9
ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite Adaptive Control Software for Closed-loop Traffic Control Systems Raj Ghaman, P.E. Operations Team Leader FHWA RD&T

ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

Embed Size (px)

Citation preview

Page 1: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

ACS Lite Overview – NTOC Webinar Aug06

U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047

Slide 1

ACS-LiteAdaptive Control Software for Closed-loop

Traffic Control Systems

Raj Ghaman, P.E.

Operations Team Leader

FHWA RD&T

Page 2: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

ACS Lite Overview – NTOC Webinar Aug06

U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047

Slide 2

Adaptive in the U.S. (FHWA)

• 1970s-1980s: UTCS / TRPS– Second by second central

• 1990s: Predictive control (ACS)– FHWA ACS: RHODES, OPAC, RTACL– Second by second distributed

• 2002: Controller-based Adaptive– FHWA ACS “Lite”– Leverage existing hardware / infrastructure– Download new controller parameters every five-fifteen minutes

Page 3: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

ACS Lite Overview – NTOC Webinar Aug06

U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047

Slide 3

FHWA Goals for ACS-Lite

• Low cost design• Leverage existing infrastructure

• Standard US-style actuated controllers and logic (rings, phases, splits, barriers, gap-out/extension, etc.)

• Standard fully-actuated detector layouts• Standard NTCIP Communications

• “Retro-fit” with major US signal system vendors

Page 4: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

ACS Lite Overview – NTOC Webinar Aug06

U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047

Slide 4

Project Team

Page 5: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

ACS Lite Overview – NTOC Webinar Aug06

U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047

Slide 5

Field trials

Peek/QuixoteBradenton

(St. Petersburg/Tampa), Florida

EconoliteGahanna

(Columbus), OhioEagle/SiemensHouston, Texas

McCainEl Cajon

(San Diego), California

Page 6: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

ACS Lite Overview – NTOC Webinar Aug06

U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047

Slide 6

Gahanna, OH field test results

0

1

2

3

4

Total A

LL

NB ALL

SB ALL

ALL AM

ALL PM

Before

After

Results - Number of Stops

Page 7: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

ACS Lite Overview – NTOC Webinar Aug06

U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047

Slide 7

Gahanna, OH field test results

1Peak hours = Average savings*(Average Corridor Peak Hour Volume*4 peak hours)

Unit Costs:• Total Delay – $12.10 per hour

• Stops – $0.014 per stop

• Fuel Consumed – $0.59 per liter ($2.25 per gallon)

 

Before(per veh)

After(per veh)

Savings(per veh)

Peak Hours(all vehs)

Peak Hours Savings

Total Delay (hour) 0.03761 0.03758 0.00003 0.15588 $1.89

Total Stops 3.5 2.9 0.6 3117.6 $43.65

Fuel (Liters) 0.390 0.373 0.017 89.287 $53.08

Peak Hours Benefit $98.61

Daily Benefit $340.03

Annual Benefit $88,500.00

Page 8: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

ACS Lite Overview – NTOC Webinar Aug06

U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047

Slide 8

Houston, TX field test results

Results - Travel Time

0

50

100

150

200

250

300S

econ

ds Before

After

Page 9: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite

ACS Lite Overview – NTOC Webinar Aug06

U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047

Slide 9

Houston, TX field test results

 

Before(per veh)

After(per veh)

Savings(per veh)

Peak Hours(all vehs)

Peak Hours Savings

Total Delay (hour) 0.01856 0.01214 0.00642 39.16252 $473.87

Total Stops 1.7 1.2 0.5 3051.6 $42.72

Fuel (Liters) 0.490 0.455 0.035 214.837 $127.71

Peak Hours Benefit $644.30

Daily Benefit $2,221.72

Annual Benefit $577,648.12

Unit Costs:• Total Delay – $12.10 per hour

• Stops – $0.014 per stop

• Fuel Consumed – $0.59 per liter ($2.25 per gallon)