Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
ii
Abstract
Cloud computing is the key technology widely used across most of the organizations. The
main advantage with cloud computing is that, the risk of infrastructure maintenance reduces a
lot. Most of the service providers offer a wide range of services to their clients in the form of
cloud services and the clients can use the same from a remote location. Apart from the list of
advantages with cloud computing there are some limitations and security has a significant role
among them. Providing security to the client’s information and data are the main challenge to the
cloud service providers and there is lot research done in this context to provide the required
security for the information and data. In general the services offered by the cloud service
providers are accessible through the web and blocking the web traffic across the cloud access
should be given top priority. The main aim of this project is to evaluate the cloud security against
the firewall implementation under three different scenarios. OPNET IT guru is used as the
simulation tool in this project and three scenarios are created in this context. First scenario has no
security across the cloud, second scenario has the actual firewall implementation and this
particular firewall allows all the required traffic, whereas the third scenario deals with the
firewall implementation which discards the web traffic. Database and web applications are used
as the required applications across the cloud to generate the traffic and now the firewalls will act
on these applications. The performance of these applications is estimated against the firewall
working conditions and the overall performance of the cloud is evaluated. All the three scenarios
are compared against the metrics for the individual applications and also the performance of the
cloud is estimated.
iii
Contents
1: Introduction ................................................................................................................................. 1
1.1.1 Public cloud .............................................................................................................. 1
1.1.2 Private clouds ............................................................................................................ 2
1.1.3 Community clouds .................................................................................................... 2
1.1.4 Combined cloud ........................................................................................................ 2
1.1.5 Hybrid clouds ............................................................................................................ 3
1.2 History .............................................................................................................................. 3
1.2.1 The Cloud cube model .............................................................................................. 3
1.2.2 Data Security model .................................................................................................. 4
1.3 Data storage example clouds ............................................................................................ 5
1.4 Benefits with cloud computing ........................................................................................ 6
1.5 Security issues with Cloud computing ............................................................................. 7
1.5.1 Privacy issues ............................................................................................................ 7
1.5.2 Availability and backup ............................................................................................ 8
1.5.3 Access issues ............................................................................................................. 8
1.5.4 Trust .......................................................................................................................... 8
1.5.5 Illegal secondary usage ............................................................................................. 9
1.5.6 Data proliferation issues ........................................................................................... 9
2: Narrative ................................................................................................................................... 10
iv
2.1 Problem definition ............................................................................................................... 10
2.2 Aims and objectives ............................................................................................................ 12
3. Design of proposed model ........................................................................................................ 13
3.1 No firewall scenario ............................................................................................................ 13
3.2 Firewall scenario ................................................................................................................. 16
3.3 Firewall scenario: Block web access ................................................................................... 16
4. Simulation procedure ................................................................................................................ 17
4.1 OPNET IT guru as Simulation tool ..................................................................................... 17
4.3 Simulation of No Firewalls scenario ................................................................................... 18
4.3.1 Application configuration settings................................................................................ 21
4.3.2 Profile configuration settings........................................................................................ 23
4.3.3 Cloud configuration ...................................................................................................... 24
4.3.4 West router and East router configuration .................................................................... 25
4.3.5 Home office configuration ............................................................................................ 26
4.3.6 Server configurations .................................................................................................... 28
4.3.7 Performance metrics ..................................................................................................... 30
4.4 Firewall scenario ................................................................................................................. 33
4.5 Firewall blocking scenario .................................................................................................. 35
4.6 Running the simulation ....................................................................................................... 36
5. Results and Evaluation .............................................................................................................. 38
v
5.1 Results for Database application ......................................................................................... 38
5.2.1 Database query response time ...................................................................................... 39
5.2.2 Server DB query load ................................................................................................... 40
5.2.3 Database Server point to point utilization .................................................................... 42
5.3 Results for web application ................................................................................................. 43
5.3.1 Page response time for no firewall scenario ................................................................. 43
5.3.2 Page response time across firewall scenarios ............................................................... 44
5.4 Cloud performance .............................................................................................................. 46
5.4.1 Point to point cloud utilization across west router ....................................................... 46
6: Testing ...................................................................................................................................... 49
6.1 First case:............................................................................................................................. 49
6.1.1 Database query response time: ..................................................................................... 49
6.1.2 Server DB Query load: ................................................................................................. 50
6.1.3 Database server point to point utilization: .................................................................... 52
6.1.4 Point to point cloud utilization across west router ....................................................... 53
6.2 Second case: ........................................................................................................................ 54
6.2.1 Database query response time: ..................................................................................... 54
6.2.2 Server DB query load ................................................................................................... 55
6.2.3 Database Server point to point utilization .................................................................... 56
6.2.4 Point to point cloud utilization across east router ......................................................... 58
vi
7: Conclusion and future work ...................................................................................................... 60
7.1 Conclusion ........................................................................................................................... 60
7.2 Future work ......................................................................................................................... 62
vii
List of figures
Figure 1: OPNET Home screen.....................................................................................................14
Figure 2: New project creation......................................................................................................15
Figure 3: OPNET IT guru object palette ......................................................................................18
