Abraham Gallas for the LHCb VELO Upgrade The 20th Anniversary International Workshop on Vertex Detectors 19-24 June 2011, Rust, Austria The LHCb Upgrade from 1 to 40 MHz readout

Abraham Gallas for the LHCb VELO Upgrade

  • Upload
    cyndi

  • View
    38

  • Download
    0

Embed Size (px)

DESCRIPTION

The LHCb Upgrade from 1 to 40 MHz readout. The 20th Anniversary International Workshop on Vertex Detectors 19-24 June 2011, Rust , Austria. Abraham Gallas for the LHCb VELO Upgrade. Outline:. The LHCb upgrade: scenario & strategy The Vertex detector upgrade: Environment & plan - PowerPoint PPT Presentation

Citation preview

Page 1: Abraham  Gallas  for the  LHCb VELO Upgrade

Abraham Gallas for the LHCb VELO Upgrade

The 20th Anniversary International Workshop on Vertex Detectors 19-24 June 2011, Rust, Austria

The LHCb Upgrade from 1 to 40 MHz readout

Page 2: Abraham  Gallas  for the  LHCb VELO Upgrade

Outline:

• The LHCb upgrade: scenario & strategy• The Vertex detector upgrade:

• Environment & plan• Detector module design & layout• Sensor options• ASIC design• Data readout rates• RF foil and material constraints• Cooling• Prototyping results from test beams

• Summary

2

Page 3: Abraham  Gallas  for the  LHCb VELO Upgrade

The LHCb upgrade

• The Plan:• LHCb is currently running with excellent performance at higher

luminosity than the nominal: L = 21032 cm–2s-1

• The experiment will collect ~ 5fb-1 before the 2nd LHC shutdown circa 2017 will largely cover the Physics goals of the experiment

• During this shutdown we want to upgrade the detector to run at higher luminosity: L = 1033 cm–2s-1 to collect 50 fb-1 (5fb-1/year) and increased energy √s = 14 TeV

• This does not depend on any (HL)-LHC machine upgrade

3

Page 4: Abraham  Gallas  for the  LHCb VELO Upgrade

The LHCb upgrade• Problem: The L0 hadron hardware trigger loses efficiency at higher luminosities:

• Because the DAQ event readout rate is limited to 1MHz trigger thresholds (ET) need to be raised…

• Solution: • No hardware trigger, increase the readout rate to 40MHz and implement a fully software-based trigger in the CPU farm

4

L0-buffer

1MHz

Current DAQ

Front-end

router

CPU-farm

Tell1

40MHz

Upgraded DAQ

Front-end

router

CPU-farm

Tell40 +

LLT-buffer

1MHz

1MHz

5-10MHz

5-10MHz

L0 LLT

Max 3 kHz Max 20 kHzStorage Storage ~ 50 kB ~ 100 kB

Page 5: Abraham  Gallas  for the  LHCb VELO Upgrade

Environment: radiation challenge

5

Severe & non-uniform irradiation damage.

Dose after 50 fb-1

The sensors edges placed at 7mm from the beam line during “stable beams”. After 50 fb-1 they see a fluence > 4x1015 1 MeV neq cm-2

Recent RD50 studies have shown that silicon irradiated at these levels still delivers a signal of ~ 10ke- / MIP

After that dose, we expect currents of ~120 mA/cm2

@ -15 °C and Vbias= 900 V Danger of thermal runaway at the tip of the sensor from bulk current and heat injected by ROC

• Efficient heat removal mandatory to avoid thermal runaway!!• Low noise electronics to cope with reduced signal

185 MRad or 4.1 1015 neq/cm2

7mm

Page 6: Abraham  Gallas  for the  LHCb VELO Upgrade

Environment: data rate challenge

6

Curves fitted to A.r-1.9 radius (cm)Par

ticle

Hits

/ E

vent

/ cm

2

Luminosity (cm-2s-1)

