79
table-1 BWSSB Completed and Ongoing Works as on 01st January 2010 Bangalore North Zone MLA Constituencies 1. Hebbal Constituency A) BBMP Wards - 08 i. Ward No. 18 - Radhakrishna Temple ii. Ward No. 19 - Sanjayanagar iii. Ward No. 20 - Ganganagar iv. Ward No. 21 - Hebbal v. Ward No. 22 - Vishwanatha Nagenahalli vi. Ward No. 33 - Manorayanapalya vii. Ward No. 34 - Gangenahalli viii. Ward No. 46 - Jayachamarajendranagar B) BWSSB service station - 4 i. Sanjayanagar. ii. R.T.Nagar. iii. Anandanagar. iv. BEL Road. C) No. of water supply connections - 31000 D) Borewells i. Total No. of Borewells - 358 ii. Borewell with hand pumps - 190 iii. Borewell with Mini Water Tank - 168 iv. New borewells drilled & commissioned - 133 E) Details of water supply and UGD works. HEBBAL CONSTITUENCY WATER SUPPLY WORKS 2008-09 SL NO. Particulars Nos. Amount 1 No. of works completed 8 3,70,40,700/- 2 No. of works under progress 3 1,47,67,000/- 3 No. of works to be taken up 2 89,06,000/- Total 6,07,67,700/- HEBBAL CONSTITUENCY SANITARY WORKS 2008-09 SL NO. Particulars Nos. Amount 1 No. of works completed 6 1,34,87,000/- 2 No. of works under progress 6 1,83,50,000/- 3 No. of works to be taken up 1 25,00,000/- Total 3,52,94,000/- HEBBAL CONSTITUENCY WATER SUPPLY & SANITARY WORKS 2009-10 SL NO. Particulars Nos. Amount 1 No. of works sanctioned 41 3,83,82,000/-

Abstract 27 Constituency

Embed Size (px)

Citation preview

Page 1: Abstract 27 Constituency

table-1

BWSSB Completed and Ongoing Works as on 01st January 2010

Bangalore North Zone MLA Constituencies

1. Hebbal Constituency

A) BBMP Wards - 08

i. Ward No. 18 - Radhakrishna Temple

ii. Ward No. 19 - Sanjayanagar

iii. Ward No. 20 - Ganganagar

iv. Ward No. 21 - Hebbal

v. Ward No. 22 - Vishwanatha Nagenahalli

vi. Ward No. 33 - Manorayanapalya

vii. Ward No. 34 - Gangenahalli

viii. Ward No. 46 - Jayachamarajendranagar

B) BWSSB service station - 4

i. Sanjayanagar.

ii. R.T.Nagar.

iii. Anandanagar.

iv. BEL Road.

C) No. of water supply connections - 31000

D) Borewells

i. Total No. of Borewells - 358

ii. Borewell with hand pumps - 190

iii. Borewell with Mini Water Tank - 168

iv. New borewells drilled & commissioned - 133

E) Details of water supply and UGD works.

HEBBAL CONSTITUENCY

WATER SUPPLY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed 8 3,70,40,700/-

2 No. of works under progress 3 1,47,67,000/-

3 No. of works to be taken up 2 89,06,000/-

Total 6,07,67,700/-

HEBBAL CONSTITUENCY

SANITARY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed 6 1,34,87,000/-

2 No. of works under progress 6 1,83,50,000/-

3 No. of works to be taken up 1 25,00,000/-

Total 3,52,94,000/-

HEBBAL CONSTITUENCY

WATER SUPPLY & SANITARY WORKS 2009-10

SL

NO.

Particulars Nos. Amount

1 No. of works sanctioned 41 3,83,82,000/-

Page 2: Abstract 27 Constituency

table-1

2. Malleshwaram Constituency

A) BBMP Wards - 07

i. Ward No. 35 - Aramanenagar

ii. Ward No. 36 - Mattikere

iii. Ward No. 45 - Malleshwara

iv. Ward No. 64 - Rajmahal Gutahalli

v. Ward No. 65 - Kadu Malleshwara Ward

vi. Ward No. 66 - Subramanyanagar

vii. Ward No. 76 - Gayatrinagar

B) BWSSB service station - 5

i. Malleshwaram,

ii. Sriramapuram,

iii. K.G. Tower,

iv. Yeshwanthpura

v. Bahubalinagara.

C) No. of water supply connections - 24200

D) Borewells

i. Total No. of Borewells - 391

ii. Borewell with hand pumps - 231

iii. Borewell with Mini Water Tank - 160

iv. New borewell drilled & commissioned - 13

E) Details of water supply and UGD works.

MALLESHWARAM CONSTITUENCY

WATER SUPPLY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed 9 1,79,43,000.00

2 No. of works under progress 1 17,66,000.00

3 No. of works to be taken up 1 11,94,000.00

Total 11 2,09,03,000/-

MALLESHWARAM CONSTITUENCY

SANITARY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed 27 1,38,45,000.00

2 No. of works under progress 3 16,95,000.00

3 No. of works to be taken up - -

Total 30 1,55,40,000/-

MALLESHWARAM CONSTITUENCY

WATER SUPPLY & SANITARY WORKS 2009-10

SL

NO.

Particulars Nos. Amount

1 No. of works sanctioned 41 1,42,14,400/-

Page 3: Abstract 27 Constituency

table-1

3. Gandhinagar Constituency

A) BBMP Wards - 07

i. Ward No. 77 - Dattatreya Temple

ii. Ward No. 94 - Gandhinagar

iii. Ward No. 95 - Subhashanagar

iv. Ward No. 96 - Okalipura

v. Ward No. 109 - Chickpete

vi. Ward No. 120 - Cottanpete

vii. Ward No. 121 - Binnipete

B) BWSSB service station - 07

i. Bhashyam Park,

ii. LLR

iii. Chicklalbhagh

iv. Rajajinagar

v. Magadi Road.

vi. Kumar Park.

vii. Jayamahal.

C) No. of water supply connections

D) Borewells.

i. Total No. of Borewells - 445

ii. Borewell with hand pumps - 252

iii. Borewell with mini water tanks - 193

iv. New borewell & drilled & commissioned - 23

E) Details of water supply and UGD works.

GANDHINAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 15 3,37,52,000/-

2 No of works under progress 05 1,89,22,000/-

3 No of works to be taken up 01 15,85,000/-

Total 21 5,42,59,000/-

GANDHINAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 28 44,05,000/-

2 No of works under progress 01 19,75,000/-

3 No of works to be taken up - -

Total 29 63,80,000/-

GANDHINAGAR CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 74 1,92,09,400/-

Page 4: Abstract 27 Constituency

table-1

4. Yeshwanthapura Constituency

A) BBMP Wards - 10

i. Ward No. 38 - HMT

ii. Ward No. 42 - Lakshmidevinagar

iii. Ward No. 16 - Jalahalli

iv. Ward No. 17 - J.P.Garden

v. Ward No. 37 - Yeshwanthpura

vi. Ward No. 130 - Ullalu

vii. Ward No. 159 - Kengeri

viii. Ward No. 198 - Hemmigepura

ix. Ward No. 40 - Doddabidarakallu

x. Ward No. 72 - Herohalli

B) BWSSB service station - 3

i. Kengeri,

ii. Yeshwanthpura

iii. Bahubalinagar.

C) No. of water supply connections - 10300

D) Borewells

i. Total No. of Borewells - 189

ii. Borewell with hand pumps - 84

iii. New Borewell drilled & commissioned - 81

E) Details of water supply and UGD works.

YESHAWANTHPURA CONSTITUENCY

WATER SUPPLY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed 7 12,91,900.00

2 No. of works under progress -

3 No. of works to be taken up -

Total 7 12,91,900.00

YESHAWANTHPURA CONSTITUENCY

SANITARY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed 2 9,40,000.00

2 No. of works under progress

3 No. of works to be taken up

Total 7 9,40,000.00

YESHAWANTHPURA CONSTITUENCY

WATER SUPPLY & SANITARY WORKS 2009-10

SL

NO.

Particulars Nos. Amount

1 No. of works sanctioned 8 17,97,750/-

Page 5: Abstract 27 Constituency

table-1

5. Mahalaxmi Layout Constituency

A) BBMP Wards - 07

i. Ward No. 43 - Nandhini Layout

ii. Ward No. 44 - Marappanapalya

iii. Ward No. 68 - Mahalakshmipura

iv. Ward No. 74 - Shaktiganapati Nagar

v. Ward No. 67 - Nagapura

vi. Ward No. 75 - Shankaramatta

vii. Ward No. 102 - Vrushabhavathinagar

B) BWSSB service station - 5

i. Mahalaxmi Layout

ii. Nandini Layout

iii. Rajajinagar.

iv. WOC Road.

v. Kamalanagar

C) No. of water supply connections - 32600

D) Borewells

Total No. of Borewells - 514

Borewell with hand pumps - 330

Borewell with Mini Water Tank - 184

No. of borewell drilled & commissioned - 9

E) Details of water supply and UGD works.

MAHALAKSHMI LAYOUT CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 04 2,37,000/-

2 No of works under progress 04 38,31,000/-

3 No of works to be taken up 01 7,89,000/-

Total 09 48,57,000/-

MAHALAKSHMI LAYOUT CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 23 17,57,000/-

2 No of works under progress 11 53,24,000/-

3 No of works to be taken up - -

Total 34 70,81,000/-

MAHALAKSHMI LAYOUT CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 30 76,32,000/-

F) General.

It is proposed to provide Diesel Generator 1000 KVA at Srigandakawal pump

house to supply uninterrupted water during power shutdown.

Page 6: Abstract 27 Constituency

table-1

6. Dasarahalli Constituency

A) BBMP Wards - 08

i. Ward No. 12 - Shettyhalli

ii. Ward No. 13 - Mallasandra

iii. Ward No. 14 - Bagalakunte

iv. Ward No. 15 - T. Dasarahalli

v. Ward No. 39 - Chokkasandra

vi. Ward No. 41 - Peenya Industrial Area

vii. Ward No. 70 - Rajgopalanagar

viii. Ward No. 71 - Hegganahalli

B) BWSSB service station - 2

i. Peenya

ii. Yelahanka

C) No. of water supply connections - 6950

D) Borewells

i. Total No. of Borewells - 498

ii. No. of New Borewell Drilled & commissioned - 151

E) Cauvery Water Serviced in Ward Nos. 7, 11, 13, 22, 24, 25 & 32.

F) Details of water supply and UGD works.

DASARAHALLI CONSTITUENCY

WATER SUPPLY WORKS 2008-09

SL

No.

Particulars Nos. Amount

1 No. of works completed 30 32,40,000.00

2 No. of works under progress 02 2,93,600.00

3 No. of works to be taken up - -

Total 32 35,33,600.00

DASARAHALLI CONSTITUENCY

SANITARY WORKS 2008-09

SL

No.

Particulars Nos. Amount

1 No. of works completed 03 2,27,300.00

2 No. of works under progress -- -

3 No. of works to be taken up - -

Total 03 2,27,300.00

DASARAHALLI CONSTITUENCY

WATER SUPPLY & SANITARY WORKS 2009-10

SL

No.

Particulars Nos. Amount

1 No. of works sanctioned 18 88,70,300/-

G) 474.702 Km distribution pipeline completed 27.58 Km feeder line out of 31.30

Km laid under GBWASP.

Page 7: Abstract 27 Constituency

table-1

7. Yelahanka Constituency

A) BBMP Wards - 04

i. Ward No. 1 - Kempegowda

ii. Ward No. 2 - Chowdeshwari

iii. Ward No. 3 - Attooru

iv. Ward No. 4 - Yalahanka Satellite Town

B) BWSSB service station - 1

i. Yelahanka S/stn.,

C) No. of water supply connections - 5500

D) Borewells

i. Total No. of Borewells - 215

ii. Borewell with hand pumps - 4

iii. New Borewell drilled & commissioned - 87

E) Cauvery Water Serviced in Ward Nos. 24.

F) Details of water supply and UGD works.

YELAHANKA CONSTITUENCY

WATER SUPPLY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed - -

2 No. of works under progress - -

3 No. of works to be taken up - -

Total

YELAHANKA CONSTITUENCY

SANITARY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed 1 13,55,000/-

2 No. of works under progress 2 26,40,000/-

3 No. of works to be taken up - -

Total 3 39,95,000/-

YELAHANKA CONSTITUENCY

WATER SUPPLY & SANITARY WORKS 2009-10

SL

NO.

Particulars Nos. Amount

1 No. of works sanctioned 36 25,51,100/-

G) 66.5 Km Distribution. Pipeline laid under GBWASP & 100% completed.

Page 8: Abstract 27 Constituency

table-1

8. Byatarayanapura Constituency

A) BBMP Wards - 07

i. Ward No. 5 - Jakkuru

ii. Ward No. 6 - Thanisandra

iii. Ward No. 7 - Byatarayanapura

iv. Ward No. 8 - Kodigehalli

v. Ward No. 9 - Vidyaranyapura

vi. Ward No. 10 - Doddabommasandra

vii. Ward No. 11 - Kuvempunagar

B) BWSSB service station - 2

i. Sahakara Nagar,

ii. Vidyaranya pura

C) No. of water supply connections - 5300

D) Borewells

i. Total No. of Borewells - 464

ii. Borewell with hand pumps - 8

iii. Borewell with Mini Water Tank - 35

iv. New Borewell drilled & commissioned - 132

F) Cauvery Water Serviced in Ward Nos. 4, 15 & 19.

G) Details of water supply and UGD works.

BYATARAYANAPURA CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 22 32,14,000/-

2 No of works under progress 23 54,66,000/-

3 No of works to be taken up - -

Total 45 86,80,000/-

BYATARAYANAPURA CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 01 97,000/-

2 No of works under progress 01 5,98,000/-

3 No of works to be taken up - -

Total 02 6,95,000/-

BYATARAYANAPURA CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 03 2,93,100/-

H) 890 Km Distn. Pipeline laid under GBWASP & 100% work completed.

Page 9: Abstract 27 Constituency

table-1

9. Mahadevapura Constituency

A) BBMP Wards - 08

i. Ward No. 54 - Hoodi

ii. Ward No. 82 - Garudacharapalya

iii. Ward No. 85 - Doddanekkundi

iv. Ward No. 83 - Kadugodi

v. Ward No. 84 - Hagadooru

vi. Ward No. 149 - Varthur

vii. Ward No. 86 - Marathhalli

viii. Ward No. 150 - Bellanduru

B) BWSSB service station - 2

i. AECS Layout.

ii. Hoody

C) No. of water supply connections - 1656

D) Borewells

i. Total No. of Borewells - 449

ii. Borewell with hand pumps - 15

iii. Borewell with energized - 397

iv. New Borewell drilled % commissioned - 116

E) Details of water supply and UGD works.

MAHADEVAPURA CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 06 4,64,400/-

2 No of works under progress 05 80,59,000/-

3 No of works to be taken up 03 1,98,000/-

Total 14 87,21,400/-

MAHADEVAPURA CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed - -

2 No of works under progress - -

3 No of works to be taken up - -

Total - -

MAHADEVAPURA CONSTITUENCY

WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No.

Particulars Nos. Amount

1 No of works sanctioned 03 11,15,000/-

F) 386.221 Km distribution pipeline work completed under GBWASP

Page 10: Abstract 27 Constituency

table-1

10. Shivajinagar Constituency

A) BBMP Wards - 07

i. Ward No. 9 - Ulsoor

ii. Ward No. 91 - Bharathinagar

iii. Ward No. 92 - Shivajinagar

iv. Ward No. 62 - Ramaswamipalya

v. Ward No. 63 - Jayamahal

vi. Ward No. 93 - Vasanthanagar

vii. Ward No. 110 - Sampangiramanagar

B) BWSSB service station - 2

i. HGR

ii. Coles Park

C) No. of water supply connections - 13400

D) Borewells

i. Total No. of Borewells - 167

ii. Borewell with hand pumps - 132

iii. Borewell with Mini Water Tank - 35

iv. New borewells drilled & commissioned - 6

E) Details of water supply and UGD works.

SHIVAJINAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 07 94,64,000/-

2 No of works under progress 04 3,13,87,000/-

3 No of works to be taken up - -

Total 11 4.08.51.000/-

SHIVAJINAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 33 1,31,48,000/-

2 No of works under progress - -

3 No of works to be taken up 03 25,00,000/-

Total 36 1,56,48,000/-

SHIVAJINAGAR CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 14 50,02,800/-

Page 11: Abstract 27 Constituency

table-1

11. Pulakeshinagar Constituency

A) BBMP Wards - 07

i. Ward No. 31 - Kushalanagar

ii. Ward No. 32 - Kaval Byrasandra

iii. Ward No. 48 - Muneshwarnagar

iv. Ward No. 60 - Sagayapura

v. Ward No. 47 - Devarajeevanahalli

vi. Ward No. 61 - S.K. Garden

vii. Ward No. 78 - Pulakeshinagar

B) BWSSB service station - 2

i. Pillanna Garden.

ii. Machalibetta.

C) No. of water supply connections - 15580

D) Borewells

i. Total No. of Borewells - 184

ii. Borewell with hand pumps - 141

iii. Borewell with Mini Water Tank - 42

iv. New Borewell drilled & commissioned - 17

E) Details of water supply and UGD works.

PULAKESHINAGARA CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 02 1,99,000/-

2 No of works under progress 01 5,12,000/-

3 No of works to be taken up 03 56,51,000/-

Total 06 63,62,000/-

PULAKESHINAGARA CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 19 28,02,200/-

2 No of works under progress 03 34,55,000/-

3 No of works to be taken up 03 25,82,000/-

Total 25 88,39,000/-

PULAKESHINAGARA CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 15 1,94,38,400/-

Page 12: Abstract 27 Constituency

table-1

12. Sarvagnanagar Constituency

A) BBMP Wards - 08

i. Ward No. 27 - Banasavadi

ii. Ward No. 28 - Kammanahalli

iii. Ward No. 29 - Kacharakanahalli

iv. Ward No. 49 - Lingarajapur

v. Ward No. 59 - Maruti Sevanagar

vi. Ward No. 23 - Nagavara

vii. Ward No. 24 - HBR Layout

viii. Ward No. 30 - Kadugondanahalli

B) BWSSB service station - 6

i. Pillanna Garden.

ii. Machalibetta.

iii. HRBR

iv. HBR-I

v. HBR-II

vi. OMBR.

C) No. of water supply connections - 26396

D) Borewells

i. Total No. of Borewells - 437

ii. Borewell with hand pumps - 250

iii. Borewell with mini Water tank - 180

iv. New Borewell drilled % commissioned - 51

E) Details of water supply and UGD works.

SARVAGNANAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 02 1,18,100/-

2 No of works under progress 04 18,07,000/-

3 No of works to be taken up 01 1,70,000/-

Total 07 20,95,100/-

SARVAGNANAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed - -

2 No of works under progress 01 11,00,000/-

3 No of works to be taken up 01 10,40,000/-

Total 02 21,40,000/-

SARVAGNANAGAR CONSTITUENCY

WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No.

Particulars Nos. Amount

1 No of works sanctioned 27 33,01,450/-

Page 13: Abstract 27 Constituency

table-1

13. K.R.Puram Constituency

A) BBMP Wards - 09

i. Ward No. 25 - Horamavu

ii. Ward No. 26 - Ramamurthinagar

iii. Ward No. 51 - Vijnanapura

iv. Ward No. 52 - K.R.Puram

v. Ward No. 53 - Basavanapura

vi. Ward No. 55 - Devasandra

vii. Ward No. 56 - A. Narayanapura

viii. Ward No. 81 - Vijnanagar

ix. Ward No. 87 - HAL Airport Road

B) BWSSB service station

i. K.R.Puram

ii. Ramamurthy Nagar

iii. AECS Layout.

C) No. of water supply connections - 15

D) Borewells

i. Total No. of Borewells - 421

ii. Borewell with hand pumps - 10

iii. Borewell with energized - 411

iv. New Borewell drilled % commissioned - 173

E) Details of water supply and UGD works.

K.R. PURAM CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 58 39,24,100/-

2 No of works under progress - -

3 No of works to be taken up 01 90,000/-

Total 59 40,14,100/-

K.R. PURAM CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 01 40,00,000/-

2 No of works under progress - -

3 No of works to be taken up - -

Total 01 40,00,000/-

K.R. PURAM CONSTITUENCY

WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No.

Particulars Nos. Amount

1 No of works sanctioned 21 16,11,700/-

F) 326.95 Km distribution pipeline work completed under GBWASP.

Page 14: Abstract 27 Constituency

table-1

14. C.V.Raman Nagar Constituency

A) Area - 07

i. Ward No. 80 - Hoysalanagar

ii. Ward No. 88 - Jeevanbhimanagar

iii. Ward No. 113 - Konena Agrahara

iv. Ward No. 50 - Benniganahalli

v. Ward No. 57 - C.V. Raman Nagar

vi. Ward No. 58 - New Tippasandra

vii. Ward No. 79 - Sarvagnanagar

B) BWSSB service station - 7

i. Bhuvaneshwarinagar

ii. Jeevan Bheemanagar

iii. Ulsoor

iv. HAL II Stage

v. Indiranagara

vi. OMBR

vii. Machalibetta

C) No. of water supply connections - 20338

D) Borewells

i. Total No. of Borewells - 487

ii. Borewell with hand pumps - 178

iii. Borewell with Mini Water Tank - 305

iv. New Borewell drilled - 24

v. No. of borewell drilled & commissioned - 28

E) Details of water supply and UGD works.

