20
ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE ~ ~ I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230 DOC.DATE: 90/06/13 NOTARIZED: NO FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe AUTH. NAME AUTHOR AFFILIATION THOMAS,K.B. Niagara Mohawk Power Corp. WILLIS,J.L. Niagara Mohawk Power Corp. RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000220 SUBJECT: LER 88-012-01:on 880418,failure to hydrostatically test portion of ASME Class 1 pressure boundary. W/9 DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), nciden Rpt, etc. NOTES RECIPIENT ID CODE/NAME PD1-1 LA MARTIN,R. INTERNAL: ACNW AEOD/DOA AEOD/ROAB/DSP NRR/DET/ECMB 9H NRR/DLPQ/LHFB11 NRR/DOEA/OEAB11 NRR/DST/SELB 8D NRR~DS /+ REGS E 02 RGN1 FILE 61 EXTERNAL: EGGG STUART,V.A LPDR NSIC MAYS,G NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 2 2 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 4 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-1 PD ACRS AEOD/DSP/TPAB DEDRO NRR/DET/EMEB9H3 NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICB 7E NRR/DST/SRXB 8E RES/DSIR/EIB L ST LOBBY WARD NRC PDR NSIC MURPHY,G.A COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 /I 0 .pg,g(7 D NOTE TO ALL "RIDS" RECIPIENTS: PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl - D FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR .36 ENCL 36 p 6

ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE~ ~

I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)I

ACCESSION NBR:9006220230 DOC.DATE: 90/06/13 NOTARIZED: NOFACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe

AUTH.NAME AUTHOR AFFILIATIONTHOMAS,K.B. Niagara Mohawk Power Corp.WILLIS,J.L. Niagara Mohawk Power Corp.

RECIP.NAME RECIPIENT AFFILIATION

DOCKET05000220

SUBJECT: LER 88-012-01:on 880418,failure to hydrostatically testportion of ASME Class 1 pressure boundary.

W/9

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:TITLE: 50.73/50.9 Licensee Event Report (LER), nciden Rpt, etc.NOTES

RECIPIENTID CODE/NAME

PD1-1 LAMARTIN,R.

INTERNAL: ACNWAEOD/DOAAEOD/ROAB/DSPNRR/DET/ECMB 9HNRR/DLPQ/LHFB11NRR/DOEA/OEAB11NRR/DST/SELB 8DNRR~DS /+REGS E 02RGN1 FILE 61

EXTERNAL: EGGG STUART,V.ALPDRNSIC MAYS,GNUDOCS FULL TXT

COPIESLTTR ENCL

1 11 1

2 21 12 21 11 11 11 11 11 11 1

4 41 11 11 1

RECIPIENTID CODE/NAME

PD1-1 PD

ACRSAEOD/DSP/TPABDEDRONRR/DET/EMEB9H3NRR/DLPQ/LPEB10NRR/DREP/PRPB11NRR/DST/SICB 7ENRR/DST/SRXB 8ERES/DSIR/EIB

L ST LOBBY WARDNRC PDRNSIC MURPHY,G.A

COPIESLTTR ENCL

1 1

2 21 11 11 11 12 21 11 11 1

/I 0 .pg,g(7 D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEEDl

- D

FULL TEXT CONVERSION REQUIREDTOTAL NUMBER OF COPIES REQUIRED: LTTR .36 ENCL 36

p6

Page 2: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

C

Page 3: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

T NIAGARAV INQHANK

NINE MILEPOINT NUCLEARSTATION/P.O. BOX 32, LYCOMING,N.Y. 13093/TELEPHONE (315) 343-2110

NMP67537

June i3 , 1990

United States Nuclear Regulatory CommissionDocument Control DeskWashington, DC 20555

RE: Docket No. 50-220LER 88-12 Supplement 1

Gentlemen:

In accordance with 10 CFR 50.73, we hereby submit the followingLicensee 'Event Report:

LER 88-12Supplement 1

Which is being submitted in accordance with10 CFR 50.73 (a)(2)(i)(B), "Any operation orcondition prohibited by the plant's TechnicalSpecifications;"

This Supplement is a general rewrite of the original LER 88-12.It has.incorporated Niagara Mohawk's Inservice Testing Department'sreview of the Nine Mile Point Unit 1 first ten year InserviceInspection (ISI) Interval hydrostatic testing program.

This report was completed in the format designated in NUREG-1022,Supplement 2, dated September 1985.

