Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
BH-16-000304 2
BH-16-000304 2
CH-16-000304 3
CH-16-000304 3
AH-16-000304 1
AH-16-000304 1
DH-16-000304 4
DH-16-000304 4
EH-16-000304 5
EH-16-000304 5
FH-16-000304 6
FH-16-000304 6
HH-16-000304 7
HH-16-000304 7
IH-16-000304 8
IH-16-000304 8
JH-16-000304 9
JH-16-000304 9
90' - 10 1/4"
7' - 0" 14' - 10" 2' - 0" 13' - 0" 4' - 0" 16' - 0" 4' - 0" 20' - 7" 8' - 4 5/8"
13' -
2"
18' -
4"
4' -
0"31
' - 8
"4'
- 0"
11' -
0"
4' -
0"
21' - 10" 4' - 0" 21' - 0" 4' - 0" 14' - 0" 4' - 0" 12' - 7" 8' - 4 5/8"
153'
- 10
"
89' - 9 5/8" (CONCRETE)
SPENT RESIN HANDLING AREA
CLEAN FEED / IX MEDIA
STAGING MAINTENANCE AND LAYDOWN
STAIR TOWER ELECTRICAL ROOM AIRLOCK HVAC ROOM
LAG STORAGEVAULT
LAG-V-01(BELOW)
IX REAGENTVALVE PIT
IX-P-05
IX DELAYTANK PIT
IX-P-06
IX DELAY TANK VALVEMONITORING PIT
IX-P-07
IX VALVE PITIX-P-01
CS TANKPUMP PIT B
ECS-P-02
CS TANKVAULT
ECS-P-01(BELOW)
CS TANKPUMP PIT A
ECS-P-01
DAMPER PITBVV-P-01
CFF PITCFF-P-03
FFT PUMPPIT
CFF-P-02(ABOVE)
FFT TANKVAULT
CFF-V-01(BELOW)
FFT VALVEPIT
CFF-P-01
DEMISTERPIT
PVV-P-01
IX PITIX-P-02
SUMP PUMP SHAFT
SUMP PUMP SHAFT
675' - 0"
675' - 0"
33' -
9" (
CO
NC
RET
E)24
' - 5
" (C
ON
CR
ETE)
4' -
0"
N 41190' - 10"E -46028' - 0"
28' - 4 3/8"
LAG STORAGEMAINTENANCE AREA
1
A
ENCASED WALLBOX TO BECAST IN WITH CONCRETE POUR
ENCASED WALLBOX TO BECAST IN WITH CONCRETE POUR
ENCASED WALLBOX TO BECAST IN WITH CONCRETE POUR
ENCASED WALLBOX TO BECAST IN WITH CONCRETE POUR
ENCASED WALLBOX TO BECAST IN WITH CONCRETE POUR
IX LAGVALVE SKIDWALL BOX (B1)
IX LEADVALVE SKIDWALL BOX (B2)
EXTENT OF VAULT WALL
3 4 4.1 4.2 5 5.1 5.2 5.7 6 6.3 7 7.1 7.9 8 8.2 8.3 8.5 8.6 9
F
E.2
E.5
E
D.6
D
C.4
C.2
C
B.8
B.6
B.2
B
2
A.8
22' -
0"
2' -
5"7'
- 3"
11' -
6"
8' -
8"4'
- 1"
2' -
3"
11' -
8"
16' -
11"
4' -
0 1/
2"
26' -
9 1
/2"
5' -
10"
5"25
' - 4
"
4' -
6"
4' -
11"
43' -
4"
2' - 8"
2' -
4"
1' - 4"
2' -
4"
2' -
10"
34' - 6" 25' - 4" 3' - 0 3/8"
1' - 9 1/8"
1' - 9" 17' - 1"1' - 8 1/2"
3" 14' - 6"5' - 10 1/2" 4' - 7 1/2"
17' - 8 1/2" 3 1/2" 18' - 6 1/2"1' - 9 1/8" 1' - 10 5/8"
10' - 4 3/4" 7' - 10 1/2"
4' - 11 1/2"
12' - 10"
2' - 4"
2' - 9"
ENCASED WALLBOX TO BECAST IN WITH CONCRETE POUR
ENCASED WALLBOX TO BECAST IN WITH CONCRETE POUR
KEYPLAN
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
FIRST FLOOR PLANH-16-000302
1/8" = 1'-0"1 TOC - FIRST FLOOR
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
4' 0 4' 8' 12'
SCALE: 1/8" = 1'-0"
NOTES:
1. GRIDLINE DIMENSIONS ARE FOR REFERENCE ONLY.
2. FOR GENERAL NOTES AND SPECIFICATIONS SEE DRAWING H-16-000301-1.
3. WALLBOX AND ENCASED DRAIN DETAIL DRAWINGS WILL BE PROVIDED BY MECHANICAL AT 90%.
4. STRAIGHT THROUGH PIPE SLEEVE LOCATIONS WILL BE PROVIDED ON DETAIL DRAWINGS AT 90%.
5. FOR LINER PLAN AND EMBEDS SEE DRAWINGS H-16-000295, H-16-000296, AND H-16-000297.
6. FOR STEEL SEE DRAWINGS H-16-000299, H-16-000346, AND H-16-000368.
7.FOR CJ SEE REINFORCING DRAWINGS.
CONCRETE
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
N/A N/A
LAG STORAGE VAULTTOC EL. = 632'-0"
TOC EL. = 632'-0"
TOC EL. = 632'-0"TOC EL. = 632'-0"
TOC EL. = 632'-0" CS TANK VAULTTOC EL. = 632'-0"
TOC EL. = 632'-0"
TYP
2 3 4 5 6 7 8 8.5 9
B
C
C.4
D
E
F
TOC EL. = 632'-0"
31'-
7"30
'-10
"16
'-11
"13
'-11
"31
'-6"
3' - 0 3/8" 20' - 7 1/8" 22' - 4" 22' - 4" 20' - 7 1/8" 20' - 1 7/8" 17' - 9 1/2"
42' - 0"
29'-
4"
115'
-0"
#11 @ 12"TOP & BOT
#11 @ 9"TOP & BOT
#11 @ 12"TOP & BOT
(2)#11 @ 12"TOP & BOT
#11 @ 9"TOP & BOT
(2)#11 @ 9"TOP & BOT
#11 @ 9"TOP & BOT
(2)#11 @ 9"TOP & BOT
(2)#11 @ 9"TOP & BOT
35'-
8"50
'-0"
115'
-0"
126' - 5"
19' - 10" 64' - 7"
1' - 4"
3'-1
0"
1' - 9"
1' - 3 3/8"
10' - 0"
CJ
CJ
5'-1
1"
25' - 4"
5'-1
1"
N 41231'-9"W 46028'-8 5/8"
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
BASEMAT REINFORCING PLANH-16-000303
REINFORCEMENT
REF. DWG. 1/8" = 1'-0"
1 FOUNDATION PLAN-AT TOC EL 632'-0"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
4' 0 4' 8' 12'
SCALE: 1/8" = 1'-0"
TOC - FIRST FLOOR675' - 0"
LAG VAULT632' - 0"
43' -
0"
4' -
0"
4' - 0" 14' - 0" 4' - 0" 15' - 7" 38' - 0" 4' - 0"
4' - 0"34' - 0"19' - 7"4' - 0"21' - 0"4' - 0"14' - 10"3' - 0"
EH-16-000304 5
FH-16-000304 6H
H-16-000304 7I
H-16-000304 8J
H-16-000304 9
88' - 5"
12' - 7"
1' -
0"
43' -
0"
4' -
0"
47' -
0"
47' -
0"
LAG STORAGE VAULTLAG-V-01
CFF PIT(CFF-P-03)
FILTER FEED TANK VAULT(CFF-V-01)
FFT VALVE PIT(CFF-P-01)
DEMISTER PIT(BVV-P-02)
VAULT SUMP CURB
VOIDVOID
FFT PUMP PIT(CFF-P-02)
W12x45SEE NOTE 1
7"
7' - 0"
2' -
0"
18' -
0"
4' - 0" 14' - 0"
8' -
6"
23' -
0"
26' -
0"
7"7"7"
2' -
0"
2' -
0"
2' -
0"
2' -
0"
2' -
0"
W12x30
W12x40SEE NOTE 1
W12x22SEE NOTE 1
W12x26SEE NOTE 1
14' -
0"
14' -
0"
4' - 0"3' - 0"
21' - 0"4' - 0"17' - 10"
3' -
6"
45.00°
TOS
646' - 9 1/2"TOS
664' - 3 1/2"
658' - 9 1/2"
VOID VOID
TOS
TOS
658' - 9 1/2"TOS
672' - 9 1/2"TOS
W18x86SEE NOTE 1
FLOORDRAIN(TO CS)
FLOORDRAIN(TO SUMP)
FLOORDRAIN(TO FFT)
FLOORDRAIN(TO DAMPER)
1/8" / 1'-0"SLOPE (TYP)
W27x146(SHIELDING SUPPORT)SEE NOTE 2
3 4 5 6 7 8
9
14' - 10"
649' - 9 1/2"
1TYP
KEYPLANISO SECTION INSERT7"
TO
9" T
HK.
SH
IELD
PLA
TE
4"
EL 675'-0"
4"X6 1/4" ASTM A36SHIELD BLOCK
6 1/4"GAP1/4"
PIT COVER STEEL, SEEDRAWING H-16-000315
L 6x4x5/16
L 2x2x1/4
L 2x2x1/4
1-121/4
1-121/4
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION AH-16-000304 1
REF. DWG. 1/4" = 1'-0" H-16-000302A SECTION A - LOOKING NORTH
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
CONCRETEH-16-000302 CONCRETE - FIRST FLOOR PLAN
1 1/2" = 1'-0"1 DETAIL - PERIMETER SHIELDING BLOCK
NOTES:
1. DECKING SUPPORT FRAMING, SEE DRAWING H-16-000299.
2. PIT COVER SUPPORT FRAMING, SEE DRAWING H-16-000346.
N/A N/A
TOC - FIRST FLOOR675' - 0"
LAG VAULT632' - 0"
EH-16-000304 5
FH-16-000304 6
HH-16-000304 7
IH-16-000304 8
JH-16-000304 9
VOID
IX VALVE PIT(IX-P-01)
IX PIT(IX-P-02)
CS TANK VAULTECS-V-01
DAMPER PIT(BVV-P-01)
VOID
1' -
0"
43' -
0"
4' -
0"
47' -
0"
126' - 5"
21' -
4"
3' -
0"
24' -
4"
18' -
8"
4' -
0"
47' -
0"
4' - 0"24' - 0"4' - 0"13' - 0"2' - 0"17' - 10"4' - 0"
LAG STORAGE VAULTLAG-V-01
VAULT SUMP CURB
CS TANK PUMP PIT A/B(ECS-P-01)
7"
8' -
0"
21' -
4"
VOID
2' -
0"
12' - 7" 3' - 0"
15' - 10"
9"7"
11' -
0"
2' -
0"
14' - 10"
W12x30SEE NOTE 1
W10x22SEE NOTE 1
W18x55SEE NOTE 1
W12x26SEE NOTE 1
4' -
0"
4' - 0"
3' - 0"
106' - 7"
2' -
0"
TOS
TOS
TOS
672' - 9 1/2"TOS
TOS
664' - 9 1/2"
659' - 9 1/2"
FLOOR DRAIN(TO IX PIT)
FLOOR DRAIN(TO CS VAULT) FLOOR DRAIN
(TO CS VAULT)
20' -
2"
FLOOR DRAIN(TO CS VAULT)
ENCASED WALL BOX TO BECAST IN CONCRETE POUR
652' - 9 1/2"
1/8" / 1'-0"SLOPE (TYP)
3 4 4.1 4.2 5 5.1 5.2 5.7 6 6.3 7 7.1 7.9 8 8.2 8.3 8.5 8.6 9
12' - 10"4' - 11 1/2"7' - 10 1/2"10' - 4 3/4"
1' - 10 5/8"
1' - 9 1/8"18' - 6 1/2"3 1/2"
17' - 8 1/2"4' - 7 1/2"5' - 10 1/2"14' - 6"3"17' - 1"1' - 9"
1' - 9 1/8"
3' - 0 3/8"
2' - 8"
651' - 5 1/2"
4' - 0"34' - 0"
H-16-000304 11
-
W16x86SEE NOTE 1
KEYPLANISO SECTION INSERT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION BH-16-000304 2
REF. DWG. 1/4" = 1'-0" H-16-000302B SECTION B - LOOKING NORTH
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
CONCRETEH-16-000302 CONCRETE - FIRST FLOOR PLAN
NOTES:
1. DECKING SUPPORT FRAMING, SEE DRAWING H-16-000299.
N/A N/A
TOC - FIRST FLOOR675' - 0"
LAG VAULT632' - 0"
EH-16-000304 5
FH-16-000304 6
HH-16-000304 7
IH-16-000304 8
JH-16-000304 9
VOID
IX REAGENT VALVE PIT(IX-P-05)
IX DELAY TANK PIT(IX-P-06)
IX DELAY TANK VALVEAND MONITORING PIT
(IX-P-07)
VOID VOID
43' -
0"
4' -
0"
47' -
0"
3' -
0"22
' - 8
"
36' - 7 3/8"23' - 7"
2' -
0"19
' - 4
"
4' - 0" 15' - 10" 4' - 0" 13' - 0" 4' - 0" 16' - 0" 4' - 0" 61' - 7" 4' - 0"
LAG STORAGE VAULTLAG-V-01
126' - 5"
4' - 0"
8' -
0"
3' - 0"
2' -
0"
2' - 0" 13' - 0" 4' - 0" 4' - 0"
W12x16SEE NOTE 1W10x19
SEE NOTE 1
21' -
4"
664' - 9 1/2"TOS
TOS664' - 9 1/2"
672' - 9 1/2"TOS
672' - 9 1/2"TOS
W12x16SEE NOTE 1
7"
W18x86SEE NOTE 1
FLOOR DRAIN(TO IX PIT)
FLOOR DRAIN(TO CS PIT)1/8" / 1'-0"
SLOPE (TYP)
3 4 4.1 4.2 5 5.1 5.2 5.7 6 6.3 7 7.1 7.9 8 8.2
8.3 8.5 8.6 9
2' - 8"
12' - 10"4' - 11 1/2"7' - 10 1/2"10' - 4 3/4"
1' - 10 5/8"
1' - 9 1/8"18' - 6 1/2"3 1/2"17' - 8 1/2"4' - 7 1/2"5' - 10 1/2"14' - 6"3"1' - 8 1/2"17' - 1"1' - 9"
1' - 9 1/8"
3' - 0 3/8"
17' - 10"
16' - 0"
34' - 0"4' - 0"
H-16-000304 11
-
KEYPLANISO SECTION INSERT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION CH-16-000304 3
REF. DWG. 1/4" = 1'-0" H-16-000302C SECTION C - LOOKING NORTH
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
CONCRETE
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
H-16-000302 CONCRETE - FIRST FLOOR PLAN
NOTES:
1. DECKING SUPPORT FRAMING, SEE DRAWING H-16-000299.
N/A N/A
TOC - FIRST FLOOR675' - 0"
LAG VAULT632' - 0"
EH-16-000304 5
FH-16-000304 6
HH-16-000304 7
IH-16-000304 8
JH-16-000304 9
47' -
0"
42' - 0"
LAG STORAGE VAULTLAG-V-01
4' -
0"
2' -
0"
4' - 0"
672' - 9 1/2"TOS
W18X86SEE NOTE 1
4 4.1 4.2 5 5.1 5.2 5.7 6 6.3 7 7.1 7.9 8 8.2
8.3 8.5 8.6 9
6' -
0"
KEYPLAN
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION DH-16-000304 4
REF. DWG. 1/4" = 1'-0" H-16-000302D SECTION D - LOOKING NORTH
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
CONCRETEH-16-000302 CONCRETE - FIRST FLOOR PLAN
NOTES:
1. DECKING SUPPORT FRAMING, SEE DRAWING H-16-000299.
N/A N/A
TOC - FIRST FLOOR675' - 0"
LAG VAULT632' - 0"
BH-16-000304 2
CH-16-000304 3
AH-16-000304 1
DH-16-000304 4
4' - 0" 35' - 0" 1' - 0" 35' - 0" 1' - 0" 35' - 0" 4' - 0"
115' - 0"
4' - 0" 107' - 0" 4' - 0"
1' -
0"
4' -
0"
LAG STORAGE VAULTLAG-V-01
VAULT CONTAINMENT CURB
1/16" / 1'-0"SLOPE (TYP)
1/16" / 1'-0"SLOPE (TYP)
F E.2 E.5 E D.6 D C.4 C.2 C B.8 B.6 B.2
11' - 6"8' - 8"4' - 1"2' - 3"11' - 8"16' - 11"4' - 0 1/2"26' - 9 1/2"5' - 10"5"25' - 4"2' - 8"
W18x86 TYPSEE NOTE 1
1' - 6"
1' -
7 3/
8"
BEAM POCKET EMBED PLATESEE DRAWING H-16-000TBD)
KEYPLANISO SECTION INSERT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION EH-16-000304 5
REF. DWG. 1/4" = 1'-0" H-16-000302E SECTION E - LOOKING WEST
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
CONCRETEH-16-000302 CONCRETE - FIRST FLOOR PLAN
NOTES:
1. DECKING SUPPORT FRAMING, SEE DRAWING H-16-000299.
N/A N/A
TOC - FIRST FLOOR675' - 0"
LAG VAULT632' - 0"
BH-16-000304 2
CH-16-000304 3
AH-16-000304 1
DH-16-000304 4
43' -
0"
4' -
0"
47' -
0"
21' -
4"
3' -
0"18
' - 8
"
86' - 2"
13' - 2" 18' - 4" 4' - 0" 31' - 8" 4' - 0" 11' - 0" 4' - 0" 0"
VOID
VOID VOID
DEMISTER PITBVV-P-02
DAMPER PITBVV-P-01
43' -
0"
4' -
0"
80' - 0"
14' -
0"
2' -
0"
7"
2' -
0"
3' - 0"4' - 0"
658' - 9 1/2"
TOS
W12X26SEE NOTE 1
652' - 9 1/2"TOS
W12X26SEE NOTE 1
7"
672' - 9 1/2"TOS
W12X16SEE NOTE 1
FLOOR DRAINCAST IN FLOOR(TO DAMPER)
20' -
0"
FLOOR DRAIN(TO CS VAULT)
1/8" / 1'-0"SLOPE (TYP)
F E.2 E.5 E D.6 D C.4 C.2 C B.8 B.6 B.2 B A.8
3' -
0"
H-16-000304 11
-
KEYPLANISO SECTION INSERT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION FH-16-000304 6
REF. DWG. 1/4" = 1'-0" H-16-000302F SECTION F - LOOKING WEST
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
CONCRETE
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
H-16-000302 CONCRETE - FIRST FLOOR PLAN
NOTES:
1. DECKING SUPPORT FRAMING, SEE DRAWING H-16-000299.
N/A N/A
TOC - FIRST FLOOR675' - 0"
LAG VAULT632' - 0"
BH-16-000304 2
CH-16-000304 3
AH-16-000304 1
DH-16-000304 4
43' -
0"
4' -
0"
47' -
0"
21' -
4"
3' -
0"18
' - 8
"
80' - 0"
VOID
DELAY TANKMONITORING
PITIX-P-07
CS TANK PUMP PIT BIX-P-04
FFT VALVE PITCFF-P-01
CS TANK PUMP PIT AECS-P-01
CS TANK VAULTECS-V-01
80' - 0"
VOID
4' - 0" 3' - 0" 18' - 4" 4' - 0" 4' - 0" 11' - 0"
14' -
0"
2' -
0"
11' -
0"
4' -
0"
8' -
0"2'
- 0"
7" 7"
W12X22SEE NOTE 1658' - 9 1/2"
TOS
14' - 10"2' - 0"14' - 10"
W18X55SEE NOTE 1
659' - 9 1/2"TOS
W12X16SEE NOTE 1
664' - 9 1/2"TOS
FLOOR DRAIN(TO CS VAULT)
FLOOR DRAIN(TO CS VAULT) FLOOR DRAIN
(TO CS VAULT)
FLOOR DRAIN(CS PUMP PIT B)
1/8" / 1'-0"SLOPE (TYP)
F E.2 E.5 E D.6 D C.4 C.2 C B.8 B.6 B.2 B A.8
1' -
6 1/
8"
H-16-000304 11
KEYPLANISO SECTION INSERT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION HH-16-000304 7
REF. DWG. 1/4" = 1'-0" H-16-000302H SECTION H - LOOKING WEST
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
CONCRETE
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
H-16-000302 CONCRETE - FIRST FLOOR PLAN
NOTES:
1. DECKING SUPPORT FRAMING, SEE DRAWING H-16-000299.
N/A N/A
TOC - FIRST FLOOR675' - 0"
TOC - FIRST FLOOR675' - 0"
BH-16-000304 2
CH-16-000304 3
AH-16-000304 1
DH-16-000304 4
47' -
0"
21' -
4"
3' -
0"
80' - 0"
IX DELAY TANKPIT
IX-P-06IX PITIX-P-02
FFT PUMP PITCFF-P-02
FFT TANKVAULT
CFF-V-01
4' -
0"
80' - 0"
VOID
8' -
6"2'
- 0"
26' -
0"
2' -
0"
7" 7"
4' - 0" 3' - 0" 18' - 4" 4' - 0" 31' - 8" 4' - 0" 11' - 0" 4' - 0"
9"
21' -
4"
2' -
0"
664' - 3 1/2"TOS
W12X45SEE NOTE 1
646' - 9 1/2"TOS
W12X40SEE NOTE 1
651' - 5 1/2"
VOID
TOS
W12X40SEE NOTE 1
FLOOR DRAIN(TO FFT VAULT)
FLOOR DRAIN(TO CS VAULT)
FLOOR DRAIN(IX PIT)
ENCASED WALL BOX TO BECAST IN WITH CONCRETE POUR
1/8" / 1'-0"SLOPE (TYP)
F E.2 E.5 E D.6 D C.4 C.2 C B.8 B.6 B.2 B A.8
W27X146SEE NOTE 2
674' - 5"TOS
H-16-000304 11
-
SEE NOTE 3FOR FRAMING INTHIS AREA
KEYPLANISO SECTION INSERT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION IH-16-000304 8
REF. DWG. 1/4" = 1'-0" H-16-000302I SECTION I - LOOKING WEST
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
CONCRETE
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
H-16-000302 CONCRETE - FIRST FLOOR PLAN
NOTES:
1. DECKING SUPPORT FRAMING, SEE DRAWING H-16-000299.
2. PIT COVER SUPPORT FRAMING SEE DRAWING H-16-000346.
3. EQUIPMENT SUPPORT STEEL SEE DRAWING H-16-000368.
N/A N/A
TOC - FIRST FLOOR675' - 0"
LAG VAULT632' - 0"
BH-16-000304 2
CH-16-000304 3
AH-16-000304 1
DH-16-000304 4
43' -
0"
4' -
0"
47' -
0"
21' -
4"
3' -
0"18
' - 8
"
IX REAGENT VALVEPIT
IX-P-05
VOID
CFF PITCFF-P-03
IX VALVE PITIX-P-01
VOID
VOID
80' - 0"
23' -
0"
2' -
0"
4' - 0" 3' - 0" 18' - 4" 4' - 0" 31' - 8" 4' - 0" 11' - 0"
7" 7" 7"
8' -
0"2'
- 0"
8' -
0"2'
- 0"
649' - 9 1/2"TOS
W12X30SEE NOTE 1
TOS
W12X30SEE NOTE 1664' - 9 1/2"
W10X19SEE NOTE 1
664' - 9 1/2"TOS
F E.2 E.5 E D.6 D C.4 C.2 C B.8 B.6 B.2 B A.8
1' -
0 3/
8"
1' - 0"
1' - 0"
1' -
0 3/
8"
H-16-000304 11
-
KEYPLANISO SECTION INSERT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION JH-16-000304 9
REF. DWG. 1/4" = 1'-0" H-16-000302J SECTION J - LOOKING WEST 2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
CONCRETE
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KL SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
H-16-000302 CONCRETE - FIRST FLOOR PLAN
NOTES:
1. DECKING SUPPORT FRAMING, SEE DRAWING H-16-000299.
N/A N/A
1 2 3 4 5 6 7 8 8.5 9
B
C
C.4
D
E
F
LAG STORAGE VAULTLAG-V-01
IX REAGENTVALVE PIT
IX-P-05
IX DELAYTANK PIT
IX-P-06
IX DELAY TANKVALVE
MONITORING PITIX-P-07
CS TANKPUMP PIT B
ECS-P-02
CS TANKPUMP PIT A
ECS-P-01
DAMPER PITBVV-P-01
CFF PITCFF-P-03
FFT PUMPPIT
CFF-P-02(ABOVE)
FFT VALVEPIT
CFF-P-01
DEMISTER PITBVV-P-01
IX PITIX-P-02
IX VALVE PITIX-P-01
3' - 0 3/8" 20' - 7 1/8" 22' - 4" 22' - 4" 20' - 7 1/8" 20' - 1 7/8" 17' - 9 1/2"
31'-
6"13
'-11
"16
'-11
"30
'-10
"31
'-7"
25' - 4"34' - 6"
AH-16-000395 11
BH-16-000395 11
CH-16-000395 11
DH-16-000395 11
EH-16-000395 11
FH-16-000395 11
GH-16-000395 11
HH-16-000395 11
JH-16-000395 11
KH-16-000395 11
LH-16-000395 11
MH-16-000395 11
8'-0
"13
'-1"
14'-
0"52
'-7"
8'-0
"
95'-
8"
2'-4
"
8' - 0" 44' - 4" 12' - 0"
8' - 0" 16' - 4 3/8" 12' - 0"
2' - 4"
2'-4
"
6' - 0"
26'-
9"
8'-3
"
5'-1
1"10
'-1"
33'-
9"24
'-5"
2' - 4" 2' - 8"
6'-0
"
2' - 9"
HH-16-000395 11
SIM
3' - 1 1/2"
CORBEL
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
CONCRETE GRADE BEAM PLANH-16-000305
REINFORCEMENT
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
REF. DWG. 1/8" = 1'-0"
1 GRADE BEAM PLAN - BOC ELEVATION 669'-0"
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW DC KL SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
4' 0 4' 8' 12'
SCALE: 1/8" = 1'-0"
BH-16-000395 2
CH-16-000395 3
AH-16-000395 1
DH-16-000395 4
EH-16-000395 5
FH-16-000395 6
HH-16-000395 7
IH-16-000395 8
JH-16-000395 9
LAG STORAGE VAULTLAG-V-01(BELOW)
FFT PUMP PITTOC EL. = 666'-6"
FFT VALVE PITTOC EL. = 661'-0"
DEMISTER PITTOC EL. = 661'-0"
CS TANK PUMP PIT BTOC EL. = 664'-0"
TOC EL. = 667'-0"
IX REAGENT VALVE PITTOC EL. = 667'-0"
DELAY TANKMONITORING PITTOC EL. = 667'-0"
CS TANK PUMP PIT ATOC EL. = 664'-0"
BH-16-000395 4
3 4 5 6 7 8 8.5 9
B
C
C.4
D
E
F
3' - 0 3/8" 20' - 7 1/8" 22' - 4" 22' - 4" 20' - 7 1/8" 20' - 1 7/8" 17' - 9 1/2"
31'-
7"30
'-10
"16
'-11
"13
'-11
"31
'-6"
17' - 10" 2' - 0" 13' - 0" 4' - 0" 16' - 0" 4' - 0" 23' - 7"
4' - 0" 34' - 0" 4' - 0"
1' - 4"2' - 8 5/8"
6'-2
"4'
-0"
21'-
4"4'
-0"
31'-
8"4'
-0"
11'-
0"4'
-0"
80'-
0"
3'-1
0"1'
-7"
2'-5
"6"
115'
-0"
4'-0
"10
7'-0
"4'
-0"
AH-16-000395 4
BH-16-000395 4
BH-16-000395 4
AH-16-000395 4
#9@12" T&B
#9@12" T&B
#9@12" T&B#9@12" T&B
#9@12" T&B
#11@12" T&B
#9@12" T&B#9@12" T&B
#9@12" T&B#9@12" T&B
#9@12" T&B
#11@12" T&B
#9@12" T&B #9@12" T&B
IX VALVE PIT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
INTERMEDIATE FLOOR PLANH-16-000306
REINFORCEMENT
REF. DWG. 1/8" = 1'-0"1 UPPER LEVEL INTERMEDIATE FLOOR PLAN ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
4' 0 4' 8' 12'
SCALE: 1/8" = 1'-0"
LAG STORAGEMAINTENANCE
FLOOR
IX REAGENTVALVE PIT
IX-P-05
IX DELAYTANK PIT
IX-P-06
IX DELAY TANKMONITORING PIT
IX-P-07
CS TANKPUMP PIT B
ECS-P-02
CS TANKPUMP PIT A
ECS-P-01
DAMPER PITBVV-P-01
CFF PITCFF-P-03
FFT TANKVAULT
CFF-P-02
FFT VALVEPIT
CFF-P-01
DEMISTER PITBVV-P-01
IX PITIX-P-02
IX VALVE PITIX-P-01
W48C
1 2 4 5 6 7 8 8.5 9
B
C
C.4
D
E
F
20' - 7 1/8" 22' - 4" 22' - 4" 20' - 7 1/8" 20' - 1 7/8" 17' - 9 1/2"
31'-
6"13
'-11
"16
'-11
"30
'-10
"31
'-7"
34' - 6"
#11@9"TOP&BOT
#11@12"TOP&BOT
#11@9"TOP&BOT
#11@12"TOP&BOT
#7@ 12" EW, T&B
#7@ 12" EW, T&B
#7@ 12" EW, T&B
#7@ 12" EW, T&B
#7@ 12" EW, T&B
4'-1
1"
NEW DIM 2'-4"
2'-4
"2'
-10"
#11 @ 12"TOP & BOT
#11 @ 12"TOP & BOT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
FIRST FLOOR PLANH-16-000307
REINFORCEMENT
REF. DWG. 1/8" = 1'-0"1 FOUNDATION & FLOOR PLAN-AT TOC EL 675'-0"
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 04/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
N 41231'-9"
W 46026'-8 5/8"
4' 0 4' 8' 12'
SCALE: 1/8" = 1'-0"
LAG STORAGE VAULT LAG-V-01(BELOW)
CFF PITTOC EL. = 652'-0"
FFT TANK VAULTTOC EL. = 649'-0"
TOC EL. = 654'-10"
TOC EL. = 653'-8"
3 4 5 6 7 8 8.5 9
B
C
C.4
D
E
F
#9@12"TOP&BOT
#9@12"TOP&BOT
#9@12"TOP&BOT
#9@12"TOP&BOT
#9@12"TOP&BOT
#11@12"TOP&BOT
#9@12"TOP&BOT
#9@12"TOP&BOT
#11@12"TOP&BOT
#9@12"TOP&BOT
#11@12"TOP&BOT
#11@12"TOP&BOT
#11@12"TOP&BOT
#11@12"TOP&BOT
#11@12"TOP&BOT#11@12"TOP&BOT
#11@12"TOP&BOT
#11@12"TOP&BOT
#11@12"TOP&BOT
TOC EL. = 653'-8" TOC EL. = 653'-8" TOC EL. = 653'-8"
TOC EL. = 653'-8" TOC EL. = 653'-8"
3' - 0 3/8" 20' - 7 1/8" 22' - 4" 22' - 4" 20' - 7 1/8" 20' - 1 7/8" 17' - 9 1/2"
3'-1
0"27
'-9"
30'-
10"
16'-
11"
13'-
11"
25'-
7"5'
-11"
1' - 3 3/8"
IX PIT DAMPER PIT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
INTERMEDIATE FLOOR PLANH-16-000308
REINFORCEMENT
REF. DWG. 1/8" = 1'-0"
1
LOWER LEVEL INTERMEDIATE FLOOR PLAN AND FOUNDATION PLAN AT TOCEL 653'-8"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
4' 0 4' 8' 12'
SCALE: 1/8" = 1'-0"
IX DELAY TANK PIT
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SCHEDULEH-16-000313
EQUIPMENT EMBED SCHEDULE
REF. NO. Family WIDTH LENGTH THICKNESSSTUD
HEIGHT COMMENTSROOM
NO. MATERIAL ELEVATION REF. DWG NO.
IX-P-01_11 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_12 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_13 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_14 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_15 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_16 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_17 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_18 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_19 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_20 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_21 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_22 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_23 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_24 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_25 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_26 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_27 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295IX-P-01_28 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295IX-P-01_29 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295IX-P-01_30 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295IX-P-01_31 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295IX-P-01_32 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295IX-P-01_33 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295IX-P-05_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-05_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-05_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-05_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-05_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-05_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-05_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-06_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-06 304L SS 653' - 8 1/4" H-16-000295IX-P-06_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-06 304L SS 653' - 8 1/4" H-16-000295IX-P-06_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-06 304L SS 653' - 8 1/4" H-16-000295IX-P-06_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-06 304L SS 653' - 8 1/4" H-16-000295IX-P-06_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-06 304L SS 653' - 8 1/4" H-16-000295IX-P-06_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-06 304L SS 653' - 8 1/4" H-16-000295IX-P-06_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-06 304L SS 653' - 8 1/4" H-16-000295IX-P-06_08 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-06 304L SS 653' - 8 1/4" H-16-000295IX-P-07_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_08 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_09 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_10 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_11 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_12 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_13 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295IX-P-07_14 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-07 304L SS 667' - 0 1/4" H-16-000295LAG-V-01_01 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_02 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_03 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_04 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_05 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_06 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_07 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_08 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_09 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_10 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_11 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_12 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_13 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_14 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_15 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_16 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_17 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_18 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_19 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_20 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_21 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_22 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_23 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297LAG-V-01_24 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP LAG-V-01 304L SS 632' - 0 1/4" H-16-000297
EQUIPMENT EMBED SCHEDULE
REF. NO. Family WIDTH LENGTH THICKNESSSTUD
HEIGHT COMMENTSROOM
NO. MATERIAL ELEVATION REF. DWG NO.
CFF-P-01_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295CFF-P-01_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295CFF-P-01_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295CFF-P-01_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295CFF-P-01_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295CFF-P-01_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295CFF-P-01_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295CFF-P-01_08 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 304L SS 661' - 0 1/4" H-16-000295CFF-P-02_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-02 ASTM A36 CS 666' - 6 1/4" H-16-000295CFF-P-02_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-02 ASTM A36 CS 666' - 6 1/4" H-16-000295CFF-P-02_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-01 ASTM A36 CS 661' - 0 1/4" H-16-000295CFF-P-02_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-02 ASTM A36 CS 666' - 6 1/4" H-16-000295CFF-P-02_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-02 ASTM A36 CS 666' - 6 1/4" H-16-000295CFF-P-02_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-02 ASTM A36 CS 666' - 6 1/4" H-16-000295CFF-P-02_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-02 ASTM A36 CS 666' - 6 1/4" H-16-000295CFF-P-02_08 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-02 ASTM A36 CS 666' - 6 1/4" H-16-000295CFF-P-02_09 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-02 ASTM A36 CS 666' - 6 1/4" H-16-000295CFF-P-02_10 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-02 ASTM A36 CS 666' - 6 1/4" H-16-000295CFF-P-03_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_08 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_09 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_10 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_11 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 652' - 0 1/4" H-16-000295CFF-P-03_12 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP CFF-P-03 304L SS 666' - 6 1/4" H-16-000295CFF-V-01_01 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP CFF-V-01 304L SS 649' - 0 1/4" H-16-000296CFF-V-01_02 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP CFF-V-01 304L SS 649' - 0 1/4" H-16-000296CFF-V-01_03 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP CFF-V-01 304L SS 649' - 0 1/4" H-16-000296CFF-V-01_04 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP CFF-V-01 304L SS 649' - 0 1/4" H-16-000296CFF-V-01_05 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP CFF-V-01 304L SS 649' - 0 1/4" H-16-000296CFF-V-01_06 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP CFF-V-01 304L SS 649' - 0 1/4" H-16-000296CFF-V-01_07 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP CFF-V-01 304L SS 649' - 0 1/4" H-16-000296CFF-V-01_08 EP_20x20x1 1' - 8" 1' - 8" 0' - 1" 0' - 9" EP CFF-V-01 304L SS 649' - 0 1/4" H-16-000296ECS-P-01_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-01 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-01 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_08 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_09 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-01 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_10 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-01 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_11 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_12 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_13 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-01 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_14 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-01 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_15 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-01 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-01_16 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-01 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_08 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_09 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_10 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 ASTM A36 CS 664' - 0 1/4" H-16-000295ECS-P-02_11 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 304L SS 664' - 0 1/4" H-16-000295ECS-P-02_12 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-P-02 304L SS 664' - 0 1/4" H-16-000295ECS-V-01_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-V-01 304L SS 632' - 0 1/4" H-16-000296ECS-V-01_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-V-01 304L SS 632' - 0 1/4" H-16-000296ECS-V-01_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-V-01 304L SS 632' - 0 1/4" H-16-000296ECS-V-01_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-V-01 304L SS 632' - 0 1/4" H-16-000296ECS-V-01_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-V-01 304L SS 632' - 0 1/4" H-16-000296ECS-V-01_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-V-01 304L SS 632' - 0 1/4" H-16-000296ECS-V-01_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-V-01 304L SS 632' - 0 1/4" H-16-000296ECS-V-01_08 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP ECS-V-01 304L SS 632' - 0 1/4" H-16-000296IX-P-01_01 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_02 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_03 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_04 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_05 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_06 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_07 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_08 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_09 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295IX-P-01_10 EP_12x12x1 1' - 0" 1' - 0" 0' - 1" 0' - 7" EP IX-P-01 304L SS 667' - 0 1/4" H-16-000295
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
DS JK SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17 0901
EMBED
CONSTRUCTION DM 04/10/17
HOLD 1
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL EVALUATION 90
NOTES:
1. FOR GENERAL NOTES SEE DRAWING H-16-000301-1.
2. FOR PLATE DETAILS SEE H-16-000314.
3. FOR ORIENTATION OF RECTANGULAR PLATES, SEE REFERENCE DRAWING PER SCHEDULE.
N/A N/A
EP EMBED PLATE
LEGEND
FACE OF PLATE
7 3/16"
1' - 0"
1' -
0"
1"
(4) 3/4" x 7 3/16" LONG HEADED STUD(SEE NOTE 3) WELDED TO STEEL PLATE
EMBED DATUM POINT(SCHEDULED DIMS)
EMBED DATUM POINT(SCHEDULED DIMS)
8"
8"TYP2" 1/2" (TYP)
1/2"
(TYP
)
(4) 1/4" DIA NAIL HOLES
FACE OF PLATE
7 3/16"
1' - 3"
1' -
8"
1"
(6) 3/4" x 7 3/16" LONG HEADEDSTUD (SEE NOTE 3) WELDED TOSTEEL PLATE
EMBED DATUM POINT(SCHEDULED DIMS)
EMBED DATUM POINT(SCHEDULED DIMS)
8"
11"TYP2" 1/2" (TYP)
1/2"
(TYP
)
(4) 1/4" DIA NAIL HOLES
FACE OF PLATE
7 3/16"
1' - 8"
1' -
8"
1"
(9) 3/4" x 7 3/16" LONG HEADEDSTUD (SEE NOTE 3) WELDED TOSTEEL PLATE
EMBED DATUM POINT(SCHEDULED DIMS)
EMBED DATUM POINT(SCHEDULED DIMS)
8"
8"TYP2" 1/2" (TYP)
1/2"
(TYP
)
(4) 1/4" DIA NAIL HOLES
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
MISC. EMBED PLATE DETAILSH-16-000314
3" = 1'-0"1 12x12x1 MISC. EMBED PLATE
3" = 1'-0"2 20x15x1 MISC. EMBED PLATE
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
3" 0 3" 6"
SCALE: 3" = 1'-0"
0901
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JH JZ/JK SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
EMBEDS
CONSTRUCTION DM 04/10/17
NOTES:
MATERIAL
1. 12x12x1 AND 20x20x1 MISC. EMBED PLATE: ASTM A36, A572 GR. 50, OR A304L PER SCHEDULE.
2. 20x15x1 MISC. EMBED PLATE: ASTM A36 OR A572 GR. 50 PER SCHEDULE.
3. STUDS: NELSON STUD WELDING CATALOG S3L HEADED CONCRETE ANCHORS OR APPROVED EQUAL CARBON STEEL (AWS TYPE B) OR STAINLESS STEEL (AWS TYPE A) PER SCHEDULE.
