FAX / POST सं. देविस /अअ.1/4(ेपाले)/2016/ No. SRPC/SE-1/5(RTA)/2016/ दनांक/ Date: 1 st November, 2016 To वितरण सूची के अनुसार As per Distribution List विषय: ेीय पारेशण ऱेखा Sub: Revised RTDA for the months from April to July, 2016- Reg. Sir, The Regional Transmission Deviation Account Statement (RTDA) for the months from April, 2016 to July, 2016 have been revised due to the following reasons: MONTH REASON FOR REVISION April, 2016 Error in the Injection and Withdrawal rate entry of some entities. May, 2016 June, 2016 1. Error in the Injection and Withdrawal rate entry of some entities. 2. As per the decision taken in the 3 rd Meeting of Validation Committee for the application period 1 st Oct- 31 st Dec, 2016, PoC Slab rate for SEPL and TPCIL for their granted LTA quantum is considered (average of the Regional slab rate). 3. NTPC, Kudgi vide their mail dated 19-07-2016 intimated that average MWh was wrongly shown in the previous RTDA. The same got rectified. July, 2016 Change in Approved Withdrawal / Injection (MW) for L_16_03. The inconvenience is regretted. भिदीय,Yours faithfully, (आर एम रंगराजन/ R. M Rangarajan) अधीण अवभयता (ि)/ Superintending Engineer(C) संलक:यथोपरEncl: as above भारत सरकार के रीय विुत ावधकरण दवण ेीय विुत सवमवत 29, रेस कोसा ास रोड बगलूर :-560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29, Race Course Cross Road BANGALORE - 560 009 Phone : 080 -2228 2516 ; FAX : 080-2225 9343; e-mail: [email protected]; web site: www.srpc.kar.nic.in

विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

FAX / POST

सं. दक्षेविस /अअ.1/4(क्षेपाले)/2016/

No. SRPC/SE-1/5(RTA)/2016/ ददनांक/ Date: 1st November, 2016

To

वितरण सूची के अनुसार As per Distribution List

विषय: क्षेत्रीय पारेशण ऱेखा । Sub: Revised RTDA for the months from April to July, 2016- Reg.

Sir,

The Regional Transmission Deviation Account Statement (RTDA) for the months from

April, 2016 to July, 2016 have been revised due to the following reasons:

MONTH REASON FOR REVISION

April, 2016 Error in the Injection and Withdrawal rate entry of some entities.

May, 2016

June, 2016 1. Error in the Injection and Withdrawal rate entry of some entities.

2. As per the decision taken in the 3rd

Meeting of Validation Committee

for the application period 1st Oct- 31

st Dec, 2016, PoC Slab rate for

SEPL and TPCIL for their granted LTA quantum is considered

(average of the Regional slab rate).

3. NTPC, Kudgi vide their mail dated 19-07-2016 intimated that average

MWh was wrongly shown in the previous RTDA. The same got

rectified.

July, 2016 Change in Approved Withdrawal / Injection (MW) for L_16_03.

The inconvenience is regretted.

भिदीय,Yours faithfully,

(आर एम रंगराजन/ R. M Rangarajan)

अधीक्षण अवभयन्ता (िा)/ Superintending Engineer(C)

संलग्नक:यथोपरर Encl: as above

भारत सरकार

केन्रीय विद्युत प्रावधकरण

दवक्षण क्षेत्रीय विद्युत सवमवत

29, रेस कोसा क्रास रोड

बेंगलूर :-560 009

Government of India

Central Electricity Authority Southern Regional Power Committee

29, Race Course Cross Road

BANGALORE - 560 009

Phone : 080 -2228 2516 ; FAX : 080-2225 9343; e-mail: [email protected]; web site: www.srpc.kar.nic.in

Page 2: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - April-2016 (RTA and RTDA)

भारत सरकारGOVERNMENT OF INDIA

उजा मंालयMINISTRY OF POWER

केय वुत ाधकरणCENTRAL ELECTRICITY AUTHORITY

दिण ेीय वुत समतSOUTHERN REGIONAL POWER COMMITTEE

ेीय पारेषण लेखाREGIONAL TRANSMISSION ACCOUNT

April 2016बगलूर

BANGALORE

ANNEXURE

1 of 28

Page 3: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - April-2016 (RTA and RTDA)

1. Details of Transmission Charges towards LToA/MToA

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.23671/MW)

HVDC Charges(Rs.17192/MW)

Total Tr.Charges (Rs.)

Andhra Pradesh 1258.248 289215 363904195 29783988 21631800 41,53,19,983Karnatka (BESCOM) 1252.168 320069 400780160 29640069 21527272 45,19,47,501Karnatka (HESCOM) 509.84 320069 163183979 12068423 8765169 18,40,17,571Karnatka (GESCOM) 358.53 320069 114754339 8486764 6163848 12,94,04,951Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896Karnatka (CESCOM) 289.62 320069 92698384 6855595 4979147 10,45,33,126Kerala 1433.287 134943 193412048 33927337 24641070 25,19,80,455Tamil Nadu 4543.677 104089 472946795 107553378 78114895 65,86,15,068Telangana 1272.884 258360 328862310 30130437 21883422 38,08,76,169Puducherry 365.918 73234 26797639 8661645 6290862 4,17,50,146PGCIL(SR) 5.926 -- 1830208 140274 101880 20,72,362Goa(SR) 92.62 73234 6782933 2192408 1592323 1,05,67,664

Total(SR) 2,70,69,17,892tamilnadu(NETS(ANPARA)) 100 104089 10408900 2367100 1719200 1,44,95,200andhrapradesh(KSK(CHHATISGARH)) 400 289215 115686000 9468400 6876800 13,20,31,200kerala(PTC(BALCO,KORBA)) 100 134943 13494300 2367100 1719200 1,75,80,600tamilnadu(Farakka) 19.305 104089 2009438 456969 331892 27,98,299tamilnadu(Kahalgaon - I) 5.351 104089 556980 126664 91994 7,75,638tamilnadu(Talcher) 8.011 104089 833857 189628 137725 11,61,210telangana(NSL Sugars(Aland) ) 16.9 258360 4366284 400040 290545 50,56,869tamilnadu(Coastal Energen ) 558 104089 58081662 13208418 9593136 8,08,83,216andhrapradesh(NSL Sugars(KoppaUnit),Karnataka) 8.51 289215 2461220 201440 146304 28,08,964

andhrapradesh(NSLSugars(Tungabhadra),Karnataka) 11.14 289215 3221855 263695 191519 36,77,069

andhrapradesh(JSW Power TradingCompany) 200 289215 57843000 4734200 3438400 6,60,15,600

tamilnadu(ILFS,Tamilnadu) 540 104089 56208060 12782340 9283680 7,82,74,080tamilnadu(KSK mahanadiltd(Chattisgarh)) 500 104089 52044500 11835500 8596000 7,24,76,000

tamilnadu(BalcoLtd,korba,chattisgarh) 100 104089 10408900 2367100 1719200 1,44,95,200

tamilnadu(Jindal Power(Chattisgarh)) 400 104089 41635600 9468400 6876800 5,79,80,800tamilnadu(DB Power(Chattisgarh)) 208 104089 21650512 4923568 3575936 3,01,50,016telangana(TPCIL Andhra pradesh) 269.45 258360 69615102 6378151 4632384 8,06,25,637telangana(JSW Energy,Karnataka) 200 258360 51672000 4734200 3438400 5,98,44,600tamilnadu(Balco Ltd, Korba,Chattisgarh) 100 104089 10408900 2367100 1719200 1,44,95,200

