ACE Technical Charter School 5410 S State St Chicago, IL 60609 This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Facility Assessment Report Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors Campus Summary Main 1963 68,331 $3,071,973 3 SITE $238,256 Campus Total $3,310,229 68,331 Building: Main Category: Building Exterior Item - Type Quantity Unit Rank Cost Location Group Comments Entrance Entrance Control - Audio and Video #6 W 6 EA 1 $702 Entrance Control - Audio and Video #8 E 6 EA 1 $702 Exterior Doors - Exterior FRP Door #1 E 6 EA 3 $1,894 Exterior Doors - Exterior FRP Door #6 W 6 EA 3 $1,894 Exterior Doors - Exterior FRP Door #7 N 6 EA 3 $1,894 Exterior Doors - Exterior FRP Door #8 E 6 EA 3 $1,894 Exterior Doors - Exterior Steel Door #2 E 6 EA 1 $481 Exterior Doors - Exterior Steel Door #3 S 6 EA 1 $481 Exterior Doors - Exterior Steel Door #4 S 6 EA 1 $481 Exterior Doors - Exterior Steel Door #5 S 6 EA 1 $481 Exterior Doors - Exterior Steel Door #7.1 N 6 EA 2 $961 Exterior Doors - Exterior Steel Door #7.2 N 6 EA 1 $481 Exterior Doors - Exterior Steel Door #7.3 N 6 EA 1 $481 Exterior Doors - Exterior Steel Door #8.1_Exit E 6 EA 2 $961 Exterior Doors - Transom Lite #1 E 6 EA 3 $940 Exterior Doors - Transom Lite #6 W 6 EA 3 $940 Exterior Doors - Transom Lite #7 N 6 EA 3 $940 Exterior Doors - Transom Lite #8 E 6 EA 3 $940 Exterior Stairs - Concrete #5 S 6 LF 3 $245 Exterior Stairs - Concrete #7 N 6 LF 20 $1,635 Exterior Stairs - Concrete #7.2 N 6 LF 5 $409 Page 1 of 30 ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

ACE Technical Charter School5410 S State St Chicago, IL 60609

This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.

Facility Assessment Report

Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors

Campus Summary

Main 1963 68,331 $3,071,9733

SITE $238,256

Campus Total $3,310,22968,331

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Entrance Control - Audio and Video #6 W 6EA1 $702

Entrance Control - Audio and Video #8 E 6EA1 $702

Exterior Doors - Exterior FRP Door #1 E 6EA3 $1,894

Exterior Doors - Exterior FRP Door #6 W 6EA3 $1,894

Exterior Doors - Exterior FRP Door #7 N 6EA3 $1,894

Exterior Doors - Exterior FRP Door #8 E 6EA3 $1,894

Exterior Doors - Exterior Steel Door #2 E 6EA1 $481

Exterior Doors - Exterior Steel Door #3 S 6EA1 $481

Exterior Doors - Exterior Steel Door #4 S 6EA1 $481

Exterior Doors - Exterior Steel Door #5 S 6EA1 $481

Exterior Doors - Exterior Steel Door #7.1 N 6EA2 $961

Exterior Doors - Exterior Steel Door #7.2 N 6EA1 $481

Exterior Doors - Exterior Steel Door #7.3 N 6EA1 $481

Exterior Doors - Exterior Steel Door #8.1_Exit E 6EA2 $961

Exterior Doors - Transom Lite #1 E 6EA3 $940

Exterior Doors - Transom Lite #6 W 6EA3 $940

Exterior Doors - Transom Lite #7 N 6EA3 $940

Exterior Doors - Transom Lite #8 E 6EA3 $940

Exterior Stairs - Concrete #5 S 6LF3 $245

Exterior Stairs - Concrete #7 N 6LF20 $1,635

Exterior Stairs - Concrete #7.2 N 6LF5 $409

Page 1 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Power Door Operator and Controls #8 E 6EA2 $0

Ramp Handrail - Steel_Ramp Handrail #6 W 6LF15 $130

Ramps - Concrete #6 W 6LF15 $2,254

Stair Handrail - Steel_Stair Handrail #6 W 6LF10 $87

Foundation

Foundation - Concrete Entire Building 7LF858 $0

Superstructure - Concrete Entire Building 7SF68,331 $0

Lighting

Exterior Lighting - Parapet or Roof Mounted Entire Building 6EA4 $2,146

Exterior Lighting - Wall Mounted Entire Building 6EA12 $3,465

Roof System

Chimney - Brick Chimney- Concrete/ Mortar Liner Roof #2 Chipped brick5LF20 $57,031

Chimney - Brick Chimney- Concrete/ Mortar Liner Roof #2 6LF15 $14,320

Chimney - Metal Flue Roof #2 6LF12 $1,898

Coping - Metal Roof #1 6LF693 $22,258

Coping - Metal Roof #2 6LF686 $22,033

Coping - Metal Roof #3 6LF301 $9,667

Downspouts - Exterior Downspouts Roof #1 w/ 302 LF of Metal Gutter5LF30 $2,423

Downspouts - Interior Downspouts Roof #1 6LF240 $7,976

Downspouts - Interior Downspouts Roof #2 6LF104 $3,456

Downspouts - Interior Downspouts Roof #3 5LF45 $9,959

Parapet - 16" - 30" Height Roof #1 5LF52 $8,997

Parapet - Parapet < 16" Height Roof #2 5LF69 $6,383

Roof Structure - Concrete Roof #1 7SF18,133 $0

Roof Structure - Concrete Roof #2 7SF14,250 $0

Roof Structure - Concrete Roof #3 7SF5,645 $0

Roof - Asphalt Gravel Ballast Roof #1 5SF18,133 $428,107

Roof - Asphalt Gravel Ballast Roof #2 6SF14,250 $144,884

Roof - Asphalt Gravel Ballast Roof #3 6SF5,645 $57,394

Walls

Canopy - Concrete/ Stucco Entire Building 6SF138 $4,566

Exterior Walls - Brick Entire Building 6SF16,420 $110,359

Exterior Walls - Concrete Block Entire Building 6SF312 $2,097

Exterior Walls - Precast Panel Wall Entire Building 6SF3,883 $26,098

Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF4,856 $27,568

Page 2 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Windows

Guard - Guards wire guard Entire Building 6SF351 $4,482

Lintels - Concrete Entire Building 6LF985 $0

Lintels - Steel Entire Building 6LF36 $1,045

Skylite - Lexan Entire Building / North 6SF32 $765

Windows - Decorative Entire Building 6SF45 $336

Windows - Sash Aluminum Double-pane Entire Building 6SF5,977 $44,616

Windows - Sash Lexan Entire Building 5SF2,632 $77,270

Building Exterior Subtotal: $1,123,904

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Automatic Transfer Switch Electrical Room 6EA1 $408

Emergency A/C Power - Corridors and Stairs Entire Building 6SF12,343 $3,707

Emergency A/C Power - Gym Entire Building / 1st Floor 6SF3,877 $1,441

Emergency Battery Packs - Corridors and Stairs Entire Building 6EA19 $3,848

Emergency Battery Packs - Multipurpose Room Entire Building / 1st Floor gym and lunchroom6EA5 $1,013

Emergency Battery Packs - Students Toilets Entire Building 6EA8 $1,620

Exit Signs - Corridors and Stairs Entire Building 7EA19 $0

Exit Signs - Multipurpose Room Entire Building / 1st Floor gym and lumchroom7EA6 $0

Security System - CCTV Entire Building 6SF68,331 $20,520

Security System - Intrusion Detection Entire Building 6SF68,331 $17,588

Main Service

Independent Electrical Service for emergency power Electrical Room 2'nd feed from ComEd7EA1 $0

Main Electrical Service - 2000 A 120/208/3PH Electrical Room 7EA1 $0

PA System Entire Building 6SF68,331 $22,474

Power Distribution

Lighting and Power Panels - 100 A Entire Building / Electrical Room 7EA1 $0

Lighting and Power Panels - 100 A Entire Building 7EA2 $0

Lighting and Power Panels - Above 100 A Entire Building 7EA4 $0

Lighting and Power Panels - Above 100 A Entire Building 6EA2 $994

Main Distribution Panels - 400 - 600 amp Entire Building / Electrical Room 7EA2 $0

