ACCOUNTING system for procurement. ACCOUNTING CYCLE. Receives Disbursement Vouchers from GSO together with supporting documents – 1 min per transaction Tracking Numbers – required for Administrative Officers, Supply Officers, Dept. Heads, Suppliers to track their documents. - PowerPoint PPT Presentation
Citation preview
ACCOUNTING CYCLE
Receives Disbursement Vouchers from GSO together with supporting documents – 1 min per transactionTracking Numbers – required for Administrative Officers,
Supply Officers, Dept. Heads, Suppliers to track their documents
Receiving personnel stamps ADV Nos, Type of Fund, Date received on the face of the voucher and to all supporting documents – 5-10 min/transaction
Encodes the ADV No. in the Document Tracking System – 1 min
Evaluates/Checks as to completeness of supporting documents, legality and appropriateness of the procurement/transactiono 20 min – 1 hr/ transactionoGasoline – 1 hr – 2 hr/transactiono Infrastructure Vouchers – 1-2 hrs/transactions
Encodes the transaction in the ledger per supplier – 1 min
REQUIREMENTS/ SUPPORTING DOCUMENTS
(COA CIRCULAR 2012-001)
Supplies, Rentals, Meals, Gasoline, Equipment, Vehicles and Accessories Competitive Bidding Alternative modes
o Shoppingo Small Value Procurement (SVP)o Emergency Caseo Twice-Failedo Direct Contractingo Repeat Order
COMPETITIVE BIDDING
Obligation Requests Purchase Requests BAC Resolution for mode of procurement duly approved by
LCE For Procurement of more than 2M – Minutes of Pre-
Procurement Conference
For procurement of more than 1M – Minutes of Pre-Bid Conference
Invitation to Bid – Philgeps Posting or Newspaper Publication Bidder’s Technical Documents – esp. Bidder’s Bond Bidder’s Financial Proposal Minutes of Bid Opening
Abstract of Bids BAC Certification for Results of Eligibility Screening Post Qualification Report Bid Evaluation Report BAC Resolution Declaring Winning Bidder – duly approved
by LCE Notice of Award
Notice to Proceed – indicating receipt by the supplier Performance Security – before signing the Purchase Order
(supplier)oCash Bond – 5% of contract priceoBank Guarantee – 5 % of contract priceoSurety Bond – 30% of contract price
Print-out copy of posting of Notice of Award, Notice to Proceed and Contract of Award in the Philgeps
Warranty Security against manufacturing defects (patent and latent defects) – 10 % of total contract priceoBank GuaranteeoAuthorization to deduct retention
NOTE : WARRANTY SECURITY
Minimum period of three (3) months, in the case of expendable supplies, or a minimum of one (1) year in the case of non-expendable supplies, AFTER ACCEPTANCE by the procuring entity of the delivered supplies
Acceptance & Inspection Report- Date received must be the actual date when goods where received
Charge Invoices For PPEo Property Issuance Slipo Property Acknowledgment Receipt
For Inventorieso Property Issuance Slipo Inventory Custodian Slip
For Supplieso Utilization Report
Evidence of Invitation of three (3) observers in all stages of the procurement process pursuant to section 13.1 of the Revised IRR of R.A. # 9184
ALTERNATIVE MODES Shopping, SVP, Repeat Order, Twice-Failed Bidding, Emergency Case
o Purchase Requestso Purchase Orderso BAC Resolution for mode of Procuremento Canvass – at least 3 eligible supplierso Abstract of Canvasso BAC Resolution recommending award of contract duly approved by
LCE
oStatement of prospective bidder that it is not blacklisted or barred from bidding by the Gov’t or any of its agencies, offices, corporations or LGU’s – refer to BAC Secretariat for format
oSworn Affidavit of the Bidder that it is not related to the Head of Procuring Entity (HOPE) by consanguinity or affinity up to the third civil degree – refer to BAC Secretariat for format
TWICE FAILEDBIDDINGS
Additional RequirementsoCertification of BAC on the failure of
