51
Innovative Solutions for HV Substations PASS and TIP Stefano Cervidi - ABB S.p.A. PPHV J.T. ABB Peru - Lima, 23 de Abril 2015

Abb Pass Compass

Embed Size (px)

DESCRIPTION

400KV PASS & COMPASS breakers by ABB

Citation preview

Innovative Solutions for HV SubstationsPASS and TIPStefano Cervidi - ABB S.p.A. PPHV J.T. ABB Peru - Lima, 23 de Abril 2015Success StoryPASS M0 145 kV Retrofitting Tauron Welnowiec PLJune 22, 2012 | Slide 2 ABB GroupCustomer needOld substation that needs to be retrofittedABB response Substation H4 on the roof of the building made with 2 PASS M0 DCB, minimisingswitchyard space.Customer benefitSignificant cost, time and riskreduction in Substationextension. Pre-fabricatedPretestedTransportableNo high voltagetest on site ABB Group May 4, 2015 | Slide 3Customer needRefurbishment of two old AIS S/S minimizing the outage and installation time Utilize pre-existing bus bar system and AIS equipments (PT, SA)ABB responseABB supplied 10 completed HV bays optimizingthe PASS for harsh environmental condition(Desert storm, +52 C, Extreme solar radiation)Customer benefitsCosts and time saving during erection and commissioningReduced outage time during S/S revampingSuccess StoryPASS M0 145 kV Saudi Aramco - Shaybah e Abquaiq SAPre-fabricatedPre-testedTrasportableNo HV test on siteSuccess StoryPASS M0S 245 kV - Tenaris Co-generation plant IT June 22, 2012 | Slide 4 ABB GroupCustomer needSub-station solution with limited space availability at a hazardous material depositABB responseOutdoor substation made with PASS M0S DCB in a small area between twotrafosCustomer benefitSpace and environmentalsaving using a different area far from depositPre-fabricatedPretestedTransportableNo high voltagetest on siteSuccess StoryPASS M00 DCB 72,5 kV Qatar Steel via Air Liquide FRJune 22, 2012 | Slide 5 ABB GroupCustomer needDouble-breaker connection to two new PTR to supply two new steel mills. Limited spaceavailability inside the plant in a desert and marine environment.ABB responseContainerized solution made with PASS M00 DCB with bayP&C system integrated. Customer benefitCompact and higly reliablesubstation with a 2-day energization time. Environmentally protected from corrosive salinity and sandstorms.Pre-fabricatedPretestedTransportableNo high voltagetest on siteSuccess StoryPASS M00H 72,5 kV Russein Axpo Hydro PP - CH June 22, 2012 | Slide 6 ABB GroupCustomer needComplete refurbishment of a 70-year old AIS substation at 1000m asl. Not enough space availablefor AIS or conventional hybrid. Energization to be done beforeonset of the winter weather.ABB response4-bay prefabricated substationcompletely transportable(8500x2800x3100mm) Customer benefitFast energization due to a 36-hours time erection and commissioning. Minimum civilworks on site. See VideoPre-fabricatedPretestedTransportableNo high voltagetest on site ABB Group May 4, 2015 | Slide 7E 13th StWall St.Customers issues:In Lower Manhattan, close to the Financial District, Con Edison was looking to increase flexibility and reliability after the substation was damaged by superstorm Sandy in 2012.ABB response:5 PASS M0S 420kV designed for special platform application 9m above the ground, providing line and transformer protection.Benefits:Increased flexibility and reliability from a compact outdoor solution without any HV equipment relocation minimizing cost, time and risk.IEC 61850 9-2 LE P&C system integratedinside the Local Control Cubicle of PASS Success StoryPASS M0S 420kV - Con Edison East 13th St. NYC USACustomer needSubstation located in isolated Californiandesert. Need for small amount of low- and medium-voltage output to supply critical auxiliary and control applications.High Seismic Standards:IEEE 693-2005 0,5gcompliantABB response Re-designed gas-insulated service voltagetransformer TIP for 500 kV application. Engineered, delivered and energized in lessthan seven months.Customer