26
AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

Embed Size (px)

Citation preview

Page 1: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation Overview - TGAHigh Voltage AC (HVAC) Power Lines Operating near Pipelines

November 15, 2013Ryan Dillender

Page 2: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

HVAC Power Lines and Pipelines

• High voltage alternating current (HVAC) power lines operating near pipelines can be hazardous in two ways.

1. Electric shock hazards to people and animals.

2. Increased corrosion of metallic pipelines.

Page 3: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

What is a HVAC Power Line?

• High voltage alternating current (HVAC) power lines are grouped into transmission and distribution categories.

• Typically lines of 26kV and less do not significantly impact pipelines, however severe phase imbalances can create abnormal issues.

Page 4: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

Influencing Factors

• Typical HVAC transmission power lines are 138 kV, 230 kV, and 345 kV.

• Typical HVAC transmission lines have historically had design limits in the 1000-3000 A range.

• Conductor improvements now allow design limits of 5000 A.

• Increased emphasis on sharing a common corridor has increased collocation length and frequency.

• Increased HVAC power line construction activity.

• Increased awareness in the industry of the AC related hazards and pipeline integrity.

Page 5: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

Electric Transmission in Texas

Page 6: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

Discovery of AC Interference Issue

• Observation of new HVAC power line construction or increased awareness of existing issue.

• Request of HVAC power line crossing.

• Observation of unacceptable AC potential readings.

• Must be taken at peak power line load.

• Must be taken at proper location.

• Observation of unacceptable AC density.

• Must be taken at peak power line load and proper location.

• Requires coupon test station.

Page 7: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation Project Lifecycle

1. Survey site and collect data

• GPS data of location for pipelines and power lines

• Resistances between power line structures and pipeline

• Soil resistivity

• Pipe to soil measurements

• Pipeline parameters and alignment sheets

• Power line parameters and plan and profile drawings.

2. Use computer model with collected data to predict impact of the HVAC power lines on the pipeline and design AC mitigation system.

• AC potential (step and touch hazard)

• AC density (corrosion hazard)

3. Install coupon test stations and AC mitigation system.

Page 8: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation – Criteria

• AC Potential

• Used to assess risk of step and touch safety hazard

• 15 VAC or more is a shock hazard

• NACE SP0177-2007

• AC Density

• Used to assess risk of corrosion hazard

• 20 A/m2 or more is at risk for accelerated corrosion

• NACE AC Corrosion State-of-the-Art, Publication 35110

Page 9: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation – Study Expectations• The AC interference study will typically identify the expected pipeline conditions

under peak power line loading.

• Field measurements are likely to be less than the expected peak values, unless field measurement are taken at peak power line loading.

Page 10: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation– Study Expectations

Page 11: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation– Study Expectations

Page 12: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation– Study Expectations

PipelinePower Line

A

T

TK

TK1

Page 13: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation– Study Expectations

Page 14: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation – Data Collection

• The power grid is managed in real time without the use of stored energy.

• There is no current limiting device on the power grid.

• Load is balanced with lines being switched in and out of service.

• HVAC transmission lines loads vary with time.

• This variation can be driven by supply and/or demand.

• Power lines often have an emergency rating.

• This rating can be used for a short duration.

• Conductor sag and melting is the limiting factor.

Page 15: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Interference – Mitigation Methods

• AC interference is monitored using coupon test stations.

• To be effective, test station must be monitored continuously.

• Step and touch hazards can be mitigated with through the use of gradient mats and bonding.

• The typical implementation of this is only effective at piping and appurtenances that are normally above ground.

• Step and touch hazards as well as corrosion hazards can be mitigated through the use of grounding systems.

Page 16: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation – Grounding System

• Grounding systems can mitigate AC interference along the entire length of the pipeline.

• Grounding systems reduce the AC interference on the pipeline to acceptable levels.

• Grounding systems are typically created by installing a grounded conductor that parallels the pipeline.

• This is often accomplished with zinc ribbon.

• In order to maintain adequate cathodic protection, a decoupling device is required.

Page 17: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation – Grounding System

• Grounding systems are developed using survey and model data.

• Grounding systems will be designed using a target pipeline to ground resistance value.

• In general, the resistance of the pipe to ground circuit is lowered by increasing the surface area of the grounding material.

• Horizontal and vertical lengths

• Zinc and copper are both common grounding materials.

• The use of copper requires close monitoring to ensure that it does not become connected to the pipeline in a way that allows DC to flow.

Page 18: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation – Decoupling Devices

• The decoupling device allows AC to pass but not DC.

• Types of devices

• Polarization Cell (Kirk Cell)

• Solid State Decoupler (SSD)

• Polarization Cell Replacement (PCR)

• Failure mode

• Wet cells such as the Kirk Cell fail open.

• Dry cells such as the SSD and PCR fail closed.

Page 19: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Mitigation – Operations Impact

• Installation of grounding systems.

• Installation of coupon test stations.