Main Distribution Panels - Greater than 600 amp Entire Building / Electrical Room 7EA3 $0

Page 3 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Electrical System Subtotal: $73,613

Building: Main

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Fire Alarm

Fire Alarm Panel Entire Building / Electrical Room 6EA1 $6,406

Fire Alarm Strobe Lights Entire Building 6SF68,331 $24,428

Fire Alarm_System Entire Building 6SF68,331 $33,223

Safty System Subtotal: $64,057

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Conditioning

Chemical Pot Feeder Roof / Mechanical Room 6EA1 $725

Chiller-Air Cooled-Scroll Type-Roof Mounted - 101 - 150 tons Roof 6EA1 $4,314

Glycol Feed Roof / Mechanical Room 6EA1 $490

Pressure Fill System Roof / Mechanical Room 6EA1 $1,405

Air Handling Systems

Air Handling Unit- Package Multi Zone- Indoor- Hot Water Coils - 10001-15000 cfm

Penthouse 5EA1 $52,178

Air Handling Unit- Package Multi Zone- Indoor- Hot Water Coils - 15001-

20000 cfm

Penthouse 5EA1 $64,830

Air Handling Unit-Package Single Zone- Indoor- Hot Water Coils - 8001-

12000 cfm

Mezzanine serves gym east.5EA1 $34,175

Air Handling Unit-Package Single Zone- Indoor- Hot Water Coils - 8001-12000 cfm

Mezzanine Serves gym west. 5EA1 $34,175

Air Handling Unit-Package Single Zone- Indoor- Hot Water Coils - Less than 4000 cfm

shop ceiling / 1st Floor serves shop, ceiling mounted6EA1 $3,350

Air Intake Mezzanine / Roof 7EA1 $0

Air Intake Mezzanine / Roof 7EA1 $0

Air Intake Penthouse / Roof 7EA1 $0

Air Intake Penthouse / Roof 7EA1 $0

Air Intake shop ceiling / Roof 7EA1 $0

Fan Coil Unit- Celing Mounted - Hot Water and Chilled Water Entire Building Above ceiling mounted5EA43 $275,808

Indoor Return Fans- Centrifugal Squirrel Cage - 5000 - 10000 CFM Penthouse serve AHU-1, AHU-26EA2 $3,714

Page 4 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Handling Systems

Make Up Air Unit-Roof Mounted- Dual Temperature Coils - 10,001 -

20,000 cfm

Roof 6EA1 $3,350

Zone Dampers Penthouse / Entire Building zones counted at BAS system6EA16 $13,329

Zone Dampers Penthouse / Entire Building zones counted at BAS system6EA15 $12,495

Boiler Systems

Boiler Auxiliary- Condensing Hot Water - 2001 - 3000 HP Boiler Room 6EA2 $6,143

Chemical Pot Feeder Boiler Room 6EA1 $725

Condensing- Hot Water Boiler - 2001 - 3000 MBH Boiler Room 6EA2 $1,996

Glycol Feed System Boiler Room / Mechanical Room 6EA1 $539

Water Fill System Boiler Room / Mechanical Room 6EA1 $1,168

Heating Devices

Cabinet Heaters - With Hot Water Coil Entire Building / 1st Floor Cabinet has significant corrosion. 4EA1 $3,839

Cabinet Heaters - With Hot Water Coil Entire Building / 1st Floor 6EA8 $2,835

Cabinet Heaters - With Hot Water Coil Entire Building / 2nd Floor 6EA8 $2,835

Fin Tube - Hot Water Entire Building 6LF60 $566

Unit Heater - Hot Water Entire Building 6EA5 $1,396

Wall Heater - Electric Entire Building 6EA4 $556

Mechanical Plumbing

Daul Temperature Pump - 10 - 20 HP Mechanical Room 6EA2 $2,485

Hydronic Supply and Return - Copper Entire Building 6LF600 $31,480

Hydronic Supply and Return - Galvanized Entire Building Dual temperature.6LF150 $11,598

Temperature Control

DDC System Entire Building 6SF68,331 $39,085

Electric Thermostat Entire Building for unit heater6EA5 $0

Thermostats - DDC Entire Building 6EA43 $0

Unit Ventilation

Unit Ventilators- Floor Mounted- Hot Water & Chilled Water Coils Entire Building 6EA12 $14,973

Ventilation

Exhaust Fans- Indoor - 1501 - 8000 CFM Entire Building / 1st Floor 4EA1 $6,392

Exhaust Fans- Indoor - 500 - 1500 CFM Entire Building 6EA3 $1,777

Exhaust Fans- Indoor - Less than 500 CFM Entire Building 6EA2 $592

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Entire Building / Roof 6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Roof 6EA7 $4,147

Exhaust Fans- Roof Mounted - Less than 500 CFM Entire Building / Roof 6EA2 $592

Page 5 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Ventilation

Lab Exhaust Hood Entire Building / 2nd Floor 6EA1 $1,248

Roof Mounted Duct Work Entire Building / Roof 6LF25 $9,476

Type I Exhaust Hood- Kitchen Entire Building / 1st Floor 6EA1 $1,248

Type II Exhaust Hood- Warming Kitchen Entire Building / 1st Floor 6EA1 $920

Mechanical System Subtotal: $653,539

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Hot Water

Gas Heater - 150000 - 300000 BTU/HR Boiler Room 5EA1 $2,249

Piping

Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF68,331 $13,680

Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF68,331 $16,611

Domestic Piping-Cold Water Risers Entire Building 6SF68,331 $12,703

Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF68,331 $10,748

Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF68,331 $12,703

Domestic Piping-Hot Water Return Lines Entire Building 6SF68,331 $9,771

Domestic Piping-Hot Water Return Risers Entire Building 6SF68,331 $9,771

Sanitary Piping Entire Building 6SF68,331 $62,537

Storm Piping Entire Building 6SF68,331 $59,605

Vent Piping Entire Building 6SF68,331 $45,925

Pumps

Pumps - Domestic Booster Pump-Simplex Basement / Mechanical Room 6EA1 $1,446

Pumps - Ejector-Duplex Basement / Boiler Room 6EA1 $1,387

Pumps - Sump-Simplex Basement / Mechanical Room 6EA1 $745

Plumbing System Subtotal: $259,882

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #102 (Regular Classroom)

Ceiling - Splined 1st Floor 6SF718 $585

Page 6 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #102 (Regular Classroom)

Doors - Side-lite 1st Floor 6SF10 $167

Doors - Transom Window 1st Floor 6SF15 $254

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF718 $1,571

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF16 $0

Walls - Concrete Block 1st Floor 6SF795 $2,331

Walls - Plaster/Drywall 1st Floor store front6SF240 $662

Classroom #103 (Computer Lab)

Ceiling - Splined 1st Floor 6SF694 $566

Ceiling - Splined 1st Floor damaged5SF24 $232

Doors - Side-lite 1st Floor 6SF10 $167

Doors - Transom Window 1st Floor 6SF15 $254

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF718 $1,571

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF8 $0

Walls - Concrete Block 1st Floor 6SF505 $1,480

Walls - Plaster/Drywall 1st Floor damaged5SF5 $26

Walls - Plaster/Drywall 1st Floor 6SF285 $787

Walls - Plaster/Drywall 1st Floor store front6SF240 $786

Work Sink 1st Floor leaking5EA1 $1,508

Classroom #104 (Regular Classroom)

Ceiling - Splined 1st Floor 6SF718 $585

Doors - Side-lite 1st Floor 6SF10 $167

Doors - Transom Window 1st Floor 6SF15 $254

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF718 $1,571

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF14 $0

Walls - Concrete Block 1st Floor 5SF795 $8,163

Walls - Plaster/Drywall 1st Floor store front6SF240 $662

Classroom #105 (Computer Lab)