C.V. RAMAN NAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 02 11,50,000/-

2 No of works under progress 06 43,14,000/-

3 No of works to be taken up 02 83,20,000/-

Total 10 1,37,84,000/-

C.V. RAMAN NAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed - -

2 No of works under progress 01 4,22,000/-

3 No of works to be taken up 02 34,84,000/-

Total 03 39,06,000/-

C.V. RAMAN NAGAR CONSTITUENCY

WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 14 2,81,61,500/-

Page 15: Abstract 27 Constituency

table-1

Bangalore South Zone MLA Constituencies

1. Padmanabhanagara Constituency

A) BBMP Wards - 08

i. Ward No.161 - Hosakerehalli

ii. Ward No. 165 - Ganesh Mandhir

iii. Ward No. 182 - Padmanabhanagar

iv. Ward No. 183 - Chikkalasandra

v. Ward No. 166 - Karisandra

vi. Ward No. 167 - Yadiyooru

vii. Ward No. 180 - Banashankari Temple

viii. Ward No. 181 - Kumarswamy Layout

B) BWSSB service station - 6

i. MNK Park.

ii. Devagiri.

iii. Banashankari.

iv. Kumaraswamy Layout.

v. Hosakerehalli.

vi. Poorna Prajna Layout.

C) No. of water supply connections - 34500

D) Borewells

i. Total No. of Borewells - 262

ii. Borewell with hand pumps - 149

iii. Borewell with Mini Water Tank - 113

iv. New Borewell drilled & commissioned - 6

E) Details of water supply and UGD works.

PADMANABHANAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 07 27,82,000/-

2 No of works under progress 08 1,66,33,000/-

3 No of works to be taken up 01 5,70,000/-

Total 16 1,99,85,000/-

PADMANABHANAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 10 39,21,000/-

2 No of works under progress 03 18,90,000/-

3 No of works to be taken up 13 52,10,000/-

Total 26 1,10,21,000/-

PADMANABHANAGAR CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 35 4,20,40,600/-

Page 16: Abstract 27 Constituency

table-1

2. Basavanagudi Constituency

A) BBMP Wards - 06

i. Ward No. 154 - Basavanagudi

ii. Ward No. 155 - Hanamanthanagar

iii. Ward No. 164 - Vidyapeetha

iv. Ward No. 156 - Srinagar

v. Ward No. 162 - Girinagar

vi. Ward No. 163 - Kattriguppe

B) BWSSB service station - 6

i. MNK Park.

ii. Mount joy.

iii. Nagendra Block

iv. Kathriguppa.

v. V.V. Puram

vi. B.T.R.

C) No. of water supply connections - 30500

D) Borewells

i. Total No. of Borewells - 363

ii. Borewell withhand pumps - 208

iii. Borewell with Mini Water Tank - 155

iv. New Borewell drilled & commissioned - 23

E) Details of water supply and UGD works.

BASAVANAGUDI CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 03 7,30,000/-

2 No of works under progress 04 15,38,000/-

3 No of works to be taken up 12 1,58,36,000/-

Total 19 1,81,04,000/-

BASAVANAGUDI CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 12 22,70,000/-

2 No of works under progress 08 79,50,000/-

3 No of works to be taken up 14 65,21,000/-

Total 34 1,67,41,000/-

BASAVANAGUDI CONSTITUENCY

WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-

10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 15 26,59,100/-

Page 17: Abstract 27 Constituency

table-1

3. BTM Constituency

A) BBMP Wards - 08

i. Ward No. 146 - Lakkasandra

ii. Ward No. 152 - Suddaguntepalya

iii. Ward No. 172 - Madivala

iv. Ward No. 176 - BTM Layout

v. Ward No. 147 - Adugodi

vi. Ward No. 148 - Ejipura

vii. Ward No. 151 - Koramangala

viii. Ward No. 173 - Jakkasandra

B) BWSSB service station - 3

i. Hombegowdanagar

ii. Koramangala

iii. CLR

C) No. of water supply connections - 23100

D) Borewells

i. Total No. of Borewells - 207

ii. Borewell with hand pumps - 128

iii. Borewell with Msini Water Tank - 79

iv. New borewell drilled & commissioned - 13

E) Details of water supply and UGD works.

BTM CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 04 46,15,000/-

2 No of works under progress 06 1,06,39,000/-

3 No of works to be taken up 14 1,38,00,000/-

Total 24 2,90,54,000/-

BTM CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 09 20,96,000/-

2 No of works under progress 06 42,05,000/-

3 No of works to be taken up 21 40,76,000/-

Total 36 1,03,77,000/-

BTM CONSTITUENCY

WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No.

Particulars Nos. Amount

1 No of works sanctioned 44 1,11,62,500/-

Page 18: Abstract 27 Constituency

table-1

4. Chickpet Constituency

A) BBMP Wards - 07

i. Ward No. 118 - Sudhamanagar

ii. Ward No. 119 - Dharmaraya Temple

iii. Ward No. 142 - Sunkenahalli

iv. Ward No. 143 - Vishveshwarapura

v. Ward No. 144 - Siddapura

vi. Ward No. 145 - Hombegowdanagar

vii. Ward No. 153 - Jayanagar

B) BWSSB service station - 4

i. Bannappa Park

ii. V.V.Puram

iii. Hombegowdanagar

iv. Byrasandra

C) No. of water supply connections - 23600

D) Borewells

i. Total No. of Borewells - 252

ii. Borewell with hand pumps - 194

iii. Borewell with Mini Water Tank - 58

iv. New borewell drilled & commissioned - 07

E) Details of water supply and UGD works.

CHICKPET CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 05 1,02,32,000/-

2 No of works under progress 06 80,66,000/-

3 No of works to be taken up 13 96,42,000/-

Total 24 2,79,40,000/-

CHICKPET CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 17 38,99,000/-

2 No of works under progress 08 24,16,000/-

3 No of works to be taken up 18 1,02,42,000/-

Total 43 1,65,57,000/-

CHICKPET CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 25 51,44,500/-

Page 19: Abstract 27 Constituency

table-1

5. Vijayanagar Constituency

A) BBMP Wards - 08

i. Ward No. 122 - Kempapura Agrahara

ii. Ward No. 123 - Vijaynagar

iii. Ward No. 124 - Hosahalli

iv. Ward No. 134 - Bapoojinagar

v. Ward No. 132 - Attiguppe

vi. Ward No. 133 - Hampinagar

vii. Ward No. 157 - Gali Anjaneya Temple

viii. Ward No. 158 - Deepanjalinagar

B) BWSSB service station - 6

i. Nagendra Block

ii. Kathriguppe

iii. Magadi Road

iv. Mysore Road

v. Hosahalli

vi. Chandra Layout

C) No. of water supply connections - 25,286

D) Borewells

i. Total No. of Borewells - 458

ii. Borewell with hand pumps - 236

iii. Borewell with Mini Water Tank - 222

iv. New borewell drilled & commissioned- 26

E) Details of water supply and UGD works

VIJAYANAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 06 20,09,000/-

2 No of works under progress 07 53,23,000/-

3 No of works to be taken up - -

Total 13 73,32,000/-

VIJAYANAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 25 61,53,000/-

2 No of works under progress 07 39,31,000/-

3 No of works to be taken up - -

Total 32 1,00,84,000/-

VIJAYANAGAR CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 21 5,47,97,100/-

Page 20: Abstract 27 Constituency

table-1

.

6. Jayanagara Constituency

A) BBMP Wards - 07

i. Ward No. 168 - Pattabhiramanagar

ii. Ward No. 169 - Byrasandra

iii. Ward No. 170 - Jayanagar East

iv. Ward No. 171 - Guruppanapalya

v. Ward No. 177 - J.P. Nagar

vi. Ward No. 178 - Sarakki

vii. Ward No. 179 - Shakambarinagar

B) BWSSB service station - 4

i. Devagiri

ii. Jayanagar

iii. Jayanagar IV T Block

iv. Byrasandra

C) No. of water supply connections - 26300

D) Borewells

i. Total No. of Borewells - 137

ii. Borewell with hand pumps - 93

iii. Borewell with Mini Water Tank - 44

iv. New borewell drilled & commissioned - 04

E) Details of water supply and UGD works.

JAYANAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 05 32,66,000/-

2 No of works under progress 05 96,29,000/-

3 No of works to be taken up 06 1,59,85,000/-

Total 16 2,88,80,000/-

JAYANAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 15 45,35,000/-

2 No of works under progress 07 95,49,000/-

3 No of works to be taken up 15 1,01,43,000/-

Total 37 2,42,27,000/-

JAYANAGAR CONSTITUENCY

WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-

Sl.

No.

Particulars Nos. Amount

1 No of works sanctioned 21 80,01,000/-

Page 21: Abstract 27 Constituency

table-1

7. Chamarajpet Constituency

A) BBMP Wards - 07

i. Ward No. 135 - Padarayanapura

ii. Ward No. 136 - Jagajeevanaram Nagar

iii. Ward No. 137 - Rayapura

iv. Ward No. 138 - Chalavaipalya

v. Ward No. 139 - Krishnaraj Market

vi. Ward No. 140 - Chamarajpet

vii. Ward No. 141 - Ajadhanagar

B) BWSSB service station - 2

i. Chamarajpet

ii. J.J.Nagara

C) No. of water supply connections - 24010

D) Borewells

i. Total No. of Borewells - 115

ii. Borewell with hand pumps - 65

iii. Borewell with Mini Water Tank - 50

iv. New Borewell drilled & commissioned - 12

E) Details of water supply and UGD works.

CHAMARAJPET CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 05 19,81,000/-

2 No of works under progress 04 18,11,000/-

3 No of works to be taken up 04 74,35,000/-

Total 13 1,12,27,000/-

CHAMARAJPET CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 36 68,51,000/-

2 No of works under progress 08 56,37,000/-

3 No of works to be taken up 04 33,90,000/-

Total 48 1,58,78,000/-

CHAMARAJPET CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 19 39,51,550/-

Page 22: Abstract 27 Constituency

table-1

8. Bangalore South Constituency

A) BBMP Wards - 08

i. Ward No. 191 - Singasandra

ii. Ward No. 192 - Beguru

iii. Ward No. 184 - Uttarahalli

iv. Ward No. 185 - Yelechenahalli

v. Ward No. 197 - Vasantapura

vi. Ward No. 194 - Gottigere

vii. Ward No. 195 - Konanakunte

viii. Ward No. 196 - Anjanapura

B) BWSSB service station - 4

i. Poorna Pragna Layout

ii. Kumaraswamy Layout

iii. Banashankari

iv. Kothnur Dinne

C) No. of water supply connections - 1200

D) Borewells

i. Total No. of Borewells - 133

ii. Borewell with hand pumps - 25

iii. Borewell with Energized - 108

iv. New Borewell drilled & commissioned- 67

E) Details of water supply and UGD works.

BANGALORE SOUTH CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works to be taken up 1 4,00,000/-

Total 1 4,00,000/-

BANGALORE SOUTH CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 1 1,45,000/-

H) 203 Km Distribution pipeline laid under GBWASP.

Page 23: Abstract 27 Constituency

table-1

9. Shanthinagara Constituency

A) BBMP Wards - 07

i. Ward No. 111 - Shantalanagar

ii. Ward No. 116 - Neelasandra

iii. Ward No. 117 - Shanthinagar

iv. Ward No. 89 - Jogupalya

v. Ward No. 112 - Domlur

vi. Ward No. 114 - Agara

vii. Ward No. 115 - Vannarapeta

B) BWSSB service station - 5

i. CLR

ii. Johnson Market

iii. Ulsoor.

iv. Indiranagara.

v. Domlur.

C) No. of water supply connections - 24780

D) Borewells

i. Total No. of Borewells - 171

ii. Borewell with hand pumps - 94

iii. Borewell with Mini Water Tank - 77

iv. New Borewell drilled & commissioned- 09

E) Details of water supply and UGD works.

SHANTHI NAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 06 1,33,14,000/-

2 No of works under progress 02 35,62,000/-

3 No of works to be taken up 09 2,03,31,000/-

Total 17 3,72,07,000/-

SHANTHI NAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 07 77,99,000/-

2 No of works under progress 03 25,56,000/-

3 No of works to be taken up 19 1,46,11,000/-

Total 29 2,49,66,000/-

SHANTHI NAGAR CONSTITUENCY

WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No.

Particulars Nos. Amount

1 No of works sanctioned 22 78,08,000/-

Page 24: Abstract 27 Constituency

table-1

10. R.R.Nagara Constituency

A) BBMP Wards - 04

i. Ward No. 160 - Rajarajeshwarinagar

ii. Ward No. 129 - Jnanabharathi

iii. Ward No. 69 - Laggere

iv. Ward No. 73 - Kottigepalya

B) BWSSB service station - 2

i. R.R.Nagara

ii. Nagarabhavi

C) No. of water supply connections - 9400

D) Borewells

i. Total No. of Borewells - 571

ii. Borewell with hand pump - 110

iii.Borewell taken over from BBMP - 333

iv. No. of New Borewell Drilled & commissioned - 96

E) Cauvery Water Serviced in Ward No. 6 & 16

F) Details of water supply and UGD works.

RAJARAJESHWARINAGAR CONSTITUENCY

WATER SUPPLY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed 43 1,16,63,050.00

2 No. of works under progress 04 17,75,600.00

3 No. of works to be taken up - -

Total 47 1,34,38,650.00

RAJARAJESHWARINAGAR CONSTITUENCY

SANITARY WORKS 2008-09

SL

NO.

Particulars Nos. Amount

1 No. of works completed 24 1,38,33,800.00

2 No. of works under progress 04 51,26,100.00

3 No. of works to be taken up 06 5,49,000.00

Total 34 1,95,08,900.00

RAJARAJESHWARINAGAR CONSTITUENCY

WATER SUPPLY & SANITARY WORKS 2009-10

SL

NO.

Particulars Nos. Amount

1 No. of works sanctioned 11 1,21,40,300/-

G) 315 Km distribution pipeline completed feeder line work is in-progress under

GBWASP.

Page 25: Abstract 27 Constituency

table-1

11. Rajajinagar Constituency

A) BBMP Wards - 07

i. Ward No. 99 - Rajajinagar

ii. Ward No. 100 - Basaveshwaranagar

iii. Ward No. 101 - Kamakshipalya

iv. Ward No. 107 - Shivanagar

v. Ward No. 97 - Dayanandanagar

vi. Ward No. 98 - Prakashanagar

vii. Ward No. 108 - Sri Ramamandhir

B) BWSSB service station - 6

i. Rajajinagara

ii. Kethmaranahalli

iii.WCR

iv. Mahalaxmi Layout

v. Nandini Layout

vi. Kamakshipalya

vii. Kamalanagara

C) No. of water supply connections - 23950

D) Borewells

i. Total No. of Borewells - 461

ii. Borewell with hand pumps - 286

iii. Borewell with Mini Water Tank - 175

iv. New Borewell drilled & commissioned- 11

E) Details of water supply and UGD works.

RAJAJINAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 05 6,44,000/-

2 No of works under progress 06 26,35,000/-

3 No of works to be taken up 02 42,94,000/-

Total 13 75,73,000/-

RAJAJINAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 22 23,76,000/-

2 No of works under progress 07 45,63,000/-

3 No of works to be taken up 01 10,53,000/-

Total 30 79,92,000/-

RAJAJINAGAR CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 15 1,21,71,500/-

Page 26: Abstract 27 Constituency

table-1

12. Govindarajanagara Constituency

A) BBMP Wards - 09

i. Ward No. 103 - Kaveripura

ii. Ward No. 104 - Govindarajnagar

iii. Ward No. 105 - Agrahara Dasarahalli

iv. Ward No. 106 - Dr. Rajakumar

v. Ward No. 125 - Marenahalli

vi. Ward No. 126 - Maruthi Mandhir

vii. Ward No. 127 - Moodalapalya

viii. Ward No. 128 - Nagarabhavi

ix. Ward No. 131 - Nayandahalli

B) BWSSB service station - 3

i. Moodalapalya

ii. Vijayanagara OHT

iii.Chandra Layout

C) No. of water supply connections - 30896

D) Borewells

i. Total No. of Borewells - 408

ii. Borewell with hand pumps - 230

iii. Borewell with Mini Water Tank - 178

iv. New borewell drilled & commissioned - 51

E) Details of water supply and UGD works.

GOVINDARAJ NAGAR CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 08 18,40,000/-

2 No of works under progress 06 63,90,000/-

3 No of works to be taken up 05 31,22,000/-

Total 19 1,13,52,000/-

GOVINDARAJ NAGAR CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No. Particulars Nos. Amount

1 No of works completed 55 1,54,03,000/-

2 No of works under progress 13 79,25,000/-

3 No of works to be taken up - -

Total 68 2,33,28,000/-

GOVINDARAJ NAGAR CONSTITUENCY WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No. Particulars Nos. Amount

1 No of works sanctioned 18 4,49,12,000/-

Page 27: Abstract 27 Constituency

table-1

13. Bommanahalli Constituency

A) BBMP Wards - 08

i) Ward No. 173 - HSR layout

ii) Ward No. 175 - Bommanahalli

iii) Ward No. 189 - Hongasandra

iv) Ward No. 190 - Mangammanapalya

v) Ward No. 186 - Jaraganahalli

vi) Ward No. 187 - Puttenahalli

vii) Ward No. 188 - Bilekahalli

viii) Ward No. 193 - Arekere

B) BWSSB service station - 3

i. Kothnur Dinne

ii. J.P.Nagara

iii.HSR Layout.

C) No. of water supply connections - 5400

D) Borewells

i. Total No. of Borewells - 902

ii. Borewell with hand pumps - 200

iii. Borewell with Energized - 682

iv. No. of Borewell drilled

& commissioned - 176

E) Cauvery water serviced in ward No. 11, 19, 26, 27, 28, 29, 30, 31

F) Details of water supply and UGD works.

BOMMANAHALLI CONSTITUENCY

WATER SUPPLY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 03 1,01,85,000/-

2 No of works under progress 03 26,13,000/-

3 No of works to be taken up 02 1,23,28,000/-

Total 08 2,51,26,000/-

BOMMANAHALLI CONSTITUENCY

SANITARY WORKS-2008-09

Sl.

No.

Particulars Nos. Amount

1 No of works completed 01 98,000/-

2 No of works under progress 01 3,60,000/-

3 No of works to be taken up 03 42,16,000/-

Total 05 46,74,000/-

BOMMANAHALLI CONSTITUENCY

WATER SUPPLY & SANITARY WORKS SANCTIONED-2009-10

Sl.

No.

Particulars Nos. Amount

1 No of works sanctioned 09 17,88,200/-

G) 556 Km Distribution pipeline laid under GBWASP as against 597 Km and feeder

line work is in progress.

Page 28: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

HEBBAL CONSTITUENCY

Work Completed

Sl No

W/S particulars Est. cost in

Lakhs

1

Laying and Linking of 8" Feeder Main to improve W/S to Sultanpalya area, coming under R.T. Nagar S/Station.

Rs. 27.10

2 replacing of 8" dia PVC by 8" dia MS line in 80 feet road upto Bus Stop in HMT L/O area, R.T. Nagar S/Station.

Rs.23.35

3

Laying & Linking of 300 mm dia Feeder main line on CBI Road in Ganga Nagar area, coming under R.T. Nagar S/Station.

Rs. 73.70

Part A 13.15 4

Replacement of 110 mm dia PVC old existing line at AECS L/O, I & II Stage, Vinayaka L/o, coming under Sanjayanagar S/Station. Part B 12.50

5

P/L of proposed 150 mm dia DI pipeline from Sanjay Nagar main Road to Ramana Maharishi Memoral hall & from Poona Bakery to K.E.B. L/O, coming under Sanjayanagar S/Station.

Rs. 11.75

6

P/L 100mm dia W/S line in place of 3" dia corroded line at Hebbal, C.N. Halli, V. Nagena Halli, Babu Reddy L/O, Anand Nagar II Block, coming under Anandanagar S/Station.

Rs. 20.55

7 P/L of proposed 150mm dia Feeder Main to Railway colony at Lotte Golla Halli, coming under New BEL Road S/Station.

Rs. 183.107

8

P/L of proposed 100 mm dia DI pipeline and linking to 200mm dia to 100 mm dia at 4th Cross, 3rd Block to 1st Main, BDA L/O, Chikkamarana Halli, coming under New BEL Road S/Station.

Rs. 5.20

Total Rs. 370.407

Work under Progress

Sl No

particulars Est. cost in

Lakhs

1 Shifting of 600mm dia PSC main to 600 mm dia PSC main to 600mm dia MS line at Ballary Main Road & Defence area, coming under R.T. Nagar S/Station.

Rs.98.60

2 Replacement of 110 mm dia PVC old existing line at AECS L/O, I & II Stage, Vinayaka L/o, coming under Sanjayanagar S/Station.

Part C 21.10

3 Providing Laying 100mm dia DI at BEL road & 80’road opp.Ramaiah Hospital & 12th cross near Lakshmi Tent MSR Nagar coming under BEL S/Station.

Rs.27.97

Total Rs. 147.67

Work to be taken up

Sl No

particulars Est. cost in

Lakhs

1

Replacement of 3' dia CI line by 100mm dia CI line at AK colony, Sultanpalya, Manorayanapalya, Ganga Nagar, Bhuvaneshwari Nagar, Gangappa Block, Cross Road Ganga Nagar, Harijan colony, Ganga Nagar, L.D.

Rs. 40.00

Page 29: Abstract 27 Constituency

table-1

Block, Dena Bank Colony & Krishnappa Block, coming under R.T.Nagar S/Station.

2

Work of Replacement of 4’dia PVC pipe by Providing & Laying 100mm dia DI line at R.T.Nagar HMT Layout 1st & 2nd stage Narayanappa Block ,P & T Colony matadahalli for the extention Servicemen Colony HMT Layout Anandanagar S/Station.

Rs.49.60

Total Rs. 89.06

Grand Total Rs. 607.677

HEBBAL CONSTITUENCY Work Under Progress

Sl

No

UGD particulars Est. cost in

Lakhs

1.

work of P/L 225mm dia SW line in place of 6" dia SW line at

A.K. Colony, J.C. Nagar Board Qtrs, A.K. Ashrama, Mothi

Nagar, Rahamath Nagar, Munishwara Block, coming under

Jayamahal S/Station.