GENERAL
4. SEE SPECIFICATIONS 13-2-001 AND 13-2-010 FOR EMBED PROCUREMENT AND INSTALLATION.
5. SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3 FOR GENERAL NOTES.
DOC. NO. 13-2-001 CONCRETE WORK
DOC. NO. 13-2-010 SPECIFICATION FOR PROCUREMENT OFFEROUS METALS
H-16-000301-1 STRUCTURAL GENERAL NOTES AND SPECIALINSPECTIONS
H-16-000301-2
H-16-000301-3
STRUCTURAL GENERAL NOTES AND SPECIALINSPECTIONS
STRUCTURAL GENERAL NOTES AND SPECIALINSPECTIONS
3" = 1'-0"3 20x20x1 MISC. EMBED PLATE
N/A N/A
H-16-000313 EMBED SCHEDULE
A2 A3A1 B2 B3B1
C1 C3 C4
D1
D2
D3
E1
E2
E3
E4
E5
E6
E7
F1 F2 F3 F4 F5 F6
F10
D4
D5
D6
J1
J2
J3
J4
J5
K1 K2 K3 K4 K5
K6 K7 K8 K9 K10
L1
L2
L3
L4
D7
K11 K12
E8
D9
D8
A4
F11 F12 F13 F14
F17 F18
L5
C2
J6
G3
G2
G1
G4
G5
G6
G7
M1
M2
M3
M4
M5
F9
F7
F8
F15
F16
C5
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
PLANH-16-000315
1/4" = 1'-0"1 PIT SHIELD COVER - PLAN
IX-P-05, IX REAGENT VALVE PIT COVERS(SEE DWG H-16-000338 FOR DETAILS)IX-P-05-AIIX-P-05-A2IX-P-05-A3IX-P-05-A4
IX-P-06, IX DELAY TANK PIT COVERS(SEE DWG H-16-000340 FOR DETAILS)IX-P-06-B1IX-P-06-B2IX-P-06-B3
IX-P-07, DELAY TANK VALVE AND MONITORING PIT COVERS(SEE DWG H-16-000342 FOR DETAILS)IX-P-07-C1IX-P-07-C2IX-P-07-C3IX-P-07-C4IX-P-07-C5
IX-P-01, IX VALVE PIT COVERS(SEE DWG H-16-000328 FOR DETAILS)
IX-P-02, IX PIT COVERS(SEE DWG H-16-000331 FOR DETAILS)IX-P-02-E1IX-P-02-E2IX-P-02-E3IX-P-02-E4IX-P-02-E5IX-P-02-E6IX-P-02-E7IX-P-02-E8
ECS-P-01/02, CS TANK PUMP PIT A/B COVERS(SEE DWG H-16-000334 FOR DETAILS)ECS-P-02-F1ECS-P-02-F2ECS-P-02-F3ECS-P-02-F4ECS-P-02-F5ECS-P-02-F6ECS-P-02-F7ECS-P-02-F8ECS-P-01-F9ECS-P-01-F10ECS-P-01-F11ECS-P-01-F12ECS-P-01-F13ECS-P-01-F14ECS-P-01-F15ECS-P-01-F16ECS-P-02-F17ECS-P-02-F18
BVV-P-01, DAMPER PIT COVERS(SEE DWG H-16-000336 FOR DETAILS)BVV-P-01-G1BVV-P-01-G2BVV-P-01-G3BVV-P-01-G4BVV-P-01-G5BVV-P-01-G6BVV-P-01-G7
CFF-P-03, CFF PIT COVERS(SEE DWG H-16-000317 FOR DETAILS)CFF-P-03-J1CFF-P-03-J2CFF-P-03-J3CFF-P-03-J4CFF-P-03-J5CFF-P-03-J6
CFF-P-02, FFT PUMP PIT COVERS(SEE DWG H-16-000320 FOR DETAILS)CFF-P-02-K1CFF-P-02-K2CFF-P-02-K3CFF-P-02-K5CFF-P-02-K6CFF-P-02-K7CFF-P-02-K8CFF-P-02-K9CFF-P-02-K10CFF-P-02-K11CFF-P-02-K12
CFF-P-01, FFT VALVE PIT COVERS(SEE DWG H-16-000323 FOR DETAILS)CFF-P-01-L1CFF-P-01-L2CFF-P-01-L3CFF-P-01-L4CFF-P-01-L5
PVV-P-01, DEMISTER PIT COVERS(SEE DWG H-16-000325 FOR DETAILS)PVV-P-01-M1PVV-P-01-M2PVV-P-01-M3PVV-P-01-M4PVV-P-01-M5
IX-P-01-D1IX-P-01-D2IX-P-01-D3IX-P-01-D4IX-P-01-D5IX-P-01-D6IX-P-01-D7IX-P-01-D8IX-P-01-D9
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
PIT COVERS
1000
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17CONSTRUCTION DM 04/10/17
NOTES:
1. MATERIAL: ASTM A36 CARBON STEEL.
2.FOR GENERAL NOTES SEE DRAWING H-16-000301 SHEETS 1 THROUGH 3.
N/A N/A
J1
J2
J3
J4
J5
J6
PIT
OPE
NIN
G18
' - 4
"
PIT OPENING14' - 10"
TOC
OPE
NIN
G19
' - 4
"TOC OPENING
15' - 10"
2H-16-000317
COVER15' - 9 1/2"
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
5
HOLD 1
TOC - FIRST FLOOR675' - 0"
1' - 9"
7"
5' - 6 1/2"5' - 4 1/2"
1' - 8"
5' - 0 3/8"
4' - 10 3/8"
5' - 6 1/2"5' - 4 1/2"
1' - 8 1/8"
1' - 7 1/8"
1/4" GAP (TYP) 1/4" GAP (TYP)
J5 J4 J3 J2 J1
4 x 6 CSSHIELD BLOCK
HOLD 2
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
CFF PITH-16-000317
1/2" = 1'-0"1 CFF-P-03 CFF PIT COVERS - PLAN
1/2" = 1'-0"2 CFF PIT COVERS - SECTION 2
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
1000
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
PIT COVERS
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000318 (HOLD FOR 90% REVIEW)
H-16-000315
CONSTRUCTION DM 04/10/17
H-16-000315 LAWPS PIT COVERS - PLAN
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
2 HOLD PENDING FINAL SEAM CONFIGURATION
N/A N/A
90
90
3H-16-000320
TOC
OPE
NIN
G19
' - 4
"
CO
VER
9' -
7 5/
8"C
OVE
R9'
- 7
5/8"
1/4"
GAP
PIT
OPE
NIN
G18
' - 4
"
2H-16-000320
TOC OPENING22' - 0"
PIT OPENING21' - 0"
1/4"
GAP
1/4" GAP
SUMP3' - 0"
SUM
P O
PEN
ING
2' -
0"
CO
VER
2' -
11 3
/4"
1/4"
GAP
TOC OPENING4' - 0"
TOC
OPE
NIN
G3'
- 0"
1/4"
GAP
COVERS21' - 11 1/2"
6
HOLD 1
K2 K3 K4 K5
K6 K7 K8 K9 K10
K1
K11 K124
H-16-000320
COVER3' - 11 1/2"
5H-16-000320
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
TOC - FIRST FLOOR675' - 0"
4' - 5 3/8"4' - 4 3/8"
4' - 11 5/8"4' - 9 3/4"
4' - 5 3/4"4' - 3 3/4"
3' - 10 3/4"3' - 8 5/8"
4' - 4 7/8"4' - 3 7/8"
TYP1/4" GAP
7"
TYP1/4" GAP
6
K1 K2 K3 K4 K5
4 x 6 CSSHEILD BLOCK
TOC - FIRST FLOOR675' - 0"
674' - 5"TOS
4' - 6 3/8"4' - 5 3/8"
5' - 1 3/4"4' - 11 3/4"
5' - 2 3/4"5' - 0 3/4"
3' - 10 3/4"3' - 8 3/4"
3' - 4 7/8"3' - 3 7/8"
TYP1/4" GAP
7"
TYP1/4" GAP
6
K7K6 K10K8 K9
4 x 6 CSSHIELD BLOCK
W27x146COVER SUPPORT(SEE DWG H-16-000346)
HOLD 2
TOC - FIRST FLOOR675' - 0"K11 K12
1' - 5 1/2"
1' - 6 1/2"
2' - 5 3/4"
2' - 4 3/4"(TYP)
1/4" GAP
(TYP)1/4" GAP
(TYP)1/4" GAP
HOLD 2
TOC - FIRST FLOOR675' - 0"K12 K6
SUMP WALL1' - 0"
4 x 6 CSSHIELD BLOCK
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
FFT PUMP PITH-16-000320
1/2" = 1'-0"1 CFF-P-02 FFT PUMP PIT COVERS - PLAN
1/2" = 1'-0"3 FFT PUMP PIT COVERS - SECTION 3
1/2" = 1'-0"2 FFT PUMP PIT COVERS - SECTION 2
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
4' 0 4' 8' 12'
SCALE: 1/8" = 1'-0"
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
PIT COVERS
H-16-000315
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000321 (HOLD FOR 90% REVIEW)
1/2" = 1'-0"4 FFT PUMP PIT COVERS - SECTION 4
1/2" = 1'-0"5 FFT PUMP PIT COVERS - SECTION 5
CONSTRUCTION DM 04/10/17
HOLD 2
1000
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
H-16-000315 LAWPS PIT COVERS - PLAN
2 HOLD PENDING FINAL SEAM CONFIGURATION
N/A N/A
90
90
L1
L2
L3
L4
L5
2H-16-000323
PIT
OPE
NIN
G18
' - 4
"
PIT OPENING14' - 0"
COVER14' - 11 1/2"
TOC OPENING15' - 0"
CO
VER
S19
' - 3
1/2
"TO
C O
PEN
ING
19' -
4"
7
E
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
TOC - FIRST FLOOR675' - 0"
3' - 2 7/8"3' - 2 1/4"
5' - 3 3/4"5' - 2 1/2"
4' - 7 1/4"4' - 6"
6' - 2 3/4"6' - 2"
TYP1/4" GAP
7" L4 L3 L2 L1
TYP1/4" GAP
E
4 x 6 CSSHIELD BLOCK
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
FFT VALVE PITH-16-000323
1/2" = 1'-0"1 CFF-P-01 FFT VALVE PIT COVERS - PLAN
1/2" = 1'-0"2 FFT VALVE COVERS - SECTION 2
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
HOLD 1
PIT COVERS
H-16-000315
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000324 (HOLD FOR 90% REVIEW)
CONSTRUCTION DM 04/10/17
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
HOLD 2
1000H-16-000315 LAWPS PIT COVERS - PLAN
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
2 HOLD PENDING FINAL SEAM CONFIGURATION
N/A N/A
90
90
M1
M2
M3
M4
M5
2H-16-000325 7.9
E
10 1
/2"
7 5/8"
1' -
2"
5' - 7 3/8"8' - 9"
1' - 7 1/8"
11' - 6"
1' - 2"
7 5/
8"
10 7/8"
5 7/
8"
2' -
4"
2' -
11 3
/4"
2' -
7 1/
8"11
1/4
"
1' - 8 5/8"
5' -
0 3/
8"11
1/4
"
4' -
2 5/
8"
9' - 11"
1' - 2"
1' - 2"
6' -
7 3/
4"
2' - 0 1/8"
10' - 4"
10' - 7"2'
- 6"
5 7/
8"
7' -
10 1
/2"
5 7/
8"
5' -
2 3/
4"9'
- 0"
5 7/
8"
5 7/
8"
10 7/8"
10 7/8"
10 7/8"
7 5/
8"
7 5/
8"
13' - 7" COVER OPENING
19' -
4" C
OV
ER O
PEN
ING
HOLD 1PIT OPENING12' - 7"
PIT
OPE
NIN
G18
' - 4
"
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
TOC - FIRST FLOOR675' - 0"
E
3' - 9 3/4"
4' - 0"
4' - 0"
4' - 0"
3' - 9 3/4"
(TYP)1/4" GAP
7"
3' - 8 1/2"
3' - 9 1/2"
3' - 9 1/2"
3' - 9 1/2"
3' - 8 1/2"
4 x 6 CSSHIELD BLOCK
M5 M4 M3 M2 M1
(TYP)1/4" GAP
HOLD 2
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
DEMISTER PITH-16-000325
1/2" = 1'-0"1 PVV-P-01 DEMISTER PIT COVERS - PLAN
1/2" = 1'-0"2 DEMISTER PIT COVERS - SECTION 2
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
1000
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
PIT COVERS
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
H-16-000315
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000326 (HOLD FOR 90% REVIEW)
CONSTRUCTION DM 04/10/17
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
2 HOLD PENDING FINAL SEAM CONFIGURATION
H-16-000315 LAWPS PIT COVERS - PLANN/A N/A
90
90
D1
D2
D3
D4
D5
D6
D7
D9
D8
2H-16-000328
5
D
TOC
OPE
NIN
G32
' - 8
"
PIT OPENING14' - 10"
COVER15' - 9 1/2"
PIT
OPE
NIN
G31
' - 8
"
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
3H-16-000328
3H-16-000368
SIM
TOC - FIRST FLOOR675' - 0"
E D
4' - 5 1/8"
4' - 6 1/8"
4' - 5 3/4"4' - 3 3/4"
5' - 11 3/4"
5' - 9 3/4"
3' - 5 1/2"3' - 3 1/2"
4' - 8"
4' - 6"
4' - 4 3/4"4' - 2 3/4"
5' - 5 1/4"
5' - 6 1/4"
1/4" GAP (TYP)
1/4" GAP (TYP)
SUPPLEMENTAL COVER FRAMINGSEE DWG H-16-000346
D1D2D8D4D9D6D7
4 x 6 CSSHIELD BLOCK
HOLD 2
TOC - FIRST FLOOR675' - 0"
5
D9D5
1/4" GAP (TYP)
4' - 8 7/8"
1/4" GAP (TYP)
11' - 0 3/8"
1/4" GAP (TYP)
SUPPLEMENTAL COVER FRAMINGSEE DWG H-16-000346
4 x 6 CSSHIELD BLOCK
HOLD 2
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
IX VALVE PITH-16-000328
1/2" = 1'-0"1 IX-P-01 IX VALVE PIT COVERS - PLAN
1/2" = 1'-0"2 IX VALVE PIT COVER - SECTION 2
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
1000
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
PIT COVERS
HOLD 1
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000329 (HOLD FOR 90% REVIEW)
H-16-000315
CONSTRUCTION DM 04/10/17
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
2 HOLD PENDING FINAL SEAM CONFIGURATION
H-16-000315 LAWPS PIT COVERS - PLAN
1/2" = 1'-0"3 IX VALVE PIT COVER - SECTION 3
N/A N/A
90
90
E1
E2
E3
E4
E5
E6
E7
E8
2H-16-000331
5.7
E
D
TOC
OPE
NIN
G32
' - 8
"
TOC OPENING14' - 0"
COVER13' - 11 1/2"
PIT OPENING13' - 0"
PIT
OPE
NIN
G31
' - 8
"
HOLD 1
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
3H-16-000328
TOC - FIRST FLOOR675' - 0"
E D
4' - 5"
4' - 6"
3' - 8"3' - 6"
4' - 2 1/4"
4' - 0 1/4"
4' - 2 3/8"3' - 11 7/8"
4' - 2 3/8"
3' - 11 7/8"
4' - 2 3/8"3' - 11 7/8"
4' - 2 3/8"
3' - 11 7/8"
3' - 11"4' - 0 1/4"1/4" GAP (TYP)
1/4" GAP (TYP)
4 x 6 CSSHIELD BLOCK
HOLD 2
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
IX PITH-16-000331
1/2" = 1'-0"1 IX-P-02 IX PIT COVERS - PLAN
1/2" = 1'-0"2 IX PIT COVER - SECTION 2
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000332 (HOLD FOR 90% REVIEW)
PIT COVERS
H-16-000315
E1E2E3E4E5E6E7E8
0901
CONSTRUCTION DM 04/10/17
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
H-16-000315 LAWPS PIT COVERS - PLAN
2 HOLD PENDING FINAL SEAM CONFIGURATION
N/A N/A
90
90
F1 F2 F3 F4 F5 F6
F15
F7
F9 F10 F11 F12 F13 F14
F17 F18
2H-16-000334
6 7
E
D
F8
F16
TOC
OPE
NIN
G15
' - 1
0"
TOC OPENING25' - 0"
TOC
OPE
NIN
G15
' - 1
0"
HOLD 1
HOLD 1
CO
VER
15' -
9 1
/2"
CO
VER
15' -
9 1
/2"
PIT
OPE
NIN
G14
' - 1
0"PI
T O
PEN
ING
14' -
10"
PIT OPENING24' - 0"
3H-16-000334
4H-16-000334
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
TOC - FIRST FLOOR675' - 0"
6 7
6' - 9 1/4"6' - 10 1/4"
3' - 6"
3' - 4"
4' - 6"4' - 4"
3' - 10"
3' - 8"
4' - 7 1/2"4' - 5 1/2"
1' - 10 1/2"
1' - 11 1/2"
1/4" GAP (TYP) 1/4" GAP (TYP)
F14F13F12F11F10F9
4 x 6 CSSHIELD BLOCK(TYP)
7 1/
2"
HOLD 3
HOLD 2
TOC - FIRST FLOOR675' - 0"
2' - 5 1/2"2' - 4 1/2"
1' - 6 3/4"
1' - 5 3/4"
(TYP)1/4" GAP
(TYP)1/4" GAP
F18F17
7 1/
2"
HOLD 3
HOLD 2
TOC - FIRST FLOOR675' - 0"
SUMP WALL1' - 0"
4 x 6 CSSHIELD BLOCK
F17F5
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
CS TANK PUMP PITH-16-000334
1/2" = 1'-0"1 ECS-P-01/02 CS TANK PUMP PIT A/B COVERS - PLAN
1/2" = 1'-0"2 CS TANK PUMP PIT A/B COVERS - SECTION 2
PIT COVERS
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000335 (HOLD FOR 90% REVIEW).