tamilnadu(Dhariwal InfrastructureLtd, Maharashtra ) 100 104089 10408900 2367100 1719200 1,44,95,200

kerala(Maithon Power Ltd-RBTPP) 140.5 134943 18959492 3325776 2415476 2,47,00,744tamilnadu(NSPCL, Bhilai,Chattisgarh) 13.65 104089 1420815 323109 234671 19,78,595

kerala(CSPDCL, Chattisgarh) 297 134943 40078071 7030287 5106024 5,22,14,382telangana(JSW Energy, Karnataka) 150 258360 38754000 3550650 2578800 4,48,83,450tamilnadu(IND- BARATH ENERGY,ODISHA) 500 104089 52044500 11835500 8596000 7,24,76,000

tamilnadu(GMR(Maharashtra)) 150 104089 15613350 3550650 2578800 2,17,42,800tamilnadu(Adhunik) 100 104089 10408900 2367100 1719200 1,44,95,200andhrapradesh(Thermal Powertech) 230.55 289215 66678518 5457349 3963616 7,60,99,483karnataka(Mejia(DVC)) 200 320069 64013800 4734200 3438400 7,21,86,400karnataka(Koderma) 250 320069 80017250 5917750 4298000 9,02,33,000

ANNEXURE

2 of 28

Page 4: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - April-2016 (RTA and RTDA)

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.23671/MW)

HVDC Charges(Rs.17192/MW)

Total Tr.Charges (Rs.)

telangana(JHAJJAR) 94.75 258360 24479610 2242827 1628942 2,83,51,379kerala(Mejia-DVC) 94.75 134943 12785849 2242827 1628942 1,66,57,618kerala(Raghunathpur) 46.75 134943 6308585 1106619 803726 82,18,930kerala(PTC (Simhapuri)) 166.667 134943 22490545 3945175 2865339 2,93,01,059telangana(Shree Cements (SesaSterlite Ltd., Odisha) ) 62 258360 16018320 1467602 1065904 1,85,51,826

tamilnadu(Jindal Power(Chattisgarh)) 59.5 104089 6193296 1408425 1022924 86,24,645kerala(PTC India Ltd (Simhapuri)) 83.333 134943 11245205 1972575 1432661 1,46,50,441

Total(Others) 1,34,54,86,550

ANNEXURE

3 of 28

Page 5: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - April-2016 (RTA and RTDA)

3. Annex-I Entitelment of States From Stations

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA ORISSA TOTAL

NTPC RSTPS1&2 284.456 441.96 230.268 496.849 333.195 78.217 2.156 92.62 0 1959.72

NTPC RSTPS3 72.007 112.009 57.993 125.946 83.637 19.658 0 0 0 471.25

NTPCTALCHERSTPS 2

182.091 372.445 402.448 462.61 213.005 60.132 3.77 0 188.5 1885

NTPCSIMHADRISTPS 2

203.357 214.414 89.583 210.342 215.167 14.636 0 0 0 947.5

NTECLVALLUR STPS 85.799 147.78 46.608 997.227 101.381 20.855 0 0 0 1399.65

NLC STAGE IIUNIT 1 46.978 151.112 78.662 170.251 27.317 47.66 0 0 0 521.98

NLC STAGE IIUNIT 2 82.641 205.068 95.506 252.074 63.298 12.431 0 0 0 711.02

NLC STAGE 1EXP 0 99.853 61.36 207.683 0 15.404 0 0 0 384.3

NLC STAGE 2EXP 0 126.003 76.654 229.571 0 17.772 0 0 0 450

NTPL 129.604 260.73 85.651 370.797 88.135 12.582 0 0 0 947.5NPCIL, MAPSKALPAKKAM 17.025 32.666 20.596 296.695 20.09 6.727 0 0 0 393.8

NPCIL,KAIGA1&2 52.441 121.304 34.024 108.768 61.899 15.365 0 0 0 393.8

NPCIL,KAIGA3 & 4 55.749 131.155 31.307 96.238 65.758 13.593 0 0 0 393.8

NPCIL,KKNPP 46.1 203.762 122.626 518.625 0 30.887 0 0 0 922

4 . Details of Regional Tranmsission Deviation

ANNEXURE

4 of 28

Page 6: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - April-2016 (RTA and RTDA)

Entity Tranmission Deviation Charges Payable (Rs)Andhra Pradesh 10,10,364Karnataka 24,71,545Kerala 53,41,798Tamil Nadu 42,07,553Telangana 23,39,575Puducherry 3,64,534PGCIL(SR) 3,885Goa(SR) 3,86,389NTPC,RSTPS 1& 2 0NTPC, RSTPS 3 0NTPC, TALCHER 2 0NTPC, SIMHADRI 2 0NTECL, VALLUR 0NLC Stage 2 UNIT 1 0NLC Stage2 UNIT 2 0NLC Stage 1 EXPN 0NLC Stage 2 EXPN 1,47,953NTPL 17,340NPCIL,KGS 1 & 2 0NPCIL, KGS 3 & 4 0NPCIL, MAPS 0NPCIL, KKNPP 31,974

SellerLKPPL STAGE 2 2,44,454LKPPL STAGE 3 13,115MEPL 52,162SEL 3,63,739TPCIL 5,35,850COASTAL ENERGEN 3,90,704IL&FS 7,23,956

InfirmILFS (INFIRM) 1,66,21,520KKNPP (INFIRM) 8,94,096NTPL(INFIRM) 0NLC 2 EXPN (INFIRM) 0LKPPL 3 (INFIRM) 37,69,800TPCIL (INFIRM) 0COASTAL (INFIRM) 0NTPC,KUDGI (INFIRM) 9,38,551NCC (INFIRM) 8,52,079

ANNEXURE

5 of 28

Page 7: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - April-2016 (RTA and RTDA)

4 (a). Details of Deviation Entity Wise in MWHr.

EntityInjectionRateRs/Mwhr

WithdrawalRateRs/Mwhr

ExcessInjectionupto120%

ExcessWithdrawalupto 120%

ExcessInjectionAbove120%(@1.25times)

ExcessWithdrawalAbove120%(@1.25times)

Charges For ExcessInjection/Withdrawalupto 120%

Charges For ExcessInjection/WithdrawalAbove 120%

BeneficiariesANDHRAPRADESH 63.2 240.1 0 0 0 0 0 0

KARNATAKA 240.1 240.1 0 540.63 0 0 129805 0KERALA 63.2 129.5 0 33043.19 0 0 4279093 0TAMIL NADU 195.9 107.4 0 15974.13 0 0 1715622 0TELANGANA 63.2 218 0 5718.85 0 0 1246709 0PUDUCHERRY 63.2 63.2 0 698.92 0 0 44172 0PGCIL(SR) 240.1 240.1 0 0 0 0 0 0GOA(SR) 63.2 63.2 0 4963.06 0 471.1 313665 37217

Inter State Generating StationsRSTPS 1& 2 107.4 218 6995.29 0 0 0 751294 0RSTPS 3 107.4 218 3014.44 0 0 0 323751 0TALCHER 2 240.1 240.1 6370.83 0 0 0 1529636 0SIMHADRI 2 107.4 240.1 1715.83 0 0 0 184280 0NTECL 63.2 107.4 0 0 0 0 0 0NLC 2 UNIT 1 85.3 107.4 6871.03 0 0 0 586099 0NLC 2 UNIT 2 85.3 107.4 7472.9 0 0 0 637438 0NLC 1 EXPN 85.3 107.4 3927.06 0 0 0 334978 0NLC 2 EXPN 85.3 107.4 0 0 0 1102.07 0 147953NTPL 107.4 107.4 0 0 0 129.16 0 17340MAPS 195.9 107.4 0 0 0 0 0 0KAPS 1&2 107.4 240.1 8031.96 0 0 0 862633 0KAPS3&4 107.4 240.1 26205.02 0 0 0 2814419 0KKNPP 107.4 107.4 4541.86 0 0 238.17 487796 31974