Ceiling - Splined 1st Floor damaged5SF10 $97

Ceiling - Splined 1st Floor 6SF708 $577

Doors - Side-lite 1st Floor 6SF10 $167

Page 7 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #105 (Computer Lab)

Doors - Transom Window 1st Floor 6SF15 $254

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF718 $1,571

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF16 $0

Walls - Concrete Block 1st Floor 6SF505 $1,480

Walls - Plaster/Drywall 1st Floor 6SF290 $800

Work Sink 1st Floor leaking5EA1 $1,508

Classroom #106 (Regular Classroom)

Ceiling - Splined 1st Floor 6SF718 $585

Doors - Side-lite 1st Floor 6SF10 $167

Doors - Transom Window 1st Floor 6SF15 $254

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF718 $1,571

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF14 $0

Walls - Concrete Block 1st Floor 6SF795 $2,331

Classroom #108 (Regular Classroom)

Ceiling - Splined 1st Floor 6SF718 $585

Doors - Side-lite 1st Floor 6SF10 $167

Doors - Transom Window 1st Floor 6SF15 $254

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF718 $1,571

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF14 $0

Walls - Concrete Block 1st Floor 6SF795 $2,331

Classroom #112 (Office)

Ceiling - Splined 1st Floor 6SF717 $584

Ceiling - Splined 1st Floor damaged5SF1 $10

Doors - Side-lite 1st Floor 6SF10 $167

Doors - Transom Window 1st Floor 6SF15 $254

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Carpet 1st Floor 6SF718 $1,530

Lighting - Lay-in 1st Floor 7EA16 $0

Walls - Concrete Block 1st Floor 6SF795 $2,331

Page 8 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #114 - Woodshop (Carpentry)

AC Units 1st Floor 6EA1 $496

Ceiling - Splined 1st Floor 6SF1,584 $1,291

Doors - Steel Doors incl hw 1st Floor 6EA3 $903

Floor - Concrete Epoxy/ Painted 1st Floor needs refinishing5SF1,584 $2,718

Lighting - Pendent/Surface 1st Floor 7EA19 $0

Marker Board 1st Floor 7LF8 $0

Walls - Concrete Block 1st Floor 6SF760 $2,228

Walls - Plaster/Drywall 1st Floor 6SF430 $1,187

Wood Shop Equipment 1st Floor 6EA15 $60,410

Classroom #116 -Wood class (Regular Classroom)

AC Units 1st Floor 6EA1 $496

Casework 1st Floor 6LF6 $152

Ceiling - Splined 1st Floor 6SF1,034 $843

Ceiling - Splined 1st Floor damaged5SF6 $58

Doors - Steel Doors incl hw 1st Floor 6EA3 $903

Floor - Concrete Epoxy/ Painted 1st Floor needs refinishing5SF1,040 $1,785

Lighting - Pendent/Surface 1st Floor 7EA15 $0

Marker Board 1st Floor 7LF16 $0

Walls - Concrete Block 1st Floor 6SF210 $616

Walls - Plaster/Drywall 1st Floor 6SF660 $1,822

Work Sink 1st Floor 6EA2 $758

Classroom #201 (Regular Classroom)

Casework 2nd Floor 6LF18 $455

Ceiling - Lay-in 2nd Floor 6SF750 $2,252

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Floor - Tile/Sheet 2nd Floor 6SF750 $751

Lighting - Pendent/Surface 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF20 $0

Walls - Concrete Block 2nd Floor 6SF876 $2,568

Classroom #203 (Regular Classroom)

Casework 2nd Floor 6LF18 $455

Ceiling - Splined 2nd Floor 6SF750 $611

Doors - Side-lite 2nd Floor 6SF18 $301

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Transom Window 2nd Floor 6SF12 $203

Floor - Tile 2nd Floor 6SF750 $1,641

Page 9 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #203 (Regular Classroom)

Lighting - Lay-in 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF20 $0

Walls - Concrete Block 2nd Floor 6SF876 $2,568

Classroom #204 (Regular Classroom)

Casework 2nd Floor 6LF18 $455

Ceiling - Lay-in 2nd Floor 6SF750 $2,252

Doors - Side-lite 2nd Floor 6SF24 $401

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Transom Window 2nd Floor 6SF18 $305

Floor - Tile 2nd Floor 6SF750 $1,641

Lighting - Lay-in 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF14 $0

Walls - Concrete Block 2nd Floor 6SF876 $2,568

Classroom #205 (Regular Classroom)

Casework 2nd Floor 6LF18 $455

Ceiling - Splined 2nd Floor 6SF750 $611

Doors - Side-lite 2nd Floor 6SF24 $401

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Transom Window 2nd Floor 6SF18 $305

Floor - Tile 2nd Floor 6SF750 $1,641

Lighting - Lay-in 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF20 $0

Walls - Concrete Block 2nd Floor 6SF876 $2,568

Classroom #206 (Regular Classroom)

Casework 2nd Floor 6LF18 $455

Ceiling - Splined 2nd Floor 6SF750 $611

Doors - Side-lite 2nd Floor 6SF24 $401

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Transom Window 2nd Floor 6SF18 $305

Floor - Tile 2nd Floor 6SF750 $1,641

Lighting - Lay-in 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF8 $0

Walls - Concrete Block 2nd Floor 6SF1,095 $3,210

Walls - Plaster/Drywall 2nd Floor Storefront6SF240 $662

Page 10 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #209 (Regular Classroom)

Casework 2nd Floor 6LF12 $303

Ceiling - Lay-in 2nd Floor 6SF750 $2,252

Doors - Side-lite 2nd Floor 6SF18 $301

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Transom Window 2nd Floor 6SF24 $406

Floor - Tile 2nd Floor 6SF750 $1,641

Lighting - Lay-in 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF8 $0

Walls - Concrete Block 2nd Floor 6SF876 $2,568

Classroom #210 (Laboratory/Shop)

AC Units 2nd Floor 6EA2 $991

Casework 2nd Floor 6LF36 $909

Ceiling - Lay-in 2nd Floor 6SF1,470 $4,414

Doors - Side-lite 2nd Floor 6SF48 $802

Doors - Steel Doors incl hw 2nd Floor 6EA2 $602

Doors - Transom Window 2nd Floor 6SF36 $610

Floor - Tile/Sheet 2nd Floor 6SF1,470 $1,471

Lighting - Pendent/Surface 2nd Floor 7EA32 $0

Marker Board 2nd Floor 7LF8 $0

Walls - Concrete Block 2nd Floor 6SF1,533 $4,494

Classroom #211 (Regular Classroom)

Casework 2nd Floor 6LF18 $455

Ceiling - Lay-in 2nd Floor 6SF750 $2,252

Doors - Side-lite 2nd Floor 6SF24 $401

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Transom Window 2nd Floor 6SF18 $305

Floor - Tile/Sheet 2nd Floor 6SF750 $751

Lighting - Lay-in 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF20 $0

Walls - Concrete Block 2nd Floor 6SF876 $2,568

Classroom #212 (Art Room)

Casework 2nd Floor 6LF18 $455

Ceiling - Lay-in 2nd Floor 6SF750 $2,252

Doors - Side-lite 2nd Floor 6SF24 $401

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Transom Window 2nd Floor 6SF18 $305

Page 11 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #212 (Art Room)

Floor - Tile/Sheet 2nd Floor 6SF750 $751

Lighting - Lay-in 2nd Floor 7EA3 $0

Lighting - Pendent/Surface 2nd Floor 7EA10 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Concrete Block 2nd Floor 6SF876 $2,568

Work Sink 2nd Floor 6EA1 $379

Classroom #301 (Regular Classroom)

Casework 3rd Floor 6LF18 $455

Ceiling - Lay-in 3rd Floor 6SF750 $2,252

Doors - Side-lite 3rd Floor 6SF24 $401

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Transom Window 3rd Floor 6SF18 $305

Floor - Tile/Sheet 3rd Floor 6SF750 $751

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF8 $0

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Classroom #302 (Regular Classroom)

