,069 247,283 ‐ 214 8,376 251,955 260,483 ‐ 8,528
CT 6,535 480,617 189,683 187,170 (103,764) 6,158 461,234 184,953 171,255 (105,026) 5,804 445,010 180,763 163,484 (100,763)
Hydro 38,682 1,048 1,077,887 102,187 1,179,026 38,702 964 1,125,789 98,138 1,222,963 38,710 901 1,184,057 53,831 1,236,988
Nuclear 37,271 524,535 1,015,093 ‐ 490,559 37,465 527,262 1,074,099 ‐ 546,836 37,638 529,702 1,134,143 ‐ 604,441
Other 7,398 4,314 200,984 1,123 197,792 7,397 4,163 211,870 740 208,447 7,378 3,240 222,362 313 219,435
RPS 67,161 258,062 1,729,433 ‐ 1,471,371 67,908 266,297 1,862,716 ‐ 1,596,420 68,537 277,600 1,999,881 ‐ 1,722,281
Steam 8,712 478,901 238,647 49,994 (190,260) 8,722 479,213 251,879 49,946 (177,389) 8,705 477,742 263,563 44,300 (169,880)
DR 2 1,054 1,054 17,412 17,412 1 330 330 13,873 13,873 0 178 178 1,890 1,890
FS PSH ‐ 2,725 ‐ 102,302 18,205 120,507 1,551 ‐ 53,826 14,831 68,657
AS PSH ‐ ‐ 3,763 ‐ 127,728 37,074 164,802
Total 265,538 5,077,510 7,694,883 814,849 3,432,222 267,001 4,966,947 8,364,252 821,287 4,218,593 269,374 4,906,701 8,615,283 736,576 4,445,158
Table 4.2‐16 California Generator Generation, Generation Cost, Energy Revenue and Ancillary Service Revenue for the Base Renewable Scenario in Year 2022
California Generator Generation, Generation Cost, Energy Revenue and Ancillary Service Revenue for the High‐wind Renewable Scenario
No PSH With FS PSH With FS&AS PSH
Generator Type
Generation
(GWh)
Total Generation Cost ($000)
Energy Revenue ($000)
Reserves Revenue ($000)
Net Operatin
g Revenue($000)
Generation
(GWh)
Total Generation Cost ($000)
Energy Revenue ($000)
Reserves Revenue ($000)
Net Operatin
g Revenue($000)
Generation
(GWh)
Total Generation Cost ($000)
Energy Revenue ($000)
Reserves Revenue ($000)
Net Operatin
g Revenue($000)
CC 52,802 2,053,833 1,081,713 655,103 (317,017) 48,666 1,873,071 1,070,992 677,108 (124,970) 44,339 1,692,346 1,055,120 542,556 (94,670)
Coal 13,518 170,464 455,827 26,231 311,594 13,496 169,973 215,339 25,965 71,332 13,508 170,130 290,909 26,634 147,413
69 | P a g e
California Generator Generation, Generation Cost, Energy Revenue and Ancillary Service Revenue for the High‐wind Renewable Scenario
No PSH With FS PSH With FS&AS PSH
Generator Type
Generation
(GWh)
Total Generation Cost ($000)
Energy Revenue ($000)
Reserves Revenue ($000)
Net Operatin
g Revenue($000)
Generation
(GWh)
Total Generation Cost ($000)
Energy Revenue ($000)
Reserves Revenue ($000)
Net Operatin
g Revenue($000)
Generation
(GWh)
Total Generation Cost ($000)
Energy Revenue ($000)
Reserves Revenue ($000)
Net Operatin
g Revenue($000)
CoGen 6,715 207,040 115,144 ‐ (91,896) 6,636 203,757 121,289 ‐ (82,468) 6,599 200,964 127,397 ‐ (73,567)
CT 6,641 497,018 84,280 278,700 (134,039) 6,519 491,018 85,483 268,850 (136,685) 6,279 478,730 91,018 264,313 (123,399)
Hydro 37,805 2,755 517,907 179,687 694,839 37,983 2,799 555,414 200,595 753,210 38,228 3,359 626,609 86,044 709,294
Nuclear 36,164 508,959 439,944 ‐ (69,015) 36,338 511,405 490,219 ‐ (21,187) 36,718 516,753 542,632 ‐ 25,879
Other 7,242 4,730 89,704 2,524 87,498 7,257 4,895 99,163 2,117 96,386 7,258 3,893 109,737 1,624 107,468
RPS 84,324 193,104 796,763 ‐ 603,659 85,218 195,940 909,511 ‐ 713,572 86,058 201,095 1,061,961 ‐ 860,865
Steam 8,659 480,878 109,182 76,998 (294,698) 8,656 481,331 123,460 77,732 (280,139) 8,574 476,971 135,780 71,432 (269,759)
DR 3 1,655 1,655 27,858 27,858 0 30 30 25,083 25,083 1 384 384 9,990 9,990
FS PSH 5,299 ‐ 147,285 32,122 179,407 4,480 ‐ 98,534 27,166 125,700
AS PSH 4,976 ‐ 118,769 58,985 177,754
Total 253,872 4,120,437 3,692,120 1,247,100 818,783 256,069 3,934,218 3,818,185 1,309,572 1,193,539 257,018 3,744,626 4,258,850 1,088,744 1,602,968
Table 4.2‐17 California Generator Generation, Generation Cost, Energy Revenue and Ancillary Service Revenue for the High‐wind Renewable Scenario in Year 2022
70 | P a g e
The Net Operating Revenue of the fixed speed and adjustable speed PSHs for the base and high-wind renewable scenarios are listed in the following tables.
California PSH Net Operating Revenue for the Base Renewable Scenarios in Year 2022 from the Simulation With FS PSHs
Product FS PSHs AS PSHs Grand Total
Energy
Generation (GWh) 2,725 2,725
Pump Energy (GWh) 3,840 3,840
Generation Cost ($000) ‐ ‐
Pump Cost ($000) 65,768 65,768
Energy Revenue ($000) 102,302 102,302
Subtotal Energy Net Profile ($000) 36,533 36,533
Non Spinning Reserve
AS provision (GWh) 7,090 7,090
AS Revenue ($000) 7,557 7,557
Spinning Reserve
AS provision (GWh) 224 224
AS Revenue ($000) 1,218 1,218
Flexible Down
AS provision (GWh) 47 47
AS Revenue ($000) 389 389
Flexible Up
AS provision (GWh) 13 13
AS Revenue ($000) 43 43
Regulation Down
AS provision (GWh) 171 171
AS Revenue ($000) 4,562 4,562
Regulation Up
AS provision (GWh) 164 164
AS Revenue ($000) 4,436 4,436
Total AS Provision (GWh) 7,709 7,709
Subtotal AS Revenue ($000) 18,205 18,205
Total Profit ($000) 54,739 54,739
Capacity (MW) 2,626 2,626
Annual Profit Rate ($/kW‐Year) 20.84 20.84 Table 4.2‐18 California PSH Net Operating Revenue for the Base Renewable Scenarios in Year 2022 from the Simulations with FS PSHs
California PSH Net Operating Revenue for the Base Renewable Scenarios in Year 2022 from the Simulation With FS&AS PSHs
Product FS PSHs AS PSHs Grand Total
Energy
71 | P a g e
California PSH Net Operating Revenue for the Base Renewable Scenarios in Year 2022 from the Simulation With FS&AS PSHs
Product FS PSHs AS PSHs Grand Total
Generation (GWh) 1,551 3,763 5,313
Pump Energy (GWh) 2,180 4,676 6,856
Generation Cost ($000) ‐ ‐ ‐
Pump Cost ($000) 43,985 120,523 164,508
Energy Revenue ($000) 53,826 127,728 181,554
Subtotal Energy Net Profile($000) 9,841 7,205 17,046
Non Spinning Reserve
AS provision (GWh) 7,469 436 7,905
AS Revenue ($000) 8,310 253 8,563
Spinning Reserve
AS provision (GWh) 126 2,337 2,463
AS Revenue ($000) 769 7,819 8,588
Flexible Down
AS provision (GWh) 20 1,078 1,098
AS Revenue ($000) 165 5,564 5,728
Flexible Up
AS provision (GWh) 19 322 341
AS Revenue ($000) 74 657 731
Regulation Down
AS provision (GWh) 103 1,161 1,264
AS Revenue ($000) 2,661 17,698 20,360
Regulation Up
AS provision (GWh) 104 1,005 1,109
AS Revenue ($000) 2,852 5,083 7,935
Total AS Provision (GWh) 7,841 6,339 14,180
Subtotal AS Revenue ($000) 14,831 37,074 51,905
Total Profit ($000) 24,671 44,279 68,951
Capacity (MW) 2,626 1,799 4,425
Annual Profit Rate ($/kW‐Year) 9.40 24.61 15.58 Table 4.2‐19 California PSH Net Operating Revenue for the Base Renewable Scenarios in Year 2022 from the Simulations with FS & AS PSHs
California PSH Net Operating Revenue for the High‐Wind Renewable Scenarios in Year 2022 from the Simulation With FS PSHs
Product FS PSHs AS PSHs Grand Total
Energy
Generation (GWh) 5,299 5,299
Pump Energy (GWh) 7,501 7,501
Generation Cost ($000) ‐ ‐
72 | P a g e
California PSH Net Operating Revenue for the High‐Wind Renewable Scenarios in Year 2022 from the Simulation With FS PSHs
Product FS PSHs AS PSHs Grand Total
Pump Cost ($000) (13,229) (13,229)
Energy Revenue ($000) 147,285 147,285
Subtotal Energy Net Profile ($000) 160,514 160,514
Non Spinning Reserve
AS provision (GWh) 141 141
AS Revenue ($000) 1,626 1,626
Spinning Reserve
AS provision (GWh) 26 26
AS Revenue ($000) 80 80
Flexible Down
AS provision (GWh) 4,774 4,774
AS Revenue ($000) 5,246 5,246
Flexible Up
AS provision (GWh) 377 377
AS Revenue ($000) 19,511 19,511
Regulation Down
AS provision (GWh) 144 144
AS Revenue ($000) 4,144 4,144
Regulation Up
AS provision (GWh) 247 247
AS Revenue ($000) 1,515 1,515
Total AS Provision (GWh) 5,709 5,709
Subtotal AS Revenue ($000) 32,122 32,122
Total Profit ($000) 192,636 192,636
Capacity (MW) 2,626 2,626
Annual Profit Rate ($/kW‐Year) 73.36 73.36 Table 4.2‐20 California PSH Net Operating Revenue for the High‐Wind Renewable Scenarios in Year 2022 from the Simulation with FS PSHs
California PSH Net Operating Revenue for the High‐Wind Renewable Scenarios in Year 2022 from the Simulation With FS&AS PSHs
Product FS PSHs AS PSHs Grand Total
Energy
Generation (GWh) 4,480 4,976 9,456
Pump Energy (GWh) 6,338 6,183 12,521
Generation Cost ($000) ‐ ‐ ‐
Pump Cost ($000) (6,028) 31,074 25,045
Energy Revenue ($000) 98,534 118,769 217,302
Subtotal Energy Net Profile ($000) 104,562 87,695 192,257
73 | P a g e
California PSH Net Operating Revenue for the High‐Wind Renewable Scenarios in Year 2022 from the Simulation With FS&AS PSHs
Product FS PSHs AS PSHs Grand Total
Non Spinning Reserve
AS provision (GWh) 139 1,795 1,934
AS Revenue ($000) 1,695 13,239 14,934
Spinning Reserve
AS provision (GWh) 45 155 200
AS Revenue ($000) 148 265 412
Flexible Down
AS provision (GWh) 5,359 133 5,492
AS Revenue ($000) 6,125 59 6,184
Flexible Up
AS provision (GWh) 272 1,489 1,761
AS Revenue ($000) 13,830 36,055 49,885
Regulation Down
AS provision (GWh) 137 1,064 1,201
AS Revenue ($000) 3,868 4,660 8,528
Regulation Up
AS provision (GWh) 254 1,768 2,022
AS Revenue ($000) 1,501 4,707 6,208
Total AS Provision (GWh) 6,206 6,405 12,611
Subtotal AS Revenue ($000) 27,166 58,985 86,151
Total Profit ($000) 131,728 146,680 278,408
Capacity (MW) 2,626 1,799 4,425
Annual Profit Rate ($/kW‐Year) 50.16 81.53 62.92 Table 4.2‐21 California PSH Net Operating Revenue for the High‐Wind Renewable Scenarios in Year 2022 from the Simulation with FS&AS PSHs
From the above tables the followings can be observed.
