Achievements, Highlights & Remarkable Points (Apr-Oct 2021) Other Achievement 1 st electric goods trains run from WADI to BIJAPUR via Hotgi chord line on 30.06.2021. 1 st Crack train run from Puntamba to Pune on 29.06.2021 RE Work completed on 18 th June-2021 from Dudhani to Hotgi 51.22 RKM & 127.47 TKM. One long haul train run from DD to MKPT on 30.09.2021 total km 145.43 with avg speed 45 kmph Modification from Halt station to ‘B’ Class station : Harangul station(HGL) has been modified from Halt station to B class or 4 lines station with connectivity to Marathwada Coach Factory on 25.08.2021. Double line commissioned in between BLNI-WSB section total 26.33 kms on 27.10.2021. New Traffic Since May-2021, Srigonda goods shed has been opened for Goods traffic. 1 st Rake of sugar is loaded on 25.05.2021. In Aug-2021, Tilati goods shed has been opened for Goods traffic, 1 st Rake of sugar is loaded on 19.08.2021 by Sidheshwar Sugar Factory Solapur with earning 61.61 lakhs. In the month of Oct-2021, first time, 1 rake of Molasses is loaded at Belapur station with earning 74.99 lacs.

Achievements, Highlights & Remarkable Points (Apr-Oct 2021)

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Achievements, Highlights & Remarkable Points (Apr-Oct 2021)

Other Achievement

1st electric goods trains run from WADI to BIJAPUR via Hotgi chord

line on 30.06.2021.

1st Crack train run from Puntamba to Pune on 29.06.2021

RE Work completed on 18th

June-2021 from Dudhani to Hotgi 51.22

RKM & 127.47 TKM.

One long haul train run from DD to MKPT on 30.09.2021 total km

145.43 with avg speed 45 kmph

Modification from Halt station to ‘B’ Class station : Harangul

station(HGL) has been modified from Halt station to B class or 4 lines

station with connectivity to Marathwada Coach Factory on 25.08.2021.

Double line commissioned in between BLNI-WSB section total 26.33

kms on 27.10.2021.

New Traffic

Since May-2021, Srigonda goods shed has been opened for Goods traffic. 1st

Rake of sugar is loaded on 25.05.2021.

In Aug-2021, Tilati goods shed has been opened for Goods traffic, 1st Rake

of sugar is loaded on 19.08.2021 by Sidheshwar Sugar Factory Solapur with

earning 61.61 lakhs.

In the month of Oct-2021, first time, 1 rake of Molasses is loaded at Belapur station with earning ₹ 74.99 lacs.

Freight

The division has achieved 3.83 Million Tons Originating loading during Apr-Oct 2021 , which

is 51.98% more loading than last year. (Target :3.86MT, Last Year:2.52) .

Interchange: 18241total trains interchanged during Apr-Oct-2021, which is 39% more

than last year . (Apr-Oct-2020: 13130 trains).

Average speed of goods trains is improved from 37.29 to 48.38, which is 30% higher than

last year.

DSL Loco Utilisation is 373.19, which is 9.78% better than last year & 3.66% than target. (Apr-Oct -2020: 339.95, Target: 360).

Wagon kms per wagon day During Apr- Oct -2021 Wagon kms per wagon day is 267.76 kms, which is 4.36% better than last year & 19% than target. (Apr-Oct -2020: 256.58 ,

Target: 225)

NTKM’s: During Apr-Oct-2021, NTKMs is 10197, which is 11.54% improved than last

year & 39.04% than target. (Apr-Oct-2020: 9142, Target: 7334).

WTR: During Apr-Oct -2021, WTR is 1.39, which is 13% & 19.65% improved than last year & target respectively.(Apr-Oct -2020: 1.60, Target 2020-21: 1.73)

DWB is 3029, which is 5.34% balance less than target (LY: 2723 & Target (2020-21): 3200).

0.65MT 0.54MT 0.59MT 0.53MT 0.56MT 0.46 MT 0.48MT

2.52MT

3.83MT 3.86 MT

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

Ldg in MT

Coaching

Punctuality M/Exp: During Apr-Oct 2021, punctuality of M/Exp trains is 97.57%

which is 2nd

Rank in Central Railway & 17th

Rank in Indian Railway.

Punctuality Passengers: During Apr-Oct 2021; punctuality of passenger trains is

97.12% which is 2nd

Rank in Central Railway & 22nd

Rank in Indian Railway.

During Apr-Oct 2021, 369 Parcel trains run including Kisan Special trains.

Blocks: During Apr-Oct 2021, 25.06% more machine blocks given than last year. (Apr-

Oct-2021: 7708.17 hrs. Apr-Oct-2020: 6163.40 hrs.)

OPERATING PERFORMANCE vis-à-vis Last year and Targets

ITEMS

April-October +/- % over

Actual 2020-2021

Target 2021-2022

Actual 2021-2022 Last

Year Target

Originating Loading ( Average wgns/day )

Cement 77 126 63.64

Clinker 78 82 5.13

Total 155 223 209 34.84 -6.28

Others (Including Sugar,Onion,RMC etc) 21 47 60 185.71 27.66

Total 176 270 269 52.84 -0.37

Million tonnes

Cement 1.11 1.80 62.16

Clinker 1.15 1.23 6.96

Total 2.26 3.25 3.03 34.07 -6.77

Others (Including Sugar,Onion,RMC etc) 0.26 0.61 0.80 207.69 31.15

Total 2.52 3.86 3.83 51.98 -0.78

Punctuality

M/Exp. 98.13 93 97.57 -0.57 4.91

Zonal 98.90 90 98.74 -0.16 9.71

Pass. 96.88 97.12 0.25

Asset Utilisation

Engine Utilisation

DSL LOCO 339.95 360 373.19 9.78 3.66

Electric Loco 289.81 270 243.20 -16.08 -9.93

Wagon Utilisation

a) Wagon Kms/Wagon Day in Use 256.58 225.0 267.76 4.36 19.00

b) Wagon Turn round (In days) 1.60 1.73 1.39 -13.13 -19.65 c) l.Divisional Wagon Balance (Railway) 2723 3200 3029 11.24 -5.34

d) Net Tonn Kilometers (Wagon days) 9142 7334 10197 11.54 39.04

e) % of Distt. Wagons unloaded to total available 91 100 89 -2.20 -11.00

f) Train Interchanged (Total) 13130 18241 38.93

g) Average Speed of Goods Trains 37.29 50 48.38 29.74 -3.24