Very truly yours,

J. L. WillisGeneral SuperintendentNuclear Generation

JLW/GB/lmc

ATTACHMENT

cc: Thomas T. Martin, Regional AdministratorW. A. Cook, 5r. Resident Inspector

9006220230 050po2200 90O6a=-

PD~ PDOCK PDCS

(gledj)P )pIp

/ipse

Page 4: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

4

Page 5: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

NRC FORM 366>(669)

V.S. NUCLEAR REGULATORY COMMISSION

LICENSEE EVENT REPORT ILER)

APPROVED OMB NO. 31504H04EXPIRES: 4I30I92

ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THISINFORMATION COLLECTION AEQUESTt 50.0 HRS. FORWARDCOMMENTS REGARDING BVADEN ESTIMATETO THE RECORDSAND REPORTS MANAGEMENTBRANCH (P630), U.S. NUCLEARAEGULATOAYCOMMISSION, WASHINGTON, DC 20555, ANO TOTHE PAPERWORK REDUCTION PROJECT (31500104). OFF ICEOF MANAGEMENTANO BUDGET, WASHINGTON,DC 20503.

FACILITYNAME (1) DOCKET NUMBER (2) PA E

Nine Nile Point Unit 1 o 5 o o o 22 1OF 08»T«i~I as ure to ydrostatsca y est a Por tion of the ASME Class 1 Pressure Boundary

Due to Procedural ErrorEVENT DATE (6) LER NUMBER (6I AEPORT DATE (7) OTHER FACILITIES INVOLVED (SI

MONTH OAY YEAR YEAR WF)SEQUENTIAL 6th 88VISION

NUM86R 5:r NUM88R MONTH DAY YEAR

N/AFACILITYNAMES DOCKET NVMBERISI

0 5 0 0 0

0 4 18 888 0 1 2 0 1 0 6 1 3 9 0 N/A 0 5 0 0 0

OPERATINGMODE (9)

POWERLEVEL p p p

c ccv

20.402(bl

20.405(a) (I I Ii)

20.405(a I (1 I (iiI

20405(sl(1) (iii)

20.405(s I (1)(ix)

20.405(e I (1) (r)

20405(cl

50.36(c) (1)

50.36(c) (2)

50.73(e I (2) (I)

50.73(a) (2)(8)

50.73(e)(2) (iiil

LICENSEE CONTACT FOR THIS LER (12)

50,73(s I l2 I lix)

50 73(al(2)(r)

50.73(a I (2) (r i))

50.73(a) (2) (riiil(AI

50.73(sl (2) lriiiI(6 I

50.73 (e I(2)(xI

0 THE RLQUIREMENTS OF 10 CFR (It ICaeck one or more ol ths Iollowino) (1'llTHI6 REPORT IS SUBMITTED PURSUANT T

73.71(8)

73.71(c)

OTHER ISpeclfy In ASttrsctOalorr and In Text, HRC Form3664)

NAME

AAEA CODE

TELEPHONE NUMBER

Kenneth B. Thomas, Inservice Ins ection Su erintendent Unit 1 3 1 5 3 4 9 - 7 2 7COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

CAUSE SYSTEM COMPONENT MANUFAC.TUAER

C. cr'vgEPORTABLE:6TO NPAOS

W((' 78

'::INNER

CAUSE SYSTEM COMPONENT MANVFACTURER

jul "EPORTABLETO NPRDS

.C

SUPPLEMENTAL REPORT EXPECTED (14)

YEs Illyet, complete ExpEcTED stJBsclssIDII DAFEI NO

ABSTRACT ILlmlt to lc00 tprcet, Ie.. approximately lllmen tlnpla.apace typsrrritten lineal (16)

ABSTRACT

EXPECTEDSUBMISSION

DATE (16)

MONTH DAY YEAR

On April 18, 1988, while Nine Mile Point Unit 1 (NMP1) was in cold shutdownfor refueling, it was discovered that several portions of the ASME SectionXI Class 1 Pressure Boundary had not been hydrostatically tested in 1986.ASME Section XI requires a hydrostatic test of the pressure boundary forClass 1, 2, and 3 piping and equipment at or near the end of each InserviceInspection (ISI) Interval. The first ten year ZSI Interval was to becompleted in 1986. Failure to complete testing in accordance with ASMESection XI constitutes a violation of plant Technical Specification 3.2.6.