Casework 3rd Floor 6LF18 $455

Ceiling - Lay-in 3rd Floor 6SF750 $2,252

Doors - Side-lite 3rd Floor 6SF24 $401

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Transom Window 3rd Floor 6SF18 $305

Floor - Tile/Sheet 3rd Floor 6SF750 $751

Lighting - Lay-in 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF8 $0

Storage/ Closet 3rd Floor 6SF126 $914

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Classroom #303 (Regular Classroom)

Casework 3rd Floor 6LF18 $455

Ceiling - Lay-in 3rd Floor 6SF750 $2,252

Doors - Side-lite 3rd Floor 6SF24 $401

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Transom Window 3rd Floor 6SF18 $305

Floor - Tile/Sheet 3rd Floor 6SF750 $751

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF20 $0

Page 12 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #303 (Regular Classroom)

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Classroom #304 (Computer Lab)

Ceiling - Lay-in 3rd Floor 6SF750 $2,252

Doors - Side-lite 3rd Floor 6SF24 $401

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Transom Window 3rd Floor 6SF18 $305

Floor - Tile/Sheet 3rd Floor 6SF750 $751

Lighting - Lay-in 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF8 $0

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Wireless System 3rd Floor 6EA1 $372

Classroom #305 (Regular Classroom)

Casework 3rd Floor 6LF18 $455

Ceiling - Lay-in 3rd Floor 6SF750 $2,252

Doors - Side-lite 3rd Floor 6SF24 $401

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Transom Window 3rd Floor 6SF18 $305

Floor - Tile/Sheet 3rd Floor 6SF750 $751

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF16 $0

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Classroom #306 (Regular Classroom)

Casework 3rd Floor 6LF18 $455

Ceiling - Lay-in 3rd Floor 6SF750 $2,252

Doors - Side-lite 3rd Floor 6SF24 $401

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Wood Doors inclu hw 3rd Floor 6EA18 $5,418

Floor - Tile 3rd Floor 6SF750 $1,641

Lighting - Lay-in 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF20 $0

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Classroom #307 (Regular Classroom)

Casework 3rd Floor 6LF18 $455

Ceiling - Lay-in 3rd Floor 6SF750 $2,252

Doors - Side-lite 3rd Floor 6SF24 $401

Page 13 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #307 (Regular Classroom)

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Transom Window 3rd Floor 6SF18 $305

Floor - Tile/Sheet 3rd Floor 6SF750 $751

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF8 $0

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Classroom #308 (Regular Classroom)

Casework 3rd Floor 6LF18 $455

Ceiling - Lay-in 3rd Floor 6SF750 $2,252

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Floor - Tile/Sheet 3rd Floor 6SF750 $751

Lighting - Lay-in 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF20 $0

Storage/ Closet 3rd Floor 6SF126 $914

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Classroom #309 (Regular Classroom)

Casework 3rd Floor 6LF18 $455

Ceiling - Lay-in 3rd Floor 6SF750 $2,252

Doors - Side-lite 3rd Floor 6SF24 $401

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Transom Window 3rd Floor 6SF1 $17

Floor - Tile/Sheet 3rd Floor 6SF750 $751

Lighting - Lay-in 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF20 $0

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Classroom #310 (Science)

Casework 3rd Floor 6LF40 $1,010

Ceiling - Lay-in 3rd Floor 6SF240 $721

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Fume Hood 3rd Floor 6EA1 $816

Lighting - Pendent/Surface 3rd Floor 7EA4 $0

Walls - Concrete Block 3rd Floor 6SF619 $1,815

Work Sink 3rd Floor 6EA1 $379

Classroom #311 (Regular Classroom)

Casework 3rd Floor 6LF18 $455

Page 14 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #311 (Regular Classroom)

Ceiling - Splined 3rd Floor 6SF750 $611

Doors - Side-lite 3rd Floor 6SF24 $401

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Transom Window 3rd Floor 6SF18 $305

Floor - Tile/Sheet 3rd Floor 6SF750 $751

Lighting - Lay-in 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF8 $0

Walls - Concrete Block 3rd Floor 6SF876 $2,568

Classroom #312 (Science)

Casework 3rd Floor 6LF76 $1,919

Ceiling - Lay-in 3rd Floor 6SF1,266 $3,802

Doors - Side-lite 3rd Floor 6SF48 $802

Doors - Steel Doors incl hw 3rd Floor 6EA2 $602

Doors - Transom Window 3rd Floor 6SF36 $610

Eye Wash Station 3rd Floor 6EA1 $336

Floor - Terrazzo 3rd Floor 6SF1,266 $2,770

Gas Line 3rd Floor Teachers use only6EA2 $1,018

Lighting - Lay-in 3rd Floor 7EA24 $0

Marker Board 3rd Floor 7LF8 $0

Storage/ Closet 3rd Floor 6SF126 $914

Walls - Concrete Block 3rd Floor 6SF1,427 $4,183

Work Sink 3rd Floor 6EA10 $3,790

Classrooms Subtotal: $296,196

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Ceiling - Splined 101 Discipline Director's Office Water damage4SF10 $141

Ceiling - Splined 101 Discipline Director's Office 6SF398 $324

Doors - Transom Window 101 Discipline Director's Office Boarded5SF9 $381

Doors - Wood Doors inclu hw 101 Discipline Director's Office 6EA1 $301

Floor - Concrete Epoxy/ Painted 101 Discipline Director's Office need refinishing5SF408 $700

Lighting - Pendent/Surface 101 Discipline Director's Office 6EA1 $124

Lighting - Pendent/Surface 101 Discipline Director's Office 7EA9 $0

Page 15 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Power Distribution 101 Discipline Director's Office 7EA6 $0

Walls - Concrete Block 101 Discipline Director's Office 6SF842 $2,468

Work SInk 101 Discipline Director's Office 6EA1 $508

Ceiling - Splined 101A Discipline office damaged5SF127 $904

Doors - Wood Doors inclu hw 101A Discipline office 6EA5 $1,505

Floor - Tile 101A Discipline office damaged5SF127 $570

Lighting - Pendent/Surface 101A Discipline office T12s4EA5 $2,703

Power Distribution 101A Discipline office 7EA6 $0

Walls - Concrete Block 101A Discipline office 6SF545 $1,598

Ceiling - Splined 110 Conference Room 6SF718 $585

Doors - Side-lite 110 Conference Room 6SF10 $167

Doors - Transom Window 110 Conference Room 6SF15 $254

Doors - Wood Doors inclu hw 110 Conference Room 6EA1 $301

Floor - Carpet 110 Conference Room 6SF718 $1,530

Lighting - Pendent/Surface 110 Conference Room 7EA16 $0

Power Distribution 110 Conference Room 7EA12 $0

Walls - Concrete Block 110 Conference Room 6SF795 $2,331

AC Unit 119 Department office old 5EA1 $1,826

Ceiling - Splined 119 Department office 5SF601 $4,280

Doors - Transom Window 119 Department office Boarded5SF9 $381

Doors - Wood Doors inclu hw 119 Department office 6EA1 $301

Floor - Carpet 119 Department office 6SF601 $1,281

Lighting - Pendent/Surface 119 Department office 7EA8 $0

Power Distribution 119 Department office 7EA20 $0

Walls - Concrete Block 119 Department office 6SF698 $2,046

Ceiling - Splined 1st Floor Main Office 6SF548 $447

Doors - Steel Doors incl hw 1st Floor Main Office Vault6EA1 $301

Doors - Wood Doors inclu hw 1st Floor Main Office 6EA1 $301

Floor - Carpet 1st Floor Main Office old5SF548 $2,813

Lighting - Pendent/Surface 1st Floor Main Office 7EA12 $0

Power Distribution 1st Floor Main Office 7EA12 $0

Storage/ Closet 1st Floor Main Office Vault6SF55 $399

Storage/ Closet 1st Floor Main Office 6SF234 $1,697

Walls - Concrete Block 1st Floor Main Office 6SF535 $1,568

AC Unit 1st Floor Principal's Office 6EA1 $496

Ceiling - Splined 1st Floor Principal's Office 6SF516 $421

Doors - Side-lite 1st Floor Principal's Office 6SF20 $334

Page 16 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Doors - Transom Window 1st Floor Principal's Office Boarded5SF24 $1,016

