Upload
ngotu
View
216
Download
3
Embed Size (px)
Citation preview
© ABB Group February 18, 2013 | Slide 1
© ABB Group February 18, 2013 | Slide 2
EvaLis Danielson, Travel manager
Longest underground power link
Longest and highest capacity power link
Longest underwater power link
Largest gearless mill drive (for crushing ore)
Largest SVC installation
Most remote offshore wind farm linked to grid
First platform connected to mainland grid
Europe’s largest thermal solar power plant
First commercial wave power plant
First 600 kV power link
Longest conveyor belt
Substation in world’s tallest building
Power and automation of largest chemical cellulose plant
Automation of largest alumina plant
Largest battery
Mine hoist for largest potash mine
Largest reverse-osmosis desalination plant
Largest SCADA network
Power Products
Power Systems
Discrete Automation and Motion
Process Automation
$10.9 billion 35,300 emp.
$8.1 billion 19,600 emp.
$8.8 billion 28,500 emp.
$8.3 billion 28,300 emp.
Low Voltage Products
$7.7 billion 31,400 emp.
© ABB Group February 18, 2013 | Slide 5
© ABB Group February 18, 2013 | Slide 6
© ABB Group February 18, 2013 | Slide 7
ABB Anne Moberg Hotel / EvaLis Danielson TMC
HRG Lotta Blommé
Amadeus Helena Franzen & Malin Wesström
© ABB Group February 18, 2013 | Slide 8
Squatter Rates
© ABB Group February 18, 2013 | Slide 9
1900 contracted hotels – 6000 loaded in Amadeus 145 000 employees ABB small v.s ABB large Lost savings & Less compliance TM:s credibility
Correct channel – No control
© ABB Group February 18, 2013 | Slide 10
New areas for improvements
Prioritisation of hotel Correct rates Hotel location v.s. ABB office location
© ABB Group February 18, 2013 | Slide 11
© ABB Group February 18, 2013 | Slide 12
Solutions No more squatter rates & extra process for TMC § Amadeus created an ” ABB office ID /database”. HRG loaded ABBs contracted hotels =
Clean Data
§ TMC serving ABB globally and using Amadeus à log in à Clean data
§ Process in place to maintain clean data controlled by Sweden à ABB WW
Location ABB hotel vs ABB office § ABB loaded all ABB office locations and matching is done with ABBs contracted hotel.
§ New Amadeus Tools
Priority § Priority loading in ”ABBoffice ID/database”
§ New Amadeus Tools
Filter for contracted Hotels room rate - correct loaded § New Amadeus Tool; But to high cost offered from Amadeus - Hold
© ABB Group February 18, 2013 | Slide 13
Cost & Time
ABB
§ Project hours
§ 7 TEUR to load ABB 1900 hotel data into ABB office ID/database
§ Smaller cost to maintain the ”ABB office ID/database”
HRG § Project hours
§ Business Manager, IT, ABB team members
§ ABB team member education
Amadeus § Project hours
§ Account Manager, Sales Engineer, Channel Manager
© ABB Group February 18, 2013 | Slide 14
First results ABB
§ Implemented in Sweden, Norway, Finland - Continue in Germany, Spain
§ Sweden 53% increase of hotel transactions 2012
§ Goal for cost decrease on hotel 7%, small markets minimum 10%
HRG § More effective process
§ Increase of hotel transactions - profit
§ Customer satisfaction – management & traveler
Amadeus § Customer & End Customer satisfaction
§ Evidence - Amadeus listen
§ Amadeus SCA & Nordics in front line
§ Increase of hotel transactions – profit
© ABB Group February 18, 2013 | Slide 15
No hidden agenda
Copy & Paste
Amadeus new approach
The invisible thieves
© ABB Group February 18, 2013 | Slide 16
© ABB Group February 18, 2013 | Slide 17