The root causes of this event have been determined to be managementineffectiveness in implementing the ISI Program Plan, and inadequate reviewof the hydrostatic test procedures. Contributing factors weremisinterpretation of ASME Section XI requirements, an overly aggressiveschedule, inadequate control of measuring and testing equipment, andproviding insufficient resources for tracking ASME Section XI requirements.

Corrective actions include: conducting a review of the first ten year ISIInterval hydrostatic test procedures and test perfor'mance data to assurethat ASME Section XI requirements were met; completing first ten year ISIInterval hydrostatic test; submitting Relief Requests where required;completing ASME Section XI training, and issuing a Lessons LearnedTransmittal to address root causes and contributing factors.

NRC Form 366 (669)

Page 6: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230
Page 7: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

NRC FORM 366A(669)

US. NUCLEAR REGULATORY COMMISSION

LICENSEE EVEREPORT (LERITEXT CONTINUATION

APPROVED OMB NO. 31500104EXP IR ESI r/30/92

TED BURDEN PER RESPONSE TO COMPLY.WTH THISI ATION COLLECTION REQUEST: 50J) HRS. FORWARDCO ENTS REGARDING BURDEN ESTIMATETO THE RECORDSAND REPORTS MANAGEMENTBRANCH (PJ)30), U.S. NUCLEARREGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO1HE PAPERWORK REDUCTION PROJECT (31504)Or), OFFICEOF MANAGEMENTAND BUDGET, WASHINGTON,OC 20503..

FACILITYNAME (1) DOCKET NUMBER (1) LER NUMBER (6)

YEAR ~g SEQUENTIAL giB REVSIONPP,5 NUMBER ~NO NUM ER

PAGE (3)

Nine Nile Point Unit 1

TEXT ///IIRvs EPEES /r IrfIdRN/, Urr rddlo'oIM/NRC FonII 3664'r/ ()7)

o s o o o 88 —0 12 0 1 0 2 oF

DESCRIPTION OF EVENT

On April 18, 1988, during the development of a procedure for ASMESection XI Class 1 System Leakage Testing, it was noted that a portionof the ASME Section XI Class 1 boundary was not incorporated into thehydrostatic test performed for the first ten year Inservice Inspection(ISI) Interval. 'ine Mile Point 1 (NMP1) was in a cold shutdowncondition for a refueling outage with the core off-loaded when thisevent was discovered.

ASME Section XI paragraph IWB-5210 requires a hydrostatic test of thepressure retaining boundary for all ASME Section XI Class 1 piping andequipment at or near the end of each ISI Interval. NMP1 was tocomplete the first ten year ISI Interval in 1986. Failure to performhydrostatic testing in accordance with ASME Section XI constitutes aviolation of plant Technical Specification (T.S.) Section 3.2.6.

Hydrostatic Test Procedure Nl-ISI-HYD-01, "Reactor Pressure Vessel andAll ASME Class I Systems and Reactor Vessel Instrumentation Class 2HFRevision 0, was being utilized to perform hydrostatic testing inaccordance with ASME Section XI, paragraph IWB-5210. The intent ofthis procedure was to incorporate all ASME Section XI Class 1 systemswithin the test boundary. However, the valve line-up described in theprocedure required that the manual blocking valves upstream of theElectromatic Relief Valves (EMRVs) be closed. This resulted inexcluding from the test boundary, one weld, the manual blocking valve,and associated pressure retaining components for each of the EMRVs.

There are six EMRVs located on the two main steam lines (three on eachline) within the primary containment. Each EMRV bolts to a flangewhich is welded to the manual blocking valve. The manual blockingvalves are connected to the main steam lines via welded attachments.

This condition was discovered by Nuclear Energy Services, Inc. (NES)'nApril 18, 1988. NES was contracted by Niagara Mohawk Power

Corporation to support implementation of both the first ten year ISIInterval program and the current ISI Interval program. Procedure Nl-ISI-HYD-01, Revision 0, was written in May of 1986 during the refuelingoutage by E.N. Consulting, Inc., who was subcontracted by NES. Theprocedure was based upon a Reactor Pressure Vessel Hydrostatic TestProcedure written by Stone & Webster Engineering Corporation (NMP1Construction Architect/ Engineer) in January 1968, which also requiredthe manual blocking valves to be closed. Hydrostatic Test ProcedureNl-ISI-HYD-01, Revision 0, was reviewed and approved on May 25, 1986,iq, accordance with Site Administrative Procedures, and performed onJune 3 and 4, 1986.