Doors - Wood Doors inclu hw 1st Floor Principal's Office 6EA2 $602

Floor - Carpet 1st Floor Principal's Office old5SF516 $2,649

Lighting - Lay-in 1st Floor Principal's Office 7EA1 $0

Lighting - Pendent/Surface 1st Floor Principal's Office 7EA12 $0

Power Distribution 1st Floor Principal's Office 7EA8 $0

Walls - Concrete Block 1st Floor Principal's Office 6SF777 $2,278

Ceiling - Lay-in 202 6SF750 $2,252

Doors - Side-lite 202 6SF24 $401

Doors - Steel Doors incl hw 202 6EA1 $301

Doors - Transom Window 202 6SF18 $305

Floor - Carpet 202 6SF588 $1,253

Floor - Tile 202 6SF130 $284

Lighting - Pendent/Surface 202 7EA16 $0

Power Distribution 202 7EA18 $0

Walls - Concrete Block 202 6SF657 $1,926

Walls - Plaster/Drywall 202 6SF438 $1,209

Ceiling - Lay-in 207 6SF396 $1,189

Doors - Side-lite 207 6SF24 $401

Doors - Steel Doors incl hw 207 6EA1 $301

Doors - Transom Window 207 6SF18 $305

Floor - Carpet 207 6SF396 $844

Lighting - Pendent/Surface 207 7EA6 $0

Power Distribution 207 7EA6 $0

Walls - Concrete Block 207 6SF820 $2,404

Walls - Plaster/Drywall 207 6SF716 $1,976

AC Unit Assistant Principal's Office 6EA1 $496

Ceiling - Splined Assistant Principal's Office 6SF250 $204

Doors - Side-lite Assistant Principal's Office 6SF36 $602

Doors - Transom Window Assistant Principal's Office Boarded5SF12 $508

Doors - Wood Doors inclu hw Assistant Principal's Office 6EA2 $602

Floor - Carpet Assistant Principal's Office 6SF250 $533

Lighting - Pendent/Surface Assistant Principal's Office 7EA6 $0

Power Distribution Assistant Principal's Office 7EA6 $0

Walls - Concrete Block Assistant Principal's Office 6SF279 $818

Ceiling - Splined Copy Room in Main Office 6SF145 $118

Doors - Transom Window Copy Room in Main Office 6SF9 $152

Page 17 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Doors - Wood Doors inclu hw Copy Room in Main Office 6EA1 $301

Floor - Carpet Copy Room in Main Office old5SF145 $744

Lighting - Pendent/Surface Copy Room in Main Office 7EA4 $0

Power Distribution Copy Room in Main Office 7EA6 $0

Storage/ Closet Copy Room in Main Office 6SF6 $44

Walls - Concrete Block Copy Room in Main Office 6SF373 $1,093

Ceiling - Splined Counselor office next to library 6SF105 $86

Doors - Transom Window Counselor office next to library 6SF24 $406

Doors - Wood Doors inclu hw Counselor office next to library 6EA1 $301

Floor - Carpet Counselor office next to library 5SF105 $539

Lighting - Pendent/Surface Counselor office next to library 7EA4 $0

Power Distribution Counselor office next to library 7EA4 $0

Walls - Concrete Block Counselor office next to library 6SF202 $592

Walls - Plaster/Drywall Counselor office next to library 6SF202 $557

Ceiling - Exposed Engineers Office-Basement 6SF132 $196

Doors - Steel Doors incl hw Engineers Office-Basement 6EA1 $301

Floor - Concrete Epoxy/ Painted Engineers Office-Basement 6SF132 $70

Lighting - Pendent/Surface Engineers Office-Basement 7EA10 $0

Power Distribution Engineers Office-Basement 7EA6 $0

Walls - Concrete Block Engineers Office-Basement 6SF459 $1,346

Ceiling - Splined Gym office damaged5SF30 $250

Ceiling - Splined Gym office 6SF40 $33

Doors - Wood Doors inclu hw Gym office 6EA1 $301

Floor - Carpet Gym office old5SF70 $359

Lighting - Pendent/Surface Gym office 7EA2 $0

Power Distribution Gym office 7EA4 $0

Walls - Concrete Block Gym office 6SF320 $938

Ceiling - Splined IT OFfice in Library damaged5SF17 $142

Ceiling - Splined IT OFfice in Library 6SF102 $83

Doors - Wood Doors inclu hw IT OFfice in Library 6EA1 $301

Floor - Carpet IT OFfice in Library old5SF119 $611

Lighting - Pendent/Surface IT OFfice in Library 7EA4 $0

Power Distribution IT OFfice in Library 7EA4 $0

Walls - Concrete Block IT OFfice in Library 6SF230 $674

Walls - Plaster/Drywall IT OFfice in Library 6SF230 $635

Ceiling - Lay-in RM 207A-Private office-inside Rm 207 6SF225 $676

Doors - Wood Doors inclu hw RM 207A-Private office-inside Rm 207 6EA1 $301

Page 18 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Floor - Carpet RM 207A-Private office-inside Rm 207 6SF225 $479