1. In the high-wind renewable scenario, the pumping energy cost is priced at the negative. This indicates that PSHs pumping using the curtailed hydro and renewable energy so that the PSHs help the renewable generation integration.
2. The adjustable speed PSHs have much higher reserve revenue due to the fact that AS PSHs can provision reserves in the pumping mode and the generation dispatchable capacity has wider range than the FS PSHs.
4.2.8 California Transmission Congestions
The annual transmission interface congestion hours and average congestion prices for the base renewable scenario are listed in Table 4.2-22 Comparison of CA Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the Base Renewable Scenario in Year 2022.
74 | P a g e
The power flows in the interties between California and the rest of WI are modeled as fixed exchanges, and the congestion of those interties are not reported.
Comparing the case “With FS PSHs” and “With FS&AS PSHs” with the case “No PSHs”, the average CA transmission congestion price (in Green Columns) are reduced as more PSHs introduced into the system. Interface “P27 Intermountain Power Project DC Line” has the most congestion price reduction.
75 | P a g e
No PSH With FS PSH With FS&AS PSH
Interfaces
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
P26 Northern‐Southern California 297 355 0.13 0.68 345 376 0.27 0.63 370 430 0.31 0.50P27 Intermountain Power Project
DC Line 4,632 ‐ 87.40 ‐ 2,413 ‐ 9.57 ‐ 1,782 ‐ 5.35 ‐
P42 IID‐SCE 44 ‐ 0.09 ‐ 64 ‐ 0.13 ‐ 105 ‐ 0.21 ‐
P61 Lugo‐Victorville 500 kV Line 11 ‐ 0.02 ‐ 6 ‐ 0.01 ‐ 8 ‐ 0.02 ‐
Grand Total 4,984 355 3.51 0.03 2,828 376 0.40 0.03 2,265 430 0.24 0.02Table 4.2‐22 Comparison of CA Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the Base Renewable Scenario in Year 2022
76 | P a g e
4.2.8.1 Transmission Expansion for the High-wind Renewable Scenario
The transmission in the existing TEPPC 2022 network was not adequate to accommodate the High-wind renewable Scenario, so some transmission expansion assumptions had to be made. The transmission expansion assumptions were added to allow the simulations to deliver the renewable energy at the high renewable penetration level. Without the transmission expansion assumptions, the simulation would not have been able to generate results for the High-wind renewable scenario.
Given that this study is not a transmission expansion study, it is important to note that the transmission expansion methodology was simplistic. And the transmission expansion methodology did not include detailed economic or reliability analyses. Nor did it take into account issues such as rights of way, environmental concerns, policy constraints, or any other factor that might normally be considered in detailed transmission planning activities.
The same transmission expansion assumptions in the WI simulations for the high-wind renewable scenario are used for the California simulations for the high-wind renewable scenario.
The annual transmission interface congestion hours and average congestion prices for the high-wind renewable scenario are listed in the following table.
Comparing the case “With FS PSHs” and “With FS&AS PSHs” with the case “No PSHs”, the average CA transmission congestion price (in Green Columns) is reduced as both FS and AS PSHs are introduced into the system. Again, Interface “P27 Intermountain Power Project DC Line” has the most congestion price reduction.
77 | P a g e
No PSH With FS PSH With FS&AS PSH
Interface
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
Hours Congested
(hrs)
Hours Congested Back (hrs)
Shadow Price
($/MW)
Shadow Price Back
($/MW)
P15 Midway‐LosBanos 343 15 0.81 0.03 343 20 0.79 0.02 386 18 0.89 0.02
P26 Northern‐Southern California 656 133 0.93 0.22 644 133 1.46 0.20 587 134 1.38 0.23P27 Intermountain Power Project
DC Line 3,216 ‐ 40.55 ‐ 1,752 ‐ 8.26 ‐ 3,864 ‐ 5.85 ‐
P41 Sylmar to SCE ‐ ‐ ‐ ‐ ‐ 2 ‐ 0.01 ‐ 2 ‐ 0.02
P42 IID‐SCE 187 ‐ 0.43 ‐ 176 ‐ 0.32 ‐ 204 ‐ 0.35 ‐
P44 South of San Onofre ‐ ‐ ‐ ‐ 1 ‐ 0.00 ‐ 2 ‐ 0.00 ‐
P61 Lugo‐Victorville 500 kV Line 83 1 1.95 ‐ 104 ‐ 3.07 ‐ 68 ‐ 0.82 ‐
Grand Total 4,485 149 1.79 0.01 3,020 155 0.56 0.01 5,111 154 0.37 0.01 Table 4.2‐23 Comparison of CA Transmission Interface Congestion Hours and Congestion Prices in Three Cases for the High‐wind Renewable Scenario in Year 2022
78 | P a g e
4.3 SMUD Simulation Results
In this simulation task, the SUMD footprint is simulated. Before simulating the SMUD footprint, the entire WI is simulated to produce the power flows in all transmission lines at the border of SMUD and the rest of the WI grid. The WI is simulated for the base renewable scenario and the high-wind renewable scenario.
Then the SMUD grid is carved out from the WI grid. The power exchanges between SMUD and the rest of the WI are frozen for the SMUD simulations. Since there is no serious transmission congestion in the SMUD footprint, the SMUD grid is modeled at a regional level, i.e., the SMUD grid is represented by a single node.
The purpose of the SMUD simulation is to examine the PSHs impact to the utility portfolio.
The assumptions and settings for the SMUD simulations are reiterated as follows.
1. DA forecasted load / wind / solar: 24 to 48 hours ahead 2. 24 hours SCUC / ED with hourly interval 3. Regional network representation 4. Contingency, Flexibility up / down, Regulation up / down reserves modeled 5. Since there is no existing PSHs in the SMUD footprint, two cases, no PSH and
with new Adjustable Speed PSH, namely Iowa Hill, are simulated 6. The simulations are performed for the base and high-wind renewable scenarios 7. The SMUD simulations are cost-based.
Since the exchange powers between SMUD and the rest of WI are frozen in the simulation, the exchanges powers are not included in the following simulation results.
4.3.1 SMUD System Production Costs
The production cost of two cases for year 2022: No PSHs and with the new AS PSHs, are listed in the following tables for both the base renewable scenario and the high-wind renewable scenario.
Base Renewable
Total Generation Energy
PSH Generation Energy
Production Cost
Annual Cost Reduction
Annual Cost Savings due to PSHs
GWh GWh million $ million $ % Capacity MW
$/kW‐year
No PSH 16,100 ‐ 269 ‐ ‐ ‐ ‐
With AS PSH 16,273 467 246 23 8.62% 400 58.04Table 4.3‐1 Comparison of SMUD Production Cost in Two Cases for the Base Renewable Scenario in Year 2022
High‐Wind Renewable
Total Generation Energy
PSH Generation Energy
Production Cost
Annual Cost Reduction
Annual Cost Savings due to PSHs
GWh GWh million $ million $ % Capacity (MW)
$/kw‐year
No PSH 20,318 ‐ 308 ‐ ‐ ‐ ‐
With AS PSH 19,952 440 258 51 16.45% 400 126.83Table 4.3‐2 Comparison of SMUD Production Cost in Two Cases for the High‐Wind Renewable Scenario in Year 2022
79 | P a g e
The SMUD production cost is reduced by 8.62% and 16.45% for the base renewable scenario and the high-wind renewable scenario respectively.
With the renewable generation increases to 33%, the production cost savings due to the PSHs operation increases. The PSHs is more valuable in the high renewable penetration level.
The comparisons of the generation by generator type for the base and high-wind renewable scenarios are shown in the following two charts.
In the base renewable scenario, The CC and CT generation is reduced as the new AS PSHs are introduced into the system due to the fact that the PSH generation replaces the CC and CT generation. Also the renewable generation is increased as the new AS PSHs are introduced into the system due to less renewable generation being curtailed.
Figure 4‐16 Comparison of SMUD Generation of Two Cases by Generator Type for the Base Renewable Scenario in Year 2022
In the high-wind renewable scenario, The CC and CT generation is reduced as the new AS PSHs are introduced into the system due to the fact that the PSH generation replaces the CC and CT generation. Also the renewable and hydro generation is increased as the new AS PSHs are introduced into the system due to less renewable and hydro generation being curtailed.
‐
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
GWh
Generation by Generator Type (GWh)‐Yearly for Base Renewable Scenario
No PSH
With AS PSH
80 | P a g e
Figure 4‐17 Comparison of SMUD Generation of Two Cases by Generator Type for the High‐wind Renewable Scenario in Year 2022
The comparisons of the production cost in SMUD by generator type for the base and high-wind renewable scenarios are shown in the following two charts.
In both the base and high-wind renewable scenarios, all thermal generator production cost is reduced as the new AS PSHs are introduced into the system.
Figure 4‐18 Comparison of SMUD Generation Cost of Two Cases by Generator Type for the Base Renewable Scenario in Year 2022
‐
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
CC CT Hydro Other RPS CoGen PumpedStorage
Wind Solar
GWh
Generation by Generator Type (GWh)‐Yearly for High‐wind Renewable Scenario
No PSH
With AS PSH
‐
50
100
150
200
250
Million $
Total Generation Cost by Generator Type ($M)‐Yearly for Base Renewable Scenario
No PSH
With AS PSH
81 | P a g e
Figure 4‐19 Comparison of SMUD Generation Cost of Two Cases by Generator Type for the High‐wind Renewable Scenario in Year 2022
There is no renewable curtailment in the base renewable scenario in the SMUD system. In the high-wind renewable scenario, the SMUD renewable curtailment is reduced from 19GWh in the case of PSHs to 1 GWh in the case with Iowa Hill as shown in the following table.
SMUD Renewable Curtailment in the High‐wind Renewable Scenario
Renewable Curtailment Reduction
Case GWh GWh %
No PSH 19 ‐ 0%
With Iowa Hill 1 18 95%Table 4.3‐3 Comparison of SMUD Renewable Curtailment in the High‐wind Renewable Scenario
4.3.2 SMUD System Reserves
The system reserve requirements and provisions from the PSH are compared in the two cases for the base and the high-wind renewable scenarios in the following two tables.
