Action Programme

Embed Size (px)

Citation preview

  • 8/14/2019 Action Programme

    1/100

    ACTION

    PROGRAMME

    ACTION

    PROGRAMME

    CLACKMANNANSHIRE LOCAL DEVELOPMENT PLAN

    November 2013

  • 8/14/2019 Action Programme

    2/100

    The Clackmannanshire Local Development Plan 2013

    ACTION PROGRAMME

    Contents

    Part 1 - Introduct ion and Context

    1.1 Introduction

    1.2 Supplementary guidance (SG)

    1.3 List of non-statutory planning guidance

    1.4 Monitoring of the development plan

    Part 2 - Cross-cutting actions and actions relating to Infrastructure and Planning Policies 2.1 Cross-cutting actions

    2.2 Schedule of actions for Infrastructure

    2.3 Schedule of actions for Planning Policies

    Part 3 - Proposals and Opportunit ies

    3.1 Alloa

    3.2 Sauchie 3.3 Tullibody, Cambus and Glenochil

    3.4 Clackmannan

    3.5 Devon Village

    3.6 Forth - Rural and Area Wide

    3.7 Menstrie

    3.8 Alva

    3 9 Tillicoul try and Coalsnaughton

  • 8/14/2019 Action Programme

    3/100

    Part 1 - Introduction and Context

    1.1 Introduction

    The Council is required by section 21 of the Planning etc. (Scotland) Act 2006 to prepare and publisLocal Development Plan (LDP). The Action Programme must be prepared and open to consultation wheand will be re-published within 3 months of the LDP being adopted.

    Section 26 of the Town and Country Planning (Development Planning) (Scotland) Regulations 2008

    lists the actions required to deliver the policies and proposals contained in the LDP;

    indicates the person or agency responsible for each action; and

    sets out the timescale for the conclusion of each action.The Action Programme provides a clear statement on the pattern of development planned for delivery in LDP, and a broad indication for development in the longer term. This can help to better co-ordinate bothand help build confidence in the planning system.

    The actions included are not just those to be carried out by the Planning Authority, but also by key stakeproposals is dependent on a wide range of factors, including actions contained in other plans, pr

    conditions and other factors beyond the control of the LDP. As a result, the Action Programme is intenexpected timescales for development rather than a precise programme of delivery.

    A number of factors can influence the delivery of the Action Programme, including introduction of new leto policy; and issues relating to delivery of policies and proposals e.g. the delivery of related infrastrProgramme remains current and up-to-date and it will be reviewed every two years. The review of thopportunity to identify progress made in relation to delivery of policy and proposals, and to consider required. It is also intended to serve as a useful means of keeping stakeholders informed on LDP deliv

    relevant parties as part of these regular reviews Progress on implementation and review can be found o

  • 8/14/2019 Action Programme

    4/100

    1.2 Supplementary Guidance (SG)

    The Plan is accompanied by a range of Supplementary Guidance. This guidance forms part of the L

    support of policies and principles contained in the Plan. The initial range of Guidance is shown below Plan period:

    1: Developer Contributions

    2: Onshore Wind Energy

    3: Placemaking

    4: Water

    5: Affordable Housing

    6: Green Networks 7: Energy Efficiency and Low Carbon Development

    8: Woodlands and Forestry (Proposed)

    9: Minerals (Proposed)

    10: Domestic Developments (Proposed)

    1.3 List of non-statutory advice

    The current Structure and Local Plans are augmented by supplementary planning advice in the form opublished by the Council. Some of these have been reviewed and now form new SG's, e.g. Flooding, SG's e.g. Domestic Developments and the others are either incorporated into the LDP or may form fubelow:SAN2- Infill residential developmentSAN3- Shutters and GrillesSAN4- Residential homesSAN5 Windows and doors in traditional buildings

  • 8/14/2019 Action Programme

    5/100

    1.4 Monitoring of the Clackmannanshire Local Development Plan (LDP)

    Through the planning system, with ambitious and visionary development plans, a practical frameworkdegree of certainty and efficiency for investment. The Scottish Government has identified some broadsystem that includes:

    Development Plans are kept up to date, provide a framework for land use and development, and e

    To enable confidence in the planning system with predictable and transparent plan makingenforcement of the law and planning decisions

    A system that allows engagement with all interests as early and fully as possible

    A clear focus in quality of planning outcomes

    The Council has a statutory duty under section 16 (b)of thePlanning etc. (Scotland) Act 2006to keeprelevant. The Development Plan must be reviewed at least every five years and a Monitoring Report tPlan, its policies and proposals must be published regularly. The Monitoring Report will set out performaa Monitoring Framework and inform future reviews of both the Action Programme and the LDP itself.indicators relating to delivery of the Strategic Environmental Assessment.

  • 8/14/2019 Action Programme

    6/100

    Part 2 - Cross-cutting actions and actions relating to Infrastructure and Planning Policies

    2.1 Cross-cutting actions

    A table of key actions in the overall delivery of the Clackmannanshire Local Development Plan assessment is given on the timeframe for delivery:-RED= implementation is not anticipated until a later period in the plan i.e. from year 15-20AMBER = Implementation is not anticipateduntil the middle to late period of the Plan i.e. from year 10-15GREEN = implementation can be within the early period of the plan i.e. within year 1-10

    Some key actions in the overall delivery of the Clackmannanshire Local Development Plan (LDP)

    Feature Action Lead Responsibil ity

    General

    Establish and maintain on-line development plan andassociated capabilities/e-government capabilities

    Council Services to Communitie

    Publish LDP Monitoring Reports on regular basis(continuous monitoring)

    Council Services to CommunitieStakeholders

    Publish LDP Development Plan Scheme Council Services to Communitie

    Managing the LDP

    Review of the Plan Council Services to Communitie

    Statutory Guidance

    Adopt and apply:SG1 - Developer ContributionsSG2 - Onshore Wind EnergySG3 - PlacemakingSG4- WaterSG5 - Affordable HousingSG6 - Green InfrastructureSG7 - Energy Efficiency and Low Carbon Development

    Council Services to CommunitieKey stakeholders

    Ad t d l C il S i t C iti

    Supplementary Guidance (SG)

  • 8/14/2019 Action Programme

    7/100

    Deliver preservation, mitigationand enhancement measuresfrom SEA EnvironmentalReports on the Development

    Plan, related policy and SGs

    Work closely with all agencies and parties in theDevelopment Process to ensure SEA indicators areaddressed and relevant mitigation measures delivered.LDP Monitoring Reports to assess quality of planning

    outcomes.

