2
REAR ELEVATION - REAR UPGRADE BLOCK 2 WALK-OUT BASEMENT CONDITION 19-1 ELEV. 'B' (REV. ) 5 INTERIOR END CONDITION 19-1 ELEV. 'A' (STD. ) 4 19-1 ELEV. 'B' (REV. ) 3 19-1 ELEV. 'A' (STD. ) 2 19-1 ELEV. 'B' (STD. ) 1 INTERIOR END CONDITION COLOUR PACKAGE 2 COLOUR PACKAGE 2 COLOUR PACKAGE 2 COLOUR PACKAGE 2 COLOUR PACKAGE 2 FRONT ELEVATION - BLOCK 2 19-1 ELEV. 'B' (STD. ) 1 INTERIOR END CONDITION 19-1 ELEV. 'A' (STD. ) 2 19-1 ELEV. 'B' (REV. ) 3 19-1 ELEV. 'A' (STD. ) 4 19-1 ELEV. 'B' (REV. ) 5 INTERIOR END CONDITION A B C D 7:12 10 12 7:12 7:12 7:12 7:12 FG. FG. FG. FG. FG. FG. FG. FG. FG. FG. 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 30X60 COLOUR PACKAGE 2 COLOUR PACKAGE 2 COLOUR PACKAGE 2 COLOUR PACKAGE 2 COLOUR PACKAGE 2 35'-6" [10.8] 30'-9" [9.4] 10 12 WP 44 45 38 D.J. P.T. G.T. FG GB BG U/S A.F.F. 50 REVISED: DECEMBER 17, 2007 - RN STAFF IN ACCORDANCE TO O.B.C. 2006 CRYSTAL HOMES INGELHART TOWNS - PHASE 5 OAKVILLE, ONTARIO 07078 FOUNDATION PLAN GROUND FLOOR THIRD FLOOR TOTAL 2 TOTAL W/ PORCH COVERAGE W/O PORCH COVERAGE (ft ) 2 (m ) 2 (ft ) 2 (m ) 2 (ft ) 2 (m ) 2 (ft ) ELEVATION SECOND FLOOR DEDUCT O.T.B. 20888 26995 I, DANIEL J. HANNINEN DECLARE THAT I HAVE REVIEWED AND TAKE DESIGN RESPONSIBILITY FOR THE DESIGN WORK ON BEHALF OF RN DESIGN LIMITED UNDER DIVISION C, PART 3, SUBSECTION 3.2.4. OF THE BUILDING CODE. I AM QUALIFIED, AND THE FIRM IS REGISTERED, IN THE APPROPRIATE CLASSES/CATEGORIES. August 21, 2014 File:C:\_RN_Standards\ACA 2015\temp\AcPublish_7536\07078-Block-2-FINAL.dwg Plotted: Apr 07, 2015 By:DJH 1. ISSUED FOR CLIENT REVIEW NOV. 11/09 AI CR TOWNHOUSE 3/16" = 1'0" A16 BLOCK 2 2. REVISED REAR WINDOW WIDTH ON 3ND FLR. JULY 15/10 NC NC 3. REVISED FRONT ELEVATION APR. 25/11 LL CR AS PER CLIENT COMMENTS 4. REVISED REAR ELEVATION APR. 25/11 LL CR AS PER SIDE UPGRADE CLIENT COMMENTS 5. REVISED AS PER CLIENT REQUEST(INT. REVIEW) MAY. 12/11 AA RH 7. ISSUED FOR SITE PLAN APPROVAL MAY. 17/11 AA RH 6. WINDOW MODIFICATION (INT. REVIEW) MAY. 17/11 AA RH 8. REVISE GRADE ON ELEVATIONS JAN. 15/14 mM DJH 9. ISSUED FOR CofA JAN. 17/14 mM DJH 10. ADDED METRIC DIMS AS PER CITY REQUEST MAR. 10/14 DJH DJH 11. REVISED FRONT GABLES TO 10:12 FROM 12:12 APR. 07/14 DJH DJH 12. REVISED FRONT DUE TO BUILDING HEIGHT APR. 16/14 FE DJH 13. REVISED & RE-ISSUED FOR S.P.A. AUG. 21/14 DJH DJH 14. UPGRADED REAR ELEVATION AS PER CLIENT MAR. 3/15 FE DJH REQUEST

A16 planning/sp-14300010103... · a16 block 2 2. revised rear window width on 3nd flr. july 15/10 nc nc 3. revised front elevation apr. 25/11 ll cr as per client comments 4. revised

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A16 planning/sp-14300010103... · a16 block 2 2. revised rear window width on 3nd flr. july 15/10 nc nc 3. revised front elevation apr. 25/11 ll cr as per client comments 4. revised

REAR ELEVATION - REAR UPGRADE

BLOCK 2WALK-OUT BASEMENT CONDITION

19-1 ELEV. 'B' (REV. ) 5INTERIOR END CONDITION

19-1 ELEV. 'A' (STD. ) 4 19-1 ELEV. 'B' (REV. ) 3 19-1 ELEV. 'A' (STD. ) 2 19-1 ELEV. 'B' (STD. ) 1INTERIOR END CONDITION

COLOUR PACKAGE 2 COLOUR PACKAGE 2COLOUR PACKAGE 2COLOUR PACKAGE 2COLOUR PACKAGE 2

FRONT ELEVATION - BLOCK 2

19-1 ELEV. 'B' (STD. ) 1INTERIOR END CONDITION

19-1 ELEV. 'A' (STD. ) 2 19-1 ELEV. 'B' (REV. ) 3 19-1 ELEV. 'A' (STD. ) 4 19-1 ELEV. 'B' (REV. ) 5INTERIOR END CONDITION

A B C D

7:12

10

12

7:12 7:12 7:12 7:12

FG.

FG.

FG.

FG.

FG.

FG.

FG.

FG.

FG.

FG.

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

30X

60

COLOUR PACKAGE 2 COLOUR PACKAGE 2 COLOUR PACKAGE 2 COLOUR PACKAGE 2 COLOUR PACKAGE 2

35'-6"[10.8]

30'-9"[9.4]

10

12

WP

44

45

38

D.J.

P.T.

G.T.

FG

GB

BG

U/S

A.F.F.

50

REVISED: DECEMBER 17, 2007 - RN STAFF IN ACCORDANCE TO O.B.C. 2006

CRYSTAL HOMESINGELHART TOWNS - PHASE 5

OAKVILLE, ONTARIO

07078

FOUNDATION PLAN

GROUND FLOOR

THIRD FLOOR

TOTAL

2TOTAL

W/ PORCH

COVERAGE

W/O PORCH

COVERAGE

(ft )2 (m )

2 (ft )2 (m )

2 (ft )2 (m )

2 (ft )

ELEVATION

SECOND FLOOR

DEDUCT O.T.B.

2088826995

I, DANIEL J. HANNINEN DECLARE THAT I HAVE REVIEWED AND TAKE DESIGN RESPONSIBILITYFOR THE DESIGN WORK ON BEHALF OF RN DESIGN LIMITED UNDER DIVISION C, PART 3,SUBSECTION 3.2.4. OF THE BUILDING CODE. I AM QUALIFIED, AND THE FIRM IS REGISTERED,IN THE APPROPRIATE CLASSES/CATEGORIES.

August 21, 2014

File

:C:\_

RN

_Sta

ndar

ds\A

CA

201

5\te

mp\

AcP

ublis

h_75

36\0

7078

-Blo

ck-2

-FIN

AL.

dwg

Plo

tted:

Apr

07,

201

5 B

y:D

JH

1. ISSUED FOR CLIENT REVIEW NOV. 11/09 AI CR

TOWNHOUSE

3/16" = 1'0"