Base Renewable
Base ‐ No PSH With AS PSH
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Non‐Spinning Reserve 493 ‐ 493 78
Spinning Reserve 493 ‐ 493 21
Flexibility Down 156 ‐ 156 46
Flexibility Up 156 ‐ 156 6
Regulation Down 238 ‐ 238 56
Regulation Up 237 ‐ 237 8 Table 4.3‐4 Comparison of SMUD Reserve Requirements and Provisions by PSH in Two Cases for the Base Renewable Scenario in Year 2022
High‐wind Renewable Base ‐ No PSH With AS PSH
‐
50
100
150
200
250
300
CC CT Hydro Other RPS CoGen PumpedStorage
Wind Solar
Million $
Total Generation Cost by Generator Type ($M)‐Yearly for High‐wind Renewable Scenario
No PSH
With AS PSH
82 | P a g e
Total Req. (GWh)
PSH Provision (GWh)
Total Req. (GWh)
PSH Provision (GWh)
Non‐Spinning Reserve 493 ‐ 493 87
Spinning Reserve 493 ‐ 493 12
Flexibility Down 601 ‐ 601 86
Flexibility Up 601 ‐ 601 12
Regulation Down 439 ‐ 439 90
Regulation Up 467 ‐ 467 9 Table 4.3‐5 Comparison of SMUD Reserve Requirements and Provisions by PSH in Two Cases for the High‐wind Renewable Scenario in Year 2022
4.3.3 SMUD System Emission Production
The system emission productions in the two cases for the base and high-wind renewable scenarios are listed in the following two tables.
Base Renewable
CO2 NOx SO2 Emission Reduction (ton)Emission Reduction
(%)
Ton ton ton CO2 NOx SO2 CO2 NOx SO2
No PSH 2,856,489 1,880 3 ‐ ‐ ‐ ‐ ‐ ‐
With AS PSH 2,683,737 1,777 1 172,752 103 2 6.0% 5.5% 69.3%Table 4.3‐6 Comparison of SMUD Emission Productions in Two Cases in Year 2022 for the Base Renewable Scenario
High‐wind Renewable CO2 NOx SO2 Emission Reduction (ton)
Emission Reduction (%)
Ton ton ton CO2 NOx SO2 CO2 NOx SO2
No PSH 3,299,928 2,168 3 ‐ ‐ ‐ ‐ ‐ ‐
With AS PSH 2,814,536 1,872 1 485,392 296 3 14.7% 13.7% 83.2%Table 4.3‐7 Comparison of SMUD Emission Productions in Two Cases in Year 2022 for the High‐Wind Renewable Scenario
In both the base renewable scenario and the high-wind renewable scenario, all emission productions are reduced as the PSHs are introduced into the SMUD system.
4.3.4 SMUD Thermal Generator Cycling
The number of starts and startup cost of the thermal generators in the two cases for the base and high-wind renewable scenarios are listed in the following two tables.
Base Renewable
Total Number of Thermal Starts
Total Thermal Start Cost Cost Reduction
million $ million $ %
No PSH 1,812 5 ‐ ‐
With AS PSH 828 3 2 44.83%Table 4.3‐8 Comparison of Number of Starts and Startup Costs of the SMUD Thermal Generators in Year 2022 for the Base Renewable Scenario
High‐Wind Renewable Total Number of Total Thermal Cost Reduction
83 | P a g e
Thermal Starts Start Cost
million $ million $ %
No PSH 2,159 5 ‐ ‐
With AS PSH 773 3 2 41.87%Table 4.3‐9 Comparison of Number of Starts and Startup Costs of the SMUD Thermal Generators in Year 2022 for the High‐wind Renewable Scenario
In both the base and high-wind renewable scenarios, the number of starts and startup costs of the thermal generators are reduced substantially as the PSHs are introduced into the SMUD system.
The comparisons of the thermal generator ramp up and down in the two cases for the base and high-wind renewable scenarios are listed in the following two tables.
Base Renewable
Total Thermal Generator Ramp Up
Total Thermal Generator Ramp Down Ramp Up Reduction
Ramp Down Reduction
GW GW GW % GW %
No PSH 367 502 ‐ ‐ ‐ ‐
With AS PSH 231 305 136 37.03% 197 39.29%Table 4.3‐10 Comparison of Thermal Generator Ramp Up and Down of the SMUD Thermal Generators in Year 2022 for the Base Renewable Scenario
High‐Wind Renewable
Total Thermal Generator Ramp Up
Total Thermal Generator Ramp Down Ramp Up Reduction
Ramp Down Reduction
GW GW GW % GW %
No PSH 369 489 ‐ ‐ ‐ ‐
With AS PSH 250 315 119 32.16% 174 35.59%Table 4.3‐11 Comparison of Thermal Generator Ramp Up and Down of the SMUD Thermal Generators in Year 2022 for the High‐wind Renewable Scenario
In both the base and high-wind renewable scenarios, the thermal generator ramp up and down are reduced substantially as the PSHs are introduced into the SMUD system.
4.3.5 SMUD Regional LMPs
The comparison of the average SMUD LMP in the two cases for the base renewable scenario is shown in following chart. As the AS PSHs are introduced into the SMUD system, the average SMUD LMP is reduced.
84 | P
Figure
The crenewthe A
Figure
4
Sincemode
P a g e
4‐20 Compariso
comparisonswable scenar
AS PSHs are
4‐21 Compariso
4.3.6 SMU
e the SMUDeled.
on of SMUD Reg
s of the averario is shown introduced i
on of SMUD Reg
UD Transmiss
is modeled
gional LMP in Tw
age SMUD Lin followinginto the syst
gional LMP in Tw
sion Conges
at the region
wo Cases in Year
LMP in the tg chart. Theem.
wo Cases in Year
stions
nal level, no
r 2022 for the Ba
two cases foe average SM
r 2022 for the H
transmissio
ase Renewable
or the high-wMUD LMP in
igh‐wind Renew
on interfaces
Scenario
wind ncreases as
wable Scenario
and lines arre
85 | P a g e
5 Three-Stage DA-HA-RT Sequential Simulations
5.1 Intermittent Renewable Generation Variability and Uncertainty
The intermittent renewable generation variability and uncertainty places challenges to the power system planning and operation. One of the questions that the power industry needs to answer is: what is the impact of the sub-hourly renewable generation variable and uncertainty to the system operation?
The following four charts show the 5-minute solar and wind generation variability and uncertainty in the Southern California in the high-wind renewable generation scenario in a typical winter week and a typical summer week of year 2022. The source of the data is the WWSIS Phase 2 study by NREL.
Figure 5‐1 5‐minute Actual Solar Generation and Hourly DA / HA Forecasts in Southern California in a Typical Winter Week of Year 2022
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
1
82
163
244
325
406
487
568
649
730
811
892
973
1054
1135
1216
1297
1378
1459
1540
1621
1702
1783
1864
1945
MW
Southern California Solar RT Generation and DA/HA Forecasts in Week of January 16 of 2022
RT
HA
DA
86 | P a g e
Figure 5‐2 5‐minute Actual Wind Generation and Hourly DA / HA Forecasts in Southern California in a Typical Winter Week of year 2022
The maximum and minimum forecast errors in this winter week are listed in the following table.
Forecast Error(MW) in a Typical Winter Week
Solar Generation Wind Generation
RT‐HA HA‐DA RT‐HA HA‐DA
Max 3002 53 1524 3167
Min ‐3220 ‐995 ‐2142 ‐1353
Table 5.1‐1 Max and Min Wind and Solar Forecast Errors in Southern California in a Typical Winter Week of year 2022
0
1000
2000
3000
4000
5000
6000
7000
8000
185
169
253
337
421
505
589
673
757
841
925
1009
1093
1177
1261
1345
1429
1513
1597
1681
1765
1849
1933
MW
Southern California Wind RT Generation and DA/HA Forecasts in Week of January 16 of 2022
RT
HA
DA
87 | P a g e
Figure 5‐3 5‐minute Actual Solar Generation and Hourly DA / HA Forecasts in Southern California in a Typical Summer Week of year 2022
Figure 5‐4 5‐minute Actual Wind Generation and Hourly DA / HA Forecasts in Southern California in a Typical Summer Week of Year 2022
The maximum and minimum forecast errors in a typical summer week are listed in the following table.
Forecast Error(MW) in a Typical Summer Week
Solar Generation Wind Generation
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
185
169
253
337
421
505
589
673
757
841
925
1009
1093
1177
1261
1345
1429
1513
1597
1681
1765
1849
1933
MW
Southern California Solar RT Generation and DA/HA Forecasts in Week of July 17 of 2022
RT
HA
DA
0
1000
2000
3000
4000
5000
6000
185
169
253
337
421
505
589
673
757
841
925
1009
1093
1177
1261
1345
1429
1513
1597
1681
1765
1849
1933
MW
Southern California Wind RT Generation and DA/HA Forecasts in Week of July 17 of 2022
RT
HA
DA
88 | P a g e
RT‐HA HA‐DA RT‐HA HA‐DA
Max 2863 727 3969 991
Min ‐2163 ‐1697 ‐2969 ‐3558
Table 5.1‐2 Max and Min Wind and Solar Forecast Error in Southern California in a Typical Summer Week of Year 2022
The following two figures show the wind and solar forecast errors between RT and HA, and between HA and DA in the typical weeks of winter and summer of 2022. It is obvious that the wind and solar generation forecast error from HA to RT has higher frequency and magnitude (blue curves).
Figure 5‐5 Wind and Solar generation forecasted error from DA to HA and HA to RT in Southern California in a typical winter week of year 2022.
‐4000
‐3000
‐2000
‐1000
0
1000
2000
3000
4000
185
169
253
337
421
505
589
673
757
841
925
1009
1093
1177
1261
1345
1429
1513
1597
1681
1765
1849
1933
MW
Southern California Wind and Solar Generation RT‐HA and HA‐DA Forecast Errors in Week of January 16 of 2022
RT‐HA
HA‐DA
‐4000
‐3000
‐2000
‐1000
0
1000
2000
3000
4000
185
169
253
337
421
505
589
673
757
841
925
1009
1093
1177
1261
1345
1429
1513
1597
1681
1765
1849
1933
MW
Southern California Wind and Solar Generation RT‐HA and HA‐DA Forecast Errors in Week of July 17 of 2022
RT‐HA
HA‐DA
89 | P a g e
Figure 5‐6 Wind and Solar generation forecasted error from DA to HA and HA to RT in Southern California in a typical winter week of year 2022.
To meet the sub-hourly renewable generation variability and uncertainty, the system needs to ramp generators more and/or to cycle the quick-startup generators more. This project task examines the hourly security constrained unit commitment and the sub-hourly security constrained dispatch to quantify the PSH impact to the system production cost and the sub-hourly generator ramping and cycling. The simulation approach adopted is the 3-stage DA-HA-RT sequential simulation as described in Section 3.2 3-Stage DA-HA-RT Sequential Simulations. The 3-stage simulations are performed for three cases: No PSH, With FS PSH and With FS&AS PSH in the base and high-wind renewable scenarios. The 3-stage simulations will cover the three study footprint areas: WI, California and SMUD.
In the following three subsections, the system production cost and the generator ramp and cycle from the DA, HA and RT simulations are presented. First the simulation solutions in the California footprint are presented.