    Council Services to CommunitieKey stakeholders

    2.2 Schedule for Infrastructure

    Infrastructureprovision/feature

    Action Lead responsibi li ty

    Transport and Travel

    Implementation of the LocalTransportation Strategy

    Enable related sustainable development outcomesthrough the planning system

    Council Community and RegulatoServices

    Council Travel Plan Enable sustainable development outcomes throughthe planning system

    Council Services to Communiti(Transportation)

    Designing Streets principles Work with developers to prioritise quality design inaccord with Policy SC5 and Supplementary Guidance3 - Placemaking

    Council Services to Communiti(Transportation)

    Traffic modelling Updated travel modelling to be commissioned andcompleted

    Council Services to Communiti(Transportation)

    New Railway Halts with Parking

    T03 Safeguard land for access road, parking at AlloaStation Council

    T07 New rail halt, access road, park and ride at Cambus CouncilDevelopers

    T10 Safeguarding of land for rail halt, access road, parkingat Clackmannan

    Council

    Other Parking Provision

    H03 Provision of car park for recreational users within SiteH03 (Carsebridge Road North)

    Developer

    Junction Improvement

  • 8/14/2019 Action Programme

    8/100

    T05 B908/Branshill Developer

    Council

    T09 Provision of roundabout on A907 at Helensfield, and

    provision of cycle crossing on A907

    Developer

    Council

    T21 New roundabout at A91/C101, Menstrie DeveloperCouncil

    T22 Junction improvements on A91, including pedestriancrossing and signalisation of Queen Street and BrookStreet junctions

    DeveloperCouncil

    T27 Junction improvements along A91 in Dollar, includingjunction with B913; roundabout east of Dollar to

    access new development, to include pedestriancrossing

    DeveloperCouncil

    T30 New roundabouts on A977 at Forestmill to accessnew developments

    DeveloperCouncil

    T31 A977/B913 near Dollar as part of Dollar settlementexpansion

    DeveloperCouncil

    Cycle Infrastructure

    T04 Provision of cycle infrastructure on NCN76 atClackmannan

    Council

    T06 Provision of link road and/or cycle path linkingBranshill to Lornshill; provision of cycle path fromLornshill to Glenochil

    DeveloperCouncil

    T15 Provision of cycle link between NCN764 andHelensfield along the disused railway with cyclecrossing on A907

    Council

    T16 Cycle infrastructure Helensfield to Jellyholm Council

    T17 Safeguarding of former Alloa - Oakley railway line forrail use (including replacement of NCN764)

    DeveloperCouncil

    T18 Pro ision of c cle link along e isting road bet een Co ncil

  • 8/14/2019 Action Programme

    9/100

  • 8/14/2019 Action Programme

    10/100

    Mitigation measures andSUDS secured, whereappropriate, through theplanning system.

    On a site by site basis DevelopersSEPAScottish WaterSNH

    CouncilSG4 - Water Apply best practice through the planning system Council Services to Communities

    SEPAScottish WaterSNH

    Energy Supply

    Apply SG7 - Energy Efficiencyand Low Carbon Development

    Apply SG3 - Placemaking

    Apply SG2 - Onshore WindEnergy

    Apply SG9 - Minerals(including coal)

    Enable sustainable development outcomes through

    the planning system

    Council Services to Communities

    Stakeholders

    Waste Management

    Apply Zero Waste PlanClackmannanshire

    Enable sustainable development outcomes throughthe planning system

    Council Services to Communities

    Open Space, Recreation Facilities and Green Network

    Apply SG1 - Developer

    Contributions

    Delivery of improvements to open space and green

    network as required

    Council Services to Communities

    DevelopersImplementation of SG6 -Green Networks and principlesof the Central Scotland GreenNetwork (CSGN)

    Enable sustainable development outcomes throughthe planning system

    Services to CommunitiesClackmannanshire AllianceKey stakeholders

    Implement Adopted OpenSpace Strategy and ActionPlan and safeguard valuableopen spaces

    Council Services to CommunitiesStakeholders

    S t i i l f C il'

    Enable sustainable development outcomes throughthe planning system

    C il C it d R l t

  • 8/14/2019 Action Programme

    11/100

    Education Facilities

    Apply SG1 - DeveloperContributions

    Delivery of improvements to education estate asrequired

    Council Services to CommunitiesDevelopers

    Manage and deliver Council's

    Property Portfolio and Plan2010-2015

    Enable sustainable development outcomes through

    the planning system, where appropriate

    Council Services to Communities

    Redwell Primary School New school to be built Council Services to Communities

    Sauchie West Primary School New school to be built Council Services to CommunitiesDevelopers

    Forestmill Primary School New school to be built Council Services to CommunitiesDevelopers

    Community Facilities

    Apply SG1 - Developer

    ContributionsDelivery of improvements to community facilities as

    required

    Council Services to Communities

    Developers

    2.3 Schedule of actions for Planning Polic ies

    Creating sustainable communities

    Planning Policy Action A planned outcome

    HOUSING

    Produce and maintain Housing LandAudit

    Annual Housing Land Audit (HLA) agreedand published/HNDA updates

    C

    Joint working with private sector andneighbouring authorities

    Housing Strategic Partnershipoperative/HNDA updates (outcomesbased)

    C

    Support implementation ofClackmannanshire Housing Strategy

    Enable sustainable development outcomesthrough the planning system, whereappropriate

    CD

    POLICY SC1 -Maintaining aHousing Land Supply

    LDP M it i R t

    Analysis of planning application data

    t bli h d d l l i t i d C

  • 8/14/2019 Action Programme

    12/100

  • 8/14/2019 Action Programme

    13/100

  • 8/14/2019 Action Programme

    14/100

    HAZARDOUS SUBSTANCES

    Policy SC21 - Pipeline andHazard Consultation Zones

    Policy SC22 - Hazardous

    Substances Consent

    LDP Monitoring Report Published C

    DEVELOPMENT IN THE COUNTRYSIDE AND THE RURAL ECONOMY

    Policy SC23 - Development inthe Countryside - GeneralPrinciples

    Policy SC24 -ResidentialDevelopment in the Countryside

    Policy SC25 - BusinessDevelopment in the Countryside

    Policy SC26 - EnablingDevelopment in the Countryside

    Justification for the rural location isrequired in accord with the policycriteria

    Monitor D

    Employment and prosperity

    Planning policy Action A planned outcome

    BUSINESS AND EMPLOYMENT

    Policy EP1 - Strategic Land forBusiness

    Policy EP2 - Existing BusinessSites

    Policy EP3 - Business andIndustrial Uses Outwith Existingor Allocated Business Sites

    Policy EP4 - Non-EmploymentGenerating Uses on Existing orAllocated Business Sites

    P li EP5 H W ki

    Business Land AuditLDP Monitoring Report

    5 year business land supply maintained C

  • 8/14/2019 Action Programme

    15/100

    Policy EP8 -TelecommunicationsDevelopment - AdditionalInformation

    Policy EP9 - Protection ofMineral Resources

    Policy EP10 - Minerals, GeneralPrinciples

    Policy EP11 - Opencast CoalExtraction

    Policy EP12 -AggregateMinerals

    Policy EP13 - Coal Bed

    Methane

    Apply SG9 - MineralsEnable sustainable developmentoutcomes, as feasible

    C

    RETAIL AND TOWN CENTRES

    Policy EP14 - Retail NetworkCentre and Hierarchy

    Review of Retail CapacityTown centre health checksLDP Monitoring Reports

    Published/active marketing/Implementation of policy/Enablesustainable development outcomes

    CBC

    Town centre enhancement plansEnable sustainable developmentoutcomes, as appropriate

    CB

    Review of Retail Capacity and TownCentre Health Checks

    PublishedCB

    Policy EP15 - Promoting TownCentre Regeneration

    Clackmannanshire HousingStrategy/Plans for investment

    "Living in the town centre"/investmentplans/Delivery Plan/Enable sustainabledevelopment outcomes, as required