NRC Form 366A (BJ)9)

Page 8: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230
Page 9: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

NRC FORM 366A(669)

U.S. NUCLEAR REGULATORY COMMISSION

LICENSEE EV REPORT ILER)TEXT CONTINUATION

APPROVEO 0MB NO. 31600104EXPIRES: 4/30/92

ATEO BURDEN PER RESPONSE TO COMPLY WTH THISAMATION COLLECTION REQUEST: 60.0 HRS. FORWARD

COMMENTS REGARDING BURDEN ESTIMATE TO THE AECOADSAND AEPOATS MANAGEMENTBRANCH (P4)30), U.S. NUCLEARREGULATORY COMMISSION, WASHINGTON, DC 20566, AND TOTHE PAPERWORK REDUCTION PROJECT (3)504)104), OFF ICEOF MANAGEMENTAND BUDGET, WASHINGTON,DC 20503. ~

FACILITYNAME (() DOCKET NUMBER (2)

YEAR

LER NUMBER (6)

SEOUENTIALNUMBER

REVISIONNUMBER

PAGE (3)

Nine Mi1e Point Unit 1

TEXT llfmoru r/»ce /r rrqukrd, u» rddrbbnr/NRC Frnn 36543/ (17)

o s o o o 2 208 8 012 1 3oF0 8

Revision 0 of the hydrostatic test procedure, written by .Stone andWebster Engineering Corporation in January 1968, is the originalconstruction test procedure. Revision 1 of this procedure, datedOctober 1968 and performed in November 1968, opened the manual blockingvalves and hydrostatically tested the EMRVs as part of ASME Section XIClass 1 at a pressure of 1800 pounds per square inch gauge.

Additionally, a review of the first ten year ISI Interval (1986)Hydrostatic Test. procedures and test, performance data was conducted toprovide assurance that the ASME Section XI requirements were met. Thereview identified discrepancies in 23 hydrostatic test procedures (i.e.various systems whose pipe and/or equipment should have beenpressurized and ASME Section XI, VT-2 examined but were not, orsections of pipe and/or equipment which were tested at lower pressurethan that required by ASME Section XI). Requests for relief from theASME Section XI requirements had not been submitted to the Commissionfor any of the above discrepancies.

CAUSE OF EVENT

The root cause of this event was originally determined to be personnelerror. However, as a result of the additional 23 test discrepanciesidentified, the root cause was re-evaluated and has been determined tobe:

A. Management ineffectiveness in implementing the ISI Program Planand;

B. Inadequate review of procedures used in hydrostatic testing.Other factors which contributed to the pressure testing errors are:

Misinterpretation of ASME Section XI requirementswhich'eadto the omission of portions of piping and equipment

from the hydrostatic test procedures;

Lack of NMP1 Controlled ASME Section XI Boundary Diagrams;

An overly aggressive schedule;I

Inadequate control of measuring and testing equipment and;

Providing insufficient resources for tracking ASME SectionXI requirements.

The misinterpretation of ASME Section XI requirements by both theauthor of the hydrostatic test procedure (N1-ISI-HYD-01) and procedurereview personnel was determined to be a result of an ineffective and

NRC Foun 366A (669)

Page 10: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230
Page 11: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

NRC FORM 366A(64)9)

US. NUCLEAR REGULATORY COMMISSION

LICENSEE EV REPORT (LER)TEXT CONTINUATION

APPROYEO OMB NO. 31504))04EXPIRES: 4/30/92

TED BURDEN PER RESPONSE TO COMPLY WTH THISI~MATIONCOLLECTION REQUEST: 504 HRS. FORWARDCOMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDSAND REPORTS MANAGEMENTBRANCH (P4)30). U.S. NUCLEARREGULATORY COMMISSION, WASHINGTON, DC 20555, ANDTOTHE PAPERWORK REDUCTION PROJECT (31504104). OFFICEOF MANAGEMENTANO BUDGET,WASHINGTON,OC 20503. ~

FACILITYNAME ('ll DOCKET NUMBER (2) LER NUMBER (6)

seoUSNTIAL 2/??INUMeeR 'PA?r

REVISIONNUMeeR

PAGE (3)

Nine Mile Point Unit 1

TEXT ///mom 4/Mce /4 meeker, ooo 4I/duodenal NRC fcmI 3564'4/ (ITl

o s o o o 220 88 0 1 2—01 04 OF 0 8

inadeuqately trained staff knowledgeable of ASME code requirements.The hydrostatic test procedures received the level of review prescribedby Site Administrative Procedures, however, the procedure reviewersfailed to recognize the impact of procedurally excluding the relevantpiping or equipment from the test boundary. Relief Requests to excludethe relevant piping or equipment from hydrostatic testing were neithersubmitted nor granted.