5.2 3-stage DA-HA-RT Simulation Results for California
Before simulating the California system, the WI simulations are performed to produce the power flows for the interties between California and the rest of WI for both the base and high-wind renewable scenarios. Then the power flows for these intertie lines are frozen in the California DA, HA and RT simulations.
The assumptions and settings for the California 3-stage simulations are reiterated as follows.
1. Four typical weeks are simulated for the California footprint: the 3rd week of January, April, July and October;
2. DA simulations: a. DA forecasted load / wind / solar: 24 to 48 hours ahead b. 24-hours SCUC / ED with hourly interval c. Nodal network representation d. Contingency, Flexibility up / down, Regulation up / down reserves
modeled e. Generator maintenance outages are modeled
3. HA simulations: a. 4-HA forecasted load / wind / solar: 4 hours ahead b. 4-hours plus 20-hours look-ahead SCUC / ED with hourly interval c. Nodal network representation d. Contingency, Flexibility up / down, Regulation up / down reserves
modeled e. Unit Commitment patterns from the DA simulation are frozen for the
generators with the min down time greater than 4 hours f. Generator maintenance outages are modeled
4. RT 5-min simulations: a. 5-min actual load / wind / solar generation b. 12 5-minutes plus 23-hours look-ahead SCUC / ED with 5-minutes
interval
90 | P a g e
c. Nodal network representation d. Contingency, regulation up / down reserves modeled. Flexibility up /
down reserves are deployed e. Unit Commitment patterns from the HA simulation are frozen for the
generators with the min down time greater than 1 hour. The CT generator with the min down time of 1 hour or less than 1 hour can be committed or de-committed
f. Generator maintenance outages (and forced outages) are modeled 5. Three cases, no PSH, with the existing FS PSHs, with existing FS PSHs and two
new adjustable speed PSHs (Iowa Hill and Eagle Mountain), are simulated; 6. The simulations are performed for the high-wind renewable scenario; 7. For the high-wind renewable scenario, the simplified transmission expansion is
performed to deliver renewable generation to load buses; 8. The California simulations are bid-based (For the energy and AS bidding price
determinations, please refer to subsection 4.2.1 Power Market Bidding Prices).
5.2.1 CA 3-stage Simulation Results for Four Typical Weeks in Year 2022
To focus on the PSH impact to the system operation and the difference between the 5-min SCUC/ED and the hourly SCUC/ED, the results of the 3-stage DA-HA-RT simulations with only the generator maintenance outages are examined first. These simulations are performed for the four typical weeks and the high-wind renewable scenario.
The California system cost is presented in the following chart. In this chart, the production costs are labeled by “case name” and “simulation stage”. For example, the production cost for the case of no PSH from the DA simulation is labeled as “No PSH DA”.
From the following chart we can have the following observations.
1. In general, the production cost from the HA simulations (the red columns) is higher than that from the DA simulations (the blue columns), and the production cost from the RT simulations (the green columns) is higher than that from the DA and HA simulations. The average production cost over four weeks from the RT simulations (the green columns) is 6% higher than that from the DA simulations (the blue columns). The higher production cost in the RT simulations is due to more thermal generator ramping and more quick-startup CT commitment to meet the sub-hourly load and renewable generation variability and uncertainty.
2. The production costs from the DA-HA-RT simulations are reduced as PSHs are introduction to the system.
a. With the fixed speed PSHs, the average production cost from the RT simulations over four weeks (the solid green columns) is reduced by 4% as opposed to that from the RT simulations without PSHs (the dotted green columns).
b. With the additional adjustable speed PSHs, the average production cost from the RT simulations over four weeks (the tilted strip green columns) is reduced by 6% as opposed to that from the RT simulation without PSHs (the dotted green columns).
91 | P a g e
Figure 5‐7 California Production Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 70,345 62,365 113,498 74,921
No PSH HA 73,183 66,020 121,994 76,456
No PSH RT 72,255 67,653 124,247 76,832
FS PSH DA 65,730 61,555 112,887 70,960
FS PSH HA 68,099 65,319 121,098 71,728
FS PSH RT 67,910 66,104 122,881 71,920
FS&AS PSH DA 64,901 56,624 112,063 69,672
FS&AS PSH HA 66,715 60,374 120,478 71,041
FS&AS PSH RT 66,300 62,263 122,150 70,953
40,000
50,000
60,000
70,000
80,000
90,000
100,000
110,000
120,000
130,000
$000
California Production Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance Outages in
the RT Simulations)
92 | P a g e
The startup costs from the 3-stage simulations for the three cases and four typical weeks with only maintenance outages in the DA, HA and RT simulations are presented in the following chart.
The followings can be observed from the chart.
1. The start-up cost from the RT simulations (the green columns) is higher than that from the DA and HA simulations (the blue and red columns) due to the additional CT commitment in the RT simulations to meet the sub-hourly load and renewable generation variability and uncertainty.
2. Comparing the startup costs between the RT simulations and the DA simulations, the followings are observed.
a. Without PSHs, the average startup cost from the RT simulations over four weeks (the dotted green columns) is 36% higher than that from the DA simulations (the dotted blue columns).
b. With the fixed speed PSHs, the average startup cost from the RT simulations over four weeks (the solid green columns) is 18.9% higher than that from the DA simulations (the solid blue columns).
c. With the fixed speed and adjustable speed PSHs, the average startup cost from the RT simulations over four weeks (the tilted strip green columns) is 21.2% higher than that from the DA simulations (the titled strip blue columns).
3. Comparing the startup costs from the RT simulations without and with PSHs, the followings are observed.
a. With the fixed speed PSHs, the average startup cost from the RT simulation over four weeks (the solid green columns) is reduced by 31% as opposed to the RT simulations without PSHs (the dotted green columns).
b. With the additional adjustable speed PSHs, the average startup cost from the RT simulation over four weeks (the tilted strip green columns) is reduced by 47% as opposed to the RT simulations without PSHs (the dotted green columns).
These observations indicate that the PSHs reduce the additional CT commitment and the associated startup cost.
93 | P a g e
Figure 5‐8 California Startup Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 1,032 821 1,595 990
No PSH HA 1,138 954 1,750 1,024
No PSH RT 1,468 1,267 2,103 1,206
FS PSH DA 595 753 1,344 799
FS PSH HA 667 781 1,468 686
FS PSH RT 876 969 1,536 771
FS&AS PSH DA 439 489 1,157 559
FS&AS PSH HA 464 578 1,313 541
FS&AS PSH RT 544 737 1,341 582
‐
500
1,000
1,500
2,000
2,500
$000
California Start & Shutdown Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance
Outages in the RT Simulations)
94 | P a g e
The thermal generator ramp up and down from the 3-stage simulations for the three cases and four typical weeks with only maintenance outages in the DA, HA and RT simulation are presented in the following two charts.
The followings can be observed from the two charts.
1. The thermal generator ramp up and down (MW) from the RT simulations (the green columns) is substantially higher than the DA and HA simulations (the blue and red columns) due to the thermal generator ramp to meet the sub-hourly load and renewable generation variability and uncertainty.
2. Comparing the ramp up and down between the RT simulations and DA simulations, the followings are observed.
a. Without PSHs, the average thermal generator ramp up and down from the RT simulations over four weeks (the dotted green columns) is 597,120 (MW) and 663,359 (MW) higher than that from the DA simulations (the dotted blue columns) respectively.
b. With the fixed speed PSHs, the average thermal generator ramp up and down from the RT simulations over four weeks (the solid green columns) is 508,451 (MW) and 532,650 (MW) higher than that from the DA simulations (the solid blue columns) respectively.
c. With the additional adjustable speed PSHs, the average thermal generator ramp up and down (MW) from the RT simulations over four weeks (the tilted strip green columns) is 391,860 (MW) and 412,259 (MW) higher than that from the DA simulations (the tilted blue columns) respectively.
3. Comparing the thermal generator ramp up and down from the RT simulations without and with PSHs, the followings are observed.
a. With the fixed speed PSHs, the average thermal generator ramp up and down in MW from the RT simulations over four weeks (the solid green columns) is reduced by 17% and 20% as opposed to the RT simulations without PSHs (the dotted green columns) respectively.
b. With the additional adjustable speed PSHs, the average thermal generator ramp up and down in MW from the RT simulations over four weeks (the titled strip green columns) is reduced by 36% and 38% as opposed to the RT simulations without PSHs (the dotted green columns) respectively.
These observations indicate that the PSHs reduce the thermal generator ramp substantially.
95 | P a g e
Figure 5‐9 California Thermal Generator Ramp Up (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 90,243 73,114 103,422 98,910
No PSH HA 97,857 84,188 108,668 98,186
No PSH RT 231,484 212,432 288,633 230,260
FS PSH DA 56,852 62,980 92,600 79,716
FS PSH HA 74,210 75,666 86,781 84,791
FS PSH RT 190,215 178,966 221,568 209,850
FS&AS PSH DA 44,186 47,275 78,141 58,612
FS&AS PSH HA 53,161 60,795 81,030 72,222
FS&AS PSH RT 144,449 135,476 177,903 162,247
‐
50,000
100,000
150,000
200,000
250,000
300,000
350,000
MW
California Thermal Ramp Up (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance
Outages in the RT Simulations)
96 | P a g e
Figure 5‐10 California Thermal Generator Ramp Down (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 126,251 105,086 162,019 139,545
No PSH HA 136,165 123,375 170,400 148,735
No PSH RT 278,692 262,414 365,607 289,547
FS PSH DA 78,908 92,754 137,761 112,699
FS PSH HA 98,170 108,153 136,473 117,426
FS PSH RT 219,470 215,182 274,207 245,913
FS&AS PSH DA 62,994 65,165 119,140 82,934
FS&AS PSH HA 71,026 82,397 125,830 99,613
FS&AS PSH RT 164,784 161,190 224,567 191,951
‐
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
MW
California Thermal Ramp Down (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario
(Maintenance Outages in the RT Simulations)
97 | P a g e
In the real world system operations, the unexpected generator forced outages occur at real time. To closely mimic the system operations, the generator maintenance outages are modeled in the DA and HA simulations; the generator maintenance and forced outage are modeled in the RT simulations. The production costs, startup cost, and thermal generator ramp up and down from the 3-stage DA-HA-RT simulations with the forced outages modeled in the RT simulations for the four typical weeks and the high-wind renewable scenario are presented in following four charts.
When the forced outages are modeled in the RT simulations, the followings can be observed.
1. The average production cost from the RT simulations (the green columns) over four typical weeks is increased further by additional 7.3%, 5.6% and 5.4% as opposed to the DA simulations in the three cases: No PSH, with fixed speed PSHs, and with fixed and adjustable speed PSHs (the blue columns) respectively.
2. The average startup cost from the RT simulations (the green columns) over four typical weeks is increased further by additional 25.2%, 29.7% and 36.9% as opposed to the DA simulations in the three cases: No PSH, with fixed speed PSHs, and with fixed and adjustable speed PSHs (the blue columns) respectively. The additional startup costs include the startup costs from the generators whose unit commitment frozen in the RT simulation due to the forced outages.
3. However, the thermal generator ramp up and down in MW does not change substantially as opposed to that without the forced outages modeled in the RT simulations.