Rs.24.50

2

work of P/L 225mm dia SW lines in place of 6" dia SW line at

Lakshmaiah Block,k Ganesh Block, Matada Halli, Burial

Ground, Giddappa Block, Weaver's Colony, Jaki Garden,

Pillappa Block, Ambedkar Slum, Harijan Colony, Ist Block, II

Block, Thimmaiah Garden, Ganga Nagar Extn., Vasanthappa

Block, Papanna Block, Krishnappa Block, Matappa Block,

Hebbal Mill, Darmanna Garden, Dinnur Village, Ex-Servicemen

Colony, R.B.I Colony, C.P.V. Block, Lakshmidevamma Block,

Appanna Block, Kempegowda colony, coming under R.T. Nagar

S/Station.

Rs. 84.15

3

work of P/L 300mm dia RCC NP3 pipeline in place of 225mm

dia SW line at KGE L/o, 7th

Main, HIG Colony, coming under

New BEL Road S/Station.

Rs.11.00

4 work of P/L 300mm dia SW line linking to Sub-Main at Central

Excise L/O, coming under Sanjay Nagar S/Station. Rs. 5.00

5

work of Laying and linking of 450mm dia NP3 Sub-Main at

V.N. Halli Main Road, Hebbal, coming under Ananda Nagar

S/Station.

Rs. 28.85

6

work P/L 225mm dia SW line in place of 6" mm dia SW line at

Balaji L/O, HMT L/O, Amarajyothi L/O, R.B.I. Colony, S.B.M.

Colony, A.G.S. L/O, S.S.A. L/O, Govt Middle School, Sunrise

Colony, Muniyappa L/O, Hebbal, Geddala Halli, Chola Nagar,

Kempe Gowda Nagar, Chamundi Nagar, coming under Ananda

Nagar S/Station.

Rs. 30.00

Total Rs.183.5

Work Completed

Sl

No

particulars Est. cost in

Lakhs

1. work of rectification of 225mm dia SW line at RDMH's at 13

th

cross, Kanakanagar coming under Annandanagara S/Station. Rs.0.97

2

work of P/L 225mm dia SW line in place of 6" dia SW line at

Pomme Gowda, Matada Halli, 3rd

Cross by the side of burial

ground, coming under Jayamahal S/Station.

Rs. 5.90

3 work of P/L 225mm dia SW lines in place of 6" dia at

Munihanumaiah Colony, Venkata Chari Nagar, L.G.Halli,4th, 5

th,

Rs. 13.75

Page 30: Abstract 27 Constituency

table-1

7th

& 8th

Cross, MSR Nagar, KGE L/O, M.S. Ramaiah L/o, 80'

Road, coming under New BEL Road S/Station.

4 work of Providing/Laying and linking of 300mm dia NP3 Class

at Railway Parallel Road, coming under Ananda Nagar S/S Rs. 19.00

5

work of P/L 300mm dia SW lines in place of 225mm dia SW

line at 2nd

Cross, Shiva Shankar Block, Jayalakshmi Theater

Road, Pillamma Temple Road, 9th

Cross, M.R. Garden,

Seethappa L/O, Chamundi Nagar, M.S.S. L/O, Akbar Masjid

Road, CIL L/O, coming under Ananda Nagar S/Station.

Rs. 65.90

6

work laying and linking of 450mm dia NP3 Sub-Main at C.N.

Halli Main Road, Cholanayakana Halli, from Hospital to Sub-

Main, coming under Anand Nagar S/Sta

Rs. 29.35

Total Rs. 134.87

Work To Be Taken Up

Sl

No

particulars Est. cost in

Lakhs

1.

work of P/L 300mm dia SW lines in place of 6" dia at 4th

& 8th

Cross, Muniramappa Garden, 7th

Main, K.E.B. L/O, Geddala

Halli, Central Excise L/O, N.T.I. L/O, Vinayaka L/O, L.G. Halli,

coming under Sanjay Nagar S/Station.

Rs. 25.00

Total Rs. 25.00

Grand Total Rs. 352.94

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

HEBBAL CONSTITUENCY

Sl.

No. Name of the work Amount

1

Work of providing & laying 300 mm dia NP3 S & S RCC

pipeline from V. Nagenahalli main road to Guddadahally road

coming under Anandanagar S/s.

4.25

2

Work of providing & laying 450/300 mm dia NP3 S & S RCC

pipeline from RK Garden to 5th cross, Cholanayakanahalli via

New BEL road inplace of 225 mm dia SW pipeline coming under

New BEL road S/s.

14.00

3

Work of providing and laying 300 mm dia NP3 S & S RCC

pipeline / 225 mm dia SW line at Continuity of 80’ road

Ashwathnagar under Sanjayangar S/s.

7.75

4

Work of providing and laying 450 mm dai NP3 S & S RCC

pipeline inplace of 225 mm dia SW line from 1st main HIG to

Basaveshwarangar layout main road Via patel Muniyappa layout

and regarding 225 mm dia SW line at 2nd

cross, Patelappa layout

coming under Sanjyanagar S/s.

16.20

5

Work of providing and laying 300 mm dia NP3 S & S RCC

pipeline inplace of damaged 225 mm dia & 6th cross, 80’ road,

RMV 2nd

stage, Sanjayanagar to 450 mm dia and sub main near

80’ road, coming under Sanajayangar S/s.

7.40

6

Work of providing and laying 450 mm dia & 300 mm dai NP3 S

& S RCC pipeline inplce of 225 mm dia SW pipeline from

Sanjayuanagar main road to Bhupasandra mainroad via Kalpana

Chawla road under Sanjayanagar S/s.

40.65

7

Work of providing and laying 9” dia SW line at 9th corss,

Adikabir Ashrama Mothingar and Ramaiahnagar Bande area Opp

Mazid under Jayamahal S/s.

0.74

8 Work of P/L 9” dia SW line inplace of 6” dia SW line at 0.97

Page 31: Abstract 27 Constituency

table-1

Ramakrishnappa block 3rd

cross, AK colony, Bemmegowda road,

JC nagara under Jayamahal Ss/.

9

Work of P/L 9” dia SW line inplace of 6” dia SW line at 4th cross,

Bangaragirinagar, W No. 93 of Pulakeshinagara Constituency

under Jayamahal Ss/.

0.95

10 Work of P/L 9” dia SW line inplace of 6” dia SW line at 2

nd main,

Chunchappa block under Jayamahal Ss/.

0.71

11

Work of providing and laying 9” dia SW line inplace of 6” dia

SW pipeline at 1st cross, Siddivinayaka layout and RDMH’s

under Sanjaya nagar S/s AEEN-3 sub division.

0.99

12

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline at 3rd

and 4th

cross road Krishnappa layout and

linking to the existing 450 mm dia sub-main to avoid sewage over

flow in to storm water drain and RDMH’s coming under

Sanjayangar S/s AEEN-3 sub division.

0.90

13

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline at Jaladharshini layout main road and RDMHs

coming under BEL road S/s AEEN-3 sub division.

0.99

14

Work of providing and laying 9” dia SW line inplace of 6” dia

SW pipeline at 3rd

main road HIG and RDMH’s coming under

BEL road S/s AEEN-3 sub division.

0.99

15

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline @ 1st cross, R K Garden under New BEL Road

S/stn.,

0.45

16

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline 4th

main, AECS L/o to 6th cross, KEB Layout

under Sanjayanagar S/stn.,

0.99

17

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline at 7th cross, RBI colony, Ganganagar under R T

Nagar S/stn.,

0.96

18

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline at 4th

cross, 4th main, Vasanthappa Block,

Ganganagar under R T Nagar S/stn.,

0.99

19

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline at 4th cross, L D Block, Ganganagar under RTN

S/stn.,

0.98

20

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline at 5th

main, 10th

cross,Giddappa Block,

Ganganagar under R T Nagar S/stn.,

0.99

21

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline at 4th main 3

rd cross, L D Block, Ganganagar

under R T Nagar S/stn.,

0.99

22

Work of P/L 9” dia SW line in place of 6” dia SW line at 9th

Cross, Adikabir Ashrama Mothinagar and Ramaiahnagar Bande

area Opp. Mazid under Jayamahal S/stn.,

0.73

23

Work of P/L 225 mm dia SW line in place of 150 mm dia SW line

from 3rd

Cross, M.R. Garden to Salem Railway Track coming

under Anandanagar S/stn.,

0.93

24 Work of P/L 225 mm dia SW line in place of 150 mm dia SW line

at 3rd

Cross, Patel Muniyappa layout under Anandanagar S/stn.,

0.63

25

Work of P/L 9” dia SW line at 12, 13., 14 & 15, 1st Cross, Modi

garden W.No. 95, J.C. Nagar coming under Jayamahal S/stn.,

3.65

26

Work P/L 300 mm dia NP3 class S & S RCC pipeline in place of

existing 150x225 mm dia line at R.T.Nagar Main Road 2nd

Main

MLA layout coming under RTN S/stn.,

15.00

27 Work of providing and laying 150 mm dia feeder main at 3

rd main

to 4th cross, P & T colony Sanjayangar under Sanjayanagar S/s.

12.11

28

Work of providing and laying 100 mm dia DI line inplace of 110

mm dia PVC line at 5th main, 6

th main, and 2

nd G main road

NGEF layout Sanjayanagar S/s.

12.26

Page 32: Abstract 27 Constituency

table-1

29 Work of providing and laying 100 mm dia DI line at 5

th, 6

th, 7

th &

7th A corss UAS layout under Sanjayanagar S/s.

12.11

30 Work of providing and laying 100 mm dia DI line at 1

st cross to

4th cross, UAS layout under Sanjayanagar S/s.

11.42

31 Work of providing and laying 100 mm dia DI line at AEC’s

layout under Sanjayanagar S/s.

12.07

32

Work of providing and laying 100 mm dia DI line inplace of 110

mm dia PVC line at 1st to 4

th cross, NGEF layout under

Sanjayanagar S/s.

11.07

33

Work of providing and laying 100 mm dia DI line at 4th main, 5

th

cross, NGEF layout under Sanjayanagar S/s.

10.60

34 Work of providing and laying 100 mm dia DI line at 1

st to 3

rd

main, NGEF layout under Sanjayanagar S/s.

11.94

35 Work of providing and laying 150 mm dia DI feeder main at 5

th

cross, NGEF layout Sanjayangar S/s.

12.81

36 Work of providing and laying 150 mm dia DE feeder line at 1

st to

7th cross, UAS layout Sanjayanagar S/s.

12.49

37 Work of providing and laying 150 mm dia DI line at

Bhoopasandra village 1st, 2

nd & 8

th cross under Sanjayanagar S/s.

7.41

38

Work of providing and laying 9” dia SW line inplace of 6” dia

SW line from 20th

main road to 21st main road, MC layout comes

under Chandra layout S/s.

40.00

39

Work of providing and laying 100 mm dia DI pipeline inplace of

corroded 3” dia CI line and 110 mm dia PVC line at HMT layout

1st cross, 2

nd main, 5

th main, SBM colony, 2

nd cross, SBM colony

and surrounding area under Anandanagar S/s.

50.20

40

Work of supplying, fixing pipeline of 100 mm dia DI line to

linking 300 mm dia CI line at new 80’ road Ashwanthanagar

under Sanjayanagar S/s.

6.50

41

Work of providing and laying 100 mm dia DI line inplace of 100

mm dia PVC line at 4th, 5

th crsso, Vinayaka layout 2

nd main,

Patelappa layout, 3rd

cross, 1st main and 1

st A main, CIL layout,

2nd

cross, Amarjyothi layout ACEs layout 3rd

stage, 2nd

cross

under Sanjaynagar S/s.

36.05

Total 383.82

Page 33: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

MALLESHWARAM CONSTITUENCY Work Completed

Sl No

Water supply works particulars Est. cost in Lakhs

1

work of providing and laying 4" dia. DI pipe line by replacing the damage corroded 3" dia. C.I. pipeline at Subedar palya 6th and 7th Cross coming under YPR S/Station.(Ward No.7)

Rs.11.70

2 work of 100 mm dia W/S line at 11th cross, Kodandarampuram, Vyalikaval, coming under Malleswaram S/Station.

Rs.3.00

3 P/L of 100 mm dia DI line replacing 3" dia old corroded pipeline at 11th A B & C Cross KR pura, Vyalikaval, Malleswaram.

Rs. 4.70

Rs.5.43

4

work of replacement of 3" corroded CI line by 100mm dia DI line at Malleswaram 2nd 3rd & 4th Cross, by the side of K C G Hospital & 15th Cross GD Park 1st, 2nd Main Road Malleswaram.

Rs. 7.87

5

work of replacement of 3" corroded CI line by 100 mm dia CI line at Rammohanpura Gandigrama Gyatharinagar near Arun Kumar clinic coming under Srirampura S/Station.

Rs. 6.24

6

work of Replacement of 100mm PVC & 3" dia corroded line by laying 100mm dia DI line at Palace Gutta halli & surrounding areas, Sadashiva Nagar, Dodda Byrappa street, Vyalikaval Ist & IInd Cross, lower Palace arch & Upper Palace arch, coming under KG Tower S/Station.

Rs.42.55

7 P/L 100mm dia DI line in place of 3” dia Corroded line for new W/S connection to 8th main road in between 2nd & 4th cross Sadhashivanagar coming under K.G.T.S/Stn main

Rs. 2.75

8 Shifting & linking 600mm dia W/S line to foot path by the side of palace compound wall in Ballary main road

Rs. 94.23

9 Work of Providing & Fixing cobble stones from fly over to Cauvery theater at Ballary Road coming under Kumara Park S/Stn.

Rs.0.96

Total Rs. 179.43

MALLESHWARAM CONSTITUENCY Work Completed

Sl

No

UGD works particulars Est. cost in

Lakhs

1.

work replacement of 6"dia SW pipeline by 9" dia SW line at 12th

A B, and C Cross, 6th main to 10

th main Kodanda Ramapuram

Vyalikaval, coming under Malleshwaram S/Station.

Rs.6.58.00

2.

work of providing and laying 9"dia SW line in place of 6" dia

SW line at A.K. Colony, Subedar Palya and reconstruction of

damaged Manholes coming under YPR S/Stn.

Rs.9.21

3.

work providing & linking to 225mm dia SW line at 33, No.11,

No.37/19, No. 45, 2nd

main Kempaiah & brothers L/o, RDMH's

& construction of MH's coming under K.P.S/Station premises.

Rs.0.91

4.

work of providing and laying 9" dia SW line in place of 6" dia

SW line at 1st main, K.B. L/o & RDMH's coming under K.P.

S/Station premises.

Rs.0.98

Page 34: Abstract 27 Constituency

table-1

5

work of providing and laying 9" dia SW line in place of 6" dia

SW line at 1st cross, K.B. L/o & RDMH's brothers L/0. &

RDMH's & Construction of MH's coming under K.P. S/Station

premises.

Rs.0.97

6

work of providing & laying 9" dia SW line in place of 6" dia SW

line at Opp. to # 13th "A" main to Railway Parallel Road, 17

th A

Cross, MVM & RDMH's coming under MVM S/Station.

Rs. 0.99

7

work providing & laying 9" dia SW line place of 6" dia SW line

at Opp. to 40/3, 3rd

main, K.B. L/o & RDMH's coming under

K.P. S/Station premises.

Rs. 0.95

8 work of replacing of 6" dia SW line at SP Extn, 4

th Cross, 6

th

Cross, coming under Malleswaram S/Station. Rs.2.55

9 work of replacing of 6" dia SW line by 9" dia SW line at

Devarayana Palya in ward No.4, Yeshwanthapura S/Station. Rs. 6.00

10 work of replacing of 6" dia SW line by 9" dia SW line P/L at

Mathikere & Subedar Palya at Yeshwanthapura S/Station. Rs.5.40

11 work of P/L 225mm dia SW line in place of 6" dia SW line at

Jabber Block & P.G. Halli area, K.G. Tower S/Station. Rs.22.85

12

work of replacement of 6" dia SW line by 9" dia SW line at 5th

Cross, 6th

Cross S.P. Extension coming under Malleshwaram

Service Station.

Rs. 6.00

13

work of replacement of 6" dia SW line by 9" dia SW line at 13th

Cross, Vyalikaval surrounding area coming under Malleshwaram

Service Station.

Rs. 3.00

14

work of replacement of 6" dia SW line by 12" dia SW line at 6th

Cross Near S.S.L.C. Board coming under Malleshwaram Service

Station.

Rs. 2.50

15

work providing and laying of 9" dia SW line in place of 6" dia

SW line at 7th

Main, Gokula 1st Stage, coming under YPR S/Stn.

Rs. 0.96

16

work providing and laying of 9" dia SW line in place of 6" dia

SW line at 1st 'E' Cross, Mathikere Extn., coming under YPR

S/Stn.

Rs. 0.99

17

work providing and laying of 9" dia SW line in place of 6" dia

SW line at Subhaiah Hospital Main Road, Mathikere, coming

under YPR S/Stn.

Rs. 0.96

18

work of providing and laying 9" dia SW line in place of 6" dia

SW line at Muthati Bank, Mathikere Main Road, coming under

YPR S/Stn.

Rs. 0.99

19

work providing and laying of 9" dia SW line in place of 6" dia

SW line at Diana beauty Parlor, Mathikere Main Road, coming

under YPR S/Stn.

Rs. 1.00

20

work providing and laying of 9" dia SW line in place of 6" dia

SW line at 8th

Main, Devanarapalya & Pampanagar, Gokula 1st

Stage, coming under YPR S/Stn.

Rs. 1.00

21

work providing and laying of 9" dia SW line in place of 6" dia

SW line at Srinivasa Kalyana Manthappa, Mathikere Extn.,

coming under YPR S/Stn.

Rs. 0.98

22 work of P/L 9" dia SW line in place of 6" dia SW line at 2

nd

Cross(West) & RDMH's coming under YPR S/Stn. Rs. 0.25

23

work of P/L 450mm dia NP3 S & RCC pipe line in place of

225mm dia SW line @ DR. JeevrajAlva road adjacent to sankey

tank & P/L 225mm dia SW line300mm dia lineNP3 S &S RCC

pipe line in place of 150mm SW pipe line from 9th

cross, RMV

extension linking towards 450mm dia RCC line @ sankey tank

main gate coming under KG tower S/Stn.

Rs. 54.40

Page 35: Abstract 27 Constituency

table-1

Total Rs. 130.52

Work Under Progress

Sl

No

particulars Est. cost in

Lakhs

1.

work of replacing of 6" dia SW line by 9" dia SW line P/L at

Ankala Parameshwari Temple, 4th

Cross, (L.N. Pura) Nagappa

Block.

Rs. 2. 50

Total Rs. 2. 50

Grand Total Rs. 133. 02

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

MALLESHWARAM CONSTITUENCY

Sl.

No. Name of the work Amount

1 Work of P/L 9” dia SW line in place of 6” dia SW line at 11

th A

Main, D Block, 2nd

Stage Rajajinagar under KM Halli S/stn.,

0.63

2

Work of P/L 9” dia SW line in place of damaged 6” dia SW line

at 6th A Main D Block, 2

nd Stage Rajajinagar under K.M.Halli

S/stn.,

0.58

3

Work of providing and laying 9” dia SW line inplace of damaged

6” dia SW line between 11th

& 12th main, 12

th cross, MLM (Opp

Jaggesh house) under MLM S/s.

4.20

4

Work of providing and laying 9” dia SW line inplace of 6” dia

SW line at Opp to Maruthi hospital 1st cross Model colony under

YPR S/s.

0.664

5

Work of providing and laying 9” dia SW line inplace of 6” dia

SW line at Govt Higher school Yeshwanthpura and near Keshav

Talkies under YPR S/s.

0.77

6 Work of providing and laying 9” dia SW line inplace of 6” dia

SW line at No. 393, 414, 6th main, Sadashivangar under KGT S/s.

0.495

7 Wok of P/L of 9” dia SW line at No. 36/3, 5

th cross, 7

th main, KN

Extension Gokula, 1st phase, 2

nd stage under Yeshwanthpura S/s.

0.495

8 Wok of P/L of 9” dia SW line at No. 606, 624, 1

st main road, 2

nd

cross, Mathikere Yeshwanthpura under Yeshwanthpura S/s.

0.491

9 Wok of P/L of 9” dia SW line at No. 18, 48, 2

nd cross, Mathikere

under Yeshwanthpura S/s.

0.491

10 Work of P/L 9” dia SW line inpalce of 6” dia SW line at

Subbaiah hospital MS Ramaiah road under Yeshwanthpura S/s.

0.96

11

Work of P/L 9” dia SW line inpalce of 6” dia SW line at

Muthathi Finance Sri. MS Ramaiah road Mathikere under

Yeshwanthpura S/s.

0.979

12

Work of P/L 9” dia SW line inpalce of 6” dia SW line at Dayana

Beauty Parlour No. 35, Sri. MS Ramaiah road, Mathikere under

Yeshwanthpura S/s.

0.985

13 Work of P/L 9” dia SW line inpalce of 6” dia SW line at 6

th

cross, Ayyappanagar under Bahubalinagara S/s.

0.431

14

Work of P/L 9” dia SW line inpalce of 6” dia SW line at near

Chandu’s Hotel,. 8th

cross, Malleshwram under Malleshwaram

S/s.

0.945

15

Work of providing , laying and linking 9” dia SW line at New

BEL Road I/F of newly constructed TATA Institution Building

under New BEL Road S/stn.,

0.95

16 Work of providing and laying 9” dia SW pipeline inplace of 6” 0.997

Page 36: Abstract 27 Constituency

table-1

dia SW pipeline @ 7th

cross, MSR Nagar under New BEL Road

S/stn.,

17

Work of providing and laying 9” dia SW pipeline inplace of 6”

dia SW pipeline at 4TH

cross MSR Nagar (pipeline road under

BEL Road S/stn.,

0.981

18 Work of P/L 9” dia SW line in place of 6” dia SW line at 6

th

Cross, Ayappa Nagar coming under Bahubalinagar S/stn.,

0.43

19

Work of P/L 9” dia SW line in place of 6” dia SW line at near

Chandra Hotel, 8th Cross, malleshwaram coming under

Malleshwaram S/stn.,

0.94

20 Work of P/L 9” dia SW line in place of 6” dia SW line at near 6

th

Cross, Ayappanagar under Bahubalinagar S/stn.,

0.95

21 Work of P/L 9” dia SW line in place of 6” dia SW line at Opp. to

Maruthi Hospital 1st Cross Model Colony under YPR S/stn.,

0.66

22

Work of P/L 9” dia SW line in place of 6” dia SW line at Govt.