SELLERCOASTALENERGEN 129.5 107.4 2232.99 0 34.41 714.8 289172 101532

MEPL 173.8 240.1 290.55 0 7.66 0 50498 1664SEPL 173.8 240.1 2092.86 0 0 0 363739 0TPCIL 173.8 240.1 3083.14 0 0 0 535850 0LKPPL 107.4 240.1 0 0 0.91 814.1 0 244454LKPPL3 107.4 240.1 51.79 0 8.22 21.49 5562 7553IL&FS 129.5 107.4 1803.5 0 117.47 3511.27 233553 490403

Generating Station Under INFIRM StageKKNPP 107.4 -107.4 0 0 0 -6659.931 0 894096ILFS 129.5 -107.4 0 0 100321.742 -2844.974 16239582 381938NTPL 107.4 -107.4 0 0 0 0 0 0NLC 2 EXP 85.3 -107.4 0 0 0 0 0 0LKPPL 3 107.4 -240.1 0 0 26707.935 -613.945 3585540 184260TPCIL 173.8 -240.1 0 0 0 0 0 0COASTAL 129.5 -107.4 0 0 0 0 0 0NTPC,KUDGI 240.1 -240.1 0 0 0 -3127.2 0 938551NCC 63.2 -240.1 0 0 0 -2839.08 0 852079

ANNEXURE

6 of 28

Page 8: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - April-2016 (RTA and RTDA)

4 (b) . Apportioning Long Term Deviation charges on Its Beneificary

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA

NTPCRSTPS 1&2 109052 169433 88277 190476 127736 29986 826 35507

NTPCRSTPS 3 49469 76951 39842 86525 57459 13505 0 0

NTPCTALCHER 2 147763 302231 326577 375398 172849 48795 3059 0

NTPCSIMHADRI2

39551 41702 17423 40910 41848 2847 0 0

NTECLVALLUR 0 0 0 0 0 0 0 0

NLC 2UNIT 1 52748 169674 88325 191164 30673 53515 0 0

NLC 2UNIT 2 74089 183847 85622 225988 56748 11145 0 0

NLC 1 EXP 0 87037 53485 181029 0 13427 0 0NLC 2 EXP 0 0 0 0 0 0 0 0NTPL 0 0 0 0 0 0 0 0MAPS 0 0 0 0 0 0 0 0KAPS 1& 2 114874 265720 74531 238259 135592 33657 0 0KAPS 3&4 398428 937342 223746 687797 469961 97144 0 0KKNPP 24390 107803 64877 274385 0 16341 0 0TOTAL 1010364 2341740 1062705 2491931 1092866 320362 3885 35507

ANNEXURE

7 of 28

Page 9: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - May-2016 (RTA and RTDA)

भारत सरकारGOVERNMENT OF INDIA

उजा मंालयMINISTRY OF POWER

केय वुत ाधकरणCENTRAL ELECTRICITY AUTHORITY

दिण ेीय वुत समतSOUTHERN REGIONAL POWER COMMITTEE

ेीय पारेषण लेखाREGIONAL TRANSMISSION ACCOUNT

May 2016बगलूर

BANGALORE

ANNEXURE

8 of 28

Page 10: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - May-2016 (RTA and RTDA)

1. Details of Transmission Charges towards LToA/MToA

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.23671/MW)

HVDC Charges(Rs.17192/MW)

Total Tr.Charges (Rs.)

Andhra Pradesh 1262.663 289215 365181080 29888496 21707702 41,67,77,278Karnatka (BESCOM) 1187.592 320069 380111384 28111490 20417082 42,86,39,956Karnatka (HESCOM) 483.547 320069 154768405 11446041 8313140 17,45,27,586Karnatka (GESCOM) 340.04 320069 108836263 8049087 5845968 12,27,31,318Karnatka (MESCOM) 199.268 320069 63779509 4716873 3425815 7,19,22,197Karnatka (CESCOM) 274.684 320069 87917833 6502045 4722367 9,91,42,245Kerala 1435.688 134943 193736046 33984171 24682348 25,24,02,565Tamil Nadu 4565.879 104089 475257779 108078922 78496592 66,18,33,293Telangana 1344.035 258360 347244883 31814652 23106650 40,21,66,185Puducherry 400.215 73234 29309345 9473489 6880496 4,56,63,330PGCIL(SR) 5.926 -- 1830208 140274 101880 20,72,362Goa(SR) 93.283 73234 6831487 2208102 1603721 1,06,43,310

Total(SR) 2,68,85,21,625tamilnadu(NETS(ANPARA)) 100 104089 10408900 2367100 1719200 1,44,95,200andhrapradesh(KSK(CHHATISGARH)) 400 289215 115686000 9468400 6876800 13,20,31,200kerala(PTC(BALCO,KORBA)) 100 134943 13494300 2367100 1719200 1,75,80,600tamilnadu(Farakka) 19.305 104089 2009438 456969 331892 27,98,299tamilnadu(Kahalgaon - I) 5.351 104089 556980 126664 91994 7,75,638tamilnadu(Talcher) 8.011 104089 833857 189628 137725 11,61,210telangana(NSL Sugars(Aland) ) 14.174 258360 3661995 335513 243679 42,41,187tamilnadu(Coastal Energen ) 558 104089 58081662 13208418 9593136 8,08,83,216andhrapradesh(NSL Sugars(KoppaUnit),Karnataka) 7.137 289215 2064127 168940 122699 23,55,766

andhrapradesh(NSLSugars(Tungabhadra),Karnataka) 9.343 289215 2702136 221158 160625 30,83,919

andhrapradesh(JSW Power TradingCompany) 167.742 289215 48513503 3970621 2883820 5,53,67,944

tamilnadu(ILFS,Tamilnadu) 540 104089 56208060 12782340 9283680 7,82,74,080tamilnadu(KSK mahanadiltd(Chattisgarh)) 500 104089 52044500 11835500 8596000 7,24,76,000

tamilnadu(BalcoLtd,korba,chattisgarh) 100 104089 10408900 2367100 1719200 1,44,95,200

tamilnadu(Jindal Power(Chattisgarh)) 400 104089 41635600 9468400 6876800 5,79,80,800tamilnadu(DB Power(Chattisgarh)) 208 104089 21650512 4923568 3575936 3,01,50,016telangana(JSW Energy,Karnataka) 167.742 258360 43337823 3970621 2883820 5,01,92,264tamilnadu(Balco Ltd, Korba,Chattisgarh) 100 104089 10408900 2367100 1719200 1,44,95,200

tamilnadu(Dhariwal InfrastructureLtd, Maharashtra ) 100 104089 10408900 2367100 1719200 1,44,95,200

kerala(Maithon Power Ltd-RBTPP) 140.5 134943 18959492 3325776 2415476 2,47,00,744tamilnadu(NSPCL, Bhilai,Chattisgarh) 13.65 104089 1420815 323109 234671 19,78,595

kerala(CSPDCL, Chattisgarh) 297 134943 40078071 7030287 5106024 5,22,14,382telangana(JSW Energy, Karnataka) 125.806 258360 32503238 2977954 2162857 3,76,44,049tamilnadu(IND- BARATH ENERGY,ODISHA) 500 104089 52044500 11835500 8596000 7,24,76,000

tamilnadu(GMR(Maharashtra)) 150 104089 15613350 3550650 2578800 2,17,42,800tamilnadu(Adhunik) 100 104089 10408900 2367100 1719200 1,44,95,200andhrapradesh(Thermal Powertech) 230.55 289215 66678518 5457349 3963616 7,60,99,483karnataka(Mejia(DVC)) 200 320069 64013800 4734200 3438400 7,21,86,400karnataka(Koderma) 250 320069 80017250 5917750 4298000 9,02,33,000telangana(JHAJJAR) 94.75 258360 24479610 2242827 1628942 2,83,51,379

