2
Date Sludge Generated(Bags) Sludge Despt.(Bags) Sludge Despt.(Kgs.) 3/1/2014 40 40 720 3/22/2014 45 45 700 4/1/2014 114 48 830 4/1/2014 - 66 710 4/12/2014 131 66 750 4/12/2014 - 65 670 4/20/2014 70 70 730 5/5/2014 123 68 610 5/5/2014 - 55 680 5/10/2014 55 55 610 5/18/2014 70 70 630 6/1/2014 47 47 690 6/23/2014 75 75 720 6/28/2014 60 60 820 7/12/2014 68 68 770 9/20/2014 155 80 1060 9/20/2014 - 75 940 10/5/2014 75 75 720 11/2/2014 70 70 850 11/23/2014 50 50 720 12/28/2014 65 65 880 1/3/2015 70 70 710 2/15/2015 65 65 930 3/2/2015 60 60 770 3/15/2015 62 62 990 Total 19210 Karamtara Engineering Pvt Ltd(Unit-1) Sludge D

abc

Embed Size (px)

DESCRIPTION

ksfo

Citation preview

Sheet1Karamtara Engineering Pvt Ltd(Unit-1) Sludge DetailsDateSludge Generated(Bags)Sludge Despt.(Bags)Sludge Despt.(Kgs.)Date of Despt.3/1/1440407203/5/143/22/1445457003/26/144/1/14114488304/2/144/1/14-667104/8/144/12/14131667504/15/144/12/14-656704/16/144/20/1470707304/22/145/5/14123686105/6/145/5/14-556805/7/145/10/1455556105/13/145/18/1470706305/20/146/1/1447476906/3/146/23/1475757206/25/146/28/1460608207/1/147/12/1468687707/15/149/20/141558010609/23/149/20/14-759409/30/1410/5/14757572010/8/1411/2/14707085011/4/1411/23/14505072011/25/1412/28/14656588012/30/141/3/1570707101/6/152/15/1565659302/18/153/2/1560607703/4/153/15/1562629903/18/15Total19210

Sheet2

Sheet3