    CB

    Policy EP16 - New Retail andCommercial LeisureDevelopment

    Policy EP17 - Supermarket andSuperstore Development

    Policy EP18 - Food and Drink

    P li EP19 Siti f M bil

  • 8/14/2019 Action Programme

    16/100

    Environmental Assets

    Planning policy Action A planned outcome

    THE NATURAL ENVIRONMENT

    Enable mitigation, enhancement, andpreservation in accord with theClackmannanshire Biodiversity ActionPlan (CBAP)

    C

    Apply SG8 - Woodland and Forestry

    CCStSt

    Apply SG6 - Green Networks

    S

    CImplement Open Space Strategy andSport and Leisure Strategy

    C

    Habitat and species surveys required,where appropriate, on site by site basis

    Enable sustainable development outcomesthrough the planning system, whereappropriate

    DS

    Policy EA1 - ClackmannanshireGreen Network

    LDP Monitoring Reports Implement agreed recommendations C

    Policy EA2 - Habitat Networksand Biodiversity

    Apply relevant SG C

    Policy EA3 - Protection of

    Designated Sites and ProtectedSpecies

    Site survey for any Protected Species;

    Management Plans for specific sitesrequired

    Enable sustainable development outcomesthrough the planning system, where

    appropriate

    S

    CD

    Policy EA4 - Landscape Quality LDP Monitoring ReportsPublished/Implement agreedrecommendations

    CS

    Policy EA5 - GeologicalConservation Review Sites

    Assess whether any new SSSIdesignations required

    Sites designatedSC

    SCStF

    Policy EA6 - Woodlands andF t

    Apply SG8 - Woodlands and Forestry

    d SG1 D l C t ib ti

    Enable sustainable development outcomes

    th h th l i t h

  • 8/14/2019 Action Programme

    17/100

  • 8/14/2019 Action Programme

    18/100

    in New Development

    Site Waste Management PlansSite Waste Management Plans approved,deliver

    D

    THE BUILT ENVIRONMENT

    Policy EA19 - Scheduled

    MonumentsPolicy EA20 - OtherArchaeological Resources

    Policy EA21 - Historic Gardensand Designed Landscapes

    Policy EA22 - Listed Buildings

    LDP Monitoring ReportPublish/Implement agreedrecommendations

    C

    Policy EA23 - ConservationAreas

    Conservation Area Appraisals for eachdesignated area (Pool of Muckhart isalready completed)

    To be complete/implementrecommendations

    CC

    Policy EA24 - Buildings at Riskand Non-Designated HeritageAssets

    LDP Monitoring Reports Implement agreed recommendations C

    Policy EA25 - TheDevelopmentof Brownfield and ContaminatedLand

    Vacant and derelict land audits Published C

  • 8/14/2019 Action Programme

    19/100

    Part 3 - Proposals and Opportunit ies by Settlement

    List of sites

    ALLOA H01 - Sunnyside, AlloaH02 - Ashley Terrace, AlloaH03 - Carsebridge Road North, AlloaH04 - Carsebridge, AlloaH05 - South Earlsfield 2, AlloaH06 - Alloa Park, Phase 4, Alloa

    H07 - Earlsfield 1, AlloaH08 - Earlsfield West, AlloaH09 - Elm Grove 2, AlloaH10 - Central Parkland, AlloaH11 - St.John's Primary School, AlloaH12 - Claremont, AlloaH13 - Claremont Primary School, AlloaH14 - Paton's Bowling Club, Tullibody Road, Alloa

    M01 - Alloa Coop site, Primrose Street/Drysdale Street, AlloaM02 - The Shore, AlloaM03 - Greenfield, AlloaS01 - Redwell, AlloaS02 - Carsebridge, AlloaS03 - Sunnyside Primary School, AlloaS04 - Pine Grove, Alloa

    T t 2 2 'S h d l f I f t t '

    SAUCHIEH15 - Former FV College, H16 - Sauchie West, SaucH17 - Fairfield School, SauH18 - Main Street, SauchieH19 - Sauchie Nursery, SaH20 - Former Scout Hall, HH21 - Todd's Yard, SauchiH22 - Preston Terrace, SaH23 - The Manse, Main StS05 - Sauchie West, Sauc

    Transport - see 2.2 'Sched

    TULLIBODY, CAMBUS and H24 - Tullibody By-pass, TH25 - Baingle Brae, TulliboH26 - Muirside, Lethen VieM04 - Alloa Road, TullibodS06 - Tullibody Civic Cent

    Transport - see 2.2 'SchedB08 - Dumyat Business PaB09 - Station Road, Camb

    CLACKMANNANH27 - Main Street/North StH28 - Helensfield, Clackm

    T t 2 2 'S h d

  • 8/14/2019 Action Programme

    20/100

    FORTH - RURAL and AREA WIDE

    H31 - Lornshill Steading, AlloaH32 - Ditch Farm, TullibodyTransport - see 2.2 'Schedule for Infrastructure'.B11 - KilbagieB12 - Garvel Farm, BlackgrangeB13 - Midtown, BlackgrangeB14 - KennetpansB15 - Meadowend

    MENSTRIE

    H33 - Middletonkerse, MenstrieH34 - Ochil Road, MenstrieH35 - Mains Farm Steading, MenstrieB16 - Glenochil Yeast, MenstrieTransport - see 2.2 'Schedule for Infrastructure'.

    ALVAH36 - Brook Street/Beauclerc Street, Alva

    H37 - Brook Street/Back Road, AlvaH38 - Berryfield, AlvaH39 - Former Alva Glen Hotel, AlvaH40 - Queen Street, AlvaH41 - Alva West, AlvaM05 - Park Street, AlvaS07 - Alva Cemetery Extension, Alva

    S08 W dl d B i l Sit Al

    H45 - Coalsnaughton NortM06 - Former Tillicoultry CS09 - Playing Fields ExtenTransport - see 2.2 'Sched

    WEST OCHILS - RURAL andTransport - see 2.2 'SchedB18 - Former Glenochil Nu

    DOLLARH46 - Dollar Settlement Ex

    H47 - Dollar Golf Club, DoS10 - Strathdevon PrimaryS11 - Lover's Loan PlayingS12 - Dollar Golf Club, DoS13 - Dollar Settlement ExDollarTransport - see 2.2 'SchedB19 - Devon Road, Dollar

    B20 - Dollar Expansion Em

    MUCKHARTH48 - South and East of PTransport - see 2.2 'Sched

    EAST OCHILS - RURAL and

    H49 F t ill

  • 8/14/2019 Action Programme

    21/100

    3.1 ALLOA

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H01 - Sunnyside, AlloaSize - 5.32 haLandowner/Developer - Mulraney Properties Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    320 0 Completions 0 0 20 20 30

    Action Descript ion Responsible

    H1.1 Masterplan and Development Brief approved Developer

    H1.2 Transport Assessment approved Developer

    H1.3 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/ Scottish Wa

    H1.4 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    22/100

    Housing Site H02 - Ashley Terrace, AlloaSize - 0.63 haLandowner/Developer - NHS Forth Valley

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 222 0 Completions 0 0 0 0 0

