A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 11
Status of the PS Status of the PS TFBTFBUpgrade launched in July 2005Upgrade launched in July 2005
L. Arnaudon, A. Blas, F. Caspers, D. Glenat, R. Louwerse, V. Rossi
1. Background2. System block-diagram3. Hardware overview4. Planning
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 22
PS TFBPS TFBBackground
05/05 Presentation to the APC to ask for some founding (new amplifiers, Strip line kicker upgradekicker impedance matching transformers, PLC control system, LHC type electronic core …)
System specified for < +/- 2mm injection errors and compatibility with LHC:
End 06 System expected to be ready
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 33
PS TFBPS TFB
Blue boxes represent new hardware since 6/05
Block diagram
BeamPick-up
SS02
VMEElectronic core
Pre-driver
PowerAmplifier
Control Interface
ClockGeneration
Particle Flight time
BetatronPhase difference
= (k+1)./2
BeamPick-up
SS98
Pick-upAmplifiers
signals
KickerSS97
WaterCooling
Power Attenuator
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 44
PS TFBPS TFB Pick-up amplifiers(J. Belleman)
Were ready in October 2003
BW: 20 kHz – 40 MHz80 dB dynamic range (compatible with ions)
Remotely programmable gain
Located in the ring below concrete slab
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 55
PS TFBPS TFB Electronic core
Ongoing design using the hardware foreseen for the LHC 1TFB
Ready in late 2007 ????.
NotchFilter
HilbertFilter
AutomaticDelay
G
G
PU 1(Aux)
PU 2
BTFSet-up
GAIN
DAC OUT
M=1M=3
ON/OFFFilter coefs
160 *FREV 160 *FREV
40 MHz &160 *FREV
(KFLIGHT - KLOOP CLK)TFIX
Automaticdelay
PU1-PU2Particle
Flight time PU1
PU2
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 66
PS TFBPS TFB Electronic core
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 77
PS TFBPS TFB Clock generation (J. Sladen)
1 GHz DDS
Available since mid-2004
Receives the frequency program from the PS central building and outputs the 160*Frev (< 80 MHz).
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 88
PS TFBPS TFB Pre-Amplifier
Fast Clipping of the output signal0 and 180o outputsProgrammable gainTFM setupLocal / Remote control Interface with the PLC controlCompatible with analogue systems
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 99
PS TFBPS TFB Power Amplifier
[2.5 kHz – 23 MHz], 3kW – 5ms, 750W - CW
4 amplifiers required+ 2 spares
2 amplifiers ready used in 2006 MDs3 amplifiers under final tests1 amplifier under construction waiting for missing material
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1010
PS TFBPS TFB Power Amplifier
Amplitude Phase
Power Response (inactive trace = version used in MD)
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1111
PS TFBPS TFB Impedance matching transformers
Input impedance: 50 ΩOutput impedance: 100 ΩEach coax: 50 ΩVoltage gain = 2
[ 2kHz – 40 MHz]up to 3 kW
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1212
PS TFBPS TFB Kicker
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1313
PS TFBPS TFB Kicker
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1414
PS TFBPS TFB Power loads
50 Ω / 30 dB Attenuator[ DC – 1GHz] 1 kW CW
100Ω to 50Ω resistive transition[ DC – 190 MHz] 1.6 kW CW
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1515
PS TFBPS TFB Power Control
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1616
PS TFBPS TFB Water cooling
Electric valves coupled to leak detectors
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1717
PS TFBPS TFB LHC 26 GeV + MTE MD setup
Pick-upSS98/100
Pick-upAmplifier
VertorSum
PowerAmplifiers
KickerSS97/100
FunctionGenerator
184 ns
SP2T
4 ns5 ns
100 MHz3dB BW
359.42 kHz2Vpp
Splitter
2 ns 2 ns
3 ns
1
2
Start 1PX.TF-start-CCanal 1 TG8
Start 2PX.TF-Start-RF
PR.SCTFBGVPR.SCTFBGH
[20 kHz, 40 MHz]Transfer impedance
[11m, 1 k]0.167 dB steps
Beam235 ns
235 ns
Kicker length = 0.9 m, ZC = 112 deviation (H plane) = 2 rad/(kW on both sides) at
1.4 GeV
100
16 ns
14 ns
SP2T1
2
Start 2PX.TF-Scope-
RF
14 ns
1 ns
50
Pick-upSS02/100
16 ns
Patch Panel
Combiner
0o180o
86.5 ns
57 ns
Start 1PX.TF-Scope-C
Splitter
10 dBAtt.
-9dBCableComp.+cable
Combiner
0.5 ns 0.5 ns
Total 2100.7 nsWith +/- 2.5o error
below 20 MHz
-9dBCableComp.+cable
Total 1340 nsWith +/- 1o error below 20 MHz
At 26 GeVFrev = 476.83 MHz
Trev = 2097 nsStart C20 at C2305Start C40 at C2340
Start Coarse synchro C2155Start Fine Synchro C2367
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1818
PS TFBPS TFB 26 GeV MD setup
2100 ns Notch delay+1340 ns 1-turn-delay
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 1919
PS TFBPS TFB
MTE blow-up at 14 GeV, Oct.2006, A. Franchi, S. Gilardoni, M. Giovannozzi, D. Quatraro
See APC slides 9 March 2007
26 GeV, LHC beam transverse damping, Oct. - Nov. 2006.R. Steerenberg, G. Arduini, E. Benedetto, H .Damereau, A. Grudiev, W. Höfle, E. Métral,M.
Morvillo, C. Rossi, G. Rumolo……. (APC slides 22 September and 15 December 2006)
- Excitation–Damping test. Observation of the first betatron line amplitude: 5.7 ms damping time instead of 21 ms natural decay (100 to 5 %),with C10 cavities
only active.No significant results with C20, C40 or C80 Problem found afterwards: Power resistors (200W CW, 3kW/2ms peak) dead !!
MD’s
A.Blas AB/RF/FBA.Blas AB/RF/FB APC meeting 20/4/2007APC meeting 20/4/2007 2020
PS TFBPS TFB Summary
The transverse feedback system is waiting for its VME electronic core to be completed. For this unit, the time table is under discussion
The system is ready for another set of measurements on the 26 GeV flat-top.The system is ppm => parallel MDs