Figure 4: New project creation using OPNET...............................................................................19
Figure 5: Basic workspace for the network...................................................................................20
Figure 6: Basic network setup……………………………………………………………………21
Figure 7: Application configuration settings…………………………………………………….22
Figure 8: Database profile configuration.......................................................................................23
Figure 9: Web profile configuration..............................................................................................24
Figure 10: IP32 cloud configuration..............................................................................................25
Figure 11: East and West router configuration..............................................................................26
Figure 12: Home office configuration...........................................................................................27
Figure 13: Home office connection to Router west.......................................................................27
Figure 14: Database server configuration......................................................................................26
Figure 15: Web server configuration.............................................................................................29
Figure 16: Server connections to Router east................................................................................29
Figure 17: Three levels of performance metrics............................................................................30
Figure 18: Global statistics............................................................................................................31
Figure 19: Node level statistics......................................................................................................32
Figure 20: Link level statistics.......................................................................................................32
viii
Figure 21: Procedure to duplicate scenario....................................................................................33
Figure 22: Firewall configuration……..........................................................................................34
Figure 23: Firewall scenario setup.................................................................................................35
Figure 24: Web traffic block..........................................................................................................36
Figure 25: Manage scenarios.........................................................................................................36
Figure 26: Simulations run for one hour.......................................................................................37
Figure 27: Response time……………………………………......................................................39
Figure 28: Load on database server………………………………...............................................41
Figure 29: Database server across router……………………………….......................................42
Figure 30: Page response time across no firewall…….………………………………………….44
Figure 31: Page response time across firewall……………………………...................................45
Figure 32: Point to point cloud utilization ....................................................................................47
Figure 33: Response time………………………………………………………………………...51
Figure 34: Load on database server……………………………………………………………..52
Figure 35: Database server across router………………………………………………………..53
Figure 36: point to point cloud utilization………………………………………………………54
Figure 37: Response time……………………………………………………………………….56
Figure 38: Load on database server…………………………………………………………….57
Figure 39: Database server across router………………………………………………………..58
Figure 40: Point to point cloud utilization………………………………………………………59
ix
1
1: Introduction
1.1 Introduction to Cloud computing
Most of the organizations are in need to some remote infrastructure to execute their
process. The term process in this context can be varied in terms of server maintenance, database
maintenance and some other key services like product optimizations. The main reasons for the
organizations to choose a remote or third party services is mainly to reduce the of maintenance
and also to reduce the cost burdens. Cloud computing is the right choice at this level and thus it
has emerged quickly in the technology market and could have attracted the attention of most of
the organizations. Cloud service providers are also increasing rapidly in the market and they are
providing wide range of services. The key services include data server and typical file storage
mechanisms. Clients in general register with the service providers to make use of the key
services provided through the cloud. In general there are different types of clouds and they are
discussed as below
1.1.1 Public cloud
Public clouds are simple internet based clouds and they are accessible publicly. Even
public domain users can also use the services provided by the public clouds. The type of services
provided by the public clouds includes some public documents, file sharing and database storing
for normal users. Few public web services are provided across the public clouds and passing the
required arguments will make the cloud accessible. Pay per usage process is followed across the
2
public clouds and there are many third parties available to provide the public access to these
clouds.
1.1.2 Private clouds
Private networks are used across maintaining the private clouds. In general one or more
organizations will make use of these private clouds and they need a separate network to access
the same. Few access level restrictions are imposed over these private clouds and a perfect pass
of these restrictions is required to access the private clouds. Private clouds are owned by a single
organization and they use their own private network domains to provide the required services.
1.1.3 Community clouds
When two or more organizations are in need of similar requirements they form together
and create the community cloud. These organizations will share the common infrastructure and
computational power of the cloud. Community clouds are really useful when it comes to group
level requirement for a group of organizations.
1.1.4 Combined cloud
Two or more clouds with different nature of operation are combined together and referred
as combined clouds. When a single cloud can’t handle the client requirements, these combined
3
clouds are used to accomplish the required job. Integrated level of services is provided by this
type of clouds and the level of integration is complex enough in this case.
1.1.5 Hybrid clouds
When a type of service can’t be provided by simple private or public clouds, hybrid
clouds are used by the organizations. High end and complex tasks are accomplished by these
hybrid clouds. Complex business needs of the organizations are solved by these hybrid clouds
and the main limitation with this type of clouds is its complex nature.
1.2 History
Security is the main concern for cloud computing, there are many existing models that
provide an idea towards the cloud security and they were discussed as below
1.2.1 The Cloud cube model
The cloud cube model identifies four different dimensions for providing security to the
clouds. These dimensions can be categorized into two important types like the internal and
external and these dimensions define the physical location of the data across the cloud.
Organizational boundaries are considered as the internal and external dimensions for the cloud
and it will be based on the cloud usage like from outside the organization or within the
organization.
4
The other dimension is the propriety or open and this defines the ownership of the cloud
against security. The degree of interoperability and data transportability is estimated across this
dimension. The typical constraints on the data usage are estimated across this dimension.
Propriety indicates the organization ownership and the control over the cloud remains with the
organization, whereas the open indicates the public nature of the cloud. Based on these
parameters the required security constraints are imposed.
The third dimension represents the Parameterized or De-Parameterized nature of the
cloud. Parameterized indicates the architecture being followed across the cloud within the IT
limits of the organization and the De-Parameterized indicates the IT architecture external to the
organization. The entire internal network firewalls act across the Parameterized architecture,
whereas the external firewalls acts across the De-Parameterized architecture.
The fourth dimension speaks about the Insourced or Outsourced nature of the cloud. In
general Insourced dimension is maintained by own staff and the internal security policies are
applied across the cloud. Outsourced dimension deals with the security policies provided by the
third parties.
1.2.2 Data Security model
Protecting the data is the main concern across cloud computing and this model describes
a famous model to protect the data. Three level defense system is used across providing security
to the cloud data. User authentication can be considered as the first layer and on this layer all the
users who are trying to access the cloud data need to be authenticated against their login
credentials.
5
Second layer is responsible for data encryption process. The user’s data is protected using
the typical data encryption models once the users are authenticated at the first layer. This can be
considered as the important layer as encryption is always required to hide the actual data from
the attackers. Third layer deals with the fast recovery of the data. If in case the data is lost the
recovery mechanism is implemented across this layer.
The user authentication layer is used for protecting the data from unauthorized access and
also to ensure that the data is not tampered. If the authentication layer fails in some cases, the
second layer encrypts the data from misusage and this provides an upper layer of data protection.
If the attacker can access the encryption keys and gain the data, the third layer has the key role to
recover the data in a faster manner.