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
0901
H-16-000315
CONSTRUCTION DM 04/10/17
1/2" = 1'-0"3 CS TANK PUMP PIT A/B COVERS - SECTION 3
1/2" = 1'-0"4 CS TANK PUMP PIT A/B COVERS - SECTION 4
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
2 HOLD PENDING FINAL SEAM CONFIGURATION
3 COVER THICKNESS TO CHANGE TO 7"
H-16-000315 LAWPS PIT COVERS - PLANN/A N/A
90
90
90
7
D
2H-16-000336
4' - 4" 1' - 5 5/8"
2' -
8 1/
2"
8' - 7 1/4" 1' - 5 5/8"
2' -
8 1/
2"
11 3
/4"
11 3
/4"
5' -
10 1
/4"
1' -
6"
7 3/4" 1' - 0"
4' - 10 7/8"
7' - 4 3/4"
9' - 7"
8' -
8 3/
8"
11' -
7 3
/4"
13' -
9 3
/8"
10' -
2 5
/8"
7' - 4 3/4"
4' - 10 7/8"
2' - 2"
2' - 2"
2' - 2"
2' - 2"
2' - 2"
2' - 2"
9' - 7"
1' -
2 1/
8"
1' -
2 1/
8"
1' -
2 1/
8"
1' -
2 1/
8"
5' -
8 3/
4"11
1/4
"
1' - 8 5/8"
1' - 7 1/8"
1' - 7 1/8" 1' - 8 5/8"10
' - 3
"
11' -
0"
11' -
7 7
/8"
5 7/
8" 5 7/
8"
3 1/
8"
10' -
8 1
/8"
11 1
/4"
4' - 8"
5' - 10 5/8"
7' - 1"
7' - 11 1/8"
9' - 1 3/4"
10 7/8" 10 7/8"
5 5/8"
10 7/8" 10 7/8"
32' -
8" T
OC
OPE
NIN
G
13' - 7" TOC OPENING
G1
G2
G3
G4
G5
G6
G7
31' -
8" P
IT O
PEN
ING
12' - 7" PIT OPENING
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
TOC - FIRST FLOOR675' - 0"
D
3' - 11 1/4"
4' - 2 3/8"
4' - 2 3/8"
4' - 2 3/8"
8' - 3 7/8"
4' - 2 3/8"
3' - 11 3/4"
TYP1/4" GAP
7"
4' - 0 1/2"
3' - 11 7/8"
3' - 11 7/8"
3' - 11 7/8"
8' - 1 3/8"
3' - 11 7/8"
3' - 10 1/2"
(TYP)1/4" GAP
4 x 6 CSSHIELD BLOCK
G7 G6 G5 G4 G3 G2 G1
HOLD 2
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
DAMPER PITH-16-000336
1/2" = 1'-0"1 BVV-P-01 DAMPER PIT COVERS - PLAN
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
1/2" = 1'-0"2 DAMPER PIT COVERS - SECTION 2
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
PIT COVERS
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000337 (HOLD FOR 90% REVIEW)
HOLD 1
H-16-000315
CONSTRUCTION DM 04/10/17
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
1000
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
H-16-000315 LAWPS PIT COVERS - PLAN
2 HOLD PENDING FINAL SEAM CONFIGURATION
N/A N/A
90
90
5
PIT
OPE
NIN
G11
' - 0
"
PIT OPENING14' - 10"
TOC OPENING15' - 10"
TOC
OPE
NIN
G12
' - 0
"
COVER15' - 9 1/2"
CO
VER
11' -
11
1/2"
HOLD 1
2H-16-000338
A1 A2 A3 A4
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
TOC - FIRST FLOOR675' - 0"
5
2' - 10"
2' - 11"
5' - 9 3/4"5' - 7 3/4"
4' - 2"
4' - 0"
3' - 1"3' - 0"
(TYP)1/4" GAP
(TYP)1/4" GAP
A1 A2 A3 A47"
HOLD 2
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
IX REAGENT VALVE PITH-16-000338
PIT COVERS
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000339 (HOLD FOR 90% REVIEW)
1/2" = 1'-0"1 IX-P-05 IX REAGENT VALVE PIT COVERS - PLAN
1/2" = 1'-0"2 IX REAGENT VALVE PIT COVERS - SECTION 2
H-16-000315
CONSTRUCTION DM 04/10/17
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
1000
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
H-16-000315 LAWPS PIT COVERS - PLAN
2 HOLD PENDING FINAL SEAM CONFIGURATION
N/A N/A
90
90
TOC OPENING14' - 0"
PIT OPENING13' - 0"
TOC
OPE
NIN
G12
' - 0
"
PIT
OPE
NIN
G11
' - 0
"
COVER13' - 11 1/2"
CO
VER
11' -
11
1/2"
HOLD 1
2H-16-000340
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
TOC - FIRST FLOOR675' - 0"
5' - 6"5' - 7"
5' - 7"5' - 5"
2' - 10"2' - 11"
(TYP)1/4" GAP
(TYP)1/4" GAP
7"
4 x 6 CSSHIELD BLOCK
B1 B2 B3
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
IX DELAY TANK PITH-16-000340
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
1/2" = 1'-0"1 IX-P-06 IX DELAY TANK PIT COVERS - PLAN
PIT COVERS
1/2" = 1'-0"2 IX DELAY TANK PIT COVERS - SECTION 2
B1 B2 B3
H-16-000315
CONSTRUCTION DM 04/10/17
1000
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
H-16-000315 LAWPS PIT COVERS - PLAN
2 HOLD PENDING FINAL SEAM CONFIGURATION
HOLD 2
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000337 (HOLD FOR 90% REVIEW)
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
N/A N/A
90
90
6PIT OPENING
16' - 0"TOC OPENING
17' - 0"
PIT
OPE
NIN
G11
' - 0
"
TOC
OPE
NIN
G12
' - 0
"
CO
VER
11' -
11
1/2"
COVER16' - 11 1/2"
2H-16-000342
C1 C2 C3 C4
C5
HOLD 1
DRILL 1 1/4" DIA x 5" DEEP HOLES WHERE NOTED FOR CROSBY HR-125UNC SWIVEL HOIST RING (OR APPROVED EQUAL) STOCK NUMBER1016975 W/ONE 1 1/4"-7x4.5" BOLT.WORKING LOAD LIMIT: 15,000 #ULTIMATE CAPACITY: 5 x WORKING LOAD LIMITINSTALLED IN ACCORDANCE WITH MFR'S INSTRUCTIONS6" CORNER OFFSET AT CENTER TYP. UNLESS OTHERWISE SHOWN
TOC - FIRST FLOOR675' - 0"
6
2' - 10"
2' - 11"
7' - 1"
6' - 11"
4' - 2 3/4"
4' - 0 3/4"
2' - 10"
2' - 11"
(TYP)1/4" GAP
(TYP)1/4" GAP
C1 C2 C3 C47"
HOLD 2
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
IX DLY TK VLV & MONIT. PITH-16-000342
PIT COVERS
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
A
SVWWLMMLCN/A
HF
DSMJMWPB
KBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP
JK KD SF N/A 04/10/1704/10/1704/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17
NOTES:
1. FOR COVER DETAILS, SEE DWG H-16-000343 (HOLD FOR 90% REVIEW)
1/2" = 1'-0"1 IX-P-07 IX DELAY TANK VALVE & MONITOR PIT COVERS - PLAN
1/2" = 1'-0"2 IX DELAY TANK VALVE & MONITORING PIT COVERS - SECTION 2
H-16-000315
4 x 6 CSSHIELD BLOCK
CONSTRUCTION DM 04/10/17
2. PENETRATIONS SCALED BUT NOT DIMENSIONED FOR 60% DESIGN REVIEW.
1000
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL PENETRATIONS
H-16-000315 LAWPS PIT COVERS - PLAN
2 HOLD PENDING FINAL SEAM CONFIGURATION
N/A N/A
90
90
4 4.2 5 6 7 8
E
D
C.4
W27x146
CLBEAM
HSS 8x8x5/8
HSS 8x8x5/8 HSS
8x8x
5/8
HSS 8x8x5/8
HSS 8x8x5/8
HSS
8x8x
5/8
3H-16-000346
2H-16-000346
HSS 8x6x5/8KICKER (TYP)
TOS EL 674'-5"
(REF
)9'
- 8"
TOC - FIRST FLOOR675' - 0"
4.2 5
HSS 8x6x5/8KICKER (TYP)
HSS 8x8x5/8
674' - 5"TOS(TYP)
9" (TYP)
HOLD 1HOLD 1
TOC - FIRST FLOOR675' - 0"
4.2 5
HSS 8x6x5/8KICKER (TYP)
HSS 8x8x5/8
(TYP)36.90°
9" (TYP)
HSS 8x8x5/8
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
ISSUED FOR60% DESIGN REVIEWA
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SUPPORT FRAMINGH-16-000346
1/4" = 1'-0"1 PIT COVER FRAMING - PLAN
0901
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
FP
KD JK SF
1. FOR GENERAL NOTES SEE DRAWING H-16-000301-1.
2. FOR DIMENSIONS NOT SHOWN SEE DRAWING H-16-000347.
3. THIS DRAWING SUPERCEDES H-16-000298 WITH 90% SUBMITTAL.
A
FIRE PROTECTION
A 01/23/17 SF DPN/A 04/10/17
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
NOTES:
PIT COVER
1/2" = 1'-0"2 PIT COVER FRAMING - SECTION 2
3/8" = 1'-0"3 PIT COVER FRAMING - SECTION 3
A
SVWWLMMLCN/A
HF
DSMJMWPBN/AKBDJ FIRE PROTECTION
04/10/17A 04/10/17 SF DP04/10/17
04/10/1704/10/17
04/10/1704/10/17
04/10/1704/10/1704/10/1704/10/17
04/10/17N/A
CONSTRUCTION DM 04/10/17
H-16-000302 CONCRETE - FIRST FLOOR PLAN
HOLD NO. DESCRIPTION RELEASE DATE
HOLD TABLE
1 HOLD PENDING FINAL CONNECTION DETAIL
SEE SECTION 2 FOR DETAIL NOT SHOWN.