Lighting - Pendent/Surface RM 207A-Private office-inside Rm 207 7EA3 $0

Power Distribution RM 207A-Private office-inside Rm 207 7EA6 $0

Walls - Concrete Block RM 207A-Private office-inside Rm 207 6SF180 $528

Walls - Plaster/Drywall RM 207A-Private office-inside Rm 207 6SF420 $1,159

Ceiling - Lay-in RM 207B-Private office-inside RM 207 6SF288 $865

Doors - Wood Doors inclu hw RM 207B-Private office-inside RM 207 6EA1 $301

Floor - Carpet RM 207B-Private office-inside RM 207 6SF288 $614

Lighting - Pendent/Surface RM 207B-Private office-inside RM 207 7EA8 $0

Power Distribution RM 207B-Private office-inside RM 207 7EA6 $0

Walls - Concrete Block RM 207B-Private office-inside RM 207 6SF203 $595

Walls - Plaster/Drywall RM 207B-Private office-inside RM 207 6SF475 $1,311

Ceiling - Splined Social Support 111 6SF249 $203

Ceiling - Splined Social Support 111 damaged5SF22 $213

Doors - Wood Doors inclu hw Social Support 111 6EA1 $301

Floor - Tile Social Support 111 6SF271 $593

Lighting - Wall Mounted Social Support 111 Uplight7EA5 $0

Power Distribution Social Support 111 7EA6 $0

Walls - Concrete Block Social Support 111 6SF864 $2,533

Gymnasia

Ceiling - Exposed 1st Floor 6SF3,877 $5,766

Doors - Steel Doors incl hw 1st Floor 5EA4 $4,696

Floor - Wood 1st Floor 5SF3,877 $56,716

Lighting - Metal Halide/Sodium Vapor 1st Floor 6EA24 $3,209

Sound System 1st Floor 6EA1 $41,654

Stage 1st Floor 6SF454 $2,623

Stage Curtain 1st Floor 6EA3 $0

Stage Lift 1st Floor 6EA1 $6,510

Stage Lighting System 1st Floor 6EA1 $12,369

Stage-Stairs - Wood 1st Floor Metal stairs6LF16 $188

Walls - Concrete Block 1st Floor 6SF6,609 $19,374

Kitchen

Ceiling - Lay-in 1st Floor 6SF78 $234

Ceiling - Plaster/Drywall 1st Floor 6SF194 $671

Ceiling - Splined 1st Floor 6SF503 $410

Doors - Wood Doors inclu hw 1st Floor 6EA7 $2,107

Page 19 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Kitchen

Floor - Tile Ceramic/ Porcelain 1st Floor 6SF775 $1,640

Lighting - Pendent/Surface 1st Floor 7EA21 $0

Serving Line 1st Floor 6LF12 $714

Storage/ Closet 1st Floor 6SF216 $1,566

Walls - Concrete Block 1st Floor 6SF749 $2,196

Library

Ceiling - Splined 109 6SF1,594 $1,299

Doors - Side-lite 109 6SF20 $334

Doors - Transom Window 109 6SF30 $508

Doors - Wood Doors inclu hw 109 6EA3 $903

Floor - Carpet 109 5SF1,594 $8,183

Lighting - Pendent/Surface 109 7EA24 $0

Walls - Concrete Block 109 6SF937 $2,747

Walls - Plaster/Drywall 109 6SF480 $1,325

Lunch & Multipurpose Room

Ceiling - Splined 1st Floor Teachers Lounge old5SF1,130 $8,047

Doors - Transom Window 1st Floor Teachers Lounge Boarded5SF9 $381

Doors - Wood Doors inclu hw 1st Floor Teachers Lounge 6EA1 $301

Floor - Tile 1st Floor Teachers Lounge 6SF1,130 $2,472

Lighting - Pendent/Surface 1st Floor Teachers Lounge 7EA12 $0

Walls - Concrete Block 1st Floor Teachers Lounge 6SF256 $750

Walls - Plaster/Drywall 1st Floor Teachers Lounge 6SF511 $1,410

Mechanical/ Service Rooms

Boiler Room Basement 6SF1,300 $9,314

Mechanical/ Service Rooms Basement Engineers Shop6SF238 $1,705

Mechanical/ Service Rooms Basement Electrical Switchgear room6SF150 $1,075

Storage Room Basement 6SF48 $344

Janitor's Closet Rm 200B-Janitor's Closet 6SF35 $251

Janitor's Closet RM 213B-Janitor's Closet 6SF35 $251

Janitor's Closet RM 300B-Janitors Closet 6SF35 $251

Janitor's Closet RM 313B-Janitors Closet 6SF35 $251

Restroom

Accessories 1st Floor in Kitchen 6SF52 $480

Ceiling - Splined 1st Floor in Kitchen 5SF52 $370

Doors - Wood Doors inclu hw 1st Floor in Kitchen 6EA2 $602

Page 20 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Floor - Tile Ceramic/ Porcelain 1st Floor in Kitchen 6SF52 $110

Lavatory 1st Floor in Kitchen 6EA1 $320

Lighting - Pendent/Surface 1st Floor in Kitchen 7EA1 $0

Lighting - Wall Mounted 1st Floor in Kitchen 7EA1 $0

Walls - Concrete Block 1st Floor in Kitchen 6SF301 $882

Water Closet 1st Floor in Kitchen 6EA1 $336

Accessories 1st Floor Men 6SF89 $821

Ceiling - Splined 1st Floor Men 6SF89 $73

Doors - Transom Window 1st Floor Men Boarded5SF9 $381

Doors - Wood Doors inclu hw 1st Floor Men 6EA1 $301

Floor Drain 1st Floor Men 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Floor Men 6SF89 $188

Lavatory 1st Floor Men 6EA1 $320

Lighting - Pendent/Surface 1st Floor Men 7EA2 $0

Walls - Plaster/Drywall 1st Floor Men 6SF228 $629

Walls - Tile Ceramic/ Porcelain 1st Floor Men 6SF152 $343

Water Closet 1st Floor Men 6EA1 $336

Accessories 1st Floor Women 6SF89 $821

Ceiling - Splined 1st Floor Women 6SF89 $73

Doors - Transom Window 1st Floor Women Boarded5SF9 $381

Doors - Wood Doors inclu hw 1st Floor Women 6EA1 $301

Floor Drain 1st Floor Women 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Floor Women 6SF89 $188

Lavatory 1st Floor Women Continually running6EA1 $320

Lighting - Pendent/Surface 1st Floor Women 7EA2 $0

Walls - Plaster/Drywall 1st Floor Women 6SF228 $629

Walls - Tile Ceramic/ Porcelain 1st Floor Women 6SF152 $343

Water Closet 1st Floor Women 6EA1 $336

Accessories 1st Flr Boys 6SF275 $2,536

Ceiling - Plaster/Drywall 1st Flr Boys 6SF267 $924

Ceiling - Plaster/Drywall 1st Flr Boys Water damage5SF8 $100

Doors - Side-lite 1st Flr Boys Boarded5SF14 $980

Doors - Transom Window 1st Flr Boys Boarded5SF5 $212

Doors - Wood Doors inclu hw 1st Flr Boys 6EA1 $301

Floor Drain 1st Flr Boys 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Flr Boys 6SF275 $582

Hand Dryer 1st Flr Boys 6EA2 $460

Page 21 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Lavatory 1st Flr Boys 6EA3 $959

Lighting - Lay-in 1st Flr Boys Missing cover6EA1 $119

Lighting - Lay-in 1st Flr Boys 7EA4 $0

Partitions 1st Flr Boys 6EA3 $891

Urinals 1st Flr Boys 6EA6 $2,016

Walls - Structural Glazed Tile 1st Flr Boys 6SF552 $1,737

Water Closet 1st Flr Boys 6EA2 $672

Accessories 1st Flr Girls 6SF275 $2,536

Ceiling - Plaster/Drywall 1st Flr Girls 6SF275 $952

Doors - Side-lite 1st Flr Girls Boarded5SF10 $700

Doors - Transom Window 1st Flr Girls Boarded5SF15 $635

Doors - Wood Doors inclu hw 1st Flr Girls 6EA1 $301

Floor Drain 1st Flr Girls 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Flr Girls 6SF275 $582

Hand Dryer 1st Flr Girls 6EA2 $460

Lavatory 1st Flr Girls 6EA3 $959

Lighting - Lay-in 1st Flr Girls 7EA5 $0

Partitions 1st Flr Girls 6EA6 $1,782

Walls - Structural Glazed Tile 1st Flr Girls 6SF552 $1,737

Water Closet 1st Flr Girls 6EA7 $2,352

Accessories 2nd Floor Boys 6SF210 $1,937

Ceiling - Plaster/Drywall 2nd Floor Boys 6SF210 $727

Doors - Steel Doors incl hw 2nd Floor Boys 6EA1 $301

Floor Drain 2nd Floor Boys 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd Floor Boys 6SF210 $444

Hand Dryer 2nd Floor Boys 6EA2 $460

Lavatory 2nd Floor Boys 6EA3 $959

Lighting - Pendent/Surface 2nd Floor Boys 7EA4 $0

Partitions 2nd Floor Boys 6EA2 $594

Partitions 2nd Floor Boys *Half of partition walls missing5EA2 $1,502

Urinals 2nd Floor Boys 6EA3 $1,008

Walls - Structural Glazed Tile 2nd Floor Boys 6SF579 $1,822

Water Closet 2nd Floor Boys 6EA2 $672

Accessories 2nd Floor Girls 6SF210 $1,937

Ceiling - Plaster/Drywall 2nd Floor Girls 6SF210 $727

Doors - Steel Doors incl hw 2nd Floor Girls 6EA1 $301

Floor Drain 2nd Floor Girls 6EA1 $1,059

Page 22 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Floor - Tile Ceramic/ Porcelain 2nd Floor Girls 6SF210 $444