ANNEXURE

9 of 28

Page 11: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - May-2016 (RTA and RTDA)

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.23671/MW)

HVDC Charges(Rs.17192/MW)

Total Tr.Charges (Rs.)

kerala(Mejia-DVC) 94.75 134943 12785849 2242827 1628942 1,66,57,618kerala(Raghunathpur) 46.75 134943 6308585 1106619 803726 82,18,930kerala(PTC (Simhapuri)) 200 134943 26988600 4734200 3438400 3,51,61,200telangana(Shree Cements (SesaSterlite Ltd., Odisha) ) 52 258360 13434720 1230892 893984 1,55,59,596

tamilnadu(Jindal Power(Chattisgarh)) 59.5 104089 6193296 1408425 1022924 86,24,645kerala(PTC India Ltd (Simhapuri)) 100 134943 13494300 2367100 1719200 1,75,80,600

Total(Others) 1,24,12,57,560

ANNEXURE

10 of 28

Page 12: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - May-2016 (RTA and RTDA)

3. Annex-I Entitelment of States From Stations

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA ORISSA TOTAL

NTPC RSTPS1&2 285.437 440.724 241.083 495.287 324.671 77.079 2.156 93.283 0 1959.72

NTPC RSTPS3 72.919 112.558 60.538 125.007 80.333 19.894 0 0 0 471.25

NTPCTALCHERSTPS 2

185.021 367.611 411.571 459.415 209.452 59.66 3.77 0 188.5 1885

NTPCSIMHADRISTPS 2

205.677 202.93 88.208 212.952 223.382 14.35 0 0 0 947.5

NTECLVALLUR STPS 85.815 147.719 46.608 997.728 100.946 20.834 0 0 0 1399.65

NLC STAGE IIUNIT 1 44.292 130.285 75.992 165.743 42.714 62.954 0 0 0 521.98

NLC STAGE IIUNIT 2 82.532 180.202 92.259 249.945 83.319 22.761 0 0 0 711.02

NLC STAGE 1EXP 0 99.621 62.947 206.318 0 15.414 0 0 0 384.3

NLC STAGE 2EXP 0 117.535 75.305 239.168 0 17.992 0 0 0 450

NTPL 129.655 197.059 72.624 393.989 131.469 22.704 0 0 0 947.5NPCIL, MAPSKALPAKKAM 17.025 32.666 20.596 296.695 20.09 6.727 0 0 0 393.8

NPCIL,KAIGA1&2 52.441 121.304 34.024 108.768 61.899 15.365 0 0 0 393.8

NPCIL,KAIGA3 & 4 55.749 131.155 31.307 96.238 65.758 13.593 0 0 0 393.8

NPCIL,KKNPP 46.1 203.762 122.626 518.625 0 30.887 0 0 0 922

4 . Details of Regional Tranmsission Deviation

ANNEXURE

11 of 28

Page 13: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - May-2016 (RTA and RTDA)

Entity Tranmission Deviation Charges Payable (Rs)Andhra Pradesh 2,27,005Karnataka 53,79,582Kerala 43,15,140Tamil Nadu 63,89,610Telangana 14,47,040Puducherry 1,47,720PGCIL(SR) 833Goa(SR) 1,57,281NTPC,RSTPS 1& 2 0NTPC, RSTPS 3 0NTPC, TALCHER 2 0NTPC, SIMHADRI 2 0NTECL, VALLUR 0NLC Stage 2 UNIT 1 0NLC Stage2 UNIT 2 0NLC Stage 1 EXPN 0NLC Stage 2 EXPN 2,47,176NTPL 0NPCIL,KGS 1 & 2 0NPCIL, KGS 3 & 4 6,92,361NPCIL, MAPS 0NPCIL, KKNPP 0

SellerLKPPL STAGE 2 2,13,442LKPPL STAGE 3 2,56,546MEPL 4,07,892SEL 6,07,388TPCIL 9,97,910COASTAL ENERGEN 5,92,598IL&FS 8,84,650

InfirmILFS (INFIRM) 0KKNPP (INFIRM) 11,91,930NTPL(INFIRM) 0NLC 2 EXPN (INFIRM) 0LKPPL 3 (INFIRM) 20,380TPCIL (INFIRM) 0COASTAL (INFIRM) 0NTPC,KUDGI (INFIRM) 12,55,319NCC (INFIRM) 14,74,934

ANNEXURE

12 of 28

Page 14: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - May-2016 (RTA and RTDA)

4 (a). Details of Deviation Entity Wise in MWHr.

EntityInjectionRateRs/Mwhr

WithdrawalRateRs/Mwhr

ExcessInjectionupto120%

ExcessWithdrawalupto 120%

ExcessInjectionAbove120%(@1.25times)

ExcessWithdrawalAbove120%(@1.25times)

Charges For ExcessInjection/Withdrawalupto 120%

Charges For ExcessInjection/WithdrawalAbove 120%

BeneficiariesANDHRAPRADESH 63.2 240.1 0 29.31 0 0 7037 0

KARNATAKA 240.1 240.1 0 19893.59 0 53.83 4776451 16156KERALA 63.2 129.5 0 30732.73 0 0 3979889 0TAMIL NADU 195.9 107.4 0 49978.33 0 48.12 5367673 6460TELANGANA 63.2 218 0 5757.24 0 32.01 1255078 8723PUDUCHERRY 63.2 63.2 0 735.28 0 27.99 46470 2211PGCIL(SR) 240.1 240.1 0 0 0 0 0 0GOA(SR) 63.2 63.2 0 2145.07 0 83.17 135568 6570

Inter State Generating StationsRSTPS 1& 2 107.4 218 2962.03 0 0 0 318122 0RSTPS 3 107.4 218 1125.76 0 0 0 120907 0TALCHER 2 240.1 240.1 1005.3 0 0 0 241373 0SIMHADRI 2 107.4 240.1 400.79 0 0 0 43045 0NTECL 63.2 107.4 0 0 0 0 0 0NLC 2 UNIT 1 85.3 107.4 1831.37 0 0 0 156216 0NLC 2 UNIT 2 85.3 107.4 1608.39 0 0 0 137196 0NLC 1 EXPN 85.3 107.4 1086.3 0 0 0 92661 0NLC 2 EXPN 85.3 107.4 0 0 0 1841.16 0 247176NTPL 107.4 107.4 0 0 0 0 0 0MAPS 195.9 107.4 0 0 0 0 0 0KAPS 1&2 107.4 240.1 0 0 0 0 0 0KAPS3&4 107.4 240.1 2458.82 0 0 2306.91 264077 692361KKNPP 107.4 107.4 10302.29 0 0 0 1106466 0

SELLERCOASTALENERGEN 129.5 107.4 3286.12 0 90.8 1134.8 425553 167045

MEPL 173.8 240.1 1041.6 0 297.35 540.65 181030 226862SEPL 173.8 240.1 3392.29 0 81.97 0 589580 17808TPCIL 173.8 240.1 5697.9 0 35.05 0 990295 7615LKPPL 107.4 240.1 0 0 0.17 711.1 0 213442LKPPL3 107.4 240.1 0.19 0 0 854.73 20 256526IL&FS 129.5 107.4 5283.01 0 116.01 1353.6 684150 200500