HOLD 1
HOLD 1HOLD 1HOLD 1
HOLD 1
HOLD 1
90
90
D.5 E.8D.1
1'-0
"8'
-0"
8'-0
"
1'-0
"8'
-0"
8'-0
"8'
-0"
1'-0
"8'
-0"
8'-0
"8'
-0"
1'-0
"8'
-0"
8'-0
"
18'-
0"25
'-0"
8'-0
"
8'-0
"
98.5
TOC EL 675'-0"
TO GRTG EL 650'-0"
TOC EL 632'-0"
AH-16-000375
AH-16-000375
8.18.2 98.5
E
D.5
E.8
D.1
B.8
BH-16-000375
BH-16-000375
5'-2
"15
'-0"
4'-2
"4'
-2"
LADDER DOWN TOTOC EL 632'-0"
4'-0
"
9"
3' - 0"
1' - 0"
13'-
6"4'
-0"
3' - 0"
LADDER DOWN TOTOC EL 632'-0"
1' - 0"
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
U.S. DEPARTMENT OF ENERGYOffice of River ProtectionA
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
1000
PLOTID
URS ARCHITECTS, LLC
3/16" = 1'-0"
PROCESS FACILITYLAWPS
LAG STORAGE PIT LADDERSH-16-000375
Author
3/16" = 1'-0"A Section A 3/16" = 1'-0"B Section B
HP TOC EL 632'-0"
TOC EL 675'-0"
DETAIL 1
TO GRTG EL 650'-0"
C6X8.2 TYP
C6X8.2 TYP
LADDER CLIPDETAIL TYP
LADDER CLIPDETAIL TYP
DETAIL 3 TYP
SAFETYGATE
HANDRAIL& KICKPLATE
GRATING
HANDRAIL& KICKPLATE
GRATING
SAFETYGATE
3/16" = 1'-0"2 LADDER PLATFORM TOS EL 650'-0"
LADDER UP TOEL 675'-0"
LADDER UP TOEL 675'-0"
LADDER CLIPDETAIL TYP
SVWN/AMMN/AN/A
N/A
DSMJN/APBSFN/ADJ FIRE PROTECTION
04/10/17N/A04/10/17N/AN/A04/10/17N/A
04/10/1704/10/17N/A04/10/1704/10/17N/A
WL 04/10/17 04/10/17N/A N/ADMMECH-HVAC
NUCLEARCONSTR
A 04/10/17 SF DP
A ISSUED FOR 60% DESIGN REVIEW KD JZ SF N/A 04/10/17
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
NOTES:
HOLD
HOLD
HOLD
HOLD
HOLD
1. FOR GUARDRAIL AND LADDER DETAILS, SEE H-16-000396-1 AND H-16-000396-2 (HOLD FOR90% REVIEW.)
2. FOR GENERAL NOTES, SEE REFERENCE H-16-000301-1.3. THE PURCHASE, FABRICATION, DELEVERY, AND ERECTION OF THE STRUCTURAL STEEL
MEMBERS SHALL BE IN ACCORDANCE WITH REFERENCE 13-2-001.4. THE PURCHASE, FABRICATION, DELEVERY, AND ERECTION OF THE MISCELLANEOUS
STEEL MEMBERS SHALL BE IN ACCORDANCE WITH REFERENCE 13-2-010.
H-16-000301-1H-16-000396-1H-16-000396-213-2-01013-2-002
STRUCTURAL GENERAL NOTES & SPECIAL INSPEC
STAIR STANDARD DETAILSLADDER STANDARD DETAILSSPEC FOR PROCUMENT OF MISC METALSSPEC FOR PURCASE,FAB, DELIVERY OF STRUC STEEL
DNUP
UPDN
DN
DN UP
HS-1 HS-2
HS-A
HS-B
HS-C
H-16-000387-11
H-16-000387-1
2
H-16-000387-23
H-16-000387-2
4
BH-16-000387-2
W10X22
W10X22
W10
X22
W10
X30
W10X22
W10
X30
W10X22
W10
X15
10'-
2"
30'-
6"
9' - 8"
AH-16-000387-1
5' - 6"
20'-
4"
4'-0
"
4' - 2"
W8X
15
L4X4X3/8
L4X4X3/8
HS-1 HS-2
HS-A
HS-B
HS-C
H-16-000387-11
H-16-000387-1
2
H-16-000387-23
H-16-000387-2
4
BH-16-000387-2
W10X22
W10
X22
W10X22
W10
X22
W10
X30
W10X22
W10
X30
W10X22
W10
X15
10'-
2"
30'-
6"
9' - 8"
AH-16-000387-1
N 41040' - 0"E -45920' - 8"
20'-
4"
4'-0
"
4' - 2" 5' - 6"
3' - 0" 3' - 0"1' - 4" 1' - 4"
TYPTYPTYP TYP
W8X
15
L4X4X3/8 L4X4X3/8
HS-1 HS-2
HS-A
HS-B
HS-C
H-16-000387-11
H-16-000387-1
2
H-16-000387-23
H-16-000387-2
4
BH-16-000387-2
W10X22
W10
X22
W10X22
W10
X22
W10X22
W10
X30
W10
X30
W10X22
W10
X22
W10
X15
10'-
2"
9' - 8"
30'-
6"
AH-16-000387-1
20'-
4"
4'-0
"
4' - 0"
W8X
15
W8X15
W8X15
L4X4X3/8
L4X4X3/8
L4X4
X3/8
L4X4X3/8
L4X4X3/8
L4X4
X3/8
L4X4X3/8
4' - 2" 5' - 6"
5'-6
"5'
-5"
5'-5
"
L4X4X
3/8
HS-1 HS-2
HS-A
HS-B
H-16-000387-11
H-16-000387-23
H-16-000387-2
4
BH-16-000387-2
W10X15
W10
X15
W10X15
W10
X15
W10
X15
10'-
2"
9' - 8"
4' - 2"
HS-1 HS-2
HS-A
HS-B
HS-C
W10
X30
W10
X30
W10X22
W10
X22
W10X22
W10
X22
W10X22
W10X22H-16-000387-11
H-16-000387-1
2
H-16-000387-23
H-16-000387-2
4
BH-16-000387-2
W10
X15 A
H-16-000387-1
10'-
2"20
'-4"
4'-0
"16
'-4"
9' - 8"
4' - 2" 5' - 6"
W8X
15
L4X4X3/8 L4X4X3/8
HS-1 HS-2
HS-A
HS-B
W10X15
W10
X15
W10X15
W10
X15
H-16-000387-11
H-16-000387-23
H-16-000387-2
4
BH-16-000387-2
W10
X15
10'-
2"
4' - 2"
9' - 8"
L4X4
X3/8
L4X4X3/8 L4X4X3/8
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
U.S. DEPARTMENT OF ENERGYOffice of River ProtectionA
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
1000
PLOTID
URS ARCHITECTS, LLC HVAC STACK STRUCTURELAWPS
FRAMING PLANSH-16-000386
1/4" = 1'-0"1 LEVEL 2 - TOS EL
1/4" = 1'-0"2 LEVEL 1 - TOS EL 1/4" = 1'-0"
3 LEVEL 6 - TOS EL
1/4" = 1'-0"4 LEVEL 10 - TOS EL
1" = 160'-0"5 KEY PLAN
1/4" = 1'-0"6 LEVEL 5 - TOS EL
1/4" = 1'-0"7 LEVEL 12 - TOS EL
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
SVWN/AMMN/AN/A
N/A
DSMJN/APBSFN/ADJ FIRE PROTECTION
04/10/17N/A04/10/17N/AN/A04/10/17N/A
04/10/1704/10/17N/A04/10/1704/10/17N/A
1 REQ'D AS SHOWN2 REQ'D AS SHOWN
2 REQ'D AS SHOWN1 REQ'D AS SHOWN
1 REQ'D AS SHOWN5 REQ'D AS SHOWN
WL 04/10/17 04/10/17N/A N/ADMMECH-HVAC
NUCLEARCONSTR
A 04/10/17 SF DP
A ISSUED FOR 60% DESIGN REVIEW KD JZ SF N/A 04/10/17
(& LEVEL 4)(& LEVEL 3)
(& LEVEL 7, 8, 9, 11)
HVAC STACKTOWER
NOTES:1. FOR GENERAL NOTES, SEE REFERENCE DRAWINGS H-16-000301-1 THRU H-16-000301-3.2. THE PURCHASE, FABRICATION, DELIVERY, AND ERECTION OF THE STRUCTURAL MEMBERS SHALL
BE IN ACCORDANCE WITH REFERENCE 13-2-002.3. FOR STAIR AND HANDRAIL DETAILS, SEE REFERENCE H-16-000396-1.4. ALL GRATING SHALL BE SERRATED.5. THE PURCHASE, FABRICATION, DELIVERY, AND ERECTION OF THE MISCELLANEOUS METALS SHALL BE IN ACCORDANCE WITH REFERENCE 13-2-010.
HOLD
H-16-000391-1
H-16-000301-1H-16-000301-2H-16-000301-3
DOC NO 13-2-002
STAIR STANDARD DETAILS
STRUCTURAL GENERAL NOTES, ETC.SPECIFICATION STRUCTURAL STEEL
STRUCTURAL GENERAL NOTES, ETC.STRUCTURAL GENERAL NOTES, ETC.
H-16-000387-1H-16-000387-2H-16-000388
FRAMING ELEVATIONSFRAMING ELEVATIONSFOUNDATION PLAN
1. ITEMS TO BE DESIGNED OR DIMENSIONEDFOR 90% REVIEW.2. STACK CONNECTIONS TO BE DESIGNED FOR90% REVIEW.
HOLD
HOLD HOLD
DOC NO 13-2-002 SPECIFICATION FOR PROCUREMENT OFMISCELLANEOUS METALS
SHOWN
HS-A HS-B HS-C
LEVEL 1 - TOS EL683' - 2"
LEVEL 2 - TOS EL691' - 4"
LEVEL 3 - TOS EL699' - 6"
LEVEL 4 - TOS EL707' - 8"
LEVEL 5 - TOS EL715' - 10"
LEVEL 6 - TOS EL724' - 0"
LEVEL 7 - TOS EL732' - 2"
LEVEL 8 - TOS EL740' - 4"
LEVEL 9 - TOS EL748' - 6"
LEVEL 10 - TOS EL756' - 8"
LEVEL 11 - TOS EL764' - 10"
LEVEL 12 - TOS EL773' - 0"
W10X22 W10X30
W10X22
W10X30
W10X30
W10X22 W10X30
W10X30
W10X22
W10X22
W10X30
W10X15
W10X15
W10X15
W10X15
W10X15
W10X15
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
W10
X39
W10
X39
W10
X39
LEVEL 0 BOS EL674' - 8"
WT7X21.5
WT7X21.5WT7X21.5
WT7X21.5
W10
X33
W10
X33
WT5X11
WT5X11
WT5X11
WT5X11
WT5X11
WT5X11
WT7X21.5
COLUMN SPLICE727' - 6"
HS-1HS-2
LEVEL 1 - TOS EL683' - 2"
LEVEL 2 - TOS EL691' - 4"
LEVEL 3 - TOS EL699' - 6"
LEVEL 4 - TOS EL707' - 8"
LEVEL 5 - TOS EL715' - 10"
LEVEL 6 - TOS EL724' - 0"
LEVEL 7 - TOS EL732' - 2"
LEVEL 8 - TOS EL740' - 4"
LEVEL 9 - TOS EL748' - 6"
LEVEL 10 - TOS EL756' - 8"
LEVEL 11 - TOS EL764' - 10"
LEVEL 12 - TOS EL773' - 0"
W10X22
W10X22
W10X22
W10X22
W10X22
W10X22
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
LEVEL 0 BOS EL674' - 8"
WT7X21.5
W10
X39
W10
X39
HS-B HS-C
LEVEL 1 - TOS EL683' - 2"
LEVEL 2 - TOS EL691' - 4"
LEVEL 3 - TOS EL699' - 6"
LEVEL 4 - TOS EL707' - 8"
LEVEL 5 - TOS EL715' - 10"
LEVEL 6 - TOS EL724' - 0"
LEVEL 7 - TOS EL732' - 2"
14-R
@7"
=8'
-2"
14-R
@7"
=8'
-2"
14-R
@7"
=8'
-2"
14-R
@7"
=8'
-2"
14-R
@7"
=8'
-2"
13 - TRD @ 11" = 11'-11"
11/
4"1
1/4"
11/
4"1
1/4"
11/
4"1
1/4"
13 - TRDS @ 11" = 11'-11"
13 - TRDS @ 11" = 11'-11"
13 - TRDS @ 11" = 11'-11'
13 - TRDS @ 11" = 11'-11"
LEVEL 0 BOS EL674' - 8"
14-TRDS @ 11" = 12'-10"
15-R
@7"
=8'
-9"
C10X15.3
C10X15.3
C10X15.3
C10X15.3
C10X15.3
C10X15.3
COLUMN SPLICE727' - 6"
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
U.S. DEPARTMENT OF ENERGYOffice of River ProtectionA
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
I1000
PLOTID
URS ARCHITECTS, LLC HVAC STACK STRUCTURELAWPS
FRAMING ELEVATIONSH-16-000387 1
3/16" = 1'-0"1 EAST ELEVATION
3/16" = 1'-0"2 NORTH ELEVATION
1/4" = 1'-0"A Section A
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTIONSVW
N/AMMN/AN/A
N/A
DSMJN/APBSFN/ADJ FIRE PROTECTION
04/10/17N/A04/10/17N/AN/A04/10/17N/A
04/10/1704/10/17N/A04/10/1704/10/17N/A
WL 04/10/17 04/10/17N/A N/ADMMECH-HVAC
NUCLEARCONSTR
A 04/10/17 SF DP
A ISSUED FOR 60% DESIGN REVIEW KD JZ SF N/A 04/10/17
NOTES:1. SEE REFERENCE H-16-000386 FOR GENERAL NOTES.
