56
Company Profile Corporate Office & Works 42 Hope Valley Road Naval Base Western Australia 61 Workshop 2 51 Hope Valley Road Naval Base Western Australia 61 Postal Address PO Box 263, Kwinana Western Australia 69 ABN 35 813 081 087 ACN 008 895 154 Website www.pacind.com.au E-Mail [email protected] Telephone +61 8 9410 2566 Directors Erasmo Mosole Marco Mosole Bankers Commonwealth Bank of Australia CORPORATE DIRECTOR 1. Corporate Directory 2. Introduction & Mission Statement 3. Vision and Corporate Values 4. Accreditation Credentials 4. Summary of Major Projects INDEX

Aac booklet

Embed Size (px)

Citation preview

Page 1: Aac booklet

Company Profile

Corporate Office & Works42 Hope Valley Road Naval BaseWestern Australia 6165

Workshop 2 51 Hope Valley RoadNaval BaseWestern Australia 6165

Postal AddressPO Box 263, KwinanaWestern Australia 6966

ABN35 813 081 087

ACN008 895 154

Websitewww.pacind.com.au

[email protected]

Telephone+61 8 9410 2566

DirectorsErasmo MosoleMarco Mosole

BankersCommonwealth Bank of Australia

CORPORATE DIRECTORY

1. Corporate Directory2. Introduction & Mission Statement3. Vision and Corporate Values 4. Accreditation Credentials4. Summary of Major Projects

INDEX

Page 2: Aac booklet

Introduction

Pacific Industrial Company, Founded in 1969 by Erasmo Mosole and

later joined by his sons, Marco and Sandro , is now established as

one of Western Australia’s leading fabrication and construction

organisations, presently combining main office and fabrication

facilities at Naval Base, Western Australia.

Pacific Industrial Company is involved in all aspects of steel

fabrication and construction from shop fabricated items through to

major construction projects including: engineering, procurement,

fabrication, installation, commissioning and related electrical,

instrumentation and civil works.

Although the company’s main clientele are involved in the oil and

gas, mining, resource and industrial sector, Pacific Industrial

Company is actively involved in all forms of fabrication and

construction for a broad customer base.

Page 3: Aac booklet

Vision “Our vision is to develop a sustainable business by being the best at what we do through the investment in our people, technology and innovation”

Company Values

RESPECT

INTEGRITY

SAFETY TEAMWORK

PERSISTENCE

Page 4: Aac booklet

Accreditation Credentials

Quality Management System

ISO 9001:2008

Certificate No: QEC0291

Occupational Health & Safety Management System

AS / NZS 4801:2001

Certificate No: HSM40062

Occupational Health & Safety Management System

OHSAS 18001:2007

Certificate No: HSM40062

Environmental Management System

ISO 140001:2004

Certificate No: EMS40134

Page 5: Aac booklet

Pacific Industrial Company has a majority shareholding in Como Engineers. Through this agreement PIC is able to offer its mineral resource clients a more cost and time efficient execution model through an EPC contracting arrangement.

Como Engineers Pty Ltd was established in 1986. The core focus is to provide engineering services and specialist products to the Mining and Resource sector with a strong focus on process metallurgy, mechanical engineering and materials handling both in Australia and abroad.

Como Engineers employs a team of experienced metallurgists, engineers, construction supervisors and drafts-people which enables us to offer a complete process and engineering service. Como Engineers are able to supply services from metallurgical testing through to scoping and definitive feasibility studies as well as detailed engineering design to project construction and commissioning.

Como Engineers specialises in fit for purpose solutions utilising modular and transportable equipment in our plant designs. Where possible, Como Engineers likes to offer design and construct projects at a fixed duration, lump-sum price, thereby removing a large portion of the project risk from the client.

Como Engineers works closely with our Clients to understand and deliver the product and service that is required for each individual project.

Como Engineers operate worldwide offering localised support with offices in Perth, Melbourne and Jakarta.

Services include: • Studies • Design and Construction • Plant and Infrastructure • Relocations and Upgrades • Maintenance and Refurbishments • Modular Gold Stripping Plants • Certified Dangerous Goods Assessments

Page 6: Aac booklet

MAJORPROJECTS

Page 7: Aac booklet

Client:

Completion:

Value:

Tropicana Gold Mine

AngloGold Ashanti

2013

$120 MILLION

Works involved the total onsite construction of the Tankage, Structural, Mechanical and Piping works for the 5.5 million tonnes per annum gold process plant located 330klms North of Kalgoorlie W.A.

