TheADEHSMSConcept
TheADEHSManagementSystem
is
an
integrated
managementtoolthatcoverstheenvironmental,Safetyandoccupational
healthaspectsof
workplaces
Throughcommitmenttosystem
implementation,
anyentitycanmanageallitsrelevantaspects
withhighefficiency,thusreducingthenegative
impactsof
its
activities
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
3/79
Scope
OccupationalHealthandSafety
Toensureemployeessafetyandthepromotionand
maintenanceof
the
highest
degreeofphysical,mentalandsocialwellbeingofworkersby
preventingillhealth,controllingrisksandthe
adaptationofworktopeople,and
people
to
their
jobs.
EnvironmentalImpacts
ResultingfromtheWorkplace
Toensurethattheseimpactsarereducedand
managed,at
the
individual
entitylevel,toensuretheworkplaceishealthyandsafeandtoprotectand
conservetheenvironmentasawholeforthebenefitof
the
Emirate
of
Abu
Dhabianditsinhabitants.
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
4/79
AchievethevisionofAbuDhabi
Governmentfor
providing
safe
and
healthy workplaces,andconsequently
forprotectingthesafetyandhealthofall
citizensandresidents,througheffective
partnershipsamongallconcerned
stakeholders,andbypushingfor
continualimprovementinthe
managementofworkplaceEHSaspects
Ensurecompliance
with
relevant
laws
andregulationsthatareapplicableatthe
Emiratelevelandencouragecontinual
improvementinthemanagementofEHS
issues,toachievebestoutcomesin
supportof theeconomicandsocial
developmentofAbuDhabiEmirate
Guaranteetheintegrationof relevant
regulatoryrequirements,toavoid
duplicationandensurealignmentwith
internationalstandards
Goals
ADEHSMSGoalsADEHSMSGoals
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
5/79
Compliance
Nomination:
Anentity
officially
nominatedbya
concernedSRAshall
complywithall
requirementsofthe
AD
EHSMS
RF,
includingdevelopinga
fullycompliantEHSMS
andgainingapproval
fromtheconcerned
SRA.
Notification
as
a
Low
Risk
Entity:
Anentity
that
officially
notifiedtodoso,shallcomply
withtherequirementsofAD
EHS
RI
Mechanism
5.0
EHS
Requirements
for
Low
Risk
Entitiesand
the
technical
requirementsofrelevant
RegulatoryInstruments(Codes
ofPractice,Mechanismsand
Standards).
All
other
Entities
Allother
entities
operatingwithinthe
EmirateofAbuDhabi
whoarenotyet
nominatedornotified
by
a
concerned
SRA
shallstrivetocomply
withtherequirements
ADEHSMSRF.
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
6/79
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
7/79
AD EHSMS Regulatory Framework
Version 2.0
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
8/79
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
9/79
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
10/79
RegulatoryFramework
Introduction
Foreword
GeneralEHSPolicy
Decree42of2009
ADEHSMSRFManual
Glossaryof
Terms
Elements
Roles,ResponsibilitiesandSelfRegulation
RiskManagement
ManagementofContractors
ConsultationandCommunication
TrainingandCompetency
EmergencyResponseandManagement
Monitoring,Investigation
and
Reporting
AuditandInspection
ComplianceandManagementReview
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
11/79
a Updated minimum management system requirements
b No major changes to minimum requirements
More prescriptive requirements
c Entities submitted EHSMS must comply with all requirements
Form C checklist of requirements
Mandatory Management System
Requirements Elements
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
12/79
Mandatory Management System
Requirements Elements
Element 01
Integration of EHS Requirements
in the Emirate of Abu Dhabi
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
13/79
Abu Dhabi EHS Center (AD EHSMS Competent Authority)
Sector Regulatory Authorities
Entities (Government and Private) Employers
Employees
Designers of Buildings / Structures
Designers, Manufacturers, Importers and Providers of Plant, Equipment orSubstances for Occupational Use
EHS Responsibilities and Authorities for Developments / Projects
Planning and Evaluation Phase
Construction Phase Operational Phase
Decommissioning and Demolition
Self-Regulation
Roles,Responsibilities andSelfRegulation
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
14/79
Mandatory Management SystemRequirements Elements
Element 02
Risk Management
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
15/79
Risk Management Program, including:
defines risk management methodologies and competencies
based on consultation with employees, contractors and other relevant stakeholders; incorporates the recognized steps of risk management
addresses routine and non-routine activities of all persons having access to the workplace
addresses supply chain and contractor undertakings
address human behavior
address plant, machinery, equipment, substances and materials at the workplace
address the design of work areas, processes, work organization and operating procedures
ensure documentation, recording and communication of the results of risk management activities