1.3 Data storage example clouds
Data storage can be considered as the primary services provided by most of the clouds and
few examples are discussed in this section. Most of the data storage services provided by the
clouds are completely based on internet. There are many websites created in this context and a
detailed discussion is as given below
Google docs can be considered as one of the important cloud data storage system.
Different types of documents like the normal word documents, templates; PDF’s and
presentations are uploaded to the Google server. Registered users can download the same
from the remote locations. Users are also provided with an option to edit the documents
and upload back based on their rights over the documents
6
Emailing servers can also be considered as an example of cloud data storage. Different
email servers like Google, Yahoo and Hotmail provide some space across the mail access
to the privileged users. Remote access to the mails is provided in this case and the
corresponding attachments and data is stored on the remote email servers.
Picasa is another good example of cloud storage. Users of Picasa can upload the photos
and share the URLS and the corresponding photos are actually stored at a remote
location. Separate data servers are provided in this case and the photos are stored on these
servers which were actually maintained at the remote locations.
YouTube is another good example of video storage at remote locations. Users can upload
the videos and these videos are stored across a remote database server and they are
accessed via the clouds.
There are few storage websites, where some space is provided to the users to upload the
files and folders. Some storage limit is given to the users and premium users provide
unlimited storage space. The best example in this context is www.4shared.com and
www.sendspace.com, where these websites provide remote database access to the
registered users.
1.4 Benefits with cloud computing
A detailed discussion of different types of clouds and the corresponding examples is done in
the previous section and the key benefits with cloud computing are given in this section. A
simple benefit with cloud computing is that any device which can access the internet can also
access the cloud services. Deployment of the cloud applications is very simple task and the users
7
need not worry about the compatibility and storage issues. All they need is a simple device and
knowledge of the application being accessed from the remote locations. Version of the software
is also automatically updated at the remote locations and users can simply access the latest
versions. Following are other important benefits of cloud computing
Data storage has increased a lot for the users, as the risk of maintaining local data servers
is reduced
Even the cost of infrastructure maintenance is reduced for the organizations
The level of flexibility is more with cloud computing when compared to other
computational aspects
Mobility of usage is another best advantage with cloud computing
Apart from the listed benefits, there are many business and technology benefits with cloud
computing.
1.5 Security issues with Cloud computing
The key benefits with cloud computing are discussed in the previous section and apart
from this, there are some key security issues and they are as discussed below
1.5.1 Privacy issues
As all the cloud services are available at the remote locations, users can’t have the
complete control over their data. But it is always their basic right to protect their data and they
8
have an intension to view all the database operations. Privacy is the main concern to be
considered here, and if the cloud services can’t provide the level of privacy it can be considered
as the main security threat. These privacy issues are mainly irritating across the public clouds,
where the access to the clouds is through the public domains.
1.5.2 Availability and backup
In general most of the client software’s and databases are maintained across the remote
locations across cloud computing. If the required resources are not available at peak times and
even the backup failing across the clouds, this situation definitely leads to lots of security issues.
1.5.3 Access issues
Cloud computing has the threat of accessing the sensitive information. There are lots of
chances where the information stored across the cloud may be lead to theft by the intruders and
hackers.
1.5.4 Trust
Trust is always required across the cloud computing implementation. A mutual trust
between the vendors and the clients is essential and if it is missing the overall security of the
cloud is affected a lot.
9
1.5.5 Illegal secondary usage
There are lots of chances where the illegal secondary usage of information across clouds
may happen. Most of the cloud business models reveal that, service providers can use the user’s
data for the secondary usage and this may lead to serious security threats.
1.5.6 Data proliferation issues
Across most of the cloud service providers share the information or data to a group of
organizations and this situation leads to data proliferation issues. It will be very easy to copy the
data from different data centers and this finally leads to lots of security issues. There are some
chances where the original copy of data can be deleted due to misuse of data proliferation.
10
2: Narrative
2.1 Problem definition
In general there are lots of security issues involved with cloud computing and they can be
broadly categorized into two different types like the security issues faced by the cloud service
providers and the security issues faced by the cloud customers. These two aspects should be
considered while estimating the overall security requirements of cloud computing (Hamlen,
2010). Cloud service providers should ensure that their infrastructure is secure enough and their
client information, data and other resources should be secure enough. Cloud customer security
requirements will be on other lines, where they always ensure a safe and privileged access to
their data which is located at the remote locations. Thus by considering all these requirements,
the security of the cloud and the corresponding policies are designed.
Implementation of Virtualization across the cloud has become one of the successful and
unique security policies being in practice these days by most of the cloud service providers.
Virtualization adds a new and additional layer across the cloud and thus the data and information
of the customers is much protected (WHITE, 2009). The actual concept of cloud computing was
introduced in 2006 when the Amazon’s Elastic Computing cloud was proposed and since then
many service providers has entered into the market. With the growth in the service providers
equally the clients are increased and this has led to more security requirements across the cloud
computing particularly in the aspects of customer data and information (Atayero, 2011). Data
security is given the top most priority across the cloud security and there are some models
proposed in this context as well. Risk coming with opportunity is the main issues to be
considered against the cloud data security. The virtual machine concept was widely used by most
11
of the service providers like IBM blue cloud and Microsoft’s Window Azure. The main
difference between IBM blue cloud and Microsoft Windows’ Azure is that, blue cloud runs on
the Linux environment, whereas Azure runs on Windows operating system.
There are many advantages with the virtual machine implementation, where all the
required server operations are no more physical in nature and a group of virtual servers is used in
this context (Binning, 2011). The services provided by the service provider are not affected even
there are some physical changes to the virtual machine and thus the customers can enjoy the
uninterrupted services. However there are some limitations to the virtual machine concept as
well and the key among them are the attacks on the virtual server. In general these virtual servers
will form a separate group which is apart from the logical groups. In general the cloud
environment is dynamic in nature and the data operations between the remote data servers and
the client are prone to frequent updates (Andry, 2010). In this process any attacker can change
the read and write operations and thus a strict authentication policy implementation is required in
this context. Thus from this overall analysis it can be understood cloud security has a lot of scope
for research and thus interested in this area and would like to create a new security model that
can be used to block the unwanted web traffic across the cloud data access. OPNET IT guru is
used as the simulation tool and the actual implementation procedure is explained in the next
section. Following are the key aims, objectives and research questions identified in this context.
