18

acc round rock presentation_v2 print

Embed Size (px)

Citation preview

Page 1: acc round rock presentation_v2 print
Page 2: acc round rock presentation_v2 print

42Doing Education Architecture

YEARSAUSTINΔ

Page 3: acc round rock presentation_v2 print
Page 4: acc round rock presentation_v2 print

100sAWARDWINNINGEDUCATIONPROJECTS

FROMThe

Worldaround

of

Page 5: acc round rock presentation_v2 print
Page 6: acc round rock presentation_v2 print

SUSTAINABILITYGO

LD&SILVER

PLATINUMAWARDS

Page 7: acc round rock presentation_v2 print

Silver

Silver

Platinum

Platinum

Page 8: acc round rock presentation_v2 print

DIVERsity

h

Page 9: acc round rock presentation_v2 print

sity

h

AtkinsArcitechure/Engineer

Jose GeraM&E Engineers*Minority owned

ColemanLandscape*Women owned

CombsiT Security & Audio/Visual*Women owned

Laura brittInterior Design*Women owned

ASIAN BLACK HISPANIC WHITE COMMUNITY COLLEGE PARTICIPATION

SLBE/ESLBE(WORKSHARE)

9% 4% 15% 72%

8% 0% 28% 64%

0% 8% 16% 76%

22% 0% 0% 78%

0% 0% 0% 100%

55% 72%

27%-40%

1.5%

1.5%

2.0%

66%

25%

62%

100%

women men

45% 55%

80%

33%

85%

0%

20%

67%

15%

100%

Page 10: acc round rock presentation_v2 print

spacesTEACHING

FORMAL

wayfindinginformal (m

eetin

g spa

ces)

&

Page 11: acc round rock presentation_v2 print
Page 12: acc round rock presentation_v2 print

STAKEHOLDER ENGAGEMENTLISTENwe

Page 13: acc round rock presentation_v2 print

1. Listen to the client’s views & thoughts

7. Start overgo around again & againuntil all voices are heard

2. Lookwho would betouched by the project

6. Playbackgo around again to give feedback &show responses

3. Planhow to talk with all possible interested parties

5 Guidecollect, distill, assess,incorporate all views

4. Meetengage, listen, respond, probe, testPerhaps the stakeholder list expands

PLA

YBA

CKST

ART OVER LISTENLO

OK

PLAN

MEETG

UIDE

Page 14: acc round rock presentation_v2 print

scopeschedule

budgetΑ

Page 15: acc round rock presentation_v2 print

Dale to provide information

Page 16: acc round rock presentation_v2 print
Page 17: acc round rock presentation_v2 print

8102710261025102

Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1JA SO ND JF MA MJ JA SO ND JF MA MJ JA SO ND JF M

Kick Off Meeting

Info Gathering

As built drawings, survey, geotechnical, central plant, program, fi eld work

Validation Master plan, program, utili-ties, central plant, code

Site Schematic DesignD esign charrette

Design package

Quality control (QC)

Cost validation

Review/approval

Design DevelopmentD esign package

QC, cost validation, review/approval (stakeholder)

Construction DocumentsD esign package

QC, cost validation, review/approval (stakeholder)

Construction Administration

Structural Foundation Schematic DesignD esign charrette

Design packageQC, cost validation, review/approval (stakeholder)

Design DevelopmentD esign PackageQC, cost validation, review/approval (stakeholder)

Construction DocumentsD esign package

QC, cost validation, review/approval (stakeholder)

Construction Administration

BuildingS chematic DesignD esign charrette

Design packageQC, cost validation, review/approval (stakeholder)

Design DevelopmentD esign packageQC, cost validation, review/approval (stakeholder)

Construction Documents 35% documents

QC, cost validation, review/approval stakeholder)

stnemucod %56)RAMC( PMGQC, cost validation, review/approval (stakeholder)Final documents

Cost validation

QCReview/approval (stakeholder)Permitting

Construction administration

Substantial Completion

Owner Move InOpen for Spring Semester