Occupational Health and Safety Control Hierarchy
Environmental Control Hierarchy
Risk Management
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
16/79
Mandatory Management SystemRequirements Elements
Element 03
Management of Contractors
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
17/79
Management of Contractors Process
Establishment of Project EHS Requirements
Evaluation / Selection
Contractual Agreement
Co-ordination and Communication
Mobilization / Work in Progress
Monitoring Performance
Commissioning
Demobilization / Decommissioning
Contract Close-Out
Principal Contractor for Construction Work
Management ofContractors
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
18/79
Mandatory Management SystemRequirements Elements
Element 04
Consultation and
Communication
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
19/79
Communication Procedure(s), including
internal communication throughout the various levels ofthe entity
communication with contractors and other visitors to the
workplace
relevant communication with external stakeholders
development of an annual EHS performance report, to
be used for internal communication and management
review purposes (external stakeholder communication /
distribution is optional)
ConsultationandCommunication
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
20/79
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
21/79
Mandatory Management SystemRequirements Elements
Element 05
Training and Competency
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
22/79
Training Procedure(s), including:
identification & evaluation of EHS training needs
providing appropriate EHS training, including:
level of responsibility and competence
frequency of training types of training
literacy, numeracy, language and other learning requirements
trainer competency and assessment activities
training records
refresher training requirements
monitoring, measuring results
TrainingandCompetency
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
23/79
EHS Competency Procedure(s) including:
ensure that employees are competent on the basis of
appropriate education, training and/or experience
a process to identify and evaluate EHS competency
requirements, including:
relevant EHS competencies
task-specific competences
methods of assessing competencies
process to record competencies
maintaining and improving competencies
TrainingandCompetency
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
24/79
Mandatory Management SystemRequirements Elements
Element 06
Emergency Management
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
25/79
Emergency Management program:
risk-based identification & response to potential emergency situations
specific emergency response & management roles, responsibilities & resources
appropriate risk-based emergency response and management plan(s),
including:
threat-specific plan(s)
facility specific(s)
appropriate support / functional plans
provision of appropriate resources (eg. human, equipment, facilities, training)
arrangements for external stakeholder communications
arrangement for communications with concerned SRAs and emergencyservices, if applicable
periodic emergency response and management tests and exercises
EmergencyManagement
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
26/79
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
27/79
EHS Targets and Objectives Procedure(s) including:
ensure documented, effectively communicated EHS targets and objectives
ensure targets and objectives, where practicable shall be measureable
incorporates requirements of:
the entity EHS policy
legal requirements
relevant Competent Authorities requirements
AD EHSMS RF mandatory key performance indicators and Sector specific
targets and objectives, if applicable
sets program(s) for achieving the targets and objectives, including, the
methods, timeframes, monitoring activities and responsibilities
ensure targets, objectives and procedure(s) are reviewed periodically to
ensure they remain relevant and appropriate
Monitoring,Investigation andReporting
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
28/79
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
29/79
EHS Monitoring Procedure(s) including:
monitoring of the entitys EHS targets and objectives
monitoring the effectiveness of EHS programs and control measures proactive & reactive measures of performance
monitoring compliance with applicable Federal Occupational Standards
and AD EHS RI - Standards and Guideline Values
requirements outlined in relevant AD EHS Regulatory Instruments:
requirements outlined in SRA / Competent Authorities permits / licenses / no
objection certificates, or equivalent
requirements outlined in approved EHS Plans and Studies
requirements outlined by relevant SRA / Competent Authority(s)
description of methodologies and instruments used to monitor, including,
calibration requirements and records