High School, Yeshwanthapura and Keshav Talkies near under

YPR S/stn.,

0.77

23 Work of P/L 9” dia SW line in place of 6” dia SW line at No. 393,

414, 6th

Main, Sadashivanagar under KGT S/stn.,

0.49

24 Work of P/L 9” dia SW line in place of 6” dia SW line at Masjid

Road, Diwanara Palya W.No. 4 under YPR S/stn.,

0.75

25 Work of P/L 9” dia SW line in place of 6” dia SW line at Gokul

Fly over under YPR S/stn.,

0.76

26 Work of P/L 9” dia SW line in place of 6” dia SW line at 1

st B

Main, Mathikere under YPR S/stn.,

0.99

27 Work of P/L 9” dia SW line in place of 6” dia SW line at No. 610,

1st D Cross, Mathikere, Bangalore.

0.84

28 Work of P/L 9” dia SW line in place of 6” dia SW line at 482/A,

19, Revathi Nilaya, 5th Main, 3

rd cross under YPR S/stn.,

0.98

29 Work of P/L 9” dia SW line in place of 6” dia SW line at 18, 1

st B

Cross, Ramakrishna Nilay Mathikere under YPR S/stn.,

0.87

30

Work of P/L 300 mm dia RCC NP3 S & S pipeline in place of 7”

dia SW line linking to 450 mm dia RCC sub main at 15th Cross B

/ W 4th to 6

th Main Malleshwaramf under MLM S/stn.,

12.70

31 Work of replacement of 6” dia by 9” dia SW line at 10

th Main,

11th

Main & 6th

Cross Mariyappanapalya under Srirampura S/stn.,

3.45

32

Work of P/L of 9” dia SW line in place of 6” dia SW line at 1st

Stage, 1st Phase to 4

th Phase Gokul coming under

Yeshwanthapura S/stn.,

31.58

33

Work of P/L 450/300 mm dia NP3 S & S RCC pipeline from

Nethaji road to Laxmi Tent Road in place of 225 mm dia

damaged SW pipeline and linking 225 mm dia SW line in various

cross at Sampangappa layout under New BEL Road S/stn.,

25.20

34

Work of P/L of 9” dia SW line in place of 6” dia SW line at Photo

plash to Jayaram Slum 3rd

Main, HMT Main Road, Mathikere

Extension Mathikere under JPR S/stn.,

6.00

35

Work of providing and laying 100 mm dia DI pipeline inplace of

3” dia corroded pipeline at 6th to 7

th main, 2

nd cross,

Subedarapalya under Yeshwanthapura S/s.

6.47

36

Work of replacement of corroded 3” dia CI line by 4” dia at

between 9th

& 10th

main, 12th C corss, Vyalikaval comes under

Malleshwaram S/s.

2.63

37

Work of providing and laying 100 mm dia DI water supply line

inplace of 110 mm dia PVC damaged water supply line at 5th

cross, Nagappa block, 7th

cross, LN Pura under Srirampuram S/s.

6.81

38 Work of providing and laying 100 mm dia DI line inpalce of

corroded 3”dia CI line at 3rd

main Mathikere Yeshwanthpura S/s.

8.05

39 Work of P/L 100 mm dia DI line in place of 3” dia corroded

pipeline and 75 mm dia PVC line at 1) L.N. Colony, 1st D Cross

4.11

Page 37: Abstract 27 Constituency

table-1

road 5th

Main, 2) Bandappa street 8th A Cross 3) Model Colony 1

st

Cross, W.No. 3 under YPR S/stn.,

40

Work of providing and laying of missing bit 150 mm dia DI line

from 3rd

main, 50, 5th

main, Mathikere extension Yeshwanthapura

S/s.

2.80

41

Work of P/L of 250x250 mm dia DI line at Binnya layout to 1st

Main Bhuvaneshwarinagar in W.No. 31 coming under JJ Nagar

S/stn.,

6.87

Total 142.144

Page 38: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

GANDHINAGAR CONSTITUENCY

Work Under Progress

Sl No

W/S Particulars Est. cost in

Lakhs

1 Shifting of existing 300mm dia MS line & specials for improving water supply to I, II,III main Seshadripuram & surrounding areas under K.P S/Stn

Rs. 63.80

Total Rs. 63.80

Work To be Taken Up

Sl No

W/S particulars Est. cost in

Lakhs

1

Laying of 100 mm dia DI line in place of 3” dia Corroded line for new W/S connection to Anjaneye temple I & II street & II main Seshadripuram coming under K.P.S/Stn

Rs. 15.85

Total Rs. 15.85

Grand Total RS.79.65

GANDHINAGAR CONSTITUENCY Work Under Progress

Sl

No

UGD particulars Est. cost in

Lakhs

1.

work of P/L 225mm dia SW line in place of 6" dia SW line at

Muneshwara Block, Ramakrishna Block, Nagappa Block, Putta

Nagamma L/O, coming under Kumara Park S/Station.

Rs.19.75

Total Rs.19.75

Work Completed

Sl

No

UGD particulars Est. cost in

Lakhs

1.

work of replacement of 6" dia SW line by 9" dia SW line from

5th

Cross to Sampige Talkies along Mr. Raghupathi House,

coming under Malleswaram S/Station.

Rs. 5.30

Total Rs.5.30

Grand Total Rs.25.05

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

GANDHINAGAR CONSTITUENCY

Sl.

No. Name of the work Amount

1 Estimate for the work of providing & laying 100 mm dia DI line to

improve water supply line at 3rd

Cross, Velumuruganpura under CLB

S/stn.,

3.00

2 Estimate for the work of replacement of 110 mm dia 3” dia corroded

line by 100 mm dia water supply line at 6th, 7

th & 1

st to 5

th Cross upto

Sirur & 8th

to 15th Cross 8

th Main Ward No. 6 & 7 under Malleshwaram

S/stn., under Gandhinagar constituency.

18.00

3 Estimate for the work of providing & laying 150 mm dia & 100 mm dia

MS pipeline to shifting the existing system supplying water to

3.20

Page 39: Abstract 27 Constituency

table-1

Gandhinagar and surrounding area Opp. DIG (Prisons) office on

Seshadri road under LLR S/stn.,

4 Estimate for the work of replacement of corroded 3” dia CI line by 4”

dia DI line at 2nd

Main to 3rd

Main along with 4th

Cross, R.C.Puram,

linking of 100 mm dia DI line at 1st Cross, 2

nd Main, RC Puram comes

under BP S/stn.,

5.00

5 Work of replacement of corroded 3” dia CI line by 4” dia DI line at 1st,

2nd

& 3rd

Cross Bhashyam Nagar, under Bhashyam Park S/stn.,

6.00

6 Work of replacement of corroded 3” dia CI line by 4” dia DI line at 3rd

,

4th

& 5th Cross Dayananda nagar & P/L of 4” dia DI line 11

th Cross,

L.N.Puram comes under B.P S/stn.,

5.40

7 Work of P/L 100 mm dia DI line to improve water supply line at 3rd

Cross, Velumuruganapura under CLB S/stn.

1.94

8 Work of P/L 9” dia SW line at 5th

Cross, Vivekananda Colony, 1st Main

Road, Railway line coming under Bhashyam Park S/stn., 2.50

9 Work of P/L 9” dia SW line in place of silted up 6” dia SW line at OTC

Road Cross, Park road & surrounding areas & reconstruction of

damaged manholes coming under CLB S/stn.,

8.00

10 Work of P/L 9” dia SW line inplace of silted up 6” dia SW line at SDM

lane & Sultanpet Cross & Sultanpet Cross & surrounding areas &

reconstruction of damaged manholes coming under CLB S/stn.,

5.00

11 Work of P/L 9” dia SW line inplace of silted up 6” dia SW line at

Kurubarapet, Veerabhadranayaka Galli and surrounding area &

reconstruction of damaged manholes coming under CLB S/stn.,

20.00

12 Work of P/L 9” dia SW line inplace of silted up 6” dia SW line at Mill

Road & reconstruction of damaged manholes coming under CLB S/stn., 6.00

13 Work of P/L 9” dia SW line in place of silted up 6” dia SW line at

Akkipet Cross, S.D.Lane, Manvarthpet & surrounding area &

reconstruction of damaged manholes under CLB S/stn.,

4.00

14 Work of providing and laying 9” dia SW pipeline inplace of 6” dia SW

pipeline at # 20, G main road, Muneshwara block (Maramma temple)

and reconstruction of damaged manholes coming under Kumara Park

S/s premises.

0.96

15 Work of providing and laying 9” dia SW pipeline inplace of 6” dia

SW pipeline at # 22, 7th cross road pipeline, Muneshwara block and

reconstruction of damaged manholes coming under Kumara Park S/s

premises.

0.97

16 Work of 9” dia SW line at RC puram 1st Main road, behind Maramma

temple coming under Bashyam Park S/stn.,

0.96

17 Work of providing 9” dia SW line at inplace of damaged 7 silted up 7”

dia SW line at 1st Main Road, Opp. No. 131, R.C. Puram Roberstson

Block coming under Bashyam Park S/stn.,

0.96

18 Work of rectification of 9” dia SW line at No. 16, 1st cross road,

Hanumanthappa colony (Ambedkar Bhavan) and reconstruction to the

damaged manholes coming under Kumara Park S/s premsises

0.81

19 Work of reconstruction of damaged collapsed manholes at CK street,

Palace Orchard Vyalikaval and P.G Halli surrounding areas coming

under KG Tower S./s premises.

0.475

20 Work of rectification of 9” dia SW line at No. 35, 1st cross,

Muneshwara block No. 25, 2nd cross D main Muneshwara block and

reconstruction to the damaged manholes coming under Kumara Park

S/s premises.

0.755

21 Work of rectification of 9” dia SW line at 1st main, Anjenaya block

and 1st cross, Muneshwara block and reconstruction to the damaged

manholes coming under Kumara Park S/s premises

0.975

22 Work of rectification of 9” dia SW line at N. 21, BBMP drivers

platform road, Seshadripuram and reconstruction to the damaged

manholes coming under Kumara Park S/s premises.

0.49

23 Work of replacement of 6” dia SW line by 9” dia SW line at E -283,

R.C Puram, 3rd cross, 3rd main, Brahmapuram, & reconstruction of

0.86

Page 40: Abstract 27 Constituency

table-1

damaged manholes coming under Bhashyam park S/s.

24 Work of replacement of 6” dia SW line by 9” dia SW line at 4th main,

4th cross, Brahmapuram, Opp House NO. F-51 & reconstruction of

damaged manholes coming under Bhashyam park S/s.

0.656

25 Work of replacement of 6” dia SW line by 9” dia SW line at 6th main,

RGI colony, coming under Bhashyam park S/s.

0.844

26 Work of P/L of 9” dia SW line inplace of 6” dia SW ine @ D NO. 12

‘M’ block, Jakkarayanakere Seshadripuram and reconstruction of

damaged manholes under Kumara Park S/s.

0.497

27 Work of rectification of 9” dia SW line at No. 25, 4th cross,

Muneshwara block and No. 234, Muneshwara block pipeline and

reconstruction of the damaged manholes under Kumara Park S/s.

0.498

28 Work of desilting of circular manholes ranging from 1.00 m 2.00 m

depth of various locations under Kumara Park S/s under AEEN-2 sub

division.

0.386

29 Work of providing 9” dia SW line at inplace of damaged & silted up 7”

dia SW line at 1st Main Road, Opp. No. 131, R.C.Puram, Roberstson

Block coming under Bashyam Park S/stn.,

0.96

30 Work of replacement of 6” dia SW line by 9” dia SW line at E-283,

R.C.Puram, 3rd

Cross, 3rd

Main, Brahmapuram & reconstruction of

damaged manholes coming under Bhashyam Park S/stn.,

0.86

31 Work of replacement of 6” dia SW line by 9” dia SW line at 4th Main,

4th

Cross, Brahmapuram Opp. House No. F-51 & reconstruction of

damaged manholes coming under Bhashyam Park S/stn.,

0.65

32 Work of replacement of 6” dia SW line by 9” dia SW line at Robertson

block, 2nd

Cross, 1st Kalappa block & Okalipuram Conservancy &

reconstruction of damaged manholes coming under Bahsyam Park

S/stn.,

0.95

33 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 4th

Cross, Kalappa block comes under B.P. S/stn., 0.96

34 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 7th

Cross, conservancy 9th

Main, S.R.Puram comes under B.P. S/stn., 0.97

35 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 3rd

B

Cross, new Kalappa block & 2nd

Cross, Pillamma block comes under

Bhashyam Park S/stn.,

0.98

36 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 3rd

B

Cross, New Kalappa block comes under Bhashyam Park S/stn., 0.99

37 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 4th

Main, 1st Cross, Brahmapura comes under Bhashyam Park S/stn.,

0.97

38 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at

M.R.Lane Parchalla Ankanna lane M.R. Lane cross CLB S/stn., 0.98

39 Work of replacement of damaged silted up 6” dia SW line by 9” dia

SW line at M.R.Lane near Maruthi temple, Police road cross

Mahavarthpet CLB S/stn.,

0.94

40 Work of replacement of 6” dia SW line by 9” dia at Maramma temple

2nd

cross, DK Lane & reconstruction of damaged manholes coming

under CLB S/s

0.60

41 Work of replacement of 6” dia SW line by 9” dia at R.T.Street, 27th

cross, Huriopet & reconstruction of damaged manholes coming under

CLB S/s

0.70

42 Work of replacement of 6” dia SW line by 9” dia at Opp. 2B,

D.K.Lane, Opp. Jalaram market & reconstruction of damaged

manholes coming under CLB S/s

0.81

43 Work of replacement of 6” dia SW line by 9” dia at R.T.Street, 2nd

cross & reconstruction of damaged manholes coming under CLB S/s 0.67

44 Work of P/L 9” dia SW line in place of existing 6” dia SW line at

MM Lane , 1st cross MM Lane, 2

nd cross & reconstruction of

damaged manholes coming under CLB S/s

0.497

45 Work of P/L 9” dia SW line in place of existing 6” dia SW line at

Munsooria lane Akkipet market & reconstruction of damaged

manholes coming under CLB S/s 0.492

Page 41: Abstract 27 Constituency

table-1

46 Work of P/L 9” dia SW line in place of existing 6” dia SW line at

Veerbhadra naik lane & reconstruction of damaged manholes

coming under CLB S/s

0.497

47 Work of P/L 9” dia SW line in place of existing 6” dia SW line at

Mill road cross & reconstruction of damaged manholes coming under

CLB S/s

0.489

48 Work of P/L 150 mm dia & 100 mm dia MS pipeline to shifting the

existing system supplying water to Gandhinagar and surrounding area

Opp. DIG (Prisons) Office on Seshadri Road under LLR S/stn.

3.20

49 Work of replacement of corroded 3” dia CI line by 4” dia DI line at 2nd

Main to 3

rd Main along with 4

th Cross, R.C.Puram linking of 100 mm dia DI line at

1st Cross, 2

nd Main, RC Puram comes under BP S/stn.

5.00

50 Work of linking 300x150 mm dia line to improvement of water supply

facilities to Achepet main road from Avenue road under CLB S/stn.

4.87

51 Work of P/L 100 mmd ia water supply line inplace of 3” dia corroded

line for improvement of water supply at Kurubarapet, Veerabhadra

Nayaka lane coming under CLB S/stn.,

9.60

52 Work of providing & linking 100x100 mm dia DI pipe & check valve at

3rd

Cross, Christain Colony to improve water facility coming under BP

S/stn.,

0.31

53 Work of providing & linking 150x100 mm dia DI line at 5th Main, Sri

rampuram near Sunrise Circle to improve water supply to Nagendra

garden comes under BP S/stn.,

0.98

54 Work of providing & linking of 100 mm dia CI line along Lakshman

Rao road, Bangalore.

0.36

55 Work of providing & linking of 150x100 mm dia DI line at 5th

Main,

Srirampuram near Harinivas hotel to improve water supply facility too

1st Main, Okalipuram comes under BP S/stn.

0.56

56 Work of providing and laying 9” dia SW line inplace of 6” dia SW line

at 12th A cross, 13

th, 14

th & 15

th cross roads at Magadi road S/s.

4.95

57 Work of providing 100 mm dia DI line in place of 110 mm dia PVC

line to IWSF and deviation of 100 mm dia DI line at Balaji Temple

Road at NTY layout, under Mysore Road S/stn.,

7.13

58 Work of linking 100x100 mm dia DI line at 3rd

Cross, Gopalapura to

IWSF to ABCD crosses behind Minerva mill coming under Magadi

Road S/stn.,

1.344

59 Work of providing and laying 300 mm dia RCC sub main and 225 mm

dia SW line in RV layout surroundings coming under Kumarapark S/s.

10.12

60 Work of providing and laying 9” dia SW line inplace of 6” dia SW line

at inbetween link road and Sirur park road, conservancy opp to Nataraj

S/s under Kumarapark S/s.

0.691

61 Work of providing and laying 9” dia SW line inplace of 6” dia SW line

at Ganesh block slum opp to Anuraga Nurshing home Vinayaka circle

under Kumarapark S/s

0.863

62 Work of providing and laying 9” dia SW line inplace of 6” dia SW

pipeline at # 20 G main road, Muneshwra Block ( Maramma Temple)

under Kumara Park S/stn.,

0.96

63 Work of providing and laying 9” dia SW line inplace of 6” dia SW

pipeline at # 22, 7th cross road, Muneshwra Block under Kumara Park

S/stn.,

0.97

64 The work of providing and laying 9” dia SW line inpalce of 6” dia SW

line @ D No. 12 ‘M’ block, Jakkarayanakere Seshadripuram under

Kumara Park Ss/.

0.497

65 Work of P/L 9” dia SW line inplace of 6” dia SW line at No. 34 Ganesh

block, & 1st main, conservancy under Kumara park Ss/.

0.982

66 Work of P/L 9” dia SW line inplace of 6” dia SW line at 1st cross,

Krishnamma block conservancy under Kumarapark S/s.

0.985

67 Work of P/L 9” dia SW line inplace of 6” dia SW line at 3rd

main,

Sriramapuram under Kumarapark S/s.

0.965

68 Work of P/L 9” dia SW line inplace of 6” dia SW line at 1st main, 0.97

Page 42: Abstract 27 Constituency

table-1

Sripura under Kumarapark S/s.

69 Work of P/L 9” dia SW line in place of 6” dia SW line at 1st Cross,

Krishnamma Block, Conservancy under Kumara Park S/stn.,

0.98

70 Work of P/L 9” dia SW line in place of 6” dia SW line at 3rd

Main

Road, Srirampuram under Kumarapark S/stn.,

0.96

71 Work of P/L 9” dia SW line in place of 6” dia SW line at 1st Main,

Srirampura under Kumara Park S/stn.,

0.97

72 Work of P/L 9” dia SW line in place of 6” dia SW line at in between

line road and Sirus Park road, conservancy opp. to Nataraj S/stn., under

Kumara Park S/stn.,

0.69

73 Work of P/L 9” dia SW line in place of 6” dia SW line at Ganesh Block

Slum, Opp. to Anuraga Nursing Home, Vinayaka Circle coming under

Kumara Park S/stn.,

.086

74 Work of replacement of 110 mm dia 3” dia corroded line by 100 mm

dia water supply line at 6th

, 7th & 1

st to 5

th cross upto Sirur and 8

th to

15th cross, 8

th main W No. 6 & 7 under Malleshwaram S/s under

Gandhinagar constituency

18.00

Total 192.094

Page 43: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

YESHWANTHAPURA CONSTITUENCY

Sl.

No. Name of the work Amount

1 Work of providing & laying of 12” dia SW line and construction of new

manholes at Thanniranahalli, Yeshwanthpura under Yeshwanthapura S/stn.,

5.57

2 Work of providing & laying 100 mm dia DI pipeline in place of 3” dia

corroded pipeline at 6th to 7

th Main, 2

nd Cross, Subedarapalya under

Yeshwanthapura S/stn.,

6.47

3 Work of P/L of 9” dia SW line in place of damaged silted 6” dia SW line

@ 7th

cross, MSR Nagar coming under BEL Road S/stn.,

0.9975

4 Work of P/L 225 mm dia SW line in place of 150 mm dia SW line lowering

& deviation in f/o No. 1670/28, 5th

Cross, Sahidanandanagar, 6th Main,

KST S/stn.,

0.99

5 Work of P/L 225 mm dia SW line in place of 150 mm dia SW line by

regarding in f/o No. 2236, near Ganesh Temple 1st Main road KST S/stn.,

area.

0.99

6 Work of P/L 225 mm dia SW line in place of 150 mm dia SW line in

conservancy from 7th Main H.No. 688 to 611, EWS House (connected to 6

th

B Main) at KST S/stn.,

0.99

7 Work of P/L 225 mm dia SW line in place of 150 mm dia SW line at in f/o

No. 14, W.No. 12 of Kengeri TMC near Bethedra church in KST S/stn.,

W.No. sub division

0.98

8 Work of rectification of existing 9” dia SW line at inside the SWD (Nala)

in between Dubasipalya and Jnanabharathi BDA layout 1st Block in KST

S/stn., area under W.5 sub divison.

0.99

Total 17.9775

Page 44: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

MAHALAKSHMI LAYOUT CONSTITUENCY

Sl.

No. Name of the work Amount

1 Work of damaged collapsed manholes at G.G. Palya, Nandini layout and

surrounding area comes under Nandini layout S/stn.,

0.53

2 Work of rectification of 12” dia SW line at Shankaranagar main road,

Martha Medical D.No. 11 & Deepak Enterprises coming under Nandini

layout S/stn.,

0.439

3 Work of rectification of 9” dia SW line at 7th main road, Opp D No-59

to No. 71 & 74, Jai Maruthinagar coming under Nandini layout S/s.