benefitCost-effective product compared to a traditional power transformer. Ideal solution to supply small amounts of power directly from high-voltage lines in remote locations. Success StoryTIP 550 installed in SDG&E substationTIP SSVT500 kV Ocotilloswitching substationOcotillo Wind Farm315 MW (California, US)ABB in Lodi - HistoryLong heritage based on innovationMonth DD, Year | Slide 9 ABB Group1926 EstablishedOil insulated Current Transformers for more than 50 years.GIS Technology - 19741981 SF6 Stand-alone Current TransformersPioneering Spirit late 1990sInventorsthe Hybrid Switchgear2005 New Focus Factoryfor High Voltage Power ProductsWorldwide successFactory BackgroundIntroductionMonth DD, Year | Slide 10 ABB Group Focus Factory for ABB Factory Portfolio: SF6 Instrument Transformers COMPASS - Hybrid Modules PASS Hybrid Modules MFM Customer Tailored SolutionsPASS HYBRIDThere are tenths of thousands of old substations based on AIS; a significant portion of that installed base is ageing.COMPASS fits extremely well in any substation built with AIS in mind; it is a good compromise of:- Compactness.- Functions integration (CB, DS, ES, CT, VT, SA).- Reliability.- Cost.The module can be delivered fully assembled or, for those countries where delivery costs are at a premium, as subassemblies ready to be completed on site, thus: - giving an additional source of profit to local service centers;- decreasing the overall cost borne by the client.Month DD, Year | Slide 11 ABB GroupThe first Multifunctional moduleAir insulated compact switchgear COMPASSInsulation AIRConfiguration SBB onlyRated voltages 100 to 170 kVBreaking current 40 kAPASS - Plug And Switch SystemSwitchgear & ModulesMonth DD, Year | Slide 12 ABB GroupLowNoFunctional integrationEncapsulationPartial FullMediumHighDTB Circuit Breaker Current TransformerLTB Circuit BreakerHybrid Modules Circuit Breaker Current Transformer Voltage Transformer Disconnector Earthing SwitchGIS Circuit Breaker Current Transformer Voltage Transformer Disconnector Earthing Switch Busbar / BusductsPASS Plug And Switch SystemDescriptionMonth DD, Year | Slide 13 ABB GroupPASS Circuit BreakerDisconnector & Earthing SwitchCurrent TransformerSF6 GASINSULATED ABB Group May 4, 2015 | Slide 14PASS M0S PASS M00 PASS M0Up to 100 kV Up to 170 kV 252 and 420 kV Up to 170 kV50 / 60 Hz 50 / 60 Hz 50 / 60 Hz 50 / 60 Hz2000 / 3150 A 3150 A Up to 5000 A 2000 / 3150 A31,5 / 40 kA 40 / 50 / 63 kA 50/ 63 kA 31,5 / 40 kAPASS Plug And Switch SystemPortfolioNEW PASS M0 H61. Stud for HV connection2. Bushing3. Current transformer4. SF6 Voltage transformer inductive type5. DS/ES Operating drive mechanism6. Circuit breaker7. CombinedDisconnector/Earthing switch8. BLK Spring-type circuitbreaker operating mechanism9. Local control cubicle54321123897PASS Plug And Switch SystemComponents ABB Group May 4, 2015 | Slide 15 ABB Group May 4, 2015 | Slide 16PASS Plug And Switch SystemCircuit breakerSelf-blast or Auto-pufferArc-assisted pressure generation leads to less need of interrupting energy Smaller operating mechanism Lower stresses on mechanical componentsPASS Plug And Switch SystemMonth DD, YYYYCB Drive- Spring: BLK Motor Drive: MD1.4 The circuit breaker is operated by the release of energy stored in a springInput-output and interlocking logics are based on electromechanical relaysStandard secondary terminalsThe circuit breaker is operated by a servomotor energized by capacitorsInput-output and interlocking logics are based on electronic boardsStandard secondary terminals ABB Group May 4, 2015 | Slide 18PASS Plug And Switch SystemCombined disconnector and earthing switchIntegrated DS\ESThe mechanism has a minimal number of mechanical components, it is reliable and maintenance-free.The position of the combined disconnector/earthing switch is clearly shown by an indicator mechanically coupled to the shaft. Moreover, visual confirmation can be obtained by means of