    Action Descript ion Responsible

    H2.1 Development Brief and Design Statement approved Developer

    H2.2 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/ Scottish Wa

    H2.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    23/100

    Housing Site H03 - Carsebridge Road North, Al loaSize - 7.57 haLandowner/Developer - Diageo per James Barr Consultants

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 290 0 Completions 0 0 0 20 20

    Action Descript ion R

    H3.1 Masterplan and Development Brief approved for the entire Carsebridge development area (H03, H04, B03) Deve

    H3.2 Transport Assessment approved for the entire Carsebridge development area (H03, H04, B03) Deve

    H3.3 Flood Risk Assessment, Drainage Assessment and SUDS scheme approved for the entire Carsebridgedevelopment area (H03, H04, B03)

    Deve

    H3.4 Tree Survey undertaken to inform Masterplan and Development Brief Deve

    H3.5 Archaeological site assessment undertaken Deve

    H3.6 Developer contributions agreed Deve

  • 8/14/2019 Action Programme

    24/100

    Housing Site H04 - Carsebridge, AlloaSize - 17.60 haLandowner/Developer - Diageo per James Barr Consultants

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2300 0 Completions 0 0 0 20 20

    Action Descript ion R

    H4.1 Masterplan and Development Brief approved for the entire Carsebridge development area (H03, H04, B03) Deve

    H4.2 Transport Assessment approved for the entire Carsebridge development area (H03, H04, B03) Deve

    H4.3 Flood Risk Assessment, Drainage Assessment and SUDS scheme approved for the entire Carsebridgedevelopment area (H03, H04, B03)

    Deve

    H4.4 Ecological appraisal undertaken to inform Masterplan and Development Brief Deve

    H4.5 On site public art provision agreed Deve

    H4.6 Developer contributions agreed Deve

  • 8/14/2019 Action Programme

    25/100

    Housing Site H05 - South Earlsfield 2, AlloaSize - 4.57 haLandowner/Developer - Allanwater Developments Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2130 0 Completions 0 0 20 20 20

    (Source: Housing Land A

    Site is under construction.

    Housing Site H06 - Alloa Park Phase 4, AlloaSize - 2.96 ha

    Landowner/Developer - Allan Water Developments Ltd

  • 8/14/2019 Action Programme

    26/100

    Housing Site H07 - Earlsfield 1, AlloaSize - 3.89 haLandowner/Developer - Allan Water Developments Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 296 0 Completions 0 0 0 30 30

    Action Descript ion R

    H7.1 Development Brief approved Deve

    H7.2 Updated Flood Risk Assessment approved

    H7.3 Drainage Assessment and SUDS scheme approved, taking account of the adjoining development site andthe SUDS features to the east of the site

    DeveScot

    H7.4 Bat survey undertaken Deve

    H7.5 Developer contributions agreed Deve

  • 8/14/2019 Action Programme

    27/100

    Housing Site H08 - Earlsfield West, Al loaSize - 2.10 haLandowner/Developer - Allanwater Developments Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 260 0 Completions 0 0 0 30 30

    Action Descript ion Res

    H8.1 Development Brief approved Develope

    H8.2 Drainage Assessment and SUDS scheme approved, taking account of the adjoining development site DevelopeScottish W

    H8.3 Site survey required to establish the location of the culverted Brothie Burn Develope

    H8.4 Bat survey undertaken Develope

    H8.5 Developer contributions agreed Develope

  • 8/14/2019 Action Programme

    28/100

    Housing Site H09 - Elm Grove 2, AlloaSize - 1.30 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 248 0 Completions 0 0 0 12 12

    Action Descript ion Responsible

    H9.1 Development Brief, informed by previously prepared 'Bowmar Masterplan', approved Developer

    H9.2 Drainage Assessment approved Developer/SEPA/ Scottish

    H9.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    29/100

    Housing Site H10 - Central Parkland, AlloaSize - 1.02 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 238 0 Completions 0 0 0 0 0

    Action Descript ion Responsible

    H10.1 Development Brief, informed by previously prepared 'Bowmar Masterplan', approved. Developer

    H10.2 Drainage Assessment approved. Developer/SEPA/ Scottish

    H10.3 Archaeological site assessment undertaken. Developer

    H10.4 Landscaping scheme approved Developer/SNH

    H10.5 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    30/100

    Housing Site H11 - St. John's School, Grange Road, AlloaSize - 0.48 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 215 0 Completions 0 0 0 15 0

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H11.1 Development Brief and Design Statement approved Developer

    H11.2 Developer contributions agreed Developer/Council

    Housing Site H12 - Claremont, Al loaSize - 4.51 haLandowner/Developer - Bellway Homes

  • 8/14/2019 Action Programme

    31/100

    Housing Site H13 - Claremont Primary School, Academy Street, AlloaSize - 1.58 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 240 0 Completions 0 0 0 20 20

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H13.1 Development Brief approved Developer

    H13.2 Drainage Assessment approved Developer/SEPA/ Scottish Water

    H13.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    32/100

    Housing Site H14 - Paton's Bowling Club, Tullibody Road, AlloaSize - 1.58 haLandowner/Developer - Unknown

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 250 0 Completions 0 0 0 10 20

    YearsAction Descript ion Responsible

    1-5 5-10 10-15

    H14.1 Development Brief and Design Statement approved Developer

    H14.2 Transport Assessment approved Developer

    H14.3 Drainage Assessment approved Developer/SEPA/ Scottish Water

    H14.4 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    33/100

    MIXED USE SITES

    Mixed Use Site M01 - Alloa Co-op Site, AlloaSize - 0.47 haLandowner/Developer - Alloa Development Company

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    62 0 Completions 0 0 0 0 20

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    M1.1 Development Brief approved Developer

    M1.2 Bat survey required Developer

    M1.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    34/100

    Mixed Use Site M02 - The Shore, AlloaSize - 4.90 haLandowner/Developer - Lochay/Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 280 0 Completions 0 0 0 20 20

    Action Descript ion Respon

    M2.1 Development Brief and Design Statement approved Developer

    M2.2 Sea wall condition survey undertaken Developer

    M2.3 On site public art provision agreed Developer

    M2.4 Habitats Regulations Appraisal required and subsequent Appropriate Assessment ifnecessary

    Developer/SNH

    M2.5 Flood Risk Assessment approved Developer/SEPA/S

    M2.6 Site survey required to establish the location of the culverted Brothie Burn Developer

    M2.7 Drainage Assessment and SUDS scheme approved Developer/SEPA/S

    M2.8 Developer contributions agreed Developer/Counci

  • 8/14/2019 Action Programme

    35/100

  • 8/14/2019 Action Programme

    36/100

    Social Infrastructure Site S03 - Sunnyside Primary School, AlloaSize - 0.19 haLandowner/Developer - Clackmannanshire Council

    Action Descript ion

    S3.1 Council to investigate the acquisition of the former bowling greens adjacent to Sunnyside Primary School foruse by the school

    Social Infrastructure Site S04 - Pine Grove, AlloaSize - 0.90 haLandowner/Developer - Clackmannanshire Council