0.345

4 Work of rectification of 9” dia SW line at 7th main road, 4th block,

Nandini layout and construction of damaged manholes coming under

Nandini layout S/s.

0.432

5 Work of rectification of 9” dia SW line at 10th cross, and 8th cross, JC

nagar under Mahalakshmi layout S/s area of No-2 W sub division

0.885

6 Work of replacement of existing 9” dia SW line by 12” dia SW line along

5th cross, Prakahsnagar and linking to the existing 36” & RCC sub main

Opp Sree Uma Shankar Timber Traders at 3rd

main under Rajajinagar S/s.

6.70

7 Work of providing and laying with deviation of 9” dia SW line inplace of

6” dia SW line at 1st A corss 3

rd stage, 4

th block, Basaveshwarangar under

WCR-II S/s

3.05

8 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

1st to 13

th cross, Indiranagar slum, near Modi hospital main road under

WCR-I S/s.

33.70

9 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

4th main, 1

st phase, Manjunathangar under WCR-I S/s.

0.924

10 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

5th cross, 2

nd phase, Manjunathangar under WCR-I S/s.

0.812

11 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

8th cross, 2

nd phase, Manjunathangar under WCR-I S/s.

0.918

12 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

16th

main to 7th main, S.G Halli 3

rd stage, 3

rd block, B.Nagar under WCR-

I S/s.

0.859

13 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

H NO. 273/B to 288 9th main, 3

rd stage WOC Manjuanthanagar

0.642

14 Work of providing house connection at 4th block, 4

th cross,

Guraguntepalya 1st main, 7

th cross, Sreekantheshwaranagar 1

st cross,

Kanteeravanagar slum near Oil Mill road of Shankaranagar main road,

and exports Syndicate Opp Praseed Film lab under Nandini layout S/s.

0.495

15 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

2nd

block, 2nd

cross, infront of H No. 87, (Padmavathi Nilay) Nandini

layout under Peenya S/s.

0.856

16 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

Vivekanada layout 1st G cross and at 4

th main, 1

st stage, BEML layout in

F/o Ward office under Kamalanagar S/s.

0.767

17 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

1st cross, SBI staff colony under Kamalanagar S/s.

0.706

18 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

KHB colony D No. 58 Krishnandangar Mazeed road under Nandini

layout S/s.

0.987

19 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

Tulsi house No. 36 & 27, Nandini layout LR 16 & Ramakrishna nagar

Ganesh Temple 1st main road, D No. 257 under Nandini layout S/s.

0.712

20 Work of providing and deviation of 9” dia SW line at 1st A cross, 3

rd

stage, 4th block, B.Nagar under WCR-II S/s.

0.765

21 Work of replacing 6” dia by 9” dia Sw line at 7th & 8

th main JC nagar 3

rd

stage, 4th block, B Nagar under WCR-II S/s.

0.886

22 Work of replacement of 6” dia by 9” dia SW line at Sakamma Badavane 0.55

Page 45: Abstract 27 Constituency

table-1

near SWD and at JC nagar 11th cross, near Dram under NLO S/s.

23 Work of providing and laying 9” dia SW line infront of Mysore Juice

Factory further extension of Mahalaxmi layout under Mahalaxmi layout

S/s.

0.94

24 Work of P/L 9” dia SW line in place of 6” dia SW line at 3rd

Cross, 3rd

Main, VHBCS layout and pipeline road (Kurubarahalli) under WCR-II

S/stn.,

0.99

25 Work of P/L 9” dia SW line in place of 6” dia SW line at 11th A Cross, 5

th

& 4th Main, Nagpura W.No. 14 coming under WCR-I S/stn.,

0.97

26 Work of P/L of 9” dia SW line in place of 6” dia SW line at 2nd

Main

Sreekanteshwaranagar Opp. H. No. 14/2 coming under NLO S/stn.,

0.69

27 Work of P/L 9” dia SW line at Sakamma Badavane, 30th, 31

st and 32

nd

Cross coming under Nandini layout S/stn.,

4.00

28 Work of P/L 12” dia RCC P/L at 8th

Main Road & P/L 9” dia SW line in

place of exislting 6” dia SW line at 2nd

Cross & 7th

Main Road,

Basaveshwaranagar, 3rd

Stage, 3rd

Block (W.No. 19) coming under WCR-

I S/stn., of AEEW-4 sub division.

2.10

29 Work of linking and laying of 100 mm dia DI line at 14th cross, JC Nagar

coming under Mahalaxmi layout S/s.

1.42

30 Work of P/L 4” dia water line at Sakamma Badavane 30th, 31

st & 32

nd

Crosses coming under Nandini layout S/stn.,

8.25

Total 76.32

Page 46: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

DASARAHALLI CONSTUTUENCY

Work Completed

Sl No

W/S particulars Est. cost in

Lakhs

1 Work of providing additional 150mm & 100mm dia valve to New CMC wards.

Rs. 5.30

Total Rs. 5.30

Page 47: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

DASARAHALLI CONSTITUENCY

Sl.

No. Name of the work Amount

1 Work of P/L 50 mm dia GI pipeline at main road and 63 mm dia PVC

pipeline at Om Shakthi temple road 1st cross to 4

th cross Rajgopalanagar

W.No.24 of Dasarahalli CMC under Peenya S/stn.

0.993

2 Work of providing & laying 50 mm dia GI pipeline at Main road and 63

mm dia PVC pipelien at OM Shakthi temple road 5th

cross to 8th cross,

Rajgopalnagar W NO. 24 of Dasarahalli CMC under Peenya S/s

0.988

3 Work of providing & laying 63 mm dia PVC pipeline and 50 mm dia GI

pipe from borewell to the area at Rajagopalnagar W. No. 28 under Peenya

S/stn.,

0.992

4 Work of providing & laying 50 mm dia GI pipeline at borewell point to

Kasturi Badavana Rajagopalnagar W.No. 24 of Dasarahalli CMC under W.

No. 6 sub division.

0.775

5 Work of P/L of PVC pipeline 50mm dia GI pipe from borewell point to

main road near Temple Ramaiah L/o, Ward No.24,Dasarahalli CMC under

Peenya S/s.

0.905

6 Work of P/L of PVC pipeline 50mm dia GI pipe from borewell to the area

at Ramaiah Badavane , 3rd

main, Peenya 2nd

stage Ward No.24 under

Peenya S/s.

0.999

7 Work of providing & laying of PVC pipeline at W.No. 24 63 mm dia PVC

pipeline 50 mm dia GI pipe from Borewell to the area at Rajagopalanagar

near Maruthinagar, Bangalore under Peenya S/stn.,

0.991

8 Work of P/L 63 mm dia PVC pipeline at Kasturi Badavane main road

Right Side from 1st cross to 8

th cross, Rajagopalanagar Ward No.24 of

Dasarahalli CMC coming under Peenya S/stn., of W-6 sub division.

0.999

9 Work of P/L 63 mm dia PVC pipeline at Kasturi Badavane main road

Right Side from 1) 6th & 5th Cross near Ashrama, 2) St. Mary’s School 3)

Backside Ashrama 5th A Cross Swathantrayodharanagar w.no. 31 of

Dasarahalli CMC

0.995

10 Work of providing and laying 63 mm dia PVC pipeline and 50 mm dia GI

pipeline at Hoysalanagar Sunkadakatte W No. 33, Dasarahalli, CMC

coming under Peenya S/s of W-6 sub division.

0.79

11 Work of providing and laying 63 mm dia PVC pipeline at W NO. 4 & 8 of

Dasarahalli CMC coming under AEEN-4 sub division.

0.497

12 Work of providing and laying 63 mm dia PVC pipeline at W NO. 8 of

Dasarahalli CMC coming under AEEN-4 sub division.

0.48

13 Work of providing and laying 63 mm dia PVC pipeline at W NO. 7,8,14 &

16 of Dasarahalli CMC coming under AEEN-4 sub division.

0.492

14 Work of providing and laying 63 mm dia PVC pipeline from 1st main to

2nd cross and 2nd, 3rd main of Goyal nagar Rajareddy layout at W NO. 8

of Dasarahalli CMC coming under AEEN-4 sub division.

0.861

15 Work of providing and laying 63 mm dia PVC pipeline at W NO. 6 of

Dasarahalli CMC coming under AEEN-4 sub division.

0.871

16 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

Jai Bhuvaneshwarinagar under Peeyna S/s.

74.70

17 Work of construction of damaged / collapsed manholes at Laxmidevinagar

Kaverynagar and Peeyna Industrial estate and surrounding areas under

Peenya S/s.

0.665

18 Work of P/L 63 mm dia PVC pipeline at 5th, 6

th & 7

th Main, Rukmininagar,

Nelagadarahalli Main Road, W.No. 18 under Peenya S/stn.,

0.71

Total 88.703

Page 48: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

YELAHANKA CONSTITUENCY Work Under Progress

Sl

No

UGD Particulars Est. cost in

Lakhs

1. work of Replacement of 6" dia SW line to 9" dia SW line KHB

'A' & 'B' Sector Yelahanka. Rs. 23.40

2 work P/L 9" dia SW line Slum Board Chikkabomma Sandra at

Yelahanka. Rs. 3.00

Total Rs.26.40

YELAHANKA CONSTITUENCY Work Completed

Sl

No

UGD particulars Est. cost in

Lakhs

1.

work of P/L 9" dia SW line in place of 6" dia SW line at H.No.

376 to 394, 623 to 647, 1173 to 1179 & 2265 to 2275 'B' Sector

Yelahanka.

Rs. 13.55

Total Rs.13.55

Grand Total Rs.39.95

Page 49: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

YELAHANKA CONSTITUENCY

Sl.

No. Name of the work Amount

1 Work of providing and laying of 75 mm dia PVC line inplace of damaged

pipe PVC pipeline to W No. 4,8,9 Yelahanka, coming under Yelahanka S/s.

0.827

2 Work of providing and linking of new borewell at Akshaya Dhaba to

NLIG 5th phase, W No. 29 of Yelahnka CMC under Yelahanka S/s.

0.941

3 Work of providing and linking 63 mm dia PVC line from new borewell to

existing 63 mm dia PVC lines at I/F of H No. 686, W No. 23, Judicial

Layout coming under Yelahanka S/s.

0.776

4 Work of attending water supply leaky joints on 63 mm dia, 90 mm dia

PVC lines at Ward No. 9,10,11,12 & Sugappa layout of Yelahanka CMC

coming under Yelahanka S/s for the month of March 2009.

0.495

5 Work of attending water supply leaky joints on 63 mm dia, 90 mm dia

PVC lines at Ward No. 5,6,7,8 of Yelahanka CMC coming under

Yelahanka S/s for the month of March 2009.

0.494

6 Work of linking of 75 mm dia new borewell at Maheshwaram temple

w.no. 29 of YNK CMC undler YNK S/stn.,

0.425

7 Work of attending water supply leaky joints on 63 mm dia PVC lines at

Ward NO. 1,2,3,4 of Yelahanka CMC coming under Yelahanka S/s for the

month of March 2009.

0.491

8 Work of providing & linking 63 mm dia PVC lines at 4th main, House No.

1629, Jidicial layout coming under Yelahanka S/s.

0.494

9 Work of attending water supply leaky joints on 63 mm dia PVC lines at

Ward No.28,29,30,31 of Yelahanka CMC coming under Yelahanka S/s for

the month of March-2009

0.494

10 Work of attending water supply leaky joints on 63 mm dia PVC lines at

Ward No.24,25,26, 27 of Yelahanka CMC coming under Yelahanka S/s for

the month of March 2009

0.49

11 Work of attending water supply leaky joints on 63 mm dia PVC lines at

Ward No.15, 21, 22, 23 of Yelahanka CMC coming under Yelahanka S/s

for the month of March 2009

0.485

12 Work of providing and laying 75 mm dia PVC pipeline in place of

damaged PVC pipeline No.920, EWS 2nd Phase,at Ward No. 30 of

Yelahanka CMC coming under Yelahanka S/s for the month of March

2009.

0.489

13 Work of providing and linking 63 mm dia PVC pipeline from new existing

63mm dia PVC lines at I/F of Sri Prabhu Vihara Hotel Road Ward No. 23

of Yelahanka CMC coming under Yelahanka S/s

0.494

14 Work of providing and linking 63 mm dia,75mm dia PVC lines at

Chikkabommasandra Ward No. 24 Ambedkaranagar W. No.25 of

Yelahanka CMC coming under Yelahanka S/s

0.492

15 Work of construction of compound wall to the BWSSB premises on

backside of quarters No. 1 & 2 of AEEN-4 sub division coming under

Yelahanka S/stn.,

0.984

16 Work of P/L 9” dia SW line in place of 6” dia SW line at 1st Main Road,

2nd Cross, Sihe Neru Road, Bommasandra coming under Yelahanka S/stn.,

0.975

17 Work of P/L 9” dia SW line in place of 6” dia SW line at H.No. 2549 to

2552, LIG 3rd Phase coming under Yelahanka S/stn.,

0.955

18 Work of P/L 9” dia SW line in place of 6” dia SW line at 707, SFS 4th

Phase I/F H.No. 453 coming under Yelahanka S/stn.,

0.871

19 Work P/L 9” dia SW line in place of 6” dia SW line at 1st Main, 1st Cross,

Bommasandra coming under Yelahanka S/stn., premises.

0.952

20 Work of construction of compound wall to the BWSSB premises on North

East Corner of AEEN-4 sub division coming under Yelahanka S/stn.,

premises.

0.984

21 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

Someshwaranagar main road coming under Yelahanka S/s.

0.486

Page 50: Abstract 27 Constituency

table-1

22 Work of providing and laying 90 mm dia PVC pipeline from 1) Ayyappa

Temple road 2) Burial Ground 3) Surabhi layout main road W No. 10 of

Yelahanka CMC coming under Yelahanka S/s.

0.472

23 Work of attending water supply leaky joints on 63 mm dia PVC lines at W

No. 13, 14, 15 of Yelahanka CMC coming under Yelahanka S/s for the

month of January-2009

0.488

24 Work of attending water supply leaky joints on 63 mm dia PVC lines at W

No. 19, 20, 21 of Yelahanka CMC coming under Yelahanka S/s for the

month of January 2009

0.483

25 Work of attending W/s leaky joints on 63mm , 75mm dia PVC lines at

W.No.18,19,20 & Surabhi L/o of YNK CMC under YNK S/stn.

0.47

26 Work of P/L 110mm dia PVC line in place of damaged 110mm dia PVC

pipeline at W.No.16 from Sapthagiri L/o to Papanna L/I, under YNK S/stn.

0.94

27 Work attending W/s leaky joints on 63mm dia PVC lines at

W.No.13,14,16,17 of YNK CMC under YNK S/stn.

0.491

28 Work of P/L 9” dia SW line in place of 6” dia SW line at 1st Main Road,

2nd Cross, Sihe Neru Road, Bommasandra coming under Yelahanka S/stn.,

0.975

29 Work of P/L 9” dia SW line in place of 6” dia SW line at H.No. 2549 to

2552, LIG 3rd Phase coming under Yelahanka S/stn.,

0.955

30 Work of P/L 9” dia SW line in place of 6” dia SW line at 707, SFS 4th

Phase I/F H.No. 453 coming under Yelahanka S/stn.,

0.871

31 Work P/L 9” dia SW line in place of 6” dia SW line at 1st Main, 1st Cross,

Bommasandra coming under Yelahanka S/stn., premises.

0.952

32 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

Someshwaranagar main road coming under Yelahanka S/s.

0.486

33 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

Sanitary Core in f/o H No.1471 to 1463 Conservancy under Yelahanka

S/stn.,

0.92

34 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

Sanitary Core in f/o H No.1363 Conservancy under Yelahanka S/stn.,

0.999

35 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

EWS H. No.675 to 696 under Yelahanka S/stn.

0.965

36 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

EWS H.No.707 under Yelahanka S/stn.,

0.95

Total 25.511

Page 51: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

BYATARAYANPURA CONSTITUENCY

Work Completed

Sl No

W/S Particulars Est. cost in

Lakhs

1 work of providing 150mm dia DI feeder main to Sahakara Nagar from Kodige Halli Main Road.

Rs. 22.90

Total Rs. 22.90

BYATARAYANAPURA CONSTITUENCY

Work Under Progress

Sl

No

UGD particulars Est. cost in

Lakhs

1. work of P/L 9" dia SW line in place of 6" dia SW line at BEL

layout Vidyaranyapura. Rs. 5.98

Total Rs. 5.98

BYATARAYANAPURA CONSTITUENCY

Work Completed

Sl

No

UGD particulars Est. cost in

Lakhs

1.

work of rectification & regarding on 9" dia SW line at No. 1820

to 2290 C block Shakaranagar coming under Shakaranagar

S/Station.

Rs.0.97

Total Rs.0.97

Grand Total Rs.6.95

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

BYATARAYANAPURA CONSTITUENCY

Sl.

No.

Sanction

No. &

Date

Name of the work Amount

1 95

21.5.09

Estimate for the work of attending water supply leaky

joints on 63 mm dia PVC lines at W No. 1 to 6 of

Yelahanka CMC coming under Vidyaranyapura S/s for

the month of February 2009

98,000/-

2 96

21.5.09

Estimate for the work of attending water supply leaky

joints on 63 mm dia PVC lines at W No. 7 to 12 of

Yelahanka CMC coming under Vidyaranyapura S/s for

the month of February 2009

99,100/-

3 113

26.5.09

Estimate for the work of P/L 75mm dia PVC line in

new borewell to existing 75mm dia PVC line at

W.No.18, Kogilu L/o, under Sahakaranagar S/stn.

96,000/-

Total 2,93,100/-

Page 52: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

PULAKESHI NAGAR CONSTITUENCY

Work To Be Taken up

Sl

No W/S particulars

Est. cost in

Lakhs

1 work of P/L 100mm dia line to left out portions for linking to Modi

garden area coming under Jayamahal S/Stn. Rs.1.00

Total Rs.1.00

PULLIKESHI NAGAR CONSTITUENCY Work Under Progress

Sl

No

UGD Particulars Est. cost in

Lakhs

1.

work of P/L 225mm dia SW line in place of 6" dia SW line at

Atmananda Colony, K.B.Sandra, Hanumanthappa L/O,

Doddamma L/O, Nagamma L/O, Rathan Singh L/O, Bheemanna

Garden, Munivenkatappa Gardeer, Manorayana Palya, Cauvery

Nagar, Brundavan L/O, Indrajeet L/o, H.M. L/O, Adrash Nagar,

Gandhi Nagar, S.H. L/O, Ambedkar College Main, Shampura

Village, N.G. L/O, in Sultanpalya area, coming under R.T. Nagar

S/Station.

Rs. 20.00

Total Rs. 20.00

Page 53: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

PULKESHI NAGAR CONSTITUENCY

Sl

No Particulars

Est. cost in

Lakhs

1 Estimate for the work of shilting of 675mm dia PSC/CI line by

600mm dia MS line from Millers road along Bore bank road up to

Pottery Town coming Frazer town Service station.

163.00

2 P/L 100mm dia DI pipeline for inmprovement of water ways supply

facilities to Kasturi Bai Nagar under pillanna garden Service station.

3.20

3 Work of providing & linking 100x100 mm dia water supply linking

behind ex-counciller ouse, DJ Halli main road, Masjid road and

providing 100 mm dia DI pipe and assest the leakage at 16th

Cross,

Jannary road coming under Pillanna Garden S/stn., No. 63 dt:

17.4.09, NO. 66 dt: 18.4.09 and No. 90 dt: 3.5.09.

0.40

4 Work of providing & fixing 150x100 mm dia central valve at New

Bagalur layout, Lingarajpura, Vinayaka temple road Kushanagara,

Vinobhanagar, Modiroad, Gandhinagara coming under No. 4 dt:

1.4.09 & No. 82 dt: 3.5.09 Pillanna garden S/stn.,

0.88

5 Work of providing & linking 150x100 mm dia DI line at 4th

Cross,

Basavanagar W.No. 94 coming under Pillanna Garden S/stn.,

0.57

6 Work of providing & linking 100x100 mm dia DI line at

Narasimhaiah layout and Makka Masjid Cross Road W.No. 94

coming under Pillanna Garden S/stn.,

0.98

7 Work of providing & fixing contral valve at Arogyamma layout,

Makka Masjid BM layout, Vinobha nagara, Old & new Bagalur

layout, Lingarajpura, W.No. 94 coming under Pillanna Garden S/stn.,

0.89

8 Work of P/L 100 x 100mm dia W/S liking behind Ex-Councillor

house, DJ Halli main road, Masjid road & providing 100mm dia

DIpipe and arrest the leakage at 16th

cross, Tannary road, coming

under Pillanna garden S/s (I.No.63dt.17.4.09 No.66 dt.18.4.09 and

I.No.90 dt.3.5.09)

0.40

9 Work of P/L 150 x 100mm dia DI line at 4th

cross , Basavanagar

W.No.94 coming Pillanna garden S/s

0.57

10 Work of P/L 100 x 100mm dia DI line at Narasimhaiah L/o and

Masjid cross road W.No.94 coming under Pillanna Garden S/s

0.984

11 Work of linking 100x100 mm dia DI line at 6th Cross, 2

nd B Main,

Gandhinagar under Pillanna Garden S/stn.,

0.67

12 Work of linking 100x100 mm dia DI line at 2nd

A Main, K.G.Halli

under Pillanna Garden S/stn.,

0.62

13 Work of linking 100x100 mm dia DI line at 3rd

Cross, A.K.Colony,

Sagayapura W.No. 90, Pillanna Garden S/stn.,

0.72

14 Work of P/L of 225 mm dia SW line at Idgah Mohall & surroundings

Bangaragirinagar under Jayanagar S/stn.,

8.10

15 Work of P/L of 225 mm dia SW pipeline & construction of new

manholes in Banagirinagar surrounding & replacement of 150 mm

dia silted up line by 225 mm dia SW pipes in

Banaragirinagarsurrounding coming under Jayamahal S/stn.,

12.40

Total 194.384

Page 54: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE LIST OF WORKS CARRIED OUT UNDER

SARVAGNA NAGAR CONSTITUENCY

Sl.