an inspection window in the enclosure. The disconnector/earthing switch can also be operated manually by means of a crank. ABB Group May 4, 2015 | Slide 19PASS Plug And Switch SystemPortholes for safe earthing ABB Group May 4, 2015 | Slide 20PASS Plug And Switch SystemCurrent TransformersCast-resin insulated ring typeSeveral cores can be installed, to suit the end customers specifications. The transformer is generally fitted to the front bushing, but can also be installed on the rear one or on both to comply with specific requirements. ABB Group May 4, 2015 | Slide 21PASS Plug And Switch SystemVoltage Transformers and Surge ArrestersSF6 Insulated Voltage transformersPASS can be equipped as request with conventional GIS inductive voltage transformers. Similarly to Current Transformers, several combinations of windings for protection and measurements with different loads are available. ABB Group May 4, 2015 | Slide 22PASS Main Features: Each PASS module is equivalent to a complete switchgear bay High customizability yet short delivery time, due to the modular design Fast erection and commissioning, due to fully-assembled modules delivered from factory. Lower life cycle costcompared to traditionaltechnologiesPhilosophypre-fabricatedpre-testedtransportable no HV-test on siteWhy Innovative SwitchgearAdvantagesPASS - Plug And Switch SystemFootprint AISMonth DD, Year | Slide 23 ABB Group Side View of a 132kV AIS Switchyard. Switchyard Length: 42 metres.PASS - Plug And Switch SystemFootprint PASSMonth DD, Year | Slide 24 ABB Group Side View of a 132kV PASS Switchyard. Switchyard Length: 20 metres.PASS - Plug And Switch SystemFootprint Comparison AIS vs PASSMonth DD, Year | Slide 25 ABB GroupPASS- Plug And Switch SystemFootprint reduction - Influenced savingsMonth DD, Year | Slide 26 ABB Group-50% FootprintCivil WorksTimeLandInfluenced SavingPASS - Plug And Switch SystemErection & CommissioningMonth DD, Year | Slide 27 ABB GroupPhilosophy: Pre-Engineered Pre-Fabricated Pre-Tested No High Voltage Test on Site Arrives on site Ready.16 hours - 132kV SBB* *Approximate and relativePASS - Plug And Switch System Erection & CommissioningMonth DD, Year | Slide 28 ABB GroupTransported to Site Assembled:Side Phases rotate to: Transport or Service PositionMonth DD, Year | Slide 29 ABB GroupPASS - Plug And Switch SystemEasy transportabilityPASS M00 and M0in a containerPASS- Plug And Switch SystemInvestment ComparisonMonth DD, Year | Slide 30 ABB Group ABB Group May 4, 2015 | Slide 31Single bus barDouble bus barPASS - Plug And Switch SystemFlexibilityPASS - Plug And Switch SystemFlexibilityDouble circuit breaker2 PASS DCB are equivalent to 4 complete switchgear bays ABB Group May 4, 2015 | Slide 32PASS - Plug And Switch SystemFlexibilityCable terminal ABB Group May 4, 2015 | Slide 33In-out SSPASS - Plug And Switch SystemContinuous innovation - PASS M0HMonth DD, Year | Slide 34 ABB Group Complete Multibay Switchyard Hand Ring Configuration available Completely Assembled and Tested in the FactoryPASS - Plug And Switch SystemContinuous innovation - PASS M0HMonth DD, Year | Slide 35 ABB GroupPASS - Plug And Switch SystemContinuous innovation - PASS M0HMonth DD, Year | Slide 36 ABB GroupPROVEN USES OF PASS M0H FAST TRACK PROJECTS FAST ERECTION AND COMMISSIONING OUTDOOR SF6 RELIABLE SWITCHGEAR SECURITY ISSUESPASS - Plug And Switch SystemCigr Independent EvaluationMonth DD, Year | Slide 37 ABB GroupPASS - Plug And Switch SystemConclusionsMonth DD, Year | Slide 38 ABB Group MAINTENANCE FRIENDLYEasy & Simple GAS INSULATEDReliability FAST & EASYErection & Commissioning TRANSPORTED ASSEMBLEDTested in the Factory COMPACTSmall FootprintCONVENTIONALSimple & MaintenanceGAS INSULATEDReliabilityPASS HYBRIDWorldwide SuccessPASS Hybrid installations in every continentTIPSF6 Station Service VoltageTransformers ABB Group May 4, 2015 | Slide 40Product portfolioSF6Instrument TransformersTG TVI