12
2.2 Aims and objectives
Aim: To evaluate the cloud performance under the secure firewall implementation and block the
unwanted web traffic using the OPNET IT guru simulation.
Objectives
Following are the research objectives
To critically review the cloud security issues and the current security models in the
implementation
To identify the key limitations with the current security models and propose a new
security model for cloud data and information security
To design the simulation using OPNET It guru and create three scenarios
To create a normal scenario where there is no firewall implementation, create a firewall
scenario for data security and finally to create a firewall scenario for web security
To measure the performance of the cloud under these three scenarios using some
performance metrics
To compare the scenario results and corresponding graphs and to evaluate the
performance of cloud and understand the level of security requirements.
13
3. Design of proposed model
As discussed the main aim of this project is to evaluate the cloud performance and
estimate the security requirements OPNET IT guru is used as the simulation tool. Three
scenarios are created in this context and a detailed description of the scenarios is as given below
3.1 No firewall scenario
In general OPNET IT guru provides an option to create scenarios and in this simulation
three scenarios are created. The main objective of this scenario is to impose no firewall
conditions across the network. An IP based cloud is used as the required cloud and this cloud
acts as the internet cloud and connects two or more subnets, which represents the service
providers. Two routers are used across the simulation process among those where one of the
router act as the firewall routers. Two different applications are created across this scenario, one
is the database application and the other is the web application. The required application traffic is
created by configuring the applications at the application configuration and profile configuration
level. A heavy database access application is used in this simulation such that imposes more
database queries over the database server. Required configurations are done at the application
and the profile config level and the performance of the cloud in terms of database applications
and web application are studied. Figure 1 shows the basic workspace of OPNET It guru and the
required simulations are done at this level
14
Fig 1: OPNET Home screen
A new project is created using the file menu and the required scenarios are also created at
this level and the corresponding process is as shown in Figure 2.
15
Figure 2: New project creation
The cloud used across this simulation is done for 150 workstations and it is simulated in a
way that all the 150 workstations access the database application and the web application. As
mentioned there is no security provided in this scenario and the normal performance of the cloud
is estimated. Following are the performance metrics used for the performance evaluation of
cloud when there is no security across the cloud
HTTP page response time is estimated for the web application
DB query time and response time for the database application are estimated
Node level statistics like server DB query response time and load are also estimated for
the database application
Link level and utilization statistics are also estimated across the simulation process
Same list of performance metrics is used for the other two scenarios and the required
description is as given below
16
3.2 Firewall scenario
The first scenario is duplicated and the required firewall scenario is created. In this
particular scenario a firewall router is created and a constant packet latency of .05 seconds are
imposed for packet filtering. Similar performance metrics are used as in the first scenario
3.3 Firewall scenario: Block web access
This scenario is created by duplicating the second scenario and the main aim of this
scenario is to block the unauthorized web access.
Once the required three scenarios are created the simulation is run for one hour and the
corresponding performance of the cloud is evaluated and the expected results are discussed in the
next section.
17
4. Simulation procedure
As the main aim of these scenarios is to evaluate the performance of database and web
application under three different scenarios like no firewall, firewall and firewall blocking the
web traffic, OPNET IT guru is used as the simulation tool. As discussed in the previous section
three scenarios are created using this simulation tool and simulation is run for one hour for the
results evaluated. A detailed explanation of the simulation procedure followed and design
metrics used is given in this chapter. Each and every scenario is explained in a detailed manner
and the proposed model of blocking the web traffic is described as below
4.1 OPNET IT guru as Simulation tool
OPNET IT guru provides a rich user interface to create the required network models.
Cloud is simulated in this project and it provides a wide range of models to create the required
cloud model. OPNET It guru has an object palette and this holds different node models and user
can use the same to create the required network model. A sample screen of object palette that
holds the nodes for creating the cloud model is as shown below Figure 3.
18
Figure 3: OPNET IT guru object palette
All the required objects from the object palette are dragged across the workspace to
create the required network. OPNET provides scope for comparing different scenarios and these
scenarios can be created and duplicated accordingly. Few changes are made towards the
duplicate scenarios and once the required number of scenarios is created, the actual performance
evaluation is done. Performance evaluation of the required network can be done by choosing
individual statics at three levels. Global level, node level and link level statistics are available
across the simulation tool and the desired metrics can be chosen for the performance comparison.
OPNET IT guru provides an option to run the simulation as per the requirements and once the
simulation is run the actual results are evaluated. The detailed procedure followed to create the
simulation of all the three scenarios is as given below
4.3 Simulation of No Firewalls scenario
A detailed explanation of the simulation procedure followed to create the no firewall
scenario is given in this section. In general a firewall is a router that can impose some security
policies over the network. Firewalls can monitor and regulate the traffic that passes across the
19
network and internet and such a firewall is used in this application. In this simulation a home
office LAN network is used as the destination and the all the communication is done through the
cloud and few routers. The actual steps followed to create the simulation is as given below
To create a basic network, a new project is created across the OPNET IT guru. Name of
the project and the corresponding scenario are given and in this project, scenario name is given
as No Firewalls and the corresponding is shown in Figure 4.
Figure 4: New project creation using OPNET IT guru
Once the required project name and scenario name are set, the following steps are used to
create the basic network
Create Empty scenario is chosen as the option for Initial topology option and next
The world is chosen as the required network scale and next
In the maps US is selected and click next
20
Click next for two times and once these steps are followed the basic workspace with the
required object palette are displayed and the corresponding screenshot is as shown below
Figure 5.