98 | P a g e
Figure 5‐11 California Production Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 70,345 62,365 113,498 74,921
No PSH HA 73,183 66,020 121,994 76,456
No PSH RT 73,025 66,910 146,355 78,183
FS PSH DA 65,730 61,555 112,887 70,960
FS PSH HA 68,099 65,319 121,098 71,728
FS PSH RT 69,166 65,690 136,580 74,787
FS&AS PSH DA 64,901 56,624 112,063 69,672
FS&AS PSH HA 66,715 60,374 120,478 71,041
FS&AS PSH RT 67,950 61,806 134,365 73,865
40,000
60,000
80,000
100,000
120,000
140,000
160,000
$000
California Production Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance & Forced
Outages in the RT Simulations)
99 | P a g e
Figure 5‐12 California Startup Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 1,032 821 1,595 990
No PSH HA 1,138 954 1,750 1,024
No PSH RT 1,690 1,320 2,580 1,575
FS PSH DA 595 753 1,344 799
FS PSH HA 667 781 1,468 686
FS PSH RT 1,104 1,027 1,973 1,085
FS&AS PSH DA 439 489 1,157 559
FS&AS PSH HA 464 578 1,313 541
FS&AS PSH RT 695 819 1,796 870
‐
500
1,000
1,500
2,000
2,500
3,000
$000
California Start & Shutdown Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance &
Forced Outages in the RT Simulations)
100 | P a g e
Figure 5‐13 California Thermal Generator Ramp Up (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 90,243 73,114 103,422 98,910
No PSH HA 97,857 84,188 108,668 98,186
No PSH RT 190,172 183,622 279,121 223,804
FS PSH DA 56,852 62,980 92,600 79,716
FS PSH HA 74,210 75,666 86,781 84,791
FS PSH RT 180,138 173,451 238,585 198,983
FS&AS PSH DA 44,186 47,275 78,141 58,612
FS&AS PSH HA 53,161 60,795 81,030 72,222
FS&AS PSH RT 141,633 123,405 182,166 139,780
‐
50,000
100,000
150,000
200,000
250,000
300,000
MW
California Thermal Ramp Up (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance Forced
Outages in the RT Simulations)
101 | P a g e
Figure 5‐14 California Thermal Generator Ramp Down (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 126,251 105,086 162,019 139,545
No PSH HA 136,165 123,375 170,400 148,735
No PSH RT 242,776 235,879 374,331 294,266
FS PSH DA 78,908 92,754 137,761 112,699
FS PSH HA 98,170 108,153 136,473 117,426
FS PSH RT 212,500 212,259 306,593 242,682
FS&AS PSH DA 62,994 65,165 119,140 82,934
FS&AS PSH HA 71,026 82,397 125,830 99,613
FS&AS PSH RT 163,926 152,739 243,329 176,124
‐
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
MW
California Thermal Ramp Down (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance &
Forced Outages in the RT Simulations)
102 | P a g e
5.3 3-stage DA-HA-RT Simulation Results for WI
The assumptions and settings for the WI 3-stage simulations are reiterated as follows.
1. Four typical weeks are simulated: the 3rd week of January, April, July and October in year 2022;
2. DA simulations: a. DA forecasted load / wind / solar: 24 to 48 hours ahead b. 24-hours SCUC / ED with hourly interval c. Nodal network representation d. Contingency, Flexibility up / down, Regulation up / down reserves
modeled e. Generator maintenance outages are modeled
3. HA simulations: a. 4-HA forecasted load / wind / solar: 4 hours ahead b. 4-hours plus 20-hours look-ahead SCUC / ED with hourly interval c. Nodal network representation d. Contingency, Flexibility up / down, Regulation up / down reserves
modeled e. Unit Commitment patterns from the DA simulation are frozen for the
generators with the min down time greater than 4 hours f. Generator maintenance outages are modeled
4. RT 5-min simulations: a. 5-min actual load / wind / solar generation b. 12 5-minutes plus 23-hours look-ahead SCUC / ED with 5-minutes
interval c. Nodal network representation d. Contingency, Regulation up / down reserves modeled. Flexibility up /
down reserve are deployed e. Unit Commitment patterns from the HA simulation are frozen for the
generators with the min down time greater than 1 hour. The CT generator with the min down time of 1 hour or less than 1 hour can be committed or de-committed
f. Generator maintenance and forced outages are modeled 5. Three cases, no PSH, with the existing FS PSHs, with the existing FS PSHS and
three proposed adjustable speed PSHs (Swan Lake, Iowa Hill and Eagle Mountain), are simulated;
6. The simulations are performed for the high-wind renewable scenarios; 7. For the high-wind renewable scenario, the simplified transmission expansion is
performed to deliver the renewable generations to the load buses; 8. The WI simulations are cost-based.
5.3.1 WI 3-stage Simulation Results for Four Typical Weeks in Year 2022
In the following simulations, the generator maintenance outages are modeled in the DA and HA simulations, and the generator maintenance and forced outages are modeled in the RT simulations.
103 | P a g e
The WI production cost ($000) from 3-stage simulations for three cases and four typical weeks in year 2022 in the high-wind renewable scenario is listed in the following chart.
The followings can be observed from the chart.
1. In general, the production cost from the HA simulations (the red columns) is higher than that from the DA simulations (the blue columns), and the production cost from the RT simulations (the green columns) is higher than that from the DA and HA simulations. The average production cost over four weeks from the RT simulations (the green columns) is about 5% higher than that from the DA simulations (the blue columns). The higher production cost from the RT simulations indicates that the generators ramp more and the quick-startup CT generators are committed more to meet the sub-hourly load and renewable generation variability and uncertainty.
2. The production costs from the DA-HA-RT simulations are reduced as PSHs are introduction to the system.
a. With the fixed speed PSHs, the average production cost from the RT simulations over four weeks (the solid green columns) is reduced by 2% as opposed to that from the RT simulations without PSHs (the dotted green columns).
b. With the additional adjustable speed PSHs, the average production cost from the RT simulations over four weeks (the tilted strip green columns) is reduced by 4% as opposed to that from the RT simulation without PSHs (the dotted green columns).
104 | P a g e
Figure 5‐15 WI Production Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 228,695 214,661 313,533 229,191
No PSH HA 233,654 216,952 331,003 230,707
No PSH RT 225,001 215,732 368,063 228,507
FS PSH DA 222,854 209,927 311,589 225,023
FS PSH HA 226,743 212,886 329,238 225,451
FS PSH RT 219,813 212,271 360,280 224,063
FS&AS PSH DA 219,878 202,987 307,278 222,105
FS&AS PSH HA 218,699 207,623 325,511 222,560
FS&AS PSH RT 213,990 208,154 355,829 222,013
20,000
70,000
120,000
170,000
220,000
270,000
320,000
370,000
420,000
$000
WI Production Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance and Forced
Outages in the RT Simulations)
105 | P a g e
The WI startup costs from the 3-stage simulations for the three cases and four typical weeks are presented in the following chart.
The followings can be observed from the chart.
1. The start-up cost from the RT simulations (the green columns) is higher than that from the DA and HA simulations (the blue and red columns) due to
a. The additional CT commitment in the RT simulations to meet the load and renewable generation variability and uncertainty;
b. The additional start up because of the forced outages in the RT simulations from the generators whose unit commitments are frozen.
2. Comparing the startup costs between the RT simulations and DA simulations, the followings are observed.
a. Without PSHs, the average startup cost from the RT simulations over four weeks (the dotted green columns) is 50% higher than that from the DA simulations (the dotted blue columns).
b. With the fixed speed PSHs, the average startup cost from the RT simulations over four weeks (the solid green columns) is 41.9% higher than that from the DA simulations (the solid blue columns).
c. With the additional adjustable speed PSHs, the average startup cost from the RT simulations over four weeks (the tilted strip green columns) is 43.8% higher than that from the DA simulations (the tilted strip blue columns).
3. Comparing the startup costs between the RT simulations without and with PSHs, the followings are observed.
a. With the fixed speed PSHs, the average startup cost from the RT simulation over four weeks (the solid green columns) is reduced by 11% as opposed to the RT simulations without PSHs (the dotted green columns).
b. With the additional adjustable speed PSHs, the average startup cost from the RT simulation over four weeks (the tilted strip green columns) is reduced by 18% as opposed to the RT simulations without PSHs (the dotted green columns).
These observations indicate that the PSHs reduce the additional CT commitment and the associated startup cost.
106 | P a g e
Figure 5‐16 WI Startup Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 2,309 3,096 4,904 3,546
No PSH HA 2,429 3,049 4,711 3,438
No PSH RT 3,938 4,516 6,949 5,387
FS PSH DA 2,198 2,999 4,440 3,373
FS PSH HA 2,399 3,108 4,308 3,207
FS PSH RT 3,558 4,263 5,715 4,924
FS&AS PSH DA 2,221 2,716 3,836 3,122
FS&AS PSH HA 2,362 2,731 3,851 3,124
FS&AS PSH RT 3,429 3,815 5,262 4,603
‐
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
$000
WI Start & Shutdown Cost ($000) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance and
Forced Outages in the RT Simulations)
107 | P a g e
The WI thermal generator ramp up and down in MW from the 3-stage simulations for the three cases and four typical weeks are presented in the following two charts.
The followings can be observed form the two charts.
1. The thermal generator ramp up and down (MW) from the RT simulations (the green columns) is substantially higher than the DA and HA simulations (the blue and red columns) due to the thermal generator ramp to meet the load and renewable generation variability and uncertainty.
2. Comparing the thermal generator ramp up and down in MW between the RT simulations and DA simulations, the followings are observed.
a. Without PSHs, the average thermal generator ramp up and down from the RT simulations over four weeks (the dotted green columns) is 979,290 (MW) and 1,129,793 (MW) higher than that from the DA simulations (the dotted blue columns) respectively.
b. With the fixed speed PSHs, the average thermal generator ramp up and down (MW) from the RT simulations over four weeks (the solid green columns) is 946,998 (MW) and 1,051,968 (MW) higher than that from the DA simulations (the solid blue columns) respectively.
c. With the additional adjustable speed PSHs, the average thermal generator ramp up and down (MW) from the RT simulations over four weeks (the tilted green columns) is 767,880 (MW) and 850,045 (MW) higher than that from the DA simulations (the titled blue columns) respectively.
3. Comparing the thermal generator ramp up and down in MW between the RT simulations without and with PSHs, the followings are observed.
a. With the fixed speed PSHs, the average thermal generator ramp up and down in MW from the RT simulations over four weeks (the solid green columns) is reduced by 5% and 8% as opposed to the RT simulations without PSHs (the dotted green columns) respectively.
b. With the additional adjustable speed PSHs, the average thermal generator ramp up and down in MW from the RT simulations over four weeks (the tilted strip green columns) is reduced by 23% and 25% as opposed to the RT simulations without PSHs (the dotted green columns) respectively.
These observations indicate that the PSHs, specially the adjustable speed PSHs, reduce the thermal generator ramp substantially.
