4
ACC 206 Week 4 Assignment Chapter Six and Seven Problems http://www.homeworkwarehouse.com/downloads/acc-206-week-4- assignment-chapter-six-and-seven-problems/ ACC 206 Week 4 Assignment Chapter Six and Seven Problems Please complete the following 8 exercises below in either Excel or a word document (but must be single document). You must show your work where appropriate (leaving the calculations within Excel cells is acceptable). Save the document, and submit it in the appropriate week using the Assignment Submission button. Chapter 6 Exercise 2 2. Schedule of cash collections Sugarland Company sells a single product and anticipates opening a new facility in Charlotte on May 1 of the current year. Expected sales during the first three months of activity are: May, $60,000; June, $80,000; and July, $85,000. Thirty percent of all sales are for cash; the remaining 70% are on account. Credit sales have the following collection pattern: Chapter 6 Exercise 4 4. Production and cash-outlay computations RPR, Inc., anticipates that 120,000 units of product K will be sold during May. Each unit of product K requires four units of raw material A. Actual inventories as of May 1 and budgeted inventories as of May 31 follow. Chapter 6 Exercise 5 5. Abbreviated cash budget; financing emphasis An abbreviated cash budget for Big Chuck Enterprises follows. Chapter 6 Problem 3 3. Comprehensive budgeting The balance sheet of Watson Company as of December 31, 20X1, follows. Chapter 7 Exercise 3 3. Variances for direct materials and direct labor

ACC 206 Week 4 Assignment Chapter Six and Seven Problems

  • Upload
    damin

  • View
    4

  • Download
    0

Embed Size (px)

DESCRIPTION

ACC 206 Week 4 Assignment Chapter Six and Seven Problems

Citation preview

  • ACC 206 Week 4 Assignment Chapter Six and Seven Problems

    http://www.homeworkwarehouse.com/downloads/acc-206-week-4-assignment-chapter-six-and-seven-problems/

    ACC 206 Week 4 Assignment Chapter Six and Seven Problems

    Please complete the following 8 exercises below in either Excel or a word document (but must be single document). You must show your work where appropriate (leaving the calculations within Excel cells is acceptable). Save the document, and submit it in the appropriate week using the Assignment Submission button.

    Chapter 6 Exercise 2

    2. Schedule of cash collectionsSugarland Company sells a single product and anticipates opening a new facility in Charlotte on May 1 of the current year. Expected sales during the first three months of activity are: May, $60,000; June, $80,000; and July, $85,000. Thirty percent of all sales are for cash; the remaining 70% are on account. Credit sales have the following collection pattern:

    Chapter 6 Exercise 4

    4. Production and cash-outlay computations

    RPR, Inc., anticipates that 120,000 units of product K will be sold during May. Each unit of product K requires four units of raw material A. Actual inventories as of May 1 and budgeted inventories as of May 31 follow.

    Chapter 6 Exercise 5

    5. Abbreviated cash budget; financing emphasis

    An abbreviated cash budget for Big Chuck Enterprises follows.

    Chapter 6 Problem 3

    3. Comprehensive budgeting

    The balance sheet of Watson Company as of December 31, 20X1, follows.

    Chapter 7 Exercise 3

    3. Variances for direct materials and direct labor

  • Banner Company manufactures flags of various countries. Each flag has a standard of eight square feet of fabric and three hours of direct labor time. Information about recent production activity follows.

    Chapter 7 Exercise 5

    5. Overhead variances

    Nova Manufacturing applies factory overhead to products on the basis of direct labor hours. At the beginning of the current year, the companys accountant made the following estimates for the forthcoming period:

    Estimated variable overhead: $500,000

    Estimated fixed overhead: $400,000

    Estimated direct labor hours: 40,000

    It is now 12 months later. Actual total overhead incurred in the manufacture of 7,900 units amounted to $895,100. Actual labor hours totaled 39,800. Assuming a direct labor standard of five hours per finished unit, calculate the following:

    a. Variable overhead efficiency variance

    b. Fixed overhead volume variance

    c. Overhead spending variance

    Chapter 7 Problem 1

    1. P26-A1 Basic flexible budgeting (L.O. 2)Centron, Inc., has the following budgeted production costs:

    Direct materials

    $0.40 per unit

    Direct labor

    1.80 per unit

    Variable factory overhead

    2.20 per unit

    Fixed factory overhead

  • Supervision

    $24,000

    Maintenance

    18,000

    Other

    12,000

    The company normally manufactures between 20,000 and 25,000 units each quarter. Should output exceed 25,000 units, maintenance and other fixed costs are expected to increase by $6,000 and $4,500, respectively.

    During the recent quarter ended March 31, Centron produced 25,500 units and incurred the following costs:

    Direct Materials

    $10,710

    Direct Labor

    47,175

    Variable factory overhead

    51,940

    Fixed factory overhead

    Supervision

    24,500

    Maintenance

    23,700

    Other

    16,800

    Total production costs

  • $174,825

    Instructions:

    a. Prepare a flexible budget for 20,000, 22,500, and 25,000 units of activity.

    b. Was Centrons experience in the quarter cited better or worse than anticipated? Prepare an appropriate performance report and explain your answer.

    c. Explain the benefit of using flexible budgets (as opposed to static budgets) in the measurement of performance.

    Chapter 7 Problem 5

    5. P26-B3 Straightforward variance analysis (L.O. 5)

    Arrow Enterprises uses a standard costing system. The standard cost sheet for product no. 549 follows.