Hand Dryer 2nd Floor Girls 6EA2 $460

Lavatory 2nd Floor Girls 6EA3 $959

Lighting - Pendent/Surface 2nd Floor Girls 7EA4 $0

Partitions 2nd Floor Girls 6EA5 $1,485

Walls - Concrete Block 2nd Floor Girls 6SF463 $1,357

Water Closet 2nd Floor Girls 6EA5 $1,680

Accessories 2nd Floor Mens 6SF32 $295

Ceiling - Plaster/Drywall 2nd Floor Mens 6SF32 $111

Doors - Steel Doors incl hw 2nd Floor Mens 6EA1 $301

Floor - Tile/Sheet 2nd Floor Mens 6SF32 $32

Lavatory 2nd Floor Mens 6EA1 $320

Lighting - Wall Mounted 2nd Floor Mens 7EA1 $0

Partitions 2nd Floor Mens 6EA1 $297

Walls - Concrete Block 2nd Floor Mens 6SF181 $531

Water Closet 2nd Floor Mens 6EA1 $336

Accessories 2nd Floor Womens 6SF32 $295

Ceiling - Plaster/Drywall 2nd Floor Womens 6SF32 $111

Doors - Wood Doors inclu hw 2nd Floor Womens 6EA1 $301

Floor - Tile Ceramic/ Porcelain 2nd Floor Womens 6SF32 $68

Lavatory 2nd Floor Womens 6EA1 $320

Lighting - Wall Mounted 2nd Floor Womens 7EA1 $0

Partitions 2nd Floor Womens 6EA1 $297

Walls - Concrete Block 2nd Floor Womens 6SF215 $630

Water Closet 2nd Floor Womens 6EA1 $336

Accessories 3rd Floor Boys 6SF210 $1,937

Ceiling - Plaster/Drywall 3rd Floor Boys 6SF210 $727

Doors - Steel Doors incl hw 3rd Floor Boys 6EA1 $301

Floor Drain 3rd Floor Boys 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd Floor Boys *Damaged floor tiles5SF2 $42

Floor - Tile Ceramic/ Porcelain 3rd Floor Boys 6SF208 $440

Hand Dryer 3rd Floor Boys 6EA2 $460

Lavatory 3rd Floor Boys 6EA3 $959

Lighting - Pendent/Surface 3rd Floor Boys 7EA4 $0

Partitions 3rd Floor Boys *Half partition missing in both stalls, also door missing in accessible stall

5EA2 $1,502

Partitions 3rd Floor Boys 6EA2 $594

Urinals 3rd Floor Boys 6EA3 $1,008

Page 23 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Walls - Concrete Block 3rd Floor Boys 6SF278 $815

Walls - Structural Glazed Tile 3rd Floor Boys 6SF417 $1,312

Water Closet 3rd Floor Boys *Toilet Damaged5EA1 $1,344

Water Closet 3rd Floor Boys 6EA1 $336

Accessories 3rd Floor Girls 6SF180 $1,660

Ceiling - Plaster/Drywall 3rd Floor Girls 6SF180 $623

Doors - Steel Doors incl hw 3rd Floor Girls 6EA1 $301

Floor Drain 3rd Floor Girls 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd Floor Girls 6SF180 $381

Hand Dryer 3rd Floor Girls 6EA2 $460

Lavatory 3rd Floor Girls 6EA3 $959

Lighting - Pendent/Surface 3rd Floor Girls 7EA4 $0

Partitions 3rd Floor Girls 6EA5 $1,485

Walls - Structural Glazed Tile 3rd Floor Girls 6SF643 $2,023

Water Closet 3rd Floor Girls 6EA5 $1,680

Accessories 3rd Floor Mens 6SF32 $295

Ceiling - Plaster/Drywall 3rd Floor Mens 6SF32 $111

Doors - Steel Doors incl hw 3rd Floor Mens 6EA1 $301

Floor - Tile/Sheet 3rd Floor Mens 6SF32 $32

Lavatory 3rd Floor Mens 6EA1 $320

Lighting - Wall Mounted 3rd Floor Mens 7EA1 $0

Partitions 3rd Floor Mens 6EA1 $297

Walls - Concrete Block 3rd Floor Mens 6SF181 $531

Water Closet 3rd Floor Mens 6EA1 $336

Accessories 3rd Floor Womens 6SF32 $295

Ceiling - Plaster/Drywall 3rd Floor Womens 6SF32 $111

Doors - Steel Doors incl hw 3rd Floor Womens 6EA1 $301

Floor - Tile/Sheet 3rd Floor Womens 6SF32 $32

Lavatory 3rd Floor Womens 6EA1 $320

Lighting - Wall Mounted 3rd Floor Womens 7EA1 $0

Partitions 3rd Floor Womens 6EA1 $297

Walls - Concrete Block 3rd Floor Womens 6SF181 $531

Water Closet 3rd Floor Womens 6EA1 $336

Accessories Basement 6SF130 $1,199

Benches Basement 6LF10 $145

Ceiling - Exposed Basement 6SF130 $193

Doors - Steel Doors incl hw Basement 6EA1 $301

Page 24 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Floor Drain Basement 6EA1 $1,059

Floor - Concrete Epoxy/ Painted Basement 6SF130 $69

Lavatory Basement 6EA1 $320

Lighting - Pendent/Surface Basement 7EA3 $0

Partitions Basement 6EA2 $594

Showers Basement 6EA1 $311

Urinals Basement 6EA1 $336

Walls - Concrete Block Basement 6SF456 $1,337

Water Closet Basement 6EA1 $336

Accessories In Discipline Office 6SF25 $231

Ceiling - Splined In Discipline Office 6SF25 $20

Doors - Wood Doors inclu hw In Discipline Office 6EA1 $301

Floor - Tile Ceramic/ Porcelain In Discipline Office 6SF25 $53

Lavatory In Discipline Office Runs5EA1 $1,590

Lighting - Wall Mounted In Discipline Office T124EA1 $393

Walls - Concrete Block In Discipline Office 6SF138 $405

Walls - Concrete Block In Discipline Office 5SF2 $28

Water Closet In Discipline Office 6EA1 $336

Accessories In main office 6SF20 $184

Ceiling - Splined In main office 6SF20 $16

Doors - Wood Doors inclu hw In main office 6EA1 $301

Floor - Tile Ceramic/ Porcelain In main office 6SF20 $42

Lavatory In main office 6EA1 $320

Lighting - Pendent/Surface In main office 7EA1 $0

Lighting - Wall Mounted In main office 7EA1 $0

Walls - Plaster/Drywall In main office 6SF79 $218

Walls - Tile Ceramic/ Porcelain In main office 6SF79 $178

Water Closet In main office 6EA1 $336

Accessories In Social Support Office 111 6SF86 $793

Ceiling - Splined In Social Support Office 111 6SF86 $70

Doors - Wood Doors inclu hw In Social Support Office 111 6EA1 $301

Floor - Tile Ceramic/ Porcelain In Social Support Office 111 6SF86 $182

Hand Dryer In Social Support Office 111 6EA1 $230

Lavatory In Social Support Office 111 6EA1 $320

Lighting - Pendent/Surface In Social Support Office 111 7EA2 $0

Partitions In Social Support Office 111 6EA2 $594

Walls - Concrete Block In Social Support Office 111 6SF353 $1,035

Page 25 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Water Closet In Social Support Office 111 6EA2 $672

Rooms (Other Than Classrooms) Subtotal: $397,868

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Plaster/Drywall 1st Floor 6SF679 $4,204

Ceiling - Splined 1st Floor 6SF5,645 $16,306

Ceiling - Splined 1st Floor 5SF8 $77

Doors - Steel Doors incl hw 1st Floor 6EA3 $903

Drinking Fountains - Single Fountain 1st Floor 6EA7 $1,930

Floor - Tile Ceramic/ Porcelain 1st Floor 6SF270 $753

Floor - Tile/Sheet 1st Floor 6SF6,532 $3,549

Lighting - Lay-in 1st Floor 7EA28 $0

Lighting - Pendent/Surface 1st Floor 7EA62 $0

Student Lockers - One Tier 1st Floor 6EA290 $26,922

Walls - Concrete Block 1st Floor 6SF8,075 $23,672

Walls - Concrete Block 1st Floor 5SF13 $183

Walls - Masonry 1st Floor 6SF2,824 $8,884

Walls - Plaster/Drywall 1st Floor 6SF80 $355

Walls - Structural Glazed Tile 1st Floor 6SF702 $2,208

Ceiling - Lay-in 2nd Floor 6SF1,504 $4,517

Doors - Steel Doors incl hw 2nd Floor 6EA2 $602

Drinking Fountains - Single Fountain 2nd Floor 6EA4 $1,103

Floor - Terrazzo 2nd Floor 6SF200 $1,679

Floor - Tile/Sheet 2nd Floor 6SF1,800 $978

Lighting - Pendent/Surface 2nd Floor 7EA25 $0

Student Lockers - One Tier 2nd Floor 6EA106 $9,841

Walls - Concrete Block 2nd Floor 6SF2,713 $7,953

Ceiling - Plaster/Drywall 2nd Floor / 3rd Floor 6SF496 $3,071

Walls - Structural Glazed Tile 2nd Floor / 3rd Floor 6SF339 $1,066

Ceiling - Lay-in 3rd Floor 6SF1,504 $4,517

Ceiling - Plaster/Drywall 3rd Floor 6SF496 $3,071

Doors - Steel Doors incl hw 3rd Floor 6EA2 $602

Drinking Fountains - Single Fountain 3rd Floor 6EA4 $1,103

Page 26 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Floor - Tile/Sheet 3rd Floor 6SF2,000 $1,087