108 | P a g e
Figure 5‐17 WI Thermal Generator Ramp Up (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 165,526 185,239 278,785 216,093
No PSH HA 182,007 177,998 237,843 212,766
No PSH RT 331,426 390,611 647,133 455,762
FS PSH DA 145,704 168,637 266,402 197,938
FS PSH HA 157,300 162,739 221,009 202,610
FS PSH RT 332,571 382,242 548,575 462,291
FS&AS PSH DA 107,822 136,537 215,443 172,903
FS&AS PSH HA 128,817 137,314 196,595 185,905
FS&AS PSH RT 290,773 285,918 445,140 378,754
‐
100,000
200,000
300,000
400,000
500,000
600,000
700,000
MW
WI Thermal Ramp Up (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance and Forced
Outages in the RT Simulations)
109 | P a g e
Figure 5‐18 WI Thermal Generator Ramp Down (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 247,543 266,399 413,835 308,090
No PSH HA 265,926 260,447 358,439 305,085
No PSH RT 438,213 504,762 834,943 587,742
FS PSH DA 219,455 238,935 382,624 277,453
FS PSH HA 236,387 232,198 329,386 284,025
FS PSH RT 433,287 474,351 691,397 571,401
FS&AS PSH DA 171,946 197,419 315,295 242,889
FS&AS PSH HA 188,335 198,574 291,804 254,916
FS&AS PSH RT 371,701 365,393 573,253 467,245
‐
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
MW
WI Thermal Ramp Down (MW) from 3‐stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance adn Forced
Outages in the RT Simulations)
110 | P a g e
5.4 3-stage DA-HA-RT Simulation Results for SMUD
Before simulating SMUD, the WI simulations are performed to produce the power exchanges between the SMUD footprint and the rest of WI for both the base and high-wind renewable scenarios. Then the power exchanges are frozen in the SMUD DA, HA and RT simulations.
The assumptions and settings for the SMUD 3-stage simulations are reiterated as follows.
1. Four typical weeks are simulated for the SMUD footprint: the 3rd week of January, April, July and October in year 2022.
2. DA simulations: a. DA forecasted load / wind / solar: 24 to 48 hours ahead b. 24-hours SCUC / ED with hourly interval c. Regional network representation d. Contingency, Flexibility up / down, Regulation up / down reserves
modeled e. Generator maintenance outages are modeled
3. HA simulations: a. 4-HA forecasted load / wind / solar: 4 hours ahead b. 4-hours plus 20-hours look-ahead SCUC / ED with hourly interval c. Regional network representation d. Contingency, Flexibility up / down, Regulation up / down reserves
modeled e. Unit Commitment patterns from the DA simulation are frozen for the
generators with the min down time greater than 4 hours f. Generator maintenance outages are modeled
4. RT 5-min simulations: a. 5-min actual load / wind / solar generation b. 12 5-minutes plus 23-hours look-ahead SCUC / ED with 5-minutes
interval c. Regional network representation d. Contingency, Regulation up / down reserves modeled. Flexibility up /
down reserve are deployed e. Unit Commitment patterns from the HA simulation are frozen for the
generators with the min down time greater than 1 hour. The CT generator with the min down time of 1 hour or less than 1 hour can be committed or de-committed
f. Generator maintenance and forced outages are modeled 5. Two cases, no PSH, and with the new Adjustable Speed PSHs (Iowa Hill), are
simulated; 6. The simulations are performed for the high-wind renewable scenarios; 7. The SMUD simulations are cost-based.
5.4.1 SMUD 3-stage Simulation Results for Four Typical Weeks in Year 2022
The SMUD production cost ($000) from 3-stage simulations for two cases and four typical weeks in year 2022 in the high-wind renewable scenario is listed in the following chart.
111 | P a g e
The followings can be observed from the chart.
1. In general, the production cost from the HA simulations (the red columns) is higher than that from the DA simulations (the blue columns), and the production cost from the RT simulations (the green columns) is higher than that from the DA and HA simulations.
a. Without the PSHs, the average production cost over four weeks from the RT simulations (the dotted green columns) is about 10.5% higher than that from the DA simulations (the dotted blue columns).
b. With the adjustable speed PSHs (Iowa Hill), the average production cost over four weeks from the RT simulations (the tilted strip green columns) is about 40% higher than that from the DA simulations (the tilted strip blue columns).
2. The production costs from the DA-HA-RT simulations are reduced as PSHs are introduction to the system.
3. With the adjustable speed PSHs (Iowa Hill), the average production cost from the RT simulations over four weeks (the tilted strip green columns) is reduced by 14.3% as opposed to that from the RT simulation without PSHs (the dotted green columns).
112 | P a g e
Figure 5‐19 SMUD Production Cost ($000) from 3‐stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 4,389 2,617 4,802 2,253
No PSH HA 4,343 2,716 6,673 2,390
No PSH RT 4,245 2,562 6,334 2,390
FS&AS PSH DA 3,055 1,481 3,448 1,523
FS&AS PSH HA 3,022 1,190 5,277 1,644
FS&AS PSH RT 3,748 2,369 5,258 1,934
‐
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
$000
SMUD Production Cost ($000) from 3‐stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance and
Forced Outages in the RT Simulations)
113 | P a g e
The SMUD startup costs from the 3-stage simulations for the two cases and four typical weeks are presented in the following chart.
The followings can be observed from the chart.
1. In general, the start-up cost from the RT simulations (the green columns) is higher than that from the DA and HA simulations (the blue and red columns) due to
a. The additional CT commitment in the RT simulations to meet the load and renewable generation variability and uncertainty;
b. The additional start up because of the forced outages in the RT simulation from the generators whose unit commitments are frozen.
2. Comparing the startup costs between the RT simulations and DA simulations, the followings are observed.
a. Without PSHs, the average startup cost from the RT simulations over four weeks (the dotted green columns) is increased to $499,000 from $421,000 from the DA simulations (the dotted blue columns).
b. With the adjustable speed PSHs (Iowa Hill), the average startup cost from the RT simulations over four weeks (the tilted strip green columns) is increased to $446,000 from $193,000 from the DA simulations (the tilted strip blue columns).
3. With the adjustable speed PSHs (Iowa Hill), the average startup cost from the RT simulations over four weeks (the titled strip green columns) is reduced by 10.6% as opposed to the RT simulations without PSHs (the dotted green columns).
This observation indicates that the PSHs reduce the additional CT commitment and the associated startup cost.
114 | P a g e
Figure 5‐20 SMUD Startup Cost ($000) from 3‐stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 124 114 68 115
No PSH HA 120 135 101 146
No PSH RT 127 138 94 140
FS&AS PSH DA 20 60 77 36
FS&AS PSH HA 64 31 70 59
FS&AS PSH RT 121 131 79 115
‐
20
40
60
80
100
120
140
160
$000
SMUD Start & Shutdown Cost ($000) from 3‐stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance and Forced
Outages in the RT Simulations)
115 | P a g e
The SMUD thermal generator ramp up and down in MW from the 3-stage simulations for the two cases and four typical weeks are presented in the following two charts.
The followings can be observed from these two charts.
1. The thermal generator ramp up and down (MW) from the RT simulations (the green columns) is substantially higher than that from the DA and HA simulations (the blue and red columns) due to the thermal generator ramp to meet the sub-hourly load and renewable generation variability and uncertainty.
2. Comparing the Ramp Up and Down in MW between the RT simulations and DA simulations, the followings are observed.
a. Without PSHs, the average thermal generator ramp up and down from the RT simulations over four weeks (the dotted green columns) is 12,225 (MW) and 14,290 (MW) higher than that from the DA simulations (the dotted blue columns) respectively.
b. With the adjustable speed PSHs, the average thermal generator ramp up and down (MW) from the RT simulations over four weeks (the tilted green columns) is 14,037 (MW) and 18,613 (MW) higher than that from the DA simulations (the titled blue columns) respectively.
3. With the adjustable speed PSHs, the average thermal generator ramp up and down from the RT simulations over four weeks (the tilted strip green columns) is reduced by 22.1% and 22.9% as opposed to the RT simulations without PSHs (the dotted green columns) respectively.
This observation indicates that the adjustable speed PSHs reduce the thermal generator ramp substantially.
116 | P a g e
Figure 5‐21 SMUD Thermal Generator Ramp Up (MW) from 3‐stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 4,710 3,224 4,627 3,128
No PSH HA 4,790 3,283 6,479 3,872
No PSH RT 7,772 3,181 9,916 7,046
FS&AS PSH DA 3,242 741 2,882 854
FS&AS PSH HA 3,644 648 3,607 2,068
FS&AS PSH RT 7,092 258 9,041 5,365
‐
2,000
4,000
6,000
8,000
10,000
12,000
MW
SMUD Thermal Ramp Up (MW) from 3‐stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance and
Forced Outages in the RT Simulations)
117 | P a g e
Figure 5‐22 SMUD Thermal Generator Ramp Down (MW) from 3‐stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High‐wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)
1/22/2022 4/23/2022 7/23/2022 10/22/2022
No PSH DA 7,886 6,051 5,995 5,565
No PSH HA 7,613 6,430 8,638 6,712
No PSH RT 10,797 6,520 12,155 10,315
FS&AS PSH DA 3,957 2,287 4,604 1,228
FS&AS PSH HA 5,636 1,463 4,513 3,231
FS&AS PSH RT 9,913 3,318 10,148 7,310
‐
2,000
4,000
6,000
8,000
10,000
12,000
14,000
MW
SMUD Thermal Ramp Down (MW) from 3‐stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High‐wind Renewable Scenario (Maintenance and
Forced Outages in the RT Simulations)
118 | P a g e
6 Findings
The findings from the simulation result analyses are listed as follows.
6.1 Energy arbitrage values
The WI simulations for year 2022 show that, with the three proposed adjustable speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain, the production cost saving is 1% of the total WI production cost in the base renewable scenario, and 1.8% in the high-wind renewable scenario. The PSH values of these three PSHs are $45.3/kw-year in the base renewable scenario and $72.04/kw-year in the high-wind renewable scenario.
The California simulations for year 2022 show that, with the two proposed adjustable speed PSH, Iowa Hill and Eagle Mountain, the production cost saving is 1.2% of the total production cost in California under the base renewable scenario, and 4.2% in the high-wind renewable scenario. The PSH values of these two PSHs are $33.35/kw-year in the base renewable scenario and $105.61/kw-year in the high-wind renewable scenario.
The SMUD simulations for year 2022 show that, with the proposed adjustable speed PSH, Iowa Hill, the production cost saving is 8.6% of the total SMUD production cost in the base renewable scenario, and 16.45% in the high-wind renewable scenario. The PSH values of these two PSHs are $58.04/kw-year in the base renewable scenario and $126.83/kw-year in the high-wind renewable scenario.
The 3-stage simulations for four typical weeks in year 2022 in the high-wind renewable scenario show that the average production cost over four typical weeks can be reduced by
1. 1.6% from the WI RT simulations with the three proposed adjustable speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain (the cost difference between “FS PSH RT” and “FS&AS PSH RT” in Figure 5-15 WI Production Cost ($000) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations));
2. 2.4% from the CA RT simulations with the two proposed adjustable speed PSHs, Iowa Hill and Eagle Mountain (the cost difference between “FS PSH RT” and “FS&AS PSH RT” in Figure 5-11 California Production Cost ($000) from 3-stage Simulations for Three Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations));
3. 14.9% from the SMUD RT simulations with the proposed adjustable speed PSHs, Iowa Hill (the cost difference between “No PSH RT” and “FS&AS PSH RT” in Figure 5-19 SMUD Production Cost ($000) from 3-stage Simulations for Two Cases and Four Typical Weeks in Year 2022 in High-wind renewable scenario (Maintenance and Forced Outages in the RT Simulations)).