Monitoring,Investigation andReporting
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
30/79
EHS Reporting Procedure(s) includes:
hierarchies, timetables & responsibilities for reporting
EHS performance & incident reporting requirements, including:
EHS Incidents to the concerned SRA as required
quarterly EHS performance to the concerned SRA
annual 3rd party external audit results to the concerned SRA;
requirements in permits / licenses / no objection certificates / equivalent
requirements outlined in approved EHS Plans and Studies
requirements outlined in relevant AD EHS Regulatory Instruments
other requirements outlined by the entitys approved EHSMS
Monitoring,Investigation andReporting
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
31/79
Mandatory Management SystemRequirements Elements
Element 08
Audit and Inspection
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
32/79
EHS audit and Inspection program / procedure(s)
including:
scope, criteria, and objectives of audits / inspections to
be conducted
responsibilities, competencies and resources
program planning and implementation processes,
including
program monitoring and review internal and external reporting requirements
AuditandInspection
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
33/79
Mandatory Management SystemRequirements Elements
Element 09
Compliance and Management
Review
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
34/79
Integrated EHS Policy, including:
be authorized by Top Management
be appropriate to nature & scale of the entitys EHS risks
include commitment to:
prevention of injury, illness and environmental pollution
enhancement of employee health and wellbeing;
legal compliance
setting, monitoring and reviewing EHS targets and objectives
provision of appropriate EHS resources
continual improvement
be communicated to all relevant stakeholders
ComplianceandManagement Review
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
35/79
Legal Compliance Procedure(s) including:
identify and access relevant legal and other requirements(eg. Legal Register)
ensure compliance to relevant legal and other
requirements when developing EHSMS procedures,processes and programs
ensure communication to relevant stakeholders of legal
and other requirements
be reviewed periodically to ensure it remains relevant and
appropriate
ComplianceandManagement Review
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
36/79
Operational program(s) / procedure(s) including:
operations and activities that are associated with identified
hazard(s) that require implementation of control
measure(s) to manage risk(s)
control measures related to supply chains (purchase of
goods, equipment and services)
control measures related to contactors and other visitors
to the workplace
stipulated operating criteria / instructions, maintenanceinstructions / integrity programs where their absence could
lead to an increase in EHS risk(s)
ComplianceandManagement Review
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
37/79
Document Control procedure(s), including:
ensure documents remain legible, traceable and secure
ensure relevant version control to prevent unintended use
of obsolete documents
ensure appropriate review and approval processes
ensure a distribution process for EHS documents
process to maintain EHS records
process to ensure identification, storage, protectionretrieval, retention and disposal of records
process to retain EHS documents
ComplianceandManagement Review
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
38/79
Management of Change process, including:
ensure that changes in organizational do not result in the inadvertent
introduction of hazards and increased risk
Management System Review procedure(s), including:
ensure top management reviews the entitys EHSMS, at planned
intervals to ensure its suitability and effectiveness, minimum of one full
review per year
identify key review team members
specify clear roles and responsibilities assigned to review team
members define the process of recording, implementing and communicating the
results of management reviews
define the criteria for the review
ComplianceandManagement Review
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
39/79
RegulatoryInstruments
Codesof
Practice(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystemProceduresandProcesses)
Standards
(ForOccupational
Exposure)
Standardsand
GuidelineValues
OccupationalAir
Standardsandguideline
valuesforoccupationalnoise
12Mechanisms62CodesofPractice
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
40/79
RegulatoryInstruments
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
a Define
EHS
Mandatory
and
Enforceable
requirements
for
asubject
area
b Legally
enacted
by
the
AD
EHSMS
RF
c Development
managed
by
the
AD
EHS
Center
with
coordination
with
subject
matterCompetentAuthorities
Approvedand
Issued
by
the
AD
EHS
Center