Page 8: Aac booklet
Page 9: Aac booklet

Client:

Completion:

Value:

Fiona Stanley Hospital

Brookfield Multiplex

2012

$5.0 Million

Page 10: Aac booklet
Page 11: Aac booklet

Client:

Completion:

Value:

Karara Iron Ore

Karara Mining Limited

2012

$40 Million

Works involved the design, fabrication, Installation and surface treatment of the project tankage for the magnetite iron ore concentrator.

Page 12: Aac booklet
Page 13: Aac booklet

Client:

Completion:

Value:

Sino Iron Project

CITIC Pacific Mining

2012

$32 Million

Works involved the Installation of approx. 5000 tonnes of steelwork and mechanical items for the stockpile cover, conveying and recovery system for the Magnetite Iron Ore Concentrator. PIC subsidiary business COMO Engineers was also engaged under separate contracts for installation works for the Ball Mill and AG Mill equipment and other mechanical works.

Page 14: Aac booklet
Page 15: Aac booklet

Client:

Completion:

Value:

BHPBIO-Bucket Wheel Reclaimers

Thyssen Krupp

2012

$30 Million

Works involved the supply, fabrication and assembly of 3 x 15000 tonnes per hour capacity Bucket Wheel Reclaimers for BHP Billiton Iron Ore. One machine located at the Jimblebar Mine and 2 machines at the Port Hedland port facilities.

Page 16: Aac booklet
Page 17: Aac booklet

Client:

Completion:

Value:

City Square – Brookfield Place

Brookfield Multiplex

2012

$52 Million

Works involved the supply, fabrication and delivery of 11,000 tonnes of steelwork, decking and column reinforcing for the 51 floor level steel frame building located in the Perth CBD.

Page 18: Aac booklet
Page 19: Aac booklet

Client:

Completion:

Value:

DIN Project

Rio Tinto Iron Ore

2012

$15 Million

Works involved the supply, fabrication, surface treatment and load out and shipping to site of the 2 Surge Bins and associated steelwork for the Dampier Incremental Expansion Project located at Rio Tinto Iron Ore port facility at Parker Point W.A.

Page 20: Aac booklet
Page 21: Aac booklet

Client:

Completion:

Value:

Gorgon LNG Subsea BIS

ALLSEAS

2011

$15 Million

Works involved the fabrication, testing and load out of 11 Buckle Initiator Structures weighing in excess of 120 tonnes each for the subsea gas pipelines delivering LNG to the Grogon LNG facility.

Page 22: Aac booklet
Page 23: Aac booklet

Client:

Completion:

Value:

BHBIO – RGP 5Rail Bridges

BHP Billiton Iron Ore

2010

$40 Million

Works involved the fabrication, assembly, transportation and Installation of 125 Bridge Truss assemblies totalling 6500 tonnes for 11 river crossings for the Rail Bridge Duplication works between Newman and Port Hedland.

Page 24: Aac booklet
Page 25: Aac booklet

Client:

Completion:

Value:

FMG-Cloud Break Mine

FLSmisth - RAHCO

2010

$12 Million

Works involved the supply, fabrication, surface treatment and assembly of 2 mobile overburden removal systems for Fortescue Metal Group Cloud Break Mine

Page 26: Aac booklet
Page 27: Aac booklet

Client:

Completion:

Value:

Pluto LNG Emission Chimneys

Woodside Petroleum

2010

$9 million

Works involved the fabrication, surface treatment, refractory lining and load out of the 3 Gas Turbine emission chimneys. Sections completed where up to 7 meters in diameter and weighing in excess of 200 tonnes each.

Page 28: Aac booklet
Page 29: Aac booklet

Client:

Completion:

Value:

Bluewaters Power Station

ALSTOM

2009

$22 Million

Works involved the installation of steelwork, piping and the turbine and generating systems for both Units 1 and 2 for the Blue Waters Power Station.

Page 30: Aac booklet
Page 31: Aac booklet

Client:

Completion:

Value:

Rio Tinto – Ship Loader

Sandvik- Voest Alpine

2009

$20 million

Works involved the supply, fabrication, surface treatment and assembly and load out of 4 x 10,000 tonnes per hour capacity Ship Loaders for various Rio Tinto port operations.

Page 32: Aac booklet
Page 33: Aac booklet

Client:

Completion:

Value:

Pluto LNG Subsea BIS

ALLSEAS

2009

$14 Million

Works involved the fabrication, testing and load out of 21 Buckle Initiator Structures for the subsea gas pipeline delivering LNG to the Pluto LNG facility.