  • 8/14/2019 Action Programme

    37/100

    EMPLOYMENT AND PROSPERITY

    BUSINESS AND EMPLOYMENT

    Business Site B01 - Forthbank, AlloaSize - 1.08 haLandowner/Developer - Unknown

    YearsAction Descript ion Responsible

    1-5 5-10 10-15

    B1.1 Flood Risk Assessment approved Developer/SEPA/Scottish Water

    B1.2 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B1.3 Bat survey required Developer

    B1.4 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    38/100

    Business Site B02 - Alloa West Business Park, AlloaSize - 53.48 haLandowner/Developer - Unknown

    Action Descript ion Respon

    B2.1 Development Brief approved Developer

    B2.2 Habitats Regulations Appraisal required and subsequent Appropriate Assessment ifnecessary

    Developer/SNH

    B2.3 Transport Assessment approved Developer

    B2.4 Travel Plan approved (depending on the nature of development proposals) Developer

    B2.5 Flood Risk Assessment approved Developer/SEPA/S

    B2.6 Drainage Assessment and SUDS scheme approved Developer/SEPA/S

    B2.7 Developer contributions agreed Developer/Counci

  • 8/14/2019 Action Programme

    39/100

    Business Site B03 - Carsebridge South, AlloaSize - 5.97 haLandowner/Developer - Diageo

    Action Descript ion R

    B3.1 Masterplan and Development Brief approved for the entire Carsebridge development area (H03, H04, B03) Deve

    B3.2 Transport Assessment approved for the entire Carsebridge development area (H03, H04, B03) Deve

    B3.3 Flood Risk Assessment, Drainage Assessment and SUDS scheme approved for the entire Carsebridgedevelopment area (H03, H04, B03)

    Deve

    B3.4 Bat survey required Deve

    B3.5 Ecological Appraisal agreed Deve

    B3.6 Flood Risk Assessment approved DeveScot

    B3.7 Drainage Assessment and SUDS scheme approved DeveScot

    B3.8 Developer contributions agreed Deve

  • 8/14/2019 Action Programme

    40/100

    Business Site B04 - North Castle Street, AlloaSize - 1.15 haLandowner/Developer - Clackmannanshire Council

    YearsAction Descript ion Responsible1-5 5-10 10-15

    B4.1 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B4.2 Developer contributions agreed Developer/Council

    Business Site B05 - The Oval, AlloaSize - 1.66 ha

    Landowner/Developer - Unknown

  • 8/14/2019 Action Programme

    41/100

    Business Site B06 - Hilton Road/Clackmannan Road, AlloaSize - 0.97 haLandowner/Developer - Unknown

    YAction Descript ion Responsible1-5 5-10

    B6.1 Transport Assessment approved Developer

    B6.2 Car Parking Plan and Car Parking Management Plan approved Developer

    B6.3 Travel Plan approved Developer

    B6.4 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B6.5 Tree Survey agreed including details of trees to be retained Developer

    B6.6 Landscaping Plan approved Developer

    B6.7 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    42/100

    Business Site B07 - Clackmannan Road Retail Park, Al loaSize - 1.64 haLandowner/Developer - Unknown

    YearsAction Descript ion Responsible1-5 5-10 10-15

    B7.1 Transport Assessment approved Developer

    B7.2 Ecological Appraisal agreed Developer/SNH

    B7.3 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B7.4 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    43/100

    3.2 SAUCHIE

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H15 - Former FV College, SauchieSize - 5.52 haLandowner/Developer - Forth Valley College

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    150 0 Completions 0 0 0 10 20

    Action Descript ion R

    H15.1 Development Brief approved Deve

    H15.2 Drainage Assessment approved DeveScot

    H15.3 Transport Assessment approved Deve

    H15.4 Travel Pack prepared and distributed to all new residents Deve

    H15.5 Ground investigation works to determine the nature, extent and type of any contaminated material withinthe site to be carried out and reported

    Deve

  • 8/14/2019 Action Programme

    44/100

  • 8/14/2019 Action Programme

    45/100

    Housing Site H17 - Fairfi eld School , SauchieSize - 0.40 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 214 0 Completions 0 14 0 0 0

    Action Descript ion Responsible

    H17.1 Development Brief approved Developer

    H17.2 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/Scottish Wa

    H17.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    46/100

    Housing Site H18 - Main Street, SauchieSize - 0.34 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 216 0 Completions 0 0 0 0 0

    Action Descript ion Responsible

    H18.1 Development Brief approved Developer

    H18.2 Ground conditions require to be assessed through geotechnical and hydrological investigations Developer

    H18.3 Developer contributions agreed Developer/Coun

  • 8/14/2019 Action Programme

    47/100

    Housing Site H19 - Sauchie Nursery, SauchieSize - 0.26 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 210 0 Completions 0 0 0 10 0

    Action Descript ion Responsible

    H19.1 Development Brief approved Developer

    H19.2 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/Scottish Wa

    H19.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    48/100

  • 8/14/2019 Action Programme

    49/100

    Housing Site H21 - Todd's Yard, SauchieSize - 1.19 haLandowner/Developer - Mulraney/Ochil View Housing Association

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 214 0 Completions 0 0 0 14 0

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H21.1 Developer contributions agreed Developer/Council

    Housing Site H22 - Preston Terrace, SauchieSize - 0.24 haLandowner/Developer - Excel Joinery

  • 8/14/2019 Action Programme

    50/100

    Housing Site H23 - The Manse, Main Street, SauchieSize - 0.14 haLandowner/Developer - Grattan and Hynds Ltd.

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 28 0 Completions 0 8 0 0 0

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H23.1 Developer contributions agreed Developer/Council

    SOCIAL INFRASTRUCTURE

    Social Infrastructure Site S05 - Sauchie West, Sauchie - new primary schoolSize - UnknownLandowner/Developer - Allanwater Developments Ltd/Clackmannanshire Council

    Action Descript ion Responsible

  • 8/14/2019 Action Programme

    51/100

    3.3 TULLIBODY, CAMBUS and GLENOCHIL

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H24 - Tullibody By-pass, TullibodySize - 2.23 haLandowner/Developer - Administrators for Carronvale Homes Ltd.

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    58 0 Completions 3 10 12 15 18

    Action Descript ion Responsible

    H24.1 Development Brief approved Developer

    H24.2 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/Scottish Wa

    H24.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    52/100

    Housing Site H25 - Baingle Brae, Tulli bodySize - 0.19 haLandowner/Developer - Benhar Developments Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 26 0 Completions 6 0 0 0 0

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H25.1 Design Statement approved Developer

    H25.2 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    53/100

    Housing Site H26 - Muirs ide, Lethen View, TullibodySize - 0.40 haLandowner/Developer - Marshall Homes

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 29 0 Completions 0 9 0 0 0

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H26.1 Bat and barn owl surveys undertaken Developer/SNH

    H26.2 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    54/100

    MIXED USE SITES

    Mixed Use Site M04 - Alloa Road, TullibodySize - 1.50 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    49 0 Completions 0 0 10 15 15

    Action Descript ion Responsible

    M4.1 Development Brief approved Developer

    M4.2 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/Scottish WaM4.3 Developer contributions agreed Developer/Council

    SOCIAL INFRASTRUCTURE

    Social Infrastructure Site S06 - Tullibody Civic Centre, Tullibody - potential co-location of facilities

  • 8/14/2019 Action Programme

    55/100

    TRANSPORT

    For Transport proposals and opportunities see 2.2 'Schedule for Infrastructure' entries in the Action Programme.