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
41/79
RegulatoryInstruments
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
a Focused
on
the
Occupational
Hazards
b Defines
the
level
of
pollutants
that
are
not
to
be
exceeded
during
agiven
time
in
adefinedoccupationalenvironment
c
Includes
OccupationalAir
Quality
OccupationalNoise
Environment ByReferencetoEmirate/FederalRequirements
MandatoryEHS
Threshold
and
Exposure
Limits
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
42/79
RegulatoryInstruments
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
MandatorySystem
implementation
Processes
andProcedures
1.IntegrationofEHS
Requirements
intheEmirateofAbuDhabi
2.Concerned
SectorEHSRequirements
3.Identify,
NominateandRegisterEntities
4.EHSMSSubmission,
Reviewand
Approval
5.RequirementsforLowRisk
Entities
6.EHSMSPerformanceand
IncidentReporting
7.ADEHSProfessionalEntity
Registration
8.ADEHSPractitionerRegistration
9.NotificationofPrincipal
ContractorforConstructionWork
10.RequesttoupdateADEHSMSRFandAssociated
Documents
11.EHSIncidentInvestigations
12.NotificationRequirementsfor
EHSMSAwarenessActivities
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
43/79
Mechanism 1
Integration of EHS Requirements
in the Emirate of Abu Dhabi
RegulatoryInstruments
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
AndGuidelineValues
(ForOccupational
Exposure)
Mandatory System implementationProcesses and Procedures
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
44/79
Defines the process and procedures to manage
the integration of EHS requirements in theADEHSMS RF
Vital process to harmonize EHS requirements
Designed to eliminate duplication and conflictingrequirements
To be complied with when new or updatedrequirements identified
IntegrationofEHSRequirements
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
45/79
Mechanism 2
Concerned Sector EHSMS
Requirements
RegulatoryInstruments
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
Mandatory System implementationProcesses and Procedures
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
46/79
Current Sector EHSMS will be replaced
Mandatory to useAD EHSMS RF Forms(e.g. Form G EHS Incident Report Form)
All Technical Requirements in Regulatory
Instruments
SectorEHSMSRequirements
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
47/79
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
48/79
Mechanism 3
Identify, Nominate and Register
Entities
RegulatoryInstruments
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
AndGuidelineValues
(ForOccupational
Exposure)
Mandatory System implementationProcesses and Procedures
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
49/79
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
50/79
Mechanism 4
EHSMS Submission,
Review and Approval
RegulatoryInstruments
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
Mandatory System implementationProcesses and Procedures
b i i i d l
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
51/79
Defines:
Entity EHSMS Submission Process
Review and Approval of a Developed EHSMS
Cancellation of Approval of Entity EHSMS
Certificate of Compliant EHSMS
EHSMS Approval and Evaluation Standard Forms
EHSMSSubmission,ReviewandApproval
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
52/79
Mechanism 5
EHS Requirements for
Low Risk Entities
RegulatoryInstruments
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
Mandatory System implementationProcesses and Procedures
EHS R i t f L Ri k E titi
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
53/79
Defines minimum EHS requirements for entities
that have been assessed by SRA as low risk anddo not require a fully compliant EHSMS.
Includes:
Standard Templates / Forms (registers etc)
Existing Federal and Emirate OHS Requirements
Incident Reporting Requirements
SRA must officially notify low risk entities of need
to comply
EHSRequirements forLowRiskEntities
Regulatory Instruments
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
54/79
Mechanism 6
EHSMS Performance and
Incident Reporting
RegulatoryInstruments
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
Mandatory System implementationProcesses and Procedures
EHSMS Performance and Incident
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
55/79
Defines:
Definitions
Types of Incidents
Incident Notification and Reporting Performance Reporting (KPIs and 3rd Party Audit)
3rd Party External Compliance Audits
Mandatory Standard Forms
EHSMSPerformanceandIncident
Reporting
EHSMS Performance and Incident
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
56/79
Includes:
Schedule A - List of Reportable Dangerous Occurrences
Schedule B - List of Reportable Serious Injuries
Schedule C - List of Reportable Occupational Illness / Diseases Appendix A Private Entity Minimum KPI Requirements
Appendix B Sector Minimum KPI Requirements
Appendix C Government Entity Minimum KPI Requirements
EHSMSPerformanceandIncident