No.

Sanction

No. &

Date

Name of the work Amount

1 83/2.7.09 Work of linking providing control valves, cleaning

of pipe at various places for improvement of water

supply facilities under HBR S/stn.,

3,60,000/-

TOTAL 3,60,000/-

Page 55: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

SARVAGNANAGARA CONSTITUENCY

Sl

No. Particulars Amount

1 Estimate for the work of p/l 100 mm dia DI w/s line at

Mutyalamma Temple street, A.K. Colony and surrounding area

ward-94 under pillanna garden Service station.

7.00

2 Estimate for the work of linking, providing control valves,

cleaning of pipe at various places for improvement of w/s

facilities under HBR Service station.

3.60

3 Work of linking 150x150 mm dia pipeline at 80’ Road 2nd

block,

HBR layout under HBR S/stn.,

0.974

4 Work of linking 100x100 mm dia water supply line at Chairman

layout to 2nd

‘C’ Main & Keerthi layout & fixing of valve at

HRBR-3rd

Stage under HRBR S/stn.,

0.99

5 Work of shifting 300mmd ia valve from buststop Nagavara

main road to opp K.G.Halli Police station Nagavara main road

under Pillanna garden S/s

0.52

6 Work of linking 200 x 100 x 100 at Nehru road & 250 x

150mm dia W/S line at 9th main 1

st block, HRBR L/o, under

HRBR S/s 0.97

7 Work of linking 150 x 150mm dia pipeline at 80’ road 2nd

block HBR L/o, under HSR L/o S/s 0.974

8 Work of linking 100 x 100mm dia W/S line at Chairman L/o,

to 2nd

C main & Keerthi L/o, & fixing of valve at HRBR –III

stage under HRBR S/s 0.99

9 Work of Proviidng & fixing 150 x 100mm dia control valve at

new bagalur L/o, Lingarajapura, Vinyaka temple road,

Kushanagara, Vinobhanagar, Modi road , Gandhinagara coming

under (I.No.4 dt.1.4.09 & I.No.82 dt.3.5.09) Pillanna garden

S/s 0.883

10 Estimate for the work of P/L 9’ dia SW line in place of 7’ dia

SW line at Kulappa lane, & D costa Layout, 2nd

cross C.C.B.I.

Centre & reconstruction of damaged manholes coming under

Machalibetta S/S

0.49

11 Estimate for the work of replacement of 225mm dia SW line by

300mm dia SW line at 2nd

main road, NGEF L/O under OMBR

S/S area coming under OMBR S/S

0.48

12 Estimate for the work of P/L 9’ dia SW line at 12th

cross,

Bharathmatha layout, Pillanna garden, under W.No.94, coming

under Pillanna garden S/S

0.88

13 Estimate for the work of replacement of 9’ dia SW line inplace

of existing 6’ dia SW line at 9th

main, Pillanna garden 3rd

stage,

coming under Pillanna garden S/S

0.98

14 Estimate for the work of P/L 9’ dia SW line in place of 6’ dia

SW line at 3rd

stage, KEB office & reconstruction of damaged

manholes coming under Pillanna Garden S/S

0.99

15 Estimate for the work of P/L & linking of 225mm dia SW line at

3rd

main cross road & 3rd

main of OMBR Layout under OMBR

S/S

0.96

16 Estimate for the work of removing 9’ dia SW line & laying 12’

dia SW line at 6th cross, Old Mill road under HRBR Layout S/S

0.97

17 Estimate for the work of removing 9’ dia SW line & laying 12’

dia SW line at Aravanda nagar cross road under HRBR L/O S/S

0.99

18 Estimate for the work of removing 6’ dia SW line & laying

225mm dia SW line at 80 ft road, 2nd

Block, HBR Layout under

HBR L/O S/S

0.98

19 Estimate for the work of P/L & linking of 225mm dia SW line at

service road, Near BDA Park under HRBR S/S

0.99

Page 56: Abstract 27 Constituency

table-1

20 Estimate for the work of replacing 9’ dia SW line by 12’ dia SW

line at 5th cross, K.M.Nagar, K.G.Halli coming under P.G S/S

0.99

21 Estimate for the work of replacing 9” dia SW line by 12” dia SW

line Harifa Mazid road K.G.road coming under P.G. S/S

0.97

22 Work of P/L & linking of 225 mm dia SW line at 4th Cross, 5

th

Main, 4th Block & backi side road, Petrol bunk 3

rd block, HBR

layout under HBR S/stn.,

0.992

23 Work of removing & laying 225 mm dia SW line at

Nandhinagar 2nd

B Main under Pillanna Garden S/stn.,

0.864

24 Work of removing & laying 9” dia SW line at Bilal Nagar 2nd

Cross, K.G.Halli under Pillanna Garden S/stn.,

0.70

25 Work of removing 6” dia by laying 9” dia SW line at 2nd

Main,

Pillanna Garden 1st Stage under Pillanna Garden S/stn.,

0.9975

26 Estimate for the work of P/L & linking of 225mm dia SW line at

5th

A cross, 2nd

Block, HRBR Layout under HRBR S/S

0.99

27 Estimate for the work of P/L 9’ dia SW line in place of 6” dia

SW line at Smadhana nagar, 2nd

cross K.G.Halli construction of

new manholes and reconstruction of damaged manholes coming

under P.G. S/S

0.90

Total 33.0145

Page 57: Abstract 27 Constituency

table-1

Jayamahal Constituency wise statement

Sl

No. Particulars Amount

1 Estimate for the work of raising & reconstruction of

damaged/collapsed manholes at Muddamma garden, Chinnappa

garden St John’s Church road, Byadarahalli, Benson town &

surrounding area coming under F.T. S/S

0.71

Shanthinagara Constituency wise statement

Sl

No. Particulars Amount

1 Estimate for the work of P/L 9” dia SW line inplace of 6’ dia

SW line at 2nd

cross, 2nd

main., Mottappa palya & reconstruction

of damaged manholes coming under Indiranagar S/S

0.87

Page 58: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

RAJARAJESHWARI NAGAR CONSTITUENCY

Work Completed

Sl No

W/S particulars Est. cost in

Lakhs

1 work of providing and laying 4" dia. DI pipe line by replacing the damage corroded 3" dia. C.I. pipeline at B.K. Nagar Ist Main coming under YPR S/Station.

Rs.3.42

Total Rs.3.42

RAJARAJESHWARINAGAR CONSTITUENCY

Work Completed

Sl

No

UGD particulars Est. cost in

Lakhs

1. work of replacing of 6" dia SW line by 9" dia SW line P/L at

L.N. Colony & Model colony of Yeshwantapura S/Station. Rs.4.25

work of replacing of 6" dia SW line by 9" dia SW line at

Mariyappanapalya coming under Srirampuram S/Station.

Rs.4.32

Total Rs.8.57

Work To Be Taken up

Sl

No

UGD particulars Est. cost in

Lakhs

1.

work providing and laying of 9" dia SW line in place of 6" dia

SW line at Opp to 6th

Cross, 16th

Main, HMT L/o, coming under

YPR S/Stn. (Ward No. 03)

Rs.0.98

2

work providing and laying of 9" dia SW line in place of 6" dia

SW line at 2nd

Main Road, LIC Colony near BMP Park, coming

under YPR S/Stn. (Ward No. 03)

Rs. 0.95

3

work providing and laying of 9" dia SW line in place of 6" dia

SW line at Opp to NMS Land mark, 6th

Cross, HMT L/o, coming

under YPR S/Stn.

Rs. 0.90

4

work providing and laying of 9" dia SW line in place of 6" dia

SW line at BBMP maternity hospital, 1st Cross, Model Colony,

coming under YPR S/Stn. Ward No. 03.

Rs. 0.90

5 work providing and laying of 9" dia SW line in place of 6" dia

SW line at Gokula Fly over, coming under YPR S/Stn. Rs. 0.80

6 work providing and laying 9" dia SW line at Samudhaya

Bhavan, Peenya 4th

Block, coming under Bahubalinagar S/Stn. Rs. 0.96

Page 59: Abstract 27 Constituency

table-1

Total Rs.5.49

Grand Total Rs.14.06

Page 60: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

R.R.NAGAR CONSTITUENCY

Sl.

No. Name of the work Amount

1

Work of providing and laying 225 mm dia SW line inplace of old /

damaged 150 mm dia SW line at 12th A cross, and 17

th main road, Ideal

Homes Society in Ideal Homes S/s.

2.55

2 Work of providing and laying 225 mm dia SW line to newly formed

roads at Krishnandanagar of Malagala under RR Nagar S/s.

16.80

3 Work of providing and laying 225 mm dia SW line of Jnanaganganagar

unde RRNagar CMC of W-5 sub div

27.40

4

Work of providing and laying 225 mm dia SW line at

Annapoorneshwarinagar, Rajarajeshwari Co-operative society

Chandrashekar layout, Chandana Badavane under Nagarabhavi S/s.

14.85

5

Work of providing and laying 9” dia SW line inplace of 6” dia SW line

at 8th main, 2

nd block, and 1

st main, Holly Mother Convent No. 55/A,

3rd

cross, Nandini layout under Nandini layout S/s.

0.736

6 Work of P/L 225 mm dia SW pipe line to PUGDF to the Guragunte

palya Slum comels under Nandini layout S/stn.,

4.25

7

Work of P/L 300 mm dia RCC NP3 class pipeline at back side of

wackhard Hospital (NGEF layout) 12th Cross, 9

th Block and at 5

th Cross

Pattegarapalya under Nagarabhavi S/stn., of W.5 sub division.

4.67

8 Work of construction of 1000000 ltrs of sump at Laxmidevinagar slum

near OHT Nandini layout under Peenya S/s.

37.40

9 Work of P/L 150 mm dia DI line at ESI hospital to Peenya Village

comes under Peenya S/stn.,

11.23

10 Work of P/L 9” dia SW line inpalce of 6” dia SW line at 6

th Cross,

Iyyappa Nagar under Bahubalinagar S/stn.,

0.957

11 Work of P/L 9” dia SW line in place of 6” dia SW line at Opp. No. 2/1,

5/10, 12/615 under Nandini layout S/stn.,

0.56

Total 121.403

Page 61: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

VIJAYANAGAR CONSTITUENCY

Sl.

No. Name of the work Amount

1 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

Vijayanagar 9th

main to 13th

main in between Vijayanagar Chord road

Service road and 5th cross road under Hoshalli S/s.

11.70

2 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at

Vijayanagar 2nd

to 6th

main in between 4th

cross to pipeline main road under

Hosahalli S/s.

12.00

3 Work of providing and laying 9” dia SW line at conservancy road behind

Thirumala Bar, Kamashipalya bus stop under Vijaynagar OHT S/s.

1.00

4 Work of providing and laying 150 mm dia DI feeder main to improvement

the water supply to 6th to 8

th main road, Vijaynagar comes under W-1 sub

div

10.80

5 Work of providing & laying 100 mm dia CI line inplace of 110 mm dia PVC

line to improve the water supply facilities from Telecom layout junction to 1st

and 2nd

cross, Raghavanagar upto Kalyana tiles coming under Mysore road

S/s.

3.55

6 Work of providing & laying 457 mm dia MS pipeline from junction of Chord

road & Mysore road upto Magadi road GLR via Sircy circle along Mysore

road & Binny Mill road coming under AEEW-3 sub division.

432.30

7 Work of providing and laying 457 mm dia MS pipeline from junction of

Chord road and Mysore road upto Magadi road GLR via Sirsi circle along

Mysore road and Binny mill road coming under AEEW-3 sub div

3.82

8 Work of providing and laying 9” dia SW line inplace of 6” dia SW line from

20th

main road to 21st main road, MC layout comes under Chandra layout S/s.

40.00

9 Work of providing & laying of linking 250 mm dia DI pipeline from 400 mm

dia F/M to IWSF from 2nd

Cross to 7th Cross, Magadi Road (lift side) under

Magadi Road S/stn.,

12.00

10 Work of P/L and linking of 150 mm dia DI pipeline fromf 250 mm dia F/M

to IWSF to 6th Main, 7

th Main, & 8

th Main, Bhuvaneshwarinagar under

Magadi Road S/stn.,

3.765

11 Estimate for the work of Replacing 6” dia SW line with 9” dia SW line at

Vinobha Badavane, Avalahalli under Nagendra block S/s.

4.60

12 Estimate for the work of Shifting water supply lines which are passing

through UGD line / passing adjacent to UGD lines result in contamination of

water supply at Masti Venkatesh Iyengar road, Conservancy, Siddartha

Badavane, Avalahalli & Raghavendra block, 1st main coming under Mount

joy & Nagendra block S/s.

4.77

13 Estimate for the work of providing 9” dia SW line in place of existing 6” dia

SW line along K.K.Hebbar road, 4th

cross, Hanumathanagar coming under

Mount Joy S/S of AEEES-4 S/D

0.86

14 Estimate for the work of providing 9’ dia SW line in place of existing 6” dia

SW line at 7th

main, 7th

cross, Ramanjaneya road, Hanumanthanagar coming

under Mount Joy S/S of AEES-4 S/D

0.88

15 Estimate for the work of replacing 6” dia SW line by 9” dia SW line at 2nd

cross and 3rd

cross, Bhuvaneshwarinagar, Dhobighat, coming under

Nagendra Block, S/S of AEES-4 S/D

0.89

16 Estimate for the work of P/L 9” dia SW Line in palce of existing 6” dia

SW line at Patalamma street, Basavanagudi (Mohammaden block) coming

under MNK S/s area of AEES-4 Sub-Dvn

0.49

17 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 1st Cross,

Adarsha Nagara coming under Chamarajpet S/stn., area of AEES-4 sub

division.

0.80

18 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 3rd

Main

Road, Adjacent to 50 feet road BSK 1st Stage, 2

nd Block, behind

Mahadeshwara temple & 4th

Cross, Avalahalli village, A.K. Colony coming

under Mount Joy S/stn.,

0.996

Page 62: Abstract 27 Constituency

table-1

19 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 6th

& 7th

Cross Muneshwara block coming under Nagendra block S/stn, area of AEES-

4 sub division.

0.76

20 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 14th Main

Road Chikka Devaraya road (Behind Rajiv Gandhi Stadium) Pipeline,

Srinagara coming under Nagendra Block S/stn., area of AEES-4 sub division.

0.994

21 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 2nd

A Cross,

Raghavendra Block & Avalahalli Main Road coming under Nagendra Block

S/stn. Area of AEES-4 sub division.

0.996

Total 547.971

Page 63: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2008-2009.

SHIVAJINAGAR CONSTITUENCY

Work Completed

Sl No

W/S particulars Est. cost in

Lakhs

1

work of Replacement of 100mm dia PVC & 3" dia CI line by laying 100mm dia DI line at Ist Main, II nd Main, IIIrd Main, Jayamahal, Miller's Road, Nandi durga Extn, IIIrd & Ist Cross, Pemmegowda Road, Rehamath Nagar, coming under Jayamahal S/Station.

Rs. 25.75

Total Rs. 25.75

SHIVAJI NAGAR CONSTITUENCY Work Completed

Sl

No

UGD particulars Est. cost in

Lakhs

1.

work of P/L of 9” dia SW line in place of 6” dia SW line @ opp

No72/1 Muniswamappa road & RDMHS coming under

Jayamahal S/Stn.

Rs.0.98

2

work of P/L of 9” dia SW line in place of 6” dia SW line @

Opp 57 & 54 Muniswamappa road & RDMHS coming under

Jayamahal S/Stn

Rs. 0.99

3

work of P/L of 224mm dia SW line in place of 6” dia SW line @

Pemmegowda road near Burial ground @ Jayamahal coming

under Jayamahal S/Stn

Rs. 5.92

4

work of P/L 9" dia SW line at Chamundipura Block Main Road,

Opp to Poona Bakery in place of 6" dia SW line coming under

Jayamahal S/Stn.

Rs. 0.76

5

work of P/L 9" dia SW line at 2,27, 28, 9 ND Road Extn., 6th

Cross & RDMH's coming under Jayamahal S/Stn.

Rs. 0.76

Total Rs.9.41

Work To Be Taken up

Sl

No

UGD particulars Est. cost in

Lakhs

1.

work of P/L 450mm dia RCC NP-3 class pipeline in place of

existing 9" dia SW pipeline and RCMH in Nandidurga Road,

coming under JM S/Station

Rs. 10.00

Total Rs. 10.00

Grand Total Rs.19.41

Page 64: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

SHIVAJINAGAR CONSTITUENCY

Sl.

No. Name of the work Amount

1 Estimate for the work of P/L 9’ da SW line in place of 6’ dia SW line at

Guptha L/O, 1st cross & reconstruction of damaged manholes coming

under Ulsoor S/S

0.99

2 Work of P/L 300 mm dia NP3 S & S RCC pipeline from 7th Main,

Vasanthanagar to 2nd

Main, Vasanthanagar coming under High Grounds

S/stn.,

5.00

3 Work of P/L 300 mm dia NP3 S & S RCC pipeline inplace of 7” dia SW

pipeline at Jain temple road coming under HGR S/stn., 7.00

4 Work of P/L 300 mm dia NP3 S & S RCC pipeline inplace of 225 mm

dia SW pipeline at Veera Pillai Street to link sewer line at Kamaraj Road

coming under HGR S/stn.,

3.00

5 Work of P/L 225 mm dia SW pipeline along station road, Shivajinagar

under HGR s/stn., 4.00

6 Work of P/L 300 mm dia NP3 S & S RCC pipeline inplace of 9” dia SW

line at Narayana Pillai street (Dispensary road to Veera Pillai street)

coming under Coles Park S/stn.,

6.00

7 Work of P/L 300 mm dia NP3 S & S RCC pipeline inplace of 150 mm

dia & 175 mm dia at Ebrahim Saib street coming under Coles park S/stn., 6.25

8 Work of P/L of 300 mm dia NP3 class S & S RCC pipeline in place of

150 mm dia SW pipeline to link 450 mm dia RCC sewer line at

commercial street, Shivajinagar under HGR S/stn.,

11.60

9 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 1st Main

Road Cross, S.R.nagar, Yelemallige Anandappa Galli & construction of

new manholes & reconstruction of damaged manholes under Banappa

Park S/stn.,

0.96

10 Work of rectification of 9” dia SW line at Lakshmi Slum Street, Johns

road comes under Coles Park S/stn., 0.49

11 Work f rectification of 9” dia SW line D.No. 158 & 156 Chick Bazar road

& D.No. 18, Muthyalamma Street comes under HGR S/stn., 0.48

12 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 7th

Cross, Conservancy 7th

Main, S.R.Puram comes under B.P. S/stn., 0.97

13 Work of P/L 300 mm dia RCC line in f/o kings crest, Apartment Millers

Road near BBMP under Pass bridge under Jayamahal S/stn.,

2.30

14 Work P/L 9” dia SW line in place of damaged SW line at 2nd

Cross, 6th

Cross, Arundathinagar backside, Doddanna house to Ramanna House

under Chandra layout S/stn.,

0.988

Total 50.028

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

CHIKKAPET CONSTITUENCY

Sl

No. Particulars Amount

1 Work of P/L 9” dia SW line inplace of 7” dia SW line at Mosque lane Opp.

Kalasipalya police station under the jurisdiction of V.V.Puram S/stn., 2.50

2 Work of P/L 300 mm dia SW line inplace of 7” & 9” dia SW line from Sajjan

Rao Road to diagonal road along Burgal Mutt road under the jurisdiction of

V.V.Puram S/stn.,

4.00

3 Work of P/L 12” dia SW line to replace 7” dia SW line from Lalbagh Fort

Road to Diagonal road along Anjaneya temple street under V.V.Puram S/stn., 3.15

4 Work of lowering & laying 9” dia SW line to replace existing 7” dia SW line

at Pampa Mahakavi road coming under V.V.Puram S/stn., 0.99

5 Work of P/L 9” dia SW line inplace of 6” dia SW line at Diagonal road Cross, 0.96

Page 65: Abstract 27 Constituency

table-1

S.B.Road, V.V.Puram under V.V.Puram S/stn.,

6 Work of P/L 9” dia SW line inplace of 6” dia SW line at C.K.C. Garden, 1st

Cross, 1st A Cross & reconstruction of damaged manholes coming under

Bannappa Park S/stn.,

1.00

7 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at behind

Lalbagh Fort Road, conservancy & reconstruction of damaged manholes

coming under V.V.Puram S/stn.,

0.94

8 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at Papaiah

street conservancy Mavalli & reconstruction of damaged manholes coming

under V.V.Puram S/stn.,

0.99

9 Work of raising & reconstruction of damaged manholes at Anjaneya temple

street, KAS lane, Ganigar lane & surrounding areas under Banappa Park

S/stn.,

0.97

10 Estimate for the work of P/L 300mm dia and 225mm dia SW line in place of

6” dia and 7” dia SW line at Khuddur L/O , Jyoti Nursing Someshwarnagar

and R/C DMH’s coming under HBGN Service station.