Lighting - Lay-in 3rd Floor 7EA25 $0

Student Lockers - One Tier 3rd Floor 6EA106 $9,841

Walls - Concrete Block 3rd Floor 6SF2,713 $7,953

Walls - Structural Glazed Tile 3rd Floor Glazed Brick & Glazed CB6SF339 $1,066

Safety

Camera Viewing Station 1st Floor 6EA1 $683

Security Cameras 1st Floor / Entire Building 6EA4 $776

Security Cameras 1st Floor / Entire Building 6EA16 $3,105

Stairs

Ceiling - Lay-in North East 6SF720 $2,162

Floor - Asphalt North East 6SF720 $5,580

Handrails North East 6LF81 $702

Lighting - Pendent/Surface North East 7EA8 $0

Stairs - Concrete North East 6LF27 $224

Walls - Structural Glazed Tile North East 6SF1,073 $3,376

Ceiling - Lay-in North West 6SF720 $2,162

Floor - Asphalt North West 6SF720 $5,580

Handrails North West 6LF72 $624

Lighting - Pendent/Surface North West 6EA8 $991

Stairs - Concrete North West 6LF27 $224

Walls - Structural Glazed Tile North West 6SF1,073 $3,376

Ceiling - Exposed South 6SF256 $381

Ceiling - Exposed South East 6SF45 $67

Floor - Concrete Epoxy/ Painted South East 6SF45 $22

Handrails South East 6LF36 $312

Lighting - Pendent/Surface South East 7EA1 $0

Stairs - Concrete South East 6LF18 $149

Walls - Concrete Block South East 6SF26 $76

Walls - Plaster/Drywall South East 6SF230 $635

Floor - Concrete South 6SF256 $135

Handrails South 6LF36 $312

Lighting - Pendent/Surface South 7EA2 $0

Stairs - Concrete South 6LF18 $149

Walls - Concrete Block South 6SF640 $1,876

Page 27 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Vertical Conveyance

Elevator - Hydraulic Elevator 1st Floor 6EA1 $19,238

Building Interior Subtotal: $202,915

Total Building Cost $3,071,973

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Civil/Drainage

Civil/ Drainage - Catch Basin Entire Site 6EA5 $5,469

Civil/ Drainage - Site Manhole Entire Site 6EA3 $4,478

Fencing

Fencing - Chain Link Entire Site 6LF253 $4,750

Fencing - Guard Rail Entire Site / Site - East 6LF160 $1,849

Fencing - New Standard Ornamental Entire Site 6LF104 $3,318

Fencing - Wood Fencing w/ Steel Frame Entire Site Gate6LF24 $315

Landscape

Benches Entire Site 6EA7 $3,010

Landscape - Grass Entire Site 6SF4,368 $3,623

Landscape - Hardscape- Concrete Entire Site 6SF2,620 $13,525

Landscape - Hardscape- Pavers Entire Site / Courtyard 6SF3,550 $20,103

Parkway trees Entire Site 6EA19 $12,541

Planting Beds/ Area Entire Site 6SF8,553 $14,065

Trash Receptacles Entire Site 6EA1 $312

Parking Lot

Concrete Curbs Parking Lot- South 6LF120 $1,541

Interior Plantings Parking Lot- South 6LF155 $6,594

Surface - Asphalt Parking Lot- North 4SF7,708 $60,844

Surface - Asphalt Parking Lot- South 6SF14,555 $35,175

Trash Compactor Parking Lot- South 6EA1 $0

Trash Enclosure Parking Lot- South 6SF336 $0

Vehicular Screening Parking Lot- South 6LF151 $11,889

Page 28 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Sidewalks

Sidewalks - Internal Walks Entire Site 6LF99 $1,189

Sidewalks - Perimeter Sidewalks Entire Site 6SF16,103 $32,008

Signage

Flag Pole - Flag Pole Entire Site 6EA1 $1,657

Marquee - Free Standing Back Lighted Entire Site 6EA1 $0

Site Subtotal: $238,256

Total Site Cost $238,256

Campus Total ² ³

² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space

reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates;

it does not reflect a complete project cost.

³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are

estimates only and are based solely on the data that was collected as of the assessment date in the footer below.

¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report; by the time the report is compiled, they have been resolved.

$3,310,229

Definitions

● Quantity

● Unit

means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,

depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and

additional work triggered by building codes.

means, for each item, the total number (or amount) of that item that exists and was evaluated.

means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like

chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).

● Cost

● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.

● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to

alleviate overcrowding; these are viewed as separate capital needs.

Page 29 of 30ACE TECH HS Assessment Date: 11/13/15

ACE Technical Charter School5410 S State St Chicago, IL 60609

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Main

NNN4040801811750212212Regular ClassroomArt Room 2nd Floor

NNN40488816111,584111114 - WoodshopLaboratory/ShopCarpentry 1st Floor

YNN40407216101718103103Regular ClassroomComputer Lab 1st Floor

NYN40408042341718105105Regular ClassroomComputer Lab 1st Floor

NNN40327276322750304304Regular ClassroomComputer Lab 3rd Floor

NNN4064144721511,470210210Laboratory/ShopLaboratory/Shop 2nd Floor

NNN4040801472718112112Regular ClassroomOffice 1st Floor

NNN4040801472718102102Regular ClassroomRegular Classroom 1st Floor

YNN4040801472718104104Regular ClassroomRegular Classroom 1st Floor

NNN4040801011718106106Regular ClassroomRegular Classroom 1st Floor

NNN4040801472718108108Regular ClassroomRegular Classroom 1st Floor

NNN405610417111,040113116 -Wood classLaboratory/ShopRegular Classroom 1st Floor

NNN4040801811750201201Regular ClassroomRegular Classroom 2nd Floor

NNN4040801811750203203Regular ClassroomRegular Classroom 2nd Floor

YNN4040801811750204204Regular ClassroomRegular Classroom 2nd Floor

NNN4040801811750205205Regular ClassroomRegular Classroom 2nd Floor

NNN4040801811750206206Regular ClassroomRegular Classroom 2nd Floor

NNN4040801811750209209Regular ClassroomRegular Classroom 2nd Floor

NNN4040801811750211211Regular ClassroomRegular Classroom 2nd Floor

YNN4040801811750301301Regular ClassroomRegular Classroom 3rd Floor

YNN4040801811750302302Regular ClassroomRegular Classroom 3rd Floor

NNN4040801811750303303Regular ClassroomRegular Classroom 3rd Floor

YNN4040801811750305305Regular ClassroomRegular Classroom 3rd Floor

YNN4040801811750306306Regular ClassroomRegular Classroom 3rd Floor

YNN4040801811750307307Regular ClassroomRegular Classroom 3rd Floor

YNN4040801811750308308Regular ClassroomRegular Classroom 3rd Floor

YNN4040801811750309309Regular ClassroomRegular Classroom 3rd Floor

YNN4040801811750311311Regular ClassroomRegular Classroom 3rd Floor

NNN401224611240310310Other Instructional UseScience 3rd Floor

NNN40561203811,266312312Science Lab Level 2Science 3rd Floor

Page 30 of 30ACE TECH HS Assessment Date: 11/13/15