ANALYSIS OF EVENT

An Occurrence Report (OR No. 88-368) was initiated on April 22, 1988,and was preliminarily determined to be not reportable. During secondlevel review by the Station Technical Staff, the determination ofreportability was questioned. After further review by Technical Staff,Operations, Engineering and Maintenance, the event was determined tobe reportable on April 29, 1988, in accordance with 10 CFR 50.36(c)(2),"Limiting Conditions for Operation". This event was also consideredreportable in accordance with 10 CFR 50.73(a)(2)(i)(B), "Any operationor condition prohibited by the plant's Technical Specifications."At the time OR 88-368 was determined to be reportable, NMP1 stationmanagement directed Site Engineering ISI to perform a comprehensivereview of the first ten year ISI Interval hydrostatic test requirementsand test performance data. As a result of this review, additionalOccurrence Reports were generated. There were no adverse safetyconsequences associated with these events. The failure to perform thehydrostatic tests, in and by themselves, did not result in any failureof the piping and, therefore, did not affect the health and safety ofplant personnel or the general public.There were, however, potential adverse safety consequences associatedwith these events. Hydrostatic tests provide information on theintegrity of the piping and equipment to contain design pressures.

The'ailureto perform these tests increased the uncertainty of knowledgeas to the condition of the piping and equipment. In the worst case,the failure to perform the hydrostatic tests could have resulted in notidentifying an impending failure and then having this failure occur;however, leakage monitoring systems should detect any significantincreases in leakage.

CORRECTIVE ACTION

A. The Root Cause of management ineffectiveness is a generic issuewhich has been addressed in the NMP1 Restart Action Plan (RAP)and Nuclear Improvement Plan (NIP). The Site Engineering ISIDepartment has been reorganized and additional staff has beenadded to improve implementation of the IST program.

NRC Fo?m 366A (669)

Page 12: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

il

Page 13: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

NRC FORM 366A(649)

U.S. NUCLEAR REGULATORY COMMISSION

LICENSEE EV REPORT {LER)TEXT CONTINUATION

APPROVED OMB NO. 31504104EXPIRES: e/30/92

ATED BURDEN PER RESPONSE TO COMPLY WTH THISI ORMATION COLLECTION REQUEST: 508) HRS. FORWARDCOMMENTS REGARDING BURDEN ESTIMATETO THE RECORDSAND REPORTS MANAGEMENTBRANCH (P430), U.S. NUCLEARREGULATORY COMMISSION, WASHINGTON, DC 20555, AND TOO'HE PAPERWORK REDUCTION PROJECT (31504104), OFEICEOF MANAGEMENTAND BUDGET, WASHINGTON,DC 20503.

FACILITYNAME (1) DOCKET NUMBER (2)

YEAR

I.ER NUMBER (6)

SEQUENTIALNVM864

46VISIONNVM864

PAGE (3)

Nine Mile Point Unit 1

TEXT /ilmore «»ce /e r/II/trod, Iree edr/I)/or»/HRC %%dmr 36r/A9/ (IT)

o so oo220 8 8 0 1 2— 1 5 OF 0 8

B. A Lessons Learned Transmittal has been issued to departmentsinvolved in the production and review of ISI related HydrostaticTest procedures. It addresses the importance of selecting orassigning test procedure reviewers with technical expertisecommensurate with the testing being performed and providingadequate time for review. It also addresses the importance ofmaintaining accurate communication of the technical requirementsof performing hydrostatic testing in accordance with ASMESection XI.

C. The Operations and Site Engineering ISI Departments haveundergone additional classroom training which includes ASMESection XI.

D.

E.

F.

G.

NMP1 ASME Section XI Boundary Diagrams have been issued.

The Planning & Scheduling Department. was reorganized; an Outage,Manager .was appointed as well as an increase in staff.A Site Measure and Test Equipment (M&TE) Department has beenorganized including new procedures for control of M&TE, and SiteEngineering Department personnel have been trained on M&TEprocedures.