3.25

11 Estimate for the work of P/L 300mm dia SW line in place of 6”dia and 7”dia

SW line at Dayanada slum, Venkatareddynagar, Jayanagar 1st Block, and R/C

of damaged manholes coming under Hombegowdanagar Service station

6.70

12 Work of replacement of 6” dia SW line by 9” dia SW line at 7th Main,

Lakkasandra coming under HBGN S/stn.,

0.97

13 Work of replacement of 6” dia SW line by 9” dia SW line at st Main,

Gopalappa layout, Lakkasandra coming under HGBN S/stn.,

0.97

14 Work of replacement of 6” dia SW line by 9” dia SW line at 1st Cross,

Chinnayya palya coming under HBGN S/stn.,

0.97

15 Work of replacement of 6” dia SW line by 9” dia SW line at 11th Cross & 17

th

Cross, Wilson Garden coming under HGBN S/stn.,

0.97

16 Work of replacement of 6” dia SW line by 9” dia SW line at 8th

Cross,

Someshwaranagar coming under HBGN S/stn.,

0.97

17 Work of replacement of 6” dia by 9” dia SW line at 9th Main, to 15

th Cross,

Wilson Garden coming under HBGN S/stn.,

0.90

18 Work of replacement of 6” dia by 9” dia SW line by 12” dia SW line at Opp.

To Chowdeshwari temple, Lakkasandra coming under HBGN S/stn.,

0.93

19 Estimate for the work of replacing 6” dia SW line by 9” dia SW line which is

running by the side of 4” dia Water supply line at 14th

cross, Shastrinagar main

road , BSK 2nd

stage under Devagiri S/s.

2.57

20 Estimate for the work of Shifting Water supply lines which are passing

through UGD Manhole adjacent to UGD lines result in contamination of water

supply at 3rd

cross, Byrappa block, 14th cross, Shastrinagar & Shasatrinagar 2

nd

cross coming under MNK Park S/s.

12.47

21 Estimate for the work of P/L 250mm dia CI pipe line crossing & construction

of 1.2 mm dia manholes and reconstruction of damaged manholes behind H.B.

Samaja conservancy coming under MNK Park S/S

0.39

22 Estimate for the work of P/L 9” dia SW line & 10” dia CI pipe line for drain

crossing and construction of 1.2mm dia manholes & reconstruction of

damaged manholes to avoid flow of sewage inside SWD at behind Vidyarthi

Bhavan Gandhi Bazar coming under MNK Park S/S of AEES-4 S/D

0.93

23 Estimate for the work of P/L 9” dia SW line & construction of manholes at 1st

cross, Guptha layout, near Sunana college coming under MNK Park S/S

0.99

24 Estimate for the work of P/L 9” dia SW line & construction of manholes at 2nd

cross, Guptha layout coming under MNK Park S/S

0.98

25 Estimate for the work of replacement of 6” dia SW line by 9” dia SW line

at No.40, L.Reddy main Kamila apartment No.36 & 35 Kavery L/o,

W.No.66, B’lore-29 coming under BTM L/o S/s

0.985

Total 51.445

Page 66: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

C.V.RAMAN NAGAR CONSTITUENCY

Sl

No. Particulars Amount

1 Estimate for the work of P/L 225mm dia SW line at temple road Krishnaiah

Palya & reconstruction of new manholes coming under Sadanandanagar S/s of

E-5 S/d

1.50

2 Estimate for the work of P/L 9” dia SW line in place of 6” dia SW line at

Annayappa garden, Opp MLA office road & reconstruction of damaged manholes

under JBN S/S

0.85

3 Estimate for the work of P/L 9” dia SW line in place of 6” dia SW line at 5th cross,

Old Binnamangala, Indiranagar, 1st stage & reconstruction of damaged manholes

coming under HAL 2nd

stage S/S

0.86

4 Estimate for the work of replacing 9’ dia SW line in place of existing 6’ dia SW

line at 6th main, Opp to LIC Building, HAL 3

rd stage & Puttappa Matta road, 1

st

cross coming under JBN S/S

0.84

5 Estimate for the work of replacement of 6’ dia SW line by 9’ dia SW line at 4th &

3rd

cross, Channasandra village, under OMBR S/S area coming under OMBR S/S

0.49

6 Estimate for the work of replacement of 6’ dia SW line by 9’ dia SW line at 3rd

cross, Channasandra village, under OMBR area coming under OMBR S/S

0.85

7 Estimate for the work of P/L 9’ dia SW line in place of 6’ dia SW line at Murphy

Town, near ward office (W.No.82) & reconstruction of damaged manholes

coming under Ulsoor S/S

0.98

8 Estimate for the work of P/L 9’ dia SW line in place of 6’ dia SW line at Kullappa

colony, 5th cross & reconstruction of damaged manholes coming under JBN S/S

0.92

9 Estimate for the work of P/L 9’ dia SW line in place of 6’ dia SW line at 7th cross,

JBN & 3rd

cross, Kullappa colony, & reconstruction of damaged manholes coming

under JBN S/S

0.95

10 Estimate for the work of P/L 9’ dia SW line in place of 6’ dia SW line at 2nd

main,

Thippasandra, BGR Lane, G 4th cross & reconstruction of damaged manholes

coming under JBN S/S

0.99

11 Estimate for the work of replacement of 6’ dia SW line by 9’ dia SW ine at

Shivalinga colony, 3rd

cross, 4th cross, 5

th cross & reconstruction of damaged

manholes coming under JBN S/S

0.96

12 Estimate for the work of P/L & linking of 225mm dia SW line from 6th A cross to

Old Channasandra road & Sapthagiri Tent Road, Banaswadi village, under OMBR

S/S

0.99

13 Estimate for the work of providing & laying of 225mm dia SW P/L with

construction of new manholes at 2nd

A cross near Motappa compound

Byrasandra under Bhuvaneshwarinagar S/s under E-4 Sub-Dvn

0.435

14 Estimate for the work of shilting of 675mm dia PSC/CI line by 700mm dia MS

line from Manipal Center up to Aero engine along Ulsoor main road old Madras

road etc., coming under Ulsoor Service station.

270.00

Total 281.615

Page 67: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

PADMANABHA NAGAR CONSTITUENCY

Sl

No. Particulars Amount

1 Estimate for the work of P/L 9” dia SW line at 10th

cross & 9th

cross

Mudamabikanagara & construction of new manholes coming under

Hosakerehalli S/s

3.00

2 Estimate for the work of P/L 9” dia SW line at Anjaneya nagar adjacent to

BDA L/o, Ittamadu under Hosakerehalli S/s

3.00

3 P/L 9” dia SW line in place of 6” dia SW line at AG’s L/o, 17th main road,

PP Layout coming PP Layout S/s

2.36

4 Estimate for the work of P/L 400/450mm dia sewer line from

Sharadanagar near Sathyan Kunte & linking to truck sewer main at Vasantha

Kalyana Mantapa near Saibaba temple Opp. to Vasanthapura main road

45.90

5 Estimate for the work of P/L 225mm dia SW line by 300mm dia NP3 class

S & S pipe linking to sub main at near storm water drain Chikkalasandra

main road, Padmanabhanagar to avoid the disposal at sewage in open drain

at Gumaiah L/o

27.60

6 Estimate for the work of replacing 6” dia SW line by 9” dia SW lien which is

running by the side of 12” dia Feeder main & 4” dia Water supply line at Ring

road, Bhava ninagar under Devagiri S/s.

3.56

7 Estimate for the work of P/L 9” dia SW lien & 12” dia SW line to avoid flow

of sewage in storm water drain at Dobhighat 23rd

main, BSK 2nd

stage under

Devagiri S/s.

4.45

8 Estimate for the work of Rectification of 9” dia SW line at Hari colony to

avoid contamination of water due to stagnation of sewage.

0.74

9 Estimate for the work of P/L 9”dia SW line at 10th Cross and 9

th Cross

Moodambikanagar and Construction of new manholes coming under

Hosakerihalli Service station.

3.00

10 Estimate for the work of P/L 9” dia SW line at Anjaneya Nagar adjacent to

BDA L/O, Ittamadu under Hosakerihalli Service station.

3.00

11 PIL 9” dia SW line inplace of 6” dia SW line at AG’s L/O 17th

main road, PP

L/O coming under PP L/o Service station.

2.36

12 Estimate for the work of P/L 400/450mm dia sewer line from Shnadanagar

near Sathyane Kunte and linking to truck sewer main at vasantha kalyana

matapa near Saibaba temple Opp to Vasantapura main road.

50.00

13 Estimate for the work of P/L 9” dia SW line at 4th

& 5th

cross, 8th

main, Guraj

Layout, BSK 3rd

stage & Shivaramakaranth road near BMTC Bus stop

Chikkalasandra coming under BSK S/S of AEES-2 S/D

0.98

14 Estimate for the work of P/L and linking 9” dia SW line at 7th

main, 5th Block,

BSK 3rd

stage, & 8th

main, Ittamadu coming under Hosakerehalli, S/S

0.99

15 Estimate for the work of P/L & linking 9” dia SW line at 1st cross, 1

st main,

Sharadamma Garden, Kanka Layout under BSK-I S/S

0.84

16 Estimate for the work of P/L & linking 9” dia SW line at Maruthinagar Slum,

2nd

main & 3rd

cross, Anganvadi School road, Maruthinagar Slum coming

under Hosakerehalli S/S

0.95

17 Estimate for the work of providing 9” dia SW pipe line Opp to H.No.39, Near

Ganapathi Engineering works Hanumagiri Layout, Chikkalasandra under

BSK-2 S/S

0.83

18 Estimate for the work of P/L 9” dia SW pipe line at Om Shakthi Temple road

Opp to H.No.01, Hanumagiri Layout, Chikkalasandra under BSK-II S/S

0.75

19 Estimate for the work of replacing 6” dia by 9” dia SW lie at 12th main & 13

th

main, Kalappa Block, Sreenagar coming under Nagendra Block, S/S of AEES-

4 S/D

0.86

20 Work of replacing 6” dia by 9” dia SW line at 9th

Main, Kumarswamy layout

1st Stage coming under K.S.Layout S/stn.,

0.755

21 Work of construction of new manholes at 2nd

Main Road, Vinobha nagar,

K.G.Halli coming under Pillanna Garden S/stn.,

0.461

22 Work of replacement of existing 9”dia SW line by 12” dia SW line at premises 0.99

Page 68: Abstract 27 Constituency

table-1

No. 215 upto the premises No. 95, 4th Main, 8

th Cross of JHBCS coming under

BSK-I S/stn.,

23 Estimate for the work of replacement of 100mm dia DI PVC w/s line by

100mm dia DI w/s line at 50ft road (Vyasaraya Ballal road) Kumarswamy L/o

under Kumarswamy L/o Service station.

73.60

24 Estimate for the work of PIL 100mm dia DI distribution w/s line Intrent of

H.no.64/3, opp to Komarla Bridge Apartment on Aubramanyapura main road,

chikkalasandra under BSK Service station.

1.45

25 Estimate for the tender work of plinking 100mm dia DI line from existing

100mm dia DI line linking to existing village panchayat water tank through

Bulk meter water supply facilities to uttarahalli village under PP L/o Service

station.

5.00

26 Estimate for the work of PIL 150mm dia feeder main branching from 300mm

dia feeder main at Anjeneyanagar & 100mm dia DI distribution line at Ravi

hills, Anjeneyanagar BDA L/o Ittamadu coming under Hosakerihalli Service

station.

10.00

27 Estimate for the work at 110mm dia PVC line by 100mm dia & DI pipeline

from 50ft road to 14th & 15

th Cross to 25

th Cross, 1

st Stage, Kumarswamy L/o

Service station.

45.00

28 Estimate for the work of replacing 110mm dia PVC line by 100mm dia DI

pipeline from 50ft road to 6th

main & 7th

Cross to 11th Cross Opp D.S.Hospital

road 1st stage Kumarswamy coming under Kumarswamy L/o Service station.

45.00

29 Estimate for the work of replacement of 110mm dia PVC line by 100mm

doa DI P/L from 58th cross to 8

th mian & 8

th cross to 13

th cross 2

nd stage

Kumaraswamy L/o coming Kumaraswamy L/o S/s

22.00

30 Estimate for the work of replacing of 100mm dia PVC water supply line by

100mm dia DI distribution W/S at 11th main, 13

th main near Arogya Kendra,

Kumaraswamy L/o, 1st stage, Kumaraswamy l/o S/s

15.00

31 Estimate for the work of replacing of 100mm dia PVC water supply line by

100mm dia DI distribution W/S at 1st main, 7

th main, (Sunnadagudu),

Kumaraswamy L/o, 1st stage, Kumaraswamy l/o S/s

16.00

32 Estimate for the work of replacement of 110mm dia PVC line by laying

100, 150mm dia W/S line at Hanumanthanagara shifted slums at

Chandranagara P/L road 2nd

stage, Kumaraswamy L/o coming

Kumaraswamy L/o S/s

25.00

33 Re-Sanctioning the estimate for the work of P/L 100mm dia W/S line at

5th cross, 1

st stage, KS Layout & 67

th cross, 2

nd stage, KS Layout coming

under Kumaraswamy L/o S/s

3.50

34 Work of P/L 100 mm dia DI water supply near H.No. 2397/38, 18th Main, 2

nd

Stage, KS. Layout under KS S/stn.,

0.74

35 Work of P/L 100mm dia DI water supply line near H.No.2397/38, 18th

main, 2nd

stage, K.S.Layout under K.S.Layout S/s

0.74

Total 420.406

Page 69: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

CHAMARAJPET CONSTITUENCY

Sl

No. Particulars Amount

1 Estimate for the work of Providing 9” dia SW line in place of 6” dia SW line

at Sirsi circle, Conservancy (between Sirsi road & 1st main, C.Pet ) under

C.Pet S/s.

0.97

2 Estimate for the work of Providing 9” dia SW line in place of 6” dia SW line

at 1st cross, 4

th main, Kasturba nagar under C.Pet S/s.

0.82

3 Estimate for the work of Providing / shifting 9” dia SW line by 6” dia SW line

at 3rd

main, near South end school, Kasturba nagar & 6th main, Kasturba nagar

under C.Pet S/s.

1.04

4 Estimate for the work of Providing / shifting 9” dia SW line by 6” dia SW line

at 4th & 5

th main, 5

th cross, behind Venlac hospital , 5

th & 4

th main,

conservancy under C.Pet S/s.

1.05

5 Estimate for the work of Shifting water supply lines which are passing through

MH’s/ passing adjacent to UGD lines result in contamination of water supply

at 2 ½” & 3” dia CI line with 4” CI line at Fort area , kalasipalya.

7.19

6 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 17th

Main,

Srinagara coming under Nagendra Block S/stn.,

0.997

7 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 1st Cross,

Nanjamma agrahara coming under Chamarajpet S/stn., areaof AEEW-4 sub

division.

0.996

8 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 2nd

Cross,

Adarsha Nagara coming under Chamarajpet S/stn., area of AEES-4 sub

division.

0.79

9 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 16th

Main &

10th

Cross junction, Srinagara coming under Nagendra Block S/stn.,

0.998

10 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 3rd

& 4th

Cross, Najamba Agrahara & Baba lane, Mysore road coming under

Chamarajpet S/stn., of AEES-4 sub division.

0.9985

11 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 2nd

Main

Road, Vittalanagara & 1st Cross, Muneshwara Nagar coming under

Chamarapet S/stn., area of AEES-4 sub division.

0.995

12 Work of replacement of 6” dia SW line by 9” dia SW line at L.No. 7th Street,

K.No. 3rd

Street & Periyar koil street coming under CLR S/stn.,

0.993

13 Work of P/L 9” dia SW line inplace of 6” dia SW line at 6th

Cross, 1st Main,

Valmikinagar & reconstruction of damaged manholes coming under

Chamarajpet S/stn.,

0.92

14 Work of P/L 9” dia SW line inplace of 6” dia SW line at 5th

Cross, 2nd

Main,

Valmikinagar & reconstruction of damaged manholes coming under

Chamarajpet S/stn.,

0.81

15 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at 5th Main, 3

rd

Cross, K.B.Nagar coming under Chamarajpet S/stn. Area of AEES-4 sub

division.

0.998

16 Work of P/L 9” dia SW line inplace of 6” dia SW line at Kasturibanagar,

Valmikinagar, Kalasipalya & reconstruction of damaged manholes coming

under Chamarajpet S/stn.,

0.79

17 Estimate for the work of providing and laying of 100mm dia DI line at Bande

slum valmikinagar 3rd

main coming under chamarajpet Service station.

2.22

18 Estimate for the work of P/L 150mm dia feeder main tapping from

300mm dia CI line at 1st cross, 1

st main Valmikinagar & 100mm dia missing

line at for 1st main 1

st cross, Valmikinagara & Tole gate Mysore road coming

under Chamarajpet S/

14.00

19 Work of P/L 100 mm dia DI line to improve water supply line at 3rd

Cross,

Velumurugan Pura comes under CLB s/stn.,

1.94

Total 39.5155

Page 70: Abstract 27 Constituency

table-1

Page 71: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

BTM CONSTITUENCY

Sl

No. Particulars Amount

1 Estimate for the work of replacing damaged 225mm dia SW line at 4th cross,

Bismillanagar under BTM S/s.

0.63

2 Estimate for the work of replacement of 6” dia SW line by 9” dia SW line at

Opp No.20, 4th

cross, 7th

B main, BTM 1st stage coming under BTM S/S

0.97

3 Estimate for the work of replacement of 6” dia SW line by 9” dia SW line at

back side conservancy No.11, 19th B cross, N.S.Palya, BTM 2

nd stage, coming

under BTM S/S

0.95

4 Estimate for the work of P/L 9” dia SW line in place of 6” dia SW line at 2nd

main, 9th

cross, Abbayappa Layout, N.S.Palya under BTM S/S

0.90

5 Estimate for the work of P/L 9” dia SW line in place of 6” dia SW line at 1st

main, MICO Layout, BTM 2nd

stage under BTM S/S

0.95

6 Estimate for the work of replacement of 6” dia Silted up line by 9” dia SW

line at Opp No.35/36, 1st main, 3

rd cross, New Gurappanapalya, Jhada road

coming under BTM Layout, S/S

0.98

7 Estimate for the work of replacement of 6” dia Silted up line by 9” dia SW

line at Opp No.9/12, 20th main, Maruthinagara, Opp to 20

th main,

Maruthinagar at Shivashakthi, Refreshment, 20th main, Maruthinagara,

Madivala & opp to 19th

cross, Shanthian Ladies Hostel, coming under BTM

Layout S/S

0.99

8 Estimate for the work of replacement of 6” dia silted up line by 9” dia SW line

at opp No.23, 1st main, 3

rd cross, New Gurappanapalya, Jhanda road coming

under BTM Layout S/S

0.97

9 Estimate for the work of replacement of 6” dia silted up line by 9” dia SW line

at Opp No.32, 7th cross, Maruthinagara, Madivala coming under BTM Layout

S/S & construction of damaged manholes at No.6/2, 8th main, 18

th cross,

N.S.Palya, BTM 2nd

stage, coming under BTM S/S

0.99

10 Estimate for the work of replacement of 6” dia silted up line by 9” dia SW line

at opp No.34, 1st main, 3

rd cross, Near Gurappanapalya, Jhanda road coming

under BTM Layout, S/S

0.92

11 Estimate for the work of P/L 9” dia SW line at No.3/8, D cross, Bismillanagar,

BTM 1st stage, under BTM S/S

0.73

12 Estimate for the work of replacing of 6” dia SW line by 9” dia SW line at 5th

cross, Abbayappa L/O, N.S.Palya, BTM 2nd

stage, under BTM S/S

0.98

13 Estimate for the work of replacing of 6” dia SW line by 9” dia SW line at 4th

cross, Abbayappa Layout, N.S.Palya, BTM 2nd

stage, under BTM S/S

0.99

14 Estimate for the work of replacing of 6” dia silted up line by 9” dia SW line at

opp No.46/3, New Gurappanapalya opp No.48/A, 7th

A main, 1st cross, behind

Divya street tower coming under BTM Layout, S/S

0.34

15 Estimate for the work of replacing of 6” dia silted up line by 9” dia SW line at

Opp No.14, New QH, Maddmamma colony, & No.63, 1st main Maddmamma

colony coming under BTM Layout S/S

0.86

16 Estimate for the work of replacing of 6” dia silted up line by 9” dia SW line at

Opp No. C.P.Ramachandra, 31, 3rd

cross, 3rd

main, Balajinagar, coming under

BTM Layout S/S

0.88

17 Estimate for the work of replacing of 6” dia silted up line by 9” dia SW line at

Opp Madduramma slum, Mask back side, Tavarekere opp No.61, slum board,

Govt under school, Tavarekere opp No.1175, 8th cross, BTM 1

st stage, 1

st

phase coming under BTM Layout S/S

0.66

18 Estimate for the work of replacing of 6” dia silted up line by 9” dia SW line at

opp No.156, Madduramma colony & opp No.under school Madduramma

slum, Madeena Majid , BTM 1st stage, coming under BTM Layout, S/S

0.81

19 Estimate for the work of replacing of 6” dia silted up line by 9” dia SW line by

9” dia SW line at opp No.147 & 133, Tavarekere Madduramma colony, near

Madeena Majid, coming under BTM L/O, S/S

0.78

Page 72: Abstract 27 Constituency

table-1

20 Estimate for the work of replacing of 6” dia silted up line by 9” dia SW line at

opp No.Gulab-140 Madduramma colony, Madeena Majid road, Tavarekere &

135, Madduramma colony, Maddena majid road, Tavarekere coming under

BTM Layout, S/S

0.94

21 Estimate for the work of replacing of 6” dia silted up line by 9” dia SW line at

opp No.7, T.D. Davis, 2nd

main, 5th

cross, Balaji Nagar, B.M.Puttaswamu

shetty, No.65/9, 5th

cross Balajinagar, 2nd

main road coming under BTM

Layout S/S

0.70

22 Estimate for the work of P/L 225mm dia UGD line frm 8th

cross to 9th

cross & linking with existing 300mm dia SW line at 8th cross, JHBCS L/o,

coming under BSK-I S/s

0.82

23 Estimate for the work of replacement of 6” dia SW line by 9” dia SW line

at No.22, Ayappa temple Taverkere main road, # 32, cristain hostel

Shanthidama Kaveri L/o, coming under BTM L/o S/s

0.98

24 Estimate for the work of replacement of 6” dia SW line by 9” dia SW line

at No. 12, Shiva Sai Nivas, Balajinagara, 2nd

cross, Near Krishnamurthy L/o,

coming under BTM L/o S/s

0.85

25 Estimate for the work of replacement of 6” dia SW line by 9” dia SW line

at No.58, 3rd

cross, masjid road, Bismillanagar B.G. Road, A.K. Entp

coming under BTM L/o S/s

0.958

26 Estimate for the work of replacement of 6” dia SW line by 9” dia SW line

at No.23/18, 6th

cross, 1st B main Balajinagar near K.M.Bakery coming under

BTM L/o S/s

0.957

27 Work of P/L 9” dia SW line inplace of 6” dia SW line at Petloom pet 3rd

Cross, Kalasipalya & 6th

Cross, Valmikinagar & reconstruction of damaged

manholes coming under Chamarajpet S/stn.,

0.83

28 Work of extending 100 mm dia DI pipe line at 3rd

Cross, Balajinagar coming

under BTM layout S/stn.,

0.65

29 Estimate for the work of P/L 300mm dia SW pipeline for missing bits in grape

garden L/o 21st Cross, 10

th Cross, RA road Ejipura area in ward No.68 of

BBMP under CLR Service station.

9.68

30 Work of replacement of 6”dia SW line by 9” dia SW line at 17th B main , 6

th

Block, KML, Bangalore.

4.00

31 Estimate for the work of P/L 225mm dia SW line in place of 6” dia SW line at 2nd

Main Lalaji L/O to 7th

Cross, S.R nagar, B.G.Road, and R/c of damaged manholes

coming under Hombegowdanagar Service station

3.56

32 Work of replacement of 6” dia SW line by 9” dia SW line at 2nd

& 3rd

Main,

Guptha layout, B.G.Road coming under HBGN S/stn.,

0.97

33 Work of replacement of 6” dia by 9” dia SW line at Bande Slum, conservancy

road coming under HBGN S/stn.,

0.96

34 Work of replacement of 6” dia SW line 9” dia SW line at 2nd

Main, Nanjappa

layout, Adugodi coming under HBGN S/stn.,

0.96

35 Work of replacement of 6” dia by 9” dia SW line at conservancy road behind

Kirloskar apartments, Hosur road coming under HBGN S/stn.,

0.92

36 Work of replacement of 6” dia by 9” dia SW line at conservancy road,

Mahalingeshwara Slum, Hosur road coming under HBGN S/stn.,

0.97

37 Revised estimate for the work of providing 150mm dia water supply DI line to

improve w/s facilities to Lalajinagar coming under HBGN Service station.

12.10

38 Estimate for the work of P/L 100mm dia DI line for missing bits in grape

garden L/O in 2nd

Cross, Ejipura area in ward No.68 of BBMP under CLR

Service station.

18.00

39 Estimate for the work of replacement of old corroded line at Dayanada slum

and providing missing line at 4th A cross, Lalaji nagar and 7

th cross SR nagar

coming HBGN Service station.

8.70

40 Estimate for the work of providing 100mm dia water supply line in place of

80mm dia corroded CI line at Chikkalakshmaiah layout and Mahalingeshwara

Badavane coming under HBGN Service station.

6.70

41 Estimate for the work of linking 100 x100mm dia DIpipe to improve W/S

facilities to Teachers colony, Service road, KML under KML S/s

1.82

Page 73: Abstract 27 Constituency

table-1

42 Estimate for the work of P/L 150mm dia DI W/S line at Basavana temple

street, Adugodi village main road, AK colony Balayya L/o, Kendriya Sadana

main road, 2nd

stage, Koramangala near masjid road coming under KML S/s

8.87

43 Estimate for the work of P/L 150mm dia DI line to improve water supply

from Sri.Rama road to JJ Church road, Aradhana L/o, & Srirama road 1st

cross at Ejipura under CLR S/s

6.35

44 Estimate for the work of linking 100 x 100mm dia DJ pipe to improve

water supply facilities to Siddartha colony KML under KML S/s

3.10

Total 111.625

Page 74: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

RAJAJINAGAR CONSTITUENCY

Sl

No. Particulars Amount

1 Work of providing and laying 9” dia SW line and construction of manholes at

Dr. Rajkumar road near Rajajinagar entrance 4th

N block, Rajajinagar under

Rajajinagar S/s.

5.05

2 Work of providing and laying 9” dia SW line inplace of 6” dia SW line at 3rd

main road, 56th

to 58th cross, 4

th B block, Rajajingar under Rajajinagar S/s.

3.00

3 Work of replacement of existing old 6” dia SW sewer flines by new 9” dia SW

pipes at 4th Cross, Prakashnagar and laying of new 9” dia SW line at

Mahalingan House (conservancy) 5th Cross Prakash Nagar under Rajajinagar

S/stn.,

0.78

4 Work fo replacement of existing old 6” dia SW line by 9”d ai SW pipes at 5th

main (Old 5th

Cross) Prakashnagar in between 3rd

Main up to and Opp. Mohan

Tailors D.No. 189/B under Rajajinagar S/stn.,

0.98

5 Work fo replacement of existing old 6” dia SW line by 9”d ai SW pipes at 1)

Conservancy back side of BBMP Tailoring Training Centre, 4th N Block,

Rajajinagar & 2) 19th main 1

st K Block, Rajajinagar near Akshaya Mini Bazar

under Rajajinagar S/stn.,

063

6 Work fo replacement of existing old 6” dia SW line by 9”d ai SW pipes at 3rd

Main, 4th

Cross (Old 5th

Main 5th

Cross) in between Balaji Enterprises, D.No.

54/4A and 4th Cross under Rajajinagar S/stn.,

0.89

7 Work fo replacement of existing old 6” dia SW line by 9”d ai SW pipes at 5th

Main, (Old 5th

Cross) Prakashanagar in between 5th

Main Opp. Poornima

Clinic to 2nd

Main Opp. Akshaya Enterprises & Hamsa Bakery under

Rajajinagar S/stn.,

0.96

8 Work fo replacement of existing old 6” dia SW line by 9”d ai SW pipes at

Opp. to Bhavya House, 3rd

Cross, 9th Main, Prakashanagar under Rajajinagar

S/stn.,

0.83

9 Work fo replacement of existing old 6” dia SW line by 9”d ai SW pipes at E

Cross Opp. to Canara Sri Vinayaka Jewellary works & at 1st Main, 9

th Cross,

Opp. to Sri Balaji Engg Works Prakashnagar under Rajajinagar S/stn.,

0.87

10 Work of deviation, providing & laying 9” dia SW line at near BBMP market,

11th

Main Road to 10th

Main Road, 60th Cross, 5

th Block, Rajajinagar under

Rajajinagar S/stn.,

0.87

11 Work of P/L 300 mm dia RCC pipeline (NP3 class) in place of 175 mm dia

SW line and raising & damaged manholes at Dr. Rajkumar Road junction 1st

Main road, 36th

Cross 2nd

Block, Rajajinagar under Rajajinagar S/stn.,

0.73

12 Work of providing & laying 100 mm dia DI line at Dr. Rajkumar road, near

Rajajinagar entrance 4th

N block, Rajajinagar under Rajajinagar S.s of W-2 sub

div

5.035

13 Work of providing & laying 150 & 100 mm dia line feedermain to IWSF near

Ramkumar Mills 1st to 5

th cross, SSI area 4

th block, Rajajinagar under

Rajajinagar S/s.

28.00

14 Work of providing & laying 100 mm dia DI line at 20th cross, near Navaranga

theatre, 17th main to 19

th main, 2

nd block, Rajajinagar under Rajajinagar S/s.

2.37

15 Work of providing & laying 100 mm dia DI line at 7th main road, Siddaramana

Dinne, 4th block, Rajajiangar coms under Rajajiangar S/s.

8.35

Total 121.715

Page 75: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

GOVINDARAJNAGAR CONSTITUENCY

Sl

No. Particulars Amount

1 Work of providing and laying 9” dia SW line inpalce of 6” dia SW line at

Sarvbhoumanagar behind the club area under Chandra layout S/s.

25.80

2 Work of providing and laying 9” dia SW line all along the 5th

main,

Nagarabhavi main road under Chandra layout S/s.

14.30

3 Work of providing and laying 9” dia SW line inplace of 6” dia SW line from

9th to 14

th cross, MC layout Vijayanagar under Hoshalli S./s

18.82

4 Work of providing and laying 9” dia SW line inplace of 6” dia SW line from

20th

main road to 21st main road, MC layout comes under Chandra layout S/s.

8.30

5 Work of providing and laying 9” dia Sw line inpalce of 6” dia SW line at old

Moodalapalya village under W-5 sub div

9.90

6 Work of providing and laying 300 mm dia RCC NP3 pipeline from

Moodalapalya circle to sub main at 1st main, Shivanandanagar and from 4

th E

cross, SVG nagar to sub main, Kanakanagar under Nagarabhavi S/s,.

27.75

7 Work of providing and laying 9” dia SW line inplace of 6” dia SW line from

1st to 8

th cross road MC layout (Udaya school) under Chandra layout S/s.

23.70

8 Work of providing and laying 9” dia SW line inplace of 6” dia SW line from

Magadi road Housing Board colony under Vijayanagar OHT S/s.

24.35

9 Work of providing and laying 400 mm dia RCC NP3 class pipeline inplace of

300 mm dia / 225 mm dia SW line and 225 mm dia SW line inplace of 150

mm dia SW line at Pipeline mainroad coming under Hoshalli S/s.

36.80

10 Work of providing and laying UGD facilities to missing bits at Flower garden

Mysore road Opp to BHEL W No. 41 coming under CLO S/s.

2.50

11 Work of providing and laying UGD facilities to missing bits at conservancy at

Pantharapalya Mysore road under CLO S/s.

4.35

12 Work of providing and laying 9” dia SW line at Venkateshwara layout

Attiguppe under Chandra layout S/s.

1.00

13 Work of providing & laying 100 & 150 mm dia DI pipeline inpalce of existing

100 mm dia & 150 mm dia PVC pipes at Revanna garden comes under

Chandra layout S/s.

16.10

14 Work of replacement of corroded 80 mm dia CI line by laying 100 mm dia DI

pipes from 9th

to 14th cross, MC layout, Vijayangar under Hoshalli S/s.

31.90

15 Work of providing & laying 100 mm dia DI pipeline inplace of leaky 80 mm

dia corroded CI pipe / 110 mm dia PVC lines from 15th to 19

th main, MC

layout under W No. 35 of Govindarajanagar constituency of W-1 sub div

56.60

16 Work of replacement of corroded 80 mm dia CI line by laying 100 mm dia DI

pipes from 1st to 8

th cross, MC layout Opp Naveen park Vijayangar under

Hosahalli S/s.

46.30

17 Work of providing & laying 100 mm dia DI line inplace of 80 mm dia CI

corroded pipe / 110 mm dia PVC pipe from 20th

to 22nd

main, MC layout

under Govindarajanagar constituency

61.80

18 Work of providing & laying 100 mm dia & 150 mm dia DI line inplace of 110

mm dia PVC pipe line at Sarvabhomanagar behind club area comes under

CLO S/s.

38.85

Total 449.12

Page 76: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

BASAVANAGUDI CONSTITUENCY

Sl

No. Particulars Amount

1 P/L of 9” dia SW line in place of 6” dia SW line at 3rd

cross, 5th cross, BSK 3

rd

stage, 3rd

phase, 3rd

Block, & construction of new manholes

0.97

2 Estimate for the work of P/L 9” dia SW line in place of fully chocked up 6”

dia SW line of non gradiented SW line at near Sri Krishna temple road, BSK

3rd

stage, 3rd

Phase, 4th cross road coming under KTG S/S

0.96

3 Estimate for the work of P/L 9” dia SW line in place of damaged 6” dia SW

line Dattatreyanagar, flag road, coming under BSK S/S

0.92

4 Work of Laying of 100mm dia DI pipe in place of fully damaged 90mm dia

PVC pipe at Ramarao area L/o field, BSK 3rd

Stage, coming under KTG

Service station.

3.00

5 Work of replacement of laying of 100 mm dia DI pipe at ITI layout dead end

of Anjaneyaswamy street coming under Kathriguppe S/stn.,

0.89

6 Work of replacement of laying of 100mm dia DI pipe at ITI layout dead

end of Anjaneyaswamy street coming under Kathriguppe S/s

0.891

7 Work of P/L 300 mm dia S/S NP3 class spun pipes from 5th

Main,

Bhavaninagar, Shanimahathma temple & linking to sub main at Kempambudi

lake to prevent flow of sewer water into Kempambudi lake under V.V.Puram

S/stn.,

6.00

8 Work of P/L 12” dia SW line from Subanna Garden Storm water drain &

linking to sub main at Sameerpura main road to prevent flow sewer water line

the Kempambudi lake under athe jurisdiction of V.V.Puram S/stn.,

6.00

9 Work of P/L 9” dia SW line inplace of existing 6” & 7” dia SW line at

Ranadheera Kanteerava road, Gavipura Guttahalli coming under V.V.Puram

S/stn.,

0.99

10 Work of P/L 9” dia SW line inplace of existing 6”& 7” dia SW line at

Vidhyarayana road, Gavipura Guttahalli coming under V.V.Puram S/stn., 0.99

11 Work of P/L 9” dia SW line inplace of existing 6”& 7” dia SW line at Echama

Nayaka road, Gavipura Guttahalli coming under V.V.Puram S/stn., 1.00

12 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at

Chandrashekar Azad Road, Gavipura Guttahalli coming under V.V.Puram

S/stn.,

1.00

13 Work of P/L 9” dia SW line inplace of existing 6”& 7” dia SW at Kithooru

Rani Channamma Road, Gavipura Guttahalli coming under V.V.Puram S/stn., 1.00

14 Work of P/L 9” dia SW line inplace of existing 6” & 7” dia SW line at

Kumara road, Gavipura Guttahalli coming under V.V.Puram S/stn., 1.00

15 Work of P/L 9” dia SW line inplace of existing 6” & 7” dia SW line at 10th

Cross, Laxmipura, Gavipura Guttahalli coming under V.V.Puram S/stn., 0.98

Total 26.591

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

SHANTHINAGARA CONSTITUENCY

Sl

No. Particulars Amount

1 Estimate for the work of P/L 9” dia SW line inplace of 6’ dia

SW line at 2nd

cross, 2nd

main., Mottappa palya & reconstruction

of damaged manholes coming under Indiranagar S/S

0.87

2 Estimate for the work of replacing 225mm dia SW line by

300mm dia SW line on Church road from Brigade road to

Museum road under CLR Service station

15.60

3 Estimate for the work of replacing existing 175 & 225mm dia

SW line by laying 300mm dia SW line at 5th A Cross, 6

th Cross,

7th

Cross, 9th

Cross and 10th

Cross roads at Anepalya under

Johnson market Service station

17.00

Page 77: Abstract 27 Constituency

table-1

4 Estimate for the work of P/L 225mm dia SW line at Bethal L/o,

(BCC Qts) Berlie street, cross under J/M S/s

4.60

5 Estimate for the work of P/L 225mm dia SW line at H street &

G street, Shanthinagar coming under J/M S/s Shanthinagar

Assembly Constituency.

3.21

6 Work of replacing blocked 150 mm dia SW line by 225 mm dia

SW line at 2nd

Main, 7th

A cross & 7th

B cross, Vinayaka nagar

coming under Johnson market S/stn.,

0.82

7 Work of replacement of 6” dia SW line by 9” dia SW line at 5th

Cross, Rose Garden apartments, Cubra Fancy store coming

under JM S/stn.,

0.97

8 Work of replacement of 6” dia SW line by 9” dia SW line at 4th

Main, Austin Town under JM S/stn,.,

0.97

9 Work of replacement of 6” dia SW line by 9” dia SW line at 6th

A Main, Austin Town, Opp. To B-14 & B-15 BDA Qtrs, Austin

Town coming under JM S/stn.,

0.97

10 Work of replacement of 6” dia SW line by 9” dia SW line at

Bazar street 5th

Cross, Neelasandra, Opp. D.No. 26 coming

under JM S/stn.,

0.97

11 Work of replacement of 6” dia SW line by 9” dia SW line at

J.K.Pura Cross Road, Vinayakanagar coming under JM S/stn.,

0.98

12 Work of construction of new manholes at M.G.Garden & E

Street, Neelasandra coming under JM S/stn.,

0.98

13 Work of construction of new manholes at 6th Cross & Rose

Garden & Baniyan Basha road coming under JM S/stn.,

0.98

14 Work of construction of new manholes at 2nd

Main road,

Vinayakanagar & JK Pura coming under JM S/stn.,

0.97

15 Work of P/L 225 mm dia SW line in place of 150 mm dia SW

line at NO. 10 & 27, 2nd

Main, Bazar street Cross road & R/C of

DMH’s coming under Johnson market S/stn.,

0.80

16 Work of P/L 225 mm dia SW line in place of 150 mm dia SW

line at 1st Main, 7

th Cross, D No. 105, Rose Garden & R/C of

DMH’s coming under Johnson Market S/stn.,

0.82

17 Work of providing 9” dia SW line in place of existing 6” dia SW

line at 6th Cross, Rose Garden & R/C of damaged manholes

coming under Johnson Market S/stn.,

0.99

18 Estimate for the work of replacing 75mm dia CI line by 100mm

dia DI line w/s at Rest house cresent road to improve w/s at Rest

house park area under CLR Service station.

10.00

19 Estimate for the work of P/L 100mm dia DI line & linking

200 x 100mm dia DI line at Rangaswamy compound, Basappa

road, SHanthinagar coming under Johnson market S/s

Shnathinagar Assembly constituency

1.61

20 Estimate for the work of P/L 150mm dia DI feeder line to

improve W/S to EWS Qts, Ambedkarnagar, Shanthinagar

coming under Johnson market S/s Shanthinagar Assembly

constituency

12.00

21 Work of deviation of 100 mm dia water supply at Barian Basha

Road, Anepalya main road coming under J.M. S/stn.,

0.99

22 Work of deviation of 100 mm dia water supply at JK Pura &

Vinayaka Nagara Cross Roads coming under J.M. S/stn.,

0.98

Total 78.08

Page 78: Abstract 27 Constituency

table-1

STATEMENT SHOWING THE ESTIMATE SANCTIONED FOR THE WORKS

DURING THE YEAR 2009-2010.

JAYANAGARA CONSTITUENCY

Sl

No. Particulars Amount

1 Estimate for the work of linking 100mm dia DI line at 4th

Cross,

LIC Colony coming under Byrasandra Service station.

4.00

2 Estimate for the tender work of PIL 100mm dia DI w/s line in

place of PVC at 15th

Cross, JP Nagar 1st Phase, coming under JP

Nagar 1st Phase Service station.

9.10

3 Estimate for the tender work of PIL 100mm dia & DI w/s line in

place of PVC at 15th

Cross JP Nagar 6th Phase, under JP Nagar

Service station.

10.00

4 P/L 9” dia SW line in place of existing 7” dia SW line at

prasiddi fast food veg,26th main road, coming under T Block

Service station

3.50

5 P/L 9” dia SW line in place of existing 7” dia SW line at 16th A

Main road, 36th Cross, 4

th T Blocl, coming under T Block

Service station

3.50

6 Estimate for the work of replacing of 7”dia SW line by 250mm

dia HDPE pipe by trenches technology at 10th Main road,

Jayanagar 3rd

Block Bangalore

27.00

7 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at

(1) 11th

Main, 5th Block, Jayanagar, 2), 11

th Main, 38

th Cross,5

th

Block, Jayanagar (3) East End Main road (4) Thilaknagar

coming under T Block S/stn.,

0.80

8 Work of P/L 9” dia SW line inplace of existing 6” dia SW line at

39th Cross, 11

th Main coming under T Block S/stn.,

0.79

9 Work of providing 9” dia SW line at 11th A & B Main 5

th Cross,

Jayanagar, 5th Block coming under 4

th ‘T’ Block S/stn.,

0.85

10 Work of providing 9” dia SW line at various locations of

Jayanagar, 5th Block, jayanagar coming under T Block S/stn.,

0.99

11 Work of providing 9” dia SW line SW line at various locations

of Marenahlli tank bund 5th Block, Jayanagar coming under T

Block S/stn.,

0.97

12 P/L 9” dia SW line at 18th main near Girl apartment 2

nd phase,

JP Nagar under J.P.Nagar S/s

4.00

13 Estimate for the work of P/L 12” dia SW line in place of 6” dia

SW lien at KSRTC L/O , JP Nagar under JP Nagar S/s.

4.05

14 Estimate for the work of PIL 9” dia SW line at 18th main near

Giri apartment 2nd

Phase, J.P.Nagar under JPN-II Service

station.

4.00

15 Estimate for the work of P/L 9” dia SW line in place of 6” dia

SW line at the junction of 1st A cross and 1

st cross, Marenahalli,

J.P.Nagar 2nd

phae, under JPN S/S

0.87

16 Estimate for the work of replacement of 6” dia SW line by 9” dia

SW line at Navodaya Layout, 3rd

main, 2nd

main, 16th cross, 4

th

phase, 4th

main, Shakambari Nagar, K.P.Road coming under

J.P.Nagar S/S

0.91

17 Estimate for the work of P/L 9” dia SW line at near Anganavadi,

Kendra, KSRTC L/O, 3rd

cross, J.P.Nagar, under J.P.Nagar S/S

0.90

18 Estimate for the work of replacing 6” dia by 9” dia SW line at

No.121, Marenahalli Palya, 2nd

phase, J.P.Nagar & KSRTC L/O,

6th

main, J.P.Nagar, 2nd

phase under J.P.Nagar S/S

0.92

19 Estimate for the work of replacing of 6” dia SW line by 9’ dia

SW line at No.70, 21st A main, Marenahalli, J.P.Nagar 2

nd phase,

under J.P.Nagar S/S

0.98

20 Estimate for the work of replacing of 6” dia SW line by 9” dia

SW lineat 8th cross, 18

th main, junction J.P.Nagar 2

nd phase

under J.P.Nagar S/S

0.99

Page 79: Abstract 27 Constituency

table-1

21 Estimate for the work of replacing of 6” dia SW line by 9” dia

SW line at the junction of 7th

cross, 18th

main, 2nd

phase,

J.P.Nagar under J.P.Nagar S/S

0.99

Total 80.11