H-16-000386 FRAMING PLANS
SHOWN
HS-AHS-BHS-C
LEVEL 1 - TOS EL683' - 2"
LEVEL 2 - TOS EL691' - 4"
LEVEL 3 - TOS EL699' - 6"
LEVEL 4 - TOS EL707' - 8"
LEVEL 5 - TOS EL715' - 10"
LEVEL 6 - TOS EL724' - 0"
LEVEL 7 - TOS EL732' - 2"
LEVEL 8 - TOS EL740' - 4"
LEVEL 9 - TOS EL748' - 6"
LEVEL 10 - TOS EL756' - 8"
LEVEL 11 - TOS EL764' - 10"
LEVEL 12 - TOS EL773' - 0"
W10
X39
W10
X39
W10
X39
W10X30 W10X22
W10X22
W10X30
W10X22W10X30
W10X22W10X30
W10X30
W10X22
W10X22W10X30
W10X15
W10X15
W10X15
W10X15
W10X15
W10X15
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
LEVEL 0 BOS EL674' - 8"
W10
X33
W10
X33
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT5X11
WT5X11
WT5X11
WT5X11
WT5X11
WT5X11
COLUMN SPLICE727' - 6"
HS-1 HS-2
LEVEL 1 - TOS EL683' - 2"
LEVEL 2 - TOS EL691' - 4"
LEVEL 3 - TOS EL699' - 6"
LEVEL 4 - TOS EL707' - 8"
LEVEL 5 - TOS EL715' - 10"
LEVEL 6 - TOS EL724' - 0"
LEVEL 7 - TOS EL732' - 2"
LEVEL 8 - TOS EL740' - 4"
LEVEL 9 - TOS EL748' - 6"
LEVEL 10 - TOS EL756' - 8"
LEVEL 11 - TOS EL764' - 10"
LEVEL 12 - TOS EL773' - 0"
W10
X39
W10
X39
W10X22
W10X22
W10X22
W10X22
W10X22
W10X22
W10X15
W10X15
W10X15
W10X15
W10X15
W10X15
LEVEL 0 BOS EL674' - 8"
W10
X33
W10
X33
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT5X11
WT5X11
WT5X11
WT5X11
WT5X11
WT5X11
COLUMN SPLICE727' - 6"
HS-1 HS-2
LEVEL 1 - TOS EL683' - 2"
LEVEL 2 - TOS EL691' - 4"
LEVEL 3 - TOS EL699' - 6"
LEVEL 4 - TOS EL707' - 8"
LEVEL 5 - TOS EL715' - 10"
LEVEL 6 - TOS EL724' - 0"
LEVEL 7 - TOS EL732' - 2"
LEVEL 8 - TOS EL740' - 4"
LEVEL 9 - TOS EL748' - 6"
LEVEL 10 - TOS EL756' - 8"
LEVEL 11 - TOS EL764' - 10"
LEVEL 12 - TOS EL773' - 0"
W10X22
W10X15
W10X15
W10X15
W10X15
W10X15
W10X15
W10
X39
W10
X39
LEVEL 0 BOS EL674' - 8"
W10
X33
W10
X33
W10X22
W10X22
W10X22
W10X22
W10X22
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT7X21.5
WT5X11
WT5X11
WT5X11
WT5X11
WT5X11
WT5X11
COLUMN SPLICE727' - 6"
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
U.S. DEPARTMENT OF ENERGYOffice of River ProtectionA
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
1000
PLOTID
URS ARCHITECTS, LLC HVAC STACK STRUCTURELAWPS
FRAMING ELEVATIONSH-16-000387 2
3/16" = 1'-0"3 WEST ELEVATION
3/16" = 1'-0"4 SOUTH ELEVATION
3/16" = 1'-0"B Section B
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTIONSVW
N/AMMN/AN/A
N/A
DSMJN/APBSFN/ADJ FIRE PROTECTION
04/10/17N/A04/10/17N/AN/A04/10/17N/A
04/10/1704/10/17N/A04/10/1704/10/17N/A
WL 04/10/17 04/10/17N/A N/ADMMECH-HVAC
NUCLEARCONSTR
A 04/10/17 SF DP
A ISSUED FOR 60% DESIGN REVIEW KD JZ SF N/A 04/10/17
NOTES:1. SEE REFERENCE H-16-00386 FOR GENERAL NOTES.
H-16-000386 FRAMING PLANS
SHOWN
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
Scale: 1/4" =1'-0"
HVAC STACK & STAIR FOUNDATION
1
A
--
B
--
Scale: 1"=1'-0"
SECTION
A
Scale: 1"=1'-0"
SECTION
B
FOR 60% DESIGN REVIEW
NOT FOR CONSTRUCTION
N/A
04/10/17
MECH-HVAC
N/AMMN/AN/AN/AN/AWL 04/10/17
04/10/17
04/10/1704/10/17
04/10/17
N/A
N/A
N/AN/A
N/AN/A
N/AN/AN/AN/A
CONSTR
FPNUCLEAR
04/10/17A SF DP ISSUED FOR 60% DESIGN REV
N/A
N/A
N/AN/A
MJ
PBSF
DM
H-16-000197
H-16-000386
H-16-000301-1
H-16-000301-2
H-16-000301-3
H-16-001033
DOC # 13-2-001
DOC # 13-2-011
EXHAUST SKID AREA
FRAMING PLANS
STRUCTURAL GENERAL NOTES, ETC
STRUCTURAL GENERAL NOTES, ETC
STRUCTURAL GENERAL NOTES, ETC
HVAC EXHAUST
CONCRETE WORK
FURNISHING AND DELIVERING READY-MIX
0900
202LP
LAG STORAGE VAULTLAG-V-01
CFF PITCFF-P-03
FILTER FEED TANK VAULTCFF-V-01
FFT VALVE PITCFF-P-01
DEMISTER PITBVV-P-02
TANK PIT
VOIDVOID
FFT PUMP PITCFF-P-02
#5 SHEAR TIES @9" VERT & 18" HORZ
(2)-#11 @ 9" EF
H-16-000395 101
(2)-#11 @ 9" EF
TOC EL 675'-0"
TOC EL 632'-0"
BOC EL 628'-0"
43'-
0"
#11 @ 9" EF #11 @ 9" EF#11 @ 9" EF
#11 @ 9" EF
#11 @ 9" EF
#11 @ 6" EF
#11 @ 9" EF
#11 @ 9" EF
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 DWLS TOMATCH VERT #11
#11 DWLS TOMATCH VERT #11
#11 DWLS TOMATCH VERT #11#11 DWLS TO
MATCH VERT #11#11 DWLS TOMATCH VERT #11
3 4 5 6 7 8 8.5 9
3' - 0 3/8" 20' - 7 1/8" 22' - 4" 22' - 4" 20' - 7 1/8" 20' - 1 7/8" 17' - 9 1/2"
4'-0
"
H-16-000395 104
H-16-000395 103
CONSTRUCTION JOINT (CJ) TYP
CONSTRUCTION JOINT
TOC EL 666'-6"
TOC EL 649'-0"
TOC EL 652'-0"
TOC EL 661'-0" TOC EL 661'-0"
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
1' - 3 3/8"
H-16-000395 101
SIM
1' - 4"
KEYPLAN
PLANTNORTH
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION AH-16-000395 1
REINFORCEMENT
REF. DWG. 1/4" = 1'-0" H-16-000306A SECTION A - LOOKING NORTH
REF. DWG. 1" = 40'-0"
1 KEYPLAN - VAULT SECTION 1
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
VOID
IX VALVE PITIX-P-01
IX PITIX-P-02
CS TANK VAULTECS-V-01
DAMPER PITBVV-P-01
VOID
LAG STORAGE VAULTLAG-V-01
VAULT CONTAINMENT CURB
CS TANK PUMP PIT AECS-P-01
VOID
MAT REINFORCINGSEE H-16-000305
SLAB REINFORCINGSEE PLAN (TYP)
#5 SHEAR TIES @9" VERT & 18" HORZ
(2)-#11 @ 9" EF
(2)-#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 6" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
DOWELS TO MATCHSLAB REINF TYP
3 4 5 6 7 8 8.5 93' - 0 3/8" 20' - 7 1/8" 22' - 4" 22' - 4" 20' - 7 1/8" 20' - 1 7/8" 17' - 9 1/2"
H-16-000395 101
SIM
H-16-000395 101
SIM
TOC EL 675'-0"
TOC EL 654'-10"
TOC EL 664'-0"
TOC EL 667'-0"
TOC EL 653'-8"
TOC EL 632'-0"
4'-0
"3'
-0"
18'-
8"21
'-4"
CONSTRUCTIONJOINT
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
WALL CJ (TYP)
TOC EL 653'-8"
TOC EL 628'-0"
1' - 4"
#11 @ 9" EF
1' - 3 3/8"
KEYPLAN
PLANTNORTH
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION BH-16-000395 2
REINFORCEMENT
REF. DWG. 1/4" = 1'-0" H-16-000306B SECTION B - LOOKING NORTH
REF. DWG. 1" = 40'-0"
1 KEYPLAN - VAULT SECTION 2
SLAB
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
#11@12" EF
#11@12" EF
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
IX REAGENT VALVE PITIX-P-05
IX DELAY TANK PITIX-P-06
IX DELAY TANKMONITORING PIT
IX-P-07
VOID VOID
LAG STORAGE VAULTLAG-V-01
MAT REINFORCINGSEE H-16-000305
SLAB REINFORCINGSEE PLAN (TYP)
#5 SHEAR TIES @9" VERT & 18" HORZ
(2)-#11 @ 9" EF
(2)-#11 @ 9" EF
TOC EL 632'-0"
BOC EL 628'-0"
#11 DWLS TOMATCH VERT #11
#5 SHEAR TIES @9" VERT & 18" HORZ
#11 @ 9" EF
#11 @ 6" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF#11 @ 9" EF#11 @ 9" EF
3 4 5 6 7 8 8.5 93' - 0 3/8" 20' - 7 1/8" 22' - 4" 22' - 4" 20' - 7 1/8" 20' - 1 7/8" 17' - 9 1/2"
4'-0
"43
'-0"
TOC EL 675'-0"
22'-
8"3'
-0"
2'-0
"
H-16-000395 101
TOC EL 653'-8"
TOC EL 667'-0"TOC EL 667'-0"
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
WALL CJ (TYP(SEE DETAIL 4H-16-000395-10
1' - 3 3/8"1' - 4"
TOC EL 650'-8"
KEYPLAN
PLANTNORTH
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION CH-16-000395 3
REINFORCEMENT
REF. DWG. 1/4" = 1'-0" H-16-000306C SECTION C - LOOKING NORTH
REF. DWG. 1" = 40'-0"
1 KEYPLAN - VAULT SECTION 3
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
#11@12" EF
#11@12" EF
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
LAG STORAGE VAULTLAG-V-01
SLAB REINFORCINGSEE PLAN (TYP)
SLAB REINFORCINGSEE PLAN (TYP)
(2)-#11 @ 9" EF
(2)-#11 @ 9" EF
TOC EL 632'-0"
BOC EL 628'-0"
#11 DWLS TOMATCH VERT #11
#5 SHEAR TIES @9" VERT & 18" HORZ
#11 @ 9" EF
#11 @ 6" EF
#11 DWLS TOMATCH VERT #11
8 8.5 9
20' - 1 7/8" 17' - 9 1/2"
#5 SHEAR TIES @9" VERT & 18" HORZ
4'-0
"41
'-0"
2'-0
"
TOC EL 675'-0"
WALL CJ (TYP)SEE DETAIL 4H-16-000395-10
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
2' - 8 5/8"
1' - 4"
KEYPLAN
PLANTNORTH
2'-0
"
3' - 0"
10' - 0"
#11@9" EF
#11@9"EF
#11 DWLS TOMATCH VERT #11
#11@12" EF
#11@12" EF
14'-
6"3'
-0"
REF DWG H-16-000306
4
2'-0
"
4' - 0"
10' - 0"
#11@9" EF
#11@4 1/2" EF
#11@9" EF
#11 DWLS TOMATCH VERT #11
#11@12" EF
#11@12" EF
1' - 3 3/8"
REF DWG H-16-000306
5'-0
"
14'-
6"3'
-0"
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION DH-16-000395 4
REINFORCEMENT
REF. DWG. 1/4" = 1'-0" H-16-000306D SECTION D - LOOKING NORTH
REF. DWG. 1" = 40'-0"
1 KEYPLAN - VAULT SECTION 4
REF. DWG. 3/8" = 1'-0"
H-16-000306B SECTION B @ BUTTRESS FOOTING
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
REF. DWG. 3/8" = 1'-0"
H-16-000306A Section A @ BUTTRESS FOOTING
TOC EL 675'-0" TOC EL 675'-0"
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
LAG STORAGE VAULTLAG-V-01
VAULT CONTAINMENT CURB (TYP)
SLAB REINFORCINGSEE H-16-000307
SLAB REINFORCINGSEE PLAN (TYP)
#4 TIES @ 12" O.C.