    EMPLOYMENT AND PROSPERITY

    BUSINESS AND EMPLOYMENT

    Business Site B08 - Dumyat Business Park, TullibodySize - 2.67 haLandowner/Developer - Unknown

    YearsAction Descript ion Responsible1-5 5-10 10-15

    B8.1 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B8.2 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    56/100

    Business Site B09 - Station Road, CambusSize - 0.55 haLandowner/Developer - Diageo

    YearsAction Descript ion Responsible1-5 5-10 10-15

    B9.1 Bat survey required Developer

    B9.2 Drainage Assessment and SUDS scheme approved Developer/SEPA/ Scottish Water

    B9.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    57/100

    3.4 CLACKMANNAN

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H27 - North Street/Main Street, ClackmannanSize - 0.11 haLandowner/Developer - Unknown

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    6 0 Completions 0 0 0 0 0

    YearsAction Descript ion Responsible1-5 5-10 10-15 15+

    H27.1 Development Brief approved Developer

    H27.2 Bat Survey undertaken Developer

    H27.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    58/100

    Housing Site H28 - Helensf ield, ClackmannanSize - 6.57 haLandowner/Developer - Jas Logan, Hillend Farm

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    55 0 Completions 0 15 15 15 10

    Action Descript ion Responsible

    H28.1 Development Brief approved Developer

    H28.2 Noise survey conducted and any necessary attenuation measures agreed Developer

    H28.3 Flood Risk Assessment approved Developer/SEPAH28.4 Riverbank survey and any necessary remediation measures approved Developer/SEPA

    H28.5 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/Scottish Wa

    H28.6 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    59/100

    3.5 DEVON VILLAGE

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H29 - Blackfaulds, Devon VillageSize - 2.87 haLandowner/Developer - Marshall Construction Ltd.

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    16 8 Completions 3 3 2 0 0

    Site is under construction.

  • 8/14/2019 Action Programme

    60/100

    Housing Site H30 - Blackfaulds Steading, Devon VillageSize - 0.84 haLandowner/Developer - Marshall Construction Ltd.

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 211 0 Completions 0 0 6 5 0

    Action Descript ion R

    H30.1 Bat Survey undertaken Deve

    H30.2 Ground investigation works to determine the nature, extent and type of any contaminated material withinthe site to be carried out and reported

    Deve

    H30.3 Developer contributions agreed Deve

  • 8/14/2019 Action Programme

    61/100

    EMPLOYMENT AND PROSPERITY

    BUSINESS AND EMPLOYMENT

    Business Site B10 - Devon VillageSize - 0.34 ha

    Landowner/Developer - Clackmannanshire Council

    Action Descript ion Responsible1-

    B10.1 Development Brief approved Developer

    B10.2 Transport Assessment approved (depending on the nature of development proposals) Developer

    B10.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    62/100

    3.6 FORTH - RURAL AND AREA WIDE

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H31 - Lornshill Steading, AlloaSize - 0.84 haLandowner/Developer - Robert Petrie/Mulraney

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    17 0 Completions 0 0 0 0 0

    YearsAction Descript ion Responsible1-5 5-10 10-15 15+

    H31.1 Bat Survey undertaken Developer

    H31.2 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    63/100

    Housing Site H32 - Ditch Farm, TullibodySize - 1.07 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 210 0 Completions 0 0 5 5 0

    Action Descript ion R

    H32.1 Drainage Assessment undertaken and the potential for SUDS on-site established DeveScot

    H32.2 Bat Survey undertaken Deve

    H32.3 Ground investigation works to determine the nature, extent and type of any contaminated material withinthe site to be carried out and reported

    Deve

    H2.4 Developer contributions agreed Deve

    TRANSPORT

    For Transport proposals and opportunities see 2.2 'Schedule for Infrastructure' entries in the Action Programme.

  • 8/14/2019 Action Programme

    64/100

    EMPLOYMENT AND PROSPERITY

    BUSINESS AND EMPLOYMENT

    Business Site B11 - KilbagieSize - 19.27 ha

    Landowner/Developer - Oran

    Action Descript ion Responsible

    B11.1 Transport Assessment approved (depending on the nature of development proposals) Developer

    B11.2 Travel Plan approved (depending on the nature of development proposals) Developer

    B11.3 Ecological Appraisal agreed Developer/SNH

    B11.4 Flood Risk Assessment approved Developer/SEPA/Scottish

    B11.5 Drainage Assessment and SUDS scheme approved Developer/SEPA/ScottishB11.6 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    65/100

    Business Site B12 - Garvel Farm, BlackgrangeSize - 20.21 haLandowner/Developer - Unknown

    Action Descript ion Respon

    B12.1 Transport Assessment approved Developer

    B12.2 Habitats Regulations Appraisal required and subsequent Appropriate Assessment if necessary Developer/SNH

    B12.3 Flood Risk Assessment approved Developer/SEPAScottish Water

    B12.4 Drainage Assessment and SUDS scheme approved Developer/SEPAScottish Water

    B12.5 Developer contributions agreed Developer/Coun

  • 8/14/2019 Action Programme

    66/100

    Business Site B13 - Midtown, BlackgrangeSize - 15.44 haLandowner/Developer - Unknown

    Action Descript ion Respon

    B13.1 Transport Assessment approved Developer

    B13.2 Habitats Regulations Appraisal required and subsequent Appropriate Assessment if necessary Developer/SNH

    B13.3 Flood Risk Assessment approved Developer/SEPAScottish Water

    B13.4 Drainage Assessment and SUDS scheme approved Developer/SEPAScottish Water

    B13.5 Developer contributions agreed Developer/Counc

  • 8/14/2019 Action Programme

    67/100

    Business Site B14 - KennetpansSize - 4.18 haLandowner/Developer - Unknown

    Action Descript ion Respons

    B14.1 Development Brief and Design Statement approved Developer

    B14.2 Transport Assessment approved (depending on the nature of development proposals) Developer

    B14.3 Travel Plan approved (depending on the nature of development proposals) Developer

    B14.4 Habitats Regulations Appraisal required and subsequent Appropriate Assessment if necessary Developer/SNH

    B14.5 Flood Risk Assessment approved Developer/SEPAScottish Water

    B14.6 Drainage Assessment and SUDS scheme approved Developer/SEPA

    Scottish WaterB14.7 Developer contributions agreed Developer/Coun

  • 8/14/2019 Action Programme

    68/100

    Business Site B15 - MeadowendSize - 8.24 haLandowner/Developer - Unknown

    Action Descript ion Responsible

    B15.1 Development Brief and Design Statement approved Developer

    B15.2 Transport Assessment approved (depending on the nature of development proposals) Developer

    B15.3 Travel Plan approved (depending on the nature of development proposals) Developer

    B15.4 Ecological Appraisal agreed Developer/SNH

    B15.5 Flood Risk Assessment approved Developer/SEPA/Scottish

    B15.6 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish

    B15.7 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    69/100

    3.7 MENSTRIE

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H33 - Middletonkerse, MenstrieSize - 9.25 haLandowner/Developer - Bett Homes Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    100 0 Completions 0 25 25 25 25