Reporting
RegulatoryInstruments
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
57/79
Mechanism 7
AD EHS Professional
Entity Registration
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
Mandatory System implementationProcesses and Procedures
EHS Professional Entity Registration
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
58/79
Defines:
Classifications of EHS Professional Entities Registration Requirements and Process
Assessment Process Maintaining Registration
Register of Approved Entities
Transitional Provisions & Phased Implementation
EHSProfessionalEntity Registration
RegulatoryInstruments
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
59/79
Mechanism 8
AD EHS Practitioner Registration
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
Mandatory System implementationProcesses and Procedures
EHS Practitioner Registration
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
60/79
Defines:
Classifications of EHS Practitioners Registration Requirements and Process
Assessment Process Maintaining Registration
Register of Approved Practitioners
Transitional Provisions & Phased Implementation
EHSPractitioner Registration
RegulatoryInstruments
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
61/79
Mechanism 9
Notification of Principal
Contractor of Construction Work
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
AndGuidelineValues
(ForOccupational
Exposure)
Mandatory System implementationProcesses and Procedures
Notification of Principal Contractor
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
62/79
Defines:
Principal Contractor Requirements
Process of Notification
Standard Forms
NotificationofPrincipalContractor
Notification of Principal Contractor
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
63/79
Important Definition - Construction Work includes:
work to erect, construct, extend, alter, convert, fit-out, commission, renovate,
repair, refurbish, disassemble, demolish and/or decommission a structure / building
/ service infrastructure, or part of a structure / building / services infrastructure; or
work connected with site preparation, earthworks, land reclamation, excavation,
piling, provision of services infrastructure or landscaping for works mentions in
paragraph (i); or
the assembly or installation of prefabricated components to form a structure /
building / services infrastructure, or part of a structure / building / services
infrastructure for work mentioned in paragraph (i); or
the disassembly of prefabricated components for work mentioned in paragraph (i)
that, immediately before the disassembly, formed a structure / building / servicesinfrastructure or part of a structure / building / services infrastructure.
NotificationofPrincipalContractor
RegulatoryInstruments
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
64/79
Mechanism 10
Request to UpdateAD EHSMS RF
and Associated Documents
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
andGuidelineValues
(ForOccupational
Exposure)
Mandatory System implementation
Processes and Procedures
Request to Update or Modify AD EHSMS
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
65/79
Defines:
Types of Development or Update
Competent Authority Considerations
Submission of Request Documents
Processing of Requests
RequesttoUpdateorModifyADEHSMS
RFor
associated
Documents
RegulatoryInstruments
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
66/79
Mechanism 11
EHS Incident Investigations
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
AndGuidelineValues
(ForOccupational
Exposure)
Mandatory System implementation
Processes and Procedures
EHSIncidentInvestigations
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
67/79
Defines:
Preserving Incident Site and Evidence EHS Incident Investigation Process
Sector Regulatory Authority Investigations
Role of the AD EHS in EHS Incident Investigation
AD EHS Center Coordination of Serious EHS
Incident Investigation
Media Activities
g
RegulatoryInstruments
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
68/79
Mechanism 12
Notification Requirements of
EHS Awareness Activities
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
AndGuidelineValues
(ForOccupational
Exposure)
Mandatory System implementation
Processes and Procedures
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
69/79
RegulatoryInstruments
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
70/79
CodesofPractice
(MandatoryTechnical
Requirements)
Mechanisms
(MandatorySystem
Proceduresand
Processes)
Standards
(ForOccupational
Exposure)
a
DevelopmentmanagedbytheADEHSCenterwith
coordinationwith
subject
matter
Competent
Authorities
b Sets
minimum
requirements
that
each
entity
must
complywith
c Additionalsubjectsunderdevelopment
MandatoryEHSTechnicalRequirements
SubjectSpecific
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
71/79
StandardFormsMandatory
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