TIP TG COMBIVoltage [kV] Up to 800kV Up to 420kV Up to 420kV / 125kVA Up to 245kVTypeSF6CurrentTransformerSF6VoltageTransformerSF6Substation ServiceVoltage TransformerSF6COMBInedCurrent and Voltage TransformerABB Italy PPHV Introduction Product portfolio Switchgear & Modules Pillars Description Footprint Erection & Commissioning Economical Comparison Reference Application PhotosThe 420kVTransportableErection & CommissioningExampleFootprintMobileM0H/RThe FutureDescriptionSuccess StoryMFMIndependent EvaluationCigreElectricity AllianceEnd of the Line ABB Group May 4, 2015 | Slide 41TIP (SF6 Station Service Voltage Transformer)IntroductionDirect high to low (or medium) voltage conversionUp to 0.5 MVA available powerSF6 isolation is non degradable, non flammable and prevents explosions; yearly leakages are less than 0.1%Compact design; installation is limited to connection and gas fillingSystem voltages from 72.5kV to 550 kVMaintenance free design ABB Group May 4, 2015 | Slide 42Substation2 MV connections Control power supply from two external MV sources; Difficulties in getting two external sources with high levels of availability and reliability.Substation1 MV connection1 internal source Control power supply from one external MV source and one internal; In special cases two internal sources are possible when no MV network is available, time schedule for external connections is not in line with SS energization etcTIP (SF6 Station Service Voltage Transformer)Example Terna in Italy ABB Group May 4, 2015 | Slide 43TIP (SF6 Station Service Voltage Transformer)ApplicationsHow to provide auxiliary power supply in a remote substation w/o a power transformer?Ex: switching substation, series compensation, wind farms, cell tower How to provide electricity to an isolated low power user such as a village? ABB Group May 4, 2015 | Slide 44TIP (SF6 Station Service Voltage Transformer)Supply of auxiliary power to remote S/sTypical solutions previously used are: Prolongation of a distribution line Installation of a 5 MVA oil power transformer Use of a diesel generatorThe current solution of using TIP allows to save on Costs Time Complexity Reliability ABB Group May 4, 2015 | Slide 45TIP (SF6 Station Service Voltage Transformer)SF6 Insulation Advantages Internal overpressure caused by an internal arc gets released through breaking of the rupture membrane no explosion follows SF6 is non flammable, providing safety to people and avoiding damages to surrounding equipment SF6 is non degradable: there is no formation of conducting gases and no consequential partial discharges; sampling is not required Included density meter provides two threshold pressure levels: warning and alarm Yearly gas leakages are less than 0.1% ABB Group May 4, 2015 | Slide 46TIP (SF6 Station Service Voltage Transformer)DetailsOptional off-loadmanual tapchanger (5% of nominal voltage)Detail: rupturedisk Burstingpressure:1.2 MPaDetail: temperature compensated density monitorOperating pressure 0.65 MPaAlarm pressure 0.6 MPaLockoutpressure 0.55 MPaStandard DILO DN8/20 valves ABB Group May 4, 2015 | Slide 47TIP (SF6 Station Service Voltage Transformer)Reference Customers Terna (Italy) Atco (Canada) BC Hydro (Canada) SDG&E (US) Quadra Mining (Chile) Rio Doble (Peru) PDVSA (Venezuela) Elering (Estonia) ABB Service (Brazil) ABB Group May 4, 2015 | Slide 48TIP (SF6 Station Service Voltage Transformer)Reference list for higher voltages 360 to 550 kVCLIENT COUTRY PRODUCT QUANTITY YEARTIP 420 3 2011TIP 550 2 2012TIP 550 1 2013TIP 362 4 2014TIP 420 6 2014TIP 550 3 2012TIP 420 3 2014 ABB Group May 4, 2015 | Slide 49TIP (SF6 Station Service Voltage Transformer)TIP Upgrade: ideal solution for remote electrificationUpgrades Tap changer Metering windings Disconnecting function Breaking functionCircuit breakerDisconnector ABB Group May 4, 2015 | Slide 50TIP (SF6 Station Service Voltage Transformer)Hannover fair 2014 exhibit