Figure 5: Basic workspace for the network
Once the basic workspace is available following objects are dragged from the object palette
to the workspace and they are as listed below
The application configuration object is used to define the applications. In this simulation
database and Http applications are used and the detailed configuration is explained in the
later sections
The profile configuration object is used to define the application profiles
Ip32_cloud object is used to act as the internet cloud
21
Two ethernet4_slip8_gtwy’s are used to act as east router and west router
10BaseT_LAN object is used to act as the home office which supports 150 workstations
and the configuration process is explained later in this section
Two ppp_server objects are used to act as the database server and web server
Once all the objects are dragged from the object palette the basic network setup is done and
the corresponding screen is as shown below Figure 6.
Figure 6: Basic network setup
4.3.1 Application configuration settings
As discussed in the previous section, two applications are created in this project to generate
the required traffic over the cloud. OPNET IT guru provides a separate object known as
application config and the required applications can be created at this level. The application
22
configuration object is dragged from the object palette and edited to add the applications and the
corresponding procedure is as given below
Right click on the Application config object and choose the edit attributes
Add two rows to the applications definitions tab, such that two applications are created
Rename a row as Database and choose the heavy load database against the Database
application
Rename another row as web and choose heavy browsing against HTTP application and
the corresponding screenshot is as shown below Figure 7.
Figure 7: Application configuration settings
23
Once the application definitions are chosen click on the Ok button and save the project.
Next step is to define the corresponding profiles and the procedure is as explained below
4.3.2 Profile configuration settings
Each and every application has a profile such that to generate the required application traffic
over the network. OPNET IT guru provides a profile configuration object and it can be dragged
from the object palette. The following steps are followed to set the profile definitions
Right click on the profile configuration object and edit the attributes
Add two rows for profile configuration
Name a row as Database_User and choose database as the desired application
Name another row as Web_User and choose web as the desired application and the
corresponding screen is as shown below Figure 8 and 9.
Figure 8: Database Profile Configuration
24
Figure 9: Web Profile Configuration
When both the profiles are created, it indicates that the applications are ready to generate
the traffic and the next step is to configure the cloud and it is discussed in the next section
4.3.3 Cloud configuration
OPNET IT guru provides an IP32 cloud which acts a simple public internet based cloud. In
this project this cloud is used to support the database and web applications and the configuration
aspects are discussed in this section. Drag the ip32_cloud from the object palette to the
workspace and edit its attributes accordingly as given below
Right click on the cloud and choose edit attributes
25
Edit the packet latency attribute and set the value as constant 0.05 seconds and the
corresponding screenshot is as given below Figure 10.
Figure 10: IP32 cloud configuration
When the packet latency is set to 0.05 seconds it indicates that, the maximum packet
delay across the cloud due to the web and database applications is 50ms. Each and every packet
is processed across the cloud with this limited delay. Once the cloud configuration is done now
the west router attributes are edited and the corresponding procedure is as shown below
4.3.4 West router and East router configuration
As discussed in the previous section, two routers are added in this simulation and this
section deal with west router configuration. Ethernet4_slip8_gtwy object is dragged from the
object palette and renamed as Router_West. Similarly another object is dragged and renamed as
Router_East and they are connected to the IP32 cloud using the PPP_DS1 links available across
the object palette. The corresponding is shown in below Figure 11.
26
Figure 11: East and West router configuration
4.3.5 Home office configuration
As mentioned in the previous sections a home office is created and the configuration is
explained in this section. Select 10BaseT_LAN object from the object palette and follow the
below steps to configure the same
Right click on the object and edit the attributes
Number of workstations are set to 150
An application supported profiles section is expanded and two rows are added
Database profile is added the number of users are set to 50
Another profile is set to web profile and the number of users are set to 100 and the
corresponding Figure 12 is as given below
27
Figure 12: Home office configurations
Now the home office is connected to Router_West using the 10BaseT links and the
corresponding Figure 13 is as given below
Figure 13: Home office connection to Router west
28
4.3.6 Server configurations
Two PPS servers are dragged from the object palette and they are set as database server and
web server. Each of the servers is edited to support the corresponding applications and the
following steps are used in this context
Right click on the database server and choose edit attributes
Edit the application supported profiles and set Database application as supported
A similar procedure is followed for web server, where the web application is supported at
this level and the corresponding Figure 14 and 15 is as shown below
Figure 14: Database server configuration
29
Figure 15: Web server configuration
Once the servers are configured they are connected to the Router east and using the
PPP_DS1 links and the corresponding Figure 16 is as given below
Figure 16: Server connections to Router East
30
4.3.7 Performance metrics
All the required configuration steps are explained in the previous sections and with this the
setup of complete network along with the configuration is done. To evaluate the performance of
cloud against the database and web applications few parameters are required and they are given
in this section. As discussed in the previous sections, OPNET IT guru provides three levels of
performance evaluation like at the global level, node level and link level all of them are used in
this simulation. The following steps are followed to set the performance metrics
Right click on the workspace and choose the option Choose Individual statistics
Now a separate window is opened where the option to choose the global, node and link
level metrics is available and the corresponding Figure 17 is as given below
Figure 17: Three levels of performance metrics
31
Following metrics are chosen for performance evaluation
From the Global level statistics, expand the DB query option and choose response time
From the global level statistics, expand the Http option and choose the page response
time and the corresponding Figure 18 is as given below
Figure 18: Global statistics
From the node level statistics following are selected
Expand the server DB query and choose load
Expand server HTTP and choose load and the corresponding Figure 19 is as given below
32
Figure 19: Node level statistics
From the link level statistics following are chosen
Expand point to point option and check both the utilization metrics and the corresponding
Figure 20 is as shown below
Figure 20: Link level statistics
33
Once all the required performance metrics are chosen, simulation of the first scenario is
done. Similar performance metrics are used for the other scenarios as well and the corresponding
procedure is as given below
4.4 Firewall scenario
The first scenario is duplicated to create this scenario. The main aim of this scenario is to
impose the firewall policies over the cloud. The firewall created in this scenario allows the
required traffic across the network, and a perfect packet filtering is done. Duplicate scenario
option is chosen from the scenarios menu to create this scenario and the corresponding Figure 21
is as given below
Figure 21: Procedure to duplicate the scenario
Once the scenario is duplicated similar network is created and the following steps are
followed to make the required firewall scenario
Right click on the Router West and edit the attributes
34
From the option model choose, ethernet2_slip8_firewall such that now the router acts as a
firewall
Proxy server information option is expanded and the row 1 option is edited such that the
latency is set a constant value of 0.05
Now expand the row 4 and set the latency to a constant value of 0.05 and the
corresponding Figure 22 is as shown below
Figure 22: Firewall configuration
The latency for database and web application is set to a constant value of 0.05 and this
indicates that, the packet filtering is done at the firewall and thus a delay of 50ms is incurred
over the router. Once the required firewall configuration steps are followed the corresponding
network is as shown in the below Figure 23
35
Figure 23: Firewall scenario setup
With this the simulation of firewall scenario is done and the similar performance metrics
are used across this scenario as well.