72/79
Form A Registration for EHSMS Development
Form B Amendment to Registered Information
Form C Submission of EHSMS
Form D Not Currently Used
Form E Entity EHSMS Quarterly Performance
Form E1 Sector EHSMS Quarterly Performance
Form E2 Government Entity EHSMS Quarterly Performance
Form A Form B Form C Form E Form E1 Form E2
StandardFormsMandatory
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
73/79
Form F Entity Annual External EHSMS Audit Report
Form G Entity EHS Incident Report
Form H Notice of Appointment of Principal Contractor
Form I EHSMS Evaluation Form - SRA Use Only
Form J Request for Modification of the AD EHSMS RF
Form K Coordination of Serious EHS Incident Investigation
Form L EHS Awareness Activity Notification
Form F Form G Form H Form J Form K Form L
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
74/79
Guidelines
TechnicalGuidelinesInsupportofmandatoryrequirements
IndoorAirQualityManagement
ManagementofContractors
ManualHandlingandErgonomics
ManualTasksInvolvingtheHandlingofPeople
ProcessofRiskManagement
SafeRemovalofAsbestosContainingMaterials
SafeWorkinConfinedSpaces
SafetyintheHeat
TrainingandCompetency
CommunicationandConsultation
AuditandInspection
EHSIncidentInvestigations
EHSMSGuidance
Documents
EHSRoles,ResponsibilitiesandStructures
KeyPerformanceIndicators
SelfRegulationandtheADEHSGuidingPrinciples
Roles and
ResponsibilitiesSelf-Regulation Understanding
KPI's
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
75/79
Updates and Improvements to
AD EHSMS RF -v2.0
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
76/79
ImprovementsofADEHSMSRFv2.0
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
77/79
Version 1.2 Version 2.0 Benefits
Included a detailed list of reporting
requirements.
Updated and improved EHS
performance and incident reporting
requirements.
More prescriptive set of EHS incident and performance requirements. More
flexible compliance requirements and includes an updated list of Reportable
Incidents / Illnesses and updated Reporting Forms.
Included general Management of
Contractors requirements only.
Introduction of Principal
Contractor for Construction Work.
Greater EHS control on construction sites of contractors and activities - aligned
to international practices. Officially identifies a main or principal contractor
on construction sites to control and have increased responsibility for activities
and EHS compliance.
Short list of EHS topics covered.
Mandatory requirements for a
broader range of EHS technical
issues (Codes of Practice).
Comprehensive set of EHS topics developed with co-operation and co-
ordination of the relevant Competent Authorities. Also includes a mechanism
for including further EHS topics.
Utilized the Environment Agency
Abu Dhabi registration.
Independent registration of
Professional EHS Service Entities.
Introduction of an independent EHS Professional Services registration process
with an increased focus on OHS and Auditing activities managed by the AD
EHS Center. This will allow the AD EHS Center increased ability to regulatethe competency of EHS service providers with the Emirate.
None. Registration of EHS Practitioners.
Introduction of a new requirement for all EHS Practitioners to register with the
AD EHS Center. This will provide the AD EHS Center increased ability to
regulate the competency of EHS practitioners with the Emirate.
Focused on lagging OHS KPIs.Updated and improved Key
Performance Indicators (KPIs).
Introduction of new leading and lagging EHS KPIs. Will produce beneficial
baseline EHS information for the Emirate of Abu Dhabi.
Existing Federal and Emirate
requirements only.
Updated asbestos requirements
and control measures.
Introduction of integrated control measures and requirements - aligned to theinternational practices. Increased management of asbestos maintenance,
removal and disposal, increased worker protection regulations and health
surveillance.
Minimum Federal and Emirate
requirements only.
Significant increase on the focus
on Occupational Health / Industrial
Hygiene issues.
Specific mandatory requirements covering a broader range of occupational
health topics.
TimeLinesforCompliance
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
78/79
29th MarchADEHSMS RF v2.0
Launched
30thApril lastdate for
submission ofEntities EHSMS
against v1.2
31st July lastdate for SRAs tocomplete reviewand approval of
systemssubmitted
against v1.2
1st November AD EHSMS RF
v2.0requirementsbecome fullyenforceable
Entities EHSMSand work
practices mustbe updated by1st November
Entity Systems that have been approved in compliance with AD
EHSMS RF v1.2 do not have to be resubmitted but must be
compliant in time for their next third party audit audit shall be on
the requirements of Version 2.0
8/10/2019 AD EHSMS RF - V2 0 - Standard Presentation
79/79
Thank you
For further information and copy of all
AD EHSMS RF Documents:
www.adehsms.ae
Contact AD EHS Center: