2
A.4c.1 - PSV installed. A.4c.2 - Each input source has PSV set no higher than MAWP of the vessel & a PSV is installed on vessel for fire exposure & thermal expansion. A.4c.3 - Each input source has PSV set no higher than the vessel’s MAWP, at least one of these PSV’s can’t be isolated from the vessel. A.4c.4 - PSVs on downstream equip can satisfy relief requirements of vessel & can’t be isolated from the vessel. A.4c.5 - Vessel is final scrubber in a flare, relief, or vent system, is designed for max. built-up back pressure & has no internal/external obstructions such as mist extractors or back-press. valves. A.4c.6 - Vessel is final scrubber in a flare, relief, or vent system, is designed for max. built-up back-pressure & has rupture disk (PSE) to bypass internal/external obstructions such as mist extractors or back-press. valves

A.4c.3 A.4c.4 A.4c - Process Engineering center of ......obstructions such as A.4c.1 - PSV installed. A.4c.2 - Each input source has PSV set no higher than MAWP of the vessel & a PSV

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

  • A.4c.1 - PSV installed.A.4c.2 - Each input source has PSV set no higher than MAWP of the vessel & a PSV is installed on vessel for fire exposure & thermal expansion.A.4c.3 - Each input source has PSV set no higher than the vessel’s MAWP, at least one of these PSV’s can’t be isolated from the vessel.A.4c.4 - PSVs on downstream equip can satisfy relief requirements of vessel & can’t be isolated from the vessel.A.4c.5 - Vessel is final scrubber in a flare, relief, or vent system, is designed for max. built-up back pressure & has no internal/external obstructions such asmist extractors or back-press. valves.A.4c.6 - Vessel is final scrubber in a flare, relief, or vent system, is designed for max. built-up back-pressure & has rupture disk (PSE) to bypass internal/external obstructions such as mist extractors or back-press. valves

  • Find valuable industry related news and view EDG’s impressive project portfolio on the web at

    WWW.EDG.NET

    1-888-EDG-9298INDUSTRIAL & INTERNATIONAL

    Ohio Singapore Luanda India

    SERVING THE GOMHouston

    10777 Westheimer, Suite 700Houston, Texas 77042

    (713) 997-2347

    Lafayette1819 W. Pinhook Road, Suite 101

    Lafayette, Louisiana 70508(337) 269-5900

    New Orleans 3900 N. Causeway, Suite 700

    Metairie, Louisiana 70002(504) 455-0858

    FUSIBLE PLUG (TSE) GUIDE

    Weekly Once every 7 days (no more than 13 days between test) Fire Pump

    SeMI-ANNUAl (no more than 180 days between test): Wellhead SCSSV, Tubing Plug, Injection Valves, and SSCSV-not installed in landing Niple, Compressor TSH’s