    YeaAction Descript ion Responsible1-5 5-10

    H33.1 Development Brief and Design Statement approved Developer

    H33.2 Transport Assessment approved Developer

    H33.3 Flood Risk Assessment approved Developer/SEPA

    H33.4 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    H33.5 Tree Survey agreed including details of trees to be retained Developer

    H33.6 Ecological Appraisal agreed Developer

    H33.7 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    70/100

    Housing Site H34 - Ochil Road, MenstrieSize - 0.25 haLandowner/Developer - W Mclaren and Sons

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 25 0 Completions 0 5 0 0 0

    Action Descript ion Responsible

    H34.1 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/Scottish Wa

    H34.2 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    71/100

    Housing Site H35 - Mains Farm Steading, MenstrieSize - 0.64 haLandowner/Developer - Mr R Muirhead

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 28 0 Completions 0 0 0 8 0

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H35.1 Development Brief approved Developer

    H35.2 Flood Risk Assessment approved Developer/SEPA

    H35.3 Drainage Assessment approved Developer/SEPA/Scottish Water

    H35.4 Bat Survey undertaken Developer H35.5 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    72/100

  • 8/14/2019 Action Programme

    73/100

    3.8 ALVA

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H36 - Brook Street/Beauclerc Street, AlvaSize - 1.05 haLandowner/Developer - Modelrange Ltd.

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    17 0 Completions 0 0 10 7 0

    (Source: Housing Land A

    Action Descript ion Respo

    H36.1 Development Brief approved Developer

    H36.2 Flood risk assessment approved Developer/SEP

    H36.3 Drainage Assessment undertaken and the potential for SUDS established Developer/SEPScottish Water

    H36.4 Ground investigation works to determine the nature, extent and type of any contaminatedmaterial within the site to be carried out and reported

    Developer

    H36.5 Developer contributions agreed Developer/Cou

  • 8/14/2019 Action Programme

    74/100

    Housing Site H37 - Brook Street/Back Road, AlvaSize - 0.29 haLandowner/Developer - Modelrange Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 28 0 Completions 0 4 4 0 0

    Action Descript ion Responsible1

    H37.1 Flood risk assessment approved Developer/SEPA

    H37.2 Drainage Assessment undertaken and the potential for SUDS established Developer/SEPA/Scottish Water

    H37.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    75/100

    Housing Site H38 - Berryfield, AlvaSize - 4.63 haLandowner/Developer - Alva Investments Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2100 0 Completions 0 0 10 25 20

    Action Descript ion Resp

    H38.1 Development Brief approved Developer

    H38.2 Flood risk assessment approved Developer/S

    H38.3 Drainage Assessment undertaken and the potential for SUDS on-site and flood storage established Developer/S

    Scottish WaH38.4 Assessment of Silver Burn and report on the potential to de-culvert and re-naturalise the burn Developer/S

    H38.5 Developer contributions agreed Developer/C

  • 8/14/2019 Action Programme

    76/100

  • 8/14/2019 Action Programme

    77/100

    Housing Site H40 - Queen Street, AlvaSize - 0.86 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 248 0 Completions 0 0 20 28 0

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H40.1 Development Brief and Design Statement approved Developer

    H40.2 Drainage Assessment approved Developer

    H40.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    78/100

  • 8/14/2019 Action Programme

    79/100

    MIXED USE SITES

    Mixed Use Site M05 - Park Street, AlvaSize - 0.98 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    20 0 Completions 0 0 10 10 0

    Action Descript ion Responsible

    M5.1 Development Brief approved Developer

    M5.2 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/Scottish WaM5.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    80/100

    SOCIAL INFRASTRUCTURE

    Social Infrastructure Site S07 - Alva Cemetery ExtensionSize - 1.19 haLandowner/Developer - Clackmannanshire Council

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    S7.1 Drainage Assessment approved Council

    Social Infrastructure Site S08 - Woodland Burial Site, AlvaSize - 2.76 ha

    Landowner/Developer - Clackmannanshire Council

  • 8/14/2019 Action Programme

    81/100

    EMPLOYMENT AND PROSPERITY

    BUSINESS AND EMPLOYMENT

    Business Site B17 - Glentana, AlvaSize - 1.01 ha

    Landowner/Developer - Unknown

    YearsAction Descript ion Responsible

    1-5 5-10 10-15

    B17.1 Development Brief approved Developer

    B17.2 Flood Risk Assessment approved Developer/SEPA/Scottish Water

    B17.3 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B17.4 Bat survey required Developer

    B17.5 Developer contributions agreed Developer/Council

    ENVIRONMENTAL ASSETS

    THE NATURAL ENVIRONMENT

    Natural Environment Site N01 - Alva Woodland Park ExpansionSize - UnknownLandowner/Developer - Clackmannanshire Council

  • 8/14/2019 Action Programme

    82/100

    3.9 TILLICOULTRY and COALSNAUGHTON

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H42 - Lower Mill Street, TillicoultrySize - 10.04 haLandowner/Developer - Hallam Land Management

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    74 0 Completions 0 0 24 24 24

    Action Descript ion Responsible

    H42.1 Development Brief approved Developer

    H42.2 Flood risk assessment approved Developer/SEPA

    H42.3 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/Scottish Wa

    H42.4 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    83/100

    Housing Site H43 - Middleton Mill/Upper Mill Street, TillicoultrySize - 0.75 haLandowner/Developer - Unknown

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 250 0 Completions 0 0 0 20 30

    Action Descript ion R

    H43.1 Development Brief approved Deve

    H43.2 Flood risk assessment approved Deve

    H43.3 Assessment of Tillicoultry Burn and report on the potential to re-naturalise the burn Deve

    H43.4 Investigation and report on opportunities to include flood attenuation measures as part of the development DeveH43.5 Archaeological site assessment undertaken Deve

    H43.6 Ground investigation works to determine the nature, extent and type of any contaminated material withinthe site to be carried out and reported

    Deve

    H43.7 Developer contributions agreed Deve

  • 8/14/2019 Action Programme

    84/100

    Housing Site H44 - Coalsnaughton NorthSize - 12.06 haLandowner/Developer - Hazeldene (Coalsnaughton) Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2240 0 Completions 0 0 10 10 10

    Action Descript ion Responsible1-5 5-1

    H44.1 Masterplan approved Developer

    H44.2 Ground conditions require to be assessed through geotechnical investigations Developer

    H44.3 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    85/100

    Housing Site H45 - Coalsnaughton North (The Glen), CoalsnaughtonSize - 2.31 haLandowner/Developer - LMF Homes Ltd

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 234 28 Completions 0 5 6 10 10

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H45.1 Developer contributions agreed for each phase Developer/Council

  • 8/14/2019 Action Programme

    86/100

    MIXED USE SITES

    Mixed Use Site M06 - Former Tillicoultry Community Centre, TillicoultrySize - 0.75 haLandowner/Developer - Clackmannanshire Council

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    50 0 Completions 0 0 0 30 20

    Action Descript ion Responsible

    M6.1 Development Brief approved Developer

    M6.2 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    87/100

    SOCIAL INFRASTRUCTURE

    Social Infrastructure Site S09 - Tillicoultry - Playing Fields ExtensionSize - 4.13 haLandowner/Developer - Unknown

    Action Descript ion Responsible

    S9.1 Drainage Assessment undertaken and the potential for SUDS on-site established Developer/SEPA/Scottish Wa

    3.10 WEST OCHILS RURAL and AREA WIDE

    TRANSPORT

    For Transport proposals and opportunities see 2.2 'Schedule for Infrastructure' entries in the Action Programme.