2.1032

Current5.1032 10.1032 20.1032

A= 0.98 1.46 2.46 4.80

~ 5 particles/cm2/event at r=7.0 mm

Particle occupancy per event (simulation) • Electronics has to digitize, zero suppress and transmit event data at 40 MHz

• By pixel standards the occupancy of the VELO is miniscule, but the data rate is HUGE

• 1 chip O(1cm2) has to transmit ~13 Gbit s-1

• Our current granularity, occupancies = ok but FE electronics and DAQ are not

Page 7: Abraham  Gallas  for the  LHCb VELO Upgrade

VELO Upgrade plan• Different systems of the current VELO1 will be retained:

• CO2 cooling plant• LV & HV power supply systems• Vacuum vessel and equipment• Motion system

• Major new components:• Detector modules based on pixel sensors• New readout ASIC: ´VELOPIX´• Enhance module cooling interface• New design of low material RF foil between beam and detector vacua• Multi Gb s-1 readout system

• Main design concerns: • Efficient cooling to avoid thermal runaway• Handle the huge data rate • Reduce material budget • Maintain if not improve the excellent performance2:

• Proper time resolution ~ 50 fs• IP resolution ~ 13 + 25/pT μm

7

Replace

1,2 See talk by Kazu AKIBA, Silvia Borghi

Page 8: Abraham  Gallas  for the  LHCb VELO Upgrade

• Sensor tiles: 3 readout ASICs on a single sensor, with a guard ring ~500 μm

• 2 sensor tiles are mounted on opposite sides of a substrate:

• Readout & power traces on the substrate

• Substrate choices:• CVD diamond : excellent mechanical & thermal properties: => low mass• Carbon fibre/TPG or Al/TPG

• Material in sensitive region ~ 0.8%X0

• Prototype work started using Timepix ROCs (@ CNM).

Velo Pixel module

8

~15mm ASIC ASIC ASIC

~43mm

Sensor tile :

sensor

Bot Sensor 200um

ASIC150um

Substrate 400um

Coolingchannel

Glue 50um

Top Sensor 200umASIC150u

m

Connector

60μm Kapon+120μm Al

Page 9: Abraham  Gallas  for the  LHCb VELO Upgrade

Pixel module & detector layout

9

BEAM

• The full detector is composed of 26 stations• The modules on either side of the beam are

staggered to create overlap regions• This layout has been simulated to be fully

efficient (~98.3%, 4 hit per track) in the LHCb acceptance 15-250x300mrad Varying spacing along the beam

axis. Minimal pitch 24 mm

beam

• A ‘station’ is made of 8 sensor tiles. • active area ~100% (except

small gaps)• Closest pixel is at 7.5 mm

from the beam center

top tiles, bottom tiles

~ 1 mm gap

Page 10: Abraham  Gallas  for the  LHCb VELO Upgrade

Sensor options R&D

10

• Planar Silicon:• Thin sensors seem well suited to the high fluences• R&D focus is on:

• Reducing guard ring size. (closer approach to the beam, better impact parameter resolution)• More exotics solutions: trenches, laser scribing & Al2O3 Sidewall

passivation (under investigation) • Reducing thickness. (less X0, lower bias voltage)

• Several wafers with various manufacturers• CNM/USC : 150μm p-in-n sensors, 150-200μm n-in-p sensor single ASICs and later in the year 3x1 ASICs tiles• Micron/Liverpool: n-in-p (150 and 300μm thick) • VTT: slim edge (active) 50,100μm edge, different GR, 50-200 μm thick

• Irradiation campaign up to 1.4 x 1016 MeV neq/cm2:• Planar silicon + Medipix3 check performance in test beam• Different GR structures to be fabricated at the manufacturers

d

Dicing distances= 250μm, 400μm, 600μmDistance calculated from the active area.One guard ring. CNM G. Pellegrini et al.

Marc Christophersen et al.