competitive bidding for the second timeoPerformance SecurityoWarranty Security
DIRECT CONTRACTING Justification for the necessity of the procurement that can only be done
through Direct Contracting BAC Resolution duly approved by LCE for Mode of Procurement BAC Resolution which states that:
o Study/survey has been done to determine that there are no sub-dealers selling at lower prices and for which no suitable substitute can be obtained at more advantageous terms to the gov’t
oResult of BAC survey (confirmation of exclusivity)o Copy of letter to selected supplier to submit a price quotation
and conditions of saleo Certificate of Exclusive Distributorship issued by the principal
under oath and authenticated by the embassy/consulate nearest the place of the principal, in case of foreign suppliers
REPEAT ORDER
Copy of the Original Contract used as basis for repeat order indicating that the original contract was awarded through public bidding
Certification from the Purchasing Department/Office that the supplier has complied with all the requirements under the original contract
Performance Security Warranty Security
CONDITIONS FOR REPEAT ORDER Unit prices must be the same or lower than those in the original
contract, provided such prices are still the most advantageous to the gov’t after price verification
The repeat order will not result in splitting of contracts, requisitions, or purchase orders, as provided for in Sec. 54.1 of the Revised IRR of R.A. 9184
Except in cases duly approved by the GPPB, availed only within six (6) months from the contract effectivity date stated in the Notice to Proceed arising from the original contract, and
Repeat order shall not exceed 25 % of the quantity of each item in the original contract
ADDITIONAL REQUIREMENTS FOR PARTICULAR PROCUREMENT
VehiclesoBrochures – technical specificationsoGSIS Insurance PolicyoLTO OR and Certificate of Registration
Repair and maintenance of vehicles
oLatest/updated Vehicle Ledger – history of repairoPre-repair evaluation report and approved detailed
plans by the agency showing in sufficient detail the scope of work/extent of repair to be done
oWaste Materials ReportoPost Repair InspectionoCertificate of Acceptance
DRUGS & MEDICINES Certificate of Product Registration from FDA Certificate of Good Manufacturing Practice from FDA Batch Release Certificate from FDA List of Expiry dates duly signed by GSO Inspector and CHO
Pharmacist License to Operate
MEALS Representation Expense - meetingsoAgendaoMinutes of the MeetingoAttendance Sheets – duly certified correct
Training ExpenseoProgram DesignoAttendance Sheets
Number of participants and menu – indicated in the purchase request and canvass
Note: per LFC Res # 006-10 Series of 2010 Maximum amount allowed per participant/employee Meals (lunch, dinner) – P 250.00 Snacks – P 75.00
LUGAW Schedule of Pakaon Billing Statement/Invoice Delivery Receipts Acknowledgment from the Brgy.
Captain that lugaw was served in their area
UNIFORMS/SHIRTS
Sample Cloth Uniform/Shirt Design Program Design Distribution List – duly signed by recipients and
certified correct by Dept. Head/Administrative Officer
PUBLICATION/ADVERTISING Affidavit of Publication Copy of Published Issue Bill/Statement of Account CD in case of TV/Radio Commercial
RENTAL CONTRACTS – PRIVATELY OWNED OFFICE/BUILDING Complete copy of the building floor plans indicating in shaded
colors the rentable space Copy of Certificate of Occupancy of the building or appropriate
approved documents showing the date the building was constructed or age of the building
Complete description of the building as to type, kind and class, including its component parts and equipment facilities such as, but not limited to, parking areas, elevators, air-conditioning systems, firefighting equipments, etc.