I

Procedure N1-88-7.7 (Restart requirements; Inservice PressureTesting Program) was developed to track and close out the ASMESection XI Pressure Test requirements for the first ten yearISI Xnterval. A Pressure Test Program Plan will be developedwhich will enhance the ISI Program. The second ten year ISIXnterval Program Plan is currently undergoing an extensivereview using personnel experienced in the area of ASME SectionXI. This review will ensure compliance to ASME Section XI andUnit 1 T.S. for the future.

The portions of plant systems which were excluded from the ASME SectionXI Class 1, 2 and 3 hydrostatic tests or that were tested at the wrongpressure in the 1986 outage will be tested as necessary prior tostartup from the current refueling outage. Relief requests have beensubmitted and granted for portion of systems that cannot be tested toASME Section XI requirements. Hydrostatic test procedures have beengenerated which will test the portions of the systems which wereomitted from the first ten year ISX Interval. Certain systems havebeen reclassified as non-safety related, or have been excluded from theISI Program based on Regulatory Guide 1.26; no pressure test isrequired for these systems.

NRC Form 366A (649

Page 14: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

J i

Page 15: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

NRC FORM 366A(64)9)

U.S NUCLEAR REGULATORY COMMISSION

LICENSEE EVE REPORT ILER)TEXT CONTINUATION

APPROVED OMB NO. 31500104EXPIRES: 4/30/92

TEO BURDEN PER RESPONSE TO COMPLY WTH THISIN MATION COLLECTION REQUEST: 50.0 HRS. FORWARDCOMMENTS REGARDING BURDEN ESTIMATE TO THE RECOAOSAND REPORTS MANAGEMENTBRANCH (P430), U.S. NUCLEARREGULATORY COMMISSION, WASHINGTON, OC 20555, ANDTOTHE PAPERWORK REDUCTION PROJECT (31500)04). OFFJCEOF MANAGEMENTAND BUDGET, WASHINGTON, DC 20503.

FACILITYNAME (1) DOCKET NUMBER (2)

YEAR

LEA NUMBER (6)

SSOUSNTIALNVMSSN

II6VIS IONNvMesrI

PAGE (3)

Nine Nile Point UnitTEXT ///more epeoe /4 netu/rerL u» 4 /R/ooe/ARC %%drm 36549/ (12)

o s o o o 2 8 8 0 2 01 06 OF 0 8

ADDITIONAL INFORMATION

A. Previous similar events:

There have been three previous events involving deficienciesidentified in the first ten year ISI Interval program. Details ofthese events are contained in LER 87-27, LER 88-01, and LER 88-01-S1. However, the conditions identified in those events did notinvolve deficiencies related to the hydrostatic testing program.Consequently, corrective actions from these previous events would nothave identified the conditions described in this LER.

B.

c ~

Failed component identification: none.

Identification of procedures referred to in this LER:

The 23 discrepancies found with the hydrostatic test procedures arecategorized as follows: 6 discrepancies required ASME ReliefRequests to be written, submitted and approved by the NRC; theremaining 17 discrepancies required original procedures to berewritten. Presently, 11 of these 17 test procedures have beensatisfactorily completed with no conditions adverse to quality found.The remaining 6 tests will be completed prior to plant startup.The status and identification of the 23 discrepancies is provided inTable 1. Table 2 provides a summary of the 6 issued Relief Requests.

**************************************************************** REASONS FOR RETEST LEGEND USED IN TABLE 1* ** 1. Incorrect hydrostatic test boundary (per ASME ** Sect. XI Boundary Drawings and NMPl ISI Program Plan ** 2. Hydrostatic test pressure lower than required by ASME ** Section XI ** 3. Measuring and Testing Equipment; gauges found out of ** cal ** 4. No procedure was written ** 5. Incorrect hold time ****************4***********************************************

NRC Form 366A (669)

Page 16: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230
Page 17: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

NRC FORM 368A(889)

UrL NUCLEAR REGULATORY COMMISSION

LICENSEE EV REPORT (LER)TEXT CONTINUATION

APPROVED OMB NO.31500106E XP I R E S: O/30/92

ATED BURDEN PEA RESPONSE TO COMPLY WTH THISMATION COLLECTION REOUEST: 60.0 HRS. FORWARD

COMMENTS REGARDING BUADEN ESTIMATE TO THE RECORDSAND REPOATS MANAGEMENTBRANCH (PJ)30), U.S. NUCLEARAEGULATORYCOMMISSION, WASHINGTON, DC 20555, ANDTOTHE PAPERWORK REDUCTION PROJECT (3150410E), OFFICEOF MANAGEMENTAND BUDGET, WASHINGTON, DC 20503. ~