Generating Station Under INFIRM StageKKNPP 107.4 -107.4 0 0 0 -8878.434 0 1191930ILFS 129.5 -107.4 0 0 0 0 0 0NTPL 107.4 -107.4 0 0 0 0 0 0NLC 2 EXP 85.3 -107.4 0 0 0 0 0 0LKPPL 3 107.4 -240.1 0 0 0 -67.906 0 20380TPCIL 173.8 -240.1 0 0 0 0 0 0COASTAL 129.5 -107.4 0 0 0 0 0 0NTPC,KUDGI 240.1 -240.1 0 0 0 -4182.654 0 1255319NCC 63.2 -240.1 0 0 0 -4914.4 0 1474934

ANNEXURE

13 of 28

Page 15: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - May-2016 (RTA and RTDA)

4 (b) . Apportioning Long Term Deviation charges on Its Beneificary

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA

NTPCRSTPS 1&2 46335 71543 39135 80400 52704 12512 350 15143

NTPCRSTPS 3 18709 28879 15532 32073 20611 5104 0 0

NTPCTALCHER 2 23692 47072 52701 58828 26820 7639 483 0

NTPCSIMHADRI 2 9344 9219 4007 9674 10148 652 0 0

NTECLVALLUR 0 0 0 0 0 0 0 0

NLC 2 UNIT1 13255 38991 22743 49603 12783 18841 0 0

NLC 2 UNIT2 15925 34771 17802 48229 16077 4392 0 0

NLC 1 EXP 0 24020 15177 49747 0 3717 0 0NLC 2 EXP 0 0 0 0 0 0 0 0NTPL 0 0 0 0 0 0 0 0MAPS 0 0 0 0 0 0 0 0KAPS 1& 2 0 0 0 0 0 0 0 0KAPS 3&4 37385 87951 20994 64536 44096 9115 0 0KKNPP 55323 244529 147160 622387 0 37067 0 0TOTAL 219968 586975 335251 1015477 183239 99039 833 15143

ANNEXURE

14 of 28

Page 16: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - June-2016 (RTA and RTDA)

भारत सरकारGOVERNMENT OF INDIA

उजा मंालयMINISTRY OF POWER

केय वुत ाधकरणCENTRAL ELECTRICITY AUTHORITY

दिण ेीय वुत समतSOUTHERN REGIONAL POWER COMMITTEE

ेीय पारेषण लेखाREGIONAL TRANSMISSION ACCOUNT

June 2016बगलूर

BANGALORE

ANNEXURE

15 of 28

Page 17: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - June-2016 (RTA and RTDA)

1. Details of Transmission Charges towards LToA/MToA

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.23671/MW)

HVDC Charges(Rs.17192/MW)

Total Tr.Charges (Rs.)

Andhra Pradesh 1236.529 289215 357622735 29269878 21258407 40,81,51,020Karnatka (BESCOM) 1206.716 320069 386232383 28564174 20745861 43,55,42,418Karnatka (HESCOM) 491.333 320069 157260462 11630343 8446997 17,73,37,802Karnatka (GESCOM) 345.516 320069 110588961 8178709 5940111 12,47,07,781Karnatka (MESCOM) 202.477 320069 64806611 4792833 3480985 7,30,80,429Karnatka (CESCOM) 279.107 320069 89333498 6606742 4798408 10,07,38,648Kerala 1373.575 134943 185354331 32513894 23614501 24,14,82,726Tamil Nadu 4559.628 104089 474607119 107930954 78389125 66,09,27,198Telangana 1388.796 258360 358809335 32874190 23876181 41,55,59,706Puducherry 410.049 73234 30029528 9706270 7049562 4,67,85,360PGCIL(SR) 5.926 -- 1830208 140274 101880 20,72,362Goa(SR) 93.169 73234 6823139 2205403 1601761 1,06,30,303

Total(SR) 2,69,70,15,753andhrapradesh(KSK(CHHATISGARH)) 200 289215 57843000 4734200 3438400 6,60,15,600kerala(PTC(BALCO,KORBA)) 100 134943 13494300 2367100 1719200 1,75,80,600tamilnadu(Farakka) 19.305 104089 2009438 456969 331892 27,98,299tamilnadu(Kahalgaon - I) 5.351 104089 556980 126664 91994 7,75,638tamilnadu(Talcher) 8.011 104089 833857 189628 137725 11,61,210tamilnadu(Coastal Energen ) 558 104089 58081662 13208418 9593136 8,08,83,216tamilnadu(ILFS,Tamilnadu) 540 104089 56208060 12782340 9283680 7,82,74,080tamilnadu(KSK mahanadiltd(Chattisgarh)) 500 104089 52044500 11835500 8596000 7,24,76,000

tamilnadu(BalcoLtd,korba,chattisgarh) 100 104089 10408900 2367100 1719200 1,44,95,200

tamilnadu(Jindal Power(Chattisgarh)) 400 104089 41635600 9468400 6876800 5,79,80,800tamilnadu(DB Power(Chattisgarh)) 208 104089 21650512 4923568 3575936 3,01,50,016tamilnadu(Balco Ltd, Korba,Chattisgarh) 100 104089 10408900 2367100 1719200 1,44,95,200

tamilnadu(Dhariwal InfrastructureLtd, Maharashtra ) 100 104089 10408900 2367100 1719200 1,44,95,200

kerala(Maithon Power Ltd-RBTPP) 140.5 134943 18959492 3325776 2415476 2,47,00,744tamilnadu(NSPCL, Bhilai,Chattisgarh) 13.65 104089 1420815 323109 234671 19,78,595

kerala(CSPDCL, Chattisgarh) 297 134943 40078071 7030287 5106024 5,22,14,382tamilnadu(IND- BARATH ENERGY,ODISHA) 500 104089 52044500 11835500 8596000 7,24,76,000

tamilnadu(GMR(Maharashtra)) 150 104089 15613350 3550650 2578800 2,17,42,800tamilnadu(Adhunik) 100 104089 10408900 2367100 1719200 1,44,95,200andhrapradesh(Thermal Powertech) 230.55 289215 66678518 5457349 3963616 7,60,99,483karnataka(Mejia(DVC)) 200 320069 64013800 4734200 3438400 7,21,86,400karnataka(Koderma) 250 320069 80017250 5917750 4298000 9,02,33,000kerala(Mejia-DVC) 94.75 134943 12785849 2242827 1628942 1,66,57,618kerala(Raghunathpur) 46.75 134943 6308585 1106619 803726 82,18,930tamilnadu(Jindal Power(Chattisgarh)) 59.5 104089 6193296 1408425 1022924 86,24,645kerala(Kerala (Maithan PowerLimited)) 122 134943 16463046 2887862 2097424 2,14,48,332

kerala(Kerala (Jindal Power Ltd,Stage-2, Chattisgarh)) 165 134943 22265595 3905715 2836680 2,90,07,990

andhrapradesh(Andhra Pradesh(KSKMahanadi Power Company Limited)) 57.833 289215 16726171 1368965 994265 1,90,89,401

andhrapradesh(Andhra Pradesh(KSKMahanadi Power Company Limited)) 2.417 289215 699033 57213 41553 7,97,799

sepl(SEPL (Untied Power)) 205.5 196652 40411986 4864391 3532956 4,88,09,333

ANNEXURE

16 of 28

Page 18: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - June-2016 (RTA and RTDA)