2-#4 CONT. (TYP)
#5 SHEAR TIES @9" VERT & 18" HORZ
#11 @ 9" EF
#11 @ 6" EF
TOC EL 632'-0"
BOC EL 628'-0"
#11 DWLS TOMATCH VERT #11
#5 SHEAR TIES @9" VERT & 18" HORZ
#11 @ 9" EF
#11 @ 6" EF
#11 DWLS TOMATCH VERT #11
CC.4DEF
31' - 7" 30' - 10" 16' - 11" 13' - 11" 25' - 7"
3' - 10" 27' - 9"
4'-0
"41
'-0"
2'-0
"
TOC EL 675'-0"
15'-
2"15
'-0"
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
WALL CJSEE DETAIL 4H-16-000395-10
KEYPLAN
PLANTNORTH
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION EH-16-000395 5
REINFORCEMENT
REF. DWG. 1/4" = 1'-0" H-16-000306E SECTION E - LOOKING WEST
REF. DWG. 1" = 40'-0"
1 KEYPLAN - VAULT SECTION 5
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
VOID
DEMISTER PITBVV-P-02
DAMPER PITBVV-P-01
SLAB REINFORCINGSEE PLAN (TYP)
SLAB REINFORCINGSEE H-16-000307
#11 @ 9" EF
#11 @ 9" EF
TOC EL 632'-0"
BOC EL 628'-0"
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 4 1/2" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 6" EF
#11 DWLS TOMATCH VERT #11
BOC EL 650'-8"
TOC EL 653'-8"
TOC EL 675'-0"
CC.4DEF31' - 7" 30' - 10" 16' - 11"2' - 4"
3' - 10"
4'-0
"
H-16-000395 102
3'-0
"19
'-4"
2'-0
"18
'-8"
TOC EL 655'-0"
TOC EL 661'-0"
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
WALL CJSEE DETAIL 4H-16-000395-10
4' - 6"
VOID
VOID
KEYPLAN
PLANTNORTH
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION FH-16-000395 6
REINFORCEMENT
REF. DWG. 1/4" = 1'-0" H-16-000306F SECTION F - LOOKING WEST
REF. DWG. 1" = 40'-0"
1 KEYPLAN - VAULT SECTION 6
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
DELAY TANKMONITORING
PITIX-P-07FFT VALVE PIT
CFF-P-01CS TANK PUMP PIT A
ECS-P-01
CS TANK VAULTECS-V-01
SLAB REINFORCINGSEE PLAN (TYP)
SLAB REINFORCINGSEE PLAN (TYP)
G
SLAB REINFORCINGSEE H-16-000307
4'-0
"
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 6" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
TOC EL 632'-0"
BOC EL 628'-0"
BOC EL 650'-8"
TOC EL 653'-8"
TOC EL 675'-0"
CC.4DEF
#11@ 12" EF
#11@ 12" EF
18'-
8"3'
-0"
19'-
4"2'
-0"
H-16-000395 102
SIM
TOC EL 667'-0"
TOC EL 664'-0"TOC EL 664'-0"
TOC EL 661'-0"
2'-0
"14
'-6"
3'-0
"
TOC EL 658'-0"
WALL CJSEE DETAIL 4H-16-000395-10
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
CS TANK PUMP PIT BECS-P-02
2' - 4" 31' - 7" 30' - 10" 16' - 11" 4' - 6" 9' - 5"
6' - 2"
VOID
KEYPLAN
PLANTNORTH
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION HH-16-000395 7
REINFORCEMENT
REF. DWG. 1/4" = 1'-0" H-16-000306H SECTION H - LOOKING WEST
REF. DWG. 1" = 40'-0"
1 KEYPLAN - VAULT SECTION 7
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
IX DELAY TANKPIT
IX-P-06
IX PITIX-P-02
FFT PUMP PITCFF-P-02
FILTER FEEDTANK VAULT
CFF-V-01
VOID
SLAB REINFORCINGSEE PLAN (TYP)
SLAB REINFORCINGSEE PLAN (TYP)
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 6" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
TOC EL 632'-0"
BOC EL 628'-0"
BOC EL 650'-8"
TOC EL 653'-8"
TOC EL 675'-0"
CC.4DEF
4'-0
"18
'-8"
3'-0
"19
'-4"
2'-0
"
H-16-000395 102
SIM
TOC EL 653'-8"
TOC EL 666'-6"
TOC EL 649'-0"
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
WALL CJSEE DETAIL 4H-16-000395-10
VOID
2' - 4" 3' - 10" 27' - 9" 30' - 10" 16' - 11" 4' - 6" 9' - 5"
KEYPLAN
PLANTNORTH
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION IH-16-000395 8
REINFORCEMENT
REF. DWG. 1/4" = 1'-0" H-16-000306I SECTION I - LOOKING WEST
REF. DWG. 1" = 40'-0"
1 KEYPLAN - VAULT SECTION 8
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
IX REAGENTVALVE PIT
IX-P-05
CFF PITCFF-P-03
IX VALVE PITIX-P-01
VOID
SLAB REINFORCINGSEE PLAN (TYP)
SLAB REINFORCINGSEE H-16-000307
TOC EL 632'-0"
BOC EL 628'-0"
BOC EL 650'-8"
TOC EL 653'-8"
TOC EL 675'-0"
#11 @ 9" EF
#11 @ 6" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
#11 DWLS TOMATCH VERT #11
#11 DWLS TOMATCH VERT #11
#11 @ 9" EF
#11 @ 9" EF
CC.4DEF31' - 7" 30' - 10" 16' - 11"
4'-0
"18
'-8"
3'-0
"19
'-4"
2'-0
"
#11 @ 9" EF
H-16-000395 102
SIM
TOC EL 667'-0"TOC EL 667'-0"
TOC EL 652'-0"
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
6" CONSTRUCTIONMUD MAT(LEAN CONCRETE)
WALL CJSEE DETAIL 4H-16-000395-10
2' - 4"
VOIDVOID
4' - 6" 9' - 5"
KEYPLAN
PLANTNORTH
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTION JH-16-000395 9
REINFORCEMENT
REF. DWG. 1/4" = 1'-0" H-16-000306J SECTION J - LOOKING WEST
REF. DWG. 1" = 40'-0"
1 KEYPLAN - VAULT SECTION 10
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DPISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
2' 0 2' 4' 6'
SCALE: 1/4" = 1'-0"
3 4 4.1 4.24
4' - 0" 3' - 0"
#11@
6"O
C
7"
#5 TIES@12" (TYP)
#5 TIES@12" (TYP)
2-#11@6" OC (TYP)
2-#1
1@6"
OC
2-#1
1@6"
OC
#11@
6"O
C
F
6' - 2" 4' - 0" 3' - 0"
3'-0
"
#11@
6"O
C
3'-0
"3'
-6"
2-#1
1@6"
OC
2"C
LR6"
3"C
LR
BAR LAP
POUR #1POUR #2
STAY-FORM (AMICO)
6" CONSTRUCTIONMUD MAT
CONSTRUCTIONJOINT (CJ)
8
2" CLR 2" CLR
BAR
LAP
POU
R#1
POU
R#2
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTIONS AND DETAILSH-16-000395 10
REINFORCEMENT
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
REF. DWG. 1/2" = 1'-0"
H-16-000395 11 DETAIL 1 REF. DWG.
1/2" = 1'-0"H-16-000395 6
2 DETAIL 2
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DP
#11 @ 12" T&B
#11 @ 12" T&B
#5 TIES @ 12" TYP
#11 @ 9"2- #11TOC EL 675'-0" TOC EL 675'-0"
WALL REINF
#5 TIES@12"
REF. DWG. 1/2" = 1'-0"
H-16-000395 13 DETAIL 3 REF. DWG.
1/2" = 1'-0"H-16-000395 1
4 DETAIL 4
ROUGHEN (LIGHT BUSH HAMMER OR HYDRO BLAST)AND CLEAN AND FREE OF LAITANCE. ROUGHEN TO AFULL AMPLITUDE OF 1/4 INCH. APPLY CONCRETEBONDING AGENT IN ACCORDANCE WITHMANUFACTURES INSTRUCTIONS PRIOR TO SECONDPOUR.
-
REF DWG H-16-000395-1REF DWG H-16-000395-1
REF DWG H-16-000395-6REF DWG H-16-000395-1
ISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW KL DC SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
CL
CO
NS
TRU
CTI
ON
JOIN
T
1' 0 1' 2' 3'
SCALE: 1/2" = 1'-0"
FF
4'-0
"
2'-0
"2'
-0"
8' - 0"
#11@ 6" T&B
#11@ 12" T&B
(3)#11 SEE SLAB REINFTOC EL 675'-0"
2' - 4"
(2)-#11
E
12' - 10"1' - 2"
2'-0
"4'
-0"
1
4'-0
"
2'-0
"2'
-0"
8' - 0"
#11 @ 12" T&BSLAB REINF SEE PLAN
#11 @ 6" T&B
TOC EL 675'-0"
3-#11
2-#11
2' - 9"
3 4 4.13 4
2'-0
"2'
-0"
4'-0
"
12' - 0"
TOC EL 675'-0"
#11 @ 12" T&B#11 @ 6" T&B
SEE DETAIL 1FOR REINFDRAWING H-16-000395-10
3-#11
3-#11
1' - 9"
C
4'-0
"
2'-0
"2'
-0"
TOC EL 675'-0"
#11 @ 12" T&B
#11 @ 6" T&B
3- #11
3- #11
8' - 0"
1"
B
4'-0
"2'
-0"
6'-0
"
TOC EL 675'-0"
(2)-#7 TIES @ 6" OC
15- #11 T&B
4- #11 EF
2' - 4"5' - 11"
8' - 3"
3 4 4.1 4.23 4
TOC EL 675'-0"
#11 @ 6" T&B
#11 @ 6" T&B
SEE SLAB PLANFOR REINF
2 - #11 EF
6' - 4" 5' - 8"
1'-0
"2'
-0"
3'-0
"
12' - 0"
B.6
2'-0
"2'
-0"
3' - 3" 2' - 9"
6' - 0"
4'-0
"
B
5' - 11"
4'-0
"2'
-0"
6'-0
"
C.4C.4
4' - 6"
TOC EL 675'-0"
FOR WALLREINF SEESECT FH-16-000395-6
#7 SEEPLAN
DECKING
#11 SEE PLAN
#7@12"
7.9 8 8.28
6'-0
"
2' - 8"
2
4'-0
"2'
-0"
5' - 8" 2' - 4"
8' - 0"
6'-0
"
URS ENERGY & CONSTRUCTION Inc. - an AECOM Company
REVISION APPROVAL RECORD REV
DISCIPLINE
CIVIL
STRUCTURAL
PROCESS
DISCIPLINE
PIPING
ELECTRICAL
DATE DATE
GEN. ARRANG.
QA / QC
MECHANICAL
BY BY
ARCH.
ENVIRON.
I & C
BUILDING SERVICES
DRAWING STATUS
ISSUED REV DATE SDE PEM
APPROVED FORDESIGN
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION UNLESS SIGNEDAND DATED. DESTROY ALL PRINTS BEARINGEARLIER DATE AND/OR REV.NO. AECOM PROJECT NO.: 31269
PLOTID
A
DRAFTER
DRAFTING CHECKER
DISCIPLINE ENGINEER
DESIGN AUTHORITY
202LP
A
B
C
DRAWING TRACEABILITY LISTDWG NUMBER TITLE
D
E
F
8 7 6 5
REVISIONSNEXT USED ON
REF NUMBERREFERENCES
TITLE SIZE
SCALE
FDRAWING NUMBER
DOE_TB_F.DWG (NOV 2015)
REV
A
C
4 3 2
D
E
1
F
DATECOMPANYNAME
SHEET
B
CAUTIONNOT COMPLETE WITHOUT CURRENTCHANGE DOCUMENTS FROM DATABASE
ATTENTIONDESTROY THIS DOCUMENT BY SHREDDINGMAY CONTAIN SENSITIVE INFORMATION
8 7 6 5 4 3 2 1
BLDG. NO.
INDEX NO.
DESCRIPTIONREVNO.
U.S. DEPARTMENT OF ENERGYOffice of River Protection
REV DESCRIPTION ORIG CHKAPVD IDV DATE
SHOWN
LAWPS
SECTIONS AND DETAILSH-16-000395 11
REINFORCEMENT
ISSUED FOR 60% DESIGN REVIEWNOT FOR CONSTRUCTION
REF. DWG. 3/8" = 1'-0"
H-16-000305A SECTION A REF. DWG.
3/8" = 1'-0"H-16-000305
B SECTION B
REF. DWG. 3/8" = 1'-0"
H-16-000305C SECTION C
REF. DWG. 3/8" = 1'-0"
H-16-000305D SECTION D
REF. DWG. 3/8" = 1'-0"
H-16-000305E SECTION E
REF. DWG. 3/8" = 1'-0"
H-16-000305F SECTION F
REF. DWG. 3/8" = 1'-0"
H-16-000305G SECTION G
REF. DWG. 3/8" = 1'-0"
H-16-000305H SECTION H
REF. DWG. 3/8" = 1'-0"
H-16-000305J SECTION J
REF. DWG. 3/8" = 1'-0"
H-16-000305K SECTION K
REF. DWG. 3/8" = 1'-0"
H-16-000305L SECTION L
TOC EL 675'-0"
#11 @ 6" EW, T&BSLAB REINF SEE PLAN
3-#11 EF
TOC EL 675'-0"#6 TIES @ 6"
8- #11 T&B
FOR SLAB REINFSEE SLAB PLAN3- #11 EF
#11 @ 9" T&B
#11 @ 6" T&B
TOC EL 675'-0"
FOR SLAB REINFSEE SLAB PLAN
4-#11
SWW 04/10/17WL 04/10/17MM 04/10/17CFN/ADJHF
04/10/17
04/10/1704/10/17
DS 04/10/17MJ 04/10/17MW 04/10/17PBN/AKBDM
04/10/17N/A04/10/1704/10/17
04/10/17
N/A
CONSTRFIRE PROT
A SF DP
#11 @ 6" T&B
TOC EL 675'-0"
#11 @ 9" T&B
DWG. H-16-000305DWG. H-16-000305
DWG. H-16-000305
DWG. H-16-000305
DWG. H-16-000305
DWG. H-16-000305
DWG. H-16-000305
DWG. H-16-000305
DWG. H-16-000305
DWG. H-16-000305
DWG. H-16-000305
REF. DWG. 3/8" = 1'-0"
H-16-000305M SECTION M
#11 @12"
DWG. H-16-000305
TOC EL 675'-0"
(6)-#11 EF
24-#11 T&B
(2)-#7 TIES @ 6" OC
ISSUED FOR 60%A ISSUED FOR 60% DESIGN REVIEW DC KL SF N/A 4/10/17
NOTES:1. FOR GENERAL NOTES, SEE DRAWINGS H-16-000301-1 THROUGH H-16-000301-3.
(6)-#11 EF
12' 0 12' 24' 36'
SCALE: 3/8" = 1'-0"