4.5 Firewall blocking scenario
The main aim of this scenario is to block the web traffic over the network and this scenario is
created by duplicating the second scenario. Following are the changes done to the network in this
scenario and they are as given below
Right click on the Router west and edit the attributes
Expand the Proxy server information and choose the row 4 i.e. HTTP
Set the proxy server deployed option to no and the corresponding Figure 24 is as given
below
36
Figure 24: Web traffic block
With this all the web traffic across the cloud is blocked and thus the simulation of
firewall blocking scenario is done.
4.6 Running the simulation
Once all the three scenarios are done the simulation is run for one hour. It can be done
from the scenarios menu by choosing the manage scenarios option as shown in the Figure 25.
Figure 25: Manage scenarios
37
When this option is selected a new window is opened and from the simulation is run for
one hour and the corresponding Figure 26 is as shown below
Figure 26: Simulation runs for one hour
Once the simulation is done the next step is to evaluate the results and a detailed
evaluation of results is given in the next chapter. All the three scenarios are compared against the
performance metrics chosen.
38
5. Results and Evaluation
A detailed explanation for the simulation steps followed and the process implemented to
create the required scenarios is given in the previous section. This chapter deals with the results
evaluation once the simulation runs for one hour as explained in the previous chapter. As
mentioned three scenarios are created in this simulation like the no firewall scenario, where there
is no firewall, firewall scenario where the firewall is created to filter the database and web
application packets and the third scenario is created to block the web traffic across the cloud. The
performance of the database application and web application are evaluated in this chapter based
on the performance metrics chosen at all the three levels like global level, node level and link
level. All the obtained graphs are compared against the performance metrics and a detailed
evaluation is as given below
5.1 Results for Database application
As discussed two applications are created in this simulation and they are database and
web application. This section deals with the performance evaluation of database application
under the three scenarios. First scenario has no firewall, where the second scenario has a firewall
which filters the database application packets and the third scenario blocks the web access
completely. The overall database performance against these three scenarios is estimated as per
the performance metrics chosen and the corresponding graphs are as given below
39
5.2.1 Database query response time
Query response time for a database operation indicates the overall performance of the
database application. In general if there are no security policies or barriers to the application
traffic across the network, the query response time would be very less and the actual comparison
graph is as shown below Figure 27
Figure 27: Response time
From the above graph it can be understood that the average query response time is more
when there is a firewall. This is due to the fact that, the packet latency across the firewall router
is set to a constant value 0.05 seconds and thus the delay is incurred due to the packet filtering.
40
Even the delay is more due to the packet filtering initially, later the response time is reduced after
10 minutes of simulation. When the case with no firewall scenario is considered the response
time is very less when compared to firewalls scenario. As there is no packet delay across the
west router, the response time is very quick and the application performance is enhanced.
When the case with the web application blocking scenario, the response time is reduced
even there is a firewall which filters the packets. As the firewall completely blocks the web
traffic, the load on the firewalls is reduced and thus the performance of the database application
is enhanced. From the overall analysis it can be concluded that when the unwanted web traffic is
blocked, the overall performance of the database application is enhanced and also the security
across the cloud is enhanced.
5.2.2 Server DB query load
The overall load on the database server is estimated in this section. As there are three
scenarios, the load under each scenario is estimated and the corresponding comparison graph is
as given below in Figure 28
41
Figure 28: Load on database server
It can be analyzed from the above comparison graph that, when there is no firewall the
load is less when compared to the other scenarios. The load on the database server is almost
equal across all the three scenarios, apart from the firewall implementation. This situation
indicates that, due to the extra firewall policies there could be some packet delay as they are
filtered, but the overall burden on the server is not affected. When the case with the firewall
blocking scenario is considered the load is almost equal where no firewall is even the web
application traffic is blocked. When there is firewall over the network the overall load on the
database server is increased as due to the additional security firewall policies.
42
5.2.3 Database Server point to point utilization
The overall utilization of the database server across the router indicates the application
performance against the key security issues. The actual comparison graph of all the three
scenarios is as given below Figure 29
Figure 29: Database server across router
The average database server point to point utilization across the three scenarios is as
shown above. From the graph it is clear that the overall utilization of the database server is more
when there is firewall across the cloud. It can be observed that, the point to point utilization is
less when there is no firewall and this indicates that, when there are no packet filtering or
43
external firewall policies the overall utilization of the server is reduced. When the web traffic is
blocked across the third scenario the utilization of the server is increased. From the overall
analysis it is clear that, the point to point utilization of the database server is increased when
there is firewall across the cloud.