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.23671/MW)

HVDC Charges(Rs.17192/MW)

Total Tr.Charges (Rs.)

tpcil(TPCIL(Untied power)) 413.333 196652 81282761 9784005 7106021 9,81,72,787Total(Others) 1,12,85,34,498

ANNEXURE

17 of 28

Page 19: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - June-2016 (RTA and RTDA)

3. Annex-I Entitelment of States From Stations

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA ORISSA TOTAL

NTPC RSTPS1&2 279.058 458.46 229.837 486.463 332.513 78.066 2.156 93.169 0 1959.72

NTPC RSTPS3 71.381 113.487 57.565 124.627 84.24 19.951 0 0 0 471.25

NTPCTALCHERSTPS 2

178.641 376.088 405.153 460.665 212.241 59.942 3.77 0 188.5 1885

NTPCSIMHADRISTPS 2

199.803 203.003 84.023 212.433 233.251 14.987 0 0 0 947.5

NTECLVALLUR STPS 86.349 147.757 46.608 996.699 101.381 20.855 0 0 0 1399.65

NLC STAGE IIUNIT 1 44.971 136.042 58.454 167.268 47.849 67.397 0 0 0 521.98

NLC STAGE IIUNIT 2 81.728 185.266 81.421 249.957 88.272 24.374 0 0 0 711.02

NLC STAGE 1EXP 0 102.041 61.328 205.528 0 15.404 0 0 0 384.3

NLC STAGE 2EXP 0 117.652 71.94 242.243 0 18.166 0 0 0 450

NTPL 123.284 196.466 68.694 393.419 141.302 24.335 0 0 0 947.5NPCIL, MAPSKALPAKKAM 17.025 32.666 20.596 296.695 20.09 6.727 0 0 0 393.8

NPCIL,KAIGA1&2 52.441 121.304 34.024 108.768 61.899 15.365 0 0 0 393.8

NPCIL,KAIGA3 & 4 55.749 131.155 31.307 96.238 65.758 13.593 0 0 0 393.8

NPCIL,KKNPP 46.1 203.762 122.626 518.625 0 30.887 0 0 0 922

4 . Details of Regional Tranmsission Deviation

ANNEXURE

18 of 28

Page 20: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - June-2016 (RTA and RTDA)

Entity Tranmission Deviation Charges Payable (Rs)Andhra Pradesh 83,931Karnataka 70,19,717Kerala 32,08,873Tamil Nadu 31,34,434Telangana 8,59,905Puducherry 1,30,087PGCIL(SR) 73Goa(SR) 1,09,620NTPC,RSTPS 1& 2 0NTPC, RSTPS 3 0NTPC, TALCHER 2 0NTPC, SIMHADRI 2 0NTECL, VALLUR 0NLC Stage 2 UNIT 1 0NLC Stage2 UNIT 2 0NLC Stage 1 EXPN 0NLC Stage 2 EXPN 61,692NTPL 4,42,186NPCIL,KGS 1 & 2 0NPCIL, KGS 3 & 4 0NPCIL, MAPS 0NPCIL, KKNPP 0

SellerLKPPL STAGE 2 80,460LKPPL STAGE 3 1,01,230MEPL 3,40,676SEL 3,88,284TPCIL 15,76,558COASTAL ENERGEN 5,18,933IL&FS 8,78,555

InfirmILFS (INFIRM) 0KKNPP (INFIRM) 27,80,954NTPL(INFIRM) 0NLC 2 EXPN (INFIRM) 0LKPPL 3 (INFIRM) 0TPCIL (INFIRM) 0COASTAL (INFIRM) 0NTPC,KUDGI (INFIRM) 7,22,396NCC (INFIRM) 17,46,050

ANNEXURE

19 of 28

Page 21: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - June-2016 (RTA and RTDA)

4 (a). Details of Deviation Entity Wise in MWHr.

EntityInjectionRateRs/Mwhr

WithdrawalRateRs/Mwhr

ExcessInjectionupto120%

ExcessWithdrawalupto 120%

ExcessInjectionAbove120%(@1.25times)

ExcessWithdrawalAbove120%(@1.25times)

Charges For ExcessInjection/Withdrawalupto 120%

Charges For ExcessInjection/WithdrawalAbove 120%

BeneficiariesANDHRAPRADESH 63.2 240.1 0 1.5 0 0 360 0

KARNATAKA 240.1 240.1 0 27776.31 0 214.31 6669092 64320KERALA 63.2 129.5 0 23552.95 0 0 3050107 0TAMIL NADU 195.9 107.4 0 23485.53 0 0 2522346 0TELANGANA 63.2 218 0 3736.28 0 0 814509 0PUDUCHERRY 63.2 63.2 0 1283.87 0 43.67 81141 3450PGCIL(SR) 240.1 240.1 0 0 0 0 0 0GOA(SR) 63.2 63.2 0 1408.35 0 222.38 89008 17568

Inter State Generating StationsRSTPS 1& 2 107.4 218 596.22 0 0 0 64034 0RSTPS 3 107.4 218 658.48 0 0 0 70721 0TALCHER 2 240.1 240.1 6.28 0 0 0 1508 0SIMHADRI 2 107.4 240.1 198.51 0 0 0 21320 0NTECL 63.2 107.4 0 0 0 0 0 0NLC 2 UNIT 1 85.3 107.4 319.37 0 0 0 27242 0NLC 2 UNIT 2 85.3 107.4 107.6 0 0 0 9178 0NLC 1 EXPN 85.3 107.4 735.14 0 0 0 62707 0NLC 2 EXPN 85.3 107.4 0 0 0 459.53 0 61692NTPL 107.4 107.4 0 0 0 3293.75 0 442186MAPS 195.9 107.4 0 0 0 0 0 0KAPS 1&2 107.4 240.1 760.28 0 0 0 81654 0KAPS3&4 107.4 240.1 0 0 0 0 0 0KKNPP 107.4 107.4 8347.52 0 0 0 896524 0

SELLERCOASTALENERGEN 129.5 107.4 2931.66 0 60.1 965.02 379650 139283

MEPL 173.8 240.1 1881.96 0 62.56 0 327085 13591SEPL 173.8 240.1 1771.56 0 370.02 0 307897 80387TPCIL 173.8 240.1 9064.89 0 4.97 0 1575478 1080LKPPL 107.4 240.1 0 0 33.98 252.89 0 80460LKPPL3 107.4 240.1 22.19 0 35.91 313.29 2383 98847IL&FS 129.5 107.4 6500.3 0 134.24 112 841789 36766

Generating Station Under INFIRM StageKKNPP 107.4 -107.4 0 0 0 -20714.742 0 2780954ILFS 129.5 -107.4 0 0 0 0 0 0NTPL 107.4 -107.4 0 0 0 0 0 0NLC 2 EXP 85.3 -107.4 0 0 0 0 0 0LKPPL 3 107.4 -240.1 0 0 0 0 0 0TPCIL 173.8 -240.1 0 0 0 0 0 0COASTAL 129.5 -107.4 0 0 0 0 0 0NTPC,KUDGI 240.1 -240.1 0 0 0 -2406.983 0 722396NCC 63.2 -240.1 0 0 6206.109 -4184.146 490283 1255767

ANNEXURE

20 of 28

Page 22: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - June-2016 (RTA and RTDA)