Copy of the Master of Deed Declaration
List of prevailing comparable property within the vicinity
Vicinity Map Request for payment Bill/Invoices
RENTAL CONTRACTS - EQUIPMENT Agency evaluation of equipment utilization Pertinent data of area of operation Daily Equipment Utilization Report Pictures of the Activity/Project Billing Statment
Certificate of Completion (if project was implemented in the Brgy – it should be signed by the Brgy. Captain)
Accomplishment Report List of vehicles/equipment rented
GASOLINE
OBR, P.R., P.O. – same period as the bills/invoices GASTA Statement of Accounts Summary List of Gasoline Consumption note: P.O. must be applicable only for the quarter
canvassed/bidded
GARBAGE COLLECTION & DISPOSAL Complete description/specifications (brand name, model,
make/country of origin, hp, piston displacement, capacity) and number of units of dump trucks to be used
Complete descriptions/specifications (age condition, brand, etc) and number of units of all other equipments to be used
Appropriate approved documents containing the terms and conditions, whether operated or bare rental for heavy equipment, whether per trip or package deal; and other relevant condition
The designated dumpsite/location Measurement in kilometers of the total distance covered by one
(1) complete route for all the required routes to be travelled
Estimated volume in cubic meters of garbage to be hauled from area of operation, including the basis for such estimates
Accomplishment Report Request for payment Contractor’s Bill Certificate of Acceptance Record of Attendance/Service
HaulingTrips Summary Summary of Garbage Collection
Accomplishment Delivery Receipts of Hauling
Accomplishments Delivery Receipts Price Range of Hauling Services
JEEP RENTAL (LUGAW) Delivery Receipts Statements of Accounts Schedule of Pakaon Acknowledgment by the Brgy. Captain
that lugaw was served in their area Summary of Delivery – indicate place
and plate number
WITHDRAWAL Bidder’s bond
Original Official ReceiptIf winning bidder
Signed Purchase Order Performance Bond
If losing bidder Waiver from supplier to request for
reconsideration BAC Certification (losing bidder)
PERFORMANCE BOND
Performance BondOriginal Official ReceiptCertificate of Acceptace/Cert. Photocopy
of Acceptance & Inspection Report
RETENTION MONEY Photocopy of paid voucher or indicate
ADV Number/Check Number Certification that supplies were fully
utilized/consumed and found free from patent and latent defects / post completion reports & inspection report by CEO that construction has no defects – Infra Projects.
INFRASTRUCTURE(1ST AND FINAL BILLING) Pictures of the Project Obr – original copy Letter to COA – 100% completed Statement of Work Accomplished and Time
Elapsed Materials Inspection Report Bar Graph Schedule and S-Curve Project Accomplishment Statement
Post Completion Report Form 171 – Project Inspection Report Infrastructure Contract Contractor’s Affidavit Notice of Award Notice to Proceed Letter request from supplier for inspection and
billing Post Qualification Report Bid Evaluation Report Invitation to Bid Abstract of Bids
Revised Program of Works Performance Bond Bidder’s Bond BAC Resolution to Award BAC Certificate of Eligibility Sketch Plan Bid Proposal/Detailed Estimates Change Order/Itemized Revision (if any) Letter Request of Change Order (if needed)
Suspension order/Resume Order (if needed) Computation of Liquidated Damages (if
delayed) Certificate of Appropriation (from CBO)
Note: Retention – if less than 50% accomplished = 10% based on amount of the accomplished portion
If more than 50%accomplished = 5% of the total contract price
REIMBURSEMENT
1. OBR
2. PURCHASE REQUEST
3. PURCHASE ORDER
4. BAC RESOLUTION AS TO MODE OF PROCUREMENT
5. CANVASS OF PRICES
6. ABSTRACT OF BIDS/CANVASS
7. UTILIZATION REPORT
8. ACCEPTANCE & INSPECTION REPORT
9. REPORT OF DISBURSEMENT
10. OFFICIAL RECEIPTS/ CASH INVOICES
ADDITIONAL REQUIREMENTSMEALS
1. AGENDA/ MINUTES/ PROGRAM DESIGN
2. ATTENDANCE
SPORTING GOODS
3. PROGRAM DESIGN
4. REQUEST/ SOLICITATION
5. ACKNOWLEDGEMENT RECEIPT
6. DISTRIBUTION LIST
T-SHIRTS
1. PROGRAM DESIGN
2. DISTRIBUTION LIST
3. ILLUSTRATION
4. SAMPLE OF CLOTH
SUPPLIES
5. REPORT OF UTILIZATION
SEMI- EXPENDABLE SUPPLIES & MATERIALS
1. PROPERTY ISSUANCE SLIP
2. INVENTORY CUSTODIAN SLIP
SPARE PARTS, NEWSPAPERS
3. WASTE MATERIALS REPORT