A16

BLOCK 2

2. REVISED REAR WINDOW WIDTH ON 3ND FLR. JULY 15/10 NC NC

3. REVISED FRONT ELEVATION APR. 25/11 LL CRAS PER CLIENT COMMENTS

4. REVISED REAR ELEVATION APR. 25/11 LL CRAS PER SIDE UPGRADE CLIENT COMMENTS

5. REVISED AS PER CLIENT REQUEST(INT. REVIEW) MAY. 12/11 AA RH

7. ISSUED FOR SITE PLAN APPROVAL MAY. 17/11 AA RH

6. WINDOW MODIFICATION (INT. REVIEW) MAY. 17/11 AA RH

8. REVISE GRADE ON ELEVATIONS JAN. 15/14 mM DJH

9. ISSUED FOR CofA JAN. 17/14 mM DJH

10. ADDED METRIC DIMS AS PER CITY REQUEST MAR. 10/14 DJH DJH

11. REVISED FRONT GABLES TO 10:12 FROM 12:12 APR. 07/14 DJH DJH

12. REVISED FRONT DUE TO BUILDING HEIGHT APR. 16/14 FE DJH

13. REVISED & RE-ISSUED FOR S.P.A. AUG. 21/14 DJH DJH

14. UPGRADED REAR ELEVATION AS PER CLIENT MAR. 3/15 FE DJHREQUEST

Page 2: A16 planning/sp-14300010103... · a16 block 2 2. revised rear window width on 3nd flr. july 15/10 nc nc 3. revised front elevation apr. 25/11 ll cr as per client comments 4. revised

19-1 ELEV. 'B' (REV. ) 5EXTERIOR END UPGRADE CONDITION

RIGHT SIDE ELEVATION - SIDE UPGRADEWALK-OUT BASEMENT CONDITION

COLOUR PACKAGE 2

30X

60

19-1 ELEV. 'B' (STD. ) 1INTERIOR END CONDITION

LEFT SIDE ELEVATION

BLOCK 2WALK-OUT BASEMENT CONDITION

COLOUR PACKAGE 2

WP

44

45

38

D.J.

P.T.

G.T.

FG

GB

BG

U/S

A.F.F.

50

REVISED: DECEMBER 17, 2007 - RN STAFF IN ACCORDANCE TO O.B.C. 2006

CRYSTAL HOMESINGELHART TOWNS - PHASE 5

OAKVILLE, ONTARIO

07078

FOUNDATION PLAN

GROUND FLOOR

THIRD FLOOR

TOTAL

2TOTAL

W/ PORCH

COVERAGE

W/O PORCH

COVERAGE

(ft )2 (m )

2 (ft )2 (m )

2 (ft )2 (m )

2 (ft )

ELEVATION

SECOND FLOOR

DEDUCT O.T.B.

2088826995

I, DANIEL J. HANNINEN DECLARE THAT I HAVE REVIEWED AND TAKE DESIGN RESPONSIBILITYFOR THE DESIGN WORK ON BEHALF OF RN DESIGN LIMITED UNDER DIVISION C, PART 3,SUBSECTION 3.2.4. OF THE BUILDING CODE. I AM QUALIFIED, AND THE FIRM IS REGISTERED,IN THE APPROPRIATE CLASSES/CATEGORIES.

August 21, 2014

File

:C:\_

RN

_Sta

ndar

ds\A

CA

201

5\te

mp\

AcP

ublis

h_75

36\0

7078

-Blo

ck-2

-FIN

AL.

dwg

Plo

tted:

Apr

07,

201

5 B

y:D

JH

1. ISSUED FOR CLIENT REVIEW NOV. 11/09 AI CR

TOWNHOUSE

3/16" = 1'0"

A17

BLOCK 2

2. REVISED LEFT & RIGHT SIDE ELEVATIONS APR. 25/11 LL CRAS PER SIDE UPGRADE CLIENT COMMENTS

3. REVISED AS PER CLIENT REQUEST(INT. REVIEW) MAY. 12/11 AA RH

4. ISSUED FOR SITE PLAN APPROVAL MAY. 17/11 AA RH

5. REVISE GRADE ON ELEVATIONS JAN. 15/14 mM DJH

6. ISSUED FOR CofA JAN. 17/14 mM DJH

7. ADDED METRIC DIMS AS PER CITY REQUEST MAR. 10/14 DJH DJH

8. REVISED FRONT DUE TO BUILDING HEIGHT APR. 16/14 FE DJH

9. REVISED & RE-ISSUED FOR S.P.A. AUG. 21/14 DJH DJH