4 (b) . Apportioning Long Term Deviation charges on Its Beneificary

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA

NTPC RSTPS1&2 9118 14980 7510 15895 10865 2551 70 3044

NTPC RSTPS3 10712 17031 8639 18703 12642 2994 0 0

NTPCTALCHER 2 143 301 324 369 170 48 3 0

NTPCSIMHADRI 2 4496 4568 1891 4780 5248 337 0 0

NTECLVALLUR 0 0 0 0 0 0 0 0

NLC 2 UNIT1 2347 7100 3051 8730 2497 3517 0 0

NLC 2 UNIT2 1055 2391 1051 3227 1139 315 0 0

NLC 1 EXP 0 16650 10007 33536 0 2514 0 0NLC 2 EXP 0 0 0 0 0 0 0 0NTPL 0 0 0 0 0 0 0 0MAPS 0 0 0 0 0 0 0 0KAPS 1& 2 10874 25152 7055 22553 12835 3186 0 0KAPS 3&4 0 0 0 0 0 0 0 0KKNPP 44826 198132 119238 504295 0 30034 0 0TOTAL 83571 286305 158766 612088 45396 45496 73 3044

ANNEXURE

21 of 28

Page 23: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - July-2016 (RTA and RTDA)

भारत सरकारGOVERNMENT OF INDIA

उजा मंालयMINISTRY OF POWER

केय वुत ाधकरणCENTRAL ELECTRICITY AUTHORITY

दिण ेीय वुत समतSOUTHERN REGIONAL POWER COMMITTEE

ेीय पारेषण लेखाREGIONAL TRANSMISSION ACCOUNT

July 2016बगलूर

BANGALORE

ANNEXURE

22 of 28

Page 24: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - July-2016 (RTA and RTDA)

1. Details of Transmission Charges towards LToA/MToA

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.26062/MW)

HVDC Charges(Rs.16771/MW)

Total Tr.Charges (Rs.)

Andhra Pradesh 1261.32 345179 435381176 32872522 21153598 48,94,07,296Karnatka (BESCOM) 1236.162 345179 426697163 32216854 20731673 47,96,45,690Karnatka (HESCOM) 503.323 345179 173736530 13117604 8441230 19,52,95,364Karnatka (GESCOM) 353.947 345179 122175072 9224567 5936045 13,73,35,684Karnatka (MESCOM) 207.417 345179 71595993 5405702 3478591 8,04,80,286Karnatka (CESCOM) 285.918 345179 98692889 7451595 4795131 11,09,39,615Kerala 1346.225 146043 196606738 35085316 22577539 25,42,69,593Tamil Nadu 4526.85 112853 510868603 117978765 75919801 70,47,67,169Telangana 1369.412 311989 427241480 35689616 22966409 48,58,97,505Puducherry 403.037 79664 32107540 10503950 6759334 4,93,70,824PGCIL(SR) 5.926 -- 2045531 154443 99385 22,99,359Goa(SR) 93.283 79664 7431297 2431142 1564449 1,14,26,888

Total(SR) 3,00,11,35,273kerala(PTC(BALCO,KORBA)) 100 146043 14604300 2606200 1677100 1,88,87,600tamilnadu(Farakka) 19.305 112853 2178627 503127 323764 30,05,518tamilnadu(Kahalgaon - I) 5.351 112853 603876 139458 89742 8,33,076tamilnadu(Talcher) 8.011 112853 904065 208783 134352 12,47,200tamilnadu(Coastal Energen ) 558 112853 62971974 14542596 9358218 8,68,72,788tamilnadu(ILFS,Tamilnadu) 540 112853 60940620 14073480 9056340 8,40,70,440tamilnadu(KSK mahanadiltd(Chattisgarh)) 500 112853 56426500 13031000 8385500 7,78,43,000

tamilnadu(BalcoLtd,korba,chattisgarh) 100 112853 11285300 2606200 1677100 1,55,68,600

tamilnadu(JindalPower(Chattisgarh)) 400 112853 45141200 10424800 6708400 6,22,74,400

tamilnadu(DBPower(Chattisgarh)) 208 112853 23473424 5420896 3488368 3,23,82,688

tamilnadu(Balco Ltd, Korba,Chattisgarh) 100 112853 11285300 2606200 1677100 1,55,68,600

tamilnadu(DhariwalInfrastructure Ltd,Maharashtra )

100 112853 11285300 2606200 1677100 1,55,68,600

kerala(Maithon Power Ltd-RBTPP) 140.5 146043 20519042 3661711 2356326 2,65,37,079

tamilnadu(NSPCL, Bhilai,Chattisgarh) 13.65 112853 1540443 355746 228924 21,25,113

kerala(CSPDCL, Chattisgarh) 297 146043 43374771 7740414 4980987 5,60,96,172tamilnadu(IND- BARATHENERGY, ODISHA) 500 112853 56426500 13031000 8385500 7,78,43,000

tamilnadu(GMR(Maharashtra)) 150 112853 16927950 3909300 2515650 2,33,52,900tamilnadu(Adhunik) 100 112853 11285300 2606200 1677100 1,55,68,600karnataka(Mejia(DVC)) 200 345179 69035800 5212400 3354200 7,76,02,400karnataka(Koderma) 250 345179 86294750 6515500 4192750 9,70,03,000kerala(Mejia-DVC) 94.75 146043 13837574 2469375 1589052 1,78,96,001kerala(Raghunathpur) 46.75 146043 6827510 1218399 784044 88,29,953tamilnadu(JindalPower(Chattisgarh)) 59.5 112853 6714754 1550689 997875 92,63,318

kerala(Kerala (Maithan PowerLimited)) 122 146043 17817246 3179564 2046062 2,30,42,872

kerala(Kerala (Jindal PowerLtd, Stage-2, Chattisgarh)) 165 146043 24097095 4300230 2767215 3,11,64,540

ANNEXURE

23 of 28

Page 25: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - July-2016 (RTA and RTDA)

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.26062/MW)

HVDC Charges(Rs.16771/MW)

Total Tr.Charges (Rs.)

andhrapradesh(AndhraPradesh(KSK Mahanadi PowerCompany Limited))

347 345179 119777113 9043514 5819537 13,46,40,164

andhrapradesh(AndhraPradesh(KSK Mahanadi PowerCompany Limited))

14.5 345179 5005096 377899 243180 56,26,175

sepl(SEPL (Untied Power)) 411 146043 60023673 10711482 6892881 7,76,28,036tpcil(TPCIL (Untied Power)) 55 179232 9857760 1433410 922405 1,22,13,575andhrapradesh(TPCIL (AndhraPradesh)) 230.55 345179 79581018 6008594 3866554 8,94,56,166

telangana(TPCIL (Telangana-L_16_03)) 269.45 311989 84065436 7022406 4518946 9,56,06,788

telangana(TPCIL (Telangana-L_16_03TS2)) 570 311989 177833730 14855340 9559470 20,22,48,540

Total(Others) 1,49,78,66,902

ANNEXURE

24 of 28

Page 26: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - July-2016 (RTA and RTDA)

3. Annex-I Entitelment of States From Stations

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA ORISSA TOTAL

NTPC RSTPS1&2 286.481 450.41 228.557 487.095 334.907 76.832 2.156 93.283 0 1959.72

NTPC RSTPS3 72.278 115.387 57.274 123.057 84.132 19.121 0 0 0 471.25

NTPCTALCHERSTPS 2

182.299 373.983 402.53 460.556 213.367 59.995 3.77 0 188.5 1885

NTPCSIMHADRISTPS 2

205.547 219.263 81.603 204.403 221.783 14.901 0 0 0 947.5

NTECLVALLUR STPS 85.799 147.483 46.608 997.428 101.477 20.855 0 0 0 1399.65

NLC STAGE IIUNIT 1 49.645 153.201 50.114 162.162 43.531 63.328 0 0 0 521.98

NLC STAGE IIUNIT 2 85.531 207.017 73.257 240.779 80.998 23.436 0 0 0 711.02

NLC STAGE 1EXP 0 106.868 58.939 203.175 0 15.318 0 0 0 384.3

NLC STAGE 2EXP 0 124.282 70.176 237.483 0 18.06 0 0 0 450

NTPL 122.425 199.986 68.613 390.386 141.469 24.62 0 0 0 947.5NPCIL, MAPSKALPAKKAM 17.025 32.666 20.596 296.695 20.09 6.727 0 0 0 393.8

