15
TTS148-1 Caterpillar Confidential: Green Craig Anderson Director, Environmental Affairs Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-1Caterpillar Confidential: Green

Craig Anderson Director, Environmental Affairs

Solar Turbines

AB 32-Cap and Trade Compliance &Solar Turbines Product Test FacilitiesMarch 2012

Page 2: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-2Caterpillar Confidential: Green

Business SummaryBusiness Summary

• Wholly Owned Caterpillar Subsidiary

• Customers In 98 Countries

– 13,700 Units Installed

• $3.3B Revenue in 2010

• Leading California Exporter

– 75% of Revenue International

• Leading Supplier of Mid-range Gas Turbine Power Systems

2

Page 3: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-3Caterpillar Confidential: Green

Turbomachinery Product LinesTurbomachinery Product Lines

Mars 90 & 100

Titan 130

Titan 250

Taurus 70

Taurus 65

Taurus 60

Mercury 50

Centaur 40 & 50

Saturn 20

Generator SetsCompressor

Sets

Mechanical

Drives

Page 4: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-4Caterpillar Confidential: Green

Business Summary Business Summary

• 83 Years in California

• Products Designed, Manufactured

and Tested in San Diego

• 4,000 Employed in San Diego

– Harbor Drive

– Kearny Mesa

4

Page 5: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-5Caterpillar Confidential: Green

Cap and Trade ApplicabilityCap and Trade Applicability

0.025% of Cap in 20130.01% of Cap in 2015

Page 6: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-6Caterpillar Confidential: Green

Solar’s Kearny Mesa Facility

Solar’s Kearny Mesa Facility

•100% of all new product is assembled and tested and shipped from KM•95% is shipped outside of Calif•70% is shipped outside US

Page 7: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-7Caterpillar Confidential: Green

Kearny Mesa GHG Emissions and Energy Usage

Kearny Mesa GHG Emissions and Energy Usage

Kearny Mesa GHG 2010 2009 2008 2007

Source Mtons Mtons Mtons Mtons

Stationary Combustion 31,048.00 31,924.71 38,942.72 27,648.84

Electricity Usage (indirect) 7,522.98 6,705.98 7,241.16 7,889.04

Natural Gas Use (1000 lbs) 22,116 22,766 27,050 17,812

Diesel Use (1000 lbs) 2,143 2,320 3,474 2,967

Page 8: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-8Caterpillar Confidential: Green

Kearny Mesa 2009 GHG EmissionsKearny Mesa 2009 GHG Emissions

20%

30%

40%

Annual Variation

Page 9: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-9Caterpillar Confidential: Green

The Big IssuesThe Big Issues

Page 10: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-10Caterpillar Confidential: Green

BenchmarkBenchmark

Page 11: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-11Caterpillar Confidential: Green

Leakage Risk = Business RiskLeakage Risk = Business Risk

Page 12: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-12Caterpillar Confidential: Green

“Compliance Instruments”“Compliance Instruments”

• Reduce GHG Emissions = Reduce Testing

• Purchase Emission Offsets

• Participate in Allowance Auctions and/or

Private Contracts

• All of the Above

Page 13: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-13Caterpillar Confidential: Green

0

10

20

30

40

50

60

201

7

201

8

201

9

202

0

Free Allowances (1000,s Mtons)KM GHG Emissions

GHG Allowance Compliance Scenario100% Allowances

GHG Allowance Compliance Scenario100% Allowances

2018-2020Deficit= 97,000

Mtons

100% Through Purchase of Allowances• Cost: $10-55/Allowance•Total Cost: $300K - $1.55M/year•Risk:

Will there be allowances available?

Page 14: AB 32-Cap and Trade Compliance & Solar Turbines Product ... - AB 32-Cap and Tr… · Solar Turbines AB 32-Cap and Trade Compliance & Solar Turbines Product Test Facilities March 2012

TTS148-14Caterpillar Confidential: Green

0

10

20

30

40

50

60

201

7

201

8

201

9

202

0

Free Allowances (1000,s Mtons)KM GHG Emissions

GHG Allowance Compliance ScenarioAllowances and Offset Credits

GHG Allowance Compliance ScenarioAllowances and Offset Credits

2018-2020Deficit= 97,000

Mtons

92% Through Purchase of Allowances• Cost: $10-55/Allowance•Total Cost: $280K - $1.3M/year•Risk:

Will there be allowances available?

8% Through Offset Projects•Cost: Unknown•Risk:

Will offset projects remain Viable (Permanent)