8
ANNEXURE –VI CONTENTS OF THE REPORT 1. Cover page (Light Green) – on hard paper 2. Inner page – same as cover page but on the soft paper 3. Declaration 4. Acknowledgment (if any) 5. Contents Summary Introduction Work Industry ANNEXURE –VII INDUSTRIAL PROJECT REPORT (For Project Semester 2015 ) for (Name of Student) Roll No………. Under the Guidance of (Name of Faculty Coordinator Name of Industry Coordinator with Designation) with Designation)

aaadadw

Embed Size (px)

DESCRIPTION

dfdf

Citation preview

ANNEXURE VI

ANNEXURE VI

CONTENTS OF THE REPORT1. Cover page (Light Green) on hard paper2. Inner page same as cover page but on the soft paper3. Declaration

4. Acknowledgment (if any)

5. Contents

Summary Introduction

Work

IndustryANNEXURE VIIINDUSTRIAL PROJECT REPORT(For Project Semester 2015)

for

(Name of Student)

Roll No.Under the Guidance of

(Name of Faculty Coordinator

Name of Industry Coordinator

with Designation)

with Designation)

Department of Electronics and Communication Engineering

THAPAR UNIVERSITY-PATIALAJune 2015

ANNEXURE VIII

DECLARATION

I hereby declare that the project work entitled ( Title of the Project) is an authentic record of my own work carried out at (Place of work) as requirement of project semester for the award of degree of B.E. (Electronics & Communication Engineering) at Thapar University Patiala, Under the Guidance of ( Name of the Industry Coordinator) and (Name of Faculty Coordinator), during Even Semester starting from January 2015.(Signature of student)

(Name of the student)

(Roll No.)

Date:__________________

Certified that the above statement made by the student is correct to the best of our knowledge and belief.

(Name & Designation)

(Name & Designation)

Faculty Coordinator

Industry CoordinatorIndustry Name: ANNEXURE IX

THAPAR UNIVERSITY, PATIALA

Department of Electronics & Communication Engineering

PROJECT SEMESTER Session 2015

FEEDBACK FROM INDUSTRY ON PROJECT SEMESTER

1. Were the students serious about their work?

ABC

2. Has the work done by the student been of value to the

Yes / NoCompany?

3. Did the students have adequate background knowledge?ABC4. Did the students have adequate maturity and adjustability?ABC5. Do you think that the Institute can interact with the

Yes / No Industry /organization in some other way also?

Please specify (Ignore if not applicable).

6. How do you rate the student overall?

ABC7. Would you like to take Thapar University students again next year? Yes / No (Please find request-letter for arranging some Training-slots for next year too- ANNEXURE XI)AExcellent

B Good

CFair

Industry Coordinator Signature__________

Name:____________ Designation:________ Mobile:_________

Email:___________

Students Name: ANNEXURE X

Roll No.:

THAPAR UNIVERSITY, PATIALA

Department of Electronics & Communication Engineering

PROJECT SEMESTER Session 2015STUDENT FEED BACK FORM

1. Name and Place of the Industry: ______________________________________

2. Are you satisfied with the manner the department did your:

(i) Placement in various industrial units

Satisfied

Unsatisfied

(ii) Registration & Orientation

Satisfied

Unsatisfied

(iii) Evaluation

Satisfied

Unsatisfied

If not satisfied, please give your suggestions overleaf.

3.Was the technical assistance /guidance received from the Institute satisfactory? If not, identify the area where assistance was lacking?

_________________________________________________________________

_________________________________________________________________

SingleNo. of Project

4.Were you given a single project or number of similar projects?

5. Specify below areas of the projects carried out by you

Analysis & Design/Fabrication/R& D/Supervision/..

6. What additional subjects did you study in order to successfully complete the projects in the industry?

PROJECTSUBJECT

YES NO

7.Problem faced in the industry with regards to:

i) Project identification

ii) Problem analysis

iii) Implementation of the Project

iv) Acceptance in industry

v) Recognition of the work done by you

8. Has the Project Semester proved to be an exercise that has enhanced your

IPersonal Attributed at work:

YES NO

i) Communication Skills

ii) Confidence level

iii) Creativity

iv) Planning

v) Adaptability

vi) Being methodical

vii) Organizational skills

IITechnical Aspects

i) Knowledge

ii) Skill at work9.Were you provide following

i) Stipend

ii) Accommodation

iii) Conveyance

10. Any additional information /suggestion for further improvement of the project:

_______________________________________________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

A-Excellent

B-Good

C- Fair

ANNEXURE X

No.-TU/ECED/IAP15/SR

Dated: 24th April 2015

Sub: Slots request for Project Semester of B.E. Final Year (Electronics & Communication Engineering) students of Thapar University, Patiala to be started from January 2016.Dear Sir,

As part of course-curriculum of the Bachelor of Engineering (B.E.) E&C degree final year students are required to undergo a project semester training (of one semester duration) in Industry, Research Laboratories or Private/Government organizations in India or abroad.

The present final year engineering students of Electronics & Communication Engineering are required to undergo this project work for one full semester starting from January 2016. We shall feel obliged, if you could kindly allot a few slots for B.E. Final Year (Electronics & Communication Engineering) students in your esteemed organization. Kindly intimate us whether your company can offer stipend or not.

We look forward to your early & favorable reply.

With warm regards.

Thanking you,

Dr. Mukesh Kumar,Assistant Professor & IAP Coordinator

Department of Electronics & Communication Engineering

Thapar University, Patiala-147004, Punjab

Email: [email protected];

Contact Numbers: +91-175-2393334; +91-175 - 2393083