NPCIL,KAIGA1&2 52.441 121.304 34.024 108.768 61.899 15.365 0 0 0 393.8

NPCIL,KAIGA3 & 4 55.749 131.155 31.307 96.238 65.758 13.593 0 0 0 393.8

NPCIL,KKNPP 46.1 203.762 122.626 518.625 0 30.887 0 0 0 922

4 . Details of Regional Tranmsission Deviation

ANNEXURE

25 of 28

Page 27: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - July-2016 (RTA and RTDA)

Entity Tranmission Deviation Charges Payable (Rs)Andhra Pradesh 3,80,360Karnataka 1,09,48,462Kerala 32,76,758Tamil Nadu 22,39,324Telangana 25,95,160Puducherry 2,51,190PGCIL(SR) 240Goa(SR) 3,32,506NTPC,RSTPS 1& 2 0NTPC, RSTPS 3 31,147NTPC, TALCHER 2 0NTPC, SIMHADRI 2 0NTECL, VALLUR 2,29,953NLC Stage 2 UNIT 1 0NLC Stage2 UNIT 2 0NLC Stage 1 EXPN 0NLC Stage 2 EXPN 0NTPL 0NPCIL,KGS 1 & 2 0NPCIL, KGS 3 & 4 0NPCIL, MAPS 0NPCIL, KKNPP 0

SellerLKPPL STAGE 2 1,15,962LKPPL STAGE 3 14,783MEPL 1,69,416SEL 4,83,085TPCIL 6,79,658COASTAL ENERGEN 7,47,228IL&FS 7,45,899

InfirmILFS (INFIRM) 0KKNPP (INFIRM) 31,41,599NTPL(INFIRM) 0NLC 2 EXPN (INFIRM) 0LKPPL 3 (INFIRM) 0TPCIL (INFIRM) 0COASTAL (INFIRM) 0NTPC,KUDGI (INFIRM) 14,84,260NCC (INFIRM) 16,21,020

ANNEXURE

26 of 28

Page 28: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - July-2016 (RTA and RTDA)

4 (a). Details of Deviation Entity Wise in MWHr.

EntityInjectionRateRs/Mwhr

WithdrawalRateRs/Mwhr

ExcessInjectionupto120%

ExcessWithdrawalupto 120%

ExcessInjectionAbove120%(@1.25times)

ExcessWithdrawalAbove120%(@1.25times)

Charges For ExcessInjection/Withdrawalupto 120%

Charges For ExcessInjection/WithdrawalAbove 120%

BeneficiariesANDHRAPRADESH 71.5 269.4 0 0 0 0 0 0

KARNATAKA 71.5 269.4 0 36242.13 0 442.16 9763630 148897KERALA 71.5 145.7 0 19638.21 0 45.07 2861287 8208TAMIL NADU 269.4 96.2 0 8498.92 0 32.29 817596 3883TELANGANA 71.5 244.6 0 9069.99 0 0.52 2218520 159PUDUCHERRY 71.5 71.5 0 1566.6 0 0 112012 0PGCIL(SR) 71.5 269.4 0 0 0 0 0 0GOA(SR) 71.5 96.2 0 3131.44 0 259.32 301245 31183

Inter State Generating StationsRSTPS 1& 2 96.2 244.6 17.02 0 0 0 1637 0RSTPS 3 96.2 244.6 139.63 0 0 101.87 13432 31147TALCHER 2 269.4 269.4 441.94 0 0 0 119059 0SIMHADRI 2 120.9 269.4 165.67 0 0 0 20030 0NTECL 71.5 96.2 0 0 0 1912.29 0 229953NLC 2 UNIT 1 96.2 96.2 11.96 0 0 0 1151 0NLC 2 UNIT 2 96.2 96.2 248.7 0 0 0 23925 0NLC 1 EXPN 96.2 96.2 1447.93 0 0 0 139291 0NLC 2 EXPN 96.2 96.2 0 0 0 0 0 0NTPL 120.9 96.2 0 0 0 0 0 0MAPS 269.4 96.2 0 0 0 0 0 0KAPS 1&2 145.7 269.4 15405.76 0 0 0 2244619 0KAPS3&4 145.7 269.4 0 0 0 0 0 0KKNPP 120.9 96.2 9976.38 0 0 0 1206144 0

SELLERCOASTALENERGEN 145.7 96.2 1981.1 0 180.03 3540.91 288646 458582

MEPL 195.1 269.4 822.95 0 36.32 0 160558 8858SEPL 195.1 269.4 1797.59 0 448.35 68.4 350710 132375TPCIL 170.4 269.4 3986.3 0 1.84 0 679266 392LKPPL 71.5 269.4 0 0 53.08 330.27 0 115962LKPPL3 71.5 269.4 195.04 0 9.38 0 13945 838IL&FS 145.7 96.2 2825.62 0 196.24 2482.04 411693 334206

Generating Station Under INFIRM StageKKNPP 120.9 -96.2 0 0 0 -26125.567 0 3141599ILFS 145.7 -96.2 0 0 0 0 0 0NTPL 120.9 -96.2 0 0 0 0 0 0NLC 2 EXP 96.2 -96.2 0 0 0 0 0 0LKPPL 3 71.5 -269.4 0 0 0 0 0 0TPCIL 170.4 -269.4 0 0 0 0 0 0COASTAL 145.7 -96.2 0 0 0 0 0 0NTPC,KUDGI 71.5 -269.4 0 0 0 -4407.601 0 1484260NCC 71.5 -269.4 0 0 318.327 -4729.236 28450 1592570

ANNEXURE

27 of 28

Page 29: विय क्षेत्रीय पारेण ऱेखा · Karnatka (MESCOM) 210.103 320069 67247457 4973348 3612091 7,58,32,896 Karnatka (CESCOM) 289.62 320069 92698384

Southern Regional Power Committee (SRPC) Secretariat - RTA - July-2016 (RTA and RTDA)

4 (b) . Apportioning Long Term Deviation charges on Its Beneificary

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA

NTPC RSTPS1&2 239 376 191 407 280 64 2 78

NTPC RSTPS3 2060 3289 1632 3507 2398 545 0 0

NTPCTALCHER 2 11514 23621 25424 29089 13477 3789 238 0

NTPCSIMHADRI 2 4345 4635 1725 4321 4688 315 0 0

NTECLVALLUR 0 0 0 0 0 0 0 0

NLC 2 UNIT1 109 338 111 358 96 140 0 0

NLC 2 UNIT2 2878 6966 2465 8102 2725 789 0 0

NLC 1 EXP 0 38735 21363 73641 0 5552 0 0NLC 2 EXP 0 0 0 0 0 0 0 0NTPL 0 0 0 0 0 0 0 0MAPS 0 0 0 0 0 0 0 0KAPS 1& 2 298908 691417 193935 619964 352817 87578 0 0KAPS 3&4 0 0 0 0 0 0 0 0KKNPP 60307 266558 160417 678456 0 40406 0 0TOTAL 380360 1035935 407263 1417845 376481 139178 240 78