5.3 Results for web application
The web application is also created in this simulation and the performance of the web
application is estimated against the page response time. As the web application is blocked across
the third scenario only two scenario results are evaluated for the first two scenarios individually
and they are as given below
5.3.1 Page response time for no firewall scenario
The overall page response time across the web application when there is no firewall is
given as below in Figure 30
44
Figure 30: Response time across no firewall
From the above graph it is clear that, the average response time is constant across the
simulation and the maximum time consumed in this context is one minute. It can be analyzed
that when there is no firewall the overall page response time is constant and this indicates that
the flow of the web application is constant across the cloud without any limitations
5.3.2 Page response time across firewall scenarios
When there is a firewall the page response time across the web application is given in the
below graph as Figure 31
45
Figure 31: Response time across firewall
From the above graph it is clear that, the average maximum page response time across the
web application is 6 seconds and this value is very high when compared to the previous scenario.
Even the page response time is not constant as the firewall policies impose some packet latency
against the packet filtering process. As the web traffic is filtered the overall page response time is
increased.
When both the scenarios are compared it can be understood the overall page response
time is very high when there is a firewall implementation over the cloud. Due to the security
policies and the packet latency time imposed over the firewall the overall response time is
increased. From the overall analysis it can be understood that blocking the web traffic will
increase the page response time.
46
5.4 Cloud performance
The performance of web application and database application is evaluated against the
three scenarios in the previous section. The actual performance of cloud across the three
scenarios is discussed in this section and the corresponding comparison graphs are as shown
below
5.4.1 Point to point cloud utilization across west router
The overall point to point cloud utilization across the west router is given in the below
graph as Figure 32
47
Figure 32: Point to point cloud utilization
It can be observed from the above graph that the overall point to point utilization of cloud
is more when there is firewall across the network. As the firewalls imposes some security
policies and also delays the packets due to filtering the cloud utilization is increased. When the
third scenario where the web traffic is blocked the overall utilization of the cloud is reduced as
shown in the above graph. As the complete web traffic is blocked the cloud has ample space to
process the database packets and the overall utilization is reduced. When there is no firewall also
the utilization is more as the cloud needs to process the database and Http packets continuously.
Thus from the overall analysis it can be estimated that the overall utilization of the cloud can be
optimized when the web traffic is blocked using the firewalls.
48
From the overall analysis of the results the proposed firewall model is well used for
enhancing the database application. In this simulation two applications are used like the database
application and web application and it is proved the overall performance of database application
is enhanced when the web traffic is blocked. When the web traffic is blocked across the third
scenario, even the cloud utilization is improved against processing the database application
towards the home office. As mentioned 150 workstations are used and out of that 50 users
support the database application. The overall database point to point utilization for all the users is
enhanced as well even against the security policies and packet latency of firewalls. Thus the
main aim of the project to improve the overall performance of cloud under the firewalls and also
improve the security by blocking the web traffic is proved from the result analysis. When there is
heavy browsing across the clouds the overall cloud utilization is increased and thus the
performance is reduced. As the proposed design blocks the web traffic the database users are
provided with quick query response time and also the overall performance of the cloud is also
increased in terms of reducing the point to point utilization.
49
6: Testing
In order to prove the above results, to the proposed model the number of workstations
and the packet latency is changed to test. Two cases are used to prove the results, in the first case
the number of workstations is changed to 300 and in the second case packet latency is changed to
0.10.
6.1 First case:
In this case, the number of workstations is changed to 300. By increasing the number of
workstations, the numbers of users in the cloud are also increased. By right clicking on the
HomeOffice, the attributes of workstations is changed from 150 to 300. After changing the
number of workstations in each scenario, the simulation runs for an hour. The following results
are observed:
6.1.1 Database query response time:
Response time indicates the overall performance of the database application. When there
are no firewalls the page response time would be very less when compared with the firewall
scenario.
50
Figure 33: Response time
The above graph indicates that when web access is blocked the average response time is
very less when compared with other scenarios. As the response time is indirectly proportional to
performance, thus it can be stated that the performance of cloud is enhanced.
6.1.2 Server DB Query load:
The overall load of the database server can be estimated here. Load on database server at
each scenario, when there are 300 workstations can be known from below graph.
51
Figure 34: Load on database server
When there is no firewall the load is less when compared to the other scenarios. The load
on the database server is almost equal across all the three scenarios, apart from the firewall
implementation. This situation indicates that, due to the extra firewall policies there could be
some packet delay as they are filtered, but the overall burden on the server is not affected.
Even if the number of workstations is increased, the same result is observed i.e. there will
be no extra load on database server when a firewall is placed across the cloud.
52
6.1.3 Database server point to point utilization:
The overall utilization of the database server across the router indicates the application
performance against the key security issues.
Figure 35: Database server across router
When the numbers of workstations are increased, the utilization of database server
is same in all three scenarios. From the graph it is clear that, the point to point utilization of the
database server is increased when there is firewall across the cloud.
53
6.1.4 Point to point cloud utilization across west router
The overall point to point cloud utilization across the west router is given in the below
graph
Figure 36: point to point cloud utilization
It can be observed from the above graph that the overall point to point utilization of cloud
is more when there is firewall across the network. In the third scenario where the web traffic is
blocked the overall utilization of the cloud is reduced as shown in the above graph. As the
complete web traffic is blocked the cloud has ample space to process the database packets and
the overall utilization is reduced. From the overall analysis it can be estimated that, irrespective
54
of the number of workstations the overall utilization of the cloud can be optimized when the web
traffic is blocked using the firewalls.
6.2 Second case:
Here the packet latency of IP cloud is changed from 0.05 to 0.10, there by generating the
result. The simulation will be results will be generated after an hour.