Page 34: Aac booklet
Page 35: Aac booklet

Client:

Completion:

Value:

NewGen Power Station

ALSTOM

2008

$12 Million

Works involved the installation of the Heat Recovery Steam Generator Boiler (HRSG) for the combined cycle 280MW gas turbine power station located in Kwinana W.A.

Page 36: Aac booklet
Page 37: Aac booklet

Client:

Completion:

Value:

Burrup LNG Train 4 & 5

Woodside Petroleum

2008

$11 Million

Works involved the fabrication, surface treatment, refractory lining and load out of the 7 Gas Turbine emission chimneys and Thermal Combustion Unit. Sections completed where up to 7 metres in diameter and weighing in excess of 200 tonnes each.

Page 38: Aac booklet
Page 39: Aac booklet

Client:

Completion:

Value:

Ravensthorpe Nickel Mine

Outotec

2007

$35 Million

Works involved the supply, fabrication and installation of the 15 Thickeners – 6 x CCD thickeners, 4 x Precipitation thickeners, 5 x PAL, SAP and LIM deep cone thickeners and associated tanks totalling approx. 5000 tonnes of steelwork.

Page 40: Aac booklet
Page 41: Aac booklet

Client:

Completion:

Value:

Telfer Gold Mine

Newcrest Mining

2005

$11 million

Works involved the fabrication and structural, mechanical and piping installation of the crushing, conveying, stockpiling and reclaim circuits for the gold – copper treatment plant located 400 klms south east of Port Hedland WA.

Page 42: Aac booklet
Page 43: Aac booklet

Client:

Completion:

Value:

Hlsmelt Project

Rio Tinto Iron Ore

2004

$20 million

Works involved the fabrication and structural, mechanical and piping installation of the coal drying and preparation facility. In addition PIC fabricated the massive Smelt Reduction Vessel and two Hot Blast Stoves for the HIsmelt plant located at Kwinana WA.

Page 44: Aac booklet
Page 45: Aac booklet

Client:

Completion:

Value:

BHPBIO- Yandicoogina Rail Bridge

BHP Billiton Iron Ore

2003

$3.5 million

Works involved the fabrication, assembly and transportation of the 7 rail truss assemblies for the Yandicoogina Creek bridge located 150 kms north east of Newman WA. Individual girders fabricated where 3.2 metres deep and 45 meters long weighing 50 tonnes each and assembled into truss arrangements weighing 150 tonnes each for transportation and incremental launching.

Page 46: Aac booklet
Page 47: Aac booklet

Client:

Completion:

Value:

AMC – Assembly Hall

Brookfield Multiplex

20003

$5.0 million

Works involved the fabrication and assembly of the mobile assembly hall located at the Australian Marine Complex in Henderson WA. The building dimension was 45 metres high, 90 meters long and spanned 90 meters. Included was also the fabrication and assembly of the 200 tonne capacity portal crane.

Page 48: Aac booklet
Page 49: Aac booklet

Client:

Completion:

Value:

Cockburn Power Station

ALSTOM

2003

$6.0 million

Works involved the structural, mechanical, piping installation, hydrostatic testing and certification to ASME standard of the Heat Recovery Steam Generation (HRSG) unit for the 240MW combined cycle gas fired power station at Kwinana WA. Additional works included the fabrication and installation of the 60 meter high emission chimney.

Page 50: Aac booklet
Page 51: Aac booklet

Client:

Completion:

Value:

Redbank Power Station

ALSTOM

2001

$12 million

Works involved the EPC contract for the materials handling plant for the 151MW coal fired power station located at Singleton NSW. Scope included the design, civil, structural, mechanical, piping, electrical, instrumentation and performance testing requirements using both coal and beneficiated dewatered tailings as fuels.

Page 52: Aac booklet
Page 53: Aac booklet

Client:

Completion:

Value:

Globex Grain Terminal

GrainCorp

2000

$10 million

Works involved the EPC contract for the grain silo construction at the Globex Grain Export Terminal located in Melbourne Victoria. Scope included the design and construction of 4 x 750 tonne, 14 x 1500 tonne capacity elevated silos and 2 x 12000 tonne capacity flat bottom steel silos for grain storage.

Page 54: Aac booklet
Page 55: Aac booklet

Client:

Completion:

Value:

Merlin Diamond Mine

Rio Tinto

2000

$11 million

Works involved the total construction including the earthworks, civil works, structural, mechanical, piping, electrical and instrumentation requirements for the Merlin Diamond Mine located 800 klms south east of Darwin NT.

Page 56: Aac booklet