  • 8/14/2019 Action Programme

    88/100

    EMPLOYMENT AND PROSPERITY

    BUSINESS AND EMPLOYMENT

    Business Site B18 - Former Glenochil NurserySize - 2.70 ha

    Landowner/Developer - Clackmannanshire Council

    YeaAction Descript ion Responsible

    1-5 5-10

    B18.1 Development Brief and Design Statement approved Developer

    B18.2 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B18.3 Bat survey required Developer

    B18.4 Tree Survey agreed including details of trees to be retained Developer

    B18.5 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    89/100

    3.11 DOLLAR

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H46 - Dollar Settlement ExpansionSize - 33.10 haLandowner/Developer - K Stewart per PPCA Ltd, B Poett , and Others

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    350 0 Completions 0 0 10 20 20

    Action Descript ion Responsible1-5 5-10

    H46.1 Masterplan and Development Brief approved Developer

    H46.2 Phasing Plan tied to Developer Contributions agreed Developer

    H46.3 Transport Assessment approved Developer

    H46.4 Flood Risk Assessment, Drainage Assessment and SUDS strategy approved Developer/SEPA

    H46.5 Archaeological site assessment undertaken Developer

    H46.6 Strategic Landscape Framework and Woodland Management Plan agreed Developer/SNH

    H46.7 Habitat Survey approved Developer/SNH

  • 8/14/2019 Action Programme

    90/100

    Housing Site H47 - Dollar Golf Club, DollarSize - 0.05 haLandowner/Developer - Dollar Golf Club

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 24 0 Completions 0 0 4 0 0

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H47.1 Flood risk assessment approved Developer/SEPA

    H47.2 Developer contributions agreed Developer/Council

    SOCIAL INFRASTRUCTURE

    Social Infrastructure Site S10 - Strathdevon Primary School, Dollar

    Action Descript ion

    S10.1 Identify the preferred solution for the provision of primary school capacity to accommodate the new housingproposed in the East of Clackmannanshire

  • 8/14/2019 Action Programme

    91/100

    Social Infrastructure Site S12 - Dollar Golf Club, Dollar - New ClubhouseSize - 0.10 haLandowner/Developer - Dollar Golf Club

    YearsAction Descript ion Responsible 1-5 5-10 10-15 15+

    S12.1 Flood Risk Assessment approved Developer/SEPA

    Social Infrastructure Site S13 - Dollar Settlement Expansion Community Sports Facility, Dollar

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    No ActionsIdentified

    TRANSPORT

    For Transport proposals and opportunities see 2.2 'Schedule for Infrastructure' entries in the Action Programme.

  • 8/14/2019 Action Programme

    92/100

    EMPLOYMENT AND PROSPERITY

    BUSINESS AND EMPLOYMENT

    Business Site B19 - Devon Road, Dollar

    Size - 0.25 haLandowner/Developer - Stewart

    YearsAction Descript ion Responsible

    1-5 5-10 10-15

    B19.1 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B19.2 Developer contributions agreed Developer/Council

    Business Site B20 - Dollar Expansion EmploymentSize - UnknownLandowner/Developer - K Stewart per PPCA Ltd, B Poett , and Others

    Action Descript ion R

    B20.1 Agree the extent of business and employment opportunities to be included as part of the Dollar ExpansionArea

    Deve

  • 8/14/2019 Action Programme

    93/100

    3.12MUCKHART

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H48 - South and East of Pool of MuckhartSize - 6.64 haLandowner/Developer - Izat

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    35 0 Completions 0 0 0 10 20

    Action Descript ion Responsible1-5 5-10

    H48.1 Masterplan and Development Brief approved Developer

    H48.2 Flood Risk Assessment, Drainage Assessment and SUDS strategy approved Developer/SEPA

    H48.3 Developer contributions agreed Developer/Council

    TRANSPORT

  • 8/14/2019 Action Programme

    94/100

    3.13 EAST OCHILS - RURAL AND AREA WIDE

    CREATING SUSTAINABLE COMMUNITIES

    HOUSING

    Housing Site H49 - ForestmillSize - 121.81 haLandowner/Developer - Hermiston Securities/Others

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    1250 0 Completions 0 0 10 50 100

    Action Descript ion Responsible1-5 5-10

    H49.1 Masterplan, Design Statement and Development Briefs approved Developer

    H49.2 Phasing Plan tied to Developer Contributions agreed Developer

    H49.3 Transport Assessment approved Developer

    H49.4 Protected species survey and habitat surveys approved Developer/SNH

    H49.5 Flood Risk Assessment, Drainage Assessment and SUDS strategy approved Developer/SEPA

    H49.6 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    95/100

    Housing Site H50 - SolsgirthSize - 5.71 haLandowner/Developer - Unknown

    Capacity Bui lt Programming 2012/13 2013/14 2014/15 2015/16 2016/17 2

    45 0 Completions 0 0 5 10 10

    (Source: Housing Land A

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    H50.1 Development Brief approved Developer

    H50.2 Flood Risk Assessment Developer

    H50.3 Developer contributions agreed Developer/Council

    SOCIAL INFRASTRUCTURE

    Social Infrastructure Site S14 - Forestmill Primary SchoolLandowner/Developer - Hermiston Securities/Others/Clackmannanshire Council

    Action Descript ion R

  • 8/14/2019 Action Programme

    96/100

    Social Infrastructure Site S15 - Forestmill Gol f Course and HotelLandowner/Developer - Hermiston Securities/Others

    YearsAction Descript ion Responsible

    1-5 5-10 10-15 15+

    No Actions Identified

    TRANSPORT

    For Transport proposals and opportunities see 2.2 'Schedule for Infrastructure' entries in the Action Programme.

  • 8/14/2019 Action Programme

    97/100

    EMPLOYMENT AND PROSPERITY

    BUSINESS AND EMPLOYMENT

    Business Site B21 - Bridge Business Park, Forestmill

    Size - 11.16 haLandowner/Developer - Scottish Resources Group

    YearsAction Descript ion Responsible

    1-5 5-10 10-15

    B21.1 Development Brief approved Developer

    B21.2 Ecological Appraisal agreed Developer/SNH

    B21.3 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B21.4 Developer contributions agreed Developer/Council

  • 8/14/2019 Action Programme

    98/100

    Business Site B22 - SolsgirthSize - 4.69 haLandowner/Developer - Unknown

    YearsAction Descript ion Responsible1-5 5-10 10-15

    B22.1 Flood Risk Assessment approved Developer/SEPA/Scottish Water

    B22.2 Drainage Assessment and SUDS scheme approved Developer/SEPA/Scottish Water

    B22.3 Developer contributions agreed Developer/Council

    ENVIRONMENTAL ASSETS

    THE NATURAL ENVIRONMENT

    Natural Environment Site N02 - Meadowhill Opencast RestorationSize - 100.70 haLandowner/Developer - Hermiston Securities/Others

  • 8/14/2019 Action Programme