Though the production cost savings in percentage from the RT simulations are comparable to the production cost savings from the DA simulations, the production cost from the RT simulations are higher than that from the DA simulations. The production cost difference between the RT simulation and the DA simulation could be over 50% in some week. The higher production cost in the RT simulations is due to the sub-hourly
119 | P a g e
thermal dispatch at less economic loading points and the CT commitment cost to accommodate the sub-hourly load and renewable generation variability and uncertainties.
6.2 Contributions to reserves: contingency, flexibility and regulation reserves.
The WI simulations for year 2022 show that the three proposed adjustable speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain, provide 1.7% ~ 8.19% of the total WI upward reserves and 12.0% ~ 12.9% of the total WI downward reserves in the base renewable scenario. The three adjustable speed PSHs provide 0.6% ~ 4.2% of the total WI upward reserves and 10.6% ~ 12.3% of the total WI downward reserves for the high-wind renewable scenario.
The CA simulations for year 2022 show that the two proposed adjustable speed PSHs, Iowa Hill and Eagle Mountain, provide 9.6% ~ 26.3% of the total CA upward reserves and 28.7% ~ 33.6% of the total CA downward reserves in the base renewable scenario. The two adjustable speed PSHs provide 3.6% ~ 23.8% of the total CA upward reserves and 31.5% ~ 37.3% of the total CA downward reserves in the high-wind renewable scenario.
The SMUD simulations for year 2022 show that the proposed adjustable speed PSH, Iowa Hill, provides 3.4% ~ 15.8% of the total SMUD upward reserves and 23.5% ~ 29.5% of the total SMUD downward reserves in the base renewable scenario. The adjustable speed PSH provides 2.0% ~ 17.6% of the total SMUD upward reserves and 14.3% ~ 20.5% of the total SMUD downward reserves in the high-wind renewable scenario.
The following table summarizes the reserve provisions from the PSHs in the base and high-wind renewable scenarios.
Reserve Provisions from Adjustable Speed PSH in % of Total Reserve Requirements
WI Simulations CA Simulations SMUD Simulations
Base Renewable
High‐wind Renewable
Base Renewable
High‐wind Renewable
Base Renewable
High‐wind Renewable
Non‐Spinning 8.1% 4.2% 9.6% 17.6% 15.8% 17.6%
Spinning 1.7% 0.6% 26.3% 2.4% 4.3% 2.4%
Flexi Down 12.9% 12.3% 33.6% 14.3% 29.5% 14.3%
Flexi Up 1.9% 0.4% 10.5% 2.0% 3.8% 2.0%
Reg Down 12.0% 10.6% 28.7% 20.5% 23.5% 20.5%
Reg Up 3.0% 1.3% 24.6% 1.9% 3.4% 1.9%Table 6.2‐1 Reserve Provisions from Adjustable Speed PSH in % of Total Reserve Requirements
6.3 Contributions to the emission reductions
The regional simulations, WI and California, do not show significant emission reduction with the Adjustable Speed PSHs introduced in the system in both the base and high-wind renewable scenarios. However, the emission productions are reduced from the base renewable scenario to the high-wind renewable scenario.
The SMUD portfolio simulations show a significant emission reductions when the adjustable speed PSHs, Iowa Hill, is introduced to the system in both the base and high-wind renewable scenarios.
120 | P a g e
6.4 Contribution to the renewable generation integration
The contribution of the adjustable-speed PSHs to the renewable generation integration includes the following two areas.
1. Reserve provisions to cover the renewable generation variability and uncertainty, and
2. The renewable generation curtailment due to the over-generation.
The reserve provisions from the adjustable-speed PSHs are listed in the above Table 6.2-1 Reserve Provisions from Adjustable Speed PSH in % of Total Reserve Requirements.
With the three adjustable-speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain, the renewable generation curtailment from the WI simulations for year 2022 is reduced from 0.77% (1,356 GWh) to 0.55% (964 GWh) of the total renewable energy in the base renewable scenario; the renewable generation curtailment is reduced from 14% (48,403 GWh) to 13% (44,211 GWh) of the total renewable energy in the high-wind renewable scenario.
With the two adjustable-speed PSHs, Iowa Hill and Eagle Mountain, the renewable generation curtailment from the CA simulations for year 2022 is reduced from 46 GWh to 14 GWh in the base renewable scenario; the renewable generation curtailment is reduced from 380 GWh to 275 GWh in the high-wind renewable scenario.
There is no renewable curtailment in the base renewable scenario in the BANC system. With the adjustable-speed PSH, Iowa Hill, the renewable generation curtailment from the BANC simulations for year 2022 is reduced from 19 GWh to 1.0 GWh in the high-wind renewable scenario;
6.5 Contributions to reserves: contingency, flexibility and regulation reserves
With the three adjustable speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain, the renewable generation curtailment from the WI simulations for year 2022 is reduced from 0.77% (1,356 GWh) to 0.55% (964 GWh) of the total renewable energy in the base renewable scenario; the renewable generation curtailment is reduced from 14% (48,403 GWh) to 13% (44,211 GWh) of the total renewable energy in the high-wind renewable scenario.
With the two adjustable speed PSHs, Iowa Hill and Eagle Mountain, the renewable generation curtailment from the CA simulations for year 2022 is reduced from 46 GWh to 14 GWh in the base renewable scenario; the renewable generation curtailment is reduced from 380 GWh to 275 GWh in the high-wind renewable scenario.
There is no renewable curtailment in the base renewable scenario in the SMUD system. With the adjustable speed PSH, Iowa Hill, the renewable generation curtailment from the SMUD simulations for year 2022 is reduced from 19 GWh to 1.0 GWh in the high-wind renewable scenario.
6.6 Contribution to the thermal generation cycling reductions
The WI simulations for year 2022 show that, with the three proposed adjustable speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain, the total thermal startup cost is reduced by 15% (20 million $) in the base renewable scenario, and 10% (16 million $) in
121 | P a g e
the high-wind renewable scenario. The ramp up and down in GW is reduced by 17% (1634 GW) and 16% (2257 GW) respectively in the base renewable scenario. The ramp up and down GW is reduced by 16% (1334 GW) and 15% (1904 GW) respectively in the high-wind renewable scenario.
The CA simulations for year 2022 show that, with the two proposed adjustable speed PSHs, Iowa Hill and Eagle Mountain, the total thermal startup cost is reduced by 22% (10 million $) in the base renewable scenario, and 20% (9 million $) in the high-wind renewable scenario. The ramp up and down in GW is reduced by 19% (699 GW) and 20% (1095 GW) respectively in the base renewable scenario. The ramp up and down in GW is reduced by 22% (683 GW) and 21% (998 GW) respectively in the high-wind renewable scenario.
The SMUD simulations for year 2022 show that, with the proposed adjustable speed PSHs, Iowa Hill, the total thermal startup cost is reduced by 45% (2 million $) in the base renewable scenario, and 42% (2 million $) in the high-wind renewable scenario. The ramp up and down in GW is reduced by 37% (136 GW) and 39% (197 GW) respectively in the base renewable scenario. The ramp up and down in GW is reduced by 32% (119 GW) and 36% (174 GW) respectively in the high-wind renewable scenario.
The 3-stage simulations for four typical weeks in year 2022 in the high-wind renewable scenario show that the average startup cost over four typical weeks can be reduced by
1. 7% from the WI RT simulations with the three proposed adjustable speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain,
2. 19% from the CA RT simulations with the two proposed adjustable speed PSHs, Iowa Hill and Eagle Mountain,
3. 46% from the SMUD RT simulations with the proposed adjustable speed PSHs, Iowa Hill.
Though the startup cost savings in percentage from the RT simulations are comparable to the startup cost savings from the DA simulations, the startup cost from the RT simulations are higher than that from the DA simulations. The startup cost difference between the RT simulation and the DA simulation could be over 60% in some week. The higher startup cost in the RT simulations is due to the CT commitment cost to accommodate the sub-hourly load and renewable generation variability and uncertainties.
The 3-stage simulations for four typical weeks in year 2022 in the high-wind renewable scenario show that the average thermal generator ramp up and down in MW over four typical weeks can be reduced by
1. About 19% from the WI RT simulations with the three proposed adjustable speed PSHs, Swan Lake, Iowa Hill and Eagle Mountain,
2. About 25% from the CA RT simulations with the two proposed adjustable speed PSHs, Iowa Hill and Eagle Mountain,
3. About 25% from the SMUD RT simulations with the proposed adjustable speed PSHs, Iowa Hill.
Though the thermal generator ramp up and down reduction in percentage from the RT simulations are comparable to the ramp up and down reduction from the DA simulations, the ramp up and down from the RT simulations are higher than that from the DA
122 | P a g e
simulations. The ramp up and down difference between the RT simulation and the DA simulation could be over 170% in some week. The higher thermal generator ramp up and down in the RT simulations indicates that the thermal generators are ramp more to meet the sub-hourly load and renewable generation variability and uncertainties.
6.7 Impact to the market generator participants
The CA simulations show that the system generator profit (the generation and reserve revenue less the generation production cost) increases as more PSHs are introduced into the system in both the base and high-wind renewable scenarios. The profit increases are due to the LMP increases in the pumping hours, which yield higher generation revenues.
The generator profit is smaller in the high-wind renewable scenario as opposed to the base renewable scenario because of lower LMPs in the high-wind renewable scenario.
In the base renewable scenario, the reserve revenue is less than 10% of the total market revenue (energy revenue plus reserve revenue). The reserve revenue increases to 25% of the total market revenue in the high-wind renewable scenario due to higher flexibility and regulation reserve requirements.
6.8 Contributions to the portfolio
With the adjustable speed PSHs, Iowa Hill, the SMUD simulations show substantial reductions in the SMUD production cost, emission, thermal generator cycling, and the renewable generation curtailment, as opposed to the case of without the PSHs. The significant reductions in the production cost, emission, thermal generation cycling and the renewable curtailment are due to the higher ratio of the PSH capacity and the portfolio peak demand. The reduction is even higher with the higher renewable generation level.
6.9 Impact to the transmission congestions
In the WI simulations, the WI average transmission congestion prices are reduced from $4/MWh in the case of no PSHs to $2/MWh in the cases of with FS and AS PSHs in the based renewable scenario. Since the preliminary transmission expansion was performed for the high-wind renewable scenario, there is no significant WI average transmission congestion price reduction. However, in both the base and high-wind renewable scenarios, the interface with the significant congestion price reduction is “P27 Intermountain Power Project DC Line” that is in the neighboring area of PSHs “Castaic” and “Eagle Mountain”.
In the CA simulations, the CA average transmission congestion prices are reduced from $3.51/MWh in the case of no PSHs to $0.4/MWh in the case of with FS PSHs, and further to $0.24/MWh in the case of with FS&AS PSHs in the based renewable scenario. The CA average transmission congestion prices are reduced from $1.79/MWh in the case of no PSHs to $0.56/MWh in the case of with FS PSHs, and further to $0.37/MWh in the case of with FS&AS PSHs in the high-wind renewable scenario. The lower transmission congestion price in the high-wind renewable scenario is due to the transmission expansion assumptions for the high-wind renewable scenario. Again, in both the base and high-wind renewable scenarios, the interface with the significant congestion price reduction is “P27 Intermountain Power Project DC Line” that is the neighboring area of PSHs “Castaic” and “Eagle Mountain”.
