AAs in PEP Jan Geralt Bij de Vaate. PEP. Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction AA-mid part of the Advanced Instrumentation Program (AIP) 2012-2016. Allocation of Requirements from System to Element level. - PowerPoint PPT Presentation

Citation preview

Page 1: AAs in PEP Jan Geralt Bij de Vaate

AAs in PEP

Jan Geralt Bij de Vaate

Page 2: AAs in PEP Jan Geralt Bij de Vaate

PEP

• Project Execution Plan for the pre construction phase of the SKA

• Consortium to be formed• AA-low ready for construction• AA-mid part of the Advanced Instrumentation Program (AIP)• 2012-2016

Page 3: AAs in PEP Jan Geralt Bij de Vaate

Allocation of Requirements from System to Element level

Pre-Stage 1

System RR

Element SRR

• 1st allocation is science requirements, operations requirements (Instrument Requirements Review).

• Later allocations are extensibility requirements and non-functional requirements.

System Level (SPDO/SPO)

Element Level (WPCs)

1

2

Page 4: AAs in PEP Jan Geralt Bij de Vaate

Assembling Element Level RFPs for Stage 1 Work

SoW

Pre-Stage 1

Planning Element 1 CoDR-SRR Work

Planning Element 2 CoDR-SRR Work

Planning Element N CoDR-SRR Work

RFP Bid

Def

ine

Top

-leve

l WB

S

Develop Stage 1 Legal, Bid Policy, T&C Contract Templates

Stage 1 Element MoAs

Nov/11 Apr/12

Assemble Work Package Consortia

review

Jun/12

Page 5: AAs in PEP Jan Geralt Bij de Vaate

AA SoW writing team

Page 6: AAs in PEP Jan Geralt Bij de Vaate

AA SoW

• Draft WBS created• SoW writing started• Full draft by mid Jan.

Page 7: AAs in PEP Jan Geralt Bij de Vaate

AA Consortium

AA-midreceptorAA-midreceptor

System Engineering

System Engineering

WP MgtWP Mgt

AA-lowAA-low

AA Consortium board

AA Consortium board

Page 8: AAs in PEP Jan Geralt Bij de Vaate

AA Consortium

AA-midreceptorAA-midreceptor

System Engineering

System Engineering

WP MgtWP Mgt

AA-lowAA-low

Signal processing

Signal processing

Verification systems

Verification systems InfrastructureInfrastructure

System DesignSystem Design

Front-end array

Front-end array

Page 9: AAs in PEP Jan Geralt Bij de Vaate

pre Consortium

• INAF• Oxford University• Manchester University• Cambridge University• Obs Paris (Nancay) / Univ. of Bordeaux• ICRAR• Raman Research Institute• ASTRON

– Aperture Array Design and Construction Consortium: AADC2..?

Page 10: AAs in PEP Jan Geralt Bij de Vaate

Consortium

Work package Consortium

Industry Participating Orgs

Work package Consortium

Industry

Participating Org

Industry

Participating Org

Stage 1 ?

Stage 2 ?-IP issues-Funding/budgets

Page 11: AAs in PEP Jan Geralt Bij de Vaate

Pre Consortium

• Telecons and meeting in Perth (Aug/Sept 2011)• This Friday focus on AA-mid

• Meeting in Manchester during/after the SPO gathering– Second half of 30th Jan- 3rd Feb week

• Letter of Intend proposal drafted

• Composing the bid on AA work package April/May 2012• Start 1st July 2012

Page 12: AAs in PEP Jan Geralt Bij de Vaate

General AAVS Schedule

AA-low Small array demonstrators AAVS0 2011

Technology demonstrator AAVS1 2013

SKA1 full pre-production prototype array AAVS2 2015

SKA1 manufacturing data package 2016

AA-mid Individual tile demonstrators AAVS0 2011

Single array performance demonstrator AAVS1 2013

Multi-array interferometer performance demonstrator AAVS2 2016

SKA2 capable costed design 2016

Page 13: AAs in PEP Jan Geralt Bij de Vaate

AA-low Demonstrators

Array Scale Site Purpose & Comments

AAVS02011/2

AA-low 16 elements LocalProve electromagnetic performance in small array. Multiple arrays

AAVS12013/4

AA-low256elements

Selected SKA site strongly preferred.

Single station showing beam performance and the limits of analogue power requirements

AAVS22015/6

AA-low

,000’s of elements in single or multiple arrays

Selected SKA site.

Multiple stations, similar to AAVS1, to show imaging performance. Final proving for SKA2.

Small numbers of beams for processing reasons.NOT a science instrument

AAVS2 science capable

Page 14: AAs in PEP Jan Geralt Bij de Vaate

AA-mid Demonstrators

Array Scale Site Purpose & Comments

AAVS02011/2

AA-mid ~1m2 tileTest chambers/EMBRACE

For ORA: prove concept and LNA interfaceFor Vivaldi: refine array and manufacturing techniques

AAVS12013/4

AA-mid 256 clusters Selected SKA site strongly preferred.

Single station showing beam performance and the limits of analogue power requirements

AAVS22015/6

AA-midSingle or array of stations

Selected SKA site.

Multiple stations, similar to AAVS1, to show imaging performance. Final proving for SKA2.

Small numbers of beams for processing reasons.NOT a science instrument

AAVS2 science capable

Page 15: AAs in PEP Jan Geralt Bij de Vaate

Event list…..Date Milestone/Event Remarks

Jan 2010 AAVP start

April 2011 AA CoDR Aperture Array system, AA-low and AA-mid, Concept design review

Nov. 2011 AA dCoDR Aperture Array delta concept design review of the AA-mid

Q1 2012 AAVS0 completion and test Testing of the various small array test systems

April 2012 AAVP final report for PrepSKA Consolidated findings from the PrepSKA work

Q2 2012 SKA site selection

Q2 2012 AAVS1 PRR Production readiness for a small AAVS system

Q3 2012 Start AAVS1 construction Build AAVS1 on SKA site

Q1 2013 AA- SRR SKA2 System Requirements Review for the AA-mid

Q1 2013 Start AAVS1 commissioning Start test and evaluation process

Q2 2013 AAVS2 PDR

Q3 2013 AAVS2 CDR Covers both AA-low and AA-mid

..

Page 16: AAs in PEP Jan Geralt Bij de Vaate

AAVS Funding

• Self funded by the AA consortium

• Material AAVS1: 1M€

• Material AAVS2: 5M€

– PEP numbers..

Page 17: AAs in PEP Jan Geralt Bij de Vaate

Notes

• A site decision delay impacts AAVS1/2• SKA site needs to be ‘happy’ to host AA Verification Systems

• Significant step needed from pathfinders to SKA1

– Tight schedule

• Connect to deliverables of STaN, Computing and Software?• Interference with pre-cursors?

• Need to tackle outstanding issues with existing team up to 1st July 2012– AAVS0 design, build and evaluation, AA-station specification/design