FACILITYNAME (1) DOCKET NUMBER (2)

YEAR

LEA NUMBER (6)

SEQUENTIALNUMBER '.../ REVISION

NUMBER

PAGE (3)

Nine Nile Point Unit 1

TEXT /llII»ro g»co /r r/lr/rod, Irro odr//dor»/HRC /rorm 368AB/(12)

o s o o o 220 8 8 0 1 2—01 07 OF 0 8

TABLE 1

SYSTEMIEEE-805

SYSTEMPROCEDURE

NUMBERREASON FOR

RETEST

PERFORMED PROCEDURES

Reactor Core Spray (Class 1)Main Steam Line Which Encompassesthe Block Valves and EMRV'sReactor Liquid PoisonCondensate Demin. Return toFeedwater Booster PumpsCondensate DemineralizersSpent Fuel Pool Filtering andCoolingCondensate Storage, Transfer &Sealing WaterEmergency Service WaterReactor Containment SprayReactor Core SprayDrywell Sump

BG

SBBR

SDSF

DA

KABIBOBGWD

N1-ISI-HYD-402N1-ISI-HYD-407

13

* N1-ISI-HYD-410* Nl-ISI-HYD-411(A)

Nl-ISI-HYD-413

N1-ISI-HYD-414N1-ISI-HYD-421N1-ISI-HYD-423N1-ISI-HYD-424N1-ISI-HYD-425

11&2

223

* N1-ISI-HYD-401(A) F 1&2

HYDRO. TESTS PERFORMED ZN 1990 WITH SOME PORTIONS OMITTEDPortions to be tested before restart

Reactor Building & Waste Bldg.Closed Loop Cooling WaterControl Room/Admin. Bldg. HVACChill WaterReactor Vessel Hydro. Heatup

CC

KMSA

N1-ISI-HYD-420

N1-ISI-HYD-428N1-ISI-PMT-503

~ 45

S stems listed below have been determined to be NON-ASME for InserviceIns ection and will be removed from the Second ten ear ISI IntervalPro ram Plan. No pressure test required.CRD HydraulicFeedwater Low & High PressurePrimary Cont. Inert Gas Purge &Fill

AASJ

BB

N1-ISI-HYD-404N1-ISI-HYD-405

N1-ISI-HYD-427 1&2

* Delineates procedures are «One Time Use Only66

NRC Form 368A (889)

Page 18: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

>k~

Page 19: ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE · 2017-06-30 · ACCELERATED DISTPJBUTION DEMONSTPWTION SYNE I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I ACCESSION NBR:9006220230

NRC FORM 366A(6 69)

US. NUCLEAR REGULATORY COMMISSION

LICENSEE EV REPORT ILER)TEXT CONTINUATION

APPROVED 0MB NO. 31500104EXPIRES: 4/30/92

ATED BURDEN PER RESPONSE TO COMPLY WTH THISMATION COLLECTION REOUEST: 60l) HRS, FORWARD

COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDSAND REPORTS MANAGEMENTBRANCH (P4)30), U.S. NUCLEARREGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO1HE PAPERWORK REDUCTION PROJECT (31500104). OFFICEOF MANAGEMENTANO BUDGET, WASHINGTON,DC 20503. ~

FACILITYNAME (1) DOCKET NUMBER (2) LER NUMBER (6) PAGE (31

Nine Mile Point Unit 1

TEXT ///mom 4/Moo lE reEM)a/, o4o SI/I/R/ono/HRC %%dmI 36643/ ()7)

YEAR

p p p p p 2 2 0 8 8

61 SEOVENZIALm'.: NUMBER

012REVEIIONNVMSER

0 10 8 OF 0 8

TABLE 2

RELIEF RE UESTS WRITTEN

Control Rod DriveReactor RecirculationNitrogen PurgeControl Rod.DriveReactor Core SprayContainment Spray

Insert and Withdraw Lines1" Instrument LinesRupture DisksBearing 6 Gear Oil CoolersPump and Motor CoolersPump and Motor Coolers

RRg 16RR420RR42 1RR524RRg 25RRg27

ApprovedApprovedApprovedApprovedApprovedApproved

NOTE: Relief Request 421 6 f24 will be withdrawnreclassification of the systems

due to the

NRC FonII 366A (669)