1
S43 500m 250m 100m 0 Q8 AS Q4 Flammability Meter AS Q6 Q7 Q5 AS H6 NY303 NY304 AS Q2 Flammability Meter AS TR15 Flammability Meter AS NY7 AS AS AS HS2 H3 H4 H5 AS AS F8 F7 F6 F5 F4 F3 F2 F7 Flammability Meter F1 AS MH E10 MH D2 AS E12 D1 F11 F9 F10 P1 AS E11 P2 P3 P4 AS PH11 P5 E9 P6 AS AS AS AS AS E4 E5 Q1 P8 P9 P7 P10 E6 G1 G2 E7 E8 G5 G4 E2 E3 C6 B1 B2 B3 B4 A1 A3 A4 A5 A6 SAMPLEROOM Tilt Plate Seperator C5 Flammability Meter C Flammability Meter Butakon Pumping Station D4 C1 C Drain Flammability Meter AS Corridor Pumping Station AS AS A7 Site Penstock Outfall Website: www.sembcorp.co.uk Tel: +44 (0) 1642 212000 For illustration and publicity purposes only. This Map should not be used or relied upon for commercial use and must not be loaned or copied without the consent of SembCorp Utilities UK Limited. Contains information reproduced with permission/provided under license from third parties. All relevant rights reserved and respected. E-Mail: [email protected] Reference Title Date Scale DATE APP. CHK'D DRAWN ALTERATION REV Size A1 Revision GIS-00-L-02663 APPLICATION DOCUMENT REFERENCE No. 4.10 INDICATIVE DRAINAGE PLAN SHEET 2 of 3 09/11/17 1 1:5500 1 FIRST ISSUE PS 521,00.00N 458,000.00E Reproduced by permission of Ordnance Survey on behalf of HMSO Crown Copyright and Database right 2005. All rights reserved. Ordnance Survey License No. 100050351. N E S W Tees Combined-Cycle Power Plant (CCPP) Order Infrastructure Planning (Applications: Prescribed Forms and Procedures) Regulations 2009 - Regulation 5(2)(o) KEY THE ORDER LIMITS EXISTING DRAINAGE CONNECTION

A1... · f1 as mh e10 mh d2 as e12 d1 f11 f9 f10 p1 as p2 e11 p3 p4 as ph11 p5 e9 p6 as as as as as e4 e5 q1 p8 p9 p7 p10 e6 g1 g2 e7 e8 g5 g4 e2 e3 ... indicative drainage plan sheet

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A1... · f1 as mh e10 mh d2 as e12 d1 f11 f9 f10 p1 as p2 e11 p3 p4 as ph11 p5 e9 p6 as as as as as e4 e5 q1 p8 p9 p7 p10 e6 g1 g2 e7 e8 g5 g4 e2 e3 ... indicative drainage plan sheet

S43

500m250m100m0

Q8

AS

Q4 Flammability Meter

AS

Q6

Q7

Q5

AS

H6 NY303

NY304

AS

Q2 Flammability Meter

AS

TR15 Flammability Meter AS

NY7

AS

AS

AS HS2

H3

H4

H5

AS

AS

F8

F7

F6

F5

F4

F3

F2

F7 Flammability Meter

F1

AS

MHE10

MH

D2

AS

E12D1

F11

F9

F10

P1

AS

E11P2

P3

P4

AS PH11

P5E9

P6

AS

AS

AS

AS

AS

E4

E5Q1

P8

P9

P7

P10 E6

G1

G2E7

E8 G5

G4

E2

E3

C6B1B2B3B4

A1

A3A4

A5

A6

SAMPLEROOM

Tilt Plate Seperator

C5 Flammability Meter

C Flammability Meter

Butakon Pumping Station

D4

C1

C Drain Flammability Meter

AS

Corridor Pumping Station

AS

AS

A7

Site Penstock Outfall

Website: www.sembcorp.co.ukTel: +44 (0) 1642 212000For illustration and publicity purposes only. This Map should not be used or relied upon for commercial use and must not be loaned or copied without the consent ofSembCorp Utilities UK Limited. Contains information reproduced with permission/provided under license from third parties. All relevant rights reserved and respected. E-Mail: [email protected]

Reference

Title

DateScale

DATEAPP.CHK'DDRAWNALTERATIONREV

Size

A1Revision

GIS-00-L-02663

APPLICATION DOCUMENT REFERENCE No. 4.10INDICATIVE DRAINAGE PLAN SHEET 2 of 3

09/11/17 11:55001 FIRST ISSUE PS

521,00.00N

458,

000.

00E

Reproduced by permission of Ordnance Survey on behalf of HMSO Crown Copyright and Database right 2005. All rights reserved. Ordnance Survey License No. 100050351.

N

E

S

W

Tees Combined-Cycle Power Plant (CCPP) Order

Infrastructure Planning(Applications: Prescribed Forms and Procedures)

Regulations 2009 - Regulation 5(2)(o)

KEY

THE ORDER LIMITS

EXISTING DRAINAGE CONNECTION