6.2.1 Database query response time:
The response time is almost similar to above cases if there are no security policies or
barriers to the application traffic across the network, the query response time would be very less
and the actual comparison graph is as shown below
55
Figure 37: Response time
In the case with the web application blocking scenario, the response time is reduced even
there is a firewall which filters the packets. As the firewall completely blocks the web traffic, the
load on the firewalls is reduced and thus the performance of the database application is
enhanced. Though the packet latency is changed, the behavior of the database server is not
changed.
6.2.2 Server DB query load
The load of the database server is estimated here, where the load under three scenarios
are shown in the graph.
56
Figure 38: Load on database server
From the above graph it can be observed that due to the extra firewall policies there could
be some packet delay as they are filtered, but the overall burden on the server is not affected. The
load is almost equal in the three scenarios.
6.2.3 Database Server point to point utilization
The overall utilization of the database server across the router indicates the application
performance against the key security issues.
57
Figure 39: Database server across router
It can be observed that, the point to point utilization is less when there is no firewall and
this indicates that, when there are no packet filtering or external firewall policies the overall
utilization of the server is reduced. The overall performance of the cloud is same as in the above
cases even if the packet latency is changed.
58
6.2.4 Point to point cloud utilization across east router
The overall point to point cloud utilization across the east router is given in the below
graph
Figure 40: Point to point cloud utilization
Even if the packet latency is changed the overall point to point utilization of cloud is
more when there is firewall across the network. When there is no firewall also the utilization is
more as the cloud needs to process the database and Http packets continuously.
59
By observing the above two test cases, the overall performance is enhanced when
unauthorized web access is blocked. Apart from the above cases, this network is been tested by
changing the number of workstations and the packet latency.
60
7: Conclusion and future work
7.1 Conclusion
With the increase in the usage of the internet the demand for cloud computing has
increased drastically. A lot of cloud service providers have emerged in the market and they are
successful in attracting many clients. In general cloud service providers offers wide range of
services to their clients and the key among them are database and other software services. The
main advantage with cloud computing is that, the risk of infrastructure maintenance is reduced to
the direct parties. Third parties are involved across the cloud maintenance and thus the overall
cost to the organization is also reduced a lot. Apart from the advantages with cloud computing
the key limitation is security. As the database and the key resources of the organization are
maintained across a remote location, the level of user control over the resources would be very
less. Providing security to the database resources and web resources is a tedious task and in this
context there were lots of security models proposed. Based on the literature survey reports it is
clear that there was no clear model that defines the performance of the database applications due
to the security models imposed over the cloud.
The main aim of this project is to evaluate the performance of the database applications
that were accessed from an internet cloud under the guidance of a firewall. In general when a
firewall is attached to the network, the overall performance of any application against the traffic
sent or received is degraded. In this context an alternative security model is required to make
sure that the performance of the applications is not affected due to the unnecessary web traffic or
packet filtering done by firewalls. In this project a new security model is proposed and the
proposed design is explained in the previous chapters. OPNET IT guru is used as the simulation
61
tool in this project and three scenarios are created based on an IP based cloud. First scenario has
no firewall across the cloud, second scenario has a firewall router and the third scenario
completely blocks the web traffic over the cloud. Database and web application are used across
the cloud and a home network with 150 users is created such that to support the corresponding
applications. Few performance metrics like database query response and web page load response
are used for the performance evaluation.
From the overall analysis of the results the proposed firewall model is well used for
enhancing the database application. In this simulation two applications are used like the database
application and web application and it is proved the overall performance of database application
is enhanced when the web traffic is blocked. When the web traffic is blocked across the third
scenario, even the cloud utilization is improved against processing the database application
towards the home office. As mentioned 150 workstations are used and out of that 50 users
support the database application. The overall database point to point utilization for all the users is
enhanced as well even against the security policies and packet latency of firewalls. Thus the
main aim of the project to improve the overall performance of cloud under the firewalls and also
improve the security by blocking the web traffic is proved from the result analysis. When there is
heavy browsing across the clouds the overall cloud utilization is increased and thus the
performance is reduced. As the proposed design blocks the web traffic the database users are
provided with quick query response time and also the overall performance of the cloud is also
increased in terms of reducing the point to point utilization.
62
7.2 Future work
Apart from the work done towards the proposed design, there is some future scope and it is
as given below
More number of applications can be used to evaluate the performance of the security
model proposed
Combined clouds and hybrid clouds can be used in the future to evaluate the security
requirements
Bibliography and References
1. Galen Gruman . (2009). What cloud computing really means. Journal of cloud
computing. 21 (1), p10-14.
2. Dave Asprey. (2010). Building a truly secure Cloud with Dell and Trend Micro. Journal
of Computer Applications. 2 (1), p9-15.
3. Richard Chow. (2009). Controlling Data in the Cloud: Outsourcing Computation without
Outsourcing Control. International Journal of Network Security & Its Applications
(IJNSA. 20 (1), p7-12.
63
4. Jon Brodkin. (2008). Gartner: Seven cloud-computing security risks. Cloud Security
Journal . 3 (1), p4-7.
5. Alan Boehme. (2010). Top Threats to Cloud Computing V1.0. Cloud Security Alliance. .
10 (2), p19-23.
6. CHEN Quan. (2009). Cloud computing and its key techniques. Journal of Computer
Applications. 20 (1), p10-12.
7. Kevin Hamlen. (2010). Security Issues for cloud computing. International Journal of
Information Security and Privacy. 4 (2), p12-15.
8. ELIZABETH WHITE. (2009). Safeguarding Management and Security in the Cloud.
Cloud Security Journal . 3 (1), p8-12.
9. Aderemi A. Atayero. (2011). Security Issues in Cloud Computing: The Potentials of
Homomorphic Encryption. Journal of Emerging Trends in Computing and Information
Sciences. 2 (10), p12-16.
10. David Binning. (2011). Top five cloud computing security issues. International Journal of
Software engineering. 4 (2), p20-24.
11. Terri Quinn-Andry. (2010). Pervasive Security Answers Cloud Computing Worries.
Cisco cloud articles. 2 (1), p10-13.