123 | P a g e
The transmission congestion price is an indicator of transmission congestion in the transmission grid. The lower transmission congestion prices with PSHs indicate that PSHs helps mitigating the transmission congestion.
6.10 Transmission Deferral
In the base renewable scenario, PSHs help reducing the transmission congestion for some interfaces in the Southern California. The interface with the most congestion price reduction is “P27 Intermountain Power Project DC Line” after the PSHs are introduced to the system.
In the high-wind renewable scenario, the interface with the most congestion price reduction is “P27 Intermountain Power Project DC Line” after the PSHs are introduced to the system, though the preliminary transmission expansion is performed to deliver the renewable generation to the load centers.
This study shows that PSHs can help reduce the transmission congestion or defer the transmission build-out in the neighboring areas where the PSHs are located.
124 | P a g e
7 Appendix – Transmission Expansion Assumptions for High-wind Renewable Scenario
Line From Bus From Bus Region To Bus
To Bus Region
Capacity (MW)
ARR___PS_11014 to ARROYO_11017 1 1 11014_ARR___PS EPE 11017_ARROYO EPE 275
ARR___PS_11014 to ARROYO_11017 1 2 11014_ARR___PS EPE 11017_ARROYO EPE 275
B‐A_10025 to GUADLUPE_10116 1 1 10025_B‐A PNM 10116_GUADLUPE PNM 1076
B‐A_10025 to GUADLUPE_10116 1 2 10025_B‐A PNM 10116_GUADLUPE PNM 1076
BILINGS_62082 to BLGS PHA_62045 1 1 62082_BILINGS NWMT 62045_BLGS PHA NWMT 300
BILINGS_62082 to BLGS PHA_62045 1 2 62082_BILINGS NWMT 62045_BLGS PHA NWMT 300
BONANZA_65193 to MONA_65995 1 1 65193_BONANZA PACE_UT 65995_MONA PACE_UT 725
CBK 500_50791 to CR_NEST1_54458 1 1 50791_CBK 500 BCH 54458_CR_NEST1 AESO 940
CBK 500_50791 to CR_NEST1_54458 1 2 50791_CBK 500 BCH 54458_CR_NEST1 AESO 940
FLAGSTAF_79024 to PINPKBRB_79053 1 1 79024_FLAGSTAF WALC 79053_PINPKBRB WALC 747
GATES_30055 to MIDWAY_30060 1 1 30055_GATES PG&E_VLY 30060_MIDWAY PG&E_VLY 1931.2
GLENCANY_79032 to GLENCANY_79031 1 1 79032_GLENCANY WALC 79031_GLENCANY WALC 300
GLENCANY_79032 to GLENCANY_79031 1 2 79032_GLENCANY WALC 79031_GLENCANY WALC 300
GLENCANY_79032 to GLENCANY_79031 2 1 79032_GLENCANY WALC 79031_GLENCANY WALC 300
H ALLEN_18001 to H ALLEN_18019 1 1 18001_H ALLEN NEVP 18019_H ALLEN NEVP 300
H ALLEN_18001 to H ALLEN_18019 1 2 18001_H ALLEN NEVP 18019_H ALLEN NEVP 300
H ALLEN_18001 to H ALLEN_18019 1 3 18001_H ALLEN NEVP 18019_H ALLEN NEVP 300
H ALLEN_18001 to H ALLEN_18019 1 4 18001_H ALLEN NEVP 18019_H ALLEN NEVP 300
HA PS_18002 to H ALLEN_18001 1 1 18002_HA PS NEVP 18001_H ALLEN NEVP 300
HA PS_18002 to H ALLEN_18001 1 2 18002_HA PS NEVP 18001_H ALLEN NEVP 300
HA PS_18002 to H ALLEN_18001 2 1 18002_HA PS NEVP 18001_H ALLEN NEVP 300
LANGDON2_54158 to CR_NEST1_54458 01 1 54158_LANGDON2 AESO 54458_CR_NEST1 AESO 940
LANGDON2_54158 to CR_NEST1_54458 01 2 54158_LANGDON2 AESO 54458_CR_NEST1 AESO 940
125 | P a g e
Line From Bus From Bus Region To Bus
To Bus Region
Capacity (MW)
LANGDON2_54158 to CR_NEST1_54458 01 3 54158_LANGDON2 AESO 54458_CR_NEST1 AESO 940
LANGDON2_54158 to LANGDOB9_58158 T1 1 54158_LANGDON2 AESO 58158_LANGDOB9 AESO 1200
LANGDON2_54158 to LANGDOB9_58158 T1 2 54158_LANGDON2 AESO 58158_LANGDOB9 AESO 1200
LANGDON2_54158 to LANGDOB9_58158 T1 3 54158_LANGDON2 AESO 58158_LANGDOB9 AESO 1200
LAR.RIVR_73107 to LAR.RIVR_73108 1 1 73107_LAR.RIVR WACM 73108_LAR.RIVR WACM 600
MATLB1_54451 to MATL AB_56451 T1 1 54451_MATLB1 AESO 56451_MATL AB AESO 330
NEWMAN_11111 to NEWMAN_B_11204 1 1 11111_NEWMAN EPE 11204_NEWMAN_B EPE 184
NEWMAN_11111 to NEWMAN_B_11204 1 2 11111_NEWMAN EPE 11204_NEWMAN_B EPE 184
NEWMAN_11111 to NEWMAN_B_11204 1 3 11111_NEWMAN EPE 11204_NEWMAN_B EPE 184
NLY 230_50784 to NLY 2PS2_50822 2 1 50784_NLY 230 BCH 50822_NLY 2PS2 BCH 400
NLY 230_50784 to NLY 2PS2_50822 2 2 50784_NLY 230 BCH 50822_NLY 2PS2 BCH 400
NLY 230_50784 to NLY 2PS2_50822 2 3 50784_NLY 230 BCH 50822_NLY 2PS2 BCH 400
OJO_10232 to TAOS_12082 1 1 10232_OJO PNM 12082_TAOS PNM 299
OJO_10232 to TAOS_12082 1 2 10232_OJO PNM 12082_TAOS PNM 299
PINPKBRB_79053 to PINPK_19062 1 1 79053_PINPKBRB WALC 19062_PINPK WALC 600
REDBUTTE_66280 to UTAH‐NEV_67657 1 1 66280_REDBUTTE PACE_UT 67657_UTAH‐NEV PACE_UT 300
REDBUTTE_66280 to UTAH‐NEV_67657 1 2 66280_REDBUTTE PACE_UT 67657_UTAH‐NEV PACE_UT 300
REDBUTTE_66280 to UTAH‐NEV_67657 1 3 66280_REDBUTTE PACE_UT 67657_UTAH‐NEV PACE_UT 300
REDBUTTE_66280 to UTAH‐NEV_67657 1 4 66280_REDBUTTE PACE_UT 67657_UTAH‐NEV PACE_UT 300
RIOPUERC_10390 to B‐A_10025 2 1 10390_RIOPUERC PNM 10025_B‐A PNM 1195.1
RIOPUERC_10390 to WESTMESA_10369 1 1 10390_RIOPUERC PNM 10369_WESTMESA PNM 1195.1
SANJN PS_79060 to SAN_JUAN_10292 1 1 79060_SANJN PS WACM 10292_SAN_JUAN PNM 600
UTAH‐NEV_67657 to HA PS_18002 1 1 67657_UTAH‐NEV PACE_UT 18002_HA PS NEVP 300
UTAH‐NEV_67657 to HA PS_18002 1 2 67657_UTAH‐NEV PACE_UT 18002_HA PS NEVP 300
UTAH‐NEV_67657 to HA PS_18002 1 3 67657_UTAH‐NEV PACE_UT 18002_HA PS NEVP 300
UTAH‐NEV_67657 to HA PS_18002 1 4 67657_UTAH‐NEV PACE_UT 18002_HA PS NEVP 300
126 | P a g e
Line From Bus From Bus Region To Bus
To Bus Region
Capacity (MW)
WABAMUN9_54134 to CARVEL02_55364 96 1 54134_WABAMUN9 AESO 55364_CARVEL02 AESO 121
WABAMUN9_54134 to CARVEL02_55364 96 2 54134_WABAMUN9 AESO 55364_CARVEL02 AESO 121Table 6.10‐1 Transmission line expansion for high‐wind renewable scenario
Before Expansion After Expansion
Row Labels Max Flow Min Flow Max Flow Min Flow
Interstate AB‐MT 325 ‐300 325 ‐600
Interstate WA‐BC East 400 ‐400 2400 ‐400
Interstate WA‐BC West 3000 ‐2850 3000 ‐3850
Intrastate CA PDCI South 2780 ‐3100 3780 ‐3100
P01 Alberta‐British Columbia 700 ‐720 700 ‐2160
P03 Northwest‐British Columbia 3000 ‐3150 3000 ‐4150
P18 Montana‐Idaho 337 ‐256 674 ‐256
P24 PG&E‐Sierra 160 ‐150 160 ‐300
P26 Northern‐Southern California 4000 ‐3000 4000 ‐4000
P31 TOT 2A 690 ‐690 1380 ‐690
P35 TOT 2C 600 ‐580 2400 ‐1160
P36 TOT 3 1680 ‐1680 2680 ‐1680
P38 TOT 4B 829 ‐829 1658 ‐829
P40 TOT 7 890 ‐890 1335 ‐890
P45 SDG&E‐CFE 408 ‐800 2448 ‐800
P48 Northern New Mexico (NM2) 1970 ‐1970 1970 ‐2970
P52 Silver Peak‐Control 55 kV 17 ‐17 34 ‐170
P59 WALC Blythe ‐ SCE Blythe 161 kV Sub 218 ‐218 436 ‐218
P80 Montana Southeast 600 ‐600 600 ‐1200Table 6.10‐2 Transmission interface expansion for high‐wind renewable scenario
127 | P a g e
8 References
[1] WECC TEPPC, “Assumptions Matrix for the 2020 TEPPC Dataset.pdf”, 2020
[2] WECC TEPPC, “2022_CommonCase_InputAssumptions.doc”, 2022
[3] Department of Market Monitoring, CAISO, “2012 Annual Report on Market Issues and Performance”, April 2013, http://www.caiso.com/Documents/2012AnnualReport-MarketIssues-Performance.htm
[4] D. Lew and G. Brinkman, National Renewable Energy Laboratory, N. Kumar, P. Besuner, D. Agan, and S. Lefton, Intertek APTECH, “Impacts of Wind and Solar on Fossil-Fueled Generators”, Presented at IEEE Power and Energy Society General Meeting, San Diego, California July 22–26, 2012
[5] Lew, D., Brinkman, G., Ibanez, E., Florita, A., Heaney, M., Hodge, B.-M., Hummon, M., Stark, G., King, J., Lefton, S., Kumar, N., Agan, D., Jordan, G., Venkataraman, S. (2013). “The Western Wind and Solar Integration Study Phase 2”, NREL/TP-5500-55588. Golden, CO: National Renewable Energy Laboratory.
[6] Matt Hunsaker, Nader Samaan, Michael Milligan, Tao Guo, Guangjuan Liu, Jake Toolson, “Balancing Authority Cooperation Concepts to Reduce Variable Generation Integration Costs in the Western Interconnection: Intra-Hour Scheduling”, WECC Variable Generation Subcommittee project report, March 29, 2013