• Increased remote monitoring.

• Increased personal protective equipment (PPE).

• Increased review of crossing agreements for potential AC interference issues.

• Increased awareness of new HVAC power line construction.

• If available, increased coordination with power companies to minimize expenditure and risks.

Page 20: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Interference – Code Requirements

Subpart G – General Construction Requirements for Transmission Lines and Mains

§192.328 – Additional construction requirements for steel pipe using alternative maximum allowable operating pressure

For a new or existing pipeline segment to be eligible for operation at the alternative maximum allowable operating pressure calculated under § 192.620, a segment must meet the following additional construction requirements…To address this

construction issue:The pipeline segment must meet this additional

construction requirement:

… …

(e) Interference currents (1) For a new pipeline segment, the construction must address the impacts of induced alternating current from parallel electric transmission lines and other known sources of potential interference with corrosion control.

Page 21: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Interference – Code Requirements

Subpart I – Requirements for Corrosion Control

§ 192.473 – External corrosion control: Interference currents

(a) Each operator whose pipeline system is subjected to stray currents shall have in effect a continuing program to minimize the detrimental effects of such currents…

§ 192.467 – External corrosion control: Electrical isolation.…

(f) Where a pipeline is located in close proximity to electrical transmission tower footings, ground cables or counterpoise, or in other areas where fault currents or unusual risk of lightning may be anticipated, it must be provided with protection against damage due to fault currents or lightning, and protective measures must also be taken at insulating devices.

Page 22: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Interference – Code Requirements

Subpart L – Operations§ 192.620 – Alternative maximum allowable operating pressure for certain steel

pipelines.…(d) What additional operation and maintenance requirements apply to operation at the alternative maximum allowable operating pressure? In addition to compliance with other applicable safety standards in this part, if an operator establishes a maximum allowable operating pressure for a pipeline segment under paragraph (a) of this section, an operator must comply with the additional operation and maintenance requirements as follows:

Page 23: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

AC Interference – Code Requirements

Subpart L – Operations§ 192.620 – Alternative maximum allowable operating pressure for certain steel

pipelines.

To address increased risk of a maximum allowable operating

pressure based on higher stress levels in the following areas:

Take the following additional step:

… …

(6) Controlling interference that can impact external corrosion

(i) Prior to operating an existing pipeline segment at an alternate maximum allowable operating pressure calculated under this section, or within six months after placing a new pipeline segment in service at an alternate maximum allowable operating pressure calculated under this section, address any interference currents on the pipeline segment.

  (ii) To address interference currents, perform the following:

  (A) Conduct an interference survey to detect the presence and level of any electrical current that could impact external corrosion where interference is suspected;

  (B) Analyze the results of the survey; and

  (C) Take any remedial action needed within 6 months after completing the survey to protect the pipeline segment from deleterious current.

Page 24: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

EN 15280:2013 – Current DensitySection 7 – Acceptable Interference LevelsThe design, installation and maintenance of the cathodic protection system shall ensure that the levels of a.c. voltage do not cause a.c. corrosion. Since the conditions vary for each situation, a single threshold value cannot be applied.

This is achieved by reducing the a.c. voltage on the pipeline and current densities as below: • As a first step, the a.c. voltage on the pipeline should be decreased to a target value,

which should be 15 V rms or less. This value is measured as an average over a representative period of time (e.g. 24 h). and

• As a second step, effective a.c. corrosion mitigation can be achieved by complying with criteria defined in EN 12954:2001, Table 1, and

• maintaining the a.c. current density (rms) over a representative period of time (e.g. 24 h) to be lower than 30 A/m2 on a 1 cm2 coupon or probe; or

• maintaining the average cathodic current density over a representative period of time (e.g. 24 h) lower than 1 A/m2 on a 1 cm2 coupon or probe if a.c. current density (rms) is more than 30 A/m2; or

• maintaining the ratio between a.c. current density (Ja.c.) and d.c. current density (Jd.c.) less than 5 over a representative period of time (e.g. 24 h).

NOTE Current density ratios between 3 and 5 indicate a small risk of a.c. corrosion. However, in order to reduce the corrosion risk to a minimum value, smaller ratios of current density than 3 would be preferable …

Effective a.c. corrosion mitigation can be also demonstrated by measurement of corrosion rate. 

Page 25: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

HVAC Collocation in Texas

Natural Gas Pipelines within 1 Mile of

HVAC Power Lines

Page 26: AC Mitigation Overview - TGA High Voltage AC (HVAC) Power Lines Operating near Pipelines November 15, 2013 Ryan Dillender

References• Page 3

• Image [http://www.ferc.gov/industries/electric/indus-act/reliability/blackout/ch1-3.pdf]• Page 4

• Image [By Dave Bryant (Own work) [CC-BY-SA-3.0 (http://creativecommons.org/licenses/by-sa/3.0)], via Wikimedia Commons]• Page 18

• Image [http://www.kirkcell.com/products-kirkcell.html]