Page 11: Abraham  Gallas  for the  LHCb VELO Upgrade

Sensor options R&D

• 3D sensors:• Lower depletion voltage and low power less critical for thermal runaway• Greater signal charge due to faster collection time (less trapping) potentially super radiation hard• Active edge allows closer approach to beam• Double-sided increase yield and improved areas of inefficiency• Many Medipix /Timepix assemblies available

• Diamond p-CVD:• No thermal run away problem!• Very radiation hard• Double act: sensor and thermal path• Financially affordable for the VELO upgrade ( total surface ~ 1340 cm2 )• Produced 1.43 x 1.43 cm2 , 750 mm thick sensor• Will produce Timepix assemblies for position resolution studies in testbeam

11

Fluence (1015 1 MeV neq cm-2)

90Sr

Page 12: Abraham  Gallas  for the  LHCb VELO Upgrade

Strip-based alternative design

12

• Designed new R & F strip sensors, as ‘backup’ solution in case material budget or power of the pixel detector beyond acceptable levels:

• 30 mm minimum pitch, 20 x 128 strips per sensor

• Goal : keep occupancies < 0.6 % at 1033cm-2s-1

• Signal to Noise ratio after 50 fb-1:• Keep strip capacitance low• Remove pitch adapter to FE ROC

• 40MHz rad-hard ROC to be designed:• Adapted to low capacitance detector• Programmable ZS data transmission• Possible synergy with ST upgrade

• Sensitive area less than 500 mm from edge. First strip at 7.5 mm from beam

• Reduce X0

• Test of prototypes from Hamamatsu this year

Pixels

Strips

Page 13: Abraham  Gallas  for the  LHCb VELO Upgrade

ASIC development

13

Timepix(now) Timepix2(end 2011) VELOPIX(2012)

• 256x256 pixels, size (55mm x 55 mm) gives equal

spatial precision in both directions, removing the need

for double sided modules (factor 2 in material)

• IBM 130 nm CMOS process

• 3 modes of operation• Counting mode• Time of Arrival: ToA• Time over threshold: ToT

• Low occupancy is suited to ToT measurement, with no loss from 1 μs deadtime

Changes needed• Replace shutter based readout/acquisition scheme by continuous, deadtimeless (ZS) operation

• Sustained readout of pixels with maximum

flux 5 particles /cm2/25 ns

• Reduced ToT range and resolution• Add bunchtime identification good within 25 ns

• Timepix2 is an important step towards VELOPIX• Similar front end• Fast column bus• Data Driven readout• Simultaneous Time over

Threshold and Time of Arrival measurements

• Collaborating in the design• Aim to have first VELOPIX

by 2012

Page 14: Abraham  Gallas  for the  LHCb VELO Upgrade

ASIC developmentTimepix2/VELOPIX Analog requirements overlap ~100%:

• Reduce timewalk: <25 ns @ 1ke- threshold • Faster preamplifier and discriminator of Timepix2 covers and exceeds this requirement

• Ikrum range 5 …40nA• sensitivity 750 … 6000 e-/25ns • 20 ke- signal returns to baseline in 660 … 83 ns

• Reduced non-linearity near threshold• Analog power consumption <10 μW/pixel• Higher preamplifier gain (~50mV/ke-)

• reduced ENC (σENC ~ 75 e-), lower detectable charge (<500 e- )• reduced linear range (30 ke- ) : better suited to Si –tracking

• Threshold spread after tuning < 30e-

14

Page 15: Abraham  Gallas  for the  LHCb VELO Upgrade

ASIC development

• Digital functionality of VELOPIX:• Simultaneous 4 bit Time-over-threshold and time identification (12 bit)

• Data loss must be kept < 0.5% in worst conditions (6kHz pixel hit-rate)• Limit ToT < 400ns• Adequate buffering & bus speeds

• Sparse and data driven readout

• SEU protection of logic & registers

• multi-Gbit/s output links : 4 x 3.2Gb/s#

• Design of superpixel (4x4), column bus and EOC logic very advanced

• Total power budget <3W full chip

• Radiation hardness TID 400Mrad

15

Page 16: Abraham  Gallas  for the  LHCb VELO Upgrade

Data rates

16

1.3 1.0

5.3 2.6

0.6

1.0

1.31.0

5.32.6

0.6

1.0

Average #particles/event

• Numbers at highest occupancies:• average particle rate per ‘hottest’ asic ~ 5 particles/25ns = 200MHz• average pixel cluster size ~2: (pessimistic assumption, 200μm Si)

• Information bits per hit pixel : 32 • 4 bit : Time over Threshold value• 12 bit : bunch identification• 16 bit : pixel address

• => Single asic data rate can reach 13 Gbit/s !

• 30% data reduction can be achieved by ‘clustering’ data:• share the bunch id (12bit) and address bits between neighbor pixels.• must be done before column readout, i.e. inside pixel array !• most efficiently done in units of 4x4 pixels = “Super pixel”

• Still requires several multi-gigabit readout links

• Challenge to divide work between FPGA readout and ASIC logic

• Current questions:• Can we specify stream sizes to reduce workload on DAQ system • How much information should we decode for trigger pattern recognition stage?

A A

A A

A A

A A

Super pixelDigital

A A

A A

A A

A A

220 um

~140 um

220

um

Page 17: Abraham  Gallas  for the  LHCb VELO Upgrade

RF separation foil I

17

• Long list of severe requirements:• Vacuum tight (< 10-9 mbar l/s) • Radiation hard• Low mass ( dominates the X0 contribution before the second measured point). Rigid to prevent deflection onto the sensors or pinhole leaks• Good electrical conductivity:

• Mirror beam currents and shield against RF noise pick-up in front-end electronics

• Thermally stable and conductive(heat load from the beam)

• Material and fabrication options:• Aluminium (AlMgMn): 200-350 μm thickness:

• By 5-axis milling of a single homogeneous block• Carbon Fiber Reinforced Polymer (CFRP) coated with Aluminium• Carbon Fiber (impractical, porosity and thickness vary too much)

corrugation

Page 18: Abraham  Gallas  for the  LHCb VELO Upgrade

• Cake-shaped foil on a 3-axis milling machine• Inductive measurements + 3D measurements• Leak rate: <10−9 mbar l/s• Now more complicated shaped with 5-axis milling machine

RF separation foil II

18

Pitch = 30 mmDepth = 6 mmStep = 16 mmRadius > 6mm

Page 19: Abraham  Gallas  for the  LHCb VELO Upgrade

5 plies carbon fiber + epoxy

+ nano-particles + Al (vapor deposition)

RF separation foil III

19

A proof-of-technique prototype has been madeVery encoring results, still some issues need to be improved

Page 20: Abraham  Gallas  for the  LHCb VELO Upgrade

Cooling studies

20

• At the tip of the sensor Ileak≅ O(100) mA/cm2 :• Thermal runaway avoided if temperature -10°C to -15°C

• First ANSYS simulations done:• Model includes radial (r-1.9) and temperature dependent leakage power generated in Si.• 400 mm-thick CVD diamond substrate to the tip of the sensor• Cooling channel at 1cm from the outermost edge of silicon• Two-phase CO2 cooling capable to -35° for the cooling channel• Nominal thickness and thermal conductivities, and ROC heat loads were used

• Various parameters were modified and the conclusions:• The cooling channel should be as close as possible to the silicon• The ROC power should be minimized • Thermal impedances between cooling line and silicon should be minimized

• For a ROC power < 3.0 W/chip CO2 cooling is enough to avoid thermal runaway up to a dose ~1016 neq/cm2. Factor 2

• Verifications with thermal mockups are planned

CO2 coolingTemp -35°C

TipTemp ~ -17°C

Page 21: Abraham  Gallas  for the  LHCb VELO Upgrade

Timepix telescope evolution

21

Telescope Pixel Resolution at DUT

Time Tag Track Rate

Timepix 2009 55mm 2.3mm 100ns 100Hz

Timepix 2010 (May) 55mm 2.0mm ~1ns ~700Hz

Timepix 2010 (Aug-present)

55mm 1.5mm ~1ns 5kHz

6 pixel telescope planes angled in 2 dimensions to optimize resolution

Device Under Testmoved and rotated viaremote controlled stepper motor

Fine pitch strip detectorwith fast electronics LHC readout

USB2 readout – 700 tracks per second

USB1 readout

Page 22: Abraham  Gallas  for the  LHCb VELO Upgrade

Timepix Telescope Performance

22

RELAXD interface

Scintillator Coincidence and TDC ~1ns

RELAXD interface/ LHC readout (Beetle, …)

RELAXD interface

DUTCooled

Timepix ToT Tracking

Timepix ToT Tracking

Logic + TDC

Synchronized Trigger

Timepix ToA Track Time Tagging Plane ~100ns

• RELAXD readout from NIKHEF (FPGA-based)

• >5kHz track rate, resolution @ DUT 1.5mm

• Implemented a TDC with whichTimepix ToA mode gives us ~1ns per track time stamping

• Able to provide and record synchronized triggers to 40MHz readout

50,000,000 tracks recorded in 2 weeks (120 GeV π± @ SPS)Eight different DUTs analysed*

Telescope in Time Tagging configuration

*arXiv:1103.2739v2 [physics.ins-det]

Page 23: Abraham  Gallas  for the  LHCb VELO Upgrade

Planar Silicon: Thin vs Thick

23

Sensor Angle (deg)

s(mm

)

Thin sensors: Direct comparison of 300 and 150 μm thick sensors in identical conditions

Page 24: Abraham  Gallas  for the  LHCb VELO Upgrade

Planar sensor

24

Resolution as a function of angle

10V data (close to depletion)100V data (overdepleted)There is an enormous gain at lower voltagePossible advantage for VELO under investigation

Resolution as a function of # bits

Resolution as a function of number of bits(shown for three different angles)Input to Timepix2/Velopix design4 bits and above are safe3 bits is close to resolution degradation

Page 25: Abraham  Gallas  for the  LHCb VELO Upgrade

3D sensors test beam results

25

Detailed characterization of 3d device and direct comparison to planar sensor*. Irradiated sensor also evaluated

3D Planar *Degrees 0o 10o 0o 10o

Spatial resolution

15.8±0.1 9.18±0.1 10.15±0.1 5.86±0.1

Voltage

Corner Centre Ring Pixel

2V 35.6 79.1 99.1 91.220V 39.1 86.7 99.7 93.0

Binary resolution = 55µm / √12 = 15.9µm

Resolution before and after irradiation close to binary resolution

3D binary resolution = 74.5µm / √12 = 23.1µm

*2011 JINST 6 P05002 doi: 10.1088/1748-0221/6/05/P05002

Page 26: Abraham  Gallas  for the  LHCb VELO Upgrade

Results from Diamond p-CVD sensorsStrasbourg telescope

26

Goal: produce 400 mm sensors and compare their performance with 150 mm Si at different level of irradiation

First step: laboratory and test bench studies of 750 mm sensors in a test beam (CERN RD42 test beam with Strasbourg telescope)

Preliminary

Preliminary

Page 27: Abraham  Gallas  for the  LHCb VELO Upgrade

Summary

• We expect the LHCb Upgrade to happen in the 2nd LHC shutdown circa 2017• The experiment has a firm plan and timeline to achieve the upgrade• The VELO pixel module concepts and detector layout will be realizable• We are still pursuing different sensor options• The ASIC design is progressing well • R&D is progressing well in the key aspects of the detector• Prototypes are being built and will be tested to assess their